Section 7: Estimating
FABRICATION
Fabricator
Cost $
Mark Up % $
TOTAL METAL COST $
Freight $ MU
= $
EXTERIOR COATING
Blast hrs. @ $ hr. $
Labor to Apply hrs. @ $ hr.
$
S & A % $
SUBTOTAL $
MATERIAL gal. @ $ $
Solvent supplies
Insol III
gal. @ $ / gal. =
M E K gal. @ $ / gal. =
Toluene
gal. @ $ / gal. =
SUBTOTAL
$
Application Supplies
Grinding Stones @ =
Grinding Discs
@ =
4 Brushes @ =
2 Brushes @ =
Roller Frames
@ =
Roller Covers
@ =
SUBTOTAL $
Miscellaneous Supplies
5-Gallon Cans
@ =
1-Gallon Cans
@ =
1-Quart Cans
@ =
Work Gloves @ =
Rags/Bundles
@ =
Sand @ =
SUBTOTAL
$
Exterior Coatings
Primer Coat gal. @ $ / gal. =
Intermediate Coat gal. @ $ / gal. =
Top Coat gal. @ $ / gal. =
SUBTOTAL
$
TOTAL (FRONT)
$
PROFIT % $
TOTAL
$
Blair Rubber Company Section 7: estimating FIELD Tank Lining Estimate Sheet
BLAIR ENG 124 V6 Rev. 0