Pile No

Date

1
A-14
27-02-2015
750
23.811
10.848
13.000
2.152

Wastage
Percentage up to
C.L.(%)

Wastage (m3) up
to C.O.L.

Actual Concrete
Vol(m3)

TheroriticalConcr
ete Vol up to
C.O.L.(m3)

Boring Depth
from GL(m)

Diameter(mm)

No
Pile Boring / Concreting Summary Tower 1

19.84%

3.144
2.505
24.450

Con. Height (up


to cut of level)

Cut of Level (m)

Tape
measurement (m)

GL (m)

CTL (m)

LEVEL (MSL)
METRE

2.245
23.551
26.671
2
0.600

1.200
321.252
792.422
0.0
0.000
792.422 195.241

225mm pitch lap length

225mm pitch length

Total main wt

Additional lap
weight

Additional lap
length

weigth of Vertical
R/F

length of Vertical
R/F

VERTICLE R/F WT CALCULATION

8.3

203.561

24

14

14

15

2.450

36.750

Total Spiral Length

Spiral Length

Total wt

No of rings

Aditional length

SPIRAL R/F WT CALCULATION

22.663

203.561

240.311

125.529
Total wt of steel

Total wt of spiral

wt of spiral

TOTAL WT (Kg)

148.192
940.614

Piling Check List

November 2014

WALKERS PILING (PVT) LTD.


PILING WORK FOR PROPOSED URBAN REGENERATION PROJECT - ALUTHMAWATHA
CONTRACT NO:
WPL/2014/06
Client : Urban Development Authority.
Consultant:
SEC Consultant

Main Contractor: CML - MTD Construction Ltd


Contractor:Walkers Piling (Pvt) Ltd.

QUALITY ASSUARANCE & QUALITY CONTROLLING DOCUMENT


PILING CHECK LIST - BORED PILE
1
"A"
Reference Drawing No:
Pile No.

Check List No :
Location / Block:
Pile Location
Pile Diameter (mm)

750

Date:

started (Date/Time)

Activity

Finished (Date/Time)

BOREHOLE LOG

Drilling

26-02-2015

09.35

27-02-2015

09.15

Casing Top Level

Concreting

27-02-2015

19.55

27-02-2015

20.39

Ground Level

DESCRIPTION
Casing Top Level

TT/P/03A&TT/P/04A

Cut off Level


3.144

MSL

Cut Off Level


Ground Level
H
H1

2.245
2.505
24.450
0.260

MSL
MSL
m
m

H2
H3

22.426
1.125

m
m
Fresh Rock Level
Toe Level

Reinforcement Top Level


Fractured Rock level
Fresh Rock Level
Toe Level
Total Boring Length

3.245
-18.856
-20.181
-21.306
23.811

MSL
MSL
MSL
MSL
m

Concrete Volume Theoritical


Concreted Height

10.848
23.551

m3
m

Link (10mm) :

195.241

8.3

Concrete Volume Actual

13.000

m3

Total weight :

940.614

Kg

R/F calculation.
Main (25mm) :

23.551

1.04+1.04+1.04
0.6 2
15

Concrete supplied from CML Plant

Comment Note 1:

Comment Note 2:

Comment Note 3:

Engineer - Walkers : ..

Engineer-(CML) : .

Name : A.M.M Rukshan

Name :

Date :

Date :..

Rev. 1

27-02-2015

QA/QC

Piling Check List

November 2014

ALUTHMAWATHA

iling (Pvt) Ltd.

TT/P/03A&TT/P/04A
A-14
27-02-2015

BOREHOLE LOG
3.144
2.505
H1
2.245

H2

24.450
(W/R)

-18.856
-20.181
H3

1.04+1.04+1.04
=
=
2.450

-21.306

12

321.252
792.422

= 240.311
= 148.192

Kg
Kg

-(CML) : .

..

Rev. 1

QA/QC

Piling Check List

November 2014

WALKERS PILING (PVT) LTD.


PILING WORK FOR PROPOSED URBAN REGENERATION PROJECT - ALUTHMAWATHA
PILING WORK
CONTRACT NO: WPL/2014/06
Client : Urban Development Authority
Consultant : SEC Consultant

Main Contractor : CML - MTD Construction Ltd


Contractor : Walkers Piling (Pvt) Ltd
QUALITY ASSUARANCE & QUALITY CONTROLLING DOCUMENT
PILING CHECK LIST - PILE BORING AND CONCRETING RECORDS

Check List No.:

27-02-2015
A-14

Date :
Location:

Structure :
Boring Started at

750
2.245
2.505

Pile Diameter :
Pile Cutoff Level:
Ground Level:

Date

mm

Boring finished at :

MSL
MSL

Casing Top Level :

Penetration
Rate
(mm/hr)

Depth from
Casing Top (m)

Time

Bentonite Testing
Viscosity
(30 -90 s)

Density
( > g/ml)

27-02-2015

1.03

38

1.09

32

pH
(9.5-12)

R/F Records
Total Length of cage Main

Y(25mm)

Link

Y(10mm)

( 23.551 + 1.04+1.04+1.04

195.241 +

8.3 )

12

15 *

0.6 * 2 )

2.450

Total
Concrete Record
Es. Theoritical Concrete Volume :

10.848

Truck No.

m3

Ordered Concrete Volume :

Truck Volume (cum)

6.50

6.50

Departure at batching Plant

19.00

19.15

Arrival at Site

19.15

19.44

165

180

No. of test cubes cast

05

04

Concreting started at

19.55

20.24

Concreting Finished at

20.08

20.39

Slump at Site

(mm)

Engineer - Walkers :

Engineer (CML):

Name : A.M.M Rukshan

Name :

Date :

Rev. 1

27-02-2015

Date :

QA/QC

Piling Check List

November 2014

HMAWATHA

Ltd

Piling
26-02-2015

09.35

27-02-2015

09.15

3.144

MSL
(At the end of the Boring)

Remarks

Before Flushing
After Flushing

length (m)

Weight (kg)

321.252

792.422

240.311

148.192
940.614

13.000
6

m3
7

r (CML):

Rev. 1

QA/QC

WALKERS PILING (PVT) LTD


PILING WORK FOR PROPOSED URBAN REGENERATION PROJECT - ALUTHMAWATHA
PILING WORK
CONTRACT NO: UDA/URP(M)/D/302

Client : Urban Development Authority.


Consultant :
SEC Consultant.

Main Contractor : CML - MTD Construction Ltd


Contractor : WALKERS PILLING (PVT)
Contractor:Walkers
L
Piling(Pvt) Ltd.
QUALITY ASSUARANCE & QUALITY CONTROLLING DOCUMENT
PILING CHECK LIST - BORED CAST-IN-SITUPILE

General Data
Structure
Pile No.
Drilling commence date
Drilling starting time
Drilling Finishing
Rock Starting Level
Toe Level
Pile cut-off level
Casing Top Level
Ground level

Cage Installation
Check verticality
Lap lenth :
1.04m
Welding Condition
Cover Blocks

Piling
A-14
26-02-2015
09.35

27-02-2015 09.15
-20.181
-21.306
2.245
3.144
2.505

(Date/time)
MSL
MSL
MSL
MSL
MSL

Survey and Setting out


Check Pile Centre
Cordinates

Setting Level:

a
a
a
a

3.245

Inatallation of Tremie pipe


Check joints
Check total length :
Flushing Duration

a
a

Concreting
Check Slump (180+/- 20mm)

Cast concrete Test Cube

( 09 Nrs)
Embeded part of Tremie (2m)

Installation of Casing
Concrete Volume
Check Casing Centre
Cordinates

Verticality
a

Casing Length
Casing Diameter

:
:

Yes

No

0.600
0.900

Density (g/ml)
< 1.1 -1.2
Viscosity (s)
30-90 s
pH Valve
9.5 - 12

Concrete Start Time

19.55

Concrete Finishing Time

20.39

Boring Operator: Raju


Boring
<1.1

Before
Concreting

Flushing
<1.1

1.03

< 1.2

38.00

Concrete Supervisor: Hashan

1.09

Boring Supervisor: Isuru

32.00

Site incharge: Manjula


Site Engineer: Rukshan

Check Verticality of Kelly bar

Yes

No

Socketing and Termination


1. Penetration Rate

Yes

No

2. Pile Capacity Calculation

Yes

No

Final Cleaning

Yes

No

Cage Fabrication
Main Bar Diameter
No of Main bars
Lap Length
Hoop Bar Diameter
Intervals of Hoop Bar
Cover Blocks

13.000
10.848

m
m

Pile Boring
Bentonite Testing
Date/Time

Removal Of Casing

E
Check Verticality

Actual
Theoritical

20
12
1.04
10
225
75

mm
NO's
m
mm
mm
mm

Prepared & checked by:


Engineer - Walkers

Certified by:
Engineer - CML-MTD

.
Name:
A.M.M Rukshan
Date :
27-02-2015

Name:
Date :

THA

Yes
Yes
Yes
Yes

No
No
No
No

Yes

No

Yes
Yes

No
No

Yes

No

Yes

No

Yes

No

Cum
Cum

Yes

No

Engineer - CML-MTD

..