Вы находитесь на странице: 1из 2

SAUDI ARAMCO ID/PID -18-MAY-05 - REV 0 (Standards Cutoff - AUGUST 2010)

Rev 5
SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Fill, Select-Fill and Marl Cap Materials Receiving Inspection
PROJECT TITLE

SAIC-A-1002
WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

31-Aug-10
DATE APPROVED
QR NUMBER

31-Aug-11

CIVIL-

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

SYSTEM ID.

PURCHASE ORDER NUMBER

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM
No.

ACCEPTANCE CRITERIA

Fill Materials

REFERENCE

A1

Gravel, sand and/or marl materials-maximum size shall be 75mm.


Note:If of lift thickness is less than 75mm, the maximum sieve size
allowed shall be equal to of lift thickness.

SAES-A-114
Sec. 6.2.1

A2

Delivered fill materials shall be free of frozen lumps, organic material,


trash, chunks of highly platic clay or other unsatisfactory materials.

SAES-A-114
Sec. 6.2.1

A3

Fill Material' shall be used for all fills except where 'Select Fill Material' is
specified. As a minimum, 'Select Fill Material' shall be used within 0.6 m
(2 ft) of the bottom elevation of foundations, spread footings, or slabs-ongrade when fill is required to achieve final grade. 'Select Fill Material'
shall also be specified for backfill which will be in contact with concrete
or steel structures.

SAES-A-114
Sec. 6.2

Select Fill Materials

B1

Maximum size of sand and gravel materials being received shall be


50mm diameter particles.

SAES-A-114
Sec. 6.2.2

B2

Select fill are composed only of inorganic materials and are free of
frozen lumps, trash, or other unsatisfactory materials.

SAES-A-114
Sec. 6.2

Marl Cap Materials

C1

Maximum size of marl materials being received shall be 75mm, and shall
have between 11-35% passing the No. 200 sieve. The capping material
shall have a maximum liquid limit of 35 and maximum plasticity index of
12, per D4318.

Page 1 of 2

SAES-A-114
Sec. 6.3.2.10

WORK PERMIT REQUIRED?

PASS

FAIL

N/A

RE-INSP DATE

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0(Standards Cutoff - AUGUST 2010)

Rev 5
SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Fill, Select-Fill and Marl Cap Materials Receiving Inspection
PROJECT TITLE

ITEM
No.

C2

SAIC-A-1002
WBS / BI / JO NUMBER

ACCEPTANCE CRITERIA

REFERENCE

Delivered fill materials shall be free of orgainic material, trash, or other


unsatisfactory materials.

31-Aug-10
DATE APPROVED
QR NUMBER

31-Aug-11

CIVIL-

CONTRACTOR / SUBCONTRACTOR

PASS

FAIL

N/A

RE-INSP DATE

SAES-A-114
Sec. 6.2.1

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-114 -- Excavation and Backfill, 23 February 2010

Contractor / Third-Party

Saudi Aramco

Construction Representative*

PMT Representative

Work is Complete and Ready for Inspection:


Name, Initials and Date:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

Name, Initials and Date:

QC Inspector

PID Representative
Performed Inspection

Work / Rework May Proceed

Name, Initials and Date:

Name, Initials and Date:

QC Supervisor

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Completion of Quality Work / Test

Y = YES

Page 2 of 2

N = NO F = FAILED