Академический Документы
Профессиональный Документы
Культура Документы
Sixth Edition
SCRAPERS
A. J. Clark School of Engineering Department of Civil and Environmental Engineering
By
Dr. Ibrahim Assakkaf
ENCE 420 Construction Equipment and Methods
Spring 2003
Department of Civil and Environmental Engineering
University of Maryland, College Park
Slide No. 1
CHAPTER 7. SCRAPERS
TRACTORS-PULLED
SCRAPERS
CHAPTER 7. SCRAPERS
Slide No. 2
ENCE 420 Assakkaf
SCRAPERS
CHAPTER 7. SCRAPERS
APPLICATIONS
Slide No. 3
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
TRACTORS-PULLED
SCRAPERS
Slide No. 4
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
TRACTORS-PULLED
SCRAPERS
Slide No. 5
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
TRACTORS-PULLED
SCRAPERS
Slide No. 6
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
TYPES OF SCRAPERS
Slide No. 7
ENCE 420 Assakkaf
Slide No. 8
CHAPTER 7. SCRAPERS
TYPES OF SCRAPERS
9Self-loading
Push-pull, tandem-powered axles
Elevating
Auger
Slide No. 9
CHAPTER 7. SCRAPERS
CONFIGURATIONS
Conventional (push-loaded)
Single engine
CHAPTER 7. SCRAPERS
TYPES OF SCRAPERS
Slide No. 10
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
TYPES OF SCRAPERS
Slide No. 11
ENCE 420 Assakkaf
Conventional (push-loaded)
Slide No. 12
CHAPTER 7. SCRAPERS
CONFIGURATIONS
Elevating
Slide No. 13
CHAPTER 7. SCRAPERS
CONFIGURATIONS
Elevating scrapers are
good for short hauls
and in favorable
material.
Can work alone in the cut.
Cost more initially & to operate
Elevator adds weight & takes power.
CHAPTER 7. SCRAPERS
Slide No. 14
ENCE 420 Assakkaf
CONFIGURATIONS
Tandem powered
twin engine
CHAPTER 7. SCRAPERS
TYPES OF SCRAPERS
Slide No. 15
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
Slide No. 16
ENCE 420 Assakkaf
CONFIGURATIONS
Push-Pull
CHAPTER 7. SCRAPERS
TYPES OF SCRAPERS
Slide No. 17
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
Slide No. 18
ENCE 420 Assakkaf
CONFIGURATIONS
Auger
CHAPTER 7. SCRAPERS
Slide No. 19
ENCE 420 Assakkaf
CONFIGURATIONS
Auger
10
CHAPTER 7. SCRAPERS
TYPES OF SCRAPERS
Slide No. 20
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
VOLUME OF A SCRAPER
Slide No. 21
ENCE 420 Assakkaf
11
Slide No. 22
CHAPTER 7. SCRAPERS
BOWL
ejector
CHAPTER 7. SCRAPERS
VOLUME OF A SCRAPER
Slide No. 23
ENCE 420 Assakkaf
12
CHAPTER 7. SCRAPERS
VOLUME OF A SCRAPER
Slide No. 24
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
VOLUME OF A SCRAPER
Slide No. 25
ENCE 420 Assakkaf
13
Slide No. 26
CHAPTER 7. SCRAPERS
VOLUME OF A SCRAPER
Slide No. 27
CHAPTER 7. SCRAPERS
Loose
weight
Material
lb/cu yd
kg/m3
lb/cu yd
kg/m3
Percent
swell
Swell
factor
Clay,dry
Clay, wet
Earth, dry
Earth, wet
Earth and gravel
Gravel, dry
Gravel, wet
Limestone
Rock, well blasted
Sand, dry
Sand, wet
Shale
2,700
3,000
2,800
3,200
3,200
2,800
3,400
4,400
4,200
2,600
2,700
3,500
1,600
1,780
1,660
1,895
1,895
1,660
2,020
2,610
2,490
1,542
1,600
2,075
2,000
2,200
2,240
2,580
2,600
2,490
2,980
2,750
2,640
2,260
2,360
2,480
1,185
1,305
1,325
1,528
1,575
1,475
1,765
1,630
1,565
1,340
1,400
1,470
35
35
25
25
20
12
14
60
60
15
15
40
0.74
0.74
0.80
0.80
0.83
0.89
0.88
0.63
0.63
0.87
0.87
0.71
14
CHAPTER 7. SCRAPERS
Slide No. 28
ENCE 420 Assakkaf
Example
If a push-loaded scraper hauls a
heaped load measuring 22.5 cu yd and
the swell factor from the previous table
(Table 1) is 0.8, the calculated bank
measure volume will be
22.5 cu yd x (0.8 x 1.1) = 19.8 bcy
Note: 10% increase in for swell factor
CHAPTER 7. SCRAPERS
SCRAPER OPERATION
Slide No. 29
ENCE 420 Assakkaf
15
CHAPTER 7. SCRAPERS
SCRAPER OPERATION
Slide No. 30
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
Slide No. 31
ENCE 420 Assakkaf
For maximum production both single- and tandemengine scrapers need the assistance of a push tractor.
16
Slide No. 32
CHAPTER 7. SCRAPERS
Slide No. 33
CHAPTER 7. SCRAPERS
HAULING
17
Slide No. 34
CHAPTER 7. SCRAPERS
CHAPTER 7. SCRAPERS
SCRAPER SELECTION
Slide No. 35
ENCE 420 Assakkaf
18
CHAPTER 7. SCRAPERS
SCRAPER SELECTION
Slide No. 36
ENCE 420 Assakkaf
COST:
Cost must consider all
hourly cost for the
entire pusher-scraper
fleet.
CHAPTER 7. SCRAPERS
SEVERITY OF
CONDITIONS
ECONOMIC ZONES OF
APPLICATION
Slide No. 37
ENCE 420 Assakkaf
HAUL DISTANCE
19
CHAPTER 7. SCRAPERS
Slide No. 38
PE
RF
OR
CH M
AR AN
T CE
CHAPTER 7. SCRAPERS
Slide No. 39
ENCE 420 Assakkaf
(1)
20
Slide No. 40
CHAPTER 7. SCRAPERS
WORK CYCLE
LOAD
HAUL
RETURN
DUMP
CHAPTER 7. SCRAPERS
Slide No. 41
ENCE 420 Assakkaf
21
CHAPTER 7. SCRAPERS
Slide No. 42
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
Slide No. 43
ENCE 420 Assakkaf
22
Slide No. 44
CHAPTER 7. SCRAPERS
Example 1
0.85 min
2,000 ft:
Dumpt
accelerate @ 6 mph
steady
@ 12 mph
decelerate @ 8 mph
31 cu yd (Table 2)
Turnt
Returnt
300 ft
1,500 ft
200 ft
0.37 min
@ fill
2,000 ft:
accelerate @ 6 mph
steady
@ 18 mph
decelerate @ 10 mph
Turnt
0.57 min
1.42 min
0.28 min
0.21 min
200 ft
1,600 ft
200 ft
0.28 min
1.01 min
0.23 min
@ cut
0.30 min
5.52 min
Slide No. 45
CHAPTER 7. SCRAPERS
OPERATING EFFICIENCY
AND PRODUCTION
23
CHAPTER 7. SCRAPERS
OPERATING EFFICIENCY
AND PRODUCTION
Slide No. 46
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
EFFICIENCY FACTOR
Slide No. 47
ENCE 420 Assakkaf
50 min-hr
efficiency
24
CHAPTER 7. SCRAPERS
OPERATING EFFICIENCY
AND PRODUCTION
Slide No. 48
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
OPERATING EFFICIENCY
AND PRODUCTION
Slide No. 49
ENCE 420 Assakkaf
25
CHAPTER 7. SCRAPERS
PUSH TRACTORS
REQUIRED
Slide No. 50
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
PUSH TRACTORS
REQUIRED
Slide No. 51
ENCE 420 Assakkaf
26
Slide No. 52
CHAPTER 7. SCRAPERS
Tp = 1.4Lt + 0.25
(2)
CHAPTER 7. SCRAPERS
Slide No. 53
ENCE 420 Assakkaf
27
CHAPTER 7. SCRAPERS
Slide No. 54
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
Slide No. 55
ENCE 420 Assakkaf
28
Slide No. 56
CHAPTER 7. SCRAPERS
CHAPTER 7. SCRAPERS
Slide No. 57
ENCE 420 Assakkaf
29
Slide No. 58
CHAPTER 7. SCRAPERS
Example 2
Based on the the scraper specified in the following figures (Figures 4-8,
4-10, and 6-9 of the textbook), and for haul conditions as stated below, what
is the probable production of the scraper?
Given that the total length of haul when moving from the cut to the fill is
4,000 ft as follows:
1,200
+4% grade
1,400 ft +2% grade
1,400 ft -2% grade
Soil:
Clay
Rolling Resistance
Assumptions:
average load time = 0.85 min
load of 96% of the capacity (Figure 2, or Figure 7.10 Textbook)
CHAPTER 7. SCRAPERS
Example 2 (contd)
Slide No. 59
ENCE 420 Assakkaf
30
CHAPTER 7. SCRAPERS
Example 2 (contd)
Slide No. 60
ENCE 420 Assakkaf
CHAPTER 7. SCRAPERS
Example 2 (contd)
Slide No. 61
ENCE 420 Assakkaf
Figure 4
(for Example 2)
31
Slide No. 62
CHAPTER 7. SCRAPERS
Example 2 (contd)
Figure 5
(for Example 2)
Slide No. 63
CHAPTER 7. SCRAPERS
Example 2 (contd)
Rolling Resistance =
32
Slide No. 64
CHAPTER 7. SCRAPERS
Example 2 (contd)
Table 3. Haul and Return Speeds
Grade (%)
Total
Resistance (%)
R = rr + gr
4
4
2
-2
-2
2
2
-2
-4
-4
Distance (ft)
Speed (mph)
8
8
6
2
2
5
10
15
30
12
Total
0.68
1.02
1.06
0.45
0.19
3.40
6
6
2
0
0
10
21
32
32
12
Total
0.23
0.65
0.50
0.36
0.19
1.93
Slide No. 65
CHAPTER 7. SCRAPERS
Example 2 (contd)
Dumpt = 0.37
31 cu yd (Table 2)
@ fill
@ cut
33
Slide No. 66
CHAPTER 7. SCRAPERS
Example 2 (contd)
Number of trips per 50 - min hour =
50
= 7.08 trips
7.06
bcy
hr
Ts 7.06
=
= 4.9 5 scrapers
Tp 1.44
50
= 34.7 contacts
1.44
bcy
hr
Slide No. 67
CHAPTER 7. SCRAPERS
Example 2 (contd)
Alternatively,
Production = 172 4.9 = 843
bcy
hr
bcy
, this is wrong estimate.
hr