Project
Works
Owner
Location
No.
I.
SPESIFICATION
UNIT
QTY
UNIT PRICE
( Rp. )
PREPARATORY WORK
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
II
2.2
2.2.1
2.2.2
2.2.3
2.3
2.3.1
2.3.1.1
2.3.1.2
2.3.1.3
2.3.1.4
2.3.1.5
2.3.1.6
PILING WORKS
Concrete spun pile 300mm, L= 10 m' ( P1 )
Driving Pile
Cuting Pile
FOUNDATION & COLUMN WORK
Pile Cap
Excavation, Backfill, diaposal & compaction base soil
Sand gravel, t - 10cm
Lean concrete, t - 5cm
Formwork for pile cap
Steel bars for pile cap
Concrete work for pile cap ( 70*70*80cm )
REMARKS
199,230,000
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5,250,000
40,500,000
12,000,000
26,000,000
15,000,000
24,480,000
22,000,000
12,000,000
38,000,000
4,000,000
CONSTRUCTION WORKS
AMOUNT
( Rp. )
5,250,000
40,500,000
12,000,000
26,000,000
15,000,000
24,480,000
22,000,000
12,000,000
38,000,000
4,000,000
###
4,318,893,059
outside area
m2
m3
1,560.00
234.00
3,500
30,000
12,480,000
5,460,000
7,020,000
Incl disposal
m'
m'
nos
550.00
550.00
55.00
195,000
75,000
60,000
151,800,000
107,250,000
41,250,000
3,300,000
60,000
20,000
35,250
75,000
13,000
770,250
412,139,757
95,477,578
18,120,600
891,000
1,570,388
9,240,000
49,049,000
16,606,590
used brick/bataco
D-16, D-13
K 250 kg/cm2
m3
m2
m2
m2
kg
m3
302.01
44.55
44.55
123.20
3,773.00
21.56
###
###
###
BILL OF QUANTITY
Project
Works
Owner
Location
No.
SPESIFICATION
UNIT
QTY
UNIT PRICE
( Rp. )
AMOUNT
( Rp. )
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
AMOUNT
( Rp. )
UNIT
516.56
19.58
9.79
435.00
90.60
10,704.75
61.17
60,000
20,000
35,250
75,000
105,000
13,000
770,250
260,146,241
30,993,600
391,600
345,098
32,625,000
9,513,000
139,161,750
47,116,193
110.00
2,475.00
13.75
125,000
13,000
770,250
56,515,938
13,750,000
32,175,000
10,590,938
2.3.2
2.3.2.1
2.3.2.2
2.3.2.3
2.3.2.4
2.3.2.5
2.3.2.6
2.3.2.7
Tie Beam
Excavation, Backfill, diaposal & compaction base soil
Sand gravel, t - 10cm
Lean concrete, t - 5cm
Formwork for tie beam
Formwork for tie beam
Steel bars for tie beam
Concrete work for tie beam ( 25cm*50cm )
used brick/bataco
used plywood 12mm & wooden frame
D-16, D-8
K 250 kg/cm2
m3
m2
m2
m2
m2
kg
m3
2.3.3
2.3.3.1
2.3.3.2
2.3.3.3
m2
kg
m3
2.4
2.4.1
2.4.1.1
2.4.1.2
2.4.1.3
2.4.1.4
2.4.1.5
2.4.1.6
2.4.1.7
2.4.1.8
2.4.2
2.4.2.1
2.4.2.2
2.4.2.3
2.4.2.4
2.4.2.5
type KF 1000
used plywood 12mm & wooden frame
M8 @ 150, D-8
K 250 kg/cm2
QTY
UNIT PRICE
( Rp. )
SPESIFICATION
m3
m3
m3
m2
m'
m2
m3
m2
932.40
532.80
133.20
1,296.00
342.00
1,296.00
199.80
1,332.00
60,000
180,000
200,000
3,500
17,500
65,000
785,250
7,500
820,890,621
440,131,950
55,944,000
95,904,000
26,640,000
4,536,000
5,985,000
84,240,000
156,892,950
9,990,000
m2
m'
m2
m3
m2
998.20
342.00
998.20
149.73
998.20
125,000
15,000
65,000
785,250
15,000
327,336,483
124,775,000
5,130,000
64,883,000
117,575,483
14,973,000
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
DESCRIPTION
2.4.3
2.4.3.1
2.4.3.2
2.4.3.3
Stair Work
Formwork
Steel bars
Concrete work
2.5
2.5.1
2.5.2
2.5.3
2.5.7
2.5.8
2.5.9
2.5.10
2.5.11
2.6
2.6.1
2.6.1.1
2.6.1.2
2.6.1.3
ROOFING WORK
Roof of Finishes
Roof metal w/ colour
Insulation
Nok/ridge
AMOUNT
( Rp. )
UNIT
m2
m'
m3
55.00
2,750.00
13.75
125,000
13,000
785,250
53,422,188
6,875,000
35,750,000
10,797,188
M-22
nos
kg
kg
kg
kg
kg
lot
kg
204.00
588.51
60,451.60
25,574.38
1,209.03
925.00
1.00
88,748.52
85,000
16,250
16,250
16,250
16,250
16,250
14,421,600
1,500
1,607,047,831
17,340,000
9,563,288
982,338,500
415,583,675
19,646,738
15,031,250
14,421,600
133,122,780
QTY
UNIT PRICE
( Rp. )
SPESIFICATION
m2
m2
m'
2,045.95
2,045.95
75.00
105,000
85,000
73,500
432,073,000
394,243,000
214,824,750
173,905,750
5,512,500
2.6.2 Gutter
2.6.2.1 Gutter metal
2.6.2.2 Down spout PVC dia 4", incl accessories
m'
m'
185.00
72.00
150,000
140,000
37,830,000
27,750,000
10,080,000
m2
m2
1,060.80
2,121.60
175,000
37,500
132,600,000
185,640,000
79,560,000
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
2.8
2.8.1
2.8.1.1
2.8.1.2
2.8.1.3
2.8.1.4
2.8.2
2.8.2.1
2.8.2.2
2.8.2.3
2.8.2.4
2.8.2.5
Windows
Aluminium window type AW1, size 800*2100
Aluminium window type AW2, size 1600*1200
Aluminium window type AW3, size 2400*1200
Aluminium window type AW4, size 3200*1200
Alum window (Bouvenlight), size 500*1200
2.9
2.9.1
2.9.2
2.9.3
2.9.4
2.10
2.10.1
2.10.2
2.10.3
WALL FINISHES
Painting wall exterior
Painting wall Interior
Ceramic tile 200 x 250, H=2m for wall of toilet
2.11
2.11.1
2.11.2
2.11.3
CEILING FINISHES
Gypsum, t = 9mm + hollow frame + hanger
Cornice, w = 10cm x 10cm
Painting work
SPESIFICATION
UNIT
QTY
UNIT PRICE
( Rp. )
AMOUNT
( Rp. )
nos
nos
nos
nos
13.00
2.00
1.00
1.00
2,772,000
5,544,000
4,158,000
5,880,000
99,042,000
57,162,000
36,036,000
11,088,000
4,158,000
5,880,000
nos
nos
nos
nos
nos
4.00
1.00
6.00
1.00
4.00
2,520,000
2,400,000
3,600,000
4,800,000
750,000
41,880,000
10,080,000
2,400,000
21,600,000
4,800,000
3,000,000
m2
m'
m2
m2
1,332.00
500.00
499.10
499.10
140,000
32,500
125,000
87,500
308,788,750
186,480,000
16,250,000
62,387,500
43,671,250
m2
m2
m2
536.00
1,585.60
108.00
35,000
31,000
150,000
84,113,600
18,760,000
49,153,600
16,200,000
m2
m'
m2
240.00
210.00
240.00
127,500
27,500
31,000
43,815,000
30,600,000
5,775,000
7,440,000
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
2.12
2.12.1
2.12.2
2.12.3
2.12.4
2.12.5
2.12.6
2.12.7
2.12.8
2.12.9
SPESIFICATION
UNIT
m2
m'
m'
m'
m2
m'
m'
m2
nos
QTY
13.00
37.00
12.00
7.00
160.00
164.00
12.00
89.60
8.00
UNIT PRICE
( Rp. )
175,000
187,500
900,000
500,000
225,000
185,000
187,500
1,250,000
1,250,000
AMOUNT
( Rp. )
214,102,500
2,275,000
6,937,500
10,800,000
3,500,000
36,000,000
30,340,000
2,250,000
112,000,000
10,000,000
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
DESCRIPTION
I.
SPESIFICATION
UNIT
QTY
UNIT PRICE
( Rp. )
PREPARATORY WORK
1.1
1.2
1.3
1.4
1.5
1.6
1.7
II.
AMOUNT
( Rp. )
50,000,000
ls
ls
ls
ls
ls
ls
ls
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3,000,000
5,000,000
10,000,000
10,000,000
10,000,000
10,000,000
2,000,000
3,000,000
5,000,000
10,000,000
10,000,000
10,000,000
10,000,000
2,000,000
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
Bouwplank
Excavation
Lean concrete, t - 50mm
Concrete foundation pile cap , 400*400*800mm
Backfill
Disposal exist soil
15,161,600
m'
m3
m2
m3
m3
m3
32.00
12.00
7.20
2.56
9.44
2.56
22,000
60,000
56,700
5,000,000
45,500
39,000
704,000
720,000
408,240
12,800,000
429,520
99,840
84,175,500
m3
m3
m3
255.00
204.00
51.00
60,000
243,000
378,500
15,300,000
49,572,000
19,303,500
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
DESCRIPTION
SPESIFICATION
UNIT
QTY
UNIT PRICE
( Rp. )
52,931,540
size 30*30
m2
m2
206.20
206.20
56,700
200,000
AMOUNT
( Rp. )
11,691,540
41,240,000
105,000,000
lot
1.00
105,000,000
105,000,000
lot
1.00
43,140,000
43,140,000
lot
1.00
57,610,000
57,610,000
III.
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
Bouwplank
Excavation
Lean concrete, t - 50mm
Concrete foundation pile cap , 400*400*800mm
Backfill
Disposal exist soil
10,613,120
m'
m3
m2
m3
m3
m3
22.40
8.40
5.04
1.79
6.61
1.79
22,000
60,000
56,700
5,000,000
45,500
39,000
492,800
504,000
285,768
8,960,000
300,664
69,888
60,325,775
m3
m3
m3
182.75
146.20
36.55
60,000
243,000
378,500
10,965,000
35,526,600
13,834,175
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
DESCRIPTION
SPESIFICATION
UNIT
QTY
UNIT PRICE
( Rp. )
9,366,840
m2
165.20
56,700
m2
m2
279.96
68.64
278,250
55,000
77,898,870
3,775,200
11,019,000
nos
nos
nos
1.00
1.00
1.00
5,544,000
3,075,000
2,400,000
9,366,840
81,674,070
AMOUNT
( Rp. )
5,544,000
3,075,000
2,400,000
70,434,000
m2
270.90
260,000
70,434,000
lot
1.00
46,620,000
46,620,000
lot
1.00
63,260,000
63,260,000
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
AMOUNT
( Rp. )
UNIT
by excavator
m3
m3
m2
80.00
80.00
80.00
60,000
39,000
5,000
8,320,000
4,800,000
3,120,000
400,000
m3
m3
32.00
8.00
243,000
378,500
10,804,000
7,776,000
3,028,000
4.3
4.3.1
4.3.2
4.3.3
m2
m2
m3
33.76
33.76
1.54
35,400
56,700
5,000,000
10,789,296
1,195,104
1,914,192
7,680,000
m2
m'
80.00
54.00
306,800
39,000
26,650,000
24,544,000
2,106,000
m3
nos
0.36
16.00
6,000,000
125,000
4,160,000
2,160,000
2,000,000
PL 20mm, WF 250
kg
kg
kg
lot
kg
1,752.06
163.80
191.59
1.00
2,107.45
21,000
21,000
21,000
885,127
3,500
52,517,554
36,793,260
3,439,800
4,023,306
885,127
7,376,061
4.1
4.1.1
4.1.2
4.1.3
FOUNDATION WORK
Gravel bedding, t - 10cm
Lean concrete, t - 5cm
Pile cap, size 80cm*80cm*60cm
QTY
UNIT PRICE
( Rp. )
SPESIFICATION
IV.
DESCRIPTION
STEEL STRUCTURE
Base plate, Column, beam
Steel structure for Gording
Steel plate for joint & others
Bolt & Nut
Painting for steel structure
outside area
compaction base soil by vibro roller
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
UNIT
m2
nos
m2
m'
80.00
240.00
18.00
36.00
260,000
1,500
260,000
90,000
29,080,000
20,800,000
360,000
4,680,000
3,240,000
m3
kg
2.50
1,250.00
5,800,000
21,000
40,750,000
14,500,000
26,250,000
lot
lot
1.00
1.00
18,190,000
20,380,000
38,570,000
18,190,000
20,380,000
m2
2,027.92
113,100
229,357,752
V.
ROOFING WORK
Roofing zincalume, t - 0.5mm
Self drilling
Fascia, spandeck color, t - 0.45mm, H - 500mm
Flashing, t - 0.45mm
QTY
UNIT PRICE
( Rp. )
SPESIFICATION
4.7
4.7.1
4.7.2
4.7.3
4.7.4
DESCRIPTION
REMARKS
SUMMARY
PROGRESS REPORT
Period : 15 February 2013 ~ 21 February 2013
Project
Works
Owner
Location
ITEM
No.
Weighting
(%)
DESCRIPTION
Planing
Progress
(%)
REPORT No. : 2
Previous Progress
On Site
Weight
(%)
(%)
To Date Progress
On Site
Weight
(%)
(%)
Deviation
(%)
I.
PREPARATORY WORK
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
II
CONSTRUCTION WORKS
SITE CLEARING
PILING WORKS
FOUNDATION & COLUMN WORK
CONCRETE SLAB & STAIR WORK
STEEL STRUCTURE WORK
ROOFING WORK
WALL WORKS
DOOR AND WINDOW WORKS
FLOOR FINISH WORKS
WALL FINISHES
CEILING FINISHES
OTHERS WORK
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
TOTAL
Evaluation of Progress :
Accumulation of Planing Progress :
#REF!
Accumulation of actual Progress :
#REF!
----------------------------------#REF!
#REF!
#REF!
#REF!
Approved by;
PT. Sharp Indonesia
( Gunawan )
Project Manager
Site Manager
Project
Works
Owner
Contractor
Location
No.
I.
Contract
Weighting
Quantity
(%)
Planing
until
Previous
Actual
until
Previous
Deviation
until
Previous
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.410%
0.116%
0.896%
0.266%
0.575%
0.332%
0.542%
0.487%
0.266%
0.841%
0.089%
0.09
0.05
0.02
0.03
0.03
0.03
0.02
0.04
0.00%
8.50%
5.00%
2.00%
3.00%
2.50%
0.00%
3.00%
2.00%
4.46%
0.153%
0.000%
0.076%
0.013%
0.012%
0.010%
0.014%
0.000%
0.008%
0.017%
0.004%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
CONSTRUCTION WORKS
2.1 SITE CLEARING
2.1.1 Site Clearing / Stripping
2.1.2 Disposal
m2
m3
1,560.00
234.00
0.276%
0.121%
0.155%
0.00%
0.00%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.2
2.2.1
2.2.2
2.2.3
m'
m'
nos
550.00
550.00
55.00
3.360%
2.374%
0.913%
0.073%
45.00%
45.00%
275.00%
1.680%
1.068%
0.411%
0.201%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
302.01
44.55
44.55
123.20
3,773.00
21.56
9.122%
2.113%
0.401%
0.020%
0.035%
0.205%
1.086%
0.368%
35.13%
0.00%
0.00%
0.00%
0.00%
0.00%
0.141%
0.141%
0.141%
0.000%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
PREPARATORY WORK
Survey and Marking
Temporary Site Office ( Direksi keet & Storage )
Temporary Water
Temporary Power
Safety & Protection
Design Fee
Mobilization & Demobilization
Cleaning During Construction
Unloading fee, coordination & security
Reporting
Unit
REPORT No. : 2
II.
2.3
2.3.1
2.3.1.1
2.3.1.2
2.3.1.3
2.3.1.4
2.3.1.5
2.3.1.6
PILING WORKS
Concrete spun pile 300mm, L= 10 m' ( P1 )
Driving Pile
Cuting Pile
FOUNDATION & COLUMN WORK
Pile Cap
Excavation, Backfill, diaposal & compaction base soil
Sand gravel, t - 10cm
Lean concrete, t - 5cm
Formwork for pile cap
Steel bars for pile cap
Concrete work for pile cap ( 70*70*80cm )
m3
m2
m2
m2
kg
m3
247.50
247.50
151.25
106.09
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Project
Works
Owner
Contractor
Location
No.
REPORT No. : 2
Contract
Weighting
Quantity
(%)
Planing
until
Previous
Actual
until
Previous
Deviation
until
Previous
Description
Unit
2.3.2
2.3.2.1
2.3.2.2
2.3.2.3
2.3.2.4
2.3.2.5
2.3.2.6
2.3.2.7
Tie Beam
Excavation, Backfill, diaposal & compaction base soil
Sand gravel, t - 10cm
Lean concrete, t - 5cm
Formwork for tie beam
Formwork for tie beam
Steel bars for tie beam
Concrete work for tie beam ( 25cm*50cm )
m3
m2
m2
m2
m2
kg
m3
516.56
19.58
9.79
435.00
90.60
10,704.75
61.17
5.758%
0.686%
0.009%
0.008%
0.722%
0.211%
3.080%
1.043%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.3.3
2.3.3.1
2.3.3.2
2.3.3.3
m2
kg
m3
110.00
2,475.00
13.75
1.251%
0.304%
0.712%
0.234%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.4
2.4.1
2.4.1.1
2.4.1.2
2.4.1.3
2.4.1.4
2.4.1.5
2.4.1.6
2.4.1.7
2.4.1.8
m3
m3
m3
m2
m'
m2
m3
m2
932.40
532.80
133.20
1,296.00
342.00
1,296.00
199.80
1,332.00
18.169%
9.741%
1.238%
2.123%
0.590%
0.100%
0.132%
1.864%
3.473%
0.221%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m2
m'
m2
m3
m2
998.20
342.00
998.20
149.73
998.20
7.245%
2.762%
0.114%
1.436%
2.602%
0.331%
0.00%
0.00%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.4.2.1
2.4.2.2
2.4.2.3
2.4.2.4
2.4.2.5
Project
Works
Owner
Contractor
Location
No.
Unit
Contract
Weighting
Quantity
(%)
REPORT No. : 2
Planing Progress for Next week
Progress Weighting
Quantity
(%)
(%)
Planing
until
Previous
Actual
until
Previous
Deviation
until
Previous
Project
Works
Owner
Contractor
Location
No.
Description
Unit
REPORT No. : 2
Contract
Weighting
Quantity
(%)
Planing
until
Previous
Actual
until
Previous
Deviation
until
Previous
2.4.3
2.4.3.1
2.4.3.2
2.4.3.3
Stair Work
Formwork
Steel bars
Concrete work
m2
m'
m3
55.00
2,750.00
13.75
1.182%
0.152%
0.791%
0.239%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.5
2.5.1
2.5.2
2.5.3
2.5.7
2.5.8
2.5.9
2.5.10
2.5.11
nos
kg
kg
kg
kg
kg
lot
kg
204.00
588.51
60,451.60
25,574.38
1,209.03
925.00
1.00
88,748.52
35.569%
0.384%
0.212%
21.742%
9.198%
0.435%
0.333%
0.319%
2.946%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.6
2.6.1
2.6.1.1
2.6.1.2
2.6.1.3
ROOFING WORK
Roof of Finishes
Roof metal w/ colour
Insulation
Nok/ridge
m2
m2
m'
2,045.95
2,045.95
75.00
9.563%
8.726%
4.755%
3.849%
0.122%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m'
m'
185.00
72.00
0.837%
0.614%
0.223%
0.00%
0.00%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m2
m2
1,060.80
2,121.60
2.935%
2.054%
0.880%
0.00%
0.00%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.6.2 Gutter
2.6.2.1 Gutter metal
2.6.2.2 Down spout PVC dia 4", incl accessories
2.7 WALL WORKS
2.7.1 Brick wall + practical column, 1st floor
2.7.2 Plaster board
Project
Works
Owner
Contractor
Location
No.
Unit
REPORT No. : 2
Contract
Weighting
Quantity
(%)
0.00%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Planing
until
Previous
Actual
until
Previous
Deviation
until
Previous
2.8
2.8.1
2.8.1.1
2.8.1.2
2.8.1.3
2.8.1.4
nos
nos
nos
nos
13.00
2.00
1.00
1.00
2.192%
1.265%
0.798%
0.245%
0.092%
0.130%
2.8.2
2.8.2.1
2.8.2.2
2.8.2.3
2.8.2.4
2.8.2.5
Windows
Aluminium window type AW1, size 800*2100
Aluminium window type AW2, size 1600*1200
Aluminium window type AW3, size 2400*1200
Aluminium window type AW4, size 3200*1200
Alum window (Bouvenlight), size 500*1200
nos
nos
nos
nos
nos
4.00
1.00
6.00
1.00
4.00
0.927%
0.223%
0.053%
0.478%
0.106%
0.066%
0.00%
0.00%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m2
m'
m2
m2
1,332.00
500.00
499.10
499.10
6.834%
4.127%
0.360%
1.381%
0.967%
0.00%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
WALL FINISHES
Painting wall exterior
Painting wall Interior
Ceramic tile 200 x 250, H=2m for wall of toilet
m2
m2
m2
536.00
1,585.60
108.00
1.862%
0.415%
1.088%
0.359%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m2
m'
m2
240.00
210.00
240.00
0.970%
0.677%
0.128%
0.165%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.9
2.9.1
2.9.2
2.9.3
2.9.4
2.10
2.10.1
2.10.1
2.10.1
Project
Works
Owner
Contractor
Location
No.
2.12
2.10.1
2.10.1
2.10.1
2.10.1
2.10.1
2.10.1
2.10.1
2.10.1
2.10.1
Unit
m2
m'
m'
m'
m2
m'
m'
m2
nos
REPORT No. : 2
Contract
Weighting
Quantity
(%)
13.00
37.00
12.00
7.00
160.00
164.00
12.00
89.60
8.00
4.739%
0.050%
0.154%
0.239%
0.077%
0.797%
0.672%
0.050%
2.479%
0.221%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
1.974%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Planing
until
Previous
Actual
until
Previous
Deviation
until
Previous
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Gunawan
Site Manager
Next
Week
Deviation
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Next
Week
Deviation
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Next
Week
Deviation
Next
Week
Deviation
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Next
Week
Deviation
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Next
Week
Deviation
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.590%
SCHEDULE OF WORK
Project
Works
Owner
Location
6
7
March 2013
10
11
April 2013
12
13
14
15
May 2013
16
17
18
19
20
June 2013
21
22
23
24
July 2013
25
26
27
28
August 2013
29
30
18 ~ 24
25 ~ 31
01 ~ 07
08 ~ 14
15 ~ 21
22 ~ 28
01 ~ 07
08 ~ 14
15 ~ 21
22 ~ 28
29 ~ 04
05 ~ 11
12 ~ 18
19 ~ 25
26 ~ 02
03 ~ 09
10 ~ 16
17 ~ 23
24 ~ 30
31 ~ 06
07 ~ 13
14 ~ 20
21 ~ 27
28 ~ 04
05 ~ 11
12 ~ 18
19 ~ 25
26 ~ 01
02 ~ 08
09 ~ 15
16 ~ 22
23 ~ 29
-14dy
-7dy
7dy
14dy
21dy
28dy
35dy
42dy
49dy
56dy
63dy
70dy
77dy
84dy
91dy
98dy
105dy
112dy
119dy
126dy
133dy
140dy
147dy
154dy
161dy
168dy
175dy
182dy
189dy
196dy
203dy
210dy
0.0028
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0026
0.0001
lot
1.00
4.41%
m2
1,560.00
0.28%
m'
550.00
3.36%
m3
21.56
2.11%
m3
61.17
5.76%
m3
13.75
1.25%
m3
199.80
9.74%
m3
149.73
7.24%
m3
13.75
1.18%
kg
88,748.52
35.57%
m2
2,045.95
9.56%
m2
1,060.80
2.93%
2.8.1 Doors
unit
17.00
2.8.2 Windows
unit
16.00
m2
1,332.00
4.49%
m2
499.10
1.38%
m2
499.10
0.97%
II
(%)
Volume
PREPARATORY WORK
2
3
February 2013
Weighting
Unit
START --->
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
0.0015
100%
0.0014
CONSTRUCTION WORKS
0.0101
90%
0.0168
0.0067
0.0014
0.0070
0.0127
0.0096
0.0120
0.0264
0.0096
0.0042
0.0042
0.0042
0.0032
0.0271
0.0150
0.0070
70%
0.0116
0.0116
0.0116
0.0116
0.0261
0.0020
0.0301
0.0013
0.0049
Erection
Fabrication
0.0013
0.0049
0.0013
0.0013
0.0133
0.0333
0.0333
0.0476
0.0501
0.0358
0.0341
0.0341
0.0239
0.0095
0.0352
60%
0.0048
0.0239
0.0311
0.0311
0.0048
50%
0.0037
0.0037
0.0037
0.0037
0.0037
0.0037
0.0037
0.0037
1.27%
0.0013
0.0013
0.0013
0.0089
0.93%
0.0023
0.0023
0.0023
0.0023
40%
0.0015
0.0187
0.0150
0.0075
0.0007
0.0069
0.0048
0.0069
0.0048
30%
m2
536.00
0.42%
m2
1,585.60
1.09%
m2
108.00
0.36%
m2
240.00
0.97%
lot
1.00
0.57%
m2
160.00
0.80%
m'
164.00
0.67%
lot
1.00
2.70%
0.0010
0.0036
0.0018
0.0036
0.0031
0.0036
0.0018
20%
0.0048
0.0048
10%
0.0010
0.0022
0.0022
0.0010
0.0010
0.0010
0.0027
0.0027
0.0027
0.0010
0.0010
0.0090
0.0090
0.0022
0.0090
0%
100.00%
0.000%
0.000%
0.546%
1.175%
1.974%
2.623%
3.171%
3.667%
4.369%
4.494%
4.991%
4.991%
5.614%
5.531%
5.258%
5.088%
5.088%
4.907%
4.924%
5.076%
5.006%
4.568%
3.590%
3.087%
2.330%
1.952%
0.900%
1.414%
1.839%
1.828%
0.000%
0.000%
ACCUMULATION
TOTAL
0.00%
0.000%
0.000%
0.546%
1.721%
3.695%
6.317%
9.489%
13.156%
17.525%
22.019%
27.010%
32.001%
37.615%
43.146%
48.404%
53.492%
58.580%
63.486%
68.411%
73.486%
78.492%
83.060%
86.650%
89.737%
92.068%
94.020%
94.920%
96.334%
98.172%
100.000%
100.000%
100.000%
ACTUAL
0.00%
0.000%
0.000%
0.000%
#REF!
#REF!
0.000%
0.000%
-0.546%
#REF!
#REF!
DEVIASI
( Gunawan )
SCHEDULE OF WORK
Project
Works
Owner
Location
-1
January 2013
Description
Unit
Volume
Weighting
(%)
18 ~ 24
-14dy
25 ~ 31
-7dy
February 2013
01 ~ 07
7dy
08 ~ 14
14dy
15 ~ 21
21dy
10
March 2013
22 ~ 28
28dy
01 ~ 07
35dy
08 ~ 14
42dy
15 ~ 21
49dy
11
12
13
14
April 2013
22 ~ 28
56dy
29 ~ 04
63dy
05 ~ 11
70dy
12 ~ 18
77dy
15
16
17
18
May 2013
19 ~ 25
84dy
26 ~ 02
91dy
03 ~ 09
98dy
10 ~ 16
105dy
19
20
21
22
23
June 2013
17 ~ 23
112dy
24 ~ 30
119dy
31 ~ 06
126dy
07 ~ 13
133dy
14 ~ 20
140dy
24
25
26
27
July 2013
21 ~ 27
147dy
28 ~ 04
05 ~ 11
154dy
161dy
Site Manager
12 ~ 18
168dy
28
29
30
16 ~ 22
203dy
23 ~ 29
210dy
August 2013
19 ~ 25
175dy
26 ~ 01
182dy
02 ~ 08
189dy
09 ~ 15
196dy
100%
BILL OF QUANTITY
Project
Works
Owner
Location
No.
DESCRIPTION
I.
SPESIFICATION
UNIT
QTY
UNIT PRICE
( Rp. )
PREPARATORY WORK
1.1
1.2
1.3
1.4
1.5
1.6
1.7
II.
AMOUNT
( Rp. )
50,000,000
ls
ls
ls
ls
ls
ls
ls
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3,000,000
5,000,000
10,000,000
10,000,000
10,000,000
10,000,000
2,000,000
3,000,000
5,000,000
10,000,000
10,000,000
10,000,000
10,000,000
2,000,000
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
Bouwplank
Excavation
Lean concrete, t - 50mm
Concrete foundation pile cap , 400*400*800mm
Backfill
Disposal exist soil
15,161,600
m'
m3
m2
m3
m3
m3
32.00
12.00
7.20
2.56
9.44
2.56
22,000
60,000
56,700
5,000,000
45,500
39,000
704,000
720,000
408,240
12,800,000
429,520
99,840
84,175,500
m3
m3
m3
255.00
204.00
51.00
60,000
243,000
378,500
15,300,000
49,572,000
19,303,500
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
DESCRIPTION
SPESIFICATION
UNIT
QTY
UNIT PRICE
( Rp. )
52,931,540
size 30*30
m2
m2
206.20
206.20
56,700
200,000
AMOUNT
( Rp. )
11,691,540
41,240,000
105,000,000
lot
1.00
105,000,000
105,000,000
lot
1.00
43,140,000
43,140,000
lot
1.00
57,610,000
57,610,000
III.
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
Bouwplank
Excavation
Lean concrete, t - 50mm
Concrete foundation pile cap , 400*400*800mm
Backfill
Disposal exist soil
10,613,120
m'
m3
m2
m3
m3
m3
22.40
8.40
5.04
1.79
6.61
1.79
22,000
60,000
56,700
5,000,000
45,500
39,000
492,800
504,000
285,768
8,960,000
300,664
69,888
60,325,775
m3
m3
m3
182.75
146.20
36.55
60,000
243,000
378,500
10,965,000
35,526,600
13,834,175
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
DESCRIPTION
SPESIFICATION
UNIT
QTY
UNIT PRICE
( Rp. )
9,366,840
m2
165.20
56,700
m2
m2
279.96
68.64
278,250
55,000
77,898,870
3,775,200
11,019,000
nos
nos
nos
1.00
1.00
1.00
5,544,000
3,075,000
2,400,000
9,366,840
81,674,070
AMOUNT
( Rp. )
5,544,000
3,075,000
2,400,000
70,434,000
m2
270.90
260,000
70,434,000
lot
1.00
46,620,000
46,620,000
lot
1.00
63,260,000
63,260,000
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
AMOUNT
( Rp. )
UNIT
by excavator
m3
m3
m2
80.00
80.00
80.00
60,000
39,000
5,000
8,320,000
4,800,000
3,120,000
400,000
m3
m3
32.00
8.00
243,000
378,500
10,804,000
7,776,000
3,028,000
4.3
4.3.1
4.3.2
4.3.3
m2
m2
m3
33.76
33.76
1.54
35,400
56,700
5,000,000
10,789,296
1,195,104
1,914,192
7,680,000
m2
m'
80.00
54.00
306,800
39,000
26,650,000
24,544,000
2,106,000
m3
nos
0.36
16.00
6,000,000
125,000
4,160,000
2,160,000
2,000,000
PL 20mm, WF 250
kg
kg
kg
lot
kg
1,752.06
163.80
191.59
1.00
2,107.45
21,000
21,000
21,000
885,127
3,500
52,517,554
36,793,260
3,439,800
4,023,306
885,127
7,376,061
4.1
4.1.1
4.1.2
4.1.3
FOUNDATION WORK
Gravel bedding, t - 10cm
Lean concrete, t - 5cm
Pile cap, size 80cm*80cm*60cm
QTY
UNIT PRICE
( Rp. )
SPESIFICATION
IV.
DESCRIPTION
STEEL STRUCTURE
Base plate, Column, beam
Steel structure for Gording
Steel plate for joint & others
Bolt & Nut
Painting for steel structure
outside area
compaction base soil by vibro roller
REMARKS
BILL OF QUANTITY
Project
Works
Owner
Location
No.
UNIT
m2
nos
m2
m'
80.00
240.00
18.00
36.00
260,000
1,500
260,000
90,000
29,080,000
20,800,000
360,000
4,680,000
3,240,000
m3
kg
2.50
1,250.00
5,800,000
21,000
40,750,000
14,500,000
26,250,000
lot
lot
1.00
1.00
18,190,000
20,380,000
38,570,000
18,190,000
20,380,000
m2
2,027.92
113,100
229,357,752
229,357,752
V.
ROOFING WORK
Roofing zincalume, t - 0.5mm
Self drilling
Fascia, spandeck color, t - 0.45mm, H - 500mm
Flashing, t - 0.45mm
QTY
UNIT PRICE
( Rp. )
SPESIFICATION
4.7
4.7.1
4.7.2
4.7.3
4.7.4
DESCRIPTION
REMARKS
SCHEDULE OF WORK
Project
Works
Owner
Location
Description
Start
Finish
Duration
(Date)
(Date)
( days )
JULI 2014
01/06/2014
02/06/2014
03/06/2014
04/06/2014
05/06/2014
06/06/2014
07/06/2014
08/06/2014
09/06/2014
10/06/2014
11/06/2014
12/06/2014
13/06/2014
14/06/2014
15/06/2014
16/06/2014
17/06/2014
18/06/2014
19/06/2014
20/06/2014
21/06/2014
22/06/2014###
##
I
PREPARATORY WORK
##
###
1.1 PREPARATION
II
1-Jun-14
11-Jun-14
11
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
CONSTRUCTION
##
2.1 EXCAVATION
1-Jun-14
15-Jun-14
15
4-Jun-14
16-Jun-14
13
6-Jun-14
16-Jun-14
11
9-Jun-14
21-Jun-14
13
0.0108
0.0108
0.0108
17-Jun-14
23-Jun-14
0.0104
0.0104
0.0104
8-Jun-14
21-Jun-14
14
0.0031
0.0031
0.0031
0.0031
0.0347
0.0347
##
###
##
0.0146
0.0146
0.0146
0.0108
0.0108
0.0108
0.0108
0.0108
##
0.0104
0.0104
0.0104
0.0104
0.0104
###
RE-SCHEDULE OF WORK
Project
Works
Owner
Location
Description
Start
Finish
Duration
(Date)
(Date)
( days )
JUNI 2014
21/06/2014
22/06/2014
23/06/2014
24/06/2014
25/06/2014
JULI 2014
26/06/2014
27/06/2014
28/06/2014
29/06/2014
30/06/2014
01/07/2014
02/07/2014
03/07/2014
04/07/2014
05/07/2014
06/07/2014
07/07/2014###
##
I
PREPARATORY WORK
##
###
1.1 PREPARATION
II
1-Jun-14
28-Jun-14
28
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
0.0041
CONSTRUCTION
##
1-Jun-14
15-Jun-14
15
FINISH
4-Jun-14
16-Jun-14
13
FINISH
6-Jun-14
16-Jun-14
11
FINISH
25-Jun-14
1-Jul-14
0.0108
0.0108
0.0108
1-Jul-14
6-Jul-14
0.0104
0.0104
0.0104
26-Jun-14
2-Jul-14
29-Jun-14
5-Jul-14
26-Jun-14
1-Jul-14
4-Jul-14
6-Jul-14
1-Jun-14
7-Jul-14
37
2.9
III
CLEANING AREA
0.0031
0.0031
0.0031
0.0031
0.0347
0.0347
##
###
0.0146
0.0146
0.0146
##
0.0108
0.0108
0.0108
0.0108
##
0.0108
0.0104
0.0104
0.0104
0.0104
###
0.0104
PROGRESS PHOTOGRAPH
Project
Owner
Location
PROGRESS PHOTOGRAPH
Project
Owner
Location