Академический Документы
Профессиональный Документы
Культура Документы
Of:
11
BIB-11-GHA-MRS-ISX-001
CLIENT:
PROJECT:
03/11/2014
FOR INFORMATION
PKS
VT
BTS
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
2 Of: 11
Rev.:
DATE
PURPOSE OF REVISION
AUTHOR
REVISED
APPROVED
TABLE OF CONTENTS
1.
PURPOSE......................................................................................
2.
GENERAL DESCRIPTION..................................................................
2.1. System functions.................................................................................................................
2.1.1. Functions of main control valves......................................................................................
2.2. Equipment list and system limits.........................................................................................
2.3. Description..........................................................................................................................
2.3.1. General............................................................................................................................
2.3.2. Service Water Pumping Group and associated lines.......................................................
2.4. Emergency and transients..................................................................................................
3.
SYSTEM INTERFACES.....................................................................
3.1. General...............................................................................................................................
3.2. Support systems.................................................................................................................
3.3. Dependent systems............................................................................................................
4.
OPERATION...................................................................................
4.1. General...............................................................................................................................
4.2. Start-up...............................................................................................................................
4.3. Normal operation.................................................................................................................
4.4. Shutdown..........................................................................................................................
4.5. Emergency stop. Plant trip................................................................................................
4.5.1. Plant trip without auxiliaries voltage loss........................................................................
4.5.2. Plant trip with auxiliaries voltage loss.............................................................................
5.
CONTROL DESCRIPTION...............................................................
5.1. Analogue and regulation control loop................................................................................
5.2. Automation and protective logic.........................................................................................
5.2.1. Control of service water pumping group (10GHU21/22AP001)......................................
6.
7.
RELATED DOCUMENTS..................................................................
7.1. Piping and instrumentation diagrams................................................................................
7.2. Mechanicals......................................................................................................................
7.3. Instrumentation and control...............................................................................................
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
3 Of: 11
Rev.:
1. AIM
The aim of this document is to describe the function and physical layout of the Service Water
System for the Bibiyana South 400MW CCPP
Also, it is defined the system instrumentation and the control and the interfaces with other
systems.
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
4 Of: 11
Rev.:
2.
GENERAL DESCRIPTION
Electrical Building
H2 Generation Plant
ETP Area
ST Area
GT Area
HRSG Area
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
5 Of: 11
Rev.:
2.3. Description
General
The Service Water Distribution Pump receives water from the Clarified Water System by
means of the pipe.This Pump supplies the service water to all the consumption points by
means of the main distribution lines all of them in 1 diameter.
The main distribution line distributes service water to the above mentioned building or
areas.
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
6 Of: 11
Rev.:
3.
SYSTEM INTERFACES
3.1. General
In this section it is described the interfaces of the system with other systems or relevant
equipment. The interfaces are classified in those that are necessary for the system operation
(support systems) and those that are provided by the system and necessary for other
systems operation (dependent systems).
Mechanical systems
o
Mechanical systems
o
All the hose points where service water is required (see point 2.1)
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
7 Of: 11
Rev.:
4.
OPERATION
4.1. General
For the Service Water System operations, the following operational requirements shall be
achieved:
-
All the root valves must be opened and the instrumentation available for operation.
All the alarms and anomalies must be recognized and the equipment qualified in safe
condition to operate.
4.2. Start-up
If the level in the Clarified Water Storage Tank is below Low level, the Service Water
Distribution Pump will not be able to start.
Service Water Distribution pump will start automatically when there is low pressure in line
main distribution line due to a service water demand in the service water net.
4.4. Shutdown
In the Service Water System shutdown, when there is no demand of service water, the
Service Water Distribution Pump can be stopped.
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
8 Of: 11
Rev.:
5.
CONTROL DESCRIPTION
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
9 Of: 11
Rev.:
The sizing of the main pipes has been developed considering the maximum allowable
velocities indicated in the document BIB-10-YM_-MRD-ISX-001 Mechanical Design
Criteria.
Lines
Pipe spec.
Material
Pipe size
Outside diameter(mm)
Thickness (mm)
Inner diameter(mm)
Water Flow
Operation Conditions
Design point
Lines
Pipe spec.
Material
Pipe size
Outside diameter(mm)
Thickness (mm)
Inner diameter(mm)
Water Flow
Operation Conditions
Design point
1A1
Carbon Steel
1 1/2
48.3
5.08
38.14
4.16 m3/hr
Calculated velocity
(m/s)
1.01
1A1
Carbon Steel
3/4
26.7
3.91
18.88
1.2 m3/hr
Calculated velocity
(m/s)
1.19
Maximum
Allowable velocity
(m/s)
3
Compliance
ok
Maximum
Allowable velocity
(m/s)
3
Compliance
ok
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
10 Of: 11
Rev.:
6.1.
Principal characteristics
Quantity: 2x100%
Place:
Type:
Horizontal pumps
Fluid:
Clarified Water
6.2.
Design point
The service water is produced in the Water Treatment Plant (WTP) .It is filtered water, with
the characteristics indicated in the WTP Technical specification.
Service water is used for hose connections for the following services:
Electrical Building
H2 Generation Plant
ETP Area
ST Area
GT Area
HRSG Area
For the consumption point design, it has been considered 1.2 m 3/h per hose according to the
Water Balance Calculation Report and the peak consumption has been determined
considering a simultaneity factor of 0,2, also according to the mentioned report. Thus:
BIB-11-GHA-MCD-ISX-001
CLIENT:
PROJECT:
Page:
11 Of: 11
Rev.:
6.3.
It has been considered the effect on the pressure loss of the piping route with its specialties
as valves, elbows and filter according P&ID and Lay Out.
6.4.
1.5 m/s
It has been considered the effect on the pressure loss of the piping route with its specialties
as valves, elbows etc. according P&ID and Lay Out.
0.982 bar