Tools are being developed. Therefore, most data required in this document is not available for the time
being. Turn to related contact person to obtain tool test versions by referring to UMTS Paging: Influence
Factors +Troubleshooting Methods and Tools + Deliverables.
Tools used for the analysis include the power mapping tool, smart parameter mapping tool, parameter
checking tool, seamless upgrade tool, OMStar, PRS, M2000, FMA, and Trace Analyzer.

1 Overview
1.1 Background
Describe the background information of the current project, including the project name, project scale,
networking mode (IP transmission or microwave transmission), and major event in earlier stages.

1.2 Problem Description


Describe the current problems and verify whether they are related to the followings:
Paging success rates of swapped networks are unqualified.
Paging success rates deteriorate due to NE upgrade.
Paging success rates of live networks increase.
Current paging success rate indicators need to be increased.

1.3 Version Information


Describe versions of NEs, such as BSC and BTS, on the live network. If multiple versions are involved,
specify all the versions. If version upgrades are involved, specify the versions before and after upgrade, and
the upgrade time.
BSC version:
BTS version:

2 Implementation of Required Actions


Provide the implementation results from required actions, including necessary deliverables, troubleshooting
results, and current difficulties.

2015-03-27

Huawei confidential. No spreading without permission.

Page 1 of 8

Analysis Report on Paging Problems in the XX Project

2015-03-27

Required Action

Status

Time

Engineer
Name

Result

Required Action 1: Classifying


Triggering Scenarios of Paging
Problems

Ongoing

Required Action 2: Classifying


Problems Related to Paging
Success Rates

Ongoing

Required Action 3: Checking Log


Error Codes (Applicable to
Scenarios Where Paging Success
Rates Decrease on the CN Side But
Remain the Same on the UTRAN
Side)

Ongoing

Required Action 4: Checking the


Power Matching (Applicable to
Unqualified Paging Success Rates
after Network Swapping)

Partially
completed

Required Action 5: Checking


Parameter Matching (Applicable to
Unqualified Paging Success Rates
after Network Swapping)

Not started

Required Action 6: Checking


Parameter Inheritance (Applicable
to Paging Success Rate
Deterioration after NE Upgrade)

Partially
completed

Required Action 7: Comparing


Different Versions (Applicable to
Paging Success Rate Deterioration
after NE Upgrade)

Delayed

Required Action 8: Checking the


Hardware and Transmission Faults

Completed

Required Action 9: Checking


Paging Overload

Delayed

Required Action 10: Planning LAC


Cells

Not started

Required Action 11: Analyzing


Cells with Poor Coverage and
Paging Black Holes

Completed

Required Action 12: Analyzing Top


Terminals

Completed

Required Action 13: Checking


Paging-related Parameters

Not started

Huawei confidential. No spreading without permission.

Page 2 of 8

Analysis Report on Paging Problems in the XX Project

Required Action

Status

Time

Engineer
Name

Result

Required Action 1: Classifying


Triggering Scenarios of Paging
Problems

Ongoing

Required Action 14: Identifying the


Known Issues

Delayed

3 Detailed Analysis of Required


Actions
3.1 Required Action 1: Classifying Triggering
Scenarios of Paging Problems
Identify the causes and confirm whether paging problems are related to one of the following scenarios:
Paging success rates are unqualified on swapped networks.
Paging success rates deteriorate due to NE upgrade.
Paging success rates deteriorate due to the MOCN feature (networking sharing).
Paging success rates need to be improved on live networks.

3.2 Action 2: Classifying Problems Related to


Paging Success Rates
Confirm whether current paging problems are one of the followings:
If paging success rates on the CN side decease but hardly change on the UTRAN side, it is an Iu interface
paging problem.
If paging success rates decease on both the CN and UTRAN side, it is a Uu interface paging problem.
Paging success rates hardly change on the CN side but decrease dramatically on the UTRAN side.

3.3 Required Action 3: Checking Log Error


Codes (Applicable to Scenarios Where Paging
Success Rates Decrease on the CN Side But
Remain the Same on the UTRAN Side)
Analyze CHR logs, DEBUG logs, and PCHR logs to identify error codes related to paging failures in
IUITF modules, SCCP modules, and NBM modules. For details, see UMTS Paging: Influence Factors
+Troubleshooting Methods and Tools +Deliverables.

2015-03-27

Huawei confidential. No spreading without permission.

Page 3 of 8

Analysis Report on Paging Problems in the XX Project

3.4 Required Action 4: Checking the Power


Matching (Applicable to Unqualified Paging
Success Rates after Network Swapping)
Provide the deliverable on power matching check results and support data. Describe the power matching
check results.
Fill in items required by power mapping tool and attach the output results to this document.
Power Matching Calculation
Original

Difference

Target

Number of

Maximum

Type of

Level of

Fine-Tune

Actual

Difference

TOC

of

TOC

Modules

TOC of

the carrier

Carrier

of Power

TOC after

between

(dBm)

Antenna

(dBm)

Carrier

power

Power

Swapping

Actual

(dBm)

TOC and

System

Power

Loss

(dBm)

(dBm)

Matching?

Target
TOC
(dBm)

3.5 Required Action 5: Checking Parameter


Matching (Applicable to Unqualified Paging
Success Rates after Network Swapping)
Provide the deliverable on parameter matching check results. For details, see the guides to smart parameter
mapping tools. Attach the parameter matching check results to this document.

3.6 Required Action 6: Checking Parameter


Inheritance (Applicable to Paging Success Rate
Deterioration after NE Upgrade)
Provide comparison results of parameters before and after NE upgrade. Use the FMA tool to compare the
MML configuration scripts used before and after NE upgrade and attach the comparison results in Excel
files to this document.

3.7 Required Action 7: Comparing Different


Versions (Applicable to Paging Success Rate
Deterioration after NE Upgrade)
3.7.1 Analyzing BSC Version Differences
Confirm whether there are any influences from the version differences or the known issues of the current
version according to the released pre-warnings, announcements, release notes, and seamless upgrade tools.
Take the released preventive measures to avoid factors such as known differences.
Analyze changes in paging-related modules after performing the action.

2015-03-27

Huawei confidential. No spreading without permission.

Page 4 of 8

Analysis Report on Paging Problems in the XX Project

3.7.2 Analyzing BTS Version Differences


Confirm whether there are any influences from the version differences or the known issues of the current
version according to the released pre-warnings, announcements, release notes, and seamless upgrade tools.
Take the released preventive measures to avoid factors such as known differences.
BTS version before upgrade:
Date for completing BTS version upgrade:
BTS version after upgrade:

3.8 Required Action 8: Checking the Hardware


and Transmission Faults
Analyze traffic statistics of VS.NodeB.UnavailTime, VS.Cell.UnavailTime, and alarms of ALM-22214
NodeB Unavailable and ALM-22202 UMTS Cell Unavailable to locate cells with software, hardware,
and transmission faults. Rectify the faults by following the checking steps. If this fails, turn to product
maintenance engineers for help by submitting a service request ticket.

3.9 Required Action 9: Checking Paging


Overload
3.9.1 Analyzing Discarded Paging Messages over the
Iu Interface
Provide the following analysis results of traffic statistics:
VS.RANAP.CsPaging.Loss: the number of failures to respond to CS-oriented PAGING messages from the
CN to the RNC.
VS.RANAP.PsPaging.Loss: the number of failures to respond to PS-oriented PAGING messages from the
CN to the RNC.
If the preceding counters are available with larger values, paging messages are discarded over Iu interfaces.
Analyzer whether the CPU is overloaded in the subsystem bound to the Iu interface and identify whether
causes are one of the followings:
1.

If the subsystem is overloaded with many NodeBs, relocate some NodeBs to other idle
subsystems.

2.

If the Iu interface is configured with less links, for example, only one SCTP link, inform
operators that at least four links must be configured and bound to different subsystems.

3.9.2 Analyzing Paging Channel Congestion over Air


Interfaces
Provide the following analysis results of traffic statistics:
VS.RRC.Paging1.Loss.PCHCong.Cell: the number of losses of PAGING TYPE 1 message due to PCH
congestion in a cell.
If the preceding counter is available with a larger value, paging channels are congested.

2015-03-27

Huawei confidential. No spreading without permission.

Page 5 of 8

Analysis Report on Paging Problems in the XX Project

Perform adjustment and optimization based on UMTS Paging: Influence Factors +Troubleshooting
Methods and Tools + Deliverables. Then provide optimization results.

3.10 Required Action 10: Planning LAC Cells


3.10.1 Analyzing Paging Capacity
Combine the LACs to reduce the number of LACs in the case of low paging volume so that unnecessary
location update times decrease and paging success rates increase.

3.10.2 Analyzing Border Reasonableness


Analyze the LAC border based on the engineering parameters and the digital map to avoid that the LAC
border crosses the areas with high population flow and reduce the times that important traffic lines such as
highway and railway lay through different LACs. In this way, many location updates can be avoided.
Provide adjustment optimization results.

3.11 Required Action 11: Analyzing Cells with


Poor Coverage and Paging Black Holes
Deploy an OMStar server onsite to obtain the coverage cloud figure and use the Trace Analyzer on the
RNC side to analyze the paging black hole cells.
Perform the action according to the following steps:
1.

Use the Trace Analyzer tool to filter the paging black hole cells.

2.

Use the OMStar to provide the coverage cloud figure.

3.

Combine the two preceding step results to find out the poor coverage points of paging
black hole cells. After the drive test of the LAC border and onsite wireless environment
survey, perform the optimization according to different reasons.

Attach analysis optimization results of top cells to this document.

3.12 Required Action 12: Analyzing Top


Terminals
Use the IU Trace Analyzer to obtain top IMSIs in paging failures and check whether top IMSIs belong to
the same type of UEs based on the user information on the HLR.

3.13 Required Action 13: Checking Pagingrelated Parameters


3.13.1 Checking Related Parameters on the CN Side
Check the following parameters:
Parameter Name
IMSI implicit detachment time (minute)
Periodical user deletion time (hour)

2015-03-27

Huawei confidential. No spreading without permission.

Page 6 of 8

Analysis Report on Paging Problems in the XX Project

Parameter Name
The first paging duration
The second paging duration
The third paging duration
The fourth paging duration
The fifth paging duration
The number of paging times
All RAN paging indicators
TMSI/IMSI indicators
BSC paging threshold per second
Pre-paging function
Position update optimization function
Early release function
Paging optimization control

3.13.2 Checking Related Parameters on the RNC Side


Check the following parameters:
Parameter Name
CN domain specific Discontinuous Reception (DRX) cycle length coefficient broadcast on SIB1 and
used by UEs in Idle Mode (DRXCycleLenCoef)
Periodical position update timer (T3212)
Times of retransmission of paging messages (MaccPageRepeatTimes)
Cell selection and reselection
Number of SCCPCH channels

3.14 Required Action 14: Identifying the


Known Issues
Identify problems by referring to known issues in UMTS Paging: Influence Factors +Troubleshooting
Methods and Tools + Deliverables.

2015-03-27

Huawei confidential. No spreading without permission.

Page 7 of 8

Analysis Report on Paging Problems in the XX Project

4 Conclusion
Draw conclusions according to the analysis and summary of the required actions. Provide conclusive
opinions such as the current possible problems, the measures that can be taken, other required
troubleshooting methods, and the required data support.

5 Monitoring Optimization Measures


Monitor the application time, application scope, and application effect of every optimization measure. In
addition, provide a comparison report on the application of a measure, including analysis of indicator