Rev 5
SAIC NUMBER
SAIC-A-1001
PROJECT TITLE
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
31-Aug-10
DATE APPROVED
QR NUMBER
31-Aug-11
CIVIL-
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ITEM
No.
ACCEPTANCE CRITERIA
Laboratory Testing
A1
SAES A-114
Section 5.1.1
A2
Schedule "Q"
Section 5.5
A3
Schedule "Q"
Section 1.4
A4
Gradation, density and moisture content control test are performed at the
following frequencies: one standard sieve analysis (ASTM C 136, ASTM
D 422 or ASTM D 1140) and one Modified Proctor Test per ASTM D
1557 with corresponding Proctor curve for each type of fill material or
where there is a change in the type or source of the material.
SAES-A-114
Sec. 6.3.3.1
A5
SAES-A-114
Sec. 6.3.3.1
REFERENCE
Fill Materials
B1
SAES-A-114
Sec. 6.2.1
B2
The maximum size of fill materials shall be one-half ( ) the lift thickness
or 75mm (3 inches), whichever is less.
SAES-A-114
Sec. 6.2.1
C1
SAES-A-114
Sec. 6.2.2
C2
The amount of material passing the No. 200 sieve shall be between 020%.
SAES-A-114
Sec. 6.2.2
C3
The portion of the material passing the No. 40 sieve shall have a
maximum Liquid Limit (LL) of 35 and Plasticity Index of 12 as per ASTM
D 4318.
Note: Liquid Limit and plastic limit tests are not required if material has
less than 15% passing the No.200 sieve.
Page 1 of 2
SAES-A-114
Sec. 6.2.2
PASS
FAIL
N/A
RE-INSP DATE
Rev 5
SAIC NUMBER
SAIC-A-1001
PROJECT TITLE
WBS / BI / JO NUMBER
ITEM
No.
ACCEPTANCE CRITERIA
D1
The maximum size of fill materials shall be one-half ( ) the lift thickness
or 75mm, whichever is less.
SAES-A-114
Sec. 6.3.2.10
D2
The amount of material passing the No. 200 sieve shall be between 1135%.
SAES-A-114
Sec. 6.3.2.10
D3
SAES-A-114
Sec. 6.3.2.10
REFERENCE
31-Aug-10
DATE APPROVED
QR NUMBER
31-Aug-11
CIVIL-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-A-114 -- Excavation and Backfill, 23 February 2010
2- Schedule Q
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 2 of 2