Page 1 of 14
DELIVERY SYSTEM
REV.00
ISSUED STATUS
Date
Description
Document No.
Prepared By
Sign
Checked
By
Sign
Approved By
Sign
Subcontractor:
DELIVERY SYSTEM
Page 2 of 14
REV.00
CONTENTS
1.0
PURPOSE
2.0
SCOPE
3.0
REFERENCES
4.0
DEFINITIONS
4.1
5.0
ACRONYM
PROCEDURES
5.1
GENERAL PROCEDURE
5.2
5.3
WEATHER CONDITION
5.4
SURFACE PREPARATION
5.5
PAINT APPLICATION
5.6
APCS TO BE USED
5.7
INSPECTION
5.8
SAFETY
6.0
7.0
DOCUMENTATION
8.0
RESPONSIBILITIES
9.0
ATTACHEMENTS
Document No.
9
10
11
13
Subcontractor:
DELIVERY SYSTEM
Page 3 of 14
REV.00
1.0
PURPOSE
This work procedure serves as the guideline in the execution of the painting and
coating activities to be able to attain the quality of work required for the specified
contract project.
2.0
SCOPE
This procedure covers all the painting and coating activities for piping in the contract
project.
3.0
REFERENCES
SAES-H-100
facilities
4.0
SAES-H-101
SAES-H-102
SAES-H-002
SAES-H-101V
SATIP-H-100-01
DEFINITIONS
Company
Work
Contract
4.1
Acronym
SAES
SAMSS
5.0
SAIR
APCS
SAEP
SATIP
SAIC
SABP
PROCEDURES
5.1
General Procedures
Document No.
Subcontractor:
DELIVERY SYSTEM
Page 4 of 14
REV.00
Document No.
Subcontractor:
DELIVERY SYSTEM
Page 5 of 14
REV.00
Weather Conditions
During Surface preparation and application of paint the weather conditions shall be as
follows:
a.
b.
The substrate temperature should above than 10 C or not more than the
temperature limit given in the applicable Saudi Aramco Data Sheet.
Humidity should less than 85%
Paint shall not be applied if one or more of the adverse weather conditions exist
such as:
c.
d.
1. Wind is strong enough to blow sand, salt spray, or other foreign matter
onto the surface being painted.
2. Wind is strong enough to cause by dry spray or disturb the spray
pattern when application is by spray gun.
5.4
Surface Preparation
5.4.1 Prior to painting, all surfaces shall be thoroughly cleaned of any material that
may result in premature failure of the paint coating. For general surface
preparation procedure and requirements, the SAES-H-100 Saudi Aramco Surface
Preparation Specifications, shall be used as reference.
5.4.2 Prior to using compressed air for the surface preparation, the quality of the air
downstream of the separator shall be tested by blowing the air into clean white
blotter for two minutes to check for any contamination, oil or moisture. The test
also shall be made after any interruption of the air compressor operations.
The air shall be used only if the blotter test indicates no visible contamination, oil
or moisture.
5.4.3 If contaminants are evident, the equipment deficiencies shall be corrected and
the air stream shall be restored. Separator shall be bled continuously.
Document No.
Subcontractor:
DELIVERY SYSTEM
Page 6 of 14
REV.00
5.4.4 Surfaces, which are determined to have been blasted with contaminated air,
must be re-blasted with clean air and abrasive.
5.5
Paint Application
5.5.1 Oil, grease. Soil dust or foreign matter deposited on the surface after surface
preparation has been completed shall be removed prior to painting. If rusting
occurs after completion of surface preparation, the surface shall be re-cleaned in
accordance with SAES-H-100.
5.5.2 Paint shall be applied by one, or a combination, of the following methods.
1.
Brushing
2.
Roller Coating
Air Spraying
Airless Spraying
5.6
APCS to Be Used
5.6.1
APCS-26
Type of coating: Polyamine Cured Epoxy Mastic
5.7
Inspection
All inspection shall be carried out in accordance to specific Saudi Aramco Specification.
The QC Inspector shall verify that the paint shall be applied when:
Document No.
Subcontractor:
DELIVERY SYSTEM
Page 7 of 14
REV.00
1. The Structure is not less than 10C and not more than 60C
2. The surface is free from grease oil and rust. Adverse weather conditions do not
exist. No strong winds that may cause dry spray or a poor spray pattern.
Note:
Recoating shall not be carried out until the earlier coat has completely cured on
completion of the application the dry film thickness will be checked.
The finished coat shall be free of runs, sags, drips, dry sprayer foreign matter and
shall be in accordance with paragraph 5.1.6 of SAES-H-100
Areas requiring repairs shall be repaired as per paragraphs 8.3 and 8.4 of SAES H100.
The maximum brush size for stripe coating is 125mm
5.8
Safety
5.8.1 Minimum safety requirements applicable to shop and field painting shall be as
given in SAES-H-102.
5.8.2 Respirable air-fedhoods shall be worn while blasting or spray painting is in
progress.
5.8.3 Safety shoes and coveralls shall always be worn and safety hats shall be worn as
required by proponent organizations.
5.8.4 All blasting and coating equipment and associated attachments shall be
adequately earthed to avoid electrostatic discharges.
5.8.5 Blasting shall be equipped with a remote control shut-off dead man.
5.8.6 The blast nozzles shall be electrically connected to an external ground in order to
prevent static electrical discharges or shocks to operating personnel.
5.8.7 Respirable air-fed abrasive blasting hoods and OSHA approved in-line respirable
air filters shall be used at all times by abrasive blasting personnel.
5.8.8 Hearing protection shall be worn where abrasive blasting is in progress.
5.8.9 Airless spray guns shall never be pointed at anyone or at any part of the body.
5.8.10Leather gloves shall be worn by the operator whenever the airless spray gun is in
use.
8.0
Documentation
Document No.
Subcontractor:
DELIVERY SYSTEM
Page 8 of 14
REV.00
The following necessary checklist and inspection forms to document the compliance of
the work activities to the Project Quality Plan and other project requirements are to be
filed per SAEP-122 and to be submitted to Saudi Aramco at the close of the project.
As per SATIP-H-100-001:
SAIC-H-2023 Coating Procedure
SAIC-H-2010 Coating personnel qualification and certification
SAIC-H-2024 Verification and visual inspection of plant and abrasives
SAIC-H-2025 Storage and handling of paint and abrasives
SAIC-H-2026 Equipment Inspection
SAIC-H-2027 Inspection of surface preparation and prior to application
SAIC-H-2028
Responsibilities
The following list comprises of the minimum responsibilities for each designated
person.
9.1
Project Manager
The Project manager is in overall charge of the work production units on this
project. He monitors compliance by all personnel and all parties governing
procedure, standards and specifications, the Project Quality Manual, the QC
Document No.
Subcontractor:
DELIVERY SYSTEM
Page 9 of 14
REV.00
Inspection Plan IFC Drawing Safety Plan, relevant clients specs and Industry
Codes as per the project requirements. He communicates with other
departments (Procurement Vendors) and the Client for work in Progress, inquires
and other concerns that need to be addressed for a continuous flow of work.
9.2
9.3
9.4
Document No.
Subcontractor:
DELIVERY SYSTEM
Page 10 of 14
REV.00
9.5
Safety Supervisor
10.0
ATTACHEMENTS
Attachment B Quality Control Equipment Check Sheet
Document No.
Subcontractor:
Page 11 of 14
DELIVERY SYSTEM
REV.00
Organization: _______________________ Job Location _______________________
Compressor: _________________________________________ Date ____________
1
2
3
4
5
Size
____________
__________
___________
__________
___________
Manifold Outlet ____________
__________
___________
__________
___________
Size
____________
__________
___________
__________
___________
Gauges
____________
__________
___________
__________
___________
No. of Outlets
____________
__________
___________
__________
___________
Oil Leaks
____________
__________
___________
__________
___________
General Conditions
____________
__________
___________
__________
___________
Remarks: __________________________________________________________________
__________________________________________________________________________
Dead man Handles and Hoses: Fitted _____________________ Not Fitted _____________
Hoses Antistatic: Yes _______ No _______
Couplings and Safety Pins: Yes _____ No _____
Remarks: __________________________________________________________________
__________________________________________________________________________
Air Hoods, Air Lines, and Purifies: Type __________________ Size ____________________
Condition: _________________________________________________________________
__________________________________________________________________________
Blast Nozzles: Size __________ __Condition __________________ Size ________________
Remarks: __________________________________________________________________
Blast Pots
1
2
3
45
Type
____________
__________
___________
__________
___________
Size
____________
__________
___________
__________
___________
Condition
____________
__________
___________
__________
___________
Mixing Valves
____________
__________
___________
__________
___________
Moisture Traps
____________
__________
___________
__________
___________
Remarks: ___________________________________________________________________
___________________________________________________________________________
Compressor to Blast Pot Air Hoses: Size ______________ Condition ____________________
Remarks: ___________________________________________________________________
___________________________________________________________________________
Airless Spray: ________________________________________________________________
1
2
3
No. of Spare Filters
__________
__________
__________
Hand Ser
__________
__________
__________
Liquid Line Size
__________
__________
__________
Hand Ser Condition
__________
__________
__________
Gauges
__________
__________
__________
Tip Size
__________
__________
__________
Condition of Reversible
__________
__________
__________
No. of Machine in Size
__________
__________
__________
Spare Hand Set
__________
__________
__________
Spare Tip
__________
__________
__________
Tools
__________
__________
__________
Remarks: ___________________________________________________________________
_________________________________________________________________
Paint Mixers: Type _____________________________ Size ________________
Remarks: _________________________________________________________
_________________________________________________________________
Crew Supervisors: __________________________________________________
Saudi Aramco Inspectors Name ___________________ Signature ___________
Document No.
(Circle)
Yes
No
__________
__________
(Circle)
Yes
No
__________
__________
Subcontractor:
Page 12 of 14
DELIVERY SYSTEM
REV.00
B.
Grinding
1.
Required?
(Circle)
Yes No
__________
__________
1.1
If Required Acceptable?
(Circle)
Yes No
__________
__________
Remarks: ____________________________________________
____________________________________________________
____________________________________________________
C.
Abrasive Blasting
1.
Dew Point Start __________ Mid-Point ______ __________
__________
2.
Substrate Temp- Start ______ Mid-Point ______
__________
__________
3.
Nozzles Press - Start ______ Mid-Point ______
__________
__________
4.
Anchor Pattern- Start ______ Mid-Point ______ __________
__________
5.
Degree of Cleanliness:
Start (SA) _________
__________
__________
Mid-Point (SA) _________
__________
__________
Remarks: __________________________________________________
__________________________________________________________
Saudi
Crew Supvr.
Aramco Insp.
(Init. Line)
(Init. Line)
D.
Pre-Priming Cleanliness
1. Dust and Abrasive Removed By Brushing
(Circle) Yes No
__________
__________
2. Substrate Vacuumed
Circle) Yes No
__________
__________
3. Acceptable for Priming
Circle) Yes No
__________
__________
II. Painting
A.
Primer Coat
1. Ensure All Non- Explosion Proof Lightning
(Circle) Yes No
__________
__________
Has Been Disconnected Prior to the Start
And During Painting
2. Ventilation Acceptable
(Circle) Yes No
__________
__________
3. Mixing Acceptable
(Circle) Yes No
__________
__________
4. Ratio of Thinning (If Req.):
___________
__________
__________
5. Dew Point: Start _______ Mid-Point _______
__________
__________
6. Substrate Temp Start ______ Mid-Point _______
__________
__________
7. Average Wet Film Thickness: ________________
__________
__________
8. Average Dry Film Thickness: __________________
__________
__________
9. Prime Coat Acceptable
(Circle) Yes No
__________
__________
Remarks: _____________________________________________________________________________
_____________________________________________________________________________________
B.
Intermediate Coat
1. Ensure all non-explosion proof
(Circle) Yes No
__________
__________
Lightning has been disconnected prior
To the start and during painting
2.
Ventilation Acceptable
(Circle) Yes No
__________
__________
3.Mixing Acceptable
(Circle) Yes No
__________
__________
4.Ratio of Thinning (if Req.)
___________
__________
_________
5.
Dew Point: Start _______ Mid-Point _______
__________
__________
6.
Substrate Temp Start ______ Mid-Point _______
__________
__________
7.
Average Wet Film Thickness: ________________
__________
__________
8. Average Dry Film Thickness: __________________
__________
__________
9.
Prime Coat Acceptable
(Circle) Yes No
__________
__________
Remarks: _____________________________________________________________________________
_____________________________________________________________________________________
Crew Supvr
(Init. Line)
C.
Saudi
.Aramco Insp.
(Init. Line)
Top Coat
1.
Ensure All Non- Explosion Proof Lightning
(Circle) Yes No
__________
__________
Has Been Disconnected Prior to the Start
And During Painting
2.
Ventilation Acceptable
(Circle) Yes No
__________
__________
3.
Mixing Acceptable
(Circle) Yes No
__________
__________
4.
Ratio of Thinning (If Req.):
___________
__________
__________
5.
Dew Point: Start _______ Mid-Point _______
__________
__________
6.
Substrate Temp Start ______ Mid-Point _______
__________
__________
7.
Average Wet Film Thickness: ________________
__________
__________
8. Average Dry Film Thickness: __________________
__________
__________
9.
Final Curing Time
Time _____________ at Steel Temp. __________ ______________
10.
Top Coat Acceptable
(Circle) Yes No
__________
__________
Document No.
Subcontractor:
DELIVERY SYSTEM
Page 13 of 14
REV.00
Remarks: _____________________________________________________________________________
_____________________________________________________________________________________
Indicates Mandatory Saudi Aramco Inspection points
Document No.
Subcontractor:
DELIVERY SYSTEM
Page 14 of 14
REV.00
Document No.