Вы находитесь на странице: 1из 15

Template for Deign and Estimation of Sewerage System

Input Data
I

II

Population
Year
Population
Households
1951
49,260
1961
55,248
1971
71,266
1981
102,837
1991
146,262
2001
211,893
31,174

Present Sewerage System


Present Population
2010
Sewage disposal through sewers
No of Sewer connections
Coverage with sewer network
Length of Gravity Sewer Network
No of Sewage Pumping Stations
STP Design Capacity
STP Actual Flow
No of Employees for sewerage
Road Length Pucca
Road Length Kutcha
No of STPs at present
Waste Water qty reaching sewers
Land Required
ASP
STP capacity to develop in stages
Qty of waste from other sources
Ground Water Infiltration
Ground Water Table
Area of Municipal Council
Area of Master Plan Area, 2031

275000 Nos
MLD
Nos
Persons
15 KM
1
- MLD
0 MLD
Nos
150 KM
70 KM
80.00%
0.20 Ha/MLD
2 Stages
5 MLD
5,000 LPD/Ha
20 m
14.2 ha
46.5 ha

II

III

IV

City

Hapur

Assumptions

Population Projections

Method/Basis
Geometric Growth Method (GM)

If the above option is "Available Projected Data" enter projected population below
Year
2011
Population

Choose from drop down menu only

2021
400,000

310,000

2031
500,000

If the above option is "Growth Rate based Project" enter below the Decadal Growth Rate to be used for Projection
Decade
Decadal Growth Rate
Decade
2001-11
2011-21
2021-31
Growth Rate%
2.00%
1.90%
1.80%
Design Period
Base Year

Year
15

Design Period for STP


Market Rates
Sewer Network per KM
SPS with civil, M & E complete, per MLD
SewageTreatment Plant, Rate per MLD
Land Cost per Hectare

2011
2026

No. of Years: Choose from drop down


Rs

Length of Sewer in meter per Hactare area of city


SPS Design

5,500,000
25,000
7,000,000
10000000
DI K7 Dia in mm Rs/meter
700
9,622
800
12,550
900
15,314
1000
18,354
125
SPS1

DI K7 Dia in m
100
150
200
250
300
350
400
450
500
600
SPS2

Peak Sewage flow


Peak factor

lps

43.70
3.00

81.69
2.50

Liquid depth in wet well assumed


Invert Level
Ground Level
Delivery length of pumping Main
Level of Delivery Point above GL of SPS

m
m
m
m
m

2.20
207.50
211.00
150.00
7.00

2.20
207.50
211.00
150.00
7.00

Detention time in Wetwell

mins

20.00

20.00

Velocity of flow during peak flow


Velocity of flow during average flow

m/s
m/s

1.20
0.80

1.20
0.80

100.00%
DI

100.00%
DI

Proposed pumps Working


Stand by pumps
Material of pumping Main pipe

numbers

User Instructions
1 Input Data:The cells for data input and requiring users review are shaded with different
colours. Input data or review the data/result according to following color codes:

p down menu only

2041
600,000

on

Input data to be provided

Enter data if condition satisfy

Review the provided values &


revise/update if required
No data to be entered select from drop down menu

No value to be entered
Calculates automatically

2 Output:3 output tables are given which is final output and shall be part of report
4 Population Projection: Excle sheet gives population projection by different
standard methods. If decadal growth is assigned for future
then it should be given in decadal growth
5 Sewage Pumping Station: Three SPS required in this case. In case of more or less suitably it is to be corrected.
green cells should be reviewed and modified/updated as per need

2031-41
1.70%

Rs/meter
918
1,395
1,540
2,005
2,543
3,197
3,833
4,547
5,325
7,015
SPS3
1173.11
2.25
2.20
202.76
207.00
600.00
7.50
20.00
1.20
0.80
2
100.00%
DI

Table 1: Projected Population & Water Demand


Year

Population
2011
2016
2021
2026
2031
2036
2041

285,017
330,557
383,375
444,632
515,676
598,072
693,634

Waste Generation
MLD
35.78
40.70
46.40
53.02
60.69
69.59
79.91

Table 2: Sewage Treatment Treatement Capacity


Ultimate STP Capacity Required (30 years design period)
Existing Capacity of STPs
STP capacity required to be developed now
Land requirement for STP
STP capacity of 30 years to be developed in modules of equal capacity
STP capacity for Stage 1
STP capacity for Stage 2
Table 3: Sewage Pumping and Pumping Main
Particulars
m
Diameter of the wetwell
cum/hr
Discharge in each Pump
m
Pumping Head
KW
KW required of each pump
No
No of Pumps
KW
Total KW
mm
Diameter of the pipe proposed
Pipe Material

MLD
MLD
MLD
ha
No Modules
MLD
MLD

3.50
80.00
11.50
6.00
4.00
24.00
200.00
DI K7

5.00
150.00
11.00
11.00
4.00
44.00
270.00
DI K7

79.91
79.91
15.98
2.00
40
40

19.50
2120.00
173.00
144.00
4.00
576.00
1100.00
DI K7

Table 1: Population Projection


Year

Population
1951
1961
1971
1981
1991
2001
2011
2016
2021
2026
2031
2036
2041

49,260
55,248
71,266
102,837
146,262
211,893
285,017
330,557
383,375
444,632
515,676
598,072
693,634

Decadal Growth
Rate
12.16%
28.99%
44.30%
42.23%
44.87%
34.51%
34.51%
34.51%
34.51%
34.51%
34.51%
34.51%

Annual Growth
Rate
1.15%
2.58%
3.74%
3.59%
3.78%
3.01%
3.01%
3.01%
3.01%
3.01%
3.01%
3.01%

Households

HH Size

31,174
41,932
48,632
56,403
65,415
75,867
87,989
102,048

7
7
7
7
7
7
7
7

Population Projections
Arithmetic Growth
Method (AM)
Year

Incremental
Increase (IM)

Geometric Growth Average of


Method (GM)
AM_IM_GM

Population
1951
1961
1971
1981
1991
2001

49,260
55,248
71,266
102,837
146,262
211,893

2011
2021
2031
2041

285,017
383,375
515,676
693,634

5,988
16,018
31,571
43,425
65,631
32,527
244,420
276,946
309,473
341,999
-

10,030
15,553
11,854
22,206
14,911
259,330
291,857
324,384
356,910
-

12.16%
28.99%
44.30%
42.23%
44.87%
34.51%
285,017
383,375
515,676
693,634
1.00

262,922
317,393
383,177
464,181
-

Available
Growth Rate
Projected Data based
Projection

310,000
400,000
500,000
600,000
-

258,296
374,200
478,121
591,806
-

Input Growth
Rate

2.00%
1.90%
1.80%
1.70%

Table 2: Waste Water quantity Generation


Year
2011
2016
2021
2026
2031
2036
2041

Population
285,017
330,557
383,375
444,632
515,676
598,072
693,634

LPCD

Waste Water
MLD

135
135
135
135
135
135
135

38
45
52
60
70
81
94

WW in Sewers
GW Infiltration
MLD
MLD
30.78
35.70
41.40
48.02
55.69
64.59
74.91

Qty other sources


MLD
-

Total
MLD
5.00
5.00
5.00
5.00
5.00
5.00
5.00

35.78
40.70
46.40
53.02
60.69
69.59
79.91

Table 3: STP Capacity Requirement


Parameter
Ultimate STP Capacity Required (30 years design period)
Existing Capacity of STPs
STP capacity required to be developed now
Land requirement for STP
STP capacity of 30 years to be developed in modules of equal capacity
STP capacity for Stage 1

MLD
MLD
MLD
ha
No Modules
MLD

79.91
79.91
15.98
2.00
40

Table 3: Sewage Pumping Station


Sr. no

Design of Sewage Lifting Station

Unit

PS -1

A Input Information: In yellow cells information to be filled as per particular requirement


1 Peak Sewage flow
lps

PS -2

43.70

81.69

3.00
2.20

2.50
2.20

m
m
m

207.50
211.00
150.00

207.50
211.00
150.00

7.00

7.00

20.00
1.20

20.00
1.20

m/s
numbers

0.80
2
100.00%
DI

0.80
2
100.00%
DI

C Design of Sewage Pumping Station


1 Peak Sewage flow

lpd

3775680

7058016

2 Average Sewage flow

lpd

1258560

2823206

3 Average Sewage flow

lps

14.57

32.68

5 Volume of the Wetwell Required

Cum

17.48

39.21

7 Area of the Wetwell Required

Sq.m

7.95

17.82

8 Diameter of the wetwell


9 Diameter of the wetwell, say

m
m

3.18
3.50

4.76
5.00

2 Peak factor
3 Liquid depth in wet well assumed
9 Invert Level
10 Ground Level
11 Delivery length of pumping Main

12 Level of Delivery Point above GL of SPS


m
B Review/Update If needed: In green cells review information and update if needed
4 Detention time in Wetwell
mins
5 Velocity of flow during peak flow
m/s
6 Velocity of flow during average flow
7 Proposed pumps Working
8 Stand by pumps
13 Material of pumping Main pipe

Wetwell Design

10 Diameter of pumping main for average flow

mm

152.26

228.05

11 Diameter of pumping main for peak flow


12 Average dia for peak & average flow
13 Dia of pumping main

mm
mm
m

215.33
183.80
0.20

294.41
261.23
0.30

0.03

0.07

14 Area of pumping main pipe


15 Velocity in pipe for peak flow

Sq. m
m/s

1.39

1.16

16 Discharge in each Pump


17 Discharge in each Pump

lps
cum/hr

21.85
78.70

40.85
147.10

18 Discharge in each Pump, say

cum/hr

80.00

150.00

19 Pumping Head
Hydraulic Details

11.50

11.00

20 Depth
21 Head loss
22 Total head required

m
m
m

3.50
0.60
11.10

3.50
0.42
10.92

mm

5.00
6.00
200.00

9.00
11.00
270.00

m
cum/hr

3.50
80.00

5.00
150.00

23 KW required
KW required
24 Diameter of the pipe proposed
D Output Table
1 Diameter of the wetwell
2 Discharge in each Pump

3 Pumping Head
4 HP required of each pump
5 No of Pumps
6 Total KW
7 Diameter of the pipe proposed

8 Pipe Material

mm

11.50

11.00

6.00
4.00
24.00
200.00

11.00
4.00
44.00
270.00

DI K7

DI K7

PS -3
1173.11
2.25
2.20
202.76
207.00
600.00
7.50
20.00
1.20
0.80
2
100.00%
DI
101356704
45047424
521.38
625.66
284.39
19.03
19.50
910.94
1115.66
1013.30
1.10
0.95
1.23
586.56
2111.60
2120.00
12.50
4.24
0.43
12.17
144.00
173.00
1100.00
19.50
2120.00

173.00
144.00
4.00
576.00
1100.00

DI K7

Table 7: Estimate
S No Item
1 Sewer Net work
2 Construction of Sewage Pump House
3 Construction of Sewage Treatment Plant
4 Cost of Land for STP, SPS
5 Sub Total
6 Physical Contingency
7 Other contingencies
8 Grand Total

Quantity
205
644
40
16
10%
5%

Rate

Units
5,500,000
25,000
7,000,000
10,000,000

No
KW
MLD
Ha

Amount
Rs
1,127,500,000
16,100,000
279,693,695
159,824,968
1,583,118,663
158,311,866
79,155,933
1,820,586,463

Вам также может понравиться