DESIGN CALCULATIONS
150 M3/D STP EXTENDED AERATION
A
NO.
For Information
Rev
Date
Checked by-
Approved. By -
TITLE
PROCESS CALCULATION
PROJECT
PACKAGE
CLIENT
xxxxx- STP
STP
NOMENCLATURE
SYMBOL
V
Qp
Qa
PF
F/M
So
S
No
N
MLSS
X
Xr
DOC. NO.
REV.
SHEET NO
Page 2 of 8
DESCRIPTION
Volume, m3
Peak Flow, m3/hr
Average flow, m3/hr
Peak Factor
Food to microorganisms ratio, 1
Influent soluble BOD5 concentration, mg/l
Effluent BOD5 concentration, mg/l
Influent ammonia nitrogen, mg/l
Effluent ammonia nitrogen, mg/l
Mixed Liquor Suspended Solids
Concentration of the MLSS in aeration tank, mg/l
Concentration of sludge in the return sludge line,
OFR
Tr
QWR
SFR
A
D
QF
BFR
SYMBOL
AFR
O2
f
Px
Yobs
SOR
mg/l
Hydraulic retention time, h
Mean cell retention time, d
Overflow rate, m3/m2/day
Retention time, hr
Waste sludge flow rate from the sludge line, m3/d
Service Flow Rate, m3/m2/hr
Area of Sand Filter, m2
Diameter, m
Flow rate of Filter Feed Pump, m3/hr
Backwash Flow rate, m3/m2/hr
DESCRIPTION
Air flow rate to fluidize the media, m3/m2/hr
Theoretical oxygen, kg/d
Conversion factor for converting BOD5 to BODL
Net waste activated sludge product each day, kg/d
Observed yield, g/g
Standard Oxygen Requirement
Oxygen transfer correction factor for wastewater
Salinity surface tension factor
Minimal dissolved oxygen maintained in the
CSW
CSW
T
Fa
N
temperature, mg/l
Solubility of oxygen in tap water at 20oC, mg/l
Temperature oC
Oxygen solubility correction factor for elevation
Theoretical air requirement under filed condition,
kg/d
E
Qr
Ap
Q
n
P2
P1
XCL
TITLE
PROCESS CALCULATION
PROJECT
PACKAGE
CLIENT
xxxxx- STP
STP
DOC. NO.
REV.
SHEET NO
Page 3 of 8
2.
TITLE
PROCESS CALCULATION
PROJECT
PACKAGE
CLIENT
xxxxx- STP
STP
DOC. NO.
REV.
SHEET NO
Page 4 of 8
DESIGN DATA
Process
Extended aeration
No of Streams
12.5
150
250
Design Flow, Q
m3/day
BOD, mg/l
Ammonia Nitrogen
20
150
10
10
BOD
, mg/l
TITLE
PROCESS CALCULATION
PROJECT
PACKAGE
CLIENT
xxxxx- STP
STP
3.
DESIGN CALCULATIONS
3.1
Bar Screen
Capacity
No of duty Screens
3.2
DOC. NO.
REV.
SHEET NO
Page 5 of 8
12.5 m3/hr.
:
Biological System
3.2.1 Aeration Tank
Aeration Tank , no
:
Flow
Considering
MLSS,X
Volume of Aeration Tank
( 3500 x 0.08)
1 nos.,
:
:
:
:
129 m3
:
5.7m x5.7m x 4m
:
:
:
:
:
:
V / QAvg
130 / 150
20.7hrs
:
:
:
:
:
:
1
150 m3/day
12.5 m3/hr
10 m3/m2/d
15 m2
4m X 4m x 4m
Size of each
(water depth)
Total Height
Effective volume
Hydraulic Retention Time
150 m3/d
3500 mg/l
(250-10)x150 /
:
:
mg/l
TITLE
PROCESS CALCULATION
PROJECT
PACKAGE
CLIENT
xxxxx- STP
STP
At Qpeak
DOC. NO.
REV.
SHEET NO
Page 6 of 8
Qr / Q = X / (Xr - X)
:
:
3500/(7500-3500)
1
mg/l
6.25 m3/hr
0.6kg/kg BODr
Kg of BODr/d
:
:
150 x (250-10)/1000
36 kg/d
:
0.6 x 36
21.6 kg/d
:
:
:
:
Volume of sludge for tankering
V x X/(Sludge
21 days okay
:
Kg solids
(Sp.gr x Density x
consistency)
TITLE
PROCESS CALCULATION
PROJECT
PACKAGE
CLIENT
xxxxx- STP
STP
DOC. NO.
REV.
SHEET NO
Page 7 of 8
2.72 m3/d
%)
3.5.4
Air Requirement for Aeration Tank
Theoretical oxygen are calculated from :
O2 kg/d
:
BODr --1.42xPx+ 4.6 xKg
of N
0.68
Yobs
:
Y/(1+Kd*SRT)
:
0.6/(1+0.05*21)= 0.3
Sludge Produced /d
S)/1000
,Px
Yobs x Qa x(So
:
0.3 * 150(250 10) =
10.8 kg/d
1000
Kg of N Nitrifie
4.35
O2 kg/d
+4.6x4.35
(36/0.68)-1.42x 10.8
57.6 kg/d
SOR, Kg/d
:
:
:
:
:
:
:
30 oC
2 mg/l
6.5 mg/l
9.17 mg/l
1
0.75
0.95
TITLE
PROCESS CALCULATION
PROJECT
PACKAGE
CLIENT
xxxxx- STP
STP
DOC. NO.
REV.
SHEET NO
Page 8 of 8
3.3 FILTRATION
@ average flow ,consider filtration rate
Qa
12 m3/m2/hr
6.25 m3/hr
Qf
________________
Filtration rate
=
6.25
=
______
12
0.52083 m2