First check the hardwave

z
z
z
z

Hardware check
Indoor Equipment Installation
Microwave Antenna & IF Cable/Feeder
Power and Grounding Cables
Clearning of the Equipment Room

January 13, 2007

NEC Corporation 2007

Indoor Equipment Installation -1


1The rack should be placed
according to the project
design drawings, and should
be soundly and firmly
connected to ground.
2The horizontal error of the
rack should be less than 5 mm.
mm
3For the integrated equipment,
when the rack are lined up
together their vertical
together,
deviation should be less than
3mm. And edge of front base
of each rack should be in the
same line or based upon
customer requirement.
January 13, 2007

NEC Corporation 2007

Indoor Equipment Installation -2

4The indoor unit


should be soundly
and
d firmly
f
l
connected to the
rack.
5The grounding
cable of indoor unit
should be soundly
fastened to
grounding
di
b
bar
nearby.

January 13, 2007

NEC Corporation 2007

Indoor Equipment Installation -2


6The I/O board of 120 to 75 should be soundly
and firmly connected to the rack.(If required)
7The connector of the trunk cable should be
connected soundly and firmly, it should be ensured
that the plug is reliably crimped and appears intact.

January 13, 2007

NEC Corporation 2007

Indoor Equipment Installation -3


8The power cable, grounding cable,
trunk cable and IF cable should be
kept from any external damage.
damage No
connector is allowed in the mid of
cables.
9The connector of the IF cable should
be installed properly to avoid any
false connection,, which may
y lead to
the abnormal standing wave ratio
and affect the normal running of the
system.
system
10The IF cable in the horizontal
direction should be fixed to the
cabling
bli
ttrough.
h
January 13, 2007

NEC Corporation 2007

Indoor Equipment Installation -4


11Try not to cross the rigid
cables and keep from straining
them too much in the
connection Make sure that
connection.
enough length is reserved for
rigid cables around the corner,
p the consistent
and keep
bending
12Proper length should be
reserved for the cable
connectors
t
att the
th connecting
ti
positions.

January 13, 2007

NEC Corporation 2007

Indoor Equipment Installation -5


13The cables should be bound
tidily and neatly, and the cable
es should
s ou d be evenly
e e y arranged
a a ged
ties
with proper tightness and be
directed in the same way. All
the root of the ties should be
totally cut off without leaving
any sharp ends.
14The cabling
g should facilitate
future maintenance and
expansion.

January 13, 2007

NEC Corporation 2007

Indoor Equipment Installation -6


15Clear labels should
be attached on both
sides of the cables.
cables
The labels should be
filled in according to
th relevant
the
l
t
specifications.
16Any
y inspection
p
items
required but not
included above shall
meet the relevant
requirements of NEC.

January 13, 2007

NEC Corporation 2007

10

MW Antenna & IF Cable/Feeder-1


1The antenna
support should be
placed as designed,
p
g
,
and should be
reliably and firmly
connected to the
iron tower.
2The antenna
should be placed
as designed, and
should be reliably
and firmly
connected to the
antenna support.
January 13, 2007

NEC Corporation 2007

11

MW Antenna & IF Cable/Feeder-2


3The outdoor unit
should be reliably and
fi l connected
firmly
t d to
t the
th
antenna.
4The antenna assembly
(Polarization) should be
fit to the designed.
5The antenna should be
located within the
protection area of the
lightning arrester.
January 13, 2007

NEC Corporation 2007

12

MW Antenna & IF Cable/Feeder-3


6The grounding cable of
outdoor unit should be
soundly fastened to
grounding
di
bar
b nearby.
b
7The IF cables/Feeder
should be lined up tidily
and neatly,
neatly and should be
no obvious breakage or
distortion, and any
p
copper
pp is not
exposed
allowed.
8The bending radius of
the IF cable should be
equal to or greater than
55mm.

January 13, 2007

NEC Corporation 2007

13

MW Antenna & IF Cable/Feeder-4


9The IF cable/Feeder
should be tied/clamped on
e vertical
e ca cable
cab e ladder
adde
the
rung with 1m to 1.5m
interval
10After the IF cable are
installed, the fixing ties
with proper tightness and
be directed in the same
way. All the root of the ties
should be totally cut off
g any
y sharp
p
without leaving
ends.

January 13, 2007

NEC Corporation 2007

14

MW Antenna & IF Cable/Feeder-5


11The water-proof
sealing treatment
should be conducted
for the connectors of
all the outdoor unit.
12When
12Wh
the
th feeder
f d
window is mounted on
the building
g top
p to
lead the feeder cables
indoors, the airtightness of the feeder
window should be
guaranteed.
January 13, 2007

NEC Corporation 2007

15

MW Antenna & IF Cable/Feeder-6


13Cable connectors should be
prepared
p
p
according
g to relevant
specifications without any loose
connection.
14Any inspection items required
but not included above should
meet the relevant requirements of
NEC.

January 13, 2007

NEC Corporation 2007

16

Power and Grounding Cables-1


1The PGND protection
grounding cables should be
yellow/green or black, the
GND grounding
di
cables
bl should
h ld
be red and the -24 /48V
power cables should be blue
or black. (based upon
customer requirement)
2The power cables and
grounding
g
g cables should be
made from an intact section
of copper core wires without
any cut. They should be
reliably connected as per
relevant standards

January 13, 2007

NEC Corporation 2007

17

Power and Grounding Cables-2

January 13, 2007

NEC Corporation 2007

18

Power and Grounding Cables-3


3The diameter of all the power
cables and grounding cables
should comply with the design
requirements.
4The power cables and
grounding
di
cables
bl outside
t id th
the
indoor unit should not be bound
together
g
with other cables,, and
at least 5cm away from them.
5The excessive part of the
power and grounding cables
should be cut off. Coiling is not
allowed.
January 13, 2007

NEC Corporation 2007

19

Power and Grounding Cables-3


6The lugs on both sides of the
power cable or grounding cable
should be soundly welded or
crimped.
i
d No naked
k d core or the
h
end of the lug should be
exposed.
7The
7Th positive
iti
pole
l off th
the
primary power supply should be
connected to the ground
according to relevant
specifications.
8For the power supply and
grounding cables,
cables the grounding
terminals should be mounted
firmly and in good contact.
January 13, 2007

NEC Corporation 2007

20

Power and Grounding Cables-4


9The labels should be attached
to both sides of a power cable
and a grounding cable.
10The antistatic operation
procedures should be followed
p
g and
in the board unpacking
plugging/unplugging.
11The installation tools should
meet
eet the
t e antistatic
a t stat c
requirements.
12Any inspection items
required but not included
above should meet relevant
requirements of NEC.
January 13, 2007

NEC Corporation 2007

21

Cleaning of the Equipment Room


1The packages and boards of
NEC equipment should not be
left disorderly in the equipment
room.
2No residue of the cut-off cable
ties or any other unnecessary
articles should be left on the
floor.
floor
3Nothing unnecessary such as
the residue of the cutoff cable
ties or bolts should not be left
in the cabinet.
January 13, 2007

NEC Corporation 2007

22

Software checking
Parameter
Setting
andd
Monitoring
by LCT

Setting

Monitoring

BER Test
January 13, 2007

BiAIS RCV rate

By LCT

AIS RCVD / AIS SEND

Byy LCT
C

TX / RX frequency

Follow the link budget

TX power attenuation

Follow the link budget

E1 alarm
l
IInhibit
hibit

C
Closed
the no use E1 alarm

BER alarm point

Ber shreshold 1E-4

Alarm table

By LCT, No alarm

Monitoring TX power

Follow the link budget

Monitoring RX level

Compliant design By LCT

Alarm status

B LCT No
By
N alarm
l

Inventory

By LCT

BER test

6-hours check by LCT or PNMT

NEC Corporation 2007