PROJEK :

BILL NO. 3 - EARTHWORKS


ITEM
NO.

DESCRIPTION OF WORKS

UNIT

QTY

RATE
(RM)

3.1

STRIPPING OF TOPSOIL

3.1.1

Stripping topsoil average depth 150mm and dispose


Contractor's dump site as approved by the S.O

to
m2

3.1.2

Stripping topsoil average depth 150mm and stockpile for reuse.

3.2

EXCAVATE, LOAD, HAUL AND DEPOSIT TO FORM


EMBANKMENT

3.2.1

Common excavation in cuttings or in bulk to form embankment.

3.2.2

Excavation of hard material in cuttings or in bulk to form


embankment.

m3

3.2.3

Rock excavation by open blasting to form embankment.

m3

3.2.4

Rock excavation by control blasting to form embankment.

m3

3.2.5

Rock excavation by ripper unit to form embankment.

m3

3.2.6

Rock excavation by pneumatic to form embankment.

m3

3.3

EXCAVATE, LOAD, HAUL AND DISPOSE

3.3.1

Common excavation in cuttings or in bulk and dispose to


Contractor's dump site as approved by S.O

3.3.2

Excavation of hard material in cuttings or in bulk and dispose to


Contractor's dump site as approved by S.O/P.D*.

m2

m3

m3

m3
3.3.3

Rock excavation by open blasting and dispose to Contractor's


dump site as approved by S.O.

m3

3.3.4

Rock excavation by control blasting and dispose to Contractor's


dump site as approved by S.O.

m3

3.3.5

Rock excavation by ripper unit and dispose to Contractor's


dump site as approved by S.O.

m3

3.3.6

Rock excavation by pneumatic and dispose to Contractor's


dump site as approved by S.O.

m3

3.4

EXCAVATE UNSUITABLE MATERIAL, LOAD, HAUL AND


DISPOSE

BQ 3 / 1

AMOUNT
(RM)

PROJEK :

BILL NO. 3 - EARTHWORKS


ITEM
NO.

DESCRIPTION OF WORKS

UNIT

QTY

RATE
(RM)

3.4.1

Excavate unsuitable material below embankments, below


culverts or below formation in cuttings as shown in drawing or
as per specification as approved by S.O and dispose to
Contractor's dump site.
m3
Carried to Collection

3.4.2

Excavate unsuitable material in cuttings as per specification as


approved by S.O and dispose to Contractor's dump site.
m3

3.5

FILL, SPREAD, GRADE AND COMPACT TO FORM


EMBANKMENT

3.5.1

Suitable material
embankment.

3.5.2

Imported suitable material


Contractor's own source.

3.5.3

Suitable hard material from excavation to form embankment.

3.5.4

Rockfill from rock excavation to form embankment.

3.5.5

Imported rock to form embankment from Contractor's own


source.

m3

3.5.6

Replacement of unsuitable material with sand under standing


water in accordance with the specification below embankment
or below culverts as directed by the S.O.

m3

Supply and lay geotextile filter / seperator fabric between


drainage layer and embankment fill material. (Kiara Tex KET20
or equivalent)

m2

3.5.7

from

common

to

excavation

form

to

form

embankment

from

m3

m3

m3

m3

3.6

TURFING AND HYDROSEEDING

3.6.1

Close turfing.

m2

3.6.2

Hydroseeding.

m2

3.6.3

Hydroseeding with fibromat or equivalent.

m2

3.6.4

Vertiver grass or equivalent at 250mm spacing (in group of 3


rows).

3.7

FIELD DENSITY TEST

3.7.1

Carry out compaction test to verify the degree of compaction by


using sand replacement method or other approved method by
S.O

BQ 3 / 2

no

AMOUNT
(RM)

PROJEK :

BILL NO. 3 - EARTHWORKS


ITEM
NO.

DESCRIPTION OF WORKS

UNIT

QTY

RATE
(RM)

Carried to Collection

COLLECTION PAGE

BQ 3/1
BQ 3/2
BQ 3/3

BQ 3 / 3

AMOUNT
(RM)

PROJEK :

BILL NO. 3 - EARTHWORKS


ITEM
NO.

DESCRIPTION OF WORKS

UNIT

QTY

RATE
(RM)

TOTAL CARRIED TO SUMMARY

BQ 3 / 4

AMOUNT
(RM)

BILL NO. 3 - EARTHWORKS


AMOUNT
(SEN)

BQ 3 / 5

BILL NO. 3 - EARTHWORKS


AMOUNT
(SEN)

BQ 3 / 6

BILL NO. 3 - EARTHWORKS


AMOUNT
(SEN)

BQ 3 / 7

BILL NO. 3 - EARTHWORKS


AMOUNT
(SEN)

BQ 3 / 8