Академический Документы
Профессиональный Документы
Культура Документы
Year:
2013
Day
Date
Days
Worked
Arr
Dep
Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break
Cumul
Fr
Sa
Su
Mo
Tu
1
1
9.00
18.30 15,30-17,00
8.00
We
9.00
18.30 15,30-17,00
8.00
Th
9.00
18.30 15,30-17,00
8.00
9.00
18.30 15,30-17,00
8.00
Fr
Sa
Su
10
Mo
11
9.00
18.30 15,30-17,00
8.00
1
1
1
1
9.00
9.00
9.00
9.00
18.30
18.30
18.30
18.30
15,30-17,00
15,30-17,00
15,30-17,00
15,30-17,00
8.00
8.00
8.00
8.00
1
1
1
1
1
9.00
9.00
9.00
9.00
9.00
18.30
18.30
18.30
18.30
18.30
15,30-17,00
15,30-17,00
15,30-17,00
15,30-17,00
15,30-17,00
8.00
8.00
8.00
8.00
8.00
Tu
12
We
13
Th
14
Fr
15
Sa
16
Su
17
Mo
18
Tu
19
We
20
Th
21
Fr
22
Sa
23
Su
24
Mo
25
9.00
18.30 15,30-17,00
8.00
Tu
26
We
27
1
1
9.00
9.00
18.30 15,30-17,00
18.30 15,30-17,00
8.00
8.00
9.00
18.30 15,30-17,00
8.00
Th
TOTAL
28
18
Summary of Days Worked To Date
Contract
TOTAL
Previous
Month
This Month
18
144.00
Cumulated
18
Employee's Signature
Project Manager
Crlig C-tin
Date:
2/28/2012
Date:
2/28/2012
Date:
2/28/2012
OBS.
Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break
Day
Date
Days
Worked
Arr
Fr
9.00
18.30 15,30-17,00
8.00
Planning future activities / Cost analisys Retaing Walls, Slope Reinforcements / LOT 6
- additions on claim items (OSCAR)
Sa
Su
Mo
9.00
18.30 15,30-17,00
8.00
Tu
9.00
18.30 15,30-17,00
8.00
Dep
Cumul
We
9.00
18.30 15,30-17,00
8.00
Th
Fr
1
1
9.00
9.00
18.30 15,30-17,00
18.30 14,00-15,00
8.00
8.00
9.00
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
8.00
Sa
Su
10
Work Description
Mo
11
Tu
12
We
13
1
1
1
Th
14
9.00
18.30 14,00-15,00
8.00
9.00
18.30 14,00-15,00
8.00
1
1
1
1
1
9.00
9.00
9.00
9.00
9.00
18.30
18.30
18.30
18.30
18.30
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
8.00
8.00
8.00
8.00
8.00
IPS 03
IPS 03
IPS 03 - sent to engineer
ITEM LIST PREPARATION - bridges
ITEM LIST PREPARATION - bridges
Fr
15
Sa
16
Su
17
Mo
18
Tu
19
We
20
Th
21
Fr
22
Sa
23
Su
24
Mo
25
Tu
26
1
1
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
We
27
9.00
18.30 14,00-15,00
8.00
9.00
18.30 14,00-15,00
8.00
9.00
18.30 14,00-15,00
8.00
Th
Fr
28
Sa
29
30
Su
31
TOTAL
21
Summary of Days Worked To Date
Contract
TOTAL
Previous
Month
This Month
168.00
Cumul
18
21
39
Employee's Signature
Project Manager
Crlig C-tin
Date:
3/29/2013
Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break
Date
Days
Worked
Arr
Mo
9.00
18.30 15,30-17,00
8.00
1
1
1
1
9.00
9.00
9.00
9.00
18.30
18.30
18.30
18.30
15,30-17,00
15,30-17,00
15,30-17,00
14,00-15,00
8.00
8.00
8.00
8.00
9.00
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
8.00
Day
Dep
Cumul
Sa
Su
Tu
We
Th
Fr
Sa
Su
Mo
Tu
We
10
1
1
1
Th
11
9.00
18.30 14,00-15,00
8.00
9.00
18.30 14,00-15,00
8.00
Fr
12
Sa
13
Su
14
Mo
15
9.00
18.30 14,00-15,00
8.00
Tu
16
9.00
18.30 14,00-15,00
8.00
We
17
9.00
18.30 14,00-15,00
8.00
Th
18
Fr
19
1
1
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
Sa
20
Su
21
Mo
22
9.00
18.30 14,00-15,00
8.00
Tu
23
9.00
18.30 14,00-15,00
8.00
We
24
Th
25
1
1
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
9.00
18.30 14,00-15,00
8.00
Fr
Sa
26
27
Su
28
Mo
29
9.00
18.30 14,00-15,00
8.00
Tu
30
9.00
18.30 14,00-15,00
8.00
TOTAL
22
Summary of Days Worked To Date
Contract
TOTAL
Previous
This Month
39
22
IPS 04
IPS 04
IPS 04
IPS 04 / FOTO REPORT 1 - APRIL /
Identification of existing Billboards
IPS 04 - IPS 03 Joit
176.00
Cumul
61
Employee's Signature
Project Manager
Crlig C-tin
Date:
5/2/2013
Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break
Day
Date
Days
Worked
Arr
We
8.00
17.30 14,00-15,00
4.00
Th
9.00
18.30 15,30-17,00
8.00
Fr
9.00
18.30 14,00-15,00
8.00
Sa
Dep
Cumul
Su
Mo
Tu
9.00
18.30 14,00-15,00
8.00
We
9.00
18.30 14,00-15,00
8.00
Th
9.00
18.30 14,00-15,00
8.00
Fr
10
9.00
18.30 14,00-15,00
8.00
Sa
11
Su
12
Mo
13
9.00
18.30 14,00-15,00
8.00
Tu
14
9.00
18.30 14,00-15,00
8.00
We
15
Th
16
1
1
1
9.00
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
8.00
EASTER
Fr
17
Sa
18
Su
19
Mo
20
Tu
21
1
1
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
We
22
9.00
18.30 14,00-15,00
8.00
Th
23
9.00
18.30 14,00-15,00
8.00
9.00
18.30 14,00-15,00
8.00
8.00
Fr
Sa
24
25
Su
26
Mo
27
9.00
18.30 14,00-15,00
1
1
1
1
22
9.00
9.00
9.00
9.00
18.30
18.30
18.30
18.30
Tu
28
We
29
Th
30
Fr
31
TOTAL
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
8.00
8.00
8.00
8.00
172.00
Previous
This Month
61
22
Cumul
83
Employee's Signature
Project Manager
Crlig C-tin
Date:
5/31/2013
OBS.
Project Manager
Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
Hour
Break
Day
Date
Days
Worked
Arr
Mo
9.00
18.30 14,00-15,00
8.00
Dep
Cumul
Tu
We
1
1
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
Th
9.00
18.30 14,00-15,00
8.00
Fr
9.00
18.30 14,00-15,00
8.00
Sa
Su
Mo
10
9.00
18.30 14,00-15,00
8.00
Tu
11
9.00
18.30 14,00-15,00
8.00
We
12
9.00
18.30 14,00-15,00
8.00
Th
13
9.00
18.30 14,00-15,00
8.00
Fr
14
9.00
18.30 14,00-15,00
8.00
Sa
15
Su
16
Mo
17
9.00
18.30 14,00-15,00
8.00
Tu
18
9.00
18.30 14,00-15,00
8.00
We
19
9.00
18.30 14,00-15,00
8.00
9.00
18.30 14,00-15,00
8.00
9.00
18.30 14,00-15,00
8.00
Th
Fr
20
Sa
21
22
Su
23
Mo
24
9.00
18.30 14,00-15,00
8.00
Tu
25
We
26
1
1
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
9.00
18.30 14,00-15,00
8.00
9.00
18.30 14,00-15,00
8.00
Th
27
Fr
Sa
28
29
Su
30
TOTAL
20
Summary of Days Worked To Date
Contract
TOTAL
160.00
Previous
This Month
Cumul
83
20
103
Employee's Signature
Project Manager
Crlig C-tin
Date:
7/2/2013
Project Manager
OBS.
Contract Number:
Name of Company:
Employee's Name:
Title:
Hour
Break
Day
Date
Days
Worked
Arr
Mo
9.00
18.30 14,00-15,00
8.00
Tu
9.00
18.30 14,00-15,00
8.00
We
9.00
18.30 14,00-15,00
8.00
Th
9.00
18.30 14,00-15,00
8.00
Fr
9.00
18.30 14,00-15,00
8.00
Sa
Su
Mo
9.00
20.30 14,00-15,00
8.00
Tu
9.00
18.30 14,00-15,00
8.00
We
10
9.00
18.30 14,00-15,00
8.00
Th
11
9.00
20.30 14,00-15,00
8.00
Fr
12
9.00
18.30 14,00-15,00
8.00
Sa
13
Su
14
Mo
15
9.00
20.30 14,00-15,00
8.00
Tu
16
9.00
20.30 14,00-15,00
8.00
We
17
9.00
19.30 14,00-15,00
8.00
9.00
18.30 14,00-15,00
8.00
8.00
4
Th
Fr
Sa
18
19
20
Dep
10.30 15.30
Cumul
Su
21
Mo
22
9.00
18.30 14,00-15,00
8.00
Tu
23
9.00
18.30 14,00-15,00
8.00
We
24
9.00
18.30 14,00-15,00
8.00
Th
25
Fr
9.00
9.00
18.30 14,00-15,00
18.30 14,00-15,00
8.00
8.00
Sa
26
27
1
1
Su
28
Mo
29
Tu
30
We
31
TOTAL
Contract
TOTAL
1
9.00 18.30 14,00-15,00
1
9.00 18.30 14,00-15,00
1
9.00 18.30 14,00-15,00
23
Summary of Days Worked To Date
Previous
103
Employee's Signature
Crlig Constantin-Florin
Date:
7/25/2013
This Month
8.00
8.00
8.00
193.00
Cumul
23
126
General Manager
Antoni Ronda i Rodriguez
Work Description
OBS.
Project Manager
Contract Number:
Name of Company:
Employee's Name:
Title:
MONTHLY TIME SHEET
August / Agosto / August 2013
Hour
Break
Days
Worked
Arr
Dep
1
1
9.00
9.00
18.30
18.30
14,00-15,00
14,00-15,00
8.00
8.00
9.00
20.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
20.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
10
11
Mo
12
9.00
20.30
14,00-15,00
8.00
Tu
13
9.00
20.30
14,00-15,00
8.00
We
14
9.00
19.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
Day
Date
Th
Fr
Sa
Su
Mo
Th
15
Fr
Cumul
Sa
16
17
Su
18
Mo
19
9.00
18.30
14,00-15,00
8.00
Tu
20
9.00
18.30
14,00-15,00
8.00
We
21
9.00
18.30
14,00-15,00
8.00
Th
22
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
Fr
Sa
23
24
Su
25
Mo
26
9.00
18.30
14,00-15,00
8.00
Tu
27
9.00
18.30
14,00-15,00
8.00
We
28
Th
29
1
1
7.30 11.30
15.30 19.30
4.00
4.00
Fr
30
TOTAL
Contract
TOTAL
1
9.00 18.30 14,00-15,00
22
Summary of Days Worked To Date
Previous
126
Employee's Signature
Crlig Constantin-Florin
Date:
8/29/2013
This Month
8.00
168.00
Cumul
22
148
General Manager
Antoni Ronda i Rodriguez
IPS 07 - Advance Payment - 1st instalment arrangement to be sent / Gault Rice returnal to Romania
- arange for VO 14 to be signed / IPS 08 - daily
mesurements
IPS 08 - daily measurements E08-1/E08-3 - Prepare
draft letters for ... Asking payment for IPC 01
VO 11 - sent editable format to M. Pirnuta / Site visit
Daily measurement 5r3 / Materials on site / Culverts /
Reading claim letters from Clive Horridge
Report to David - IPC 19, VO11, VO12, VO13, VO14 /
Daily measurements - preparing table for works on 5R3
OBS.
VO 12 - VO 13 - VO 14 - clarifications
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
7
8
Mo
9.00
18.30
14,00-15,00
8.00
Tu
10
9.00
18.30
14,00-15,00
8.00
We
11
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14.00-15.00
8.00
Th
Fr
12
13
Sa
14
Cumul
Su
15
Mo
16
9.00
18.30
14,00-15,00
8.00
Tu
17
9.00
18.30
14,00-15,00
8.00
We
18
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
1
1
9.00
9.00
18.30 14,00-15,00
18.30 14.00 - 15.00
8.00
8.00
Th
19
Fr
Sa
20
21
Su
22
Mo
23
9.00
18.30
14,00-15,00
8.00
Tu
24
9.00
18.30
14,00-15,00
8.00
We
25
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
Th
26
Fr
Sa
27
28
Su
29
Mo
30
TOTAL
Contract
TOTAL
1
9.00 18.30 14,00-15,00
23
Summary of Days Worked To Date
Previous
148
Employee's Signature
Crlig Constantin-Florin
Date:
10/1/2013
This Month
8.00
184.00
Cumul
23
171
General Manager
Antoni Ronda i Rodriguez
OBS.
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Tu
9.00
18.30
14,00-15,00
8.00
We
Th
1
1
9.00
9.00
18.30
18.30
14,00-15,00
14,00-15,00
8.00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
5
6
Mo
9.00
18.30
14,00-15,00
8.00
1
1
1
0.5
9.00
9.00
9.00
9.00
18.30
18.30
18.30
13.00
14,00-15,00
14,00-15,00
14,00-15,00
8.00
8.00
8.00
4.00
1
1
1
1
1
0.5
9.00
9.00
9.00
9.00
9.00
11.00
18.30
18.30
18.30
18.30
18.30
18.30
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14.00-15.00
8.00
8.00
8.00
8.00
8.00
4.00
Tu
We
Th
10
Fr
11
Sa
12
Su
13
Mo
14
Tu
15
We
16
Th
17
Cumul
Fr
18
Sa
19
Su
20
Mo
21
9.00
18.30
14,00-15,00
8.00
Tu
22
9.00
18.30
14,00-15,00
8.00
We
23
9.00
18.30
14,00-15,00
8.00
Th
24
9.00
18.30
14,00-15,00
8.00
Fr
25
9.00
18.30
14,00-15,00
8.00
Sa
26
Su
27
Mo
28
9.00
18.30
14,00-15,00
8.00
Tu
29
9.00
18.30
14,00-15,00
8.00
We
30
9.00
18.30
14,00-15,00
8.00
Th
31
9.00
18.30
14,00-15,00
8.00
TOTAL
23
Summary of Days Worked To Date
184.00
Contract
TOTAL
Previous
171
Employee's Signature
Crlig Constantin-Florin
Date:
10/31/2013
This Month
Cumul
23
194
General Manager
Antoni Ronda i Rodriguez
OBS.
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
2
3
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
9.00
18.30
14.00-15.00
8.00
Su
10
Mo
11
9.00
18.30
14,00-15,00
8.00
Tu
12
9.00
18.30
14,00-15,00
8.00
We
13
9.00
18.30
14,00-15,00
8.00
Th
14
9.00
18.30
14,00-15,00
8.00
Fr
15
9.00
18.30
14,00-15,00
8.00
Sa
16
9.00
18.30
14.00-15.00
8.00
Su
17
Mo
18
9.00
18.30
14,00-15,00
8.00
Tu
19
9.00
18.30
14,00-15,00
8.00
We
20
9.00
18.30
14,00-15,00
8.00
Th
21
9.00
18.30
14,00-15,00
8.00
Fr
22
9.00
18.30
14,00-15,00
8.00
Sa
23
9.00
18.30
14.00-15.00
8.00
Cumul
Su
24
9.00
18.30
14.00-15.00
8.00
Mo
25
9.00
18.30
14,00-15,00
8.00
Tu
26
9.00
18.30
14,00-15,00
8.00
We
27
9.00
18.30
14,00-15,00
8.00
Th
28
9.00
18.30
14,00-15,00
8.00
Fr
29
TOTAL
Contract
TOTAL
1
9.00 18.30 14,00-15,00
25
Summary of Days Worked To Date
Previous
194
Employee's Signature
Crlig Constantin-Florin
Date:
11/29/2013
This Month
8.00
200.00
Cumul
25
219
General Manager
Antoni Ronda i Rodriguez
Ips 10 - print / Finish, sent to Engineer/ Daily site Journal / Daily activity
Program / Daily measurements - Excavations /
Targu Jiu - at Engineer Office answer querries for IPC 02 / Daily activity
Program / Daily measurements - Excavations, Culverts /
IPS 11 - GI / Breakdown for Slope Mesh / Daily site Journal / Daily
Activity Journal / Monthly Report - Photo Report
Targu Jiu - at Engineer Office answer querries for IPC 02 / Daily activity
Program / Daily measurements - Excavations, Culverts Monthly Report Copies and Scan
Targu Jiu - at Engineer Office answer querries for IPC 02 / Daily activity
Program / Daily measurements - Excavations, Culverts / Monthly Report
- Sent to Engineer
Targu Jiu - at Engineer Office - final preparations for IPC 02 / Daily
activity Program / Daily measurements - Excavations, Culverts
IPS 11 - GI / Daily Measurements - Culvets
IPS 11 - GI / Daily Measurements - Culverts / Daily site Journal / Daily
Activity Journal
IPS 11 / Daily Measurements - Excavations / Daily site Journal / Daily
Activity Journal
IPS 11 / Daily Measurements - Asphalt / Daily site Journal / Daily
Activity Journal
IPS 11 / Daily Measurements - Conterlevels / Daily site Journal / Daily
Activity Journal
IPS 11 - Daily Measurements - Material - Final preparation - Sent at
Targu Jiu for handover and explanations / Daily site Journal / Daily
Activity Journal
IPS - Updating Materials List for Precast Elements / Sand / Balast /
Cement / IPS - Update of Status of Culverts on Site - Justified and Built
IPS 12 - GI's / Daily Measurements - Culverts / Daily site Journal / Daily
Activity Journal
IPS 12 - Daily Measurements - Slope Mesh / Preparing Breakdown for
Slope Protection - Mesh / Daily site Journal / Daily Activity Journal
IPS 12 - Daily Measurements - Slope Mesh, Asphalt and Excavations /
Preparing Breakdown for Slope Protection - Mesh / Daily site Journal /
Daily Activity Journal
IPS 12 - Daily Measurements - Culverts / Final - Breakdown for Slope
Protection - Mesh / Daily site Journal / Daily Activity Journal
IPS 12 - Daily Measurement - Materials - Print to be sent to Engineer Way to Tg Jiu to handover IPS 12 and explanations / Daily site
Journal / Daily Activity Journal
IPC 03 - Preparation along with Engineer QS, answering the queries /
Preparing Copies Ready for CNADNR approval - Deadline Monday 25th
nov.
OBS.
Project Manager
Month/Mes:
Year/Ao:
Days
Worked
Arr
Dep
1
1
9.00
9.00
18.30
18.30
14,00-15,00
14,00-15,00
8.00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
Mo
9.00
18.30
14,00-15,00
8.00
Tu
10
9.00
18.30
14,00-15,00
8.00
We
11
9.00
18.30
14,00-15,00
8.00
Th
12
9.00
18.30
14,00-15,00
8.00
Fr
13
9.00
18.30
14,00-15,00
8.00
Sa
14
Su
15
Mo
16
9.00
18.30
14,00-15,00
8.00
Tu
17
9.00
18.30
14,00-15,00
8.00
We
18
9.00
18.30
14,00-15,00
8.00
Th
19
9.00
18.30
14,00-15,00
8.00
Fr
20
8.30
17.30
14,00-15,00
8.00
Sa
21
Su
22
Mo
23
8.30
17.30
14,00-15,00
8.00
Tu
24
8.30
17.30
14,00-15,00
8.00
We
25
Th
26
Fr
27
8.30
17.30
14,00-15,00
8.00
Sa
28
Su
29
Mo
30
8.30
17.30
14,00-15,00
8.00
Tu
31
8.30
17.30
14,00-15,00
8.00
Day
Date
Mo
Tu
TOTAL
20
Cumul
160.00
Previous
219
Employee's Signature
Crlig Constantin-Florin
Date:
12/18/2013
This Month
Cumul
20
239
General Manager
Antoni Ronda i Rodriguez
Answer querries on IPC02 and IPC03 regarding Materials on Site on the side of the Report prepared by
the Consultant of Ministry of Transport / Daily Site Journal / Daily Activity Program
Answer querries on IPC02 and IPC03 regarding Materials on Site on the side of the Report prepared by
the Consultant of Ministry of Transport. / Daily Site Journal / Daily Activity Program
Answer querries on IPC02 and IPC03 regarding Materials on Site on the side of the Report prepared by
the Consultant of Ministry of Transport. / Daily Site Journal / Daily Activity Program
IPS 13 - GI - Clearing Utilities Documents / Daily Site Journal / Daily Activity Program
IPS 13 - Daily Measurements - Various Tables - Mainly Culverts / Daily Site Journal / Daily Activity
Program
Table of IPC'es details for LOT 6 - asked by DRDP Timisoara - New Engineer Team Office/ Daily Site
Journal / Daily Activity Program
Table of VO's details for LOT 6 - asked by DRDP Timisoara - New Engineer Team Office/ Daily Site
Journal / Daily Activity Program
IPS 13 - Ballace of culverts between requests and payed / Clarification of Remaining Supportig
Documents / Daily Site Journal / Daily Activity Program
IPS 13 - Final checking / Daily Site Journal / Daily Activity Program
Ballace of culverts between requests and payed / Clarification of Remaining Supportig Documents /
Daily Site Journal / Daily Activity Program
Ordering Documents - IPS'es / IPC'es first working year / Daily Activity Program / Daily Site Journal
Ordering Documents - IPS'es / IPC'es first working year / Daily Activity Program / Daily Site Journal
FELIZ NAVIDAD !
Ordering Documents - IPS'es / IPC'es first working year / Daily Activity Program / Daily Site Journal
Monthly Report - December 2013 / Daily Site Journal / Daily Activity Program
Monthly Report - Photographic Report - December 2013 / Daily Site Journal / Daily Activity Program
OBS.
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
Mo
Tu
We
1
1
1
1
1
9.00
9.00
9.00
9.00
9.00
18.30
18.30
18.30
18.30
18.30
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
8.00
8.00
8.00
8.00
8.00
9.00
9.00
9.00
9.00
18.30
18.30
18.30
18.30
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
8.00
8.00
8.00
8.00
Th
Fr
10
Cumul
Sa
11
Su
12
Mo
13
Tu
14
We
15
Th
16
1
1
1
1
Fr
17
9.00
18.30
14,00-15,00
8.00
Sa
18
Su
19
Mo
20
9.00
18.30
14,00-15,00
8.00
Tu
21
9.00
18.30
14,00-15,00
8.00
We
22
9.00
18.30
14,00-15,00
8.00
Th
23
9.00
18.30
14,00-15,00
8.00
Fr
24
9.00
18.30
14,00-15,00
8.00
Sa
25
Su
26
Mo
27
9.00
18.30
14,00-15,00
8.00
Tu
28
9.00
18.30
14,00-15,00
8.00
We
29
Th
30
Fr
31
TOTAL
Contract
TOTAL
1
9.00 18.30 14,00-15,00
8.00
1
9.00 18.30 14,00-15,00
8.00
1
9.00 18.30 14,00-15,00
8.00
21
168.00
Summary of Days Worked To Date
Previous
239
Employee's Signature
Crlig Constantin-Florin
Date:
This Month
21
General Manager
Carlos Galido
Cumul
260
1/31/2014
Monthly Report - December 2013 - Written section / Daily Site Journal to be singned by Engineer ,
Print, Scan, Copy, Tide it, Prepare the Letter / Daily Site Journal / Daily Activity Program
Sent Monthy Report December 2013 at Engineer / Daily Site Journal / Daily Activity Program
IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/
IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/
IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/
IPS 13 - December 2013 / Daily Site Journal / Daily Activity Program/
LOT 6 - Overview Unapproved Variation Orders / Daily Site Journal / Daily Activity Program/
Way to Caransebes and then to Timisoare to search for IPC 17 - LOT 6 Caransebes Bypass / Daily
Activity Program / Daily site Journal
Contact Diana Pogaci (CNADNR - LOT 6 QS - replaces Marius Pirnuta) for VO11, VO12 and VO13 /
Contact Liliana Toma - Ramboll and Marius Pirnuta - ask for IPC17 Lot 6 / Prepare Front Tables for
VO11-Vertical Signals in accordance with Diana's Request / Daily Activity Program / Daily Site Journal
Prepare IPS 17 Lot 6 on M. Pirnuta format / Daily Activity Program / Daily Site Journal
Various Checks on Quantities 5R3 / Preparing Tables / Overview Supporting Documents / Daily Activity
Program / Daily Site Journal
Various Checks on Quantities 5R3 / VO 11 - Vertical Signal - Supporting Document, Quantities DDE/
Daily Activity Program / Daily Site Journal
VO 11 - Vertical Signal - Supporting Document, Quantities DDE/ Letter LOT6 - IPC17-Retention Money /
Daily Activity Program / Daily Site Journal
IPS 13 - January 2014 / Work Procedure for IPS'es / Daily Activity Program / Site Journal
IPS 13 - January 2014 / Daily Activity Program / Site Journal
IPS 13 - January 2014 / Daily Activity Program / Site Journal
Project Manager
OBS.
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
Mo
10
9.00
18.30
14,00-15,00
8.00
Tu
11
9.00
18.30
14,00-15,00
8.00
We
12
9.00
18.30
14,00-15,00
8.00
Th
13
9.00
18.30
14,00-15,00
8.00
Fr
14
9.00
18.30
14,00-15,00
8.00
Sa
15
9.00
18.30
14,00-15,00
8.00
Su
16
Mo
17
9.00
18.30
14,00-15,00
8.00
Tu
18
9.00
18.30
14,00-15,00
8.00
We
19
9.00
18.30
14,00-15,00
8.00
Th
20
9.00
18.30
14,00-15,00
8.00
Fr
21
9.00
18.30
14,00-15,00
8.00
Sa
22
Su
23
Cumul
Mo
24
9.00
18.30
14,00-15,00
8.00
Tu
25
9.00
18.30
14,00-15,00
8.00
We
26
9.00
18.30
14,00-15,00
8.00
Th
27
9.00
18.30
14,00-15,00
8.00
Fr
28
9.00
18.30
14,00-15,00
8.00
TOTAL
Contract
TOTAL
21
Summary of Days Worked To Date
Previous
260
Employee's Signature
Crlig Constantin-Florin
Date:
2/28/2014
This Month
21
General Manager
Carlos Galido
168.00
Cumul
281
In Tg Jiu at Engineer Office / Photographic Report - January 2014 / Daily Site Journal / Daily Activity
Program
Monthly Report - January 2014 - Print, Scan / Daily Site Journal / Daily Activity Program
IPS 13 - November, December, January - Summary Review _ Materials on Site / Daily Site Journal /
Daily Activity Journal
LOT 6 - Caransebes Bypass - VO's Summary Sheet / 5R3 - IPS 13 / IPC Payment Details / Daily
Activity Program / Daily Site Journal
IPS 13 - November, December, January - Summary Review _ Materials on Site / Daily Site Journal /
Daily Activity Journal
LOT6 - Caransebes Bypass - Prepare and sent e-mail explanations regarding IPC 17 to DRDP
Timisoara / 5r3 - Mining Royalty Fee_Financial Implications_Changes in Law / Daily Site Journal /
Daily Activity Program
DRDP Timisoara - LOT 6 - clarifications IPC 17 and VO's / Daily Site Journal / Daily Activity Program
DRDP Timisoara - LOT 6 - clarifications IPC 17, survey Valea Mic, quantities Valea Mic, Editing
Minute of Appendix of 20th dec 2013, Taking - Over Minute, Variation Orders / Daily Site Journal /
Daily Activity Program
DRDP Timisoara - LOT 6 - clarifications IPC 17, survey Valea Mic, quantities Valea Mic, Editing
Minute of Appendix of 20th dec 2013, Taking - Over Minute, Variation Orders / Daily Site Journal /
Daily Activity Program
Preaparing Breakdown GI 06 / Daily Activity Program / Daily site Journal
Preaparing IPC 13 - Supporting Documents
IPS 13 - Supporting Document / Daily Measurements - CUlverts / Daily Activity Program / Daily site
Journal
IPS 13 - Supporting Document / Daily Measurements - Cantilevers / Daily Activity Program / Daily
site Journal
IPS 13 - Supporting Document / General Items_Print_Scan / Daily Activity Program / Daily site
Journal
Handing over the IPS 13 at Targu Jiu_Engineer Office / Daily Activity Program / Daily Site Journal
Daily Measurements - Bridges / Daily Activity Program / Daily site Journal
OBS.
Preparing Breakdowns_ E14 - Umplutura cu Material Drenant / Preparing Breakdowns _ MS5 Parapet New Jersey pe zid de sprijin / Daily Activity Program / Daily Site Journal
Study for preparation of Breakdowns_ B38 - Injectare fisuri cu rasini epoxidice, E13 - 4 _ Excavarea
in roci stancoase cu exploziv , B72 - Derocare stanca - fara explozibil / CO 07 - Console din beton
armat / Daily Activity Program / Daily Site Journal
Preparing Breakdowns_ E13 - 4 _ Excavarea in roci stancoase cu exploziv , B72 - Derocare stanca fara explozibil / Daily Activity Program / Daily Site Journal
Preparing Breakdowns CO 07 - Console din beton armat / Daily Activity Program / Daily Site Journal
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
Mo
10
9.00
18.30
14,00-15,00
8.00
Tu
11
9.00
18.30
14,00-15,00
8.00
We
12
9.00
18.30
14,00-15,00
8.00
Th
13
Fr
14
1
1
9.00
9.00
18.30
18.30
14,00-15,00
14,00-15,00
8.00
8.00
Sa
15
Su
16
Mo
17
9.00
18.30
14,00-15,00
8.00
Tu
18
9.00
18.30
14,00-15,00
8.00
We
19
9.00
18.30
14,00-15,00
8.00
Th
20
9.00
18.30
14,00-15,00
8.00
Fr
21
9.00
18.30
14,00-15,00
8.00
Sa
22
Su
23
Mo
24
9.00
18.30
14,00-15,00
8.00
Tu
25
9.00
18.30
14,00-15,00
8.00
We
26
9.00
18.30
14,00-15,00
8.00
Th
27
9.00
18.30
14,00-15,00
8.00
Fr
28
9.00
18.30
14,00-15,00
8.00
Cumul
Sa
29
Su
30
Mo
31
TOTAL
Contract
TOTAL
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
22
Summary of Days Worked To Date
Previous
281
Employee's Signature
Crlig Constantin-Florin
Date:
3/31/2014
This Month
22
General Manager
Carlos Galido
176.00
Cumul
303
In Tg Jiu at Engineer Office for IPC 05 - 5r3 / Taking Pictures for Photographic Report - February
2014 / Daily Site Journal / Daily Activity Program
Preparing Photo Report / Monthly Report - under construction / Daily Site Journal / Daily Activity
Program
Mesurement of real DDE quantities vertical signal on LOT 6 - Caransebes Bypass / Monthly Report under construction / Daily Site Journal / Daily Activity Program
Mesurement of real DDE quantities vertical signal on LOT 6 - Caransebes Bypass / Monthly Report under construction / Daily Site Journal / Daily Activity Program
Measurement LOT 6 - Vertical Signal DDE, for VO signals and markings / Daily Site Journal / Daily
Activity Program
In Tg Jiu at Engineer Office for IPC 05 - 5r3 / Taking Pictures for Photographic Report - March 2014 /
Daily Site Journal / Daily Activity Program
Breakdows 5r3 / Clarifications Liliana Toma, LOT6 - IPC 17 - Return of Retention Money / Daily
Site Journal / Daily Activity Program
Breakdows 5r3 / Clarifications Liliana Toma, LOT6 - IPC 17 - Return of Retention Money / Daily
Site Journal / Daily Activity Program
Breakdows 5r3 / Daily Site Journal / Daily Activity Program
Breakdows 5r3 / Daily Site Journal / Daily Activity Program
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / LOT 6 - Get knowledge about SAT in preparation for Tomorrow meeting with DRDP
Timisoara Engineer Representatives
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / LOT 6 - Meeting with DRDP Timisoara Engineer Representatives - presenting the SAT for
LOT 6 and planning a schedule of work
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / LOT 6 - Overview IPS 19 in relation with SAC (for DRDP Timisoara)
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / Went to site for pictures in preparation of Photo Report - March 2014
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / Preparating of Photo Report - March 2014. Went on site with technical office to analize
consola in specific areas.
OBS.
5R3 - Daily Site Journal / 5r3 Daily Activity Program / LOT 6 - Overview IPS 19 in relation with SAC
(for DRDP Timisoara) , VO 11 and VO 12 Vertical Signal and Horizontal Markings
5R3 - IPS14 / Daily Measurements - Materials + Culverts / 5r3 Daily Site Journal / 5r3 Daily Activity
Program / Preparating of Photo Report - March 2014.Preparing the Monthly Report _ March 2014
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
10
9.00
18.30
14,00-15,00
8.00
Fr
11
9.00
18.30
14,00-15,00
8.00
Sa
12
9.00
13.00
Su
13
Mo
14
9.00
18.30
14,00-15,00
8.00
Tu
15
9.00
18.30
14,00-15,00
8.00
We
16
9.00
18.30
14,00-15,00
8.00
Th
17
9.00
18.30
14,00-15,00
8.00
Fr
18
9.00
18.30
14,00-15,00
8.00
Sa
19
Su
20
Mo
21
Tu
22
9.00
18.30
14,00-15,00
8.00
We
23
9.00
18.30
14,00-15,00
8.00
Cumul
4.00
Th
24
9.00
18.30
14,00-15,00
8.00
Fr
25
9.00
18.30
14,00-15,00
8.00
Sa
26
9.00
18.30
14,00-15,00
8.00
Su
27
Mo
28
9.00
18.30
14,00-15,00
8.00
Tu
29
9.00
18.30
14,00-15,00
8.00
We
30
9.00
18.30
14,00-15,00
8.00
TOTAL
23
Summary of Days Worked To Date
Contract
TOTAL
Previous
303
Employee's Signature
Crlig Constantin-Florin
Date:
4/30/2014
This Month
23
General Manager
Carlos Galido
180.00
Cumul
326
5R3 - IPS14 / Daily Measurements - Culverts, Bridge 125+320, Contilevels / 5r3 Daily Site Journal /
5r3 Daily Activity Program / Preparating of Photo Report - March 2014.Preparing the Monthly Report
_ March 2014
Went ot Tg Jiu at Hyder, engineer office to close the Daily Site Journal for March 2014 / 5r3 Daily
Activity Program / Taking Pictures for Photo Report - April 2014. / Preparing the Monthly Report _
March 2014
5R3 - IPS14 / Daily Measurements - Culverts, Bridge 125+320, Contilevels / 5r3 Daily Site Journal /
5r3 Daily Activity Program / Preparing the Monthly Report _ March 2014
LOT 6 - Discutions on IPC at Completion / 5R3 - IPS14 / Daily Measurements - Culverts, Bridge
125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Preparing the Monthly
Report _ March 2014 - scan, copies, bounding - ready to be sent to Engineer up to 7th of March
according with the contract.
LOT 6 - Ask clarifications about the time of completing a determination / LOT 6 - Answer to Dragos
Enasescu's e-mail regarding A027B justifications / 5R3 - Daily Measurements - Culverts, Bridge
125+320, Contilevels / 5r3 Daily Site Journal / 5r3 Daily Activity Program / Send Monthly Report _
March 2014.
LOT 6 - Finalyse and send explanations for A027b/ 5R3 - Preparing daily site journal - blank, for
subcontractors / Daily measurements - Slope protection / Daily measurements - culverts / Daily
Activity Program / Daily Site Journal
LOT 6 - Finalyse and send explanations for A027b/ 5R3 - Preparing daily site journal - blank, for
subcontractors / Daily measurements - Slope protection / Translating Index for Informe tecnico/ Daily
measurements - culverts / Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Bridge 125+320 / Daily measurement - Culverts / Translating Informe
tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Translating
Informe tecnico/ Daily Activity Program / Daily Site Journal
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Daily Activity
Program / Daily Site Journal / Working on Photo Report for April 2014
5R3 - Daily measurements - Slope protection, Contilevels , Bridge 125+320, Culverts / Daily Activity
Program / Daily Site Journal / Working on Photo Report for April 2014
5R3 - Daily measurements - Update IPS 14 - under construction / Daily Activity Program / Daily Site
Journal / Working on Photo Report for April 2014
EASTER
Second Day of EASTER
5R3 - Daily measurements - Update IPS 14 - under construction / Daily Activity Program / Daily Site
Journal / Working on Photo Report for April 2014
Targu Jiu at Engineer office to sign the Daily Site Journal / LOT 6 - Caransebes - Preparing answer
to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site Journal
OBS.
LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily
Activity Program / Daily site Journal
LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since the
FEDR Dep in Transport Ministry is looking to cut them / 5R3 - Daily Activity Program / Daily site
Journal
LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily
Activity Program / Daily site Journal
5R3 - Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since
the FEDR Dep in Transport Ministry is looking to cut them / LOT 6 - Caransebes - Preparing answer
to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site Journal
5R3 - Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since
the FEDR Dep in Transport Ministry is looking to cut them / LOT 6 - Caransebes - Preparing answer
to SoC in cooperation with Oscar and T.E.A. / 5R3 - Daily Activity Program / Daily site Journal
LOT 6 - Caransebes - Preparing answer to SoC in cooperation with Oscar and T.E.A. / 5R3 Preparing support documents for Materials in the issue of maintaing them in the IPC 05 since the
FEDR Dep in Transport Ministry is looking to cut them / 5R3 - Daily Activity Program / Daily site
Journal
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
10
11.00
16.00
Su
11
Mo
12
9.00
18.30
14,00-15,00
8.00
Tu
13
9.00
18.30
14,00-15,00
8.00
We
14
9.00
18.30
14,00-15,00
8.00
Th
15
9.00
18.30
14,00-15,00
8.00
Fr
16
9.00
18.30
14,00-15,00
8.00
Sa
17
12.00
16.00
Su
18
Cumul
5.00
4.00
Mo
19
9.00
18.30
14,00-15,00
8.00
Tu
20
9.00
18.30
14,00-15,00
8.00
We
21
9.00
18.30
14,00-15,00
8.00
Th
22
9.00
18.30
14,00-15,00
8.00
Fr
23
9.00
18.30
14,00-15,00
8.00
Sa
24
9.00
18.30
14,00-15,00
8.00
Su
25
Mo
26
9.00
18.30
14,00-15,00
8.00
Tu
27
9.00
18.30
14,00-15,00
8.00
We
28
9.00
18.30
14,00-15,00
8.00
Th
29
9.00
18.30
14,00-15,00
8.00
Fr
30
9.00
18.30
14,00-15,00
8.00
Sa
31
TOTAL
25
Summary of Days Worked To Date
Contract
TOTAL
Previous
326
Employee's Signature
Crlig Constantin-Florin
Date:
5/30/2014
This Month
25
General Manager
Carlos Galido
193.00
Cumul
351
5R3 - Preparing photograph for Photo Monthly Report - April 2014 / Preparing Monthly Report - April
2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Preparing Monthly Report - April 2014 - Scan / 2 Copies / Bounding - as final preparation to be
ready for sent / LOT 6 - Review answer prepared by TEA for DRDP Timisoara and prepare papers to
be sent to DRDP accordingly. / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / Working on Photo Report for
April 2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / Daily Activity Program / Daily
Site Journal / Working on Photo Report for April 2014 / LOT 6 - speak with Marius Pirnuta about
VO11/12/13 - sent by e-mail previously named document for review in preparation for the next week
meeting / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / Prepare answer for AM POST
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / LOT 6 - Final preparation support documents for TEA in order to send an answer
to DRDP TIMISOARA - BoQ
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / LOT 6 - Final preparation support documents for TEA in order to send an answer
to DRDP TIMISOARA - Variation Orders
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / LOT 6 - Final preparation support documents for TEA, PM-s in order to send an
answer to DRDP TIMISOARA - Variation Orders / Preparations for tomorrow meeting with DRDP
Timisoara and with CNADNR
LOT 6 - Meeting at Caransebes (with Oscar) for clarifications regarding SaC and PM's with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and with CNADNR
representative Marius Pirnuta / / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) for clarifications regarding SaC and PM's with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and with CNADNR
representative Marius Pirnuta . Also at the meeting attended David Saiz, Marian Copilu and Liliana
Dimitriu / / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) for clarifications regarding SaC and PM's with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan and with CNADNR
representative Marius Pirnuta . Also at the meeting attended Liliana Dimitriu / / 5r3 - Daily Site
Journal / Daily Activity Program
LOT 6 - Preparation of Minute of the discutions held durring the week / Ask lette VO9 to Liliana Toma
/ Send the Minute to all participants at the meeting / Make a plan of solving the issues on SaC and
PM along with Oscar / / 5R3 - Update the quantities - collect the datas from production department /
Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program
OBS.
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program / LOT 6 - Final preparation support documents for TEA, PM-s in order to send an
answer to DRDP TIMISOARA - Variation Orders / Preparations for tomorrow meeting with DRDP
Timisoara and with CNADNR
LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal /
Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal /
Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal /
Daily Activity Program
LOT 6 - Meeting at Caransebes (with Oscar) preparations of Variatios regarding SaC with DRDP
TIMISOARA - representatives, Dragos Enasescu and Doru Borlovan. / 5r3 - Daily Site Journal /
Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / Preparing the IPS no. 14 / 5r3 Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Escalation, Materials / Preparing the IPS no. 14 / 5r3 - Daily Site
Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC also way to Casansebes, in the firs part of the day - to check on site the step dichs,
the ditches and the quantities on roundabouts / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
Mo
9.00
18.30
14,00-15,00
8.00
Tu
10
9.00
18.30
14,00-15,00
8.00
We
11
9.00
18.30
14,00-15,00
8.00
Th
12
9.00
18.30
14,00-15,00
8.00
Fr
13
9.00
18.30
14,00-15,00
8.00
Sa
14
11.00
16.00
Su
15
Mo
16
9.00
18.30
14,00-15,00
8.00
Tu
17
9.00
18.30
14,00-15,00
8.00
We
18
9.00
18.30
14,00-15,00
8.00
Th
19
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
Fr
20
Sa
21
Cumul
5.00
Su
22
Mo
23
9.00
18.30
14,00-15,00
8.00
Tu
24
9.00
18.30
14,00-15,00
8.00
We
25
9.00
18.30
14,00-15,00
8.00
Th
26
9.00
18.30
14,00-15,00
8.00
Fr
27
Sa
28
Su
29
Mo
30
TOTAL
9.00
14,00-15,00
8.00
1
9.00 18.30 14,00-15,00
8.00
22
173.00
Summary of Days Worked To Date
Contract
TOTAL
Previous
351
Employee's Signature
Crlig Constantin-Florin
Date:
6/30/2014
18.30
This Month
22
General Manager
Carlos Galido
Cumul
373
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / Preparing Monthly Report Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS
14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS
14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS
14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements - Slope protection, Contilevels , Bridges / 5r3 - Daily Site Journal / Daily
Activity Program
5R3 - Daily measurements - Escalation, Materials / Preparing the IPS no. 14 / 5r3 - Daily Site
Journal / Daily Activity Program
5R3 - Daily measurements, Receiving Minutes from Quality Department (Proces verbal - Podete /
Console) and keeping accounts of the work in relation with production to build the IPS 14 / Preparing
Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
5R3 - Daily measurements, Keeping accounts of the work in relation with production to build the IPS
14 / Preparing Monthly Report - Mai 2014 / 5R3 - Daily Site Journal / Daily Activity Program
LOT 6 - with DRDP TIMISOARA - representative, Dragos Enasescu preparations of Variatios
regarding SaC / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - VO 14 - PM 10 / 5r3 - Daily Site Journal / Daily Activity Program
OBS.
LOT 6 - preparation of summary for VO13 / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - preparation of summary for VO13 / 5r3 - Daily Site Journal / Daily Activity Program
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
10
9.00
18.30
14,00-15,00
8.00
Fr
11
9.00
18.30
14,00-15,00
8.00
Sa
12
Su
13
Mo
14
9.00
18.30
14,00-15,00
8.00
Tu
15
9.00
18.30
14,00-15,00
8.00
We
16
9.00
18.30
14,00-15,00
8.00
Th
17
9.00
18.30
14,00-15,00
8.00
Fr
18
9.00
18.30
14,00-15,00
8.00
Sa
19
9.00
18.30
14,00-15,00
8.00
Su
20
Mo
21
9.00
18.30
14,00-15,00
8.00
Tu
22
9.00
18.30
14,00-15,00
8.00
We
23
9.00
18.30
14,00-15,00
8.00
Th
24
9.00
18.30
14,00-15,00
8.00
Cumul
9.00
18.30
14,00-15,00
8.00
28
9.00
18.30
14,00-15,00
8.00
Tu
29
9.00
18.30
14,00-15,00
8.00
We
30
9.00
18.30
14,00-15,00
8.00
Th
31
9.00
18.30
14,00-15,00
8.00
Fr
25
Sa
26
Su
27
Mo
TOTAL
24
Summary of Days Worked To Date
Contract
TOTAL
Previous
373
Employee's Signature
Crlig Constantin-Florin
Date:
7/29/2014
This Month
24
General Manager
Carlos Galido
192.00
Cumul
397
LOT 6 - preparation of 2 copies for VO13 - overpass quantities / 5r3 - Daily Site Journal / Daily
Activity Program
LOT 6 - preparation of 2 copies for VO13 - PM's / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - VO 13 - scanning and packaging to be sent to Buchares / 5r3 - Daily Site Journal / Daily
Activity Program
5r3 - Preparing Monthly Report - June 2014 / 5r3 - Daily Site Journal / Daily Activity Program
5r3 - Materials on Site / Daily Measurements - slope protection / 5r3 - Daily Site Journal / Daily
Activity Program
5r3 - Materials on Site / Daily Measurements - culverts / 5r3 - Daily Site Journal / Daily Activity
Program
5r3 - Materials on Site / Daily Measurements - culverts, earthworks / 5r3 - Daily Site Journal / Daily
Activity Program
5r3 - Went on Tg Jiu at Engineer Office with Antonio - disscution over IPS / Daily Site Journal / Daily
Activity Program
5r3 - Materials on Site / Daily Measurements - general items / 5r3 - Daily Site Journal / Daily Activity
Program
Preparing summary tabels for IPS 14 in order to send the IPS to Engineer / 5r3 - Daily Site Journal /
Daily Activity Program
Preparing summary tabels for IPS 14 in order to send the IPS to Engineer / Sent the IPS to Engineer
- the letter and a summary / 5r3 - Daily Site Journal / Daily Activity Program
Receiving documents from the Quality Department (culverts) - Download, classify them, put them in
forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity Program
Receiving documents from the Quality Department (culverts, contilevels, slope protection) Download, classify them, put them in forlders, put them in summary sheets / 5r3 - Daily Site
Journal / Daily Activity Program
Receiving documents from the Quality Department (culverts, contilevels, slope protection,
earthworks ) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 Daily Site Journal / Daily Activity Program
Receiving documents from the Quality Department (culverts, contilevels, slope protection,
earthworks ) - Download, classify them, put them in forlders, put them in summary sheets / 5r3 Daily Site Journal / Daily Activity Program
Went to Tg Jiu with supporting documents for IPS 14 - Receiving documents from the Quality
Department (culverts, contilevels, slope protection, earthworks ) - Download, classify them, put them
in forlders, put them in summary sheets / 5r3 - Daily Site Journal / Daily Activity Program
5r3 - Materials on Site - Summary for IPS 14 - see the last attachents for the months of May,
June ,July 2014 / 5r3 - Daily Site Journal / Daily Activity Program
5r3 - Materials on Site - Summary for IPS 14 - see the last attachents for the months of May,
June ,July 2014 / 5r3 - Daily Site Journal / Daily Activity Program
At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program
OBS.
At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program
LOT 6 - Clarifing tabels for Liliana Toma in order to close the VO13 / 5R3 - Summary of Materials on
Site - Preparing the final attachments for IPS 14 / 5r3 - Daily Site Journal / Daily Activity Program
At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program
At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program
At Engineers office in Tg. Jiu - Working on IPC 06 / 5r3 - Daily Site Journal / Daily Activity Program
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Break
Cumul
Fr
9.00
18.30
14,00-15,00
8.00
Sa
15.00
17.00
Su
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
10
Mo
11
9.00
18.30
14,00-15,00
8.00
Tu
12
9.00
18.30
14,00-15,00
8.00
We
13
9.00
18.30
14,00-15,00
8.00
Th
14
9.00
18.30
14,00-15,00
8.00
Fr
15
9.00
18.30
14,00-15,00
8.00
Sa
16
Su
17
4.00
Mo
18
9.00
18.30
14,00-15,00
8.00
Tu
19
9.00
18.30
14,00-15,00
8.00
We
20
9.00
18.30
14,00-15,00
8.00
Th
21
9.00
18.30
14,00-15,00
8.00
Fr
22
9.00
18.30
14,00-15,00
8.00
Sa
23
Su
24
Mo
25
9.00
18.30
14,00-15,00
8.00
Tu
26
9.00
18.30
14,00-15,00
8.00
We
27
9.00
18.30
14,00-15,00
8.00
Th
28
9.00
18.30
14,00-15,00
8.00
Fr
29
9.00
18.30
14,00-15,00
8.00
Sa
30
11.00
19.00
Su
31
TOTAL
23
8.00
180.00
Summary of Days Worked To Date
Contract
TOTAL
Previous
397
Employee's Signature
Crlig Constantin-Florin
Date:
8/29/2014
This Month
23
General Manager
Carlos Galido
Cumul
420
5r3 - At Engineer Office in Tg Jiu for IPS 14 / Preparing the Monthly Report - July 2014 / Daily Site
Journal / Daily Activity Program
LOT 5 - summary table for VO13 asked by Liliana Toma / Preparing the Monthly Report for July 2014 / 5r3
- Daily Site Journal / Daily Activity Program
5r3 - Preparing the Photo Report for July 2014 to be sent / 5r3 - Daily Site Journal / Daily Activity Program
IPS 14 - daily measurements, Receiving documents from the Quality Department - calculations, processing
in order to be sent and attached to IPC 06 - Daily Site Journal - Daily Activity Program
IPS 14 - Went to Tg Jiu at engineer office to hand over the documents - calculations in order to be sent
and attached to IPC 06 - Daily Site Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Receiving
documents from the Quality Department - calculations, processing in order to be sent and attached to IPC
06 - Daily Site Journal - Daily Activity Program
Went to Tg Jiu with supporting documents for IPS 14 - Receiving documents from the Quality Department
(culverts, contilevels, slope protection, earthworks ) - Download, classify them, put them in forlders, put
them in summary sheets / 5r3 - Daily Site Journal / Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
OBS.
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Daily Site
Journal - Daily Activity Program
IPC 06 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 06 - Scanning Copies for CNADNR final preparation before sending - Daily Site Journal - Daily Activity Program
IPS 15 - Under Construction - Summaries of Unpaied items - planning works for the ongoing IPS - Daily
Site Journal - Daily Activity Program
IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program
IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program
IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program
IPS 15 - Under Construction - Daily Site Journal - Daily Activity Program
5r3 - Stating Prepartion of the Monthly Report - August 2014 / IPS 15 - Under Construction - Summary
Sheet for IPS 15 items - General Items - Daily Site Journal - Daily Activiy Program
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Break
Cumul
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
9.00
18.30
14,00-15,00
8.00
Su
Mo
Tu
We
10
Th
11
VACANTA
Fr
12
Sa
13
Su
14
Mo
15
9.00
18.30
14,00-15,00
8.00
Tu
16
9.00
18.30
14,00-15,00
8.00
We
17
9.00
18.30
14,00-15,00
8.00
Th
18
9.00
18.30
14,00-15,00
8.00
Fr
19
9.00
18.30
14,00-15,00
8.00
Sa
20
9.00
18.30
14,00-15,00
8.00
Su
21
Mo
22
9.00
18.30
14,00-15,00
8.00
Tu
23
9.00
18.30
14,00-15,00
8.00
We
24
9.00
18.30
14,00-15,00
8.00
Th
25
9.00
18.30
14,00-15,00
8.00
Fr
26
9.00
18.30
14,00-15,00
8.00
Sa
27
11.00
19.00
14,00-15,00
8.00
Su
28
Mo
29
9.00
18.30
14,00-15,00
8.00
Tu
30
9.00
18.30
14,00-15,00
8.00
TOTAL
20
160.00
Summary of Days Worked To Date
Contract
TOTAL
Previous
420
Employee's Signature
Crlig Constantin-Florin
Date:
9/29/2014
This Month
20
General Manager
Carlos Galido
Cumul
440
5r3 - Preparing IPS 15 / Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity
Program
5r3 - Preparing IPS 15 - at Tg Jiu meeting with road engineer to clarify the supporting documents/
Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 15 - at Tg Jiu meeting with road engineer to clarify the supporting documents/
Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 15 / Preparing the Monthly Report - August 2014, scan, copies, forwarding letter / Daily
Site Journal / Daily Activity Program
5r3 - Preparing IPS 15 - at Tg Jiu meeting with QS in order to hand over and to present the content of IPS /
Preparing the Monthly Report - August 2014 / Daily Site Journal / Daily Activity Program
Daily Measurents - Cantilevels, Culverts, Earthworks / Daily Site Journal / Daily Activity Program
5r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in
order to Support building of the IPC / Daily Site Journal / Daily Activity Program
IPC 07 - Went to Tg Jiu at engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily Site
Journal - Daily Activity Program
IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily
Site Journal - Daily Activity Program
IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily
Site Journal - Daily Activity Program
IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily
Site Journal - Daily Activity Program
IPC 07 - Working along with engineer office to prepare along with Hyder QS the ongoing IPC 07 / Daily
Site Journal - Daily Activity Program
IPC 07 - Went to Tg Jiu at engineer office for final preparations, scan, copies of the IPC in order to e sent
to Employer / Daily Site Journal - Daily Activity Program
IPS 16 - Starting prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify,
earthworks and culverts / Daily Site Journal - Daily Activity Program
IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks
and culverts / Daily Site Journal - Daily Activity Program
IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks
and culverts / Daily Site Journal - Daily Activity Program
OBS.
IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks
and culverts / Daily Site Journal - Daily Activity Program
IPS 16 - Prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify, earthworks
and culverts / Daily Site Journal - Daily Activity Program
IPC 07 - Went to Tg Jiu at engineer office for final preparations, scan, copies of the IPC in order to e sent
to Employer / Daily Site Journal - Daily Activity Program
IPS 16 - Starting prepation of IPS 16, list with unpayed items, remaining cantileles, papers to justify,
earthworks and culverts / Daily Site Journal - Daily Activity Program
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Break
Cumul
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
Su
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
10
9.00
18.30
14,00-15,00
8.00
Sa
11
9.00
18.30
14,00-15,00
8.00
Su
12
Mo
13
9.00
18.30
14,00-15,00
8.00
Tu
14
9.00
18.30
14,00-15,00
8.00
We
15
9.00
18.30
14,00-15,00
8.00
Th
16
9.00
18.30
14,00-15,00
8.00
Fr
17
9.00
18.30
14,00-15,00
8.00
Sa
18
Su
19
Mo
20
9.00
18.30
14,00-15,00
8.00
Tu
21
9.00
18.30
14,00-15,00
8.00
We
22
9.00
18.30
14,00-15,00
8.00
Th
23
9.00
18.30
14,00-15,00
8.00
Fr
24
9.00
18.30
14,00-15,00
8.00
Sa
25
Su
26
Mo
27
9.00
18.30
14,00-15,00
8.00
Tu
28
9.00
18.30
14,00-15,00
8.00
We
29
9.00
18.30
14,00-15,00
8.00
Th
30
9.00
18.30
14,00-15,00
8.00
Fr
31
9.00
18.30
14,00-15,00
8.00
TOTAL
24
192.00
Summary of Days Worked To Date
Contract
TOTAL
Previous
440
Employee's Signature
Crlig Constantin-Florin
Date:
10/29/2014
This Month
24
General Manager
Carlos Galido
Cumul
464
5r3 - Preparing IPS 16 - at Tg Jiu meeting with road engineer to clarify the supporting documents/
Preparing the Monthly Report - September 2014 / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 / Preparing the Monthly Report - September 2014, scan, copies, forwarding letter /
Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 / Preparing the Monthly Report - September 2014, scan, copies, forwarding letter /
Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 - Daily Measurements - culvers / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 - Daily Measurements - contilevels / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 - Daily Measurements - earthworks / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 16 - Daily Measurements - slope protection / Daily Site Journal / Daily Activity Program
5r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in
order to Support building of the IPC / Daily Site Journal / Daily Activity Program
5r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in
order to Support building of the IPC / Daily Site Journal / Daily Activity Program
5r3 - Collecting informations about the status of supporting documents / Preparation of a List of Priorities in
order to Support building of the IPC / Daily Site Journal / Daily Activity Program
Preparing Table - cost for General Items - Variation Order 01.v1 / Daily Site Journal - Daily Activity Program
Preparing Table - cost for General Items - Variation Order 01.v2 / Daily Site Journal - Daily Activity Program
IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity Program
IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity Program
IPS 16 - Daily Measurements/ Preparing Table - quantitier for H4B - Variation Order 02.v1 / Daily Site
Journal - Daily Activity Program
IPS 16 - Daily Measurements/ Preparing Table - quantitier for H4B - Variation Order 02.v2 / Daily Site
Journal - Daily Activity Program
IPS 16 - Daily Measurement / Daily Site Journal - Daily Activity Program
OBS.
IPC 07 - Went to Tg Jiu at QS office to talk about the status of and to clarify issues, if any / Daily Site
Journal - Daily Activity Program
IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions
with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily
Activity Program
IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions
with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily
Activity Program
IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions
with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily
Activity Program
IPC 07 - Went to Tg Jiu at QS office talk about the status of and to clarify issues, if any also, discutions
with road engineer on issues of unreleased papers for contilevels and eartworks / Daily Site Journal - Daily
Activity Program
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Break
Cumul
Sa
9.00
18.30
14,00-15,00
8.00
Su
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
8.00
Sa
9.00
18.30
14,00-15,00
8.00
Su
Mo
10
9.00
18.30
14,00-15,00
8.00
Tu
11
9.00
18.30
14,00-15,00
8.00
We
12
9.00
18.30
14,00-15,00
8.00
Th
13
9.00
18.30
14,00-15,00
8.00
Fr
14
9.00
18.30
14,00-15,00
8.00
Sa
15
9.00
18.30
14,00-15,00
8.00
Su
16
Mo
17
9.00
18.30
14,00-15,00
8.00
Tu
18
9.00
18.30
14,00-15,00
8.00
We
19
9.00
18.30
14,00-15,00
8.00
Th
20
9.00
18.30
14,00-15,00
8.00
Fr
21
9.00
18.30
14,00-15,00
8.00
Sa
22
9.00
18.30
14,00-15,00
8.00
Su
23
Mo
24
9.00
18.30
14,00-15,00
8.00
Tu
25
9.00
18.30
14,00-15,00
8.00
We
26
9.00
18.30
14,00-15,00
8.00
Th
27
9.00
18.30
14,00-15,00
8.00
Fr
28
9.00
18.30
14,00-15,00
8.00
Sa
29
9.00
18.30
14,00-15,00
8.00
Su
30
TOTAL
25
200.00
Summary of Days Worked To Date
Contract
TOTAL
Previous
464
Employee's Signature
Crlig Constantin-Florin
Date:
12/1/2014
This Month
25
General Manager
Carlos Galido
Cumul
489
5r3 - IPC 08 - At Tg Jiu - final preparations for sending the IPC to Employer / Daily site Jurnal / Daily
Activity Program / Summary of payments - EARTHWORKS-EXCAVATIONS - in preparation for IPS 17
5r3 - Went on Site - Meeting with mr. Chesnoiu posponed for tomorrow / Daily site Jurnal / Daily Activity
Program / Summary of payments - PAVEMENT-BALLAST-CRUSHED STONE-AB2-MILLING- in
preparation for IPS 17
5r3 - Went on Site - Meeting with mr. Chesnoiu posponed for tomorrow / Daily site Jurnal / Daily Activity
Program / Summary of payments - CONSOLIDATIONS-SLOPE PROTECTION - BARRIERS - TORRENT
BARRIER start CANTILEVERS - in preparation for IPS 17
5r3 - Went on Site - Meeting with mr. Chesnoiu - talking problems regarding cantilevel papers / Bringing
Papers / VO-3 preparation of quantities tables / Daily site Jurnal / Daily Activity Program /
5r3 - Went on Site - Measuring concrete guard rails demolition and retaing wall demolitions on culverts /
Final review and preparation of the VO3 quantities table - Slope Protection / Record papers of cantilevels /
Daily site Jurnal / Daily Activity Program /
5r3 - Office paper work - Records of Cantilevers / Daily site Jurnal / Daily Activity Program /
5r3 - Photo Monthly Report / Daily site Jurnal / Daily Activity Program /
5r3 - Went on Site - Measuring concrete guard rails demolition and retaing wall demolitions on culverts /
Record of prepared papers for cantilevels / Daily site Jurnal / Daily Activity Program /
5r3 - Went of Site to Arrange a Meeting Between Topo Dep and Mr. Chesnoiu to clarify the issue of milling
for certification / Discutition over the Barriers for Torrents in order to clarify the papers for payment (it
results that the papers are not clear for this type of works ) / also discutions to clarify RNC 38 and 32 discutions are on deadlock, since the solution for RNC 32 is a new solution and it has no approval, no
notification prepared by Contractor => dificulty in chargeing/cobrar the works / Record papers of cantilevels
/ Daily site Jurnal / Daily Activity Program /
5r3 - Went on Tg. Jiu at Engineer Office to meet mr. Chesnoiu to clarrify the problems with the
Cantilevers / Picking up papers for Certification / Record papers of cantilevels / Daily site Jurnal / Daily
Activity Program /
Went on site to measure the Cantilevers 118+376 and 118+485 for clarifications regarding the IPS /
Record of demolition of concrete guard rails and existing retaining walls on Culverts / Daily Site Journal /
Daily Activity Program.
Record of Milling / Reevaluatioan of total quantities on slope protection an preparation of the financial
impact on this issue / Daily Site Journal / Daily Activity Program /
Montly Report - oct 2014
5r3 - Monthly Report - oct 2014 / Record of received papers / Preparing summary on New Jersey (as
material on site) issue / Preparing an Economical Impact Table with Issues On IPC 09 / Daily site Jurnal /
Daily Activity Program /
5r3 - Record of received papers - printing and went on Tg Jiu tu Engineer Office to present them and
register them / Tracking the way papers are prepared for the Certification / Daily Site Journal / Daily Activity
Program /
OBS.
5r3 - Record of received papers - printing / Tracking the way papers are prepared for the Certification /
Daily Site Journal / Daily Activity Program /
5r3 - Record of received papers - printing and went on Tg Jiu tu Engineer Office to present them and
register them / Tracking the way papers are prepared for the Certification / Daily Site Journal / Daily Activity
Program /
5r3 - Record of received papers - printing and went on Tg Jiu tu Engineer's QS Office to present them and
register them / Went on Road Engineer office to receive supporting documents and also to clarify the issue
with the tables for the variations on milling and on AB2 that is going to replace the BAD / Tracking the way
papers are prepared for the Certification / Daily Site Journal / Daily Activity Program /
5r3 - Record of supporting documents in order to be prepared whan the quality documents are about to
have the final signatures / Also - record of cantilevels for comparation beetwen the figures from production
and the certified figures / Daily Site Journal / Daily Activity Program /
5r3 - Record of supporting documents in order to be prepared whan the quality documents are about to
have the final signatures / Also - record of cantilevels for comparation beetwen the figures from production
and the certified figures / Daily Site Journal / Daily Activity Program /
IPC 09 - preparation on Tg Jiu (last day / postoned for tommorow)
Final preparations on supporting documents along with Quality Department and Topo department / IPC 09
- preparation on Tg Jiu (last day - finishing on midnight) / On the road to Bucharest to be there in the
morning for scanning documents befor handing over.
On Bucharest to hand over the IPC 09 (IPS17) / Went on COPISA office to scan de documents before
handing over
Starting preparations for the next IPS / Copy and folder the IPC 09 / Record of the unpaied items of
partialy unpaied items / Recover and record the datas from the last week Daily Site Journal
Coming Up-to-date with the daily site journal /
Project Manager
Month/Mes:
Year/Ao:
Day
Date
Hour
Days
Worked
Arr
Dep
Break
Work Description
Cumul
Mo
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements - in order to have the IPS prepared until wendsday / Daily site
Jurnal / Daily Activity Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD
25 -
Tu
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements - in order to have the IPS prepared until wendsday / Daily site
Jurnal / Daily Activity Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD
25 - Sending documents to mr. Chesnoiu by e-mail to TImisoara for works approval
We
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements / Daily site Jurnal / Daily Activity Program / Summary of payments EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - Sending and receiving documents to/from mr.
Chesnoiu by e-mail to/from TImisoara for/of works approval
Th
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements - in order to have the IPS prepared until wendsday / Daily site
Jurnal / Daily Activity Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD
25 - Receiving documents from mr. Chesnoiu by e-mail from TImisoara of works approval
Fr
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - Receiving
documents from mr. Chesnoiu by e-mail from TImisoara of works approval
Sa
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - Receiving
documents from mr. Chesnoiu by e-mail from TImisoara of works approval
Su
Mo
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - / Went on Tg
Jiu to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / Making
copyes, scan for IPS
Tu
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / Making
copyes, scan for IPS
We
10
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / Making
copyes, scan for IPS
Th
11
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / went on
QS Engineer office to hand over the Certificate and to discuss a plan of work in order to finish the IPC until Monday
or Thusday as late. / Making copyes, scan for IPS
Fr
12
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 - / Went on Tg
Jiu to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / /
Making copyes, scan for IPS
Sa
13
9.00
18.30
14,00-15,00
8.00
5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over/ clarrify issues about preparation of papers / reveive documents / / Making
copyes, scan for IPS
Su
14
5r3 - IPS 18 - preparations, daily measurements / Scanning, making copies of the draft documents prepares by
Quality Department to add in the Statement all the works finished up to date / Daily site Jurnal / Daily Activity
Program / Summary of payments - EARTHWORKS-EXCAVATIONS - AB2 - CULVERTS - BAD 25 / Went on Tg Jiu
to Road Engineer Office to hand over supporting documents / Making copyes, scan for IPS / Preparing along with
the QS Engineer the IPC to be finished and closed in order to be on Employer's desc until tommorow / went on the
road to Bucharest at Employer's office.
Mo
15
9.00
18.30
14,00-15,00
8.00
Tu
16
9.00
18.30
14,00-15,00
8.00
We
17
9.00
18.30
14,00-15,00
8.00
Th
18
9.00
18.30
14,00-15,00
8.00
Fr
19
9.00
18.30
14,00-15,00
8.00
Sa
20
9.00
18.30
14,00-15,00
8.00
Su
21
Mo
22
9.00
18.30
14,00-15,00
8.00
Tu
23
9.00
18.30
14,00-15,00
8.00
We
24
10.00
15.00
5.00
Th
25
10.00
15.00
5.00
9.00
18.30
14,00-15,00
8.00
8.00
Fr
26
Sa
27
Su
28
Mo
29
Tu
30
9.00
18.30
14,00-15,00
We
31
10.00
15.00
TOTAL
25
5.00
5r3 - IPS 18/ IPC 10 - at COPISA'S office - Bucharest to prepare copies and scan the IPC after havind mr's MunnMace and Diaconu signatures in Filiasi and Craiova / Handing over the IPS 18 and the IPC 10 at the Employer /
Following the events in order to be sure that the invoice is going to be prepared as soon after Employer's approval /
Daily site Journal / Daily activity program
On the way back from Bucharest to Petrosani / Daily Site Journal / Daily Activity Program
5r3 - IPC 10 - Making copie and Record the document in the Archive / Daily site Journal / Daily activity program /
Scanning the Supporting Documents received on Monday from the Road Engineer / Handing over the documents to
Q department / Analisys over BAD25m payments and repaming Quantities to be paied / Preparing for the
November Monthly Report
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Handing over the
Monthly Report - November 2014 at Tg Jiu Engineed Office / Daily Site Journal / Daily Activity Program /
Preparations for the Next IPS
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
First day of Chrismans
Second day of Chrismans
5r3 - IPC 10 - Analisys over all the items of the contract / paiments and remaining payments / Preparing for the
November Monthly Report / Daily site Journal / Daily Activity Program / Preparations for the Next IPS
Analisys on bridges items not included in the Original Bill Of Quantities / Daily Site Journal / Daily Activity Program /
Preparations for the Next IPS
Analisys on bridges items not included in the Original Bill Of Quantities / Daily Site Journal / Daily Activity Program /
Preparations for the Next IPS
Analisys on bridges items not included in the Original Bill Of Quantities / Daily Site Journal / Daily Activity Program /
Preparations for the Next IPS / Monthly Report - December 204
191.00
Summary of Days Worked To Date
Contract
TOTAL
Previous
This Month
Cumul
489
25
514
Employee's Signature
Crlig Constantin-Florin
Date:
12/18/2014
General Manager
Carlos Galido
Project Manager
OBS.
Month/Mes:
Year/Ao:
Day
Date
Days
Worked
Arr
Dep
Hour
Break
Work Description
Cumul
Mo
9.00
18.30
14,00-15,00
8.00
Tu
9.00
18.30
14,00-15,00
8.00
We
9.00
18.30
14,00-15,00
8.00
Th
9.00
18.30
14,00-15,00
8.00
9.00
18.30
14,00-15,00
8.00
8.00
5r3 - IPS 19 - preparations, daily measurements / Daily site Jurnal / Daily Activity
Program / Summary of payments / Monthly Report dec 2014
5r3 - IPS 19 - preparations, daily measurements / Daily site Jurnal / Daily Activity
Program / Summary of payments / Monthly Report dec 2014
5r3 - IPS 19 - preparations, daily measurements / Daily site Jurnal / Daily Activity
Program / Summary of payments / Monthly Photo Report dec 2014
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
Summary of payments
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
Summary of payments
Fr
Sa
10
Su
11
Mo
12
9.00
18.30
14,00-15,00
Tu
13
9.00
18.30
14,00-15,00
We
14
9.00
18.30
14,00-15,00
Th
15
9.00
18.30
14,00-15,00
Fr
16
9.00
18.30
14,00-15,00
Sa
17
9.00
18.30
14,00-15,00
Su
18
Mo
19
9.00
18.30
14,00-15,00
Tu
20
9.00
18.30
14,00-15,00
We
21
9.00
18.30
14,00-15,00
Th
22
9.00
18.30
14,00-15,00
Fr
23
9.00
18.30
14,00-15,00
Sa
24
9.00
18.30
14,00-15,00
Su
25
Mo
26
9.00
18.30
14,00-15,00
8.00
Tu
27
9.00
18.30
14,00-15,00
8.00
We
28
9.00
18.30
14,00-15,00
8.00
Th
29
9.00
18.30
14,00-15,00
8.00
Fr
30
9.00
18.30
14,00-15,00
8.00
Sa
31
9.00
18.30
14,00-15,00
Su
TOTAL
23
Summary of Days Worked To Date
Contract
TOTAL
Previous
514
Employee's Signature
Crlig Constantin-Florin
Date:
2/2/2015
This Month
23
General Manager
Carlos Galido
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
Summary of payments
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
8.00
Summary of payments
5r3 - IPS 19 - daily measurements / Daily site Jurnal / Daily Activity Program /
8.00
Summary of payments
LOT 6 - Preparing documents in accordance with M. Pirnuta e-mail asking
8.00 clarifications for VO13 /
5r3 - Daily Measurement AB2 / Daily Site Journal / Daily Activity Program
LOT 6 - Preparing documents in accordance with M. Pirnuta e-mail asking
8.00 clarifications for VO13 /
5r3 - Daily Measurement BAD / Daily Site Journal / Daily Activity Program
LOT 6 - Preparing documents in accordance with M. Pirnuta e-mail asking
8.00
clarifications for VO13
537
Project Manager
OBS.
Month/Mes:
Year/Ao:
Su
Mo
9.00
18.30
14,00-15,00
Tu
9.00
18.30
14,00-15,00
We
9.00
18.30
14,00-15,00
Th
9.00
18.30
14,00-15,00
Fr
9.00
18.30
14,00-15,00
Sa
Su
Mo
9.00
18.30
14,00-15,00
Tu
10
9.00
18.30
14,00-15,00
We
11
9.00
18.30
14,00-15,00
Th
12
9.00
18.30
14,00-15,00
8.00
Fr
13
9.00
18.30
14,00-15,00
LOT 6 - visit of Dragos Enasescu - VO9 explanations over the quantities tabels
8.00 prepared by Oscar / 5r3 - review of VO1 - GI engineer;s draft / VO 3 reinforcement / Daily Site Journal / Daily Activity Program
Sa
14
0.5
12.00
16.00
4.00
Su
15
Mo
16
9.00
18.30
14,00-15,00
8.00
Tu
17
9.00
18.30
14,00-15,00
We
18
9.00
18.30
14,00-15,00
Th
19
9.00
18.30
14,00-15,00
8.00
Fr
20
9.00
18.30
14,00-15,00
8.00
Sa
21
0.5
12.00
16.00
Su
22
Mo
23
9.00
18.30
14,00-15,00
8.00
Tu
24
9.00
18.30
14,00-15,00
8.00
We
25
9.00
18.30
14,00-15,00
8.00
Th
26
9.00
18.30
14,00-15,00
8.00
Fr
27
9.00
18.30
14,00-15,00
8.00
Sa
28
0.5
12.00
16.00
4.00
TOTAL
21.5
5r3 - Preparing IPS 19 / Preparing the Monthly Report - January 2015 / Daily Site
Journal / Daily Activity Program
5r3 - Preparing IPS 19 - at Tg Jiu meeting with road engineer to clarify the
8.00 supporting documents/ Preparing the Monthly Report - January 2015 / Daily Site
Journal / Daily Activity Program
8.00
5r3 - Preparing IPS 19 - at Tg Jiu meeting with Hyder;S QS, weekly meeting on
8.00 IPS's Issues / the supporting documents / Preparing the Monthly Report - January
2015 / Daily Site Journal / Daily Activity Program
5r3 - Preparing IPS 19 / Preparing the Monthly Report - January 2015, scan,
8.00
copies, forwarding letter / Daily Site Journal / Daily Activity Program
5r3 - Preparing tables for VO 1 / Daily Measurements / Daily Site Journal / Daily
8.00
Activity Program
LOT 6 - vo list for Antonio / 5r3 - review of VO1 - GI engineer;s draft / VO2 - guard
rails - review of Engineer;s draft / Daily Site Journal / Daily Activity Program
VO 3 - reinforcement
172.00
Previous
537
Employee's Signature
Crlig Constantin-Florin
Date:
2/3/2015
This Month
Cumul
21.5
558.5
General Manager
Carlos Galido
Project Manager
Month/Mes:
Year/Ao:
Mo
9.00
18.30
14,00-15,00
Tu
9.00
18.30
14,00-15,00
8.00
5r3 - TG. JIU visit at QS Engineer office and Road Inspector Engineer
office on asphalt and ballast issue / daily activity journal / daily site journal
We
9.00
18.30
14,00-15,00
5r3 - TG. JIU at Road Engineer and Bridge Engineer Office to pick up
documents for IPC 11 - they had not returned the documents signed as
agreed and ask for more papers - the issus is on Quality Office to be
8.00
clariffiend / also at QS Engineer office to discuss and close the Quantity
for VO - guard rainls - change of legislation / daily activity journal / daily
site journal
Th
9.00
18.30
14,00-15,00
8.00
Fr
9.00
18.30
14,00-15,00
Sa
9.00
18.30
14,00-15,00
Su
Mo
9.00
18.30
14,00-15,00
5r3 - Went on Tg Jiu to hand the Bridge Engineer the papers for Bridge
8.00 Injections also handed to Road Inspector the papers for AB2 / Working
with Engineers QS on IPC 11 / Daily Site Journal / Daily Activity Program
Tu
10
9.00
18.30
14,00-15,00
5r3 - Went on Tg Jiu to hand the Bridge Engineer the papers for Bridge
Injections also took over papers signed for certification AB2 / Get in
8.00 touch with Adrian Vechiu to find a final version of the Technical
Description for Bridges Injections / Working with Engineers QS on IPC 11
/ Daily Site Journal / Daily Activity Program
We
11
9.00
18.30
14,00-15,00
5r3 - Went on Tg Jiu to hand the Bridge Engineer the papers for Bridge
8.00 Injections also took over papers signed for certification AB2 / Working
with Engineers QS on IPC 11 / Daily Site Journal / Daily Activity Program
Th
12
9.00
18.30
14,00-15,00
9.00
18.30
14,00-15,00
Fr
13
Sa
14
Su
15
Mo
16
9.00
18.30
14,00-15,00
Tu
17
9.00
18.30
14,00-15,00
We
18
9.00
18.30
14,00-15,00
8.00
Th
19
9.00
18.30
14,00-15,00
Fr
20
9.00
18.30
14,00-15,00
8.00 5r3 - Meeting on Tg Jiu / Daily Site Journal / Daily Activity Program
5r3 - Look over vo2 - guardrails / list of payments on IPC 11 / Daily Site
8.00
Journal / Daily Activity Program
Sa
21
9.00
9.00
9.00
9.00
9.00
12.00
18.30
18.30
18.30
18.30
18.30
16.00
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
14,00-15,00
0
Su
22
Mo
23
Tu
24
We
25
Th
26
Fr
27
Sa
28
TOTAL
16
128.00
Previous
558
Employee's Signature
Crlig Constantin-Florin
Date:
2/3/2015
This Month
16
General Manager
Carlos Galido
Cumul
574
Project Manager