Академический Документы
Профессиональный Документы
Культура Документы
OPPORTUNITIES
IN INDIA JANUARY 2O15
CONTENTS
INTRODUCTION
SUMMARY 1O
PROJECTS FOR PROCUREMENT
11
12
32
CIVIL AVIATION
5O
POWER 63
DELHI-MUMBAI INDUSTRIAL CORRIDOR
78
RAILWAYS 83
INVESTMENT OPPORTUNITIES IN INDIAN STATES
1O2
1O3
113
121
129
ABBREVIATIONS
ADD Application Due Date
AKIC Amritsar-Kolkata Industrial Corridor
BOO Build Own Operate
BOT Build Operate Transfer
CCEA Cabinet Committee on Economic Affairs
CCI Cabinet Committee on Infrastructure
CEA Central Electrical Authority
CERC Central Electricity Regulatory Commission
DBFOT Design, Built, Finance, Operate and Transfer
DFC Dedicated Freight Corridor
DIPP Department Of Industrial Policy & Promotion
DMIC Delhi-Mumbai Industrial Corridor
DMICDC Delhi-Mumbai Industrial Corridor
Development Corporation
DPR
EPC
FDI
FIPB
FVCI
FY
G-G
GICC
JICA
JV
MOCA
MoP
MoR
MoS
MRTH
NH
NHAI
NHDP
NRI
PPP
PPPAC
PSU
RFP
RFQ
SH
SPV
TDR
TEFR
UMPP
VGF
INTRODUCTION
These are exciting times in India from the standpoint of economic growth and rapid development
standpoint. The last year has been marked by a number of remarkable initiatives from the government
such as Make in India, Skill India, Digital India, etc., which are committed to ensuring
improvement in the business environment in India and making it the pre-eminent destination
for global foreign direct investment.
The MAKE IN INDIA initiative was launched on
September 25, 2014 with an aim of providing global
recognition to the Indian economy. The program includes
major new initiatives designed to facilitate investment,
foster innovation, protect intellectual property, and build
best-in-class manufacturing infrastructure.
Besides focus on enabling manufacture, major initiatives
have been taken in 2014 for improving the EASE OF
DOING BUSINESS in India through simplification and
rationalization of existing rules and the introduction of
information technology to make governance more efficient
and effective.
SKILL INDIA - a multi-skill development programme
has been initiated with a mission for job creation and
entrepreneurship for all socio-economic classes. It endeavours
to establish an international equivalent of the Indian
framework on skill development, creating workforce
mobility and enhancing youth employability.
AMITABH KANT
Secretary, DIPP
RECENT FOREIGN
DIRECT INVESTMENT
POLICY MEASURES
DEFENCE
> The
RAILWAYS
> The
CONSTRUCTION DEVELOPMENT
> The
INSURANCE SECTOR
> FDI
> 100%
> Removal
> FDI
> FDI
funds.
> Nidhi
> Trading
> Real
7. Freight terminals
8. Passenger terminals
5. Railway electrification
6. Signaling systems
> Legal
74%
> Teleports
> Air
> Ground
> Satellites-
> Insurance
> Power
and sub-activities.
exchanges.
> Defence
26%
> Broadcasting
> Private
> Credit
information companies.
2O%
> Public
49%
> Petroleum
> Cable
> Air
Refining by PSU.
Networks.
> Private
security agencies.
> Commodity
exchanges.
>
> Mining
>
> FDI
26%
> Broadcasting
> Publishing/printing
> Publication
> Pharmaceuticals
brownfield.
BEYOND 49%
> Defence
>
>
>
>
>
Telecom.
> Broadcasting
> Terrestrial
OTHER
> Defence
> Airports
> Satellites
74%
> Private
> Banking
SPECIAL DISPENSATION
Special dispensations have been envisaged for NRI
investments in the following :
> Construction
> Ground
development
> NRI
> FDI
TYPES OF INVESTORS
INDIVIDUAL:
> FVCI
> Private
> Pension/Provident
> Financial
Fund
Institutions
Equity Funds
> Partnership
/ Proprietorship Firm
> Others
COMPANY:
> Foreign
Trust
> Sovereign
> NRIs
Wealth Funds
/ PIOs
> 26
CIVIL AVIATION
> PPP opportunity for Operation, Maintenance and
> Top
> Development
> Central
> 4
> Top
> Total
> Top
RAILWAYS
POWER
> Top
1O
> Top
> Majority
PPP basis.
> Total
PROJECTS FOR
PROCUREMENT
11
ROAD TRANSPORT
AND HIGHWAYS
REASONS TO INVEST
> The
> The
INVESTMENT OPPORTUNITIES
> The
> The
> The
13
> Mayurbhanj,
> PPP
PROJECT STATUS
CONTACT INFORMATION
CURRENT STATUS
IMPLEMENTING AGENCY
> DPR
> NHAI,
MODE OF IMPLEMENTATION
completed
> CMD
> To
approval is awaited
> Construction
172 millions
PROJECT DETAILS
PROJECT CONTOURS
> Four-laning
14
Keonjhar
> Keojhar,
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> DPR
> Construction
CONTACT INFORMATION
IMPLEMENTING AGENCY
> NHAI,
completed
Deogarh
154 millions
PROJECT DETAILS
PROJECT CONTOURS
> Rehabilitation
15
> Sambalpur
MODE OF IMPLEMENTATION
> EPC
PROJECT STATUS
CURRENT STATUS
> DPR
> Construction
112 millions
PROJECT DETAILS
PROJECT CONTOURS
> Four-laning/
16
> Existing
CONTACT INFORMATION
IMPLEMENTING AGENCY
> NHAI,
completed
> Project
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> EPC
> NHAI,
PROJECT STATUS
CURRENT STATUS
> Feasibility
> CCI
approval awaited
> Construction
78 millions
resources, NHAI
PROJECT DETAILS
PROJECT CONTOURS
> Improvement
of existing NH-30
Ara
17
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> EPC
CURRENT STATUS
> Feasibility
> CCI
approval awaited
> Construction
120 millions
resources, NHAI
PROJECT DETAILS
PROJECT CONTOURS
> Improvement
18
PROJECT STATUS
> Ara,
> NHAI,
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> EPC
> NHAI,
PROJECT STATUS
CURRENT STATUS
> Feasibility
> CCI
approval awaited
> Construction
95 millions
resources, NHAI
PROJECT DETAILS
PROJECT CONTOURS
> Improvement
of existing NH-84
Buxar
19
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> EPC
CURRENT STATUS
> Feasibility
approval awaited
> Construction
157 millions
resources, NHAI
PROJECT DETAILS
PROJECT CONTOURS
> Improvement
of existing NH-31
Mokama
2O
PROJECT STATUS
> CCI
> NHAI,
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> EPC
> NHAI,
PROJECT STATUS
CURRENT STATUS
> Feasibility
> CCI
approval awaited
> Construction
78 millions
resources, NHAI
PROJECT DETAILS
PROJECT CONTOURS
> Improvement
of existing NH-84
Begusarai
21
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> EPC
CURRENT STATUS
> Feasibility
> Construction
resources, NHAI
PROJECT DETAILS
PROJECT CONTOURS
> Improvement
of existing NH-31
Khagaria
22
PROJECT STATUS
> USD
> NHAI,
> Distt.
MODE OF IMPLEMENTATION
> Government
(EPC mode)
PROJECT STATUS
CURRENT STATUS
> Approved
> Required
CONTACT INFORMATION
IMPLEMENTING AGENCY
> NHAI,
> Construction
281 millions
PROJECT DETAILS
PROJECT CONTOURS
> Four-laning
23
> Districts:
MODE OF IMPLEMENTATION
> BOT
(Toll Mode)
PROJECT STATUS
CONTACT INFORMATION
CURRENT STATUS
IMPLEMENTING AGENCY
> DPR
> NHAI,
> PPPAC/CCEA
approval awaited
> Construction
340 millions
PROJECT DETAILS
PROJECT CONTOURS
> Project
is for improvement of existing six-lane to eightlane standard and service roads (7m width) on both sides
(from Mukarba Chowk at 15.500km to Panipat 86.000 km)
Structures to be constructed on the eight-lane standard.
24
> Existing
MODE OF IMPLEMENTATION
> PPP
CONTACT INFORMATION
IMPLEMENTING AGENCY
PROJECT STATUS
> NHAI,
CURRENT STATUS
> 12
> Shri
> Project
264 millions
PROJECT DETAILS
PROJECT CONTOURS
> Plain
terrain
> Towns:
25
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> Project
> USD
PROJECT DETAILS
PROJECT CONTOURS
> Project
26
CONTACT INFORMATION
IMPLEMENTING AGENCY
> NHAI,
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
> NHAI,
PROJECT STATUS
CURRENT STATUS
> The
received on 12/01/2015
357 millions
PROJECT DETAILS
PROJECT CONTOURS
> Four-laning
of Amravati-Chikli, from166.000 km to
360.000 km in the state of Maharashtra to be executed
as BOT (Toll) basis on DBFOT pattern under NHDP,
Phase-IV, length 194 km, NH 6
27
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
CURRENT STATUS
> The
received on 12/01/2015
PROJECT DETAILS
PROJECT CONTOURS
> Four-laning
28
PROJECT STATUS
> USD
> NHAI,
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
> NHAI,
> Shri
PROJECT STATUS
CURRENT STATUS
> The
received on 12/01/2015
305 millions
PROJECT DETAILS
PROJECT CONTOURS
> Four-laning
29
PROJECT DETAILS
PROJECT CONTOURS
MODE OF IMPLEMENTATION
> BOT
PROJECT STATUS
CURRENT STATUS
> District
> Project
> CCEA
approval awaited
> Technical
as 15/01/2015
> In case of non-receipt of bids on BOT (Toll) Mode,
922 millions
3O
> Project
> Greenfield
CONTACT INFORMATION
IMPLEMENTING AGENCY
> National
> District
> District
MODE OF IMPLEMENTATION
> BOT
(Toll)
PROJECT STATUS
CURRENT STATUS
> Project
completed
Documents prepared
> PPPAC/
CONTACT INFORMATION
IMPLEMENTING AGENCY
> National
> N/A
> Existing
restructuring is underway
> Feasibility
> PPPAC
> Shri
472 millions
(Toll)
PROJECT DETAILS
PROJECT CONTOURS
> Project
31
PORTS AND
SHIPPING
REASONS TO INVEST
> An
> A
> 87
> A
INVESTMENT OPPORTUNITIES
> Port
development the opportunity to serve the spilloff demand from major ports.
> Port
> Ship
33
> Well
MODE OF IMPLEMENTATION
> PPP
CONTACT INFORMATION
IMPLEMENTING AGENCY
PROJECT STATUS
> Jawaharlal
CURRENT STATUS
> Studies
> Chairman:
> Construction
152 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
34
Navi Mumbai
> Well
MODE OF IMPLEMENTATION
CONTACT INFORMATION
> PPP
IMPLEMENTING AGENCY
> Mumbai
PROJECT STATUS
CURRENT STATUS
> Studies
Port Trust
> Project
> Construction
320 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
Mumbai
35
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> DPR
> Construction
96 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
highway network
36
by rail/road to railway/national
> Visakhapatnam
> Chairman:
Port Trust
> Rail/road
MODE OF IMPLEMENTATION
> PPP
CONTACT INFORMATION
IMPLEMENTING AGENCY
PROJECT STATUS
> Paradip
CURRENT STATUS
> All
> Chairman:
studies completed
Port Trust
> Project
> Construction
250 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
District
37
> Rail/road
MODE OF IMPLEMENTATION
> PPP
CONTACT INFORMATION
IMPLEMENTING AGENCY
PROJECT STATUS
> Paradip
CURRENT STATUS
> Feasibility
> Chairman:
> Construction
192 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
38
District
Port Trust
> Well
MODE OF IMPLEMENTATION
> PPP
CONTACT INFORMATION
IMPLEMENTING AGENCY
PROJECT STATUS
> Kandla
CURRENT STATUS
> Studies
> Chairman:
completed
Port Trust
> Project
> Construction
496 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
(Kutch)
39
> Rail/
MODE OF IMPLEMENTATION
CONTACT INFORMATION
> PPP
IMPLEMENTING AGENCY
> Mormugao
PROJECT STATUS
CURRENT STATUS
of NIT for appointment of Consultant:
15/01/2015; Appointment of Consultant: 31/03/2015
> Final
> Construction
84 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
4O
> Issue
Port Trust
> Well
MODE OF IMPLEMENTATION
CONTACT INFORMATION
> PPP
IMPLEMENTING AGENCY
> New
PROJECT STATUS
CURRENT STATUS
> Studies
> Preparation
> Construction
48 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
Mangalore
41
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
CURRENT STATUS
> Preparatory
> Contact
Implementing Agency
817 millions
Investment
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
42
Port Trust
PROJECT STATUS
> Being
> Chennai
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government
+ PPP
PROJECT STATUS
> V.O
CURRENT STATUS
> Consultant
be firmed up
960 millions
PROJECT DETAILS
PROJECT CONTOURS
> At
conceptualization stage
District
43
> Rail/Road
MODE OF IMPLEMENTATION
> PPP
CONTACT INFORMATION
IMPLEMENTING AGENCY
PROJECT STATUS
> Paradip
CURRENT STATUS
> Preparatory
> Chairman:
firmed up
> Contact
Implementing Agency
528 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
44
Port Trust
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government
+ PPP
PROJECT STATUS
> V.O
> Chairman:
CURRENT STATUS
> Studies
completed
1861 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
45
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government
+ PPP
PROJECT STATUS
CURRENT STATUS
> Under
Planning Stage
400 millions
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
by Rail/Road to Railway/National
Highway network
46
> Cochin
Port Trust
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government
+ PPP
PROJECT STATUS
> Kolkata
Port Trust
CURRENT STATUS
> Studies
400 millions
Internal Resources+Private
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
47
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
CURRENT STATUS
> Under
Planning Stage
> Studies
underway
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
48
Port Ltd.
PROJECT STATUS
> USD
> Kamarajar
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government
+ PPP
PROJECT STATUS
> Visakhapatnam
Port Trust
CURRENT STATUS
> Studies
completed
> Project
SPV to be set up
974 millions
Internal Resources+Private
PROJECT DETAILS
PROJECT CONTOURS
> Contact
Implementing Agency
49
CIVIL AVIATION
REASONS TO INVEST
> India
> Indian
> Total
INVESTMENT OPPORTUNITIES
> 300
> The
51
PROJECT DETAILS
PROJECT CONTOURS
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> Airports
> RFQs
> Task
52
> Operation,
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Implementation
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government/
> Airports
New Delhi
EPC
PROJECT STATUS
CURRENT STATUS
> DPR/Feasibility/Technical
up in one year
12 millions
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Jharsuguda,
Odisha
53
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government/
EPC
PROJECT STATUS
CURRENT STATUS
> DPR/Feasibility/Technical
in one year
16 millions
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Raipur,
54
Chhattisgarh
> Airports
New Delhi
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government/
> Airports
New Delhi
EPC
PROJECT STATUS
CURRENT STATUS
> DPR/Feasibility/Technical
up in one year
8.8 millions
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Dibrugarh,
Assam
55
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government/
EPC
PROJECT STATUS
CURRENT STATUS
> DPR/Feasibility/Technical
up in one year
10 millions
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Thiruvananthapuram,
56
Kerala
> Airports
New Delhi
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government/
> Airports
New Delhi
EPC
PROJECT STATUS
CURRENT STATUS
> DPR/Feasibility/Technical
up in one year
24 millions
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Kolkata,
West Bengal
57
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government/
EPC
PROJECT STATUS
CURRENT STATUS
> DPR/Feasibility/Technical
up in one year
10 millions
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Surat,
58
Gujarat
> Airports
New Delhi
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government/
> Airports
New Delhi
EPC
PROJECT STATUS
CURRENT STATUS
> DPR/Feasibility/Technical
up in one year
17 millions
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Vijayawada,
Andhra Pradesh
59
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> Government/
EPC
PROJECT STATUS
CURRENT STATUS
> DPR/Feasibility/Technical
up in one year
8 millions
PROJECT DETAILS
PROJECT CONTOURS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Ahmedabad,
6O
Gujarat
> Airports
New Delhi
MODE OF IMPLEMENTATION
> Government/
PPP
PROJECT STATUS
CURRENT STATUS
> Project
> DPR
is being prepared.
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Implementation
is yet to finalized
be finalised
PROJECT DETAILS
PROJECT CONTOURS
> Initial
stage
61
MODE OF IMPLEMENTATION
> Government/
PPP
CONTACT INFORMATION
IMPLEMENTING AGENCY
PROJECT STATUS
CURRENT STATUS
> Project
> Meetings
yet to be finalized
4-5 millions
Operator
PROJECT DETAILS
PROJECT CONTOURS
> Initial
stage
cities
62
> Implementation
POWER:
THERMAL POWER
REASONS TO INVEST
> The
INVESTMENT OPPORTUNITIES
> Power
Generation
> Transmission
64
& Distribution
> Power
Trading
> Power
Exchanges
> As
POWER:
RENEWABLE
ENERGY
REASONS TO INVEST
> India
> Wind
INVESTMENT OPPORTUNITIES
> From
66
> The
> The
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
CONTACT INFORMATION
IMPLEMENTING AGENCY
> To
> Environment
> Construction
4160 millions
PROJECT DETAILS
PROJECT CONTOURS
> Ultra
67
> Railway
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> Water
> Construction
PPA signed
4640 millions
PROJECT DETAILS
PROJECT CONTOURS
> The
68
> Road
> Air
CONTACT INFORMATION
IMPLEMENTING AGENCY
> To
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> Survey
under progress
> Construction
400 KV
- Line bays 2 nos.
- ICT 2 x 315 MVA, 400/ 220 KV
- ICT bays 2 nos.
- Bus reactor: 1X125 MVAR
- Space for 400 KV bays 4 nos.
220 KV
- Line bays 4 nos.
- ICT bays 2 nos.
- Space for 220 KV bays 4 nos
2. Additional evacuation line from Vindhyachal-IV & V
STPP (3x500 MW)
i. Vindhyachal-IV & V STPP Vindhyachal Pool 400 KV
D/C (Quad) 2nd line
ii. 2 Nos. 400 KV Line bays at Vindhyachal - V STPP
switchyard
3. Additional System Strengthening Scheme for
Chhattisgarh IPPs (Part-A)
i. Sasan UMPP Vindhyachal Pooling station 765 KV S/C line
ii. 1 no. of 765 KV line bay at Sasan UMPP of M/s SPL,
Reliance
iii. LILO of one circuit of Aurangabad Padghe 765 KV
D/C line at Pune
iv. Raigarh (Kotra) - Champa (Pool) 765 KV 2nd S/C line
v. Champa (pool) Dharamjaigarh 765 KV 2nd S/C line
PROJECT DETAILS
PROJECT CONTOURS
> 1.
CONTACT INFORMATION
IMPLEMENTING AGENCY
> To
69
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> Survey
under progress
> Construction
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Sipat
7O
> To
PROJECT DETAILS
PROJECT CONTOURS
MODE OF IMPLEMENTATION
> PPP
> Raipur
> Rajnandgaon
KV D/C line
> Establishment of new switching station near Rajnandgaon
PROJECT STATUS
765KV
1. Line bays 6
CURRENT STATUS
> Survey
completed
> Construction
400KV
> To
CONTACT INFORMATION
IMPLEMENTING AGENCY
> To
> To
71
> Chhattisgarh,
MODE OF IMPLEMENTATION
CONTACT INFORMATION
> CPSU
IMPLEMENTING AGENCY
> POWERGRID,
PROJECT STATUS
CURRENT STATUS
> DPR
> Sudhir
> Studies
> Construction
> Anticipated
3200 millions
be finalized
PROJECT DETAILS
PROJECT CONTOURS
> HVDC
72
Gurgaon, Haryana
> Linear
MODE OF IMPLEMENTATION
CONTACT INFORMATION
> CPSU
IMPLEMENTING AGENCY
project
> POWERGRID,
PROJECT STATUS
Gurgaon, Haryana
CURRENT STATUS
> Investment
> Sudhir
> Project
> Construction
Domestic
PROJECT DETAILS
PROJECT CONTOURS
> Madhya
73
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> CPSU
CURRENT STATUS
> Investment
> Construction
Domestic
PROJECT DETAILS
PROJECT CONTOURS
> Gujarat,
project
74
Gurgaon, Haryana
PROJECT STATUS
> Project
> POWERGRID,
> Sudhir
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> To
> PPP
PROJECT STATUS
CURRENT STATUS
> Technical
studies underway
> Construction
PROJECT DETAILS
PROJECT CONTOURS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Near
75
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> Technical
studies underway
> Construction
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Husainabad
76
> To
CONTACT INFORMATION
Bihar UMPP
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> To
> PPP
PROJECT STATUS
CURRENT STATUS
> Site
identified.
> Studies
by GOI
> Construction
PROJECT DETAILS
LOCATION - DISTRICT TALUKA, TOWN, VILLAGE
> Kakwara
in Banka district
77
DELHI-MUMBAI
INDUSTRIAL
CORRIDOR
> Shendra,
MODE OF IMPLEMENTATION
> EPC/
Design build
Aurangabad District
PROJECT STATUS
> Proposed:
CURRENT STATUS
> Tender
> Preliminary
> Existing:
> Proposed:
> Expected
CONTACT INFORMATION
> Project
IMPLEMENTING AGENCY
> Construction
208 millions
> SPV
Directors
PROJECT DETAILS
PROJECT CONTOURS
> Partly
plain/rolling area
79
> Connected
MODE OF IMPLEMENTATION
> Government/
EPC
> Existing
PROJECT STATUS
CURRENT STATUS
> Pre-Qualification
02/02/2015
> Preliminary
> Construction
288 millions
PROJECT DETAILS
PROJECT CONTOURS
> Plain
terrain
8O
CONTACT INFORMATION
IMPLEMENTING AGENCY
> SPV
of SPV
MODE OF IMPLEMENTATION
> Government
> Connected
> 60m
> DADRI-NOIDA-GHAZIABAD
PROJECT STATUS
Investment Region
CURRENT STATUS
> Preliminary
> Preliminary
> Construction
98 millions
preparation
CONTACT INFORMATION
IMPLEMENTING AGENCY
> SPV
Directors
> Government
PROJECT DETAILS
PROJECT CONTOURS
> Plain
81
> Connected
MODE OF IMPLEMENTATION
> Government/
EPC
PROJECT STATUS
CURRENT STATUS
> Tender
> Detailed
> Construction
49 millions
PROJECT DETAILS
PROJECT CONTOURS
> Undulating
terrain
82
CONTACT INFORMATION
IMPLEMENTING AGENCY
> SPV:
Directors
RAILWAYS
REASONS TO INVEST
> 100%
rail connectivity projects namely Gevra RoadPendra Road new line, Raigarh-Bhupdeopur new line and
Jaigarh Port connectivity projects are being implemented
through the joint venture route.
INVESTMENT OPPORTUNITIES
> Manufacture
of components
> Infrastructure
projects:
9. Gauge conversion
84
CONTACT INFORMATION
IMPLEMENTING AGENCY
> CORE/
MODE OF IMPLEMENTATION
> BOT/
Annuity
PROJECT STATUS
CURRENT STATUS
> Studies
completed
> Bidding
be finalised
36 millions
PROJECT DETAILS
PROJECT CONTOURS
> Line
length - 200 km
> Electrification
Project
85
CONTACT INFORMATION
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> Studies
completed
> Bidding
be finalised
88 millions
PROJECT DETAILS
PROJECT CONTOURS
> Quantity
86
Kerala
> ED/ME/Proj./Railway
Board
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
> CAO/SE/HOWRAH
PROJECT STATUS
Railway Board
Phone: +91 11 23382839
CURRENT STATUS
> Technical
> Detail
estimate sanctioned
> Bidding
be finalised
27 millions
PROJECT DETAILS
PROJECT CONTOURS
> Capacity
> BOT/
Annuity
87
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
CURRENT STATUS
> Technical
> Earthwork,
> Bidding
41 millions
PROJECT DETAILS
PROJECT CONTOURS
> Capacity
> BOT/
Annuity
88
PROJECT STATUS
> To
> CAO/SE/HOWRAH
Railway Board
Phone: +91 11 23382839
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
> CAO/ECoR,
BHUBANESWAR
PROJECT STATUS
CURRENT STATUS
> Technical
> Earthwork,
> Bidding
be finalised
108 millions
PROJECT DETAILS
PROJECT CONTOURS
> Capacity
> BOT/
Annuity
89
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
CURRENT STATUS
> Technical
> Earthwork,
> Bidding
133 millions
PROJECT DETAILS
PROJECT CONTOURS
> Capacity
> BOT/
Annuity
9O
BHUBANESWAR
PROJECT STATUS
> To
> CAO/ECoR,
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
> CAO/SC/SECUNDERABAD,
PROJECT STATUS
> CAO/SC/SECUNDERABAD
Achal Khare, ED /
CURRENT STATUS
> Technical
> Final
Location survey-ongoing
> Bidding
be finalised
168 millions
PROJECT DETAILS
PROJECT CONTOURS
> Capacity
> BOT/
Annuity
- Vijaywada
91
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
CURRENT STATUS
> Technical
> Detailed
> Bidding
47 millions
PROJECT DETAILS
PROJECT CONTOURS
> Capacity
> BOT/
Annuity
92
PROJECT STATUS
> FY
> CAO/CR/MUMBAI
(Sewagram) - Nagpur
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
> CAO/SECR/BILASPUR
PROJECT STATUS
CURRENT STATUS
> Technical
> Detailed
estimate is sanctioned
> Bidding
to be finalised
24 millions
PROJECT DETAILS
PROJECT CONTOURS
> Capacity
> BOT/
Annuity
93
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> PPP
CURRENT STATUS
> Technical
> Bidding
next 2 years
23 millions
PROJECT DETAILS
PROJECT CONTOURS
> Capacity
> BOT/
Annuity
94
PROJECT STATUS
> Final
> CAO/NWR/Jaipur
Bangurgram
Railway Board
Phone: +91 11 23382839
> Dankuni-Gomoh
MODE OF IMPLEMENTATION
CONTACT INFORMATION
> PPP
IMPLEMENTING AGENCY
> DCCCIL,
PROJECT STATUS
CURRENT STATUS
> Technical
> Bidding
720 millions
PROJECT DETAILS
PROJECT CONTOURS
> The new line is planned to provide connectivity to mineral
Annuity
95
8. Manglore/SWR/Hubli,Karnataka
9. Ernakulam/SR/Chennai
10. Vijayawada/SCR/Secunderabad
MODE OF IMPLEMENTATION
11. Nagpur/CR/Mumbai
> PPP
12. Byappanahalli/SWR/Hubli
13. New Bhubneshwar/ECoR/Bhuwneshwar
PROJECT STATUS
CURRENT STATUS
CONTACT INFORMATION
> Studies
IMPLEMENTING AGENCY
are ongoing
PROJECT DETAILS
PROJECT CONTOURS
> Re-development
of Passenger terminals at
1. Habibganj/WCR
2. Shivaji Nagar/CR
3. Anand Vihar/NR
4. Bijwasan/NR
5. Chandigarh/NR
6. Surat/WR, Mumbai
7. Gandhinagar/WR/Mumbai
96
be finalized
> Cost
> MD/
> ED/
CONTACT INFORMATION
> M.
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> Feasibility
> Bidding
study ongoing
13120 millions
G-G Cooperation
PROJECT DETAILS
PROJECT CONTOURS
> BOT/
> 2300
Annuity
> Provides
97
CONTACT INFORMATION
MODE OF IMPLEMENTATION
> BOT/
G-G Cooperation
PROJECT STATUS
CURRENT STATUS
> Feasibility
study completed
to be finalized
11200 millions
G-G Cooperation
PROJECT DETAILS
PROJECT CONTOURS
> 2330
> Bidding
corridor will provide connectivity from mineralrich eastern part of the country to the consumption hub
in the West.
98
> M.
CONTACT INFORMATION
IMPLEMENTING AGENCY
MODE OF IMPLEMENTATION
> DBFOT
> CAO(O)
PROJECT STATUS
CURRENT STATUS
> Pre-feasibility
completed
open
3360 millions
PROJECT DETAILS
PROJECT CONTOURS
> 60
99
MODE OF IMPLEMENTATION
> DBFOT/
PROJECT STATUS
CURRENT STATUS
> Pre-feasibility
11200 millions
PROJECT DETAILS
PROJECT CONTOURS
> 504
km
> Bidding
for PPP
1OO
CONTACT INFORMATION
KEY CONTACT PERSON(S) AND CONTACT DETAILS
> Adv./Infra./Railway
Board (Tel.No.011-23389215)
and ED/PSU & HS, Railway Board
Phone: +91 11 23386091) and V.K. Singh, CEO/RVNL
Phone: +91 11 26169637)
> To
MODE OF IMPLEMENTATION
> DBFOT
CONTACT INFORMATION
PROJECT STATUS
CURRENT STATUS
> Pre-feasibility
studies completed
IMPLEMENTING AGENCY
> Mumbai
> Anticipated
> Ravi
> Projects
2240 millions
PROJECT DETAILS
PROJECT CONTOURS
> 49
> Bidding
1O1
INVESTMENT
OPPORTUNITIES
IN INDIAN STATES
1O2
INVESTMENT
OPPORTUNITIES IN
ANDHRA PRADESH
PCPIR EXPRESSWAY
STATE: ANDHRA PRADESH
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> DPR
be finalised
375 millions
PROJECT DETAILS
PROJECT CONTOURS
> Six-lane
1O4
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Transport,
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Infrastructure
> PPP
PROJECT STATUS
CURRENT STATUS
> TEFR
be finalised
377 millions
PROJECT DETAILS
PROJECT CONTOURS
> Development
of Bhavanapadu port
1O5
PROJECT STATUS
CURRENT STATUS
> DPR
prepared
be finalised
377 millions
PROJECT DETAILS
PROJECT CONTOURS
> Development
of Machilipatnam port
1O6
district
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Infrastructure
CONTACT INFORMATION
IMPLEMENTING AGENCY
> APTRANSCO
> PPP
Transmission Corporation of
Andhra Pradesh Limited, Vidyut Soudha, Khairatabad,
Hyderabad-500082
PROJECT STATUS
CURRENT STATUS
> Phone:
> DPR
+91 40 23396000
prepared
be finalised
10 millions
PPP
PROJECT DETAILS
PROJECT CONTOURS
> Upgradation
district
1O7
IMPLEMENTING AGENCY
> APTRANSCO
> PPP
Transmission Corporation of
Andhra Pradesh Limited, Vidyut Soudha, Khairatabad,
Hyderabad-500082
PROJECT STATUS
CURRENT STATUS
> Phone:
> DPR
prepared
be finalised
27 millions
PPP
PROJECT DETAILS
PROJECT CONTOURS
> 400
1O8
CONTACT INFORMATION
district
+91 40 23396000
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Andhra
> PPP
PROJECT STATUS
CURRENT STATUS
> DPR
prepared
be finalised
27 millions
PPP
PROJECT DETAILS
PROJECT CONTOURS
> Four-laning
1O9
PROJECT STATUS
CURRENT STATUS
> DPR
prepared
be finalised
PROJECT DETAILS
PROJECT CONTOURS
> Four-laning
11O
district
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Andhra
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Andhra
> PPP
PROJECT STATUS
CURRENT STATUS
> DPR
prepared
be finalised
PROJECT DETAILS
PROJECT CONTOURS
> Four-laning
district
111
PROJECT STATUS
CURRENT STATUS
> DPR
be finalised
PPP
PROJECT DETAILS
PROJECT CONTOURS
> Upgradation
and Kovvur
112
Godavari district
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Andhra
INVESTMENT
OPPORTUNITIES
IN BIHAR
MODE OF IMPLEMENTATION
> Government
PROJECT STATUS
CURRENT STATUS
> Procurement
> Proposed:
CONTACT INFORMATION
> Project
IMPLEMENTING AGENCY
> Construction
63 millions
PROJECT DETAILS
PROJECT CONTOURS
> Urban
Area
114
flexible pavement
Town
> Bihar
MODE OF IMPLEMENTATION
> PPP
PROJECT STATUS
CURRENT STATUS
> PPR
> Existing :
> Feasibility
> Construction
296 millions
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Bihar
PROJECT DETAILS
PROJECT CONTOURS
> Construction
> Plain
115
MODE OF IMPLEMENTATION
> Presently
> Government
PROJECT STATUS
CURRENT STATUS
> Final
> Construction
36 millions
PROJECT DETAILS
PROJECT CONTOURS
> Kishunganj,
116
NH-31 to NH-106
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Bihar
MODE OF IMPLEMENTATION
> Presently
> Government
PROJECT STATUS
CURRENT STATUS
> Final
> Construction
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Bihar
76 millions
PROJECT DETAILS
PROJECT CONTOURS
> Nawada,
Jamui
NH-31 to NH-222
117
MODE OF IMPLEMENTATION
> Presently
> Government
PROJECT STATUS
CURRENT STATUS
> Draft
> Construction
77 millions
PROJECT DETAILS
PROJECT CONTOURS
> Hajipur,
118
NH-19 to NH-28
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Bihar
MODE OF IMPLEMENTATION
> EPC,
ADB Loan
PROJECT STATUS
greenfield
> Proposed :
CURRENT STATUS
> Under
> PPR
procurement
completed
> Construction
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Bihar
798 millions
PROJECT DETAILS
PROJECT CONTOURS
> Development
119
- Vaishali
MODE OF IMPLEMENTATION
> Village:
Hajrat-Jandaha-Panapur-Mahua-Lalganj
> PPP
PROJECT STATUS
> Existing-
greenfield
> Proposed:
four-lane highway
CURRENT STATUS
> PPR
> Feasibility
> Construction
243 millions
PROJECT DETAILS
PROJECT CONTOURS
> Construction
> Plain
12O
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Bihar
INVESTMENT
OPPORTUNITIES
IN TAMIL NADU
PROJECT STATUS
CURRENT STATUS
> RFP
stage
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Chennai
> USD
59 millions
PPP
PROJECT DETAILS
PROJECT CONTOURS
> In
122
> Mr
CHENNAI-BANGALORE EXPRESSWAY
STATE: TAMIL NADU
MODE OF IMPLEMENTATION
CONTACT INFORMATION
IMPLEMENTING AGENCY
> NHAI
> PPP
PROJECT STATUS
CURRENT STATUS
> Studies
be finalised
960 millions
PROJECT DETAILS
PROJECT CONTOURS
>A
123
be finalised
PROJECT STATUS
CURRENT STATUS
> Preparation
be finalised
256 millions
PROJECT DETAILS
PROJECT CONTOURS
> Total
124
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Tamil
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Tamil
Port Ltd.
PROJECT STATUS
CURRENT STATUS
> Alignment
be finalised
160 millions
PROJECT DETAILS
PROJECT CONTOURS
> Planned
125
PROJECT STATUS
CURRENT STATUS
> Work
be finalised
160 millions
PROJECT DETAILS
PROJECT CONTOURS
> The
126
CONTACT INFORMATION
IMPLEMENTING AGENCY
> TNRDC
CONTACT INFORMATION
IMPLEMENTING AGENCY
> Industries
Department, GoTN
> PPP
PROJECT STATUS
CURRENT STATUS
> Studies
be finalised
6400 millions
PROJECT DETAILS
PROJECT CONTOURS
> The
127
> PPP
PROJECT STATUS
CONTACT INFORMATION
CURRENT STATUS
IMPLEMENTING AGENCY
> Studies
> TIDCO,
be finalised
be finalised
be finalised
PROJECT DETAILS
PROJECT CONTOURS
> TIDCO
128
REASONS TO
INVEST AND
INVESTMENT
OPPORTUNITIES
IN VARIOUS
SECTORS
129
AUTOMOBILES
REASONS TO INVEST
> By
> Over
> Global
INVESTMENT OPPORTUNITIES
> Passenger
> Three-wheelers:
passenger carriers,
goods carriers.
> Commercial
> Huge
131
AUTOMOBILE
COMPONENTS
REASONS TO INVEST
> An emerging global hub for sourcing auto components.
nations.
INVESTMENT OPPORTUNITIES
ENGINE & ENGINE PARTS:
rail systems.
EQUIPMENT:
METAL PARTS
> Manufacturers are expected to benefit from the growing demand
for sheet metal parts, body & chassis, fan belts, pressure die castings
and hydraulic pneumatic instruments in the two-wheeler segment.
> Leading players in the sheet metal parts sub-segment are in the
process of expanding their customer base.
low cost hybrid and electric vehicles (xEVs) that are suitable shortdistance urban commutes (averaging 50-100 kms per trip) and
rugged enough to perform reliably in the summer and through
the Indian monsoon. It is estimated that sales for such vehicles
would amount to 6-7 Million units by 2020.
133
BIOTECHNOLOGY
REASONS TO INVEST
> India
> India
> India
> India
> Increasing
INVESTMENT OPPORTUNITIES
> The
> India
135
CHEMICALS
REASONS TO INVEST
> India
>Indias
> The
> Strong
> India
> Polymers
INVESTMENT OPPORTUNITIES
AGRO-CHEMICALS:
> India
globally.
> India
> Growth
> The
137
CONSTRUCTION
REASONS TO INVEST
> An
> The
> Construction
INVESTMENT OPPORTUNITIES
> Construction
> Sustainable
> Technologies
> Training
> Technologies
> Smart
building solutions.
> Urban
139
DEFENCE
MANUFACTURING
REASONS TO INVEST
> Indias
INVESTMENT OPPORTUNITIES
> Defence
> Supply
products manufacturing
> Defence
offsets
141
ELECTRICAL
MACHINERY
REASONS TO INVEST
> Market-oriented
> A
> Incentives
countries.
> Investments
INVESTMENT OPPORTUNITIES
GENERATION MACHINERY: BOILERS, TURBINES,
GENERATORS
> By
TRANSMISSION MACHINERY:
> By
143
ELECTRONIC
SYSTEMS
REASONS TO INVEST
> Global
> Large
> India
INVESTMENT OPPORTUNITIES
> Setting
> Semiconductor
> Electronic
Components
> Semiconductor
> Electronics
> Telecom
products
> Industrial/
Consumer electronics
Design
> Set
> Laptops,
> Automotive
> LED
(USD 35 Billion)
> Consumer
> Medical
145
FOOD
PROCESSING
REASONS TO INVEST
> A rich agriculture resource base, India was ranked No. 1 in the
INVESTMENT OPPORTUNITIES
> Fruits and vegetables: preserved, candied, glazed and crystallized
fruits and vegetables, juices, jams, jellies, purees, soups, powders,
dehydrated vegetables, flakes, shreds and ready-to-eat curries.
> Food preservation by fermentation: wine, beer, vinegar, the
preparation of yeast, alcoholic beverages.
> BEVERAGES: fruit-based, cereal-based.
drinking water.
> Grain processing oil milling sector, rice, pulse milling and flour
milling sectors.
147
IT AND BPM
REASONS TO INVEST
> The
> Rapidly
> Indias
> The Indian IT industry has saved clients USD 200 Billion
INVESTMENT OPPORTUNITIES
> The
> IT
149
LEATHER
REASONS TO INVEST
> The
> The
> Exports
labour costs.
> Exports
INVESTMENT OPPORTUNITIES
> The
> The
151
MEDIA &
ENTERTAINMENT
REASONS TO INVEST
> Total
INVESTMENT OPPORTUNITIES
> TELEVISION:
153
MINING
REASONS TO INVEST
> India
> Indias
> Indias
INVESTMENT OPPORTUNITIES
> IRON
& STEEL:
> BASE
METALS:
155
REASONS TO INVEST
> Policies
> Despite
INVESTMENT OPPORTUNITIES
> SHALE:
> OPPORTUNITIES
157
PHARMACEUTICALS
REASONS TO INVEST
> India
of size.
> Indias
> Indias
reduced.
INVESTMENT OPPORTUNITIES
> India
> The
> The
159
SPACE
REASONS TO INVEST
> Through
> With
> The
TECHNOLOGY TRANSFER
> The
TECHNICAL CONSULTANCY
> ISRO
161
TEXTILES AND
GARMENTS
REASONS TO INVEST
> India
globally.
> The
> Increased
> A
INVESTMENT OPPORTUNITIES
> Entire
> Value-added
> Fabric
> Technical
textiles.
> Garments.
> Retail
brands.
163
TOURISM AND
HOSPITALITY
REASONS TO INVEST
> Tourism
> India
> India
> India
INVESTMENT OPPORTUNITIES
> The
> Eco-tourism
> A
> The
> Rural
> Investment
165
WELLNESS
REASONS TO INVEST
> India
INVESTMENT OPPORTUNITIES
> Ayurveda
> Medical
167
Knowledge Partner: