FOR
THE DETAIL DESIGNS,
AND TENDER
DOCUMENTATION FOR
MUNSIEVILLE, ZONE
35, WATER PIPELINE
REPLACEMENT
PROJECT
Contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
DELIVERABLES .................................................................................................................... 10
14.
PROFESSIONAL FEES........................................................................................................ 10
15.
MILESTONES......................................................................................................................... 11
16.
17.
18.
19.
20.
21.
22.
PROJECT SPONSOR........................................................................................................... 14
23.
ACCEPTANCE ....................................................................................................................... 15
Page 2 of 15
1. EXECUTIVE SUMMARY
MORAD Consulting Engineers was appointed by Mogale City Local Municipality
for the Munsieville, Zone 35 Water Pipeline Replacement Project. This Project
Charter forms part the Consultants appointment and covers the strategy for the
planning, designing and tender documentation of the water pipelines
replacement in Munsieville as per the subject project requirements.
Mogale City Local Municipality is experiencing unaccounted for water losses in
most of its areas including along the bulk water lines supplying Munsieville with
portable water. The existing bulk waterline comprises of rotten AC pipes, prone
to bursting. The infrastructure along the water pipelines is also now old.
This has made Mogale City Local Municipality assign Morad Consulting the
Munsieville bulk water pipeline replacement project in-order to assist in curbing
water losses.
The Water & Sanitation Department of MCLM has got funds in place for the
designing, tender documentation and implementation for the Munsieville, zone
35 bulk water pipeline replacement project during this current financial year.
The major objective of this project is to reduce the unaccounted for water
losses in the Municipality.
Page 3 of 15
Deliverable
Status
Importance
Project Charter
Finished
Required
Fee Proposal
Finished
Required
Report Finished
Required
Concept Design
and Drawings
Finished
Required
Finished
Required
Started
Required
Started
Required
and Started
Required
Tender Documents
Drawings
Contract Administration,
Inspection & Monthly
Progress Reports
Required
Project Program
Started
Required
Started
Required
Close-out report
Required
The project deliverables listed above lead to the projects milestones and they will
be submitted in line with the project stages as follows:
Deliverable
Submission Category
Status
Importance
Project Charter
Inception Stage
Finished
Required
Fee Proposal
Inception Stage
Finished
Required
Finished
Required
Finished
Required
Finished
Required
Design Development
Stage
Started
Required
Design Development
Started
Required
Page 4 of 15
Stage
Tender Documents and
Drawings
Documentation and
Procurement Stage
Started
Required
Contract Administration,
Inspection & Monthly
Progress Reports
Contract Administration
and Inspection Stage
Project Program
Started
Required
Design Development
Stage
Started
Required
Close-out Report
Close-out Stage
Required
Required
Page 5 of 15
With the implementation of the project, unaccounted for water losses will
be curbed in Munsieville, resulting in the Municipality saving money.
The implementation of this project will also ensure:
To achieve these goals, MOGALE CITY APPOINTED Morad Consulting
to design an appropriate solution based on current best engineering
practice and at a cost and within a time frame that is acceptable to MCLM.
Page 6 of 15
Prepare
tender
documents
and
drawings
and
assist
with
procurement.
Exclusions
EIA
It is assumed that the roads that will be crossed during laying of the
pipes are municipal roads and that permission to cross will be
obtained.
Rand Water
Johannesburg Water
Project
Team
Member(s)
Organization
Mogale City
Local
Municipality
Manager:
Water &
Sanitation
Sandile
Mbanjwa
sandile.mbanjwa@mogalecity.gov.za
Specialist:
Water &
Sanitation
johann.vaneck@mogalecity.gov.za
Engineering
Technician:
Water &
Sanitation
Org Viljoen
Mogale City
Local
Municipality
org.viljoen@mogalecity.gov.za
Project
Executive
Collin
Radebe
Morad
Consulting
collinr@morad.co.za
Project
Manager
Anna
Viljoen
Morad
Consulting
annav@morad.co.za
Project
Engineer
Michael
Benhura
Morad
Consulting
michaelb@morad.co.za
Page 8 of 15
registered where appropriate, will be assigned to the project. Mrs Anna Viljoen
will act as Project Manager for Morad Consulting and will be responsible for the
delivery of the project in terms of the defined scope. Mrs Viljoens authority in
terms of the execution of the project will be in accordance with the provisions of
the management of Morad Consulting.
9. TIME FRAME
The following time frames will apply to the project;
The project budget for the planning, design, tender documentation and
implementation of the project is about R7, 652,173.00. The professional fees
are also included in the budget.
Page 9 of 15
and
authorization
have
been
obtained
and
all
applicable
environmental requirements have been satisfied. Land ownership and SurveyorGeneral boundaries will be confirmed where necessary.
13. DELIVERABLES
Deliverable
Status
Importance
Project Charter
Finished Required
Fee Proposal
Finished Required
Finished Required
Finished Required
Finished Required
Started
Required
Started
Required
Started
Required
Required
Project Program
Started
Required
Started
Required
Close-out report
Required
Fees will be calculated according to the fee scales agreed in the above contract,
Page 10 of 15
for the following stages as defined in the Engineering Professions Act (Act 46 of
2000):
Inception
Design Development
Close-out
15. MILESTONES
The project deliverables listed above lead to the projects milestones and they will
be submitted in line with the project stages as follows:
Deliverable
Submission Category
Status
Importance
Project Charter
Inception Stage
Finished
Required
Fee Proposal
Inception Stage
Finished
Required
Finished
Required
Finished
Required
Finished
Required
Design Development
Stage
Started
Required
Design Development
Stage
Started
Required
Documentation and
Procurement Stage
Started
Required
Contract Administration,
Inspection & Monthly
Progress Reports
Contract Administration
and Inspection Stage
Project Program
Started
Required
Design Development
Stage
Started
Required
Close-out Report
Close-out Stage
Page 11 of 15
Required
Required
Other staff shall attend the meeting when required by the Manager: Water &
Sanitation.
During the execution of the project, the following reports will be prepared and
submitted
Page 12 of 15
Close-out Report
"SABS
STANDARD
SPECIFICATIONS,
STANDARDISED
SETTLEMENT
PLANNING
AND
DESIGN
and
DWAF
THE
DEVELOPMENT
OF
WATER
AND
SANITATION
INFRASTRUCTURE
Risk Identification
Risks Quantification
Risk Response
Each stage of the project shall be approved by the Manager: Water & Sanitation
before the next stage is commenced.
23. ACCEPTANCE
This Project Charter prepared by Morad Consulting is based on the content of
the appointment letter dated 19 November 2013 and the discussion during the
Project Inception Meeting held on 08 August 2014 at 15H00 at the Mogale City
Local Municipality offices in President Street, Krugersdorp.
The meeting was attended by the persons identified on the Attendance Register
attached to the Minutes of the Project Inception Meeting, included in the
Annexure B.
Prepared by:
Mr Sandile Mbanjwa
Manager: Water & Sanitation
Mogale City Local Municipality
Page 15 of 15
ANNEXURE A
Appointment Letter
ANNEXURE B
Inception Meeting Minutes
14 August 2014
14H50
REP
TEL/CELL
NO:
GENDER
RACE
DISABLED
Sandile
Mbanjwa
Mogale
City: W
&S
Mogale
City: W
&S
Mogale
City: W
&S
Morad
0783480882
0832802694
0835225038
0745274773
Org Viljoen
Johann Van
Eck
Rahel D.
Shibesh
NONE
Job
Category
Level
NONE
NONE
NONE
org.viljeon@mogalecit
y.gov.za
NONE
NONE
johannn.vaneck@mog
alecity.gov.za
NONE
Civil &
Structural
Engineer
Civil
Engineer
Michael
Benhura
Morad
0605254873
NONE
Thebe
Montiane
Morad
0845526897
NONE
Page 2
Civil
Engineering
Technician
sandile.mbanjwa@mo
galecity.gov.za
rahels@morad.co.za
michaelb@morad.co.z
a
thebem@morad.co.za
AGENDA
ITE
M
DESCRIPTION
ATTENTION TO
ALL
PROJECT TEAM:
Mogale City : Sandile Mbanjwa Project Manager
Morad Consulting Engineering and Project Management: Collin
Rahel Shibeshi Civil & Structural Engineer,
Michael Benhura Civil Engineer
Anna Viljoen Project Manager
ATTENDANCE:
As per register attached
APOLOGIES :
C Radebe,
PURPOSE OF MEETING:
5.1 Mogale City explained that the meeting was for the clarification of
the assignment given to Morad Consulting by Mogale City on the
proposed bulk waterline replacement in Munsieville.
MORAD
MORAD
Page 3
MORAD
6.2 Do designs for the new proposed new bulk water pipeline.
MORAD
6.4 Prepare a design report for the new bulk water pipeline.
MORAD
MORAD
PROBLEM STATEMENT:
7.1 The bulk water line supplying the vast of the Krugersdorp west
areas including Munsieville area with water from Rand Water is
experiencing frequent bursts. This pipe is now old and is made
up of Asbestos Cement in some portions and steel in some
portions. The pipe size ranges from 600mm DIA to 400mm DIA.
The pipe is approximately 2.5km long. As a result of the pipe
busts, the Munsieville area and Krugersdorp West areas sit
without water the majority of the time. This has necessitated the
need to replace the whole pipeline.
MORAD
DELIVERABLES:
8.4 Morad to do preliminary designs for the bulk waterline
replacement and come up with a preliminary design report for
nd
submission to Mogale by the 22 of August.
MORAD
8.6 Morad to produce monthly progress reports for the project and
present them to Mogale City.
8.7 Morad to prepare a project program.
MORAD
MORAD
MORAD
MORAD
8.9 Morad to produce a tender document for the project by
November 2014
MORAD
MORAD
Page 4
10
CLOSURE
10.1
11
Mogale City informed Morad that they now have the ticket to
start working on the project.
MORAD
GENERAL:
11.1
11.2
MORAD/MOGALE
MORAD/MOGALE
NEXT MEETING
Meeting adjourned.
At ..................................................................................................................................................................
.....................................................
...............................................
For Morad
Page 5
ANNEXURE C
Fee Proposal
ITEM
1.1
1.2
1.3
1.4
1.5
1.6
Inception
Concept and Viability
Design Development
Documentation and Procurement
Contract Administration and Inspection
Close Out Report
ITEM
2.1
2.2
2.2
DESCRIPTION
Survey
Geotechnical Investigation
Full Time Resident Engineer
R
R
R
%
5
25
25
15
25
5
R
R
R
R
R
R
100
1
1
6
3.1
3.2
3.3
3.4
Travelling
Reporting
Health and Safety
Copies and Printing
3.4.1. A4 Black and White
3.4.2 A4 Colour Pages
3.4.3 A4 Typing
3.4.4 A3 Black and White
3.4.5 A3 Colour
3.4.6 A3 Typing
3.4.7. A4 Binding
3.4.8 A1 Printing
863,145.34
AMOUNT
R
R
R
90,000.00
3.0 DISBURSEMENTS
RATE
DESCRIPTION
43,157.27
215,786.34
215,786.34
129,471.80
215,786.34
43,157.27
QTY
15,000.00
ITEM
AMOUNT
QTY
90,000.00
AMOUNT
R
R
R
5.72
1,500.00
30,000.00
3000
8
6
R
R
R
17,160.00
12,000.00
180,000.00
R
R
R
R
R
R
R
R
0.93
12.71
47.67
1.79
16.46
47.67
27.32
86.43
8000
500
500
20
20
10
20
80
R
R
R
R
R
R
R
R
7,440.00
6,355.00
23,835.00
35.80
329.20
476.70
546.40
6,914.40
R
R
R
255,092.50
1,208,237.84
169,153.30
R 1,377,391.14
ANNEXURE D
Project Program
PROJECT PROGRAMME
The proposed programme is shown in figure 1 below. (can be fast-tracked if necessary)
Figure 1 Proposed Programme (Munsieville, Zone 35)
Activities/Milestones
July 2014
Inception
Concept and Viability
Design development
Documentation and
Procurement
Working drawings
Construction Stage
Close Out
Legend:
Planned Tasks
Completed Tasks
Aug 2014
Sep 2014
Oct 2014
Nov 2014
Dec 2014
Jan 2015
Feb 2015
Mar 2015
Arp 2015