Вы находитесь на странице: 1из 2

PACKAGE V6 - CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED WORKS AT TAMAN SUNTEX, CUEPACS AND BANDAR

TUN HUSSIEN ONN STATION

S6 WEEKLY TECHNICAL MEETING NO 30 : 23/12/2014 to 13/1/2015 (updated)


No.

Reference

Doc. Ref No. (*)

Brief Description

Date Received
DC
SC

Date Sent to
DDC/D&T

Status

Remark

ARCH
1

002217

002243

002218

002259

002260

002254

(*)BTHS-TQR-ARCHDiscrepancies in Drawing SCR & Security Control Room


000392
(*)STN-TQR-FDPS- Sleeve Opening Clashes with RC Kerb as per Revised Arch
000395
W01 at the Hose Reel.
(*)STN-TQR-MECHDesign Basis for Siphonic Roof Drainage System
000393
(*)TASS-TQR-ARCH Discrepancies of Ceiling Height Between Layout Plan &
Section (IFC) for Signalling and Telecom Room at Suntex
-000400
Station.
(*)TASS-TQR-ARCH No Space for Slab Opening in ELV and ELEC Riser at TASS
-000401
Platform
(*)STN-TQR-ARCH- STN027, STN028 Discrepancies Between Door Schedule and
000399
Layout Plan (IFC)

15-Dec-14

17-Dec-14

Closed

SRF 049725 dated 24.12.2014

22-Dec-14

23-Dec-14

24-Dec-14

Open

Under review by D&T/DDC.

22-Dec-14

23-Dec-14

23-Dec-14

Closed

400mm/hr and follow MASMA.

30-Dec-14

30-Dec-14

6-Jan-15

Open

30-Dec-14

30-Dec-14

6-Jan-15

6-Jan-15

Under review by D&T/DDC.

Open
9-Jan-15

Open

Under review by D&T/DDC.

C&S
1

002101

(*)BTHS-CAL-CIVS- Design Calculation for Connection of Truss Member at BTHO


000165
Station

17-Nov-14

17-Nov-14

002100

(*)TASS-TQR-CIVS- Discrepancy Between Beam Layout Plan and Beam Details at


000372
Platform Level

20-Nov-14

24-Nov-14

002155

(*)STN-CAL-CIVSRequest Design Calculation for Hanger and Lifting Beam Details 3-Dec-14
000171

002176

(*)STN-TQR-CIVS- Escalator Beam Width to Suit Intermediate Escalator Support


000386
Bearing Plate

Open

Under review by D&T/DDC.

16-Dec-14

Open

Under review by D&T/DDC.

4-Dec-14

10-Dec-14

Open

Under review by D&T/DDC.

10-Dec-14

12-Dec-14

10-Dec-14

Open

Under review by D&T/DDC.

M&E
1

002174

(*)STN-TQR-ECS- Relocation of Refrigerant Pipe Length Exceeded Suppliers


000385
Recommendation Length

10-Dec-14

12-Dec-14

Open

002175

(*)STN-TQR-ELECRedundancy of ATS Installation


000387

12-Dec-14

12-Dec-14

Open

under review by SC/DDC.

Shop drawing has been issued by WPC.

002158

001702

(*)BTHS-TQR-ELECEarth Equipotential Bonding


000383
(*)STN-TQR-ECS - Comparison on Electrical Requirement Between IFC and Shop
000332
Drawing for ECS

2-Dec-14

2-Dec-14

Open

30-Dec-14

30-Dec-14

Open

INTERFACING
1

002123

(*)STN-TQR-ELECDetail Drawing of EACS for Roller Shutter at All Stations


000374

21-Nov-14

24-Nov-14

28-Nov-14

Open

Under review by D&T/DDC.

002144

(*)STN-TQR-ELEC- Size and Mounting Detail of Main Cable Containtment at


000380
Platform Level

26-Nov-14

26-Nov-14

1-Dec-14

Open

Waiting final layout by Comm.

002246

(*)STN-TQR-SYSI- Discrepancies on the Opening Size / Junction Box for Gate and
23-Dec-14
000398
AVM/TVM

24-Dec-14

Open

002244

(*)STN-TQR-SYSI Request Coordinated Equipment Layout of SCR for BTHS


000396

23-Dec-14

24-Dec-14

Open

002245

(*)STN-TQR-SYSI Request Coordinated Equipment Layout of SCO for BTHS


000397

23-Dec-14

24-Dec-14

Open

002267

(*)BTHS-TQR-SYSI - Request Detail Opening for Raised Floor at Station Control


000403
Room (SCR) BTHS

5-Jan-15

5-Jan-15

Open

002268

(*)TASS-TQR-SYSI- Request Coordinated Equipment Layout of Station Control


000404
Room (SCR)

6-Jan-15

6-Jan-15

Open

Вам также может понравиться