DRILLING WORDS

Etansare,montat IP
Casing head & BOP works
Masuratori geofizice
Geophysical logging
Tester
Drill stem testing, DST
Ungere revizie inst.
Rig maintenance
Rulat cablul de foraj
Replacing drilling line
Dop ciment
Cementing plug
Operatii specifice dirijarii
Directional drilling operations
Probe de presiune
Pressure test
Pauza tehnologica
Technological down-time
Operatii premergatoare
Preparatory operations
Reparatii inst de foraj
Rig repairs
Alte reparatii
Other repairs
Opriri organizatorice
Down time
Alte intreruperi (greva, timp nefavorabil)
Other
INFORMATII SUPLIMENTARE
Regim restictiv la apasare
Restricted WOB
Regim restrictive la turatie
Restricted RPM
Regim restrictive la debit
Restricted flow rate
Moment de torsiune suplimentar
Added torque
Tinere la manevra +10 t
Over pull 10t
Cu pierdere partiala 20%
Continuous loss of circulation 20%
2m3 /h
Continuous loss of circulation2mc/h
Totala
Continuous loss of circulation100%
Total pierdut in 12h: 27mc
Total loss27mc/last12h
Gazeificat fluidul de foraj la 8%
Increased gas content to 8%
Continut de gaze 8%, intra. Kgf/dmc,
Gas content 8%, inkg/dmc, outkg/dmc
Iese. kgf/dmc
mud weight
Pierdut circulatia 20%
Started circulation loss 20%
2mc/h
Or
2mc/h
Totala
Or
100%
Prins sapa
Stuck pipe
Prins coloana
Stuck casing
Crescut presiunea de la..la. bar
Pressure increase fromto..
Oprit forajul
Stopped drilling
Umplut put cu
Filled hole with
Pompat ptr umplere mclafiecare 2h
Pumped for filling
Nu se umple
Does not fill
Putul se umple dar scade lent
Filled hole but the level is slowly decreasing
Umplut putul, obtinut circulatia
Filled hole and the circulation is complete
Pussau. Plutit
Added drag
Frecari suplimentare de +10t pe int.
Over pull 10 t fromto
A fost necesara corectarea inversa pe int ---With reverse reaming fromto.
Rupt garnitura cap ramas
Drill string failure. Fishing depth.
Tratament noroi
Mud treatment

Efectuat baie cu 5 mc titei


Un volum la fiecare 5 h
30 min la fiecare 5 h (cu pauze)
Se omoara sonda, intra kg/dmc, iese
kg/dmc
Batut geala
Efectuat 80 batau cu geala
Schimbat pozitia baii cu 0,2 mc la fiecare3h
Degajat

Pumped 5mc crude oil to release drill string


Hole volume(s) everyhours
30 min every 5 hours
For killing the well in kg/dmc, outkg/dmc

Locator de mufe
Desurubat
Desurubat cu detonare
Intregit
Fixat coloana
Manifestare eruptive, inchis sonda, presiune
la coloanabar /presiunea la prajinibar,
volum suplimentar la habamc
Sonda inchisa, presiunea la coloana
bar/presiunea la prajinibar
Daramatura la sita

Joints locator
Unscrewed
Unscrewed with detonation
Reconnected drill string
Positioned at
Well kick, closed BOP, casing pressuredrill
pipe pressurekick influx volume

Deschismin
Pasta din 100t cim s2
Iesit la zi 2mc de pasta
Noroi pompat 70mcx 1.2kgf/dmc (programat
numai cand difera)
Realizat 20bar presiune in spatele coloanei
(intentionat)
Crescut presiunea in spatele coloanei de la
la--- (se constata)
Presiunea finala
Scurs presiunea de la---la---Priza ora
Lipsa motorina
Lipsa current electric
Lipsa chimicale
Pistoneaza
Circulatie inversa
Diametrul exterior
Diametrul interior
Extras

de lapana la

Manevrat
de la pana la
Mars de control
Descompus
Ansamblul de fund

Jarring
Jared 80 times
Pumped additional mud 0,2mc every 3 hours
Released drill string

Closed BOP, casing pressuredrill pipe


pressure
Carvings load added in returning mud.
mc/h
Opened formin
Prepared slurry from
Mc slurry at surface
Displaced with 70mc x 1.2 kgf/dmc (planed)
Increased pressure to 20 bar in annulus
Pressure increased fromto
Final pressure
Released pressure from .to
Cement in place, CIP at 12.00
Lack of fuel
Lack/out of electricity
Lack of mud materials
Swabbing
Reverse circulation
OD
ID
Pulled out

from
to
To
POOH pull out of hole
Pipe motion up/down
from to
Short trip from to
Laid down
BHA

Ansamblul de dirijare
Testerul
Stabilizatorii
Format
Circulat
Tubat
Detubat

de la
La
de la
la
de la
la

la
la
la

Coloana de 9 5/8
Cimentat
Priza
Sapat
25m/1275m
R8.5 in si ansamblul 1
PDC8.5 in si ansamblul 1
MD33-8.5in
Carotat
9m/1332
Carotiera 5 3/4/cap de diamante 188.9 si
ansamblul 1
cap PDC de 188.9mm
cap cu role de 188.9mm
Corectat
de la
la
Largit
de la la
Pana la
Gaura de 12 cu largitor cu role de 26 in
Cu larg. Expandabil de 26
Frezat
de la
la
Pana la
20cm/total 80cm
Restiri metalice
freza tocator de 200mm
Coloana deformata freza tronconica
Siu
freza frontala

BHA
Tester
Stabilizers
Picked up
Circulated from to
To
Ran in hole casing from to
to
Pulled out of hole casing from to
to
Od 9 5/8 casing
Cemented
Waited on cement
WOC
Drilled 25m/ 1275m
OD8.5roller bit&BHA
OD8.5 PDC bit&BHA
OD8.5Diamond bit&BHA
Cored
9m/1332
5 OD core barrel,188.9mmOD core
head(diamond)&BHA
188.9OD core bit(PDC)
188.9OD core bit(roller)
Reamed
from to
Under reamed from to
To
ID12 hole
OD 26rollerunderreaming
OD 26 expandable under reaming
Milled
from
to
To
20cm/total 80cm
Junks
OD 200mm junk mill
Collapsed casing OD 200mm taper mill
Shue
OD mm ecinomill

Elemente ale ansamblului de adancime


Motor volumic de 8
Positive displacement motor PDM8
Turbina de 8
Turbine
Dezaxata din corp 1,8grd
Bent housing 1.8deg PDM8(BH 1,8deg)
Reductie dezaxata 2.5dgr
Bent sub 2.5deg turbine8(BS2.5dgr)
Prajini grele de 8,120m
Drillcollars DC8/120m
Prajini grele amagnetice
Nonmagnetic drill colar NMDC8/145m
Prajini de trecere de 5,15m
Heavy weight drill pipe HWDP5/145m
Prajinu de trecere amagnetice
Non magnetic NMHWDP5/145m
Stabilizatori la sapa si la 18m
Stabilizers Stb(0,18)
Prajini de foraj 5,120m
Drill pipe 5 DP5/120m
Geala de 8in la 78m
Jar 8 at 78m jar8(78)
Racord de siguranta
Safety joint
SJ
MWD cu pulserul la 18m
MWD(18m)
Reductie de orientare
Orientation sub
OS