Вы находитесь на странице: 1из 10

Gulf Cooperation Council

Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

P821

Bay Ref:
Substation:
REVISION
PAGES 0
1

SUMMARY
1

PURPOSE OF TESTS

REFERENCE DOCUMENT

SCOPE

RELAY TERMINLOGY

TEST EQUIPMENT

PRE-REQUISTES

PROCEDURES

RECORD TEST SHEET

8.1 RELAY INFORMATION


8.2 CT DATA:
8.3 PRODUCT CHECKS
8.4 MEASURMENT VALUE TEST:
8.5 BREAKER FAIL PROTECTION:
8.6 BINARY INPUT TEST :
8.7 BINARY OUTPUT TEST:
8.8 FIXED LED INDICATIONS TEST:
8.9 LED INDICATIONS TEST:
8.10

FINAL CHECK

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 1 of 10

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P821
1

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

Bay Ref:
Substation:

PURPOSE OF TESTS

The purpose of the tests is to check the full functionality of the protection relay.
This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or
SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning
procedures.
This procedure does not intend to check all tripping matrix and PSL logic tests, this, when applicable,
are described into a separate document, dedicated to the specific substation and feeder type.
2

REFERENCE DOCUMENTS
DOCUMENT
REFERENCE

DOCUMENT

VERSION/
DATE

REMARKS

Protection Line Diagram


Schematic Drawing
Service Manual
Operation Manual
Protection Relay Coordination Principles
Relay setting Calculation
LED Display Configuration

SCOPE

Substation Name :Diameter:


Bay :
Panel Number :
Relay Denomination in Scheme
Scheme to be Checked

Relay Functionality Test.

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 2 of 10

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P821
4

Bay Ref:
Substation:

TERMINOLOGY

Code ( ANSI)
50/62

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

Terminology
Breaker Fail Protection Including BF timers.

TEST EQUIPMENT USED

Sl No
1.

Description

Make

Equipment
Sl No.

Calibration
date

2.

Secondary
Injection Kit
Multimeter

3.

Laptop

NA

Setting software

Type
: MICOM S1 Studio
Version : 2.14

Calibration due
date

PRE - REQUISITES
PRE-REQUISITES

REMARKS

All Safety Condition Are Ok


All Competent Personnel Available For The Test
Ac & Dc Supply Availability And Security
PPE Safety Available.
All Other Relevant Safety Instructions Been Followed
Coordination With Other Parties ( GIS, Transformer, Etc..)

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 3 of 10

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P821
7

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

Bay Ref:
Substation:

TEST PROCEDURES
The following procedures are written for demonstrating the main protection functions of the P821
relay using an Omicron test set or similar. The tests do not test the boundaries of all available function
characteristics. They do test that the function is operating at a point on one chosen characteristic. This
document is to be referred to when performing commissioning tests in association with the
commissioning section of the service manual.

NOTE :
All the Test are performed in the Test Switch.
Omicron CMC156 Test Equipment or Any Equivalent To Be Used ..

7.1 Testing the "CB Failure protection" function


7.1.1 MiCOM P821 relay parameters
Note the settings of the MiCOM P821 relays are by default the following:
I>BF = 0,10 In
Delay stage 1 = tBF1 = 100ms thus retrip after 100ms*
Delay stage 2 = tBF2 = 200ms
Also **
Output Relay operation (RL1, 2 and 3) if programmed (phase A, B and C)
Output Relay operation (RL4) if programmed (Backtrip)
* The time delay does not take into account the opto-coupler input filtering and processing (which is 20
ms 1 ms.)
**This Output Relays are programmed for testing purpose only after test completion, Actual
Programming of utput relays to check.
.
7.1.2 I>BF check
1. Energise a trip order input (A, then B, then C, then 3 phase)
2. Gradually inject the current into the 3 phases up to the stage value: retripping of the tripped phase (A,
then B, then C, then A, B and C) should occur for a current equal to the stage (I>BF) to within 2%
followed by the backtrip
Action check:
1. Appearance of an alarm message on the display
2. Flashing of the Alarm LED
3. Illumination of the Trip LED if tripping is programmed
AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 4 of 10

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P821

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

Bay Ref:
Substation:

4. Illumination of the LEDs associated with instantaneous information 50BF


5. Output Relay operation (RL1, 2 and 3) if programmed (phase A, B and C)
6. Output Relay operation (RL4) if programmed (Backtrip)
7.1.3 Timer Check tBF1 and not tBF2
1. Inject the current 1,00 In into the 3 phases
2. Energise the trip order input
3. After tBF2 cut the current injection, the retrip of the tripped phase (A or B or C) should occur at
tBF1+20ms and no backtrip shall follow
Action check:
1. Appearance of an alarm message on the display
2. Flashing of the Alarm LED
3. Illumination of the Trip LED if tripping is programmed
4. Illumination of the LEDs associated with instantaneous information 50BF
5. Output Relay operation (RL1, 2 and 3) if programmed (phase A, B and C)
6. Output Relay operation (RL4) if programmed (Backtrip)
7.1.4 Timers tBF1 and tBF2
1. Inject the current 1,00 In into the 3 phases
2. Energise the trip order input
3. After tBF2 + 10ms (or more) cut the current injection, the retrip of the tripped phase (A or B or C)
should occur at tBF1+20ms and followed by the backtrip at tBF2+20ms
Action check:
1. Appearance of an alarm message on the display
2. Flashing of the Alarm LED
3. Illumination of the Trip LED if tripping is programmed
4. Illumination of the LEDs associated with instantaneous information 50BF
5. Output Relay operation (RL1, 2 and 3) if programmed (phase A, B and C)
6. Output Relay operation (RL4) if programmed (Backtrip)
7.2 Testing of Binary Inputs :
This test checks that all the opto-isolated inputs on the relay are functioning correctly. (5
opto-isolated inputs for the P821).
The opto-isolated inputs should be energized one at a time. Ensuring correct polarity, connect the
auxiliary voltage to the appropriate terminals for the input being tested.
AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 5 of 10

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P821

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

Bay Ref:
Substation:

The line "INPUTS" in the "OP. PARAMETERS" menu gives the state of each input, a '1' indicating an
energized input and a '0' indicating a de-energized input. When each input is energized one of the digits
on the bottom line of the display will change to indicate the new state of the inputs.
7.3 Testing of Binary Outputs :
This test checks that all the output relays are functioning correctly. (8 output relays for the P821).The
output relays should be energised one at a time. Connect a continuity tester across the terminals
corresponding to output relay 1 .
In the following window in the "Relay Satus" sub-menu of the "OP PARAMETERS" menu:
Relay 8 7 6 5 4 3 2 1
Status 0 0 0 0 0 0 0 1
Repeat the test for each relay.
Operation will be confirmed by the continuity tester operating for a normally open contact and ceasing
to operate for a normally closed contact.
NOTE: It should be ensured that thermal ratings of anything connected to the output relays during the
test procedure is not exceeded by the associated output relay being operated for too long. It is therefore
advised that the time between application and removal of relay testing kept to the minimum.
If the Outputs are assigned for function this will be tested along with Functional test of relays.

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 6 of 10

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P821
8

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

Bay Ref:
Substation:

RECORD TEST SHEET

8.1 RELAY INFORMATION


Type No.:

Designation :

P821

Nominal Current :

Model No :
Serial Number
Firmware Version :

Nominal Voltage` :
Aux. Volts :

8.2 CT & VT DATA:


CTs

CT rated primary current set as


CT rated secondary current set as
Rated primary voltage (L-L) set as
Rated secondary voltage (L-L) set as

8.3 PRODUCT CHECKS


Relay damaged?
Rating information correct for installation?
Case earth installed?
External wiring checked against diagram?
Test block connections checked?
Measured auxiliary supply
LCD front panel display
Clock set to local time?
Time maintained when aux. supply removed?
8.4 MEASURMENT VALUE TEST:
Current Measurement
Current
Phase injected
injected
(Amps)
PH-N

V dc

Current read on relay display (A)


IR

IY

AREVA T&D

IB

IN

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 7 of 10

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

P821
L1-E

1.0

L2-E

1.0

L3-E

1.0

L1-L2-L3

1.0

Bay Ref:
Substation:
0

0
0

0
0

8.5 BREAKER FAIL PROTECTION:


8.5.1 Sensitivity Check
Phase
I> Setting

Pickup Current

R
Y
B
N
8.5.2 BF Timers Check
Phase
Time Setting
Stage 1
R
100 ms

Measured Time
Stage 1

Time Setting
Stage 2
200 ms

100 ms

200 ms

100 ms

200 ms

100 ms

200 ms

8.6 BINARY INPUT TEST :


Input No.
Terminal No.

Active

Function Assigned

22-24

High

SPARE*

26-28

High

CB QA11 BFI R-PH

17-19

High

CB QA11 BFI Y-PH

21-23

High

CB QA11 BFI B-PH

25-27

High

CB QA11 BFI 3-PH

Measured Time
Stage 2

sheet

Result

* SPARE: wired up to terminal blocks.


** NOT USED: Not wired.
AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 8 of 10

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

P821

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

Bay Ref:
Substation:

8.7 BINARY OUTPUT TEST:


Output No.

Terminal No.

Type

2-6

NO

2-4

NC

8-12

NO

8-10

NC

14-16

NO

18-20

NO

1-3

NO

5-7

NO

9-11

NO

8
13-15
* SPARE: wired up to terminal blocks.
** NOT USED: Not wired.

Function Assigned
(Aux relay operated)

sheet

Result

NO

8.8 FIXED LED INDICATIONS TEST:


LED No.
LED Label

Color

Trip

Red

Alarm

Yellow

Warning

Yellow

healthy

Green

8.9 LED INDICATIONS TEST: ( LEFT SIDE LED)


LED No.
LED Label
1

Color

Result

Result

2
3
AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 9 of 10

Gulf Cooperation Council


Interconnection Authority
GCCIA
Engineer

GCC Interconnection Project - Phase I

TRANSMISSION & DISTRIBUTION

Site Acceptance Test Report


MiCOM P821
50/62 (QA11 or QA21)

P821

Bay Ref:
Substation:

4
8.10
Item

FINAL CHECKS
Description

Result

All test equipment, leads, shorts and test block removed safely?

Disturbed customer wiring re-checked?

All commissioning tests disabled?

Circuit breaker operations counter reset?

Current counters reset?

Event records reset?

Fault records reset?

Disturbance records reset?

Alarms reset?

10

LEDs reset?

11

Secondary front cover replaced? (If applicable)

REMARKS

END OF REPORT

AREVA T&D

GCCIA / SNCL

Signature

Signature

Name
Date
Doc. No.

Name
Date
REV-1

Page 10 of 10