Date
1
A-14
27-02-2015
750
23.811
10.848
13.000
2.152
Wastage
Percentage up to
C.L.(%)
Wastage (m3) up
to C.O.L.
Actual Concrete
Vol(m3)
TheroriticalConcr
ete Vol up to
C.O.L.(m3)
Boring Depth
from GL(m)
Diameter(mm)
No
Pile Boring / Concreting Summary Tower 1
19.84%
3.144
2.505
24.450
Tape
measurement (m)
GL (m)
CTL (m)
LEVEL (MSL)
METRE
2.245
23.551
26.671
2
0.600
1.200
321.252
792.422
0.0
0.000
792.422 195.241
Total main wt
Additional lap
weight
Additional lap
length
weigth of Vertical
R/F
length of Vertical
R/F
8.3
203.561
24
14
14
15
2.450
36.750
Spiral Length
Total wt
No of rings
Aditional length
22.663
203.561
240.311
125.529
Total wt of steel
Total wt of spiral
wt of spiral
TOTAL WT (Kg)
148.192
940.614
November 2014
Check List No :
Location / Block:
Pile Location
Pile Diameter (mm)
750
Date:
started (Date/Time)
Activity
Finished (Date/Time)
BOREHOLE LOG
Drilling
26-02-2015
09.35
27-02-2015
09.15
Concreting
27-02-2015
19.55
27-02-2015
20.39
Ground Level
DESCRIPTION
Casing Top Level
TT/P/03A&TT/P/04A
MSL
2.245
2.505
24.450
0.260
MSL
MSL
m
m
H2
H3
22.426
1.125
m
m
Fresh Rock Level
Toe Level
3.245
-18.856
-20.181
-21.306
23.811
MSL
MSL
MSL
MSL
m
10.848
23.551
m3
m
Link (10mm) :
195.241
8.3
13.000
m3
Total weight :
940.614
Kg
R/F calculation.
Main (25mm) :
23.551
1.04+1.04+1.04
0.6 2
15
Comment Note 1:
Comment Note 2:
Comment Note 3:
Engineer - Walkers : ..
Engineer-(CML) : .
Name :
Date :
Date :..
Rev. 1
27-02-2015
QA/QC
November 2014
ALUTHMAWATHA
TT/P/03A&TT/P/04A
A-14
27-02-2015
BOREHOLE LOG
3.144
2.505
H1
2.245
H2
24.450
(W/R)
-18.856
-20.181
H3
1.04+1.04+1.04
=
=
2.450
-21.306
12
321.252
792.422
= 240.311
= 148.192
Kg
Kg
-(CML) : .
..
Rev. 1
QA/QC
November 2014
27-02-2015
A-14
Date :
Location:
Structure :
Boring Started at
750
2.245
2.505
Pile Diameter :
Pile Cutoff Level:
Ground Level:
Date
mm
Boring finished at :
MSL
MSL
Penetration
Rate
(mm/hr)
Depth from
Casing Top (m)
Time
Bentonite Testing
Viscosity
(30 -90 s)
Density
( > g/ml)
27-02-2015
1.03
38
1.09
32
pH
(9.5-12)
R/F Records
Total Length of cage Main
Y(25mm)
Link
Y(10mm)
( 23.551 + 1.04+1.04+1.04
195.241 +
8.3 )
12
15 *
0.6 * 2 )
2.450
Total
Concrete Record
Es. Theoritical Concrete Volume :
10.848
Truck No.
m3
6.50
6.50
19.00
19.15
Arrival at Site
19.15
19.44
165
180
05
04
Concreting started at
19.55
20.24
Concreting Finished at
20.08
20.39
Slump at Site
(mm)
Engineer - Walkers :
Engineer (CML):
Name :
Date :
Rev. 1
27-02-2015
Date :
QA/QC
November 2014
HMAWATHA
Ltd
Piling
26-02-2015
09.35
27-02-2015
09.15
3.144
MSL
(At the end of the Boring)
Remarks
Before Flushing
After Flushing
length (m)
Weight (kg)
321.252
792.422
240.311
148.192
940.614
13.000
6
m3
7
r (CML):
Rev. 1
QA/QC
General Data
Structure
Pile No.
Drilling commence date
Drilling starting time
Drilling Finishing
Rock Starting Level
Toe Level
Pile cut-off level
Casing Top Level
Ground level
Cage Installation
Check verticality
Lap lenth :
1.04m
Welding Condition
Cover Blocks
Piling
A-14
26-02-2015
09.35
27-02-2015 09.15
-20.181
-21.306
2.245
3.144
2.505
(Date/time)
MSL
MSL
MSL
MSL
MSL
Setting Level:
a
a
a
a
3.245
a
a
Concreting
Check Slump (180+/- 20mm)
( 09 Nrs)
Embeded part of Tremie (2m)
Installation of Casing
Concrete Volume
Check Casing Centre
Cordinates
Verticality
a
Casing Length
Casing Diameter
:
:
Yes
No
0.600
0.900
Density (g/ml)
< 1.1 -1.2
Viscosity (s)
30-90 s
pH Valve
9.5 - 12
19.55
20.39
Before
Concreting
Flushing
<1.1
1.03
< 1.2
38.00
1.09
32.00
Yes
No
Yes
No
Yes
No
Final Cleaning
Yes
No
Cage Fabrication
Main Bar Diameter
No of Main bars
Lap Length
Hoop Bar Diameter
Intervals of Hoop Bar
Cover Blocks
13.000
10.848
m
m
Pile Boring
Bentonite Testing
Date/Time
Removal Of Casing
E
Check Verticality
Actual
Theoritical
20
12
1.04
10
225
75
mm
NO's
m
mm
mm
mm
Certified by:
Engineer - CML-MTD
.
Name:
A.M.M Rukshan
Date :
27-02-2015
Name:
Date :
THA
Yes
Yes
Yes
Yes
No
No
No
No
Yes
No
Yes
Yes
No
No
Yes
No
Yes
No
Yes
No
Cum
Cum
Yes
No
Engineer - CML-MTD
..