Project Procedure PP03


Sheet

PROJECT

P12QR07003
of

RAS LAFFAN - POWER AND DESALINATION PROJECT

TITLE:

Equipment and Components Identification System KKS based

CLIENT:

AES Oasis Energy Inc.

JOB no :

Doc. no.

Employer submittal
System :

00A

50

-------------------------------------

for approval
Document type :

not requested

for information only

PG

Discipline :

File : P12QR07003-00

REV
REVISION DESCRIPTION
.
0A
First Draft for EPFI Consortium Agreement
0B

Added codes dictionary

0C

Added Fisia comments and Switchyard codes

First Issue (a) approved by Fisia Italimpianti see E-FH-EH-nnnn on dd/mm/yy

(a)

August
2001

QA/QC Coordinator

REV

DATE

PREPARED BY

QAM
FI

COOPERATIONS

(a)
QAM
EP

PM / FI

PM / EP

CHECKED

Project Director

APPROVED

ES
Issue
Scope

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

of

50

INDEX OF CONTENT

GENERAL............................................................................................3
1.1 Scope............................................................................................3
1.2 Definitions and Abbreviations.........................................................3
1.3 Approval/Authorization...................................................................4
1.4 Distribution and Control.................................................................5

TYPES OF IDENTIFICATION...................................................................6

PROCESS-RELATED IDENTIFICATION......................................................7
3.1 Breakdown Level 0 - TOTAL PLANT..................................................7
3.2 Breakdown Level 1 - SYSTEM..........................................................7
3.3 Breakdown Level 2 . EQUIPMENT UNIT.............................................9
3.4 Breakdown Level 3 - COMPONENTS...............................................10

POINT OF INSTALLATION IDENTIFICATION............................................11


4.1 Breakdown Level 0 (Total Plant)....................................................11
4.2 Breakdown Level 1 (Installation Unit)............................................11
4.3 Breakdown Level 2 (Installation Space).........................................12

LOCATION IDENTIFICATION.................................................................13
5.1 Breakdown Level 0 (Total Plant)....................................................13
5.2 Breakdown Level 1 (Structure code)..............................................13
5.3 Breakdown Level 2 (Room code)....................................................14

AUTOMATION SYSTEMS IDENTIFICATION.............................................15


6.1 Functional groups identification....................................................15
6.2 Component identification..............................................................15
6.3 Signal identification.....................................................................18

PIPELINES IDENTIFICATION AND PIPING ATTRIBUTES...........................20


7.1 Pipelines Identification Code.........................................................20
7.2 Line attributes.............................................................................20

CABLES, CABLE RACEWAYS AND CABLE RACEWAY PARTS IDENTIFICATION


22
8.1 Cables..........................................................................................22
8.2 Cable Raceways............................................................................23

ELECTRICAL COMPONENTS IDENTIFICATION........................................24

10

ATTACHMENT..................................................................................24

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

GENERAL

1.1

Scope

Document

P12QR07003

Rev. 0

on

August 01

Sheet

of

50

The companies Enelpower S.p.A. and Fisia Italimpianti S.p.A. have constituted a Consortium, hereinafter
named EPFI Consortium, and will jointly co-operate for the realization of Ras Laffan Power and Desalination
Project, an approximately 750 MW Combined Cycle Power Plant and a 40 MIGD Desalination Plant,
associated with relevant facilities, at Ras Laffan Industrial Area, QATAR.
This Project Procedure, according to the provisions set forth in the Project Quality Plan, defines the
identification system for equipment and components constituting both the power plant and the desalination
plant of Ras Laffan Project. The system adopted is based on KKS.

1.2

Definitions and Abbreviations

1.2.1

Terms and Definitions

The definition of common terms are set forth in the Engineering, Procurement and Construction Contract
EPC Contract as per clause 1. Hereinafter the more used definitions are reported.
Client

means the KAHRAMAA Qatar General Electricity and Water Corporation and
any successor or assignee of KAHRAMAA including any pursuant to a novation to a
new entity or entities assuming certain obligations of KAHRAMAA in respect of power
and water in Qatar. KAHRAMAA has issued a request for the development,
construction and operation of the Ras Laffan Project on IPWP basis, that includes the
turn-key EPC Contract.

Employer

means AES Oasis Energy Inc. a company incorporated under the laws of DUBAI
having its postal address at P.O. Box 62843, DUBAI - United Arab Emirates, and its
legal successors in title.

Lenders

means the Banks and/or Financial Institutions and/or other persons that are party to
any of the Financing Agreement.

Engineer

means the Technical Adviser, if any, appointed by the Lenders to act as Engineer for
the purposes of the EPC Contract and designated and notified to the EPC Contractor.

Engineers Representative
means any representative of the Engineer appointed from time to
time by the Engineer.
EPC Contractor

means the Consortium EPFI between Enelpower SpA and Fisia Italimpianti SpA
whose tender has been accepted by the Employer and whom has been awarded the
EPC Contract for the Ras Laffan Project implementation.

EPC Contract

means the agreement between Employer and the EPC Contractor for the execution of
the Ras Laffan Project incorporating the Clauses from 1 to 51 (inclusive), the
Schedules and Appendices (including the Outline Design Specification) and all
Technical Documentation prepared by the EPC Contractor complying with the
requirements of Technical Documentation and Information (EPC Contract clause 21)
to be submitted to the Employer.

Plant

means a gas/oil fuelled combined cycle power generating and desalinated water
producing plant with a designated electric generating capacity of 750 MW and with a
designated desalinated water production capacity of 40 MIGD to be constructed at
Ras Laffan Industrial Area, QATAR as an integrated whole, comprising the Power
Facilities and the Desalination Facilities, whether taken-over or at any stage of
development and construction as part of the Works, including, regardless of the level
of development. Land, buildings, engineering and design documents, all energy
producing equipment and its auxiliary equipment, fuel storage and receiving and
handling facilities and equipment, Metering System, waste treatment and disposal
facilities, Interfaces and Terminal Points and all other installations.

Prudent Contractor Practice


means the exercise of that degree of professional skill, diligence and
judgment that would ordinarily be expected from a skilled and experienced contractor,

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

of

50

or equipment manufacturer participating in the international independent electrical


generation and desalination industry, taking into account Applicable Laws, General
Laws, local conditions and practices, in the design, engineering, construction and
operation of electric power generation and transmission equipment and of
desalination equipment.
Site

means the land, spaces, waterways, roads, wells and any rights acquired or to be
acquired by the Employer at or in the region of Ras Laffan, QATAR for the purpose of
the Plant, through or below the ground in which the Works are to be carried out
including, those areas on which no part of the Plant is to be permanently laid-out or
constructed but which are provided or made available by the Employer for the EPC
Contractors use, including villages, townships and camps for the accommodation of
employees, offices, storage of the EPC Contractors equipment or assembly or prefabrication, all rights-of-way and access from public highways, and seaward access if
applicable as specified in the Outline Design Specification.

Sub-Contract

means any contract for any part of the Works awarded by the EPC Contractor to a
Subcontractor in accordance with the Contract.

Key Procurement Sub-Contracts means those Sub-Contracts to be entered into for the provision of the
specific item detailed in Schedule 12.
Subcontractor

means any person, including Vendors and Suppliers, to whom the EPC Contractor
has sub-contracted any part of the Works pursuant to a Subcontract.

Key Procurement Subcontractor


means any Subcontractor to which a Key Procurement Sub-Contract
is awarded, including, for the avoidance of doubt one selected pursuant to EPC
Contract Clause 9.2.1.
Ras Laffan Project

means the development, design, procurement of equipment and services,


engineering, manufacturing, financing, insurance, construction, permitting, testing,
commissioning, completion, start up, provisional acceptance, employership, operation
and maintenance of the Plant and all activities incidental thereto.

Works

means engineering, design, manufacture, supply, shipment, delivery, installation,


construction, testing, insurance, pre-commissioning, commissioning, completion,
start-up and Provisional Acceptance and obligations during Defects Liability Period in
accordance with the EPC Contract (including training for that purpose), including
performance of the Preliminary Works and Temporary Works, completion of the Plant
and the correction of defects in the Works during the Defects Liability Period and
Extended Liability Period and the supply of all other facility and materials and the
performance and where not expressly set out, to be reasonably inferred by reference
to Prudent Contractor Practice, and the Outline Design Specification of all other
obligations and services, all to be carried out by the EPC Contractor pursuant to the
EPC Contract.

GTG Block

means the assembly consisting of : one GT with relevant Generator, their auxiliary
and associated systems for the simple cycle operation.

Power Block

means the assembly consisting of : two GTG Blocks, their HRSGs, one ST with
relevant Generator, associated systems and any other auxiliaries.

Facility

means the assembly consisting of : two Power Blocks, four desalination units and one
remineralization plant.

Dependable Capacitymeans the generating capacity expressed in MW of the GTG Block, Power Block,
Facility (power) and the gross water production expressed in m 3/day of the Facility
(water) at the reference conditions available at the delivery points.
1.2.2
AES
EPFI
EP
FI

Abbreviations
AES Oasis Energy Inc.
Enelpower Fisia Italimpianti Consortium
Enelpower SpA
Fisia Italimpianti SpA

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

QP
PE
PM
QA
QC

Qatar General Petroleum Corporation


Project Engineer
Project Manager
Quality Assurance
Quality Control

1.3

Approval/Authorization

Document

P12QR07003

Rev. 0

on

August 01

Sheet

of

50

This Project Procedure has been prepared by the Enelpower QA Project Coordinator, reviewed by the
Consortium Partner QA Managers, checked by the two Project Managers, and approved by the Project
Director.

1.4

Distribution and Control

The Project Procedure is distributed according the following distribution list. Holders of Project Procedure
copies are responsible for its circulation, together with project specific procedures, within their
departments/discipline and ensure that all personnel working on Ras Laffan Project are familiar with the
contents.
Enelpower Project Key Personnel
Project Director
Project Manager
Project Engineer
Project Control Coordinator
Procurement Coordinator
QA/QC Coordinator
Site Manager
Construction Manager
Commissioning Manager
H&S Coordinator
Site Archive Section

Fisia Italimpianti Project Key Personnel


1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy

Project Manager
Project Engineer
Project Planner
Procurement Coordinator
QA Coordinator
QC Coordinator
Material Coordinator
Site Manager
Commissioning Manager
H&S Coordinator
Site Archive Section

1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

of

50

TYPES OF IDENTIFICATION

The identification system is based on the KKS system (DIN standard).


The KKS coding system has the following features:
-

hierarchically structured format with 4 breakdown levels (0 to 3) and fixed alphanumeric data character;

separate identification methods with engineering discipline specific rules by means of an uniform code
format for the three types of identification:
Process-related code
Process-related identification of systems and items of equipment according to their functions in
mechanical, civil, electrical, control and instrumentation engineering.
Point of installation code
Identification of point of installation of electrical, control and instrumentation devices in installation
units (e.g. in cabinets, panels, consoles, racks, etc.)
Location identification
Identification of location in structures, on floors and in rooms and also of free areas and
topographical stipulations (surface area grid)
These three types of code use the same identification scheme, which is subdivided into the following
breakdown levels.
Breakdown Level

Title of Breakdown
Level

Total Plant

Function

Equipment
Unit

Component

The titles of the breakdown levels for the three type of codes will be as follows:
Process-related
Identification

Total Plant

System Code

Point of installation
Identification

Total Plant

Installation
Unit Code

Total Plant

Location Identification

Structure Code

Equipment
Unit Code

Component
Code

Installation
Space Code
Room Code

Prefix symbol
Breakdown symbol
NOTES:
- The prefix symbols is normally omitted if the information content of the codes remain unambiguous.
- No breakdown level 3 shall be used for point of installation and location identification.
- The full stop breakdown symbol for point of installation identification shall always be written.
- Format and data characters for each field of the three identification types are defined in the following
chapters.

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enelpower
Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

of

50

PROCESS-RELATED IDENTIFICATION

The Identification Code is divided into different breakdown levels with different meanings, from left to right
in increasing order, starting from the Total Plant up to the Component.
In this way, depending on the kind of level (Plant, Function, Equipment Group, Process Equipment)
complete or part of the identification code can be used.
The structure of the identification code is the following, normally only up to the level 2 is used. Level 3 and
the field A3 of level 2 will be used only if required a complete unique identification at component level.

only if required
Breakdown level

TOTAL PLANT

FUNCTION / SYSTEM

EQUIPMENT UNIT

COMPONENT

Data designation
Character type

F0

F 1F 2F 3

FN

A 1A 2

AN

A3

B 1B 2

BN

AAA

NN

AA

NNN

AA

NN

Where:
Prefix symbol () for
Process-related code
Project Plant identification
Project Plant Unit
System classification
System numbering
Equipment Unit classification
Equipment Unit numbering
Equipment Unit additional code
Component classification
Component numbering
() The prefix symbol may be omitted if the code remain unique (when the point of installation code is not used).
The prefix symbol = is used for process related identification; for point of installation and location identification, the prefix
symbol to be used is + , see next chapters.

3.1

Breakdown Level 0 - TOTAL PLANT

It represents the code of the major parts in which the overall Ras Laffan Project is subdivided.
For Ras Laffan Power and Desalination Project shall be:
Common parts to the overall Project
0
Power Plant
1
Desalination Plant
2
Common Ancillaries
9

3.2

Breakdown Level 1 - SYSTEM

It is divided in two parts: the first (F 0) for the identification for the plant unit group; the second (F 1F2F3 + FN)
for the identification of the systems, subsystems and building structures and for subdivision and numbering
of subsystems pertaining to the same system.

Enelpower
Enel Group

3.2.1

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

of

50

Plant Unit Group (F0)

If two or more identical systems are to be identified in an entire plant (e.g. 4 HRSG plants, 4 Gas Turbines,
4 GT Generators, 2 Steam Turbines, 4 Desalination Units etc.) these are distinguished by means of the plant
unit group (prefix F0).
Systems common to the plants are identified with the plant unit group (prefix F 0) =0 (zero).
Each plant unit group only applies in the area of the function concerned and always relates to alphabetical
digits (F1 F2) following it.
The codes to be used for Plant Unit Groups are the following.

Plant
"G"

Unit
"F0"

Total Plant
Common Systems

Total Plant
Ancillaries

Power Plant
Common Systems

Gas Turbine 1
1 1 MB_

HRSG 1
1 1 H__

GT Generator 1
1 1 MK_

Step Up TR 1
1 1 BAT

Gas Turbine 2
1 2 MB_

HRSG 2
1 2 H__

GT Generator 2
1 2 MK_

Step Up TR 2
1 2 BAT

Gas Turbine 3
1 3 MB_

HRSG 3
1 3 H__

GT Generator 3
1 3 MK_

Step Up TR 3
1 3 BAT

Gas Turbine 4
1 4 MB_

HRSG 4
1 4 H__

GT Generator 4
1 4 MK_

Step Up TR 4
1 4 BAT

Steam Turbine 1
1 5 MA_

ST Generator 1
1 5 MK_

Step Up TR 5
1 5 BAT

Steam Turbine 2
1 6 MA_

ST Generator 2
1 6 MK_

Step Up TR 6
1 6 BAT

Power Plant
Ancillaries

Desalination Plant
Common Systems &
Remineralization Plt.

Desalination Plant
Unit 1 Systems

Desalination Plant
Unit 2 Systems

Desalination Plant
Unit 3 Systems

Desalination Plant
Unit 4 Systems

Functions and Systems

Enelpower
Enel Group

3.2.2

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

of

50

Systems, Subsystems, Building Structures (F 1 F2 F3)

The three alphabetical characters of this breakdown level are used to identify the Main Groups F 1, the
Groups F2 and the Subgroups F 3 of systems and building structures; relevant codes are listed in the
Attachment 1.
The structure of this field may vary its length starting from 1 digit for the main groups, up to 3 digit for the
subgroups or structures. For the main groups and groups of systems the code fields concerning the missing
digits are really filled with the blank character (_), e.g. the main group POWER TRANSMISSION AND
AUXILIARY POWER SUPPLY is identified with the code B__, and the group STEAM TURBINE PLANT is
identified with the code MA_.
Codes used for the Main Group F 1 are the following:
A Grid and Distribution System
B Power Transmission and Auxiliary Power Supply
C Instrumentation and Control Equipment
E Conventional Fuel Supply and Residues Disposal
G Water Supply and Disposal
H Conventional Heat Generation
L
Water, Steam, Gas Cycle
M Main Machine Set
N Process Energy Supply for External Users
P Cooling Water System
Q Auxiliary Systems
S Ancillary Systems
U Structures
X Heavy Machinery
Z
Workshop and Office Equipment
3.2.3

Systems, Subsystems numbering

The two numerical digits (F N) are of no significance as far as classification is concerned, but number and
subdivide the subsystem coded within the alphabetical digit (F 3).
In order to guarantee univocal numbering for all the items included within the power block systems for which
more than one Supplier is responsible (i.e. steam, water and so on)), the numbering code field can be
divided and settled in ranges: this subdivision must be part of an agreement.

3.3

Breakdown Level 2 . EQUIPMENT UNIT

The first two alphabetical characters (A 1A2) are used to identify apparatus, equipment, circuits, etc.
For the main groups of the Equipment Units (A 1)shall be used the following codes :
A Equipment Units (mechanical)
B Apparatus (mechanical)
C Direct measuring circuits
D Closed loop control circuits
E Analog and binary signal conditioning
F
Indirect measuring circuits
G Electrical equipment
H Subassemblies of main and heavy machinery
The codes for the secondary groups (A 2) are defined in the Attachment 2.

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

10

of

50

The last four characters (AN+ A3) include:


three numeric digits (AN) for the Equipment Unit numbering are used for equipment tagging. To help
in distinguishing different types of the same equipment (e.g. main manual valves, on/off motor
operated valves, control valves, drain vent or control/local instrument equipment, etc.) different range
of numbers are commonly used.
Each Consortium Partner will use proper coding according its internal rules and needs, within to the
agreed ranges.
one alphabetical digit (A3) can be used, if required, to identify pilot valves, drives with multiple power
supply for electric loads, measuring circuits which share one sensor etc.
Other applications must be agreed between the parties.
This additional code is not an alternative code for the components identified in level 3.
Numbering logic subdivision for pipelines, valves and measuring circuits is represented in Attachment 5.

3.4

Breakdown Level 3 - COMPONENTS

This breakdown level identifies components of the Equipment Unit (e.g. switches, pushbuttons, relays etc.);
the code is made up by two alphanumeric characters and by two numeric digits.
The first alphanumerical character, as well as for Level 2, identify the Main Groups of Components for which
shall be used the following codes:
K Mechanical components
M Mechanical components
Q Instrumentation and control components
Electrical components
X Signal origins
Y Signal applications
The codes for the secondary groups are defined in the Attachment 3.
The last two numerical digits are used, if necessary, for counting.

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

11

of

50

POINT OF INSTALLATION IDENTIFICATION

The Codes to be used for identification of the point of installation of electrical, control and instrumentation
devices mounted in installation units (e.g. cabinets, racks, panels, consoles, etc.) are structured in the
following three levels.

Breakdown level
Data designation
Character type

TOTAL PLANT

INSTALLATION UNIT

INSTALLATION SPACE

F0

F 1F 2F 3

FN

A 1A 2

AN

A3

AAA

NN

A(A)

(N)(N)N

(A)

where:
Prefix symbol for point
of installation code
Project Plant identification
Project Plant
Unit
Installation Units classification
Installation Units numbering
Breakdown symbol full
stop
Installation space code
Vertical subdivision
(rows)
Installation space code
Horizontal subdivision (columns)
Additional code for installation space identification
The array of characters used for installation point identification shall always include the prefix symbol +
and the breakdown symbol full stop. The digits of level 2 between parenthesis may be omitted if not
necessary.

4.1

Breakdown Level 0 (Total Plant)

This field assumes the same value as defined for process-related identification.
For Ras Laffan Power and Desalination Project shall be:
Common parts to the overall Project
0
Power Plant
1
Desalination Plant
2
Common Ancillaries
9

4.2

Breakdown Level 1 (Installation Unit)

As per process-related identification code, this level is subdivided in three parts.


The first part (F 0), a numerical digit, is used for the identification of the plant unit group and assumes the
same values as defined for process-related identification (see chapter 3.2.1).
The second part (F1F2F3), a three alphabetical digits array, is used for the identification of installation units
(e.g. cabinets, racks, cubicles, panels, consoles, etc.) concerning the following system main groups:

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

12

of

50

A
Grid and distribution system
B
Power transmission and auxiliary power supply
C
Instrumentation and control equipment
Coding letters and designation to be used for the characters F 1F2F3 are listed in Attachment 1.
The third part (F N) is constituted by two numerical digits used for numbering subdivision of installation units,
starting from 01 up to 99 (redundant zeros shall be written).
Numbering subdivision begins anew every time one of the preceding codes F 0 or F1F2F3 change.

4.3

Breakdown Level 2 (Installation Space)

Installation space is identified by mean of the associated planar coordinates of installation unit place where
devices are installed.
It is constituted by a vertical coordinate (field A 1A2) identifying the installation row and by a horizontal
coordinate (field AN) identifying the installation column in which the unit has been subdivided.
The field A3 is normally not necessary and is used only when further subdivision, e.g. spatial distribution,
shall be added for a unique identification.
Code A1A2 is an alphabetical array of one or two digits, normally only one digit is used starting from letter
A.
Code AN is a numeric array from one up to three digits, as necessary, depending on the number of columns
to be identified. Up to 9 columns only one digit is used; if two or three digits are used the redundant zeros
shall be written (e.g. 01, 02 ; 001, 002, ).
Code A3 is an alphabetical digit; when used the counting starts from letter A up to Z.

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

13

of

50

LOCATION IDENTIFICATION

The Codes to be used for location identification in structures, on floors, in rooms and for fire areas are
structured in the following three levels.

Breakdown level

TOTAL PLANT

STRUCTURE CODE

ROOM CODE

Data designation
Character type

F0

F 1F 2F 3

FN

A 1A 2

AN

A3

AAA

NN

(A)

(N)NN

(A)

where:
Prefix symbol for location code
Project Plant identification
Project Plant Unit
Structure Classification
Floor Numbering
Room classification
Room Numbering
Additional code for room number subdivision
As per installation point, the array of characters used for location identification shall always include the
prefix symbol +, on the contrary the breakdown symbol full stop is not used. The digits of level 2 between
parenthesis may be omitted if not necessary for unique identification.
Location identification will be applied only to the buildings and rooms where the KKS classified equipment or
components will be installed. Location identification for Logistic and General Service Structures will not be
used.

5.1

Breakdown Level 0 (Total Plant)

This field assumes the same value as defined for process-related identification.
For Ras Laffan Power and Desalination Project shall be:
Common parts to the overall Project
0
Power Plant
1
Desalination Plant
2
Common Ancillaries
9

5.2

Breakdown Level 1 (Structure code)

As per process-related identification code, this level is subdivided in three parts.


The first part (F 0), a numerical digit, is used for the identification of the plant unit group and assumes the
same values as defined for process-related identification (see chapter 3.2.1).
The second part (F1F2F3), a three alphabetical digits array, is used for the identification of structures and
areas, as defined in Attachment 1, for the following system main group:
U

Structures

The third part (FN) is constituted by two numerical digits used for numbering subdivision of structures into
floors, storeys, platforms, elevations, etc., starting from 01 up to 99 (redundant zeros shall be written).

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

14

of

50

The direction of numbering is vertical, from the lowermost floor to the upwards.
Numbering subdivision begins anew for each structure.

5.3

Breakdown Level 2 (Room code)

The room code is used to identify physically separated or fictitious rooms and place in structures and
Station areas.
It is constituted by the following three fields code:
Code A1A2 is an alphabetical array of one digit for the room or place classification; the following letters shall
be used:
R = Room physically separated
F = Fictitious room
S = Fire area
Code AN is a numeric array of two or three digits, as necessary, depending on the number of rooms/places
to be identified. Up to 99 rooms/places only two digits are used. The redundant zeros shall be written (e.g.
01, 02 ; 001, 002, ).
The field A3 is normally not necessary and is used only when further subdivision of room number is needed.
Code A3 is an alphabetical digit; when used the counting starts from letter A up to Z.

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enelpower
Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

AUTOMATION SYSTEMS IDENTIFICATION

6.1

Functional groups identification

Document

P12QR07003

Rev. 0

on

August 01

Sheet

15

of

50

The automation system is divided into functional groups/subgroups according to functionally associated
process sections.
The structure of the automation functional groups is showed in the following figure 6.1 and is made by :
Level 0 Total Plant
(see 3.1);
Level 1 - Function / System
(see 3.2), where:
the field F1F2F3 identifies the process system as defined in Attachment 1;
the field FN, to be used as appropriate, identifies and numbers the systems and subsystems
coded with the last digit F 3 .
Level 2 Group / Subgroup Control
(see 3.3), where:
the field A1A2 identifies group or subgroup control as defined in Attachment 2;
the field AN is used to number group and subgroup control;
the field A3 is used as additional digit, if necessary, to number group and subgroup control
(normally is omitted).
Figure 6.1
0

Total Plant

Function / System

Group Control

F0

F1 F2 F3

FN

AAA

NN

A1A
2

AA

AN

A3

NNN

(A)

In the following figure is represented a typical situation for automation system functional groups and
sub-groups identification.
1 2 LAC 01 EB 001
Feedwater pumps
Group Control

e.g.

1 2 LAC 01 EC 001

1 2 LAC 01 EC 002

1 2 LAC 01 EC 003

1 2 LAC 01 EC 004

Feedwater pump no. 1


Subgroup Control

Feedwater pump no. 2


Subgroup Control

Feedwater pump no. 3


Subgroup Control

Feedwater pump no. 4


Subgroup Control

LAC 01 EB001
LAC 01 EC001

6.2

is the automation functional group related to process system LAC 01 Feed


Water Pump System of Unit 2 of Power Plant.
is the first functional sub-group of LAC 01 EB001 Automation Functional
Group

Component identification

The process-related identification of the plant coding system KKS forms the base of the classification and
identification of all control and instrumentation components.

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enelpower
Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

16

of

50

The following component identification rules are generally applied:


FIELD

All control and instrumentation components will be identified.

ELECTRONIC ROOM

All cabinets of the automation system will be identified.


The components within the electronic cabinets will not be identified.

CONTROL ROOM

All control room boards, consoles, video stations, computer units, printer
units will be identified. All control and instrumentation components mounted
on the control room boards will also be identified.

The structure of the component identification code is showed in the following figure 6.2 and is made by:
Level 0 - Total Plant
(see 3.1);
Level 1 Function / System (see 3.2);
Level 2 - Equipment Unit
(see 3.3);
Level 3 - Component
(see 3.4).
Figure 6.2
0

Total Plant

Function / System

Equipment Unit

Component

F0

F1 F2 F3

AAA

FN

A1A

AN

NN

AA

NNN

A3

B1 B2

BN

(A)

AA

Examples of automation system components identification are represented in Attachment 4.


6.2.1

Function / System

This field classifies the Systems of the Plants in a process-oriented manner.


For the alphabetical field (F1F2F3) shall be used the following codes.
a) Code for systems defined on P&IDs
F0 F1F2F3 FN Process system identification according to P&ID
b) Code of the system unit not defined to P&ID
F0 F1F2F3 FN Control system identification according to attachment 1; for example 1 CWA 01 is
used for control desk
6.2.2

Equipment Unit Code

The Equipment Unit Code (A 1A2 AN A3) identifies electrical and control component, such as: open-loops,
closed loops, measuring loops. The equipment unit code is defined normally according to P&IDs.
For the alphabetical field A1A2 shall be used the following codes.
a) The use of character A1
C
D

Direct measuring loops


Closed Loop Control Circuits

b) The use of the character A2, for A1 = C or A1 = D


D
E
F
G
L
P
Q

Density
Electrical variables (e.g. current, voltage, power, frequency)
Flow
Position
Level
Pressure
Analysis (conductivity, humidity)

Enelpower
Enel Group

S
T
U
Y

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

17

of

Speed, acceleration
Temperature
Combined variable (multipoints recorder) and other variables
Vibration, expansion

AN numbering logic subdivision for measuring circuits ( A1 = C ) is represented in Attachment 5.


6.2.3

Process Component

The Process Component (B1B2 BN) fields identify single component within control loop ( if necessary).
For the alphabetical field B1B2 shall be used the following codes.
a) The use of character B1
Q Instrumentation and control component (non-electrical)
Electrical components
b) The use of character B2
b1
Instrumentation and control component (non electrical)
QP Measuring instrument, testing equipment (pressure gauge, thermometer, level indicator)
QN Positioner for control pneumatic valve (if its necessary to identify)
QB Sensors metering orifices
QT Thermo-wells
b2
Electrical components
- B Traducers for non-electrical to electrical variables and vice versa
- D Digital switches
- P Control room conventional measuring instrument
- S Switches, selectors, hand stations
- U Converters from electrical to other electrical variables (e.g. temperature transmitter)
- Y Power switch, solenoids.
b2.1
Range application -B
-B01 Two wires analogical transmitter
-B10 Four wires analogical transmitter (supply + signal)
-B40 Current to pressure converter (I/P)
-B50 Single thermocouple
-B60 Double thermocouple
-B70 Single resistance thermometer
-B80 Double resistance thermometer
b2.2
Range application -D
-D01 Process switch element with 1 SPDT contact
-D11 Process switch element with 2 SPDT contacts
-D22 Limit switch for open valve
-D25 Limit switch for intermediate position
-D32 Limit switch for close valve
b2.3
Range application -P
-P01 Indicator tile (current motor or valve position)
-P02 Single indicator
-P03 Digital indicator
-P11 Multiple indication station
-P21 Two or three pens recorder
-P22 Multi-points recorder
-P30 Totalizers
b2.4
Range application -S-S01 Signalling and command tile for motor
-S02 Signalling and command tile for pneumatic valve/solenoid

50

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enelpower
Enel Group

-S15
-S20
-S21
-S24
-S32
-S33
-S34
-S36
-S50
-S51
-S52
-S70
-S71
-S82
-S90
b2.5
-Y01
-Y10
-Y50
b2.6
-U01

6.3

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

18

of

50

Signalling and command tile for valve with intmd. stop


Signalling and command tile for remote LOC./REM. selection
Signalling and command tile for selection of stand-by users
Signalling and command tile for sequence
Signalling tile with 2 LED
Signalling tile with 3 LED
Signalling tile with 4 LED
Signalling tile with 6 LED
Signalling and selection tile for double measurement
Closed Loop Station
Set-point Station
Local control station
Local emergency push-buttons
Selector switch
Key Switch
Range application -Y
Pilot valve/solenoid normally energized
Pilot valve/solenoid normally de-energized
Power-switch (positioner for control motor valve)
Range application -U
Temperature transmitter

Signal identification

The following signals will be identified:


-

every signal that requires the planning of the electrical wiring and thus all of the interface signals with
the terminal board;

all of the information that will be displayed to the operator by the advanced interface operator;

all the information from/to other control system (local package) by serial link.

In the development of the functional planning of the automation system the signal code extension will be
omitted and reference to typical connection diagrams will be marked.
The structure of the signal identification code is showed in the following figure 6.3 and is made by :
Level 0 - Total Plant
(see 3.1);
Level 1 Function / System
(see 3.2);
Level 2 - Equipment Unit
(see 3.3);
Level 3 - Signal Designation Code (see 6.3.3).
Figure 6.3
0

Total Plant

Function / System

Equipment Unit

Signal Code

F0

F1 F2 F3

AAA

FN

A1A

AN

NN

AA

NNN

A3

B1 B2

BN

(A)

AA

(signal direction)
signal range
signal number
6.3.1

Function

F0 F1F2F3 FN Process system identification according to P&ID or to functional group.

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

6.3.2

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

19

of

50

Equipment Unit

The Equipment Unit fields (A 1A2 AN) identify electrical and control components as defined in 3.3.
6.3.3

Signal Designation

The signal direction, if required for a unique signal identification, is identified using the field (A 3) of
Equipment Unit level.
The (B1B2 BN) fields are used to identify single signal within automation and control systems.
For the alphabetical field B1B2 shall be used the following codes.
a)
The use of the character B1
X Input signal to automation system (Signal origins)
Y Output signal from automation system (Signal applications)
b)
The use of the character B2
A Functional group control / sub-loop control
B Control interface
C Closed-loop control
G Digital signal from instrument (only as XG-Signal)
H Binary limit signals derived from analog process signals (only as XH-Signal)
J
Signals from non-standard areas
K Equipment unit / component protection
L
Control room and control stations signals not assigned to specific control systems
M Higher level static individual and group alarm signals (only as XM-Signal)
N Video commands
P Video supervision
Q Analog signal
S Functional group control step signals (only as XS-Signal)
T
Turbine Generator I&C
V Free logic signals (only as XV-Signal)
W Hard wired alarm
Using of signals shall be identified as per DCS manufacturer standard.

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enelpower
Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

20

of

PIPELINES IDENTIFICATION AND PIPING ATTRIBUTES

7.1

Pipelines Identification Code

50

The code for the pipelines identification is made up by the Plant and the Function / System codes (level 0
and 1) as defined in the previous chapter 3 and a level 2 code that identifies the line number.

Breakdown level

TOTAL PLANT

FUNCTION / SYSTEM

LINE NUMBER

Data designation
Character type

7.1.1

F0

F 1F 2F 3

FN

A 1A 2

AN

AAA

NN

AA

NNN

Line number

The code is made up by two alphabetical characters (A 1A2) that identify the equipment, and three numeric
digits (AN) for the line counting.
The following examples show types of pipeline identification codes for Power Plant and for Desalination
Plant.
Data designation

F0

F 1F 2F 3

FN

A 1A 2

AN

Power Plant

LBA

20

BR

026

Desalination Plant

GDK

10

BR

010

7.2

Line attributes

Line attributes are additional information following the line identification code, that are not part of the line
identification code but are useful to give the complete characterization of the line.
Line attributes are represented by mean of the level 3 of function-related code as follow:

Breakdown level

TOTAL PLANT

FUNCTION / SYSTEM

LINE NUMBER

LINE ATTRIBUTES

Data designation
Character type

F0

F 1F 2F 3

FN

A 1A 2

AN

B1

B2

AAA

NN

AA

NNN

NNNN

A (N)

Where:
B1 = Line Diameter
B2 = Piping design specification
On drawings line attributes are printed close to the pipeline identification code.
7.2.1

Line diameter

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enelpower
Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

21

of

50

Line diameter code (B1) shall be indicated following line number, and is made up to four numeric digits that
represent the nominal diameter in millimeters.
7.2.2

Piping design specification

Piping design specification code (B 2) is made of one or two alpha-numerical digits and assume the same
values used in the piping design specification to identify design conditions, mechanical characteristics and
class of the piping.
For Power Plant is constituted by one alphabetic digit starting from A letter and is related to the level 1
Function / System code (F 1 F2 F3).
For Desalination Plant is constituted by two digits, one alphabetical plus one numerical, referring to the
piping class used
Examples for line attributes identification are the following.
Data designation

Power Plant

F0

F 1F 2F 3

FN

A 1A 2

AN

B1

B2

LBA

20

BR

026

80

The example is related to a ND 80 mm pipe, pertaining to the Power Plant Section 1 Main Steam System, which piping design specification is LBA-B
Desalination Plant

GDK

10

BR

010

1600

D2

The sample is related to a ND 1600 mm pipe, pertaining to the Desalination


Plant - Section 1 System (e.g. Distiller 21), which piping class is D2

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

22

of

CABLES, CABLE RACEWAYS AND CABLE RACEWAY PARTS


IDENTIFICATION

8.1

Cables

50

The structure of the cables identification code is based on process-related code with a numbering part as
per the following:

Breakdown level
Data designation
Character type

TOTAL PLANT

FUNCTION / SYSTEM

EQUIPMENT UNIT

CABLE

F0

F 1F 2F 3

FN

A 1A 2

AN

B1

BN

B2

AAA

NN

AA

NNN

NNN

Where:
Level 0 - Total Plant
(see 3.1);
Level 1 - Function / System
(see 3.2);
Level 2 - Equipment Unit
(see 3.3);
For level 1 and level 2 will be used the following codes:
Power Plant
code of equipment connected;
Desalination Plant
code of switchgear module
Level 3 Cable Identification
The cable identification code is made by the following fields:
B1 = one alphabetical digit for vertical subdivision
this field is optional; when vertical subdivision is not operated the field assume the value #
BN = four numeric digits for cable numbering and used for grouping in respect of cable application area.
Redundant zeros must be written in order to make effective the grouping. (e.g. : #0003; #2015; etc.)
B2 = one alphabetical digit to identify redundant or parallel cables
The first digit of BN field, used to identify the cable application area, assumes the following values:
Numbering Range
0001 0999
1000 1999
2000 3999
4000 7999
8000 8999
9000 9999

Cable Application Area Description


POWER CABLES > 1 kV
POWER CABLES 1 kV
I&C CABLES DC or AC COMMANDS and INTERLOCKS
> 60 V
I&C CABLES Digital/Analog CONTROL and PROTECTION 60 V
I&C SPECIAL PURPOSE CABLES (BUS, etc.)
TELEPHONE AND COMMUNICATION CABLES (included security system)

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enelpower
Enel Group

8.2

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

23

of

50

Cable Raceways

The structure of the cable raceways identification code is based on process-related identification of
structures including outdoor areas, as per the following:

Breakdown level
Data designation
Character type

TOTAL PLANT

FUNCTION / SYSTEM

CABLE RACEWAY

F0

F 1F 2F 3

FN

B1

BN

B2

AAA

NN

AA

NN

Where:
Level 0 - Total Plant
(see 3.1);
Level 1 - Function / System
(see 3.2);
For the Cable Raceways identification the field F 1F2F3 identifies the structure code as defined for
Main Group U, and the field F N identifies the floors subdivision;
Level 3 Cable Raceway identification
The cable raceways identification code is made by:
B1 = two alphabetical digits for raceways assembly identification;
BN = two numeric digits for raceways assembly parts numbering;
B2 = one alphabetical digit for network identification
For the network code shall be used the following characters:
A
for MV power cables
B
for LV power cables
C
for control cables
D
for low level signal cables
E
(hold)
T
for telecommunication cables
S
for special cables (coaxial, Distributed Control Systems Bus, etc.)

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

24

of

50

ELECTRICAL COMPONENTS IDENTIFICATION

Referring to the above relevant chapters some electrical components (e.g. switchgears, distribution boards,
etc.) are identified with the Process-Related Code plus the Point of Installation Code.
The Point of Installation Code identification is divided into different breakdown levels (like the ProcessRelated Code) with different meanings, from right to left in diminishing order, starting from the TOTAL
PLANT up to the Installation Space Code.
The following example illustrates how to solve the problem of allocating the Incoming/tie Feeders of
distribution boards in the process-related code. The system BBA has two destinations, namely BBE and
BCA, which both receive BBA as process-related codes. Unique identification can only be provided by
supplementing the code.
The structure of the Point of Installation Code is the following:

BCT

BBT

11 KV

+BBA

Cub 4

Cub. 7

=BBE..
+BBA04

11 KV

Cub. 1

=BCA ..
+BBA07

=BBA..
+BCA01

=BBA..
+BBE02

+BBE
Cub. 2

10

ATTACHMENT

Attachment 1 Main Groups F1, Groups F2 and Subgroups F3 Codes


Attachment 2 Equipment Units A1A2 Codes
Attachment 3 Components B1B2 Codes
Attachment 4 Examples for Measuring Devices Identification
Attachment 5 Numbering ranges for pipelines, valves and measuring circuits

+ BCA

Enelpower
Enel Group

ATTACHMENT 1

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

25

of

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

MAIN GROUPS - F1

GRID AND DISTRIBUTION SYSTEMS

POWER TRANSMISSION AND AUXILIARY POWER SUPPLY

INSTRUMENTATION AND CONTROL EQUIPMENT

CONVENTIONAL FUEL SUPPLY AND RESIDUES DISPOSAL

WATER SUPPLY AND DISPOSAL

CONVENTIONAL HEAT GNERATION

STEAM, WATER, GAS CYCLES

MAIN MACHINE SETS

COOLING WATER SYSTEMS

AUXILIARY SYSTEMS

ANCILLARY SYSTEMS

STRUCTURES

HEAVY MACHINERY (NOT MAIN MACHINE SETS)

50

Enelpower
Enel Group

ATTACHMENT 2

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

26

of

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

A__ GRID AND DISTRIBUTION SYSTEMS


AD_ 220 KV SYSTEMS
ADA

220 KV GIS SYSTEM

AR_ PROTECTION EQUIPMENT


ARA

PROTECTION EQUIPMENT FOR 220 KV SYSTEM

B__ POWER TRANSMISSION AND AUXILIARY POWER SUPPLY


BA_ POWER TRANSMISSION
BAA
BAB
BAC
BAT
BAU

GENERATOR BUS DUCT AND ACCESSORIES


STATIC STARTER OUTPUT BREAKER
GENERATOR CIRCUIT BREAKER
STEP-UP TRANSFORMERS, INCLUDING COOLING SYS
TRANSFORMERS OIL TREATMENT SYSTEMS

BB_ MV DISTRIBUTION BOARDS AND TRANSFORMERS - NORMAL SYSTEM


BBA
BBG
BBT

11 KV SWITCHBOARD
MV DISTRIBUTION BOARDS
MV AUXILIARY POWER TRANSFORMERS

BC_ MV DISTRIBUTION BOARDS AND TRANSFORMERS GENERAL PURPOSE


BCA
BCT

MV DISTRIBUTION BOARDS
START-UP, OFFSITE, GENERAL PURPOSE TRANSFORMER

BF_ LV MAIN DISTR.BOARDS AND TRANSFORMER NORMAL SYSTEM


BFA
BFL
BFT

0,4 KV POWER CENTER


LV MAIN DISTRIBUTION BOARDS
LV AUXILIARY POWER TRANSFORMER

BH_ LV MAIN DISTRIBUTION BOARDS AND TRANSFORMER GENERAL PURPOSE


BHA
BHL
BHT

BJ_
BJA
BJE
BJT

BL_
BLA
BLL
BLT

0,4 KV POWER CENTER


LV MAIN DISTRIBUTION BOARDS
LV AUXILIARY POWER TRANSFORMER

LV SUBDISTRIBUTION BOARDS AND TRANSFORMERS NORMAL SYSTEM


0,4 KV MOTOR CONTROL CENTER
LV SUBDISTRIBUTION BOARDS
LV SUBDISTRIBUTION TRANSFORMER

LV SUBDISTRIBUTION BOARDS AND TRANSFORMERS GENERAL PURPOSE


0,4 KV MOTOR CONTROL CENTER
LV SUBDISTRIBUTION BOARDS
LV AUXILIARY POWER TRANSFORMER

BM_ LV DISTRIBUTION BOARDS AND TRANSFORMERS, (DIESEL) EMERGENCY POWER


SYSTEM 1
BMA 0,4 KV POWER CENTER
BMC LV SUBDISTRIBUTION BOARDS
BMT LV AUXILIARY POWER TRANSFORMER

BR_ LV DISTRIBUTION BOARDS (CONVERTERS), EMERGENCY POWER SYSTEM 1


BRA
BRC
BRE
BRJ
BRU

220 V UPS EMERGENCY LIGHT


220 V UPS FOR I&C
220 V UPS EMERGENCY
LV DISTRIBUTION BOARDS
CONVERTER (STATIC), INVERTER

BT_ BATTERY SYSTEMS


BTA
BTB
BTC

BATTERIES 220 V
BATTERIES 110 V
BATTERIES 48 V

50

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

ATTACHMENT 2
BTL
BTM
BTN

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

27

of

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

BATTERY CHARGERS 220 V


BATTERY CHARGERS 110 V
BATTERY CHARGERS 48 V

BU_ DC DISTRIBUTION BOARDS, NORMAL SYSTEM


BUA
BUC
BUE

220 V DC DISTRIBUTION BOARD


110 V DC DISTRIBUTION BOARD
24 V DC DISTRIBUTION BOARD

BV_ DC DISTRIBUTION BOARDS, EMERGENCY SYSTEM


BVA
BVC
BVE

220 V DC DISTRIBUTION BOARD


110 V DC DISTRIBUTION BOARD
24 V DC DISTRIBUTION BOARD

C__ INSTRUMENTATION AND CONTROL SYSTEMS


CA_ PROTECTIVE INTERLOCKING
CAA
CAB
CAC
CAD
CAE
CAY

BOP PROTECTION SYSTEM


GAS TURBINE PROTECTION SYSTEM
STEAM TURBINE PROTECTION SYSTEM
HRSG PROTECTION SYSTEM
BMS PROTECTION SYSTEM
AUXILIARY BOILER PROTECTION SYSTEM

CB_ FUNCTIONAL GROUP CONTROL, SUBLOOP CONTROL


CBA CABINETS FOR FUNCTIONAL GROUP CONTROL
CBP CABINETS FOR SYNCHRONISATION
CBQ CABINETS FOR AUXILIARY POWER CHANGE-OVER

CC_ BINARY SIGNAL CONDITIONING


CCA

CABINETS FOR BINARY SIGNAL CONDITIONING

CD_ DRIVE CONTROL INTERFACE


CDA

CABINETS FOR DRIVE CONTROL INTERFACE

CE_ ANNUNCIATION
CEA
CEJ
CEK

CABINETS FOR ANNUNCIATION SYSTEM


FAULT RECORDING (SER)
FAULT RECORDING (OSCILLO)

CF_ MEASUREMENT RECORDING


CFA
CFQ

CABINETS FOR MEASUREMENT


CABINETS FOR RECORDING (METERS, PEN RECODERS)

CH_ PROTECTION (EXCLUDING REACTOR PROTECTION)


CHA

CJ_
CJA
CJD
CJF
CJJ
CJP
CJU

GENERATOR TRANSFORMER PROTECTION

UNIT COORDINATION LEVEL


UNIT CONTROL SYSTEM (INCLUDING CABINETS)
START-UP AND SET-POINT CONTROL (INCLUDING CABINETS)
BOILER CONTROL SYSTEM (INCL. CABINETS)
INSTRUMENTATION AND CONTROL CABINETS FOR TURBINE SET
INSTRUMENT & CONTROL CABINETS FOR GAS TURBINE SET
INSTRUMENTATION AND CONTROL CABINETS FOR OTHER MAIN AND HEAVY MACHINERY

CK_ PROCESS COMPUTER SYSTEM


CKA-CKH ONLINE SUPERVISORY AND DIAGNOSTIC COMPUTER DISTRIBUTED PROCESS SYSTEM

CR_ PROGRAMMABLE PROCESS CONTROL SYSTEMS AND ASSOCIATES CABINETS


CRU PROCESS CONTROL AND INFORMATION SYSTEM
CRV CONFIGURING SYSTEM
CRW DIAGNOSTICS SYSTEM

CU_ CLOSED/LOOP CONTROL (POWER SECTION)


CV_ MARSHALLING RACKS
CW_ CONTROL ROOM
CWA BTG CONTROL DESK
CWB PROCESS COMPUTER CONSOLE

50

Enelpower
Enel Group

ATTACHMENT 2
CWC
CWF
CWG
CWK
CWQ

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

28

of

50

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

OPERATOR INTERFACE STATION (OIS)


MAIN CONTR. PAN.-UNIT ELECT.VERT.BOARD
MAIN CONTR.PAN-COMMON ELECT-VERT-BOARDS
MAIN CONTR.PAN-BTG VERT.BOARDS
CABINETS FOR VOLTAGE DISTRIBUTION

CX_ LOCAL CONTROL STATIONS


CY_ COMMUNICATION EQUIPMENT
CYA
CYB
CYC
CYD
CYE
CYF
CYH
CYJ
CYK
CYM
CYN

TELEPHONE SYSTEM (PABX)


DIRECT WIRE TELEPHONE SYSTEM
PAGING SYSTEM (ACOUSTIC)
PAGING SYSTEM (OPTICAL)
FIRE ALARM SYSTEM
CLOCK SYSTEM
POCKET RADIO PAGING SYSTEM
LOUDSPEAKER PAGING
MESSENGER CALL SYSTEM
PRAYER ROOM SOUND SYSTEM
STAFF PAGING SYSTEM, HARDWIRED

E__ CONVENTIONAL FUEL SUPPLY AND RESIDUES DISPOSAL


EG_ SUPPLY OF LIQUID FUELS (HEAVY OIL)
EGA
EGB
EGC
EGD
EGR
EGT
EGX
EGY

RECEIVING EQUIPMENT INCL.PIPELINE


TANK FARM
PUMP SYSTEM
PIPING SYSTEM
RESIDUES REMOVAL SYSTEM
HEATING MEDIUM SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

EK_ SUPPLY OF GASEOUS FUEL


EKA
EKB
EKC
EKD
EKE
EKF
EKG
EKH
EKR
EKT
EKX
EKY

RECEIVING EQUIPMENT INCLUDING PIPE LINE


MOISTURE SEPARATION SYSTEM
HEATING SYSTEM
MAIN REDUCING STATION, EXPANSION TURBINE
MECHANICAL CLEANING, SCRUBBING
STORAGE SYSTEM
PIPING SYSTEM
MAIN PRESSURE BOOSTING SYSTEM
RESIDUES REMOVAL SYSTEM
HEATING MEDIUM SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

EN_ SUPPLY OF OTHER FUELS (GASOIL)


ENA
ENB
ENC
END
ENY

RECEIVING EQUIPMENT
TANK FARM
PUMP SYSTEM
PIPING SYSTEM
CONTROL AND PROTECTION EQUIPMENT

G__ WATER SUPPLY AND DISPOSAL


GB_ TREATMENT SYSTEM (CARBONATE HARDNESS REMOVAL) INCLUDED COOLING
TOWER-MAKE UP WATER TREATMENT SYSTEM
GBB
GBC
GBD
GBE
GBF
GBG
GBH

FILTERING MECHANICAL CLEANING SYSTEM


AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE, REVERSE OSMOSIS SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
EVAPORATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
DEAERATION, DRYING SYSTEM

Enelpower
Enel Group

ATTACHMENT 2
GBJ
GBK
GBL
GBN
GBP
GBQ
GBR
GBS
GBT
GBX
GBY

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

29

of

50

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

PREHEATING, COOLING SYSTEM


PIPING STORAGE.PUMP SYSTEMS FOR MAIN FLUID
STORAGE SYSTEM FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
CHEMICALS SUPPLY SYSTEM
REGENERATION. FLUSHING EQUIPMENT
INJECTION SYSTEM FOR MAIN FLUID (FOR HARDNESS STABILISATION)
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
HEATING, COOLING AND FLUSHING FLUID DISTRIBUTION SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

GC_ TREATMENT SYSTEM (DEMINERALISATION)


GCA
GCB
GCC
GCD
GCE
GCF
GCG
GCH
GCJ
GCK
GCL
GCN
GCP
GCQ
GCR
GCS
GCT
GCX
GCY

TREATMENT SYSTEM
FILTERING. MECHANICAL CLEANING SYSTEM
AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE, REVERSE OSMOSIS SYSTEM
EVAPORATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
PIPING SYSTEM, TEMPORARY STORAGE SYSTEM, PUMP SYSTEM FOR MAIN FLUID
STORAGE SYSTEM OUTSIDE FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
CHEMICALS SUPPLY SYSTEM
REGENERATION, FLUSHING EQUIPMENT
INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
HEATING, COOLING AND FLUSHING FLUID DISTRIBUTION SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

GD_ TREATMENT SYSTEM OF SEA WATER (DESALINATION)


GDB
GDC
GDD
GDE
GDF
GDG
GDH
GDJ
GDK
GDM
GDN

GDP
GDQ
GDR
GDS
GDT
GDU
GDW
GDX
GDY

STEAM SYSTEM
CONDENSATE SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID CLEANING SYSTEM
ION EXCHANGE, REVERSE OSMOSIS SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
MULTIFLASH SYSTEM, EVAPORATION SYSTEM (E.G. FOR DEMINERALISATION)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
BRINE SYSTEM
PRODUCT WATER SYSTEM
CHEMICAL SUPPLY SYSTEM
10-40 ANTISCALE
50-80 ANTIFOAM
90
CAUSTIC TRANSFER SYSTEM
SEA WATER SYSTEM
INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
SERVICE WATER SYSTEM
GAS EXTRACTION SYSTEM
ON LOAD CLEANING SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

GE_ TREATMENT SYSTEM OF DESALINATED WATER (BLENDING)


GEL LIMESTONE TRANSFER SYSTEM
GEM DESALINATED WATER
GEN CHEMICAL DOSING SYSTEM
10
HEXAFLUOROSILICIC DOSING

Enelpower
Enel Group

ATTACHMENT 2

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

30

of

50

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

20-30 CAUSTIC TRANSFER


40
POLYELECTROLYTE DOSING (SEA WATER)
50-60 ELECTROCLORINATION SYSTEM
70
POLYELECTROLYTE DOSING (WASHWATER)
GEP SEA WATER (FOR TREATMENT)
GET WASHWATER SYSTEM
10-69 LIMESTONE UNITS
70-79 RECOVERY SYSTEM
80-99 SEA WATER FILTERS
GEU GAS EXTRACTION SYSTEM
GEW SERVICE WATER SYSTEM

GH_ DISTRIBUTION SYSTEM (NOT DRINKING WATER)


GHB
GHC
GHD
GHE

DISTRIBUTION SYSTEM FTER TREATMENT (CARBONATE HARDNESS REMOVAL)


DISTRIBUTION SYSTEM FTER TREATMENT (DEMINERALIZATION)
DISTRIBUTION SYSTEM FTER TREATMENT (OTHERS)
SERVICE WATER DIST. SYSTEM

GK_ DRINKING WATER SUPPLY


GKA
GKB

GM
GMA
GMB
GMC
GMJ
GMJ

RECEIVING POINT
STORAGE, FORWARDING AND DISTRIBUTION SYSTEM

PLANT DRAINAGE SYSTEM


CENTRAL DISCHARGE SYSTEM
GAS TURBINE DRAINAGE CIRCUIT
OILY WATER PLANT DRAINAGE)
DESALINATION PLANT DRAINAGE
BLENDING PLANT DRAINAGE

GN_ PLANT DRAINS TREATMENT SYSTEM


GNB
GNC
GND
GNE
GNF
GNG
GNH
GNJ
GNK
GNL
GNN
GNP
GNQ
GNR
GNS
GNT
GNX
GNY

FILTERING, MECHANICAL CLEANING SYSTEM


AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE SYSTEM (E.G. FOR DEMINERALISATION)
EVAPORATION SYSTEM (E.G. FOR DEMINERALISATION)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
PIPING SYSTEM, TEMPORARY STORAGE SYSTEM, PUMP SYSTEM FOR MAIN FLUID
STORAGE SYSTEM OUTSIDE FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
CHEMICALS SUPPLY SYSTEM
REGENERATION, FLUSHING EQUIPMENT
INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
HEATING, COOLING AND FLUSHING FLUID DISTRIBUTION SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

GQ_ DOMESTIC WASTE WATER AND DRAINAGE SYSTEM


GQA CENTRAL DISCHARGE SYSTEM
GQB STORAGE

GR_ DOMESTIC WASTE WATER TREATMENT SYSTEM


GRB
GRC
GRD
GRE
GRF
GRG
GRH
GRJ
GRK
GRL
GRN

FILTERING. MECHANICAL CLEANING SYSTEM


AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE SYSTEM (E.G. FOR DEMINERALISATION)
EVAPORATION SYSTEM (E.G. FOR DEMINERALISATION)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
PIPING SYSTEM, TEMPORARY STORAGE SYSTEM, PUMP SYSTEM FOR MAIN FLUID
STORAGE SYSTEM OUTSIDE FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
CHEMICALS SUPPLY SYSTEM

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

ATTACHMENT 2
GRP
GRQ
GRR
GRS
GRT
GRX
GRY

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

31

of

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

REGENERATION, FLUSHING EQUIPMENT


INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
HEATING, COOLING AND FLUSHING FLUID DISTRIBUTION SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

GU_ RAINWATER, DRAINAGE SYSTEM INCLUDING TREATMENT SYSTEM


H__ CONVENTIONAL HEAT GENERATION
HA_ PRESSURE SYSTEM
HAA
HAB
HAC
HAD
HAG
HAH
HAJ
HAK
HAM
HAN
HAX
HAY

LP PART-FLOW FEED HEATING SYSTEM (FLUE GAS HEATED)


HP PART-FLOW FEED HEATING SYSTEM (FLUE GAS HEATED)
ECONOMISER SYSTEM
EVAPORATOR SYSTEM
CIRCULATING SYSTEM (NOT USED IN NATURAL CIRCILATION BOILER)
HP SUPERHEATER SYSTEM
REHEAT SYSTEM
SECONDARY REHEAT SYSTEM
TRIFLUX SYSTEM
PRESSURE SYSTEM DRAINAGE & VENTING SYSTEMS
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

HB_ SUPPORT STRUCTURE AND STEAM GENERATOR INTERIOR


HBA
HBB
HBC
HBD
HBK

FRAME INCLUDING FOUNDATIONS


ENCLOSURE, INSULATION
BRICK LINING INCLUDING INSULATING BRICKWORK
PLATFORMS AND STAIRWAYS
STEAM GENERATOR INTERIOR

HC_ FIRESIDE HEAT TRANSFERRING SURFACE CLEANING EQUIPMENTS


HCA
HCB
HCC
HCD
HCE
HCF
HCW
HCY

AIR SOOTBLOWING SYSTEM


STEAM SOOTBLOWING SYSTEM
WATER SOOTBLOWING SYSTEM
FLUSHING EQUIPMENT
RAPPING GEAR
SHOT CLEANING SYSTEM
SEALING FLUID SUPPLY SYSTEM
CONTROL AND PROTECTION EQUIPMENT

HH_ MAIN FIRING SYSTEM


HHA
HHB
HHC
HHD
HHE
HHF
HHG
HHH
HHL
HHM
HHN
HHP
HHQ
HHR
HHS
HHT
HHU
HHV
HHX
HHY

MAIN BURNERS
RETARDED COMBUSTION GRATE
GRATE COMBUSTION SYSTEM
OTHERS BURNER EQUIPMENT (E.G. VAPOUR BURNER, FLUE DUST BURNER)
PULVERIZED COAL BIN, FORWARDING AND DISTRIBUTION SYSTEM
OIL TEMPORARY STORAGE PUMP AND DISTRIBUTION SYSTEM
GAS PRESSURE REDUCTON, DISTRIBUTION SYSTEM
TEMPORARY STORAGE, FORWARDING AND DISTRIBUTION SYSTEM FOR OTHER FUELS
COMBUSTION AIR SUPPLY SYSTEM
ATOMIZED MEDIUM SUPPLY SYSTEM (STEAM)
ATOMIZED MEDIUM SUPPLY SYSTEM (AIR)
COOLANT SUPPLY SYSTEM (STEAM)
COOLANT SUPPLY SYSTEM (AIR)
PURGING MEDIUM SUPPLY SYSTEM (STEAM)
PURGING MEDIUM SUPPLY SYSTEM (AIR)
HEATING MEDIUM SUPPLY SYSTEM (STEAM)
HEATING MEDIUM SUPPLY SYSTEM (HOT WATER)
ELECTRIC HEATING SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

50

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

32

of

50

ATTACHMENT 2
FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3
HL_ COMBUSTION AIR SYSTEM
HLA
HLB
HLC
HLD
HLY

DUCTING SYSTEM
FAN SYSTEM, FORCED-DROUGHT FAN SYSTEM
EXTERNAL AIR HEATING SYSTEM (NOT FLUE-GAS-HEATED)
AIR HEATING SYSTEM (FLUE-GAS-HEATED)
CONTROL AND PROTECTION EQUIPMENT

HN_ FLUE GAS EXHAUST


HNA
HNC
HNC
HNF
HNY

DUCTING SYSTEM
INDUCED-DROUGHT FAN SYSTEM
SMOKE STACK SYSTEM (CHIMNEY)
FLUE GAS RECIRCULATION SYSTEM
CONTROL AND PROTECTION EQUIPMENT

HY_ CONTROL AND PROTECTION EQUIPMENT


HYA
HYC
HYE

FIELD INSTRUMENTATION CONTROL VALVES


INSTRUMENTATION ERECTION MATERIAL (CABLES)
AUTOMATION AND CONTROL SYSTEM

L__ STEAM WATER GAS CYCLES


LA_
LAA
LAB
LAC
LAD
LAE
LAF
LAH
LAJ
LAR
LAS
LAT
LAW
LAX
LAY

LB_

FEEDWATER SYSTEM
STORAGE DEAERATION (INCLUDING FEEDWATER TANK)
FEEDWATER PIPING SYSTEM (EXCL.. FEEDWATER PUMP AND FEEDWATER HEATING SYSTEM)
FEEDWATER PUMP SYSTEM
HP FEEDWATER HEATING SYSTEM
HP DESUPERHEATING SPRAY SYSTEM
IP DESUPERHEATING SPRAY SYSTEM
START-UP AND SHUTDOWN PIPING SYSTEM
START-UP AND SHUTDOWN PUMP SYSTEM
EMERGENCY FEEDWATER PIPING SYSTEM INCL. STORAGE (EXCL. EMERGENCY FEEDWATER
PUMP SYSTEM)
EMERGENCY FEEDWATER PUMP SYSTEM
BACK-UP EMERGENCY FEEDWATER SYSTEM
FEEDWATER SEALING WATER SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

STEAM SYSTEM

LBA
LBB
LBC
LBD
LBE
LBF
LBG
LBH
LBJ
LBK

MAIN STEAM PIPING SYSTEM


HOT REHEAT PIPING SYSTEM
COLD REHEAT PIPING SYSTEM
EXTRACTION PIPING SYSTEM
BACK PRESSURE PIPING SYSTEM
HP REDUCING STATION
AUXILIARY STEAM PIPING SYSTEM
START-UP/SHUT-DOWN STEAM SYSTEM
MOISTURE SEPARATOR/REHEATER (MSR)
MAIN STEAM SAFETY/RELIEF SYSTEM INSIDE REACTOR CONTAINMENT FOR SINGLE-CYCLE
PLANTS
LBL IP REDUCING STATION
LBQ EXTRACTION STEAM PIPING SYSTEM (HP FEEDWATER HEAT)
LBR PIPING SYSTEM FOR BRANCH OR AUXILIARY TURBINE
LBS EXTRACTION STEAM PIPING SYSTEM FOR LP FEEDWATER HEATING (MAIN CONDENSATE)
LBT EMERGENCY CONDENSING SYSTEM
LBU COMMON DUMP LINE
LBW SEALING STEAM SYSTEM
LBX FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
LBY CONTROL AND PROTECTION EQUIPMENT

LC_
LCA
LCB

CONDENSATE SYSTEM
MAIN CONDENSATE PIPING SYSTEM (EXCL. MAIN CONDENSATE PUMP SYSTEM, LP
FEEDWATER HEATING SYSTEM, CONDENSATE POLISHING PLANT)
MAIN CONDENSATE PUMP SYSTEM

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

ATTACHMENT 2
LCC
LCE
LCF
LCG
LCH
LCJ
LCL
LCM
LCN
LCP
LCQ
LCR
LCS
LCT
LCW
LCX
LCY

LF_

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

33

of

50

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

LP FEEDWATER HEATING SYSTEM


CONDENSATE DESUPERHEATING SPRAY SYSTEM
BRANCH TURBINE CONDENSATE PIPING SYSTEM
BRANCH TURBINE CONDENSATE PUMP SYSTEM
HP HEATER DRAINS SYSTEM
LP HEATER DRAINS SYSTEM
STEAM GENERATOR DRAINS SYSTEM
CLEAN DRAINS SYSTEM (COLLECTING AND RETURN SYSTEMS)
AUXILIARY STEAM CONDENSATE SYSTEM (COLLECTING AND RETURN SYSTEMS)
STAND-BY CONDENSATE SYSTEM INCLUDING STRORAGE AND PUMP SYSTEM
STEAM GENERATOR BLOWDOWN SYSTEM
STAND-BY CONDENSATE DISTRIBUTION SYSTEM
REHEATER DRAINS (MOISTURE SEPARATOR/REHEATER)
MOISTURE SEPARATOR DRAINS (MOISTURE SEPARATOR/REHEATER)
SEALING AND COOLING DRAINS SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

COMMON INSTALLATION FOR STEAM, WATER, GAS CYCLES

LFC
LFG
LFJ
LFN

COMMON DRAIN AND VENT SYSTEM


SECONDARY-SIDE STEAM GENERATOR TUBESHEET LANCING SYSTEM
STEAM GENERATOR LAY-UP SYSTEM
PROPORTIONING SYSTEM FOR FEEDWATER, CONDENSATE SYSTEM, INCLUDED
PROPORTIONING IN BOILER AND TURBINE AREA

M__ MAIN MACHINE SETS


MA_ STEAM TURBINE PLANT
MAA
MAB
MAC
MAD
MAG
MAH
MAJ
MAK
MAL
MAM
MAN
MAP
MAQ
MAV
MAW
MAX
MAY

HP TURBINE
IP TURBINE
LP TURBINE
BEARINGS
CONDENSING SYSTEM
MOTIVE WATER SYSTEM (IF SEPARATE FROM MAJ)
AIR REMOVAL SYSTEM
TRANSMISSION GEAR BETWEEN PRIME MOVER & DRIVEN MACHINE INCLUDED TURNING
GEAR
DRAIN AND VENT SYSTEM
LEAK OFF STEAM SYSTEM
TURBINE BYPASS STATION, INCLUDED DESUPERHEATING SPRAY SYSTEM
LP TURBINE BYPASS
VENTING SYSTEM (IF SEPARATE FROM MAL)
LUBRICANT SUPPLY SYSTEM
SEALING, HEATING AND COOLING STEAM SYSTEM
NON ELECTRIC CONTROL AND PROTECTION EQUIPMENT, INCLUDED FLUID SUPPLY SYSTEM
ELECTRICAL CONTROL AND PROTECTION EQUIPMENTS

MB_ GAS TURBINE PLANT


MBA
MBB
MBC
MBD
MBE
MBF
MBG
MBH
MBI
MBJ
MBK

TURBINE COMPRESSOR ROTOR WITH COMMON CASING


TURBINE CASING AND ROTOR
COMPRESSOR CASING AND ROTOR
BEARINGS
GT VIBRATION MONITORING SYSTEM
GT FOUNDATION COMPONENTS
GT ENCLOSURE VENTILATION
COOLING AND SEALING GAS SYSTEM
GT BLEED AIR SYSTEM
START-UP UNIT
TRANSMISSION GEAR BETWEEN PRIME MOVER & DRIVEN MACHINE INCLUDED TURNING
GEAR
MBL INTAKE AIR, COLD GAS SYSTEM (OPEN CYCLE)
MBM COMBUSTION CHAMBER (GAS HEATING COMBUSTION)
MBN FUEL SUPPLY SYSTEM (LIQUID)

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

ATTACHMENT 2
MBO
MBP
MBQ
MBR
MBS
MBT
MBU
MBV
MBW
MBX
MBY
MBZ

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

34

of

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

GT & REDUCTION GEARBOX ENCLOSURE AXIAL EXHAUST TYPE


FUEL SUPPLY SYSTEM (GASEOUS)
IGNITION FUEL SUPPLY SYSTEM (IS SEPARATE)
EXHAUST GAS SYSTEM (OPEN CYCLE)
STORAGE SYSTEM
MOTIVE GAS GENERATOR UNIT INCLUDING COMBUSTION CHAMBER
ADDITIVE SYSTEM
LUBRICANT SUPPLY SYSTEM
SEALING OIL SUPPLY SYSTEM
NON ELECTRIC CONTROL. & PROTECTION EQUIPMENTS, INCLUDED FLUID SUPPLY SYSTEM
ELECTRICAL CONTROL AND PROTECTION EQUIPMENTS
LUBRICANT AND CONTROL MEDIUM TREATMENT

MK_ GENERATOR PLANT


MKA GENERATOR COMPLETE, INCLUDED STATOR, ROTOR AND ALL INTEGRAL COOLING
EQUIPMENT
MKC EXCITER SET, COMPLETE (10 AUXILIARY EXCITATION, 20 MAIN EXCITATION UNIT)
MKD BEARINGS
MKF STATOR/ROTOR LIQUID COOLING SYSTEM, INCLUDED COOLANT SUPPLY SYSTEM
MKG STATOR/ROTOR GAS COOLING SYSTEM, INCLUDED COOLANT SUPPLY SYSTEM
MKH STATOR/ROTOR NITROGEN COOLING SYSTEM, INCLUDED COOLANT SUPPLY SYSTEM
MKQ EXHAUST GAS SYSTEM (IF SEPARATE FROM MKG AND MKH)
MKU STATOR/ROTOR COOLING OIL COOLING SYSTEM, INCLUDED COOLANT SUPPLY SYSTEM
MKV LUBRICANT SUPPLY SYSTEM (IF SEPARATE SYSTEM FOR GENERATOR)
MKW SEALING OIL SYSTEM, INCLUDED SUPPLY AND TREATMENT
MKY CONTROL AND PROTECTION EQUIPMENT

MM_ COMPRESSOR PLANT


MMA
MMC
MMD
MME
MMF
MMG
MMH
MMV
MMW
MMX
MMY

COMPRESSOR INCLUDING INTERNAL SYSTEM


AIR INTAKE PIPING SYSTEM
BEARINGS
INTERCOOLING SYSTEM
AFTERCOOLING SYSTEM
FINAL COOLING SYSTEM
DISCHARGE PIPING SYSTEM
LUBRICANT SUPPPLY SYSTEM
SEALING FLUID SUPPPLY SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

P__ COOLING WATER SYSTEM


PA_
PAA
PAB
PAC
PAD
PAE
PAH
PAR
PAS
PAV
PAX
PAY
PAZ

CIRCULATING (MAIN COOLING) WATER SYSTEM


EXTRACTION, CLEANING FOR DIRECT COOLING
CIRCULATING WATER PIPING AND CULVERT SYSTEM
CIRCULATING WATER PUMP SYSTEM
RECIRCULATING COOLING SYSTEM, OUTFALL COOLING SYSTEM
COOLING TOWER PUMP SYSTEM (IF SEPARATE)
CONDENSER CLEANING SYSTEM INCLUDED ALL APPURTENANCES.
MAKE-UP WATER PIPING SYSTEM
MAKE-UP WATER PUMP SYSTEM
LUBRICANT SUPPPLY SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT
CATHODIC PROTECTION

PB_ CIRCULATING (MAIN COOLING) WATER TREATMENT SYSTEM


PBA
PBB
PBC
PBD
PBE
PBF
PBG

DISCHARGE FROM FLUID TREATMENT SYSTEM


FILTERING, MECHANICAL CLEANING SYSTEM
AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE SYSTEM (E.G. FOR DEMINERALISATION)
EVAPORATION SYSTEM (E.G. FOR DEMINERALISATION)

50

Enelpower
Enel Group

ATTACHMENT 2
PBH
PBJ
PBK
PBL
PBN
PBP
PBQ
PBR
PBS
PBT
PBX
PBY

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

35

of

50

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

DEAERATION, DRYING SYSTEM


PREHEATING, COOLING SYSTEM
PIPING SYSTEM, TEMPORARY STORAGE SYSTEM, PUMP SYSTEM FOR MAIN FLUID
STORAGE SYSTEM OUTSIDE FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
CHEMICALS SUPPLY SYSTEM
REGENERATION, FLUSHING EQUIPMENT
INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
HEATING, COOLING AND FLUSHING FLUID DISTRIBUTION SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

PC_ SERVICE (SECONDARY COOLING) WATER SYSTEM


PCA
PCB
PCC
PCD
PCH
PCM
PBX
PBY

EXTRACTION, MECHANICAL CLEANING FOR DIRECT COOLING


PIPING AND CULVERT SYSTEM
PUMP SYSTEM
RECIRCULATING COOLING SYSTEM, OUTFALL COOLING SYSTEM
HEAT EXCHANER CLEANING SYSTEM
SERVICE WATER SYSTEM FOR GENERATOR, MOTOR GENERATOR COOLING
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

PD_ SERVICE (SECONDARY COOLING) WATER TREATMENT SYSTEM


PDA
PDB
PDC
PDD
PDE
PDF
PDG
PDH
PDJ
PDK
PDL
PDN
PDP
PDQ
PDR
PDS
PDT
PDX
PDY

DISCHARGE FROM FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
FILTERING, MECHANICAL CLEANING SYSTEM
AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE SYSTEM (E.G. FOR DEMINERALISATION)
EVAPORATION SYSTEM (E.G. FOR DEMINERALISATION)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
PIPING SYSTEM, TEMPORARY STORAGE SYSTEM, PUMP SYSTEM FOR MAIN FLUID
STORAGE SYSTEM OUTSIDE FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
CHEMICALS SUPPLY SYSTEM
REGENERATION, FLUSHING EQUIPMENT
INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
HEATING, COOLING AND FLUSHING FLUID DISTRIBUTION SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

PG_ CLOSED COOLING WATER SYSTEM FOR CONVENTIONAL AREA


PGB
PGC
PGD
PGX
PGY

CLOSED COOLING WATER PIPING SYSTEM


CLOSED COOLING WATER PUMP SYSTEM
CLOSED WATER COOLER
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

PH_ CLOSED COOLING WATER TREATMENT SYSTEM


PHA
PHB
PHC
PHD
PHE
PHF
PHG
PHH
PHJ
PHK
PHL

DISCHARGE FROM FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
FILTERING, MECHANICAL CLEANING SYSTEM
AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE SYSTEM (E.G. FOR DEMINERALISATION)
EVAPORATION SYSTEM (E.G. FOR DEMINERALISATION)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
PIPING SYSTEM, TEMPORARY STORAGE SYSTEM, PUMP SYSTEM FOR MAIN FLUID
STORAGE SYSTEM OUTSIDE FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)

Enelpower
Enel Group

ATTACHMENT 2
PHN
PHP
PHQ
PHR
PHS
PHT
PHX
PHY

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

36

of

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

CHEMICALS SUPPLY SYSTEM


REGENERATION, FLUSHING EQUIPMENT
INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
HEATING, COOLING AND FLUSHING FLUID DISTRIBUTION SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

Q__ AUXILIARY SYSTEM


QC_ CENTRAL CHEMICAL SUPPLY
QCA CHEMICAL REAGENTS SYSTEM
QCB BOILER DOSING SYSTEM
QCY CENTRAL CHEMICAL SUPPLY FUNCTIONAL GROUP

QE_ GENERAL COMPRESSED AIR AND CARRIER AIR SUPPLY


QEA
QEB
QEY

CENTRAL COMPRESSED AIR AND CARRIER AIR GENERATION SYSTEM


CENTRAL COMPRESSED AIR AND CARRIER AIR DISTRIBUTION
CONTROL AND PROTECTION EQUIPMENT

QF_ GENERAL CONTROL AIR SUPPLY


QFA
QFB
QFC
QFD
QFE
QFP
QFY

CENTRAL CONTROL AIR GENERATION SYSTEM


CENTRAL CONTROL AIR DISTRIBUTION SYSTEM
GT INSTRUMENT AIR CIRCUIT
DESALINATION PLANT INSTRUMENT AIR DISTRIBUTION SYSTEM
BLENDING PLANT INSTRUMENT AIR
POTABLE WATER PUMP INSTRUMENT AIR DISTRIBUTION SYSTEM
CONTROL AND PROTECTION EQUIPMENT

QH_ AUXILIARY STEAM GENERATING SYSTEM


QHA
QHB
QHC
QHD
QHE
QHF
QHG
QHH
QHJ
QHL
QHM
QHN
QHP
QHQ
QHR
QHS
QHT
QHU
QHX
QHY

PRESSURE SYSTEM
SUPPORT STRUCTURE AND ENCLOSURE
FIRESIDE HEAT TRANSFER SURFACE CLEANING EQUIPMENT
ASH AND SLAG REMOVAL
BLOWDOWN SYSTEM FLASH DRAIN SYSTEM
BUNKER, FEEDER ALD PULVERIZING SYSTEM
BOILER WATER CIRCULATION SYSTEM (ALSO DOR ELECTRODE STEAM BOILER)
MAIN FIRING SYSTEM (ALSO FOR ELECTRIC HEATING)
IGNITION FIRING EQUIPMENT (IF SEPARATE)
COMBUSTION AIR SYSTEM
GAS HEATING SYSTEM (FOR CLOSED CYCLE)
FUEL GAS EXHAUST (WITHOT GAS TREATMENT)
MECHANICAL DUST HANDLING SYSTEM
ELECTROSTATIC PRECIPITATOR
CHEMICAL FLUE GAS TREATMENT SYSTEM, INCLUDED RESIDUES REMOVAL, ABSORPTIV
PROCESS
CHEMICAL FLUE GAS TREATMENT SYSTEM, INCLUDED RESIDUES REMOVAL, CATALYTIC
PROCESS
CHEMICAL FLUE GAS TREATMENT SYSTEM, INCLUDED RESIDUES REMOVAL, ABSORPTIV
PROCESS
FLUE GAS REHEATING SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT

QJ_ CENTRAL GAS SUPPLY, ALSO INERT GAS


QJB
QJD
QJF
QJK
QJY

NITROGEN GAS SUPPLY SYSTEM


GAS SUPPLY AND DISTRIBUTION SYSTEM N2 (NITROGEN)
GAS SUPPLY AND DISTRIBUTION SYST. H2 (HYDROGEN)
GAS SUPPLY AND DISTRIBUTION SYST. CO 2 (CARBON DIOXIDE)
CONTROL AND PROTECTION EQUIPMENT

QK_ CHILLED WATER SYSTEM FOR CONVENTIONAL AREA


QKA
QKY

CENTRAL CHILLED WATER PLANT


CONTROL AND PROTECTION EQUIPMENT

50

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

37

of

ATTACHMENT 2
FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3
QL_ FEEDWATER STEAM CONDENSATE CYCLE OF AUXILIARY STEAM GENERATING AND
DISTRIBUTION
QLA
QLB
QLC
QLD
QLF
QLY

FEEDWATER SYSTEM
STEAM SYSTEM
CONDENSATE SYSTEM
CONDENSATE POLISHING PLANT
COMMON EQUIPMENT FOR AUXILIARY STEAM GENERATION AND DISTRIBUTION SYSTEMS
CONTROL AND PROTECTION EQUIPMENT

QU_ SAMPLING SYSTEM FOR CONVENTIONAL AREA


QUA SAMPLING SYSTEM
QUB I&C LABORATORY
QUY CONTROL AND PROTECTION EQUIPMENT

S__ ANCILLARY SYSTEM


SA_ HEATING, VENTILATION AIR-CONDITIONING (HVAC) SYSTEM
SAC
SAD
SAF
SAG
SAM
SAQ
SAS
SAV
SAY

FOR CONTROL & ELECTRICAL BUILDINGS/SUBSTATION BUILDING


FOR AUXILIARY BOILER BUILDING & DIESEL BUILDING
FOR FUEL OIL PUMP ROOM & HYDROGEN BUILDING
FOR WATER TREATMENT BUILDING
FOR TURBINE BUILDING
FOR COOLING WATER PUMP HOUSE
FOR FIRE FIGHTING BUILDING/WORKSHOP
FOR ADMINISTRATION BUILDING
CONTROL AND PROTECTION EQUIPMENT

SB_ SPACE HEATING SYSTEMS


SBA
SBC
SBD
SBF
SBG
SBH
SBM
SBQ
SBS
SBV
SBY

CENTRAL HEATING PLANT


FOR CONTROL & ELECTRICAL BUILDING/SUBSTATION BUILDING
FOR AUXILIARY BOILER BUILDING & DIESEL BUILDING
FOR DISTRICT HEATING BUILDING
FOR WATER TREATMENT BUILDING
FOR BOILER HOUSE
FOR TURBINE BUILDING
FOR COOLING WATER PUMP HOUSE
FOR FIRE FIGHTING BUILDING/WORKSHOP
FOR ADMINISTRATION BUILDING
CONTROL AND PROTECTION EQUIPMENT

SC_ STATIONARY COMPRESSED AIR SUPPLIES


SCA
SCB
SCE
SCP
SCY

COMPRESSED AIR GENERATION SYSTEM


COMPRESSED AIR DISTRIBUTION SYSTEM
BLENDING PLANT COMPRESSED AIR
POTABLE WATER PUMP COMPRESSED AIR DISTRIBUTION SYSTEM
CONTROL AND PROTECTION EQUIPMENT

SD_ STATIONARY CLEANING SYSTEMS


SDY

CONTROL AND PROTECTION EQUIPMENT

SG_ STATIONARY FIRE PROTECTION SYSTEMS


SGA
SGC
SGE
SGF
SGG
SGJ
SGK
SGL
SGX
SGY

FIRE WATER SYSTEM CONVENTIONAL AREA


SPRAY DELUGE SYSTEMS CONVENTIONAL AREA
SPRINKLER SYSTEMS
FOAM FIRE-FIGHTING SYSTEMS
TANK ROOF, TANK SHELL COOLING SYSTEMS
CO2 FIRE-FIGHTING SYSTEMS
HALON FIRE-FIGHTING SYSTEMS
POWDER FIRE-FIGHTING SYSTEMS
FLUID SUPPLY SYSTEM FOR CONTROL & PROTECTION EQUIPMENT
CONTROL AND PROTECTION EQUIPMENT

SM_ CRANES, STATIONARY HOISTS AND CONVEYING APPLIANCE


SMM IN TURBINE BUILDING
SMP IN CIRCULATING WATER INTAKE STRUCTURES

50

Enelpower
Enel Group

ATTACHMENT 2

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

38

of

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

SMS IN ANCILLARY SYSTEM BUILDING


SMW IN WORKSHOP BUILDING
SMY CRANES STATIONARY HOISTS & CONVEYING APPLIANCE

SN_ ELEVATORS
SNC
SNH
SNY

SWITCHGEAR BUILDING
IN BOILER HOUSE
CONTROL AND PROTECTION EQUIPMENT

ST_ WORKSHOP, STORES, LABORATORY EQUIPMENT & STAFF AMENITIES OUTSIDE


CONTROLLED AREA
STA
STC
STE
STG
STG
STY

WORKSHOP EQUIPMENT OUTSIDE CONTROLLED AREA


MAINTENANCE AREAS OUTSIDE CONTROLLED AREA
STORES AND FILLING STATION EQUIPMENT
LABORATORY EQUIPMENT
STAFF AMENITIES
CONTROL AND PROTECTION EQUIPMENT

U__ STRUCTURES
UA_ STRUCTURES FOR GRID AND DISTRIBUTION SYSTEM
UAA
UAB
UAC
UAG
UAX

SWITCHYARD STRUCTURE
INDOOR GIS SWITCHGEAR BUILDING
SUBSTATION BUILDINGS
STRUCTURE FOR TRANSFORMERS
SPECIAL STRUCTURE (PLANT SPECIFIC)

UB_ STRUCTURES FOR POWER TRANSFORMERS & AUXILIARY POWER SUPPLIES


UBA
UBC
UBF
UBJ
UBK
UBX

SWITCHGEAR BUILDING
STRUCTURE FOR OFFSITE SYSTEM TRANSFORMERS
STRUCTURE FOR GENERATOR TRANSFORMERS
STRUCTURE FOR TRANSFORMER TRACKS
TRANSFORMER MAINT. BUILD
SPECIAL STRUCTURE (PLANT SPECIFIC)

UC_ STRUCTURES FOR INSTRUMENT. AND CONTROL


UCA
UCB
UCX
UCZ

AUXILIARY CONTROL ROOM & ELECTRICAL BUILDING


CONTROL STATION BUILDING
SPECIAL STRUCTURE (PLANT SPECIFIC)
DUCTING STRUCTURE

UD_ STRUCTURES FOR DESALINATION PLANT


UDA
UDB

DESALINATION PLANT
DESALINATION PLANT CONTROL BUILDING

UE_ STRUCTURES FOR CONVENTIONAL FUEL SUPPLY AND RESIDUES DISPOSAL


UEH
UEJ
UEL
UEM
UEX

STRUCTURES FOR UNLOAD AND RECOVERY OF LIQUID FUEL


STRUCTURES FOR STORAGE OF LIQUID FUELS
FUEL OIL PUMP HOUSE
FUEL OIL TREATMENT AREA
SPECIAL STRUCTURE (PLANT SPECIFIC)

UG_ STRUCTURES FOR WATER SUPPLY AND DISPOSAL


UGA
UGD
UGE
UGF
UGG
UGH
UGN
UGP
UGQ
UGR
UGU
UGV
UGX

STRUCTURE FOR RAW WATER SUPPLY


STRUCTURE FOR DEMI. SYS. (WATER TREAT.)
STRUCTURE FOR NEUTRALISATION SYSTEM
FIRE WATER TANK
MISCELLANEOUS TANKS
GENERAL DRAINAGE STRUCTURES
WATER STORAGE TANKS
SLUDGE THICKENER (I/A)
SLUDGE DEWATERING BUILDING (I/E)
SLUDGE STORAGE STRUCTURE (I/A)
STRUCTURE FOR EFFLUENT DISPOSAL
STRUCTURE FOR SEWERAGE PLANT
SPECIAL (PLANT SPECIFIC)

50

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

ATTACHMENT 2
UGZ

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

39

of

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

DUCTING STRUCTURE

UH_ STRUCTURES FOR CONVENTIONAL HEAT GENERATION


UHA
UHN
UHQ
UHU
UHV
UHX
UHZ

UL_

STEAM GENENERATOR ENCLUDING STEAM GENERATOR BUILDING (B.H.)


SMOKE STACK, INCLUDING STRUCTURES FOR FUEL GAS CIRCULATION
VENTILATORS STRUCTURES
STRUCTURE FOR FUEL GAS REHEATING SYSTEM
STRUCTURE FOR COMBUSTION AIR CIRCULATION
SPECIAL STRUCTURE (PLANT SPECIFIC)
DUCTING STRUCTURE

STRUCTURES FOR STEAM, WATER, GAS CYCLES

ULA
ULC
ULV
ULX

FEEDWATER PUMP HOUSE


STRUCTURE FOR CONDENSATE SYSTEM
UNDERGROUND SEPTIC TANK
SPECIAL STRUCTURE (PLANT SPECIFIC)

UM_ STRUCTURES FOR MAIN MACHINE SETS


UMA
UMB
UMJ
UMM
UMP
UMX

STEAM TURBINE BUILDING


GAS TURBINE GENERATOR BUILDING
DIESEL ENGINE BUILDING
COMPRESSOR BUILDING
TURBINE GENERATOR PEDESTAL
SPECIAL STRUCTURE (PLANT SPECIFIC)

UP_ STRUCTURES FOR CIRCULATING (COOLING) WATER SYSTEM INTAKE


UPA
UPB
UPC
UPD
UPE
UPX

SEA OR RIVER COOLING WATER INTAKE


CIRCULATING WATER INTAKE CULVERT FROM INTAKE TO THE PUMP HOUSE
PUMP HOUSE
CHLORINATION BUILDING
CIRCULATING WATER PIPES FROM PUMP HOUSE TO TURBINE BUILDING
CHEMICAL DOSING PLANT

UQ_ STRUCTURES FOR CIRCULATING (COOLING) WATER SYSTEM OUTLET


UQA
UQB
UQC
UQD
UQE
UQN
UQP

DISCHARGE CHANNEL PIPES FROM TURBINE BUILDING TO DISCHARGE BASIN


CIRCULATING WATER OUTFALL CULVERT FROM DISCHARGE BASIN TO OUTFALL CHANNEL
OUTFALL CHANNEL
BRIDGE CHANNEL
ROUTING STRUCTURES FOR CIRCULATING WATER DISCHARGE
SEA WATER DISCHARGE CULVERT
HYPOCHLORINATION PLANT

US_ STRUCTURES FOR ANCILLARY SYSTEMS


USA
USG
USS
UST
USU
USV

CONDITION BUILDING
FIRE PUMP HOUSE
DIRTY OIL PUMP
WORKSHOP AND STORES BUILDING
CHLORINATION PLANT STORE
LABORATORIES BUILDING

UT_ STRUCTURES FOR AUXILIARY SYSTEMS


UTF
UTG
UTH
UTJ

COMPRESSED AIR SYSTEM BUILDING


CENTRAL GAS SUPPLY SYSTEM BUILDING, H2, CO2 SUPPLY SYSTEM
AUXILIARY BOILERS
CHIMNEY FOR AUXILIARY BOILERS

UX_ STRUCTURES FOR EXTERNAL SYSTEM (POWER PLANT SPECIFIC)


UXA
UXX

DUCTING, GALLERY, STRUCTURE FOR SLIPWAY, CABLE TUNNELS.


SPECIAL STRUCTURE (PLANT-SPECIFIC)

UY_ GENERAL SERVICE STRUCTURES


UYA
UYB
UYC
UYD
UYE

SERVICE BUILDING
AMENITIES BUILDING
ADMINISTRATION BUILDING
LOCKERS AND CANTEEN BUILDING
CAR PORT & GARD HOUSE

50

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

ATTACHMENT 2
UYF
UYG
UYH
UYJ
UYP
UYR
UYS
UYY

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

40

of

FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3

SECURITY GATE HOUSE


INFORMATION CENTRE
TRAINING FACILITIES
MEDICAL CENTRE
FIRE STATION
CAR WORKSHOP AND GARAGE
FUEL FILLING STATION
BRIDGE

UZ_ STRUCTURES FOR TRANSPORTS, TRAFFIC, FENCING, GARD.


UZA
UZC
UZD
UZJ

WORKS ROADWAYS, PATHS, INCLUDING ASSOCIATED STRUCTURES


PORT STATION URBANISATION STATION
CAR PARKING AREA
FENCING AND GATES

X__ HEAVY MACHINERY (NOT MAIN MACHINE SETS)


XJ_
XJA
XJB
XJG
XJH
XJK
XJN
XJP
XJQ
XJR
XJV
XJX
XJY

DIESEL ENGINE PLANT


ENGINE
TURBOCHARGER, BLOWER
LIQUID COOLING SYSTEM
AIR INTERCOOLING SYSTEM
TRASMISSION GEAR BETWEEN PRIME MOVER AND DRIVEN MACHINE
FUEL SYSTEMS
STARTING EQUIPMENT (INCLUDED FLYWHEEL)
AIR INTAKE SYSTEM
EXHAUST GAS SYSTEM
LUBRICANT SUPPLY SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION EQUIPMENT
CONTROL AND PROTECTION EQUIPMENT

XK_ GENERATOR PLANT


XKA
XKC

GENERATOR FRAME INCLUDING STATOR, ROTOR AND COOLING EQUIPMENT


EXCITER SET

Y__ SITE
YA_
YAE
YAG
YAP
YAS
YAZ

GROUND WORKS
GROUND PREPARATION / ESCAVATION
GEOGNOSTIC SURVEY
PILING (I/A)
STRUCTURES FOR SITE PREPARATION
DUCTS (TEMPORARY PROVISION FOR GROUND PREPARATION)

50

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

ATTACHMENT 3

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

41

of

50

FUNCTION KEY EQUIPMENT UNIT MAINGROUP A1, SUBGROUPS A2


EQUIPMENT UNIT KEY - MAIN GROUPS A1

MECHANICAL EQUIPMENT (DRIVEN)

MECHANICAL EQUIPMENT (NOT DRIVEN)

DIRECT MEASURING CIRCUITS

CLOSED LOOP CONTROL CIRCUITS

ANALOG AND BINARY SIGNAL CONDITIONING

INDIRECT MEASURING CIRCUITS (GATED, CORRECTED, SUPPRESSED)

ELECTRICAL EQUIPMENT

SUBASSEMBLIES OF MAIN AND HEAVY MACHINERY

EQUIPMENT UNIT KEY CODES A1 A2

MECHANICAL EQUIPMENT (DRIVEN)


AA
AB
AC
AE
AF
AG
AH
AJ
AK
AM
AN
AP
AS
AT
AU
AV
AW
AX

VALVES, DAMPERS, ETC. (INCL.ACTUATORS, ALSO MANUAL, RUPTURE DISK, EQUIPMENT)


ISOLATING ELEMENTS, AIR LOCKS
HEAT EXCHANGERS, HEAT TRANSFER SURFACES
TURNING, DRIVING, LIFTING AND SLEWING GEAR (ALSO MANIPULATOR)
CONTINUOUS CONVEYORS, FEEDERS (ESCALATORS)
GENERATOR UNITS
HEATING, COOLING AND AIR CONDITIONING UNITS
SIZE REDUCTION EQUIPMENT, ONLY AS PART OF PROCESS
COMPACTING AND PACKAGING EQUIPMENT, ONLY AS PART OF PROCESS
MIXERS, AGITATORS
COMPRESSOR UNITS, FANS
PUMP UNITS
ADJUSTING AND TENSIONING EQUIPMENT FOR NON ELECTRICAL VARIABLE (USE ONLY IF
FINAL CONTROL ELEMENT ITSELF FORMS A STRUCTURAL ENTITY WITH ANOTHER EQUIPMENT
UNIT)
CLEANING, DRYING, FILTERING AND SEPARATING EQUIPMENT, EXCL. "BT"
BRAKING, GEARBOX, COUPLING EQUIPMENT, NON ELECTRICAL CONVERTERS
COMBUSTION EQUIPMENT
STATIONARY TOOLING, TREATMENT EQUIPMENT
TEST AND MONITORING EQUIPMENT FOR PLANT MAINTENANCE

MECHANICAL EQUIPMENT
BB
BE
BF

STORAGE EQUIPMENT (VESSELS, TANKS)


SHAFTS (FOR ERECTION AND MAINTENANCE ONLY)
FOUNDATIONS

Enelpower
Enel Group

ATTACHMENT 2
BN
BP
BQ
BR
BS
BT
BU

P12QR07003

Rev. 0

on

August 01

Sheet

42

of

FUNCTION KEY EQUIPMENT UNIT MAINGROUP A1, SUBGROUPS A2

JET PUMPS, EJECTORS, INJECTORS


FLOW RESTRICTORS, LIMITERS, ORIFICES (NOT METERING ORIFICES)
HANGERS, SUPPORTS, RACKS, PIPING PENETRATIONS
PIPING, DUCTWORK, CHUTES
SILENCERS
FLUE GAS CATALYTIC CONVERTER MODULES
INSULATION, SHEATHING

DENSITY
ELECTRICAL VARIABLES (E.G. CURRENT, VOLTAGE, POWER, ELECTRICAL FREQUENCY)
FLOW, RATE
DISTANCE, LENGTH, POSITION, DIRECTION OF ROTATION
MANUAL INPUT (AS MANUALLY OPERATED SENSOR/E.G. FIRE DETECTOR)
POWER (MECHANICAL, THERMAL)
TIME
LEVEL (ALSO FOR DIVIDING LINE)
MOISTURE, HUMIDITY
PRESSURE
QUALITY VARIABLES (ANALYSIS MATERIAL PROPERTIES OTHER THAN "CD", "CM", "CV")
RADIATION VARIABLES
VELOCITY,SPEED,FREQUENCY (MECHANICAL), ACCELERATION
TEMPERATURE
COMBINED AND OTHER VARIABLES
VISCOSITY
WEIGHT, MASS
VIBRATION, EXPANSION

CLOSED LOOP CONTROL CIRCUITS


DD
DE
DF
DG
DJ
DK
DL
DM
DP
DQ
DS
DT
DU
DV
DW
DY

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

DIRECT MEASURING CIRCUITS


CD
CE
CF
CG
CH
CJ
CK
CL
CM
CP
CQ
CR
CS
CT
CU
CV
CW
CY

RAS LAFFAN
POWER AND DESALINATION PROJECT

DENSITY
ELECTRICAL VARIABLES (E.G. CURRENT,VOLTAGE,POWER, ELECTRICAL FREQUENCY)
FLOW RATE
DISTANCE, LENGHT,POSTION, DIRECTION OF ROTATION
POWER (MECHANICAL,THERMAL)
TIME
LEVEL (ALSO FOR DIVIDING LINE)
MOISTURE, HUMIDITY
PRESSURE
QUALITY VARIABLES (ANALYSIS,MATERIAL PROPERTIES OTHER THAN "DD","DM","DV")
VELOCITY,SPEED,FREQUENCY (MECHANICAL) ACCELERATION
TEMPERATURE
COMBINED AND OTHER VARIABLES
VISCOSITY
WEIGHT, MASS
VIBRATION EXPANSION

ANALOG DATA AND BINARY SIGNAL CONDITIONING


EA
EB
EC
EE
EG
EH
EM
EN
EP
EU

OPEN LOOP CONTROL (UNIT CONTROL)


OPEN LOOP CONTROL (GROUP CONTROL)
OPEN LOOP CONTROL (SUBGROUP CONTROL)
OPEN LOOP CONTROL (SUBLOOP CONTROL)
ALARM. ANNUNCIATION (ALARM LOGICS)
ALARM, ANNUNCIATION (HARD WIRED ALARM ANNUNCIATION SYSTEM)
PROCESS COMPUTER (ACCESS CONTROL AND NPP SPECIFIC TASKS)
PROCESS COMPUTER (STATUS DISPLAY COMPUTER, CRITEREEN DISPLAY)
PROCESS COMPUTER (SUPERVISORY COMPUTER)
COMBINED ANALOG AND BINARY SIGNAL CONDITIONING

50

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

ATTACHMENT 2
EY
EZ

Rev. 0

on

August 01

Sheet

43

of

50

FUNCTION KEY EQUIPMENT UNIT MAINGROUP A1, SUBGROUPS A2

PROTECTION (PROTECTIVE LOGIC, PRIORITY, NON EQUIPMENT UNIT RELATED)


PROTECTION (EQUIPMENT UNIT PROTECTION)

DENSITY
ELECTRICAL VARIABLES (E.G. CURRENT, VOLTAGE, POWER, ELECTRICAL FREQUENCY)
FLOW, RATE
DISTANCE, LENGTH, POSITION, DIRECTION OF ROTATION
POWER (MECHANICAL, THERMAL)
TIME
LEVEL (ALSO FOR DIVIDING LINE)
MOISTURE, HUMIDITY
PRESSURE
QUALITY VARIABLES (ANALYSIS,MATERIAL PROPERTIES OTHER THAN "FD", "FM", "FV")
VELOCITY,SPEED, FREQUENCY (MECHANICAL), ACCELERATION
TEMPERATURE
COMBINED AND OTHER VARIABLES
VISCOSITY
WEIGHT, MASS
VIBRATION, EXPANSION

ELECTRICAL EQUIPMENT
GA
GB
GC
GD
GE
GF
GG
GH
GK
GM
GP
GQ
GR
GS
GT
GU
GV
GW
GX
GY
GZ

P12QR07003

INDIRECT MEASURING CIRCUITS (GATED, CORRECTED, SUPPRESSED, CALCULATED)


FD
FE
FF
FG
FJ
FK
FL
FM
FP
FQ
FS
FT
FU
FV
FW
FY

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS (FOR DRIVE RELATED BINARY)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS (FOR NON DRIVE RELATED BINARY
TRANSMITTERS)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS(FOR ANALOG SAFETY I&C
TRANSMITTERS SILT)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS (FOR POWER CABLES > 1 KV)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS (FOR POWER CABLES < 1 KV)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS GENERAL PURPOSE < 60V)
PENETRATIONS/CABLE COVERS
ELECTRICAL AND INSTRUMENTATION AND CONTROL INSTALLATION UNITS IDENTIFIED AS
PER PROCESS SYSTEM (E.G. CUBICLES, BOXES WITHOUT INSTALLATION SPACE CODE)
INFORMATION DISPLAY AND OPERATOR CONTROL EQUIPMENT FOR PROCESS COMPUTERS
AND AUTOMATION SYSTEM
JUNCTION BOXES FOR LIGHT CURRENT SYSTEMS OF NATIONAL TELECOMMUNICATIONS
SERVICES
JUNCTION BOXES FOR LIGHTING
SUBDISTRIBUTION FOR POWER SOCKETS
DC GENERATING EQUIPMENT, BATTERIES
SWITCHGEAR EQUIPMENT IF NOT IDENTIFIED UNDER PROCESS EQUIPMENT
TRANSFORMER EQUIPMENT
CONVERTER EQUIPMENT
STRUCTURE RELATED EARTHING AND LIGHTNING PROTECTION EQUIPMENT SURGE ARRESTS
CABINET POWER SUPPLY EQUIPMENT
ACTUATING EQUIPMENT FOR ELECTRICAL VARIABLES
JUNCTION BOXES FOR LIGHT CURRENT SYSTEM (NOT NATIONAL COMMON.)
HANGERS, SUPPORTS AND RACKS FOR ELECTRICAL AND INSTRUMENTATION AND CONTROL
EQUIPMENT)

SUBASSEMBLIES OF MAIN AND HEAVY MACHINERY


HA
HB
HD

MACHINE STATIONARY ASSEMBLY


MACHINE ROTATING ASSEMBLY
BEARING ASSEMBLY

Enelpower
Enel Group

ATTACHMENT 2

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

44

of

FUNCTION KEY EQUIPMENT UNIT MAINGROUP A1, SUBGROUPS A2

50

Enelpower
Enel Group

ATTACHMENT 3

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

45

of

FUNCTION KEY COMPONENTS MAINGROUP B1, SUBGROUPS B2


COMPONENT KEY - MAIN GROUPS B1

MECHANICAL COMPONENTS

MECHANICAL COMPONENTS

INSTRUMENTATION AND CONTROL COMPONENTS (NON ELECTRICAL) ELECTRICAL COMPONENTS

ELECTRICAL COMPONENTS

SIGNAL ORIGINS

SIGNAL APPLICATIONS

COMPONENT KEY CODES B1 B2

MECHANICAL COMPONENTS
KA
KB
KC
KD
KE
KF
KJ
KK
KM
KN
KP
KT
KV
KW

MECHANICAL COMPONENTS
MB
MF
MG
MK
MM
MP
MR
MS
MT
MU

GATE VALVES, GLOBE VALVES, DAMPERS, COCKS, RUPTURE, DISKS, ORIFICES


GATES, DOORS, DAM BOARDS
HEAT EXCHANGERS, COOLERS
VESSELS, TANKS, POOLS, SURGE TANKS (FLUID SYSTEMS)
TURNING, DRIVING, LIFTING AND SLEWING GEAR
CONTINUOUS CONVEYORS, FEEDERS
SIZE REDUCTION MACHINES
COMPACTING, PACKAGING MACHINES
MIXERS, AGITATORS
COMPRESSORS, BLOWERS, FANS
PUMPS
CLEANING MACHINE, DRYERS, SEPARATORS, FILTERS
BURNERS, GRATES
STATIONARY TOOLING AND TREATMENT MACHINES FOR MAINTENANCE

BRAKES
FOUNDATIONS
GEARBOXES
CLUTCHES, COUPLINGS
ENGINES, NOT ELECTRICAL
PIPING SUPPORTS
PIPING COMPONENTS, DUCTWORK COMPONENTS
POSITIONERS, NOT ELECTRICAL
TURBINES
TRANSMISSION GEAR, NON ELECTRICAL, CONVERTER AND BOOSTERS OTHER THAN
COUPLING AND GEARBOXES

INSTRUMENTATION AND CONTROL COMPONENTS (NON ELECTRICAL)

50

Enelpower
Enel Group

ATTACHMENT 3
QA
QB
QN
QP
QR
QS
QT

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

46

of

50

FUNCTION KEY COMPONENTS MAINGROUP B1, SUBGROUPS B2

ENCLOSURES (FOR I&C COMPONENT PROTECTION ONLY)


SENSORS IF NOT STRUCTURALLY INTEGRAL WITH "QP" METERING ORIFICE QH
SIGNALLING DEVICES
CONTROLLERS, FLYBOLT GOVERNOR
MEASURING INSTRUMENTS, TESTING EQUIPMENT
INSTRUMENT PIPING
CONDENSATION CHAMBERS (DATUM RESERVOIR) IN MEASURING CIRCUITS
THERMOWELLS AND POCKETS FOR PROTECTION OF SENSORS

- ELECTRICAL COMPONENTS
-

A
B
C
D
E
F
G
H
K
L
M
N
P
Q
R
S
T
U
V
W
X
Y
Z

ASSEMBLIES AND SUBASSEMBLIES


TRANSDUCERS FOR NON ELECTRICAL VARIABLES AND VICE VERSA
CAPACITORS
BINARY ELEMENTS, DELAY DEVICES, MEMORY DEVICES
SPECIAL COMPONENTS
PROTECTIVE DEVICES
GENERATORS, POWER SUPPLY
SIGNALLING DEVICES
RELAYS, CONTRACTORS
INDUCTORS
MOTORS
AMPLIFIERS, CONTROLLERS
MEASURING INSTRUMENTS TESTING EQUIPMENT
POWER SWITCHGEAR
RESISTORS
SWITCHES, SELECTORS
TRANSFORMERS
MODULATORS, CONVERTORS FROM ELECTRICAL TO OTHER ELECTRICAL - VARIABLES
TUBES, SEMICONDUCTORS
TRANSMISSION PATHS, WAVEGUIDES, AERIALS
TERMINALS, PLUGS, SOCKETS
ELECTRICAL POSITIONERS E.G. SOLENOIDS (NOT MOTORS)
TERMINATION, BALANCING, EQUIPMENT, FILTERS, LIMITS, CABLE TERMINATION, EQUALISERS,
HYBRID TRANSFORMER

SIGNAL ORIGINS
XA
XB
XC
XD
XE
XF
XG
XH
XJ
XK
XL
XM
XN
XP
XQ
XR
XS
XT
XU
XW

FUNCTIONAL GROUP CONTROL/SUBLOOP CONTROL


CONTROL INTERFACE
HARD-WIRE CONTROL
REACTOR PROTECTION, SIGNALS IN BINARY SIGNAL PROCESSING SECTION
REACTOR PROTECTIONS, SIGNALS IN ANALOG AND BINARY SECTIONS
PRIORITY CONTROL
BINARY PROCESS SIGNALS PROCESSED BY BINARY SIGNAL CONDITIONING MODULES
BINARY LIMIT SIGNALS DERIVED FROM ANALOG PROCESS SIGNALS
SIGNALS FROM NON-STANDARD AREAS (E.G. BLACK BOX, DEDICATED CONTROLS)
EQUIPMENT UNIT/COMPONENT PROTECTION
CONTROL ROOM AND CONTROL STATIONS, SIGNALS NOT ASSIGNED TO SPECIFIC CONTROL
SYSTEMS (E.G. CONTROL INTERFACE TILES)
HIGHER LEVEL STATIC INDIVIDUAL AND GROUP ALARM SIGNALS
STATUS-DISPLAY COMPUTER/CRITERION DISPLAY
SUPERVISORY COMPUTER (PROCESS COMPUTER)
ANALOG SIGNALS
PRIORITY CONTROL AND LIMITATION FUNCTION (CONTROLS OTHER THAN "XC" AND "XT", "YC"
AND "YT", 2ZC" AND "ZT")
FUNCTIONAL GROUP STEP SIGNALS
TURBINE GENERATOR I&C, BINARY SIGNALS
HIGHER LEVEL DYNAMIC INDIVIDUAL AND GROUP ALARM SIGNALS
HARDWIRED ALARM ANNUNCIATION SYSTEM

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

47

of

50

ATTACHMENT 3
FUNCTION KEY COMPONENTS MAINGROUP B1, SUBGROUPS B2
SIGNAL APPLICATIONS
YA
YB
YC
YD
YE
YF
YJ
YN
YP
YQ
YR
YT
YV
YW

FUNCTIONAL GROUP CONTROL/SUBLOOP CONTROL


CONTROL INTERFACE
HARD-WIRE CONTROL
REACTOR PROTECTION, SIGNALS IN BINARY SIGNAL PROCESSING SECTION
REACTOR PROTECTION, SIGNALS IN ANALOG AND BINARY SECTIONS
PRIORITY CONTROL
NON-FLOTING SIGNALS FROM UNSPECIFIED PLANT AREAS (E.G. BLACK BOX, DEDICATED
CONTROLS)
STATUS-DISPLAY COMPUTER/CRITERION DISPLAY
SUPERVISORY COMPUTER (PROCESS COMPUTER
ANALOG SIGNALS
PRIORITY CONTROL AND LIMITATION FUNCTION (CONTROLS OTHER THAN "XC" AND "XT", "YC"
AND "YT", "ZC" AND "ZT")
TURBINE I&C, BINARY SIGNALS
SIGNAL INTERLOCKS (PROTECTIVE LOGICS, ALARM LOGICS)
HARDWIRED ALARM ANNUNCIATION SYSTEM

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

48

of

ATTACHMENT 4 Examples for Measuring Devices Identification

EXAMPLES FOR MEASURING DEVICES IDENTIFICATION


a) Counting for multiple measuring circuits with common tapping points
- CF001A

E
- CF001

- CF001B

- CF001C

b) Counting for common and segregated tapping points


- CT001A
- CT001B
- CT002

- CT003

c) Counting for segregated tapping points

- CP001

- CP002

- CP003

d) Counting for calculating functions


- DT001

- DT002

- CT021

- CP011

Temperature control
signal difference

Calculation
Circuit

- DT901

- CU010

50

Enelpower
Enel Group

RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

49

of

ATTACHMENT 4 Examples for Measuring Devices Identification


e) Selector Switch
- CT001
2
3
4
5

- CT901

f) 2 out of 3 with common tapping points

- CF001

analogue

- CF001A

- CF001B

AWG

- CF901

- CF001C

E
g) 2 out of 3 with segregated tapping points

E
E
E

analogue

- CP001
- CP002

AWG

- CP901

- CP003

h) 2 out of 3 with binary measurements

E
E
E

binary

- CP125
- CP126

2/3

- CP127

i) Counting of selenoid valves


AA 501 B
AA 501 A

AA 501

- CP921

50

Enelpower

RAS LAFFAN
POWER AND DESALINATION PROJECT

Enel Group

ATTACHMENT 5

Project Procedure PP03


Equipment and Components
Identification System KKS based

Document

P12QR07003

Rev. 0

on

August 01

Sheet

50

of

Numbering ranges for pipelines, valves and measuring circuits

Pipelines numbering subdivision


Component

Number range

Pipelines

001 999

Valves numbering subdivision


Component

Number range

Motor Operated Valves

001 099

Main Intercepting Valves

101 199

Draining and Venting Valves

201 399

Control Valves

401 459

On-Off Pneumatic Valves

460 499

Safety Valves

501 599

Valves at the branches for simple


extraction and dosing rate

600 699

Valves at branches for measuring circuit

700 799

Measuring Circuits numbering subdivision


Circuits

Number range

Analog Measurement

001 099

Binary Switches

101 199

Testing Equipment (+ acceptance tests)

201 299

Local Measuring Equipments

501 599

Limiting Devices

701 799

Grouped Measuring Circuits (e.g. multi-point


selector switches, multi-channel recorders)

901 999