1.
SCOPE
2.
DEFINITIONS
2.1 Plan Drawing
2.2 Detail Drawing
3.
4.
DRAWING LAYOUT
4.1 Drafting Space
4.2 Title Block
4.3 Revision Column
4.4 Note Spaces
4.5 North Mark
4.6 Pipe Support List Column
5.
6.
DIMENSIONAL INDICATION
6.1 Plan Drawing
6.2 Detail Drawing
7.
1.
SCOPE
(1)
PI-DM-001
"Drafting
Practice
of
Piping
Drawing
2.
DEFINITIONS
2.1
Plan Drawing
"Plan Drawing" used in this practice refers to a plan drawn of an area
defined and enclosed by the match lines corresponding to those indicated
on the "Key Plan Drawing". The Piping plan drawings of this type are called
"Coordinate Type Drawings".
2.2
Detail Drawing
(1)
(2)
(3)
3.
Format for a plan and detail drawing shall be Job standard form
(ISO Size A - 0)
(2)
Process Unit :
Offsite and utility Unit :
4.
DRAWING LAYOUT
(1)
(2)
Plan and detail drawing may have "Key Plan" indicated at the upper
right corner of the drawing sheet.
Note:
4.1
Drafting Space
A plan and each detail drawing for piping shall principally be drafted in
these spaces especially, for plan drawing, match line for sectioned area
defined by key plan shall be kept inside of this space, however, the
dimensions, drawing numbers of connecting piping drawing, structural
column numbers and coordinations may be shown outside of this space.
4.2
Title Block
(1)
(2)
Job Code, Drawing Number, Unit Name, drawing Name and Name
of Client shall be indicated as shown in fig. 5. These indications
may be made by using stamps or templates.
(3)
4.3
Revision Column
Indication of revisions shall be as shown in Fig. 5
4.4
Note Spaces
The Space shall be used for the following notes as required.
(1)
(1)
(2)
(2)
4.5
North Mark
Indication of the north mark shall conform to PI-DM-001 and the mark
shall be oriented toward left side or upward of the drawing sheet.
4.6
*10 mm
10 mm
PIPE
SUPPORT
LIST
PS - No.
7.5 mm
PS -
REQ'D No.
PO4-A-2
P11-A-IR
PO4-AxC-11/2"-A3
SP-10-30
4
20mm
4.6.1
SYMBOL OR
DWG.No.
67mm
15mm
REMARKS
2 SETS
30mm
2, PS-3, ... " consecutively. Where two or more supports are used in
combination at one location only one common PS-No. shall be indicated.
However, the drawing number (or support symbol) shall be indicated
respectively.
4.6.2
4.6.3
REQ'D No.
The Quantities of pipe supports shall be indicated for each PS-No.
However, where two or more different type of pipe supports are to be used
in combination, the total quantities of each type of pipe support shall be
indicated in the "REQ'D No." columns.
4.6.4
Remarks
The required set number of the same PS-No. shall be indicated in the
"REMARKS" columns.
5.
5.1
General
The indication items for plan and detail drawings shall be as shown in table
1. In addition, the method of indication shall conform to PI-DM-001 unless
otherwise specified
Drawing
Plan
Detail
Item
(1) Pipe
(2) Pipe Fitting
(3) Flange
Piping
-DITTO-
Process Equipment
- DITTO -
Others
Notes
( 1)
( 2)
Size, rating, type of flange face shall be indicated on control valves and
safety valves.
( 3)
( 4)
Where materials not specified in the line class are to be used, symbol of the
material shall be indicated.
( 5)
( 6)
In the case of large storage tanks, air - cooled heat exchangers, overall
equipment figurations need not be indicated fully, the portion related with
piping shall only be indicated, other portion may be omitted.
( 7)
( 8)
( 9)
(10)
Ducts related with piping locally shall be indicated with only the outline.
(11)
(12)
(14)
13
5.2
Pipe Supports
(1)
(2)
(3)
(4)
Where many pipe supports of the same type such as pipe shoe etc.
are used as shown in Fig. 9, indication of PS-No. shall be limited to
only two or three supports. Indication of the PS-No. on the remaining
supports may be omitted.
Fig. 7 Example for Indication of Platforms and Structures
Fig. 8
6.
DIMENSIONAL INDICATION
6.1
Plan Drawing
The dimensions on plan drawings shall be indicated in accordance with PIDM-001 without repeating. The item (1) to (17) indicated in Fig. 10,11,12
shall mean as follows
(1)
(2)
(3)
(4)
(5)
(6)
6.1.2
(7)
(8)
(9)
(10)
(11)
(12)
Where there are piping which are connected to run piping on pipe
rack at two or more different elevations, piping at the same elevation
(including those piping which run at the slightly different elevations
due to each shoe height) shall be grouped and the dimensions of
piping locations shall be indicated.
(13)
(14)
(15)
Where piping around plural number pumps are same figuration, the
dimension for one pump only shall be indicated.
(16)
(17)
Elevations
Elevations shall be indicated in accordance with PI-DM-001 without
repeating. The symbols (a) ~ (e) indicated in Fig. 10, 11, 12 shall mean as
follows:
(a)
(b)
Where piping around plural number pumps are same figuration, the
dimension for one pump only shall be indicated.
(d)
(e)
6.2
Detail Drawing
The Dimensions on detail drawings shall be indicated in accordance PI-DM001 without repeating as shown in Fig. 13
(1)
(2)
7.
7.1
Plan Drawing
7.1.1
Sectioning of Drawing
Drawings shall be sectioned per floor elevation of structure as shown
in Fig. 14.
(2)
Drafting Arrangement
(a)
(b)
(c)
7.1.2
(1)
Sectioning of Drawing
Generally, towers and vertical drums have several platforms, man
holes, piping and instrument in a overlap so that the indication is
very difficult in one plan. In this case, the indication shall be made
on a plan sectioned at the platform floor as shown in Fig. 16
Fig. 16
(2)
Drafting Arrangement
Sectioned plan drawings shall be arranged in order from bottom to top plan,
from left to right indicating their elevations. However, where the
arrangement can not be made in one row, the arrangement shall be made
as U - arrangement as shown in Fig. 17, 18. Provided that no other problem
is involved.
Fig. 17
7.1.3
Pipe Rack
(1)
Sectioning of Drawing
Sectioning of pipe rack piping shall conform to Fig. 19. 20. (for
reference). The items (a) ~ (e) indicated in Fig. 19, 20 shall mean
as follows.
(a)
(b)
(c)
(d)
(e)
Mark :
Piping Drawing)
Mark : For Reference (As per "Key Plan For Piping Drawing)
7.1.4
Drafting Arrangement
(1)
Where upper and lower run piping on pipe rack are indicated in one
drawing, the upper piping shall be drafted on upper side, and the
lower piping shall be on lower side in the drawing as shown in Fig.
21.
Fig. 21 Arrangement of Pipe Rack Piping Drawing
Detailed Drawing (see para. 7.2)
2.
For run piping on long one row pipe rack, the piping drawing shall be
drafted as shown in Fig. 22.
Fig. 22
(3)
Match line
Where the upper or lower run piping on pipe rack is sectioned on individual
drawing, the unit number and sequential number of DWG No. shall be
indicated as Fig. 24 and they shall be indicated in note spaces on the sheet
by tabulation.
Fig. 24 Example for Indication of match Line DWG No.
DWG No. D - 10 - 1362 - 112 J - B
Example for indication of Omitted Drawing No. 10-012-A
7.2
(2)
(3)
Fig. 27 Example of Piping Drawing Prepared by Plan & Detail Drawing Method