Вы находитесь на странице: 1из 5

KOVVURU MUNICIPALITY

GODAVARI PUSHKARAM WORKS 2015


PROGRAMME OF WORK WITH BAR CHARTS FOR ON GOING WORKS ON 18-08-2011
Sl.
No.

Name of the Work

Beautification of
Godavari Bund from Toll
gate to Pushkaram Road
& Seetaramanjaneya
Snana Ghat to Nearest
New 3rd Bridge in
Kovvuru Municipality

Estimate
Name of
Cost in
the
Rs. Lakhs Contractor
990.00

Sri.

Location

Proposed
Length/
Qty.

Discription of Item

Bhavani
Puram &
H.B.Colony
areas

1 No.

Drilling of Bore holes for


300 mm dia DUR Cast-inSitu Piles in B.C soils
including cutting of two
bulbs of 2.50 times of pile
dia.

4178 Rmt

Length/
Qty.
to be
Executed
in Rmt
-

a) Supply & erection of


Sreens & Sluice gates.

714 Nos

b) Paintings & Finishings

250 Sqm

Trunk Main
a) Earth work, Laying &
Jointing of Pipes

300 Rmt

Mar-15
Apr-15
May-15
Jun-15
3rd
4th
1st
2nd
3rd
4th
1st
2nd
3rd
4th
1st
2nd
Week Week Week Week Week Week Week Week Week Week Week Week

b) Construction of
Manholes
39211 Rmt Branch Lines inter
connections

800 Rmt

a) Earth work, Laying &


Jointing
b) Construction of
Manholes
2

Providing 750KVA
Transformer to Market
area D.P.Station

16.00

Supply, delivery and


erection and
commissioning of
Vertical centrifugal
Pumpsets with motors to
Market area D.P.Station .

175.00

M/s.
Maitraya
Electricals
Pvt.Ltd

Gandhiji
Municipal
School
compound

M/s. Hydro
Electrical
Systems

Gandhiji
Municipal
School
compound

1 No.

Supply & Erection of


Transformer

1 No.
Tender Stage
(Re-tenders -3rd call)

Pumpsets with Motors


5 Nos

Supply

5 Nos

Erection

Nil
5 Nos

KOVVURU MUNICIPALITY
GODAVARI PUSHKARAM WORKS 2015
PROGRAMME OF WORK WITH BAR CHARTS FOR ON GOING WORKS ON 18-08-2011
Sl.
No.

Name of the Work

Construction of 20MLD
STP at Ramalingeswara
Nagar

Construction of 20MLD
STP with UASBR
Technology at
Jakkampudi-1

Estimate
Name of
Cost in
the
Rs. Lakhs Contractor
1500.00

1295.00

Location

M/s. Ramky Ramalingeswa


Infrastructe
ra Nagar
r Ltd., Hyd.

M/s. APR
Project Pvt.
Ltd.

Jakkampudi

Proposed
Length/
Qty.

Discription of Item

1420 Cum UASB Reactors

Length/
Qty.
to be
Executed
in Rmt
284 Cum

574 Cum

Aeration Tank

410 Cum

Secondary Clarifier & Recirculation Return Sludge


slump

123Cum

170 Cum

C.C Tank

51Cum

145 Cum

Centrifuge Pump house

29 Cum

150 Cum

Gas Holder

Nil

155 Cum

M.E.P Room

155 Cum

125 Cum

Inlet & Screen Chambers

63 Cum

100%

Supply of Mechanical,
Electrical, Pipes & Valves

Nil

100%

10. Erection of Electrical


& Mechanical equipment
and Plumbing work

100%

1420 Cum UASB Reactors

Nil

284 Cum

574 Cum

Aeration Tank

Nil

410 Cum

Secondary Clarifier Recirculation Reten Sludge


slump

Nil

170 Cum

C.C Tank

145 Cum

Centrifuge Pump house

150 Cum

Gas Holder

Nil

155 Cum

M.E.P Room

Nil

125 Cum

Inlet & Screen Chambers

44 Cum

100%

Supply of Mechanical,
Electrical, Pipes & Valves

Nil

Nil
36 Cum

Mar-15
Apr-15
May-15
Jun-15
3rd
4th
1st
2nd
3rd
4th
1st
2nd
3rd
4th
1st
2nd
Week Week Week Week Week Week Week Week Week Week Week Week

KOVVURU MUNICIPALITY
GODAVARI PUSHKARAM WORKS 2015
PROGRAMME OF WORK WITH BAR CHARTS FOR ON GOING WORKS ON 18-08-2011
Sl.
No.

Name of the Work

Estimate
Name of
Cost in
the
Rs. Lakhs Contractor

Location

Proposed
Length/
Qty.
100%

Construction of 20MLD
STP -2 at Jakkampudi.

7 Providing Sewer

Collection Network and


Sump cum Pump house
in Zone-IV, Kabela area,
One town

1500.00

586.00

M/s. Ramky
Infrastructe
r Ltd., Hyd.

M/s. Shri
Ram EPC
Ltd.
Chennai

Jakkampudi

Kabela area

Discription of Item

Erection of Electrical &


Mechanical equipment

Length/
Qty.
to be
Executed
in Rmt
50%

1420 Cum UASB Reactors

497 Cum

574 Cum

Aeration Tank

516 Cum

410 Cum

Secondary Clarifier Recirculation Reten Sludge


slump

328 Cum

170 Cum
145 Cum
150 Cum
155 Cum

C.C Tank
Centrifuge Pump house
Gas Holder
M.E.P Room

170 Cum
145 Cum
150 Cum
155 Cum

125 Cum

Inlet & Screen Chambers

125 Cum

100%

Supply of Mechanical,
Electrical, Pipes & Valves

20%

100%

Erection of Electrical &


Mechanical equipment

100%

1 No.

Construction of sumpcum-pumphouse

a) Supply & erection of


Sreens & Sluice gates.
b) Paintings & Finishings
3182 Rmt

Trunk Main
a) Earth work, Laying &
Jointing of Pipes

7 Nos
250 Sqm
Nil

b) Construction of
Manholes
12231 Rmt Branch & Laterals
a) Earth work, Laying &
Jointing
b) Construction of
Manholes

6 Nos.
inter
connection
s

Mar-15
Apr-15
May-15
Jun-15
3rd
4th
1st
2nd
3rd
4th
1st
2nd
3rd
4th
1st
2nd
Week Week Week Week Week Week Week Week Week Week Week Week

KOVVURU MUNICIPALITY
GODAVARI PUSHKARAM WORKS 2015
PROGRAMME OF WORK WITH BAR CHARTS FOR ON GOING WORKS ON 18-08-2011
Sl.
No.

Name of the Work

Providing Sewer lines to


Iron & Commercial yards
at Bhavanipuram.

Estimate
Name of
Cost in
the
Rs. Lakhs Contractor
262.00

M/s.M.A.
Waheed
Engineers
&
Contractor
s. Hyd.

Location

Proposed
Length/
Qty.

Bhavanipuram

3125 Rmt

Discription of Item

Trunk Main

Length/
Qty.
to be
Executed
in Rmt
3125 Rmt

a) Earth work, Laying &


Jointing of Pipes
b) Construction of
Manholes
10000 Rmt Branch & Lateral Lines
a) Earth work, Laying &
Jointing

8500 Rmt

b) Construction of
Manholes
9

Construction of
Compound walls and
retaining walls for UGD
Pumping stations in
Circle-IV.

194.00

10 Laying of trunk sewer


main from Chitti Nagar
junction to Kabela road
junction

173.60

Sri Ch.
Gowri
Sankar,
Hyd

M/s.M.A.Wa
heed
Engineers
&
Contractor
s, Hyd.

Drainage
Pumping
Stations in
Circle-IV

1600 Rmt

Compound walls

123 Rmt

Retaining walls

K.T.Road

2200 Rmt

Trunk Main
a) Earth work, Laying &
Jointing of Pipes
b) Construction of
Manholes

150 Rmt

Nil

700 Rmt

Mar-15
Apr-15
May-15
Jun-15
3rd
4th
1st
2nd
3rd
4th
1st
2nd
3rd
4th
1st
2nd
Week Week Week Week Week Week Week Week Week Week Week Week

VIJAYAWADA MUNICIPAL CORPORATION


JnNURM - CIRCLE-IV
PROGRAMME OF WORK WITH BAR CHARTS FOR ON GOING WORKS
Sl.
No.

Name of the Work

11 Construction of
Retaining wall at
Ramalingeswara Nagar

Estimate
Name of
Cost in
the
Rs.
Contractor
Lakhs
714.00

Location

M/s. Ramky Ramalingesw


Infrastructe
ara Nagar
r Ltd., Hyd.

Proposed
Length/
Qty.
605 Rmt

Discription of Item

Retaining wall

Length/
Qty.
to be
Executed
in Rmt
605 Rmt

Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
3rd
4th
1st
2nd
3rd
4th
1st
2nd
3rd
4th
1st
2nd
3rd
4th
1st
2nd
3rd
4th
Week Week Week Week Week Week Week Week Week Week Week Week Week Week Week Week Week Week

1st
Week

Jan-12
2nd
3rd
Week Week

4th
Week

1st
Week

Feb-12
2nd
3rd
Week Week

4th
Week

1st
Week

Mar-12
2nd
3rd
Week Week

4th
Week