Tools are being developed. Therefore, most data required in this document is not available for the time
being. Turn to related contact person to obtain tool test versions by referring to UMTS Paging: Influence
Factors +Troubleshooting Methods and Tools + Deliverables.
Tools used for the analysis include the power mapping tool, smart parameter mapping tool, parameter
checking tool, seamless upgrade tool, OMStar, PRS, M2000, FMA, and Trace Analyzer.
1 Overview
1.1 Background
Describe the background information of the current project, including the project name, project scale,
networking mode (IP transmission or microwave transmission), and major event in earlier stages.
2015-03-27
Page 1 of 8
2015-03-27
Required Action
Status
Time
Engineer
Name
Result
Ongoing
Ongoing
Ongoing
Partially
completed
Not started
Partially
completed
Delayed
Completed
Delayed
Not started
Completed
Completed
Not started
Page 2 of 8
Required Action
Status
Time
Engineer
Name
Result
Ongoing
Delayed
2015-03-27
Page 3 of 8
Difference
Target
Number of
Maximum
Type of
Level of
Fine-Tune
Actual
Difference
TOC
of
TOC
Modules
TOC of
the carrier
Carrier
of Power
TOC after
between
(dBm)
Antenna
(dBm)
Carrier
power
Power
Swapping
Actual
(dBm)
TOC and
System
Power
Loss
(dBm)
(dBm)
Matching?
Target
TOC
(dBm)
2015-03-27
Page 4 of 8
If the subsystem is overloaded with many NodeBs, relocate some NodeBs to other idle
subsystems.
2.
If the Iu interface is configured with less links, for example, only one SCTP link, inform
operators that at least four links must be configured and bound to different subsystems.
2015-03-27
Page 5 of 8
Perform adjustment and optimization based on UMTS Paging: Influence Factors +Troubleshooting
Methods and Tools + Deliverables. Then provide optimization results.
Use the Trace Analyzer tool to filter the paging black hole cells.
2.
3.
Combine the two preceding step results to find out the poor coverage points of paging
black hole cells. After the drive test of the LAC border and onsite wireless environment
survey, perform the optimization according to different reasons.
2015-03-27
Page 6 of 8
Parameter Name
The first paging duration
The second paging duration
The third paging duration
The fourth paging duration
The fifth paging duration
The number of paging times
All RAN paging indicators
TMSI/IMSI indicators
BSC paging threshold per second
Pre-paging function
Position update optimization function
Early release function
Paging optimization control
2015-03-27
Page 7 of 8
4 Conclusion
Draw conclusions according to the analysis and summary of the required actions. Provide conclusive
opinions such as the current possible problems, the measures that can be taken, other required
troubleshooting methods, and the required data support.