01.12.

2014
Equipment/
Sr. No Area

Description of Job attended

TG 2

ACC Fan no 24:Gear Box all bolt tighten properly ,Oil drain out
from gear box for PMI and hardness check of Gear internals

TG 1

ACC Fan no 02:Gear Internal condition , PMI and hardness check


of Gear internals

TG 2

Turbine 02 Encloser Fitment(03nos panel fitment done out of


12)

Chiller

Chiller-2 cooling fan-3 damaged,It's Base frame,Motor and fan


fitment done trial to be taken

Chiller

Chiller-2 cooling fan- 8 damaged,It's Motor and fan removed out


from position

Chiller

Chiller-2 cooling fan-3 damaged,It's Base frame,Motor and fan


fitment done trialtaken two times

TG 2

Shifting of 3mm plate from scrap yard for Zero meter workshop
Working table Sliding door fabrication

TG 2

Zero meter workshop Working table Sliding door fabrication

Welding
Total 06 nos welding machines condition found healthy(6
Machine
transformers)
Next Day Planning (01.12.14)
17

TG 2

ACC Fan no 24:Gear Box all bolt tighten properly ,Oil drain out
from gear box for PMI and hardness check of Gear internals

TG 1

ACC Fan no 02:Gear Internal condition , PMI and hardness check


of Gear internals

TG Chiller

TG Chiller 2C compressor : Suction and discharge pressure low


to be check,If require refrigerant to be feed

TG 2

LP BYPASS#2 DOWN STREAM DRAIN TRAP TO EXHAUST DIVICE


PASSIN

TG 2

EXT#1AFTER QCNRV DRAIN TRAP JAMMING

TG 2

EXT#2 AFTER QCNRV DRAIN TRAP JAMMING

TG 2

Turbine 02 Encloser Fitment(03nos panel fitment done out of


12)

ESP Chiller

ESP Chiller

TG 2

Chiller-2 cooling fan-3 damaged,It's Base frame,Motor and fan


fitment done trial to be taken
Chiller-2 cooling fan-3 damaged,It's Base frame,Motor and fan
fitment done trialtaken two times
Zero meter workshop Working table Sliding door fabrication

Job Category
(Improvement/M
Pending
odification/PM/B
Work, If Any
D/Work
Request/Misc)

BD

Pending

PM

Pending

Assigned To

Misc

UP

Mahendra(F)
+Narayan(F)
+Ratan+Hamid

BD

UP

Tej+sarif+Sulem
an

BD

Pending

BD

UP

Misc

Completed

Jogendra+Gopal
+Govind

UP
Misc

Mahendra+Rata
n+Hamid

Tej+Suleman
Mahendra+Rata
n+Hamid
Narayan+Sarif
Narayan+Sarif

Job
Responsibility

Biju James

Specific Observation

Job Not taken due to PMI


machine at castamet
Job Not taken due to PMI
machine at castamet

No any fan or blade


available with Elect dept
for fitment
Vibrations are very high
to be rectify

Rack fabriation completed


,Sliding door fab UP

Work Order No.

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW
GENERAL SHIFT MAINTENANCE LOG BOOK
TURBINE
02.12.2014
Equipment/
Sr. No Area

Description of Job attended

Job Category
(Improvement/Mo
dification/PM/BD/
Work
Request/Misc)

TG 2

ACC Fan no 24:Gear Box all bolt tighten properly ,Oil drain
out from gear box for PMI and hardness check of Gear
internals
BD

TG 1

ACC Fan no 02:Gear Internal condition , PMI and hardness


check of Gear internals

TG 2

Turbine 02 Encloser Fitment(03nos panel fitment done out


of 12)
Misc

TG 1

TG 1

TG 1

AHU 9

10

Chiller

Chiller-2 cooling fan-3 damaged,It's Base frame,Motor and


fan fitment done trial to be taken
BD

11

Chiller

Chiller-2 cooling fan- 8 damaged,It's Motor and fan


removed out from position

12

Chiller

14

TG 2

PM

JOP Suction filter cleaning work

BD

JOP Suction Back wash filter cleaning work

BD

Duplex filter cleaning work (1A)

BD

AHU Fresh air Blower impellar removal from motor shaft

BD

BD

Chiller-2 cooling fan-3 damaged,It's Base frame,Motor and


fan fitment done trialtaken two times
BD
Zero meter workshop Working table Sliding door
fabrication
Misc

15
16
17
18
19
20
21
22
23

Welding
Machine

Total 06 nos welding machines condition found


healthy(6 transformers)
Work Order Prepare for Job Planning
Bill Prepare in ERP System Balaji Engineers
Men Power Updation in system
Weekly issuance planning
Engineer Job
Daily menpower updation
Site Round
Job allotment Men power
DJA Prepare

Next Day Planning (02.12.14)


MPB

TG 2

ACC Fan no 24:Gear Box all bolt tighten properly ,Oil drain
278171,Height
out from gear box for PMI and hardness check of Gear
Pemit no 447
internals

TG 1

MPB
ACC Fan no 02:Gear Internal condition , PMI and hardness 277141,Height
Pemit no 428
check of Gear internals

TG Chiller

TG 2

LP BYPASS#2 DOWN STREAM DRAIN TRAP TO EXHAUST


DIVICE PASSIN

TG 2

EXT#1AFTER QCNRV DRAIN TRAP JAMMING

TG 2

EXT#2 AFTER QCNRV DRAIN TRAP JAMMING

TG 2

ESP Chiller

ESP Chiller

TG 2

Turbine 02 Encloser Fitment(03nos panel fitment done out


of 12)
Chiller-2 cooling fan-3 damaged,It's Base frame,Motor and
fan fitment done trial to be taken
Chiller-2 cooling fan-3 damaged,It's Base frame,Motor and
fan fitment done trialtaken two times
Zero meter workshop Working table Sliding door
fabrication

S No

TG Chiller 2C compressor : Suction and discharge pressure MPB 279300


low to be check,If require refrigerant to be feed

Material
Consumed

Qty Used

B. WorkShop related Job If any


S No

Qty Used

1
C. Scaffolding work
S No

Particulars

Qty Used

D. Improvement related Job


S No

Manpower
Required

OK

Pending
Work, If Any

Assigned To

Job
Responsibility

Pending
Pending

UP

Narayan(f)
+Hamid(w)
+Kisan(kh)

Completed

Mahendar+Rata
n

Completed

Narayan(kh)
+Suleman

Completed

Narayan(kh)
+Suleman

Completed

Mahendar+Rata
n

Pending

Pending

UP
UP

Sokin+Usman+R
iyaz

Biju James

Mahendra+Rata
n+Hamid

.Tej+Suleman
Mahendra+Rata
n+Hamid
Narayan+Sarif
Narayan+Sarif

Any Other
Remarks

Approval Taken
(Y/N)

Approval Taken
(Y/N)

Expected Hours

SHREE CEMENT LT
SHREE MEGA POWER
GENERAL SHIFT MAINTEN

TURBINE
03.12.2014
Equipment/
Sr. No Area

Admin
Building

3
TG Chiller
3B
4

TG 2
5
TG 1
6

Ground floor sliding Door Jam due to its Glass frame


Holding screw sheared out,So its top out side channel
block removed out then sliding mechanisam alignment
done,M8 size Drilling and Tapping done then New CSK Bolt
provided instead of M4*12mm for proper strengthning of
top frame

Oil centrifuse booster pump found noisy operation and


Oil centrifuse leakage from oil seal: Pump internal check found gear
Tg 2
locking pin sheraed out also coupling key and spider found
damage

ESP Chiller

Description of Job attended

Chiller-2 cooling fan-9 damaged,So it's motor and fan


removed out then It's Base frame stratning done after that
frame, Motor and fan fitment done ,New Vibration pad
prepared from 12mm thk Neoprene rubber ,trial taken
found ok
TG Chiller 2C compressor : Suction and discharge
pressure low as per process report checked found
suc pr 26psi and disch.pr 165psi,Loading not
increase from 80% due to low cooling demand

ACC Fan no 24:Gear Box all bolt tighten properly ,Oil drain
out from gear box for PMI and hardness check of Gear
internals
ACC Fan no 02:Gear Internal condition , PMI and hardness
check of Gear internals

TG 2

LP BYPASS#2 DOWN STREAM DRAIN TRAP TO EXHAUST


DIVICE PASSIN

TG 2

EXT#1AFTER QCNRV DRAIN TRAP JAMMING

10

11

TG 2

EXT#2 AFTER QCNRV DRAIN TRAP JAMMING

TG 2

Turbine 02 Encloser Fitment(03nos panel fitment done out


of 12)

ESP Chiller

Chiller-2 cooling fan-3 damaged fan removed out ,problem


found in t's motor so motor fitment done after electrical
clearance

TG

MS plate 3mtr *6mtr shifted from near chimney to TG 2


zero meter for TG 0 mtr workshop Rack fab
Zero meter workshop Working table Sliding door
fabrication

12

13
14

15
16

17
18

19
20

21
22

23

TG 2
Welding
Machine

Total 06 nos welding machines condition found


healthy(6 transformers)
Work Order Prepare for Job Planning
Bill Prepare in ERP System Balaji Engineers
Men Power Updation in system
Weekly issuance planning
Engineer Job
Daily menpower updation
Site Round
Job allotment Men power
DJA Prepare
Next day Planning 03.12.14

Oil centrifuse booster pump found noisy operation and


Oil centrifuse leakage from oil seal: Pump internal check found gear
Tg 2
locking pin sheraed out also coupling key and spider found
damage

TG 2

TG 1

TG 2

LP BYPASS#2 DOWN STREAM DRAIN TRAP TO EXHAUST


DIVICE PASSIN

TG 2

EXT#1AFTER QCNRV DRAIN TRAP JAMMING

TG 2

EXT#2 AFTER QCNRV DRAIN TRAP JAMMING

ACC Fan no 24:Gear Box all bolt tighten properly ,Oil drain
out from gear box for PMI and hardness check of Gear
internals
ACC Fan no 02:Gear Internal condition , PMI and hardness
check of Gear internals

TG 2

Turbine 02 Encloser Fitment(03nos panel fitment done out


of 12)

ESP Chiller

Chiller-2 cooling fan-3 damaged fan removed out ,problem


found in t's motor so motor fitment done after electrical
clearance

TG 2

S No

Zero meter workshop Working table Sliding door


fabrication

Material
Consumed

B. WorkShop related Job If any


S No
1
C. Scaffolding work
S No

D. Improvement related Job


S No

Particulars

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW
GENERAL SHIFT MAINTENANCE LOG BOOK
TURBINE
Job Category
(Improvement/Mo
Pending
dification/PM/BD/
Work, If Any
Work
Request/Misc)

Assigned To

Job
Responsibility

Biju James

BD

UP

Mahendar+Ratn

BD

UP

Narayan+Kisan

BD

Completed

Sokin+Riyaz+s
arif

Misc

Completed

TejPrakash+Ha
mid

Pending

Mahendra+Rata
n+Hamid

PM

Pending

BD

Pending

BD

Pending

BD

Pending

Misc

UP

BD

UP

Misc

Completed

Misc

Pending

BD

Sokin+Riyaz

Narayan+Sarif+
kisan

BD

Mahendra+Rata
n+Hamid

PM

Kisan+Hamid

BD

Narayan+Sarif+
kisan

BD
BD

Narayan+Sarif+
kisan
Narayan+Sarif+
kisan

Misc
BD

Sokin+Riyaz+U
sman

Misc

Jogendar+Gopa
l+Govind

Qty Used

Any Other
Remarks

Qty Used

Approval Taken
(Y/N)

Qty Used

Approval Taken
(Y/N)

Manpower
Required

Expected Hours

Specific Observation

Work Order No.

Under size supporting


screw m4 size provided in
top block of railing
support is replaced by M8
size

MPB 279300

MPB
278171,Height
Pemit no 447
MPB
277141,Height
Pemit no 428

70% completed

MPB
278171,Height
Pemit no 447
MPB
277141,Height
Pemit no 428

70% completed

Approval Taken From

Any Other
Remarks

Approval Taken From

Any Other
Remarks

Spares or Consumables
reqd.

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW
GENERAL SHIFT MAINTENANCE LOG BOOK
TURBINE
04.12.2014
Equipment/
Sr.
Description of Job attended
Area
No

Job Category
(Improvement/Modi
fication/PM/BD/Work
Request/Misc)

Turbine 2

HPCV 2 Steam side spindle :It's Locking between spindle and nut welding got
daged ,So new L lock provided and welding done

BD

Admin
Building

Ground floor sliding Door Jam due to its Glass frame Holding screw ,M8 size Drilling
and Tapping done then New CSK Bolt provided instead of M4*12mm for proper
strengthning of top frame,During Opration found M8 Head touch in sliding roller so
Head oversize grinding done trial taken found ok

BD

Oil centrifuse booster pump found noisy operation and leakage from oil seal: Pump
internal check found gear locking pin sheraed out also coupling key and spider found
damage

BD

Oil centrifuse PM Job: Bowl cleaning ,Booster pump and feed pump coupling condition
and alignmenr check,Oil condition check

BD

Oil
centrifuse
Tg 2
Oil
centrifuse
Tg 1

ACC TG 2

BD
ACC Fan no 24:Fan Hub and out of 06 Blades 04 nos Blade fitment done

TG

TG

TG 2

PMI machine and ACC fin cleaning hose pipe received from Central stores to SMP
ESP Chiler fan no 3 fan repairing and fitment done trial taken found ok

Misc
BD
Misc

Turbine 02 Encloser Fitment(03nos panel fitment done out of 12)


11 TG 2

Zero meter workshop Working table Sliding door fabrication

Misc

TG 1
12
13 TG 2
14 TG 2
15 TG 2
Welding
16 Machine
17
18
19
20
Engineer
Job
21
22
23
24
1
4
5
6

TG 2
TG 2
TG 2

2
3

PM
ACC Fan no 02:Gear Internal condition , PMI and hardness check of Gear internals
LP BYPASS#2 DOWN STREAM DRAIN TRAP TO EXHAUST DIVICE PASSIN
EXT#1AFTER QCNRV DRAIN TRAP JAMMING
EXT#2 AFTER QCNRV DRAIN TRAP JAMMING
Total 06 nos welding machines condition found healthy(6 transformers)
Work Order Prepare for Job Planning
Bill Prepare in ERP System Balaji Engineers
Men Power Updation in system
Balaji enginneer Monthly men power bill Updation in ERP
Daily menpower updation
Site Round
Job allotment Men power
DJA Prepare
Next day Planning 04.12.14
ACC Fan no 24:Fan Hub and out of 06 Blades 04 nos Blade fitment done
LP BYPASS#2 DOWN STREAM DRAIN TRAP TO EXHAUST DIVICE PASSIN
EXT#1AFTER QCNRV DRAIN TRAP JAMMING
EXT#2 AFTER QCNRV DRAIN TRAP JAMMING
ESP Chiller fan no 8 Damaged ,So it's fan replacement to be done

Turbine 02 Encloser Fitment(03nos panel fitment done out of 12)


Zero meter workshop Working table Sliding door fabrication

BD
BD
BD

S No

Material
Consumed

Qty Used

B. WorkShop related Job If any


S No

Qty Used

1
C. Scaffolding work
S No

Particulars

Qty Used

D. Improvement related Job


S No

Manpower Required

LTD,BEAWAR
ER 2 X 150 MW
ENANCE LOG BOOK

NE

Pending Work,
If Any

Completed

Assigned To

Job
Responsibilit
y

Mahendar+Rat
Biju James
an

Completed

Narayan+Sule
Biju James
man

Completed

Narayan+Sule
S Khan
man

completed

Mahendra +
sokin+Riyaz+R Biju James
atan

Completed

Tej+Usman

Completed

S Khan
Hamid(W)
+Kisan(Kh)
S Khan
+Narayan(Kh)
+Sarif(W)

UP

Work Order No.

Hamid+Kisan S Khan

Completed

UP

Specific Observation

Under size supporting screw m4


size provided in top block of railing
support is replaced by M8 size

Hardness checked of out put gear


found 700 HLD(50HRC),PMI not
done due to not having proper
approch

MPB 278171,Height
Pemit no 447

Biju James

Jogendar
+Gopal+Govin Biju James
d

70% completed

70% job completed

Pending
Pending
Pending
Pending

MPB 277141,Height
Pemit no 428

Any Other
Remarks

Approval Taken
(Y/N)

Approval Taken From

Any Other Remarks

Approval Taken
(Y/N)

Approval Taken From

Any Other Remarks

Expected
Hours

Spares or Consumables reqd.

GENERAL SHIFT MAI

TUR
06.12.2014
Equipment/
Sr.
Area
No

TG 2/ACC

TG /Chiller
3A

TG /Chiller
3A

TG 1/ACC

Turbine 2

TG 2

BFP 1

Welding
Machine

9
10
11
12
13
14
15
16

Engineer
Job

15
16
17
18
19

TG
TG
TG
TG
TG

2
2
2
2
2

S No

Material
Consumed

B. WorkShop related Job If any


S No
1

C. Scaffolding work
S No

D. Improvement related Job


S No

Particulars

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

GENERAL SHIFT MAINTENANCE LOG B


TURBINE

Description of Job attended

ACC Fan no 24:Trial taken found ok


TG Chiller fan no 3A fan removed out from Motor
TG Chiller 3A condensor fan motor removed out from Foundation and put at zero
meter level due to bearing damage
ACC fan no 2 Gear Box inspection cover fitment done,Fan general inspection ,85ltr oil
filling done and permit clear--Inspection door open for check gear internal condition
found Ok
Turbine 02 Encloser Fitment(08nos panel fitment done out of 12)
Zero meter workshop Working table Sliding door fabrication
Suction strainer bottom flange found leakage attend
Total 06 nos welding machines condition found healthy(6 transformers)
Checked chiller make up line with M/S balaji for finalise scafolding location and Line
layout for replacement of line with GI (Corrosion in Existing MS line )
Work Order Prepare for Job Planning
Bill Prepare in ERP System Balaji Engineers
Men Power Updation in system
Daily menpower updation
Site Round
Job allotment Men power
DJA Prepare
Next day Planning 06.12.14
LP BYPASS#2 DOWN STREAM DRAIN TRAP TO EXHAUST DIVICE PASSIN
EXT#1AFTER QCNRV DRAIN TRAP JAMMING
EXT#2 AFTER QCNRV DRAIN TRAP JAMMING
Turbine 02 Encloser Fitment(03nos panel fitment done out of 12)
Zero meter workshop Working table Sliding door fabrication

Shop related Job If any

olding work

ovement related Job

Particulars

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

ENERAL SHIFT MAINTENANCE LOG BOOK


TURBINE
Job Category
(Improvement/Modi Pending Work,
fication/PM/BD/Work If Any
Request/Misc)
BD

Completed

BD

UP

BD

Completed

PM

PM

BD

UP

Misc

UP

BD

Completed

Assigned To

Job
Responsibilit
y

Mahenda+Rata
S Khan
n
S
Tej+Narayan Khan/Electric
al
S
Tej+Narayan Khan/Electric
al
Sokin+Riyaz+U
S Khan
sman
Hamid+Kisan S Khan
Sokin+Riyaz+U
S Khan
sman
narayan(F)
+Riyaz

Qty Used

Any Other
Remarks

Qty Used

Approval Taken
(Y/N)

Qty Used

Approval Taken
(Y/N)

Manpower Required

Expected
Hours

Specific Observation

Work Order No.

Motor bearing failure in Motor

70% job completed

Approval Taken From

Any Other Remarks

Approval Taken From

Spares or Consumables reqd.

Any Other Remarks

GENERAL SHIFT MAI

TUR
08.12.2014
Equipment/
Sr.
Area
No
1

Turbine 2

Turbine 1

Turbine 1

TG

TG 2

ESP Chiller

Welding
Machine

7
8
9
10
11
12
13
14
15

Engineer
Job

17
18
19
20
21

SWAS
SWAS

22

TG 2

23

TG 2

S No

Material
Consumed

TG 2
TG 2

B. WorkShop related Job If any


S No
1

C. Scaffolding work
S No

D. Improvement related Job


S No

Particulars

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

GENERAL SHIFT MAINTENANCE LOG B


TURBINE

Description of Job attended

ACC Gaer Box from 1 to 30 oil breather condition check -Unit 1


ACC Gaer Box from 1 to 30 oil breather condition check -Unit 2
JOP Suction filter element cleaning work
Identification of material at central stores which submited throgh GRM
(TURBSMPS0022:HP Exhaust Gland Sealing)
Zero meter workshop Working table Sliding door fabrication
AHU Fresh Air Blower impellor removal
Total 06 nos welding machines condition found healthy(6 transformers)

Checked chiller make up line with M/S balaji for finalise scafolding location and Line
layout for replacement of line with GI (Corrosion in Existing MS line )
Work Order Prepare for Job Planning
Bill Prepare in ERP System Balaji Engineers
Men Power Updation in system
Daily menpower updation
Site Round
Job allotment Men power
DJA Prepare
Next day Planning 08.12.14
Pump Gland found heavy leakage ,It's gland to be replace
Level float found not working to be check
House keeping of TG 0 mtr area
EXT#1AFTER QCNRV DRAIN TRAP JAMMING
EXT#2 AFTER QCNRV DRAIN TRAP JAMMING
Turbine 02 Encloser Fitment(10nos panel fitment done out of 12)-Side door
modification for Provision of Pedestal fan
Zero meter workshop Working table Sliding door fabrication

Shop related Job If any

olding work

ovement related Job

Particulars

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

ENERAL SHIFT MAINTENANCE LOG BOOK


TURBINE
Job Category
(Improvement/Modi Pending Work,
fication/PM/BD/Work If Any
Request/Misc)

Assigned To

PM

Completed

Jogendar

PM

Completed

Jogndar

PM

Mahendar

Misc

Narayan+ratan

Misc
BD

UP

Job
Responsibilit
y
S Khan

Hamid+Gopal+
S Khan
Govind
Deepak
Tej
Soni(Elect)

MPB279302
MPB279302

Qty Used

Any Other
Remarks

Qty Used

Approval Taken
(Y/N)

Qty Used

Approval Taken
(Y/N)

Manpower Required

Expected
Hours

Specific Observation

Work Order No.

Found Brether missing in GB no


1,2,17,18,19

70% job completed

Approval Taken From

Any Other Remarks

Approval Taken From

Spares or Consumables reqd.

Any Other Remarks

TUR

Equipment/
Sr.
Area
No
1
2
3
4
5

SWAS
SWAS
TG
TG 2
TG 2

TG 2

TG 2

TG

10
11
12
13
14
15
16

Engineer
Job

TG 2

TG 1

3
4
5
6
7

TG 2
TG 2
TG 2
Inst
TG
Material
S No
Consumed

B. WorkShop related Job If any


S No
1
C. Scaffolding work
S No

Particulars
Approx 100M3 scafolding for chiller make up line replacement

D. Improvement related Job

S No

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW
GENERAL SHIFT MAINTENANCE LOG B
TURBINE
9.12.2014
Description of Job attended

Pump Gland found heavy leakage ,It's gland to be replace


Level float found not working to be check
House keeping of TG 0 mtr area
EXT#1AFTER QCNRV DRAIN TRAP JAMMING
EXT#2 AFTER QCNRV DRAIN TRAP JAMMING
Turbine 02 Encloser Fitment(10nos panel fitment done out of 12)-Side door
modification for Provision of Pedestal fan
Zero meter workshop Working table Sliding door fabrication
Contractor Person sent to Cement plant for medical check up (total 5 Persons)
Work Order Prepare for Job Planning
Budget finalise work With Vijay more sir
Men Power Updation in system
Daily menpower updation
Site Round
Job allotment Men power
DJA Prepare
Next day Planning 09.12.14
SWAS Pump No 1 :Fitment of Pump due to Motor bearing failure(after
Motor Bearing work complition by Elec)
SWAS Pump No 1 :Decouple of Motor for inspection require by elect(after
Motor Bearing work complition by Elec)
MOT Tank Man Hole Missing Bolt to be provided(24 Bolts M12*50MM)
PM Activity BFP 2A
PM Activity BFP 2B
JB Fabriction for Instrument dept (Chiller Panel cover work)
House keeping of TG 0 Mtr Area

Shop related Job If any

olding work
Particulars
Approx 100M3 scafolding for chiller make up line replacement

ovement related Job

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW
ENERAL SHIFT MAINTENANCE LOG BOOK
TURBINE
Job Category
(Improvement/Modi Pending Work,
fication/PM/BD/Work If Any
Request/Misc)
BD
BD
Misc
Imp
Imp

Completed
Completed
Completed
Completed
Completed

Misc

Completed

Assigned To

Misc
Completed
Misc

Qty Used

Any Other
Remarks

Qty Used

Approval Taken
(Y/N)

Qty Used
100M3

Approval Taken
(Y/N)
Y(Verbal)

Job
Responsibilit
y

Manpower Required

Expected
Hours

Specific Observation

Work Order No.

MPB279302
MPB279302

Scrap removal and


Painting pending

Approval Taken From

Any Other Remarks

Approval Taken From

Any Other Remarks

HOD-Mechanical

Spares or Consumables reqd.

TUR

Equipment
Sr.
/ Area
No

1
2
3
4
5
6
7
8
9
10
11
12
13

14
15
16
17
18
19

Engineer
Job

TG 2

TG 1

TG 2

TG 2

TG 2

6
7

Inst
TG

S No

Material
Consumed

B. WorkShop related Job If any


S No
1
C. Scaffolding work
S No

Particulars
Approx 100M3 scafolding for chiller make up line replacement

D. Improvement related Job


S No

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW
GENERAL SHIFT MAINTENANCE LOG B
TURBINE
9.12.2014
Description of Job attended

TG Lift servicing with ECE service engineer


Boiler Lift servicing with ECE service engineer
Main Pump Oil centrifuse spider replacement in Unit 1
SWAS Pump 1 :Monoblock pump no 1 impellor removal and motor handover to elect
dept for repairing
Duplaex filter element 1 A cleaning work
Duplex filter element 1 B clening work
BFP 1 A Bottom oil cooler end cover removal done hydro to be to done for leakage
identification
Allumina Grit approx 1000Kgs shifted from TG Building to SMP store
Steel Angle and plate pieces shifted from TG 0 Mtr to TG 1 Five meter stores
ejector rotameter 2" valve found jam so made it free
Zero meter: Chain block rack fab and Locking hook welding in Rack for prevent theft
Work Order Prepare for Job Planning
Spares check of Oil centrifuse Pump overhauiling Kit for development purpose
Prepareness of Indent list for Month _Dec 14
ORT Meeting
Men Power Updation in system
Daily menpower updation
Site Round
Job allotment Men power
DJA Prepare
Next day Planning11.12.14
SWAS Pump 1 :Monoblock pump no 1 impellor fitment pump instalation
BFP 1 A Bottom oil cooler end cover removal done hydro to be to done for leakage
identification
Zero meter: Chain block rack fab and Locking hook welding in Rack for prevent theft
Flane SS 2" 300# to be cut and remove from Fin cleanaing waste hose pipes :total
20Flanges to be removed out from 10pipes
Waster Fin cleaning hoses submitted through GRM (Approx 100 kg weight hose
loading and unloading )
Waste Oil barrel approx 6 nos shifted in central stores through GRM

kShop related Job If any

ffolding work
Particulars
Approx 100M3 scafolding for chiller make up line replacement

rovement related Job

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW
ENERAL SHIFT MAINTENANCE LOG BOOK
TURBINE
Job Category
(Improvement/Modi Pending Work,
fication/PM/BD/Work If Any
Request/Misc)

Assigned To

Job
Responsibilit
y

Mahendar+rata
R c paliwalji
n
Mahendar+rata
Biju James
n
Narayan+Nara
Biju James
yan
Biju James
Biju James
Biju James
Biju James
Biju James
Biju James
Biju James
Biju James

Qty Used

Any Other
Remarks

Qty Used

Qty Used
100M3

Manpower Required

Approval Taken
(Y/N)

Approval Taken
(Y/N)
Y(Verbal)

Expected
Hours

Specific Observation

Work Order No.

Approval Taken From

Any Other Remarks

Approval Taken From

Any Other Remarks

HOD-Mechanical

Spares or Consumables reqd.

Sr. Equipment/ Area


No

SWAS

TG 1/Lub Oil

Misc

TG 1/BFP 1A

TG 2

TG 2

TG/Lub oil circuit

Misc

10
11
12
13

Engineer Job

14
15
16
17
18
1

TG 1

TG 1

3
4

TG 1
TG 2
Material
S No
Consumed
1
B. WorkShop related Job If any
S No
1

C. Scaffolding work
S No

Particulars
Approx 100M3 scafolding for chiller make up line replacement

D. Improvement related Job


S No

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW
GENERAL SHIFT MAINTENANCE LOG BOOK
TURBINE
9.12.2014
Description of Job attended

SWAS Pump 1 :Monoblock pump no 1 impellor removal and motor handover to elect
dept for repairing
Duplaex filter element 1 B cleaning work
Flane SS 2" 300# to be cut and remove from Fin cleanaing waste hose pipes :total
20Flanges to be removed out from 10pipes
BFP 1 A Bottom oil cooler end cover removal done proper cleaning then after charge
oil for check leakage found ok,Spare gaskets cutting done ,Fitment to be done
Zero meter: Chain block rack fab and Locking hook welding in Rack for prevent theft
TG 2 zero meter WS Rack Painting work
on 11.12.14 new filter replaced in 2A it's cleaning done and Proper pack for prevent
of dust
Medical Check up (AMC) Govind+Gopal
Wor permit claear AC fan 2 Unit 1,Work permit taken lub oil filter
Spares check of Oil centrifuse Pump overhauiling Kit for development purpose
Prepareness of Indent list for Month _Dec 14
3 to 5 pm:Meeting for Permit issuance sequance finalise with DFH & All section
HOD ,SI
Indent review for November Month with HOD
Size check of Reheater control valve spares for Local Vendor development
Discussion with vendor and Check in internet for IBR valve soft part MOC finalise
Daily menpower updation
Site Round_4 hrs due to non avaibility of forman
Job allotment Men power
DJA Prepare
Next day Planning12.12.14
Shifting of encloser from TG 0 meter
BFP 1 A Bottom oil cooler end cover removal done hydro to be to done for leakage
identification
Waste Oil barrel approx 6 nos shifted in central stores through GRM
Boiler feed Pump 1B strainer cleaning

Petrol
elated Job If any

work
Particulars
Approx 100M3 scafolding for chiller make up line replacement

nt related Job

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW
RAL SHIFT MAINTENANCE LOG BOOK
TURBINE
Job Category
(Improvement/Modi Pending Work,
fication/PM/BD/Work If Any
Request/Misc)
BD

Completed

PM

Completed

Imp

Completed

BD

UP

Misc

Completed

Misc

UP

Imp

Completed

Misc

Completed

Qty Used

Assigned To

Any Other
Remarks

3Ltr
Qty Used

Approval Taken
(Y/N)

Job
Responsibilit
y

Qty Used
100M3

Manpower Required

Approval Taken
(Y/N)
Y(Verbal)

Expected
Hours

Specific Observation

Work Order No.

redoxide two coat


done

Approval Taken From

Any Other Remarks

Approval Taken From


HOD-Mechanical

Spares or Consumables reqd.

Any Other Remarks

GENERAL SHIFT M

Sr. Equipment/ Area


No
1
2
3
4
5
6
7
8

Turbine 2
Turbine 2
Turbine 2
Turbine 2
Turbine 2
Turbine 2
Turbine 2
Turbine 2
Material
S No
Consumed
B. WorkShop related Job If any
S No
1
C. Scaffolding work
S No

Particulars
Approx 100M3 scafolding for chiller make up line replacement

D. Improvement related Job


S No

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

GENERAL SHIFT MAINTENANCE LOG BOO


TURBINE
14.12.2014
Description of Job attended

LP Bypass 1 & 2 Upstream drain valve passing.


LP Bypass 1 ( CCR side ) Upstream drain valve gland leakage.
Extraction 5 QCNRV jamming.
Extraction 4 MOV 11006 jamming.
HPH 1 Emergency drain to exhaust device passing.
HPCV 2 EH oil filter to be change.
Oil leakage near HPCV 1 to be arrest.
Oil leakage near HP trip device to be arrest.

elated Job If any

work
Particulars
Approx 100M3 scafolding for chiller make up line replacement

nt related Job

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

ERAL SHIFT MAINTENANCE LOG BOOK


TURBINE
Job Category
(Improvement/Modi Pending Work,
fication/PM/BD/Work If Any
Request/Misc)
Shut
Shut
Shut
Shut
Shut
Shut
Shut
Shut

Down
Down
Down
Down
Down
Down
Down
Down

Job
Job
Job
Job
Job
Job
Job
Job

Qty Used

Qty Used

Qty Used
100M3

Manpower Required

Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed

Assigned To

Narayan
Mahendra
Shaukin
Mahendra
Tejprakash
Kishan
Narayan
Mahendra
Any Other
Remarks
Approval Taken
(Y/N)

Approval Taken
(Y/N)
Y(Verbal)

Expected
Hours

Job
Responsibilit
y
Mr
Mr
Mr
Mr
Mr
Mr
Mr
Mr

Sabeel
Sabeel
Sabeel
Sabeel
Sabeel
Sabeel
Sabeel
Sabeel

Specific Observation

Work Order No.

Approval Taken From

Any Other Remarks

Approval Taken From

Any Other Remarks

HOD-Mechanical

Spares or Consumables reqd.

GENERAL SHIFT M

Sr. Equipment/ Area


No

Turbine 2

Turbine 2

Turbine 2

4
5

Turbine 2
Chiller

1
2
3
4

Turbine
Turbine
Turbine 1
ACC 1
Material
S No
Consumed
B. WorkShop related Job If any
S No
1
C. Scaffolding work
S No

Particulars
Approx 100M3 scafolding for chiller make up line replacement

D. Improvement related Job


S No

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

GENERAL SHIFT MAINTENANCE LOG BOOK


TURBINE
15.12.2014
Description of Job attended

Placing the Dial Gauge to check Rotor Lift


Setting the clearance in Oil catcher of Bearing no 4
Checking ecentricity 4 times
Cutting of oil Tray stuck between front pedestal & HIP casing
Miscellaneous Jobs at Chiller
Next day Planning 16.12.14
Fabrication of Safe trolley for lifting of cutting set.
Fabrication of Platform near barring gear.
Leakage from OVEF has been arrested
Dummying the Valves meant for fire fighting for external fin cleaning

elated Job If any

work
Particulars
Approx 100M3 scafolding for chiller make up line replacement

nt related Job

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

RAL SHIFT MAINTENANCE LOG BOOK


TURBINE
Job Category
(Improvement/Modi Pending Work,
fication/PM/BD/Work If Any
Request/Misc)

Assigned To

Job
Responsibilit
y

Shutdown Job

Completed

Rajjak +
Narayan

Mr Bijju

Shutdown Job

Completed

Kishan

Mr Bijju

Shutdown Job

Completed

Tejprakash

Mr Bijju

Shutdown Job
Work Request

Completed
Completed

Hamid
Narayan

Rohit
Mr Bijju

Safety
Safety
Work request
Work request
Qty Used

Qty Used

Qty Used
100M3

Manpower Required

Hamid
Shaukin
Narayan
Tej prakash
Any Other
Remarks
Approval Taken
(Y/N)

Approval Taken
(Y/N)
Y(Verbal)

Expected
Hours

Rohit
Mr Bijju
Mr Bijju
Mr Bijju

Specific Observation

Work Order No.

The rotor Lift was set as per


manual
the clearance was observed to be
0.0 but it has been made 0.1
Eccentricity found in the range of
0.045 mm

Approval Taken From

Any Other Remarks

Approval Taken From

Any Other Remarks

HOD-Mechanical

Spares or Consumables reqd.

GENERAL SHI

Sr. Equipment/ Area


No
1

SWAS

Turbine 1

Turbine 1

Turbine 2

ACC 1

Turbine 2

Turbine

Store

Store

Turbine 1

Turbine 1

Turbine

Turbine

Store

Material
Consumed
B. WorkShop related Job If any
S No

S No
1
C. Scaffolding work
S No

Particulars
Approx 100M3 scafolding for chiller make up line replacement

D. Improvement related Job

S No

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

GENERAL SHIFT MAINTENANCE LOG B


TURBINE
16.12.2014
Description of Job attended

Setting the Pressure Regulator Valve & PRV of PRV


Strainer Cleaning of CEP 2
Leakage from OVEF has been arrested
Fabrication of Key & Installation in Hogger air Valve
Dummying the Valves meant for fire fighting for external fin cleaning
Fabrication of Platform near barring gear.
Modification in Trolley of cutting set for Safe lifting
Material segregation of Turbine store
Painting on the Almira at Zero meter store at TG
Next day Planning 17.12.14
MP1-ACC Fan-15
MP1-LP Dosing Pump of Pressure HYDRAZINE DOSING 11.6 kg/cm2 and capacity 30
lph - 1
Fabrication of Platform near barring gear.
Modification in Trolley of cutting set for Safe lifting
Material segregation of Turbine store

elated Job If any

work
Particulars
Approx 100M3 scafolding for chiller make up line replacement

nt related Job

SHREE CEMENT LTD,BEAWAR


SHREE MEGA POWER 2 X 150 MW

RAL SHIFT MAINTENANCE LOG BOOK


TURBINE
Job Category
(Improvement/Modi Pending Work,
fication/PM/BD/Work If Any
Request/Misc)

Assigned To

Misc

Completed

Misc

Completed

Work Request

Completed

Narayan + Tej Mr Bijju

Work Request

Completed

Narayan + Tej Mr Bijju

Work Request

Completed

Narayan + Tej Mr Bijju

safety

U/P

Modification

U/P

Modification

U/P

Modification

Completed

Shift Gang
Mahendra
+Rattan
+Narayan

Job
Responsibilit
y

PM

Mr Bijju

Shaukin+
Mr Bijju
Usman + Riyaz
Hamid +
Shareef
Mahendra
+Rattan
+Narayan
Ratan
Mahendra
+Rattan
+Narayan
Narayan+
Kishan

PM

Mr Sabeel

Rohit
Mr Bijju
Mr Bijju

Mr Bijju
Mr Sabeel

Shaukin+
Mr Bijju
Usman + Riyaz

Safety
Modification
Store
Qty Used

Qty Used

Qty Used
100M3

Hamid +
Shareef
Mahendra
+Rattan
+Narayan
Any Other
Remarks
Approval Taken
(Y/N)

Approval Taken
(Y/N)
Y(Verbal)

Rohit
Mr Sabeel

Manpower Required

Expected
Hours

Specific Observation

Work Order No.

The Job attended in Night


High DP reported
Minor leakage Arrested
The Valve was not closing
completely hence sucking air in
Ckt.
for fin cleaning
Base frame is ready, Chequered
plate is not Available.
Trolley issued from store.

MPB 277608
MPB 277644

Approval Taken From

Any Other Remarks

Approval Taken From

Any Other Remarks

HOD-Mechanical

Spares or Consumables reqd.

GENERAL SHIFT M

Sr. Equipment/ Area


No

Material
Consumed
B. WorkShop related Job If any
S No

S No
1
C. Scaffolding work
S No

D. Improvement related Job


S No

Particulars

GENERAL SHIFT MAINTENANCE LOG BOOK


TURBINE

Description of Job attended

Next day Planning 17.12.14

elated Job If any

work

nt related Job

Particulars

RAL SHIFT MAINTENANCE LOG BOOK


TURBINE
Job Category
(Improvement/Modi Pending Work,
fication/PM/BD/Work If Any
Request/Misc)

Assigned To

Qty Used

Any Other
Remarks

Qty Used

Approval Taken
(Y/N)

Qty Used

Approval Taken
(Y/N)

Manpower Required

Expected
Hours

Job
Responsibilit
y

Specific Observation

Work Order No.

Approval Taken From

Any Other Remarks

Approval Taken From

Any Other Remarks

Spares or Consumables reqd.