Академический Документы
Профессиональный Документы
Культура Документы
DWG No.CONSTRUCTION
DESCRIPTION
5-10-2-1
5-10-2-2
ECEGR00
5-10-3-1
ECEPCSC/XC
5-10-4-1
5-10-5-1
ECECP00
5-10-6-1
Counterpoise Earthing
DWG No.
DESCRIPTION
Approved
C NOEL
HARD COPY
UNCONTROLLED
Date
14/02/2013
OVERHEAD SUB-TRANSMISSION
EARTHING
INDEX
Checked
P DE SOUSA ROQUE
Drawn
DRAWING NUMBER:5-10-1-1
T BORG
SUPERSEDES:
VOLUME
FOLDER
10
PAGE
1-1
ISSUE
0A
ROD SPEC
Nil
Standard length
Extended (2 rods)
Deep drilled
folder in subtransmission
construction manual
ELECTRODE TYPE
Not applicable
Copper Clad
SUBSIDIARY CONSTRUCTION
POLE TYPE
C
EARTHING:
Small world object type: Earth
Approved
HARD COPY
UNCONTROLLED
C NOEL
OVERHEAD SUB-TRANSMISSION
Date
EARTHING
15/11/2012
Checked
STANDARD CONFIGURATIONS
P DE SOUSA ROQUE
Drawn
DRAWING NUMBER:5-10-2-1
L BURTON
SUPERSEDES:
VOLUME
FOLDER
10
PAGE
2-1
ISSUE
0A
ELECTRODE TYPE
in subtransmission
C
construction manual
Copper Clad
ROD SPEC
0
Nil
Standard length
Extended (2 rods)
Deep drilled
EARTHING:
Small world object type: Earth
Approved
HARD COPY
UNCONTROLLED
C NOEL
OVERHEAD SUB-TRANSMISSION
Date
EARTHING
15/11/2012
Checked
ADDITIONAL EARTHING
P DE SOUSA ROQUE
Drawn
DRAWING NUMBER:5-10-2-2
L BURTON
SUPERSEDES:
VOLUME
FOLDER
PAGE
ISSUE
10
2-2
0A
MATERIAL
ASSY
1251-1
DESCRIPTION
QTY
200 in rock
Pole
- Earth rod = 1m
- Bare earth cable = 1m
Assy 1251-1
- Concrete pole = 1m
For separation from other communications assets
refer Standards Section.
700
Conc.
Pole
300
1. Burial depths
In Soil - Inner - 300mm
Outer - 600mm
In Rock - Both - 200mm
Caution tape
600
700
Notes:
GRADING RING
ECEGR00
HARD COPY
UNCONTROLLED
C NOEL
OVERHEAD SUB-TRANSMISSION
Date
EARTHING
31/07/2013
GRADING ARRANGEMENT
Checked
CONCRETE POLE
P DE SOUSA ROQUE
Drawn
DRAWING NUMBER:5-10-3-1
L BURTON
SUPERSEDES:
VOLUME
FOLDER
10
PAGE
3-1
ISSUE
0B
1252-2
XC
SC
1252-1
EP
C
EP
C
DESCRIPTION
EC
ASSY
EC
MATERIAL
1
1
Assy 1252-1
Conc.
Pole
Assy 1252-2
- Earth rod = 1m
for additional
earthing
Caution tape
- Concrete pole = 1m
For separation from other communications assets
refer Standards Section.
Notes:
1. To allow for different pole soil movement, all
risers shall contain approximately 300 slack.
2. If ferrule is recessed pack out with flat s/s washers as required to
ensure flat contact surface.
3. Copper conductor to be dry wire-brushed clean, and then liberally coated with
electrical grease before making connection. Bend earth conductors to make
Construction Code
ECEPCSC
4. Refer power co-ordinator guidelines agreement between Ergon Energy & Telstra.
ECEPCXC
Approved
HARD COPY
UNCONTROLLED
C NOEL
OVERHEAD SUB-TRANSMISSION
Date
EARTHING
15/11/2012
Checked
CONCRETE POLE
P DE SOUSA ROQUE
Drawn
DRAWING NUMBER:5-10-4-1
L BURTON
SUPERSEDES:
VOLUME
FOLDER
10
PAGE
4-1
ISSUE
0A
NOTES:
MATERIAL
1. Earthing to run in direction of mains.
ASSY
DESCRIPTION
QTY
1254-7
DESCRIPTION
Earth additional - Deep drilled
QTY
AR
Caution tape
Additional earthing
if required
Assy 1255-1
ECEDDSC
EADD (Additional)
Approved
HARD COPY
UNCONTROLLED
C NOEL
OVERHEAD SUB-TRANSMISSION
Date
EARTHING
15/11/2012
Checked
P DE SOUSA ROQUE
Drawn
DRAWING NUMBER:5-10-5-1
L BURTON
SUPERSEDES:
VOLUME
FOLDER
10
PAGE
5-1
ISSUE
0A
MATERIAL
ASSY
DESCRIPTION
QTY
1253-1
5000
5000
LINE DIRECTION
10000
5000
Pole
5000
10000
Assy 1253-1
in rock - 200
Counterpoise 750 in soil suitable for cultivation
- 300 in soil unsuitable for cultivation
- 200 in rock
All trenches to be backfilled with original material
Caution tape
Conc.
Pole
2. To allow for different pole soil movement, all risers shall contain
approximately 300 slack.
3. Copper conductor to be dry wire-brushed clean, and then liberally
coated with electrical grease before making connection.
Bend earth conductors to make connection. (do not cut)
4. For agricultural areas earthing cable to be run down pole & through 50mm conduit in backfill.
Construction Code
5. If ferrule is recessed pack out with flat s/s washers as required to ensure flat contact surface.
6. Refer power co-ordinator guidelines agreement between Ergon Energy & Telstra
ECECP00
Approved
HARD COPY
UNCONTROLLED
C NOEL
OVERHEAD SUB-TRANSMISSION
Date
EARTHING
15/11/2012
COUNTERPOISE EARTHING
Checked
CONCRETE POLE
P DE SOUSA ROQUE
Drawn
DRAWING NUMBER:5-10-6-1
L BURTON
SUPERSEDES:
VOLUME
FOLDER
10
PAGE
6-1
ISSUE
0A