INQU 5025

Implementation Specifications
Scope of Work
RUM Inc. is a pharmaceutical company that
wants to implement a potable water system to
provide potable water to three buildings. The
potable water system will use well water from
an existing well and city water as a back up
source.

Implementation Specifications
Scope of Work
Engineering services are required to provide
the following:

Configuration logic flow chart (SAMA Drawings)


Pipe and Instrumentation Diagram
Input and Output List
Input and Output cards requirements

Implementation Specifications
Scope of work
Equipment available
Potable water tank (steam jacket is available at the
tank)
Potable water pumps (2)
Piping
Concentrated chlorine tank.

Implementation Specifications
Concentrated Chlorine
City
Water

Potable Water Tank

Chlorine injection pump

User A

User B
Pump 1
User C
Well
Pump
Pump 2

Base Pipe & Instruments Drawing

Implementation Specifications
Instrumentation available
Discrete valves ( 24 Vdc coil)
Analog valves ( 4 to 20 mA)
Flow transmitters (4 to 20 mA) including a flow
element.
Turbidity meters ( 4 to 20 mA)
Level transmitter (4 to 20 mA)

Implementation Specifications
Instrumentation available
Temperature transmitters (4 to 20 mA) including
temperature element
Pressure transmitter ( 4 to 20 mA)
Flow switch high ( dry contact)
Differential pressure switches (dry contact)
Chlorine injection pump, variable speed ( 4 to 20 mA)

Implementation Specifications
Instrumentation available
Magnetic starters for pump with the following
specifications:
Coil voltage 120Vac
Auxiliary contact ( dry contact)
Auto status feedback ( dry contact)

Control Specifications
The tank level will be kept primarily by using well
water from an existing well. The tank level
should be kept between 65% and 85% when the
well water is in use.

SAMA Drawing

WELL START

Start

LT-01

H/A

WELL STOP

Output

WELL STOP

Set = 85%

Stop

Motor

Interlock
Status FB
Auto FB

L/A
Set = 65%

WELL START

WE-1
STA
WE-1
AU

Fail

WE-1
S/S

Pipe & Instrument Diagram


Concentrated Chlorine
City
Water

Potable Water Tank

Chlorine injection pump

AI

DO

DI

DI

WE-1
S/S

WE-1
AU

WE-1
STA

LT-01

User A

User B
Pump 1
User C
Well
Pump
Pump 2

Control Specifications
There is a pre established limit of 30,000 gallons of
maximum extraction of well water per day. The system
should be capable of monitoring the total water extracted
per day and should be capable of avoiding to exceed the
maximum extraction limit.

SAMA Drawing

WELL START

Start
Output

FT-01

Flow In

LIMIT ACHIEVED

WELL STOP

Set = 30,000 GPM

LIMIT ACHIEVED

Status FB
Auto FB

Clock
Set time= 23:59

Motor

Interlock

Totalizer
Reset

Stop

WE-1
STA
WE-1
AU

Fail

WE-1
S/S

Pipe & Instrument Diagram


Concentrated Chlorine
City
Water

Potable Water Tank

AI

FT-01

Chlorine injection pump

AI

DO

DI

DI

WE-1
S/S

WE-1
AU

WE-1
STA

LT-01

User A

User B
Pump 1
User C
Well
Pump
Pump 2

Control Specifications
The potable water system will use city water as
the alternate feed water source when well water
extraction limits is achieved. Tank level should
be kept between 30% and 50% when the city
water is in use.

SAMA Drawing

LT-01

H/A

CITY CLOSE

Open

Set = 50%

L/A
Set = 30%

CITY OPEN

CITY CLOSE

CITY OPEN

Close

Output

LCV01

Fail

Out 2

Valve

In 3

Interlock

In 4

Open Conf.

In 5

Close Conf.

Pipe & Instrument Diagram

Control Specifications
If well is on and no flow is detected within 2
minutes on the make up water line a visible
alarm should be activated.

SAMA Drawing
WE-1
STA
AND

FT-01

Timer
ON Delay
Set = 2 min.

WELL ALARM

L/A
Set = 5 GPM

WELL ALARM
OR
In 2

SL-01

Pipe & Instrument Diagram


DO

City
Water

Concentrated Chlorine

LCV
FCV01
-01

DO

SL-01

Strobe

Potable Water Tank

AI

FT-01

Chlorine injection pump

DO

SL-01
AI

LT-01

X
Strobe

DO

DI

DI

WE-1
S/S

WE-1
AU

WE-1
STA

User A

User B
Pump 1
User C
Well
Pump
Pump 2

Control Specifications
Water entering the tank should be monitored for
turbidity.
On the event of a high turbidity the system should
divert the make up water to drain and keep the
turbidity monitoring. If situation is solved then the
make up could be established.
If high turbidity parameter remains high for more than
10 minutes a visible alarm should be generated.

SAMA Drawing
AT-01

H/A

TO DRAIN

Set = 20%

L/A

TO TANK

Set = 5%

TO DRAIN

TO TANK
Open
Output
Close

TO DRAIN

Valve

In 3

Interlock

In 4

Open Conf.

In 5

FCV01

Close Conf.

Fail

Out 2

Open
Close

TO TANK

Output

FCV02

Fail

Out 2

Valve

In 3

Interlock

In 4

Open Conf.

In 5

Close Conf.

SAMA Drawing
AT-01

H/A
Set = 20%

Timer
ON Delay
Set = 10 min.

TURBIDITY ALM.

WELL ALARM
OR
TURBIDITY ALM.

SL-01

Pipe & Instrument Diagram

DO

SL-01

X
Strobe

Control Specifications
Potable water distribution will be implemented by a pump
pair sequence having pump 1 as the lead pump and
pump 2 as the stand by pump.
The lead pump will be always on and the stand by pump
will operate based on high demand of the three users of
in the event of a failure of the lead pump.
This high demand will be determined based on
distribution header pressure. If the header pressure
goes under 25 psig the lag pumps should be started.
If the header pressure returns to a normal pressure of 50
pumps the lag pumps should be turned off.

SAMA Drawings
PT-01

H/A

DEMAND OK

Set = 50 PSIG

L/A

HIGH DEMAND

Set = 25 PSIG

PU-1 FAIL
OR

HIGH DEMAND
Start
Output
Stop

In 3
PU-1
STA
PU-1
AU

Motor

PU-1
S/S

Start
Output

DEMAND OK

Interlock

In 3

Status FB
Auto FB

Stop

Fail

PU-1 FAIL

PU-2
STA
PU-2
AU

Motor

Interlock
Status FB
Auto FB

Fail

PU-2
S/S

Pipe & Instrument Diagram


City
Water

DO

DO

LCV01

FCV01

AI

Concentrated Chlorine

AT-01

DO

SL-01
FCV02
Strobe
DO

Drain

Potable Water Tank

AI

FT-01

Chlorine injection pump

DO

SL-01
AI

LT-01

X
Strobe

DO
WE-1
S/S

DI
WE-1
AU

DO

DI

DI

PU-1
S/S

PU-1
AU

PU-1
STA

DI
WE-1
STA

User A

AI

Pump 1

User B

PT-01

User C
Well
Pump
Pump 2

DO

DI

DI

PU-2
S/S

PU-2
AU

PU-2
STA

Control Specifications
Off line pump should be isolated by keeping an
individual pump discharge valve closed when
pump is off.

SAMA Drawings
1
Start
Output
Stop

In 3
PU-1
STA

Motor

PU-1
S/S
FCV03

Interlock
Status FB
Auto FB

Fail

PU-1 FAIL

PU-1
AU

PU-1 FAIL
OR
HIGH DEMAND

Start
Output

DEMAND OK

Stop

In 3
PU-2
STA
PU-2
AU

Motor

Interlock

FCV04

Status FB
Auto FB

PU-2
S/S

Fail

Pipe & Instrument Diagram


City
Water

DO

DO

LCV01

FCV01

AI

Concentrated Chlorine

AT-01

DO

SL-01
FCV02
Strobe
DO

Drain

Potable Water Tank

AI

FT-01

Chlorine injection pump

DO

SL-01
AI

LT-01

X
Strobe

DO
DO

DO

DI

DI

WE-1
S/S

WE-1
AU

WE-1
STA

PU-1
S/S

DI
PU-1
AU

DI
PU-1
STA

FCV03

User A

DO
AI

Pump 1

FCV04

User B

PT-01

User C
Well
Pump
Pump 2

DO

DI

DI

PU-2
S/S

PU-2
AU

PU-2
STA

Control Specifications
As the well water is not chlorinated, a chlorine injection
control loop should be provided monitoring the total free
chlorine a recirculation line available from the distribution
pump discharge to the tank level and keeping this
parameter at a set point of 2 PPM.
Concentrated chlorine should be injected on this
recirculation line using a variable speed injection pump.
The chlorine parameter should be monitored and
alarmed for high and low alarms. If the chlorine
parameter is over a high high or a low low predetermined
set points the system should shut down the potable
water distribution pumps and an a visible alarm should
be generated.

SAMA Drawings
AT-02

HIGH CHLORINE
PID

OR

PUMP
SHUTDOWN

LOW CHLORINE
CHLORINE
ALARM
SC-01

WELL ALARM

TURBIDITY ALM.

AT-02

HH/A

HIGH CHLORINE

Set = 2.5 PPM

LOW CHLORINE
LL/A
Set = 0.5 PPM

CHLORINE
ALARM

OR

SL-02

SL-01

SAMA Drawings
1
Start

PUMP
SHUTDOWN

Output
Stop

Motor

FCV03

Interlock

PU-1
STA

PU-1
S/S

Status FB
Auto FB

Fail

PU-1 FAIL

PU-1
AU
PU-1 FAIL
OR
HIGH DEMAND

Start
Output

DEMAND OK
PUMP
SHUTDOWN

Stop

Motor

Interlock

PU-2
STA
PU-2
AU

FCV04

Status FB
Auto FB

PU-2
S/S

Fail

Pipe & Instrument Diagram


City
Water

DO

DO

LCV01

FCV01

AI

Concentrated Chlorine

AT-01

DO

SL
-02

SL-01
FCV02
Strobe
DO

Drain

AO

SC-01

Potable Water Tank

AI

FT-01

Chlorine injection pump

DO

AI

AT-02

SL-01
AI

LT-01

X
Strobe

DO
DO

DO

DI

DI

WE-1
S/S

WE-1
AU

WE-1
STA

PU-1
S/S

DI
PU-1
AU

DI
PU-1
STA

FCV03

User A

DO
AI

Pump 1

FCV04

User B

PT-01

User C
Well
Pump
Pump 2

DO

DI

DI

PU-2
S/S

PU-2
AU

PU-2
STA

Control Specifications
Concentrated chlorine is kept on a small
tank and low level condition of this tank
should be monitored and alarmed. A
visible alarm should be generated if the
concentrated chlorine is at low level
condition.

SAMA Drawings
WELL ALARM

TURBIDITY ALM.

OR

CHLORINE
ALARM

LSL01

SL-03

SL-01

Pipe & Instrument Diagram


City
Water

DO

DO

LCV01

FCV01

SL
-03

AI

AT-01

Concentrated Chlorine

DO

SL
-02

SL-01
FCV02
Strobe

DI

DO

LSL01

Drain

AO

SC-01

Potable Water Tank

AI

FT-01

Chlorine injection pump

DO
AI

AT-02

SL-01
AI

LT-01

FSH01

DI

X
Strobe

DO
DO
DO

DI

DI

WE-1
S/S

WE-1
AU

WE-1
STA

PU-1
S/S

DI
PU-1
AU

DI
PU-1
STA

FCV03

User A

DO
AI

Pump 1

FCV04

User B

PT-01

User C
Well
Pump
Pump 2

DO

DI

DI

PU-2
S/S

PU-2
AU

PU-2
STA

Pipe & Instrument Diagram


City
Water

DO

DO

LCV01

FCV01

AI

Concentrated Chlorine

SL
-03

AT-01

DO

SL
SL-01
-02

FCV02
Strobe

DI

DO

LSL01

Drain

AO

SC-01

Potable Water Tank

AI

FT-01

Chlorine injection pump

DO
AI

AT-02

SL-01
AI

LT-01

AI

FSH01

DI

FT-02

Strobe

User A

DO

DO
WE-1
S/S

DI
WE-1
AU

DO

DI

DI

PU-1
S/S

PU-1
AU

PU-1
STA

DI
WE-1
STA

FCV03

AI

FT-03
DO
AI

Pump 1

FCV04

PT-01

User B
AI

FT-04

Well
Pump

DO

DI

DI

PU-2
S/S

PU-2
AU

PU-2
STA

User C
Pump 2

Control Specifications
Header temperature should be monitored
for high and low temperature conditions.
Both conditions should generate a visible
alarm.

SAMA Drawings
TT-01

HIGH HDR TEMP.

H/A

WELL ALARM

Set = 80 oF

LOW HDR TEMP.

TURBIDITY ALM.

L/A
Set = 60 oF.

CHLORINE
ALARM

LSL01

HIGH HDR TEMP.


HDR TEMP ALM.

OR
LOW HDR TEMP

HDR TEMP ALM.

OR

SL-01

Pipe & Instrument Diagram


City
Water

DO

DO

LCV01

FCV01

AI

Concentrated Chlorine

AT-01

SL
-03

DO

SL
SL-01
-02
FCV02
Strobe

DI

DO

LSL01

Drain

AO

SC-01

Potable Water Tank

AI

DO

FT-01

Chlorine injection pump


AI

SL-01

AI

LT-01

AT-02

AI

FSH01

DI

Strobe

FT-02

User A

DO

DO
WE-1
S/S

DI
WE-1
AU

DO

DI

DI

PU-1
S/S

PU-1
AU

PU-1
STA

DI
WE-1
STA

FCV03

AI

FT-03
DO

Pump 1

FCV04

AI

AI

TT-01

PT-01

User B
AI

FT-04

Well
Pump

DO

DI

DI

PU-2
S/S

PU-2
AU

PU-2
STA

User C
Pump 2

Control Specifications
Tank temperature should be kept at a set
o
point of 25 C. Steam is available to be
used on the tank jacket for temperature
control purposes

SAMA Drawings
TT-02

PID

TCV01

Pipe & Instrument Diagram


City
Water

DO

DO

LCV01

FCV01

AI

SL
-03

AT-01

Concentrated Chlorine

DO

SL
SL-01
-02
FCV02
Strobe

DI

DO

LSL01

Drain

AO
TCV01

Steam
AO

SC-01

Potable Water Tank

AI

FT-01

Chlorine injection pump

DO
AI

AT-02

SL-01
AI

LT-01

AI

FSH01

DI

FT-02

Strobe

User A

DO

DO
WE-1
S/S

DI
WE-1
AU

DO

DI

DI

PU-1
S/S

PU-1
AU

PU-1
STA

DI
WE-1
STA

FCV03

AI

FT-03
DO

Pump 1

FCV04

AI

AI

TT-01

PT-01

User B
AI

FT-04

Well
Pump

DO

DI

DI

PU-2
S/S

PU-2
AU

PU-2
STA

User C
Pump 2