Вы находитесь на странице: 1из 4

Table of Contents

1.0 INTRODUCTION....................................................................................................... 1
2.0 TRAINING OVERVIEW.............................................................................................. 2
2.1 COMPANY BACKGROUND.....................................................................................2
2.1.1 ORGANIZATION STRUCTURE OF PBJV GROUP................................................3
2.2 DAILY ACTIVITY..................................................................................................... 4
PROJECT STUDY.................................................................................................... 5
HOOK-UP AND COMMISSIONING (HUC) SERVICES...................................................6
CAMPAIGN MANAGEMENT......................................................................................7
DAILY PROGRESS REPORT.....................................................................................8
SITE VISIT.............................................................................................................. 9
WEEKLY PROGRESS REPORT...............................................................................10
FIELD INSPECTION............................................................................................... 11
SITE SURVEYING REPORT....................................................................................12
2.3 PROJECT........................................................................................................... 13
2.3.1 HUC FOR BERTAM FIELD DEVELOPMENT PROJECT.......................................13
2.3.2 REVIEW FOR PROCESS LINE ON BERTAM WELLHEAD PLATFORM.................13
2.3.3 JOB HAZARD ANALYSIS................................................................................13
2.3.4 MATERIAL TAKE-OFF (MTO)...........................................................................13
2.3.5 1ST MOP PREPERATION FOR LUNDIN PROJECT..............................................13
3.0 CONCLUSION........................................................................................................ 13
WORK PACKAGE.................................................................................................. 14

2.0 DESCRIPTION OF INTERNSHIP


2.1 COMPANY BACKGROUND
Baxtech Resources Sdn Bhd has entered into an agreement with PBJV
GROUP Sdn Bhd to participate in a joint venture company. Barakah Offshore
Petroleum Berhad (Barakah) was incorporated in Malaysia in March 2012 as an
investment holding company for PBJV Group Sdn Bhd (PBJV). The business of
PBJV started in August 2000 in offshore pipeline services and still remains an
integral part of its core business activities. PBJV recently being recognised as the
best service provider for pipeline services by Petronas in 2012 for its excellent
services. Being focused and committed in this ever-challenging industry and
consistently striving to be the best, are the key success factors of the company.

From pipeline service provider, PBJV expanded its business activities into
offshore transportation and installation works, hook-up and commissioning, onshore
construction, underwater services and chartering of marine vessels and equipment.
In 2009, as part of its expansion strategy to strengthen its in-house support services,
PBJV

commissioned

the

construction

of

its

137

meter

length

pipe-lay

accommodation barge, known as KOTA LAKSAMANA 101. With this barge


ownership, PBJV is able to undertake bigger and more challenging offshore pipeline
activities. The group is poised to be a one-stop centre as an integrated pipeline
service provider and a key player in the oil and gas industry.
With its depth of experience and strength, PBJV is positively gaining
momentum towards its vision TO BE THE PREMIER INTEGRATED SOLUTIONS IN
THE OIL AND GAS INDUSTRY. The group is capable to undertake more technically
challenging works and has set its sight to expand its business activities in the region
as well as the middle east. In 2009, as part of its expansion strategy to strengthen its
in-house support services, PBJV commissioned the construction of its 137 meter
length pipe-lay accommodation barge, known as KOTA LAKSAMANA 101. With this
barge ownership, PBJV is able to undertake bigger and more challenging offshore
pipeline activities. The group is poised to be a one-stop centre as an integrated
pipeline service provider and a key player in the oil and gas industry.

PAGE 1

2.1.1 ORGANIZATION STRUCTURE OF PBJV GROUP

PAGE 2

3.0 CONCLUSION

PAGE 3

Вам также может понравиться