Вы находитесь на странице: 1из 332

City Development Plan

Govindgarh, Madhya Pradesh

Submitted to:

Urban Administration and Development


Department, GoMP
Palika Bhawan, Bhopal, Madhya Pradesh

Project co-ordination:

City Managers Association,


Madhya Pradesh (CMAMP)
Palika Bhawan, Bhopal, Madhya Pradesh
Submitted by:

DMG Consulting Pvt. Ltd.


A-81, Sector 65, Noida, Uttar Pradesh

Govindgarh Town

DISTRICT REWA
POPULATION- 10535

Govindgarh, the summer capital of Maharaja Rewa, is about 19


Kilometres from Rewa in Madhya Pradesh. Govindgarh is also
known as `Mini Vrindavan` and a large number of famous
temples are situated in the region. Major temples are Ram
Govind Temple, Panchmukhi Temple, Chowandi Temple, Shiva
Temple and Hanuman Temple. All these temples are within the
vicinity of the famous Govind Garh Fort.

ffi-rutd-s ildr-{

cftsq dtfuryE, Fqt{q

6qr68g.6,,';{0q./d}oFjtoYr},

Cqogg)

,r'rFd-.Era rarrra

g.l.l".f 13

cft,
uFtrinr
cqfiq evflTtc gri
qoqo ri.ma

5w

fiors

l+*nq

+nqd ;rrrq i$ f,trtl Qdqtle .arFr (fro$ofro)


ir5dEq q) dqu {

ftqq:

oTftq

q"6t(q,

fuq?il<r{kr

c{ {rEflld .r: ri

qn,r+

qtft-'ilrd q.n

gowortlo qiwf&:rr qto ftro r)ver qpfto

o1

em dqn

frogo.llo ,$r qftrre. ,sT.F-e q,r{iqi_.o1 flAt'r$. 28.06.2013 gt{r


srgd<;t o-r srfltttr 1?';m rrcn c$ilq cft {iar{ o-{ Grrr+t
artq rgrtrq

*fto il

L-*-(i'

qrrr q?d qrfurr 3rbffi


9<.rq qRs-q q)fue-rrd
fuar t-or' (aoro)

Yo;5

f.6F

.....

/nlqo

/ ...1g

rtFr;{rrc

A*

Wbf M

qfttufr
f

irngffi rp5tcmlrft+ uvrsq \q ftalrw frrrrq dqrd qff sil-i


qpql ,rgrnd
r

gt*I

no
>&

crfrdT orffi
sftqq qiff"Eq-d

ilrt

:p1s

fuar

Q-m (qoso)

TrR qRrE frfuqrrd fufl.-Ardr


qRsE

of rrrcrdt t-g-fi R-qm

28.06.2013

qrarq o-qio

r ot

s.qqfrfuR
Irtflrq Fqto-1

trq

<qq qR'q-< -nfu<.ra d


frc *Sfr +q{r dtrf
6-{i d *err tl ft-dtr \ti

o1 rr{ Td or er+df,r fo-qr rqr rrn


crfurr d fuc 9oqqofro o-qfte.T qro fto +gsr
qofro am rilfuq'rd +1 GTtr{q sq t i-srr ot'd
fiSff or erq-*fi-r fu-qr qql
ftSft qn d srflfd Fqffud etr \Fi s-{d
qffiwqr ar.ro d ftqrjqn t :748 dlCI
wntffi

fuqt
o1

s-trrE

rilfu'qrrd

$-ft .arq znr cTfuq

3r-Jdrc-q

o{i

emd

vqo

ffiq

+ft:?TT
oi-e 6fir gdrn

qa fi-ors

qrorqfa qR-{fi
gq
YrdA

Ffr

qffie

wnea gRur
RreTr gfrtrr
q-Seq fuo-rs

3rq qe.F
vet gun

qd

422 'ifl{E
241 Alqg
190 arcl
830 dtEI
340 drr
4000 ar{l
275 drEI
740 FllI
1 100 drsl
170 dlcl
40 drI

q09q@

qwrfr-f, qffiocl G Emn oI oq+{q


3r.hqr fuqT rrrcr q)-c-rr a frqr<qq d Td
qRfurFd qrr fu1 qri Er-d qMq or T"i 3rk6Tc
qRrq d crs d.n

sm

--

5q

6KIqT{/3[qt4

Trn
fu-ar-o

(*

qRg-E

(aouo)

{-Scr EqTi gRT)


3nzle{

;rrR qRsE

ftrar-t-fl

(qoqo)

City Profile
CompanyName
ULB Name

DMG Consulting P. Ltd.


Govindgarh

Yes

24 22'
81 17'
1000-1100 mm
330 M
13.23
13.23
13.23
NA

Whether the Sectoral Analysis report is as per UADD requisites

Town Brief

Geographical location (Town)


Average rainfall (annual)
Height above mean sea level
Municipal area (1991)
Municipal area (2001)
Municipal area (2011)
Date of Constitution of ULB

Population

Historic importance
Population Year 1981 (under Municipal
boundary only)
Population Year 1991 (under Municipal
boundary only)
Population Year 2001 (under Municipal
boundary only)
Population Year 2011 (under Municipal
boundary only)

Famous for Govindgarh fort and known as


mini Vrindavan

In one or two
sentences

NA
8,437
9,697
10,535
Town level

Name of Population projection Method

Geometrical Progression Method

Projected population adopted Year 2015

11,041

Projected population adopted Year 2025

12,380

Projected population adopted Year 2035

13,883

Land Use

Land Use

Latitude
Longitude
MM
Mts
Sq kms
Sq kms
Sq kms
Date

Residential
Commercial
Public - semi public
Industrial
Roads
Recreational
Sensitive
Water bodies
Total Developed area
Agriculture / Undeveloped area
Total Municipal Area

% Standard (as per Land use (Tentative Land use (Tentative


UDPFI)
in Sq kms )
in percentage)
45-50%
2-3%
6-8%
8-10%
10-12%
12-14%
rest
rest
rest

1.091
0.031
0.007
0.004
0.367
0.094
4.132
5.726
7.506
13.232

19.05
0.54
0.12
0.07
6.42
1.63
72.16
100.00
56.72

City Profile (Ward Wise)


Ward #
Name of ward
Ward Population (2001)
Area (sq kms)
Density (PPSqkm) 2001
Male
Female
SC
ST
BPL
Sex ratio
Literacy rate (%)
No. of Primary schools
No. of Primary Health
Centre
No. of Households

Ward 1

Ward 2

Ward 3

Ward 4

Ward 5

Ward 6

Ward 7

Ward 8

Ward 9

Ward 10

Ward 11

Ward 12

Ward 13

Ward 14

Ward 15

Total

588
0.28
2085.1
303
285
NA
NA
NA
941
47.79
NA

625
0.74
842.9
338
287
NA
NA
NA
849
63.2
NA

731
0.94
774.3
367
364
NA
NA
NA
992
54.58
NA

653
0.12
5543.3
337
316
NA
NA
NA
938
70.9
NA

550
0.75
730.4
305
245
NA
NA
NA
803
73.82
NA

735
0.54
1353.1
381
354
NA
NA
NA
929
57.96
NA

642
0.10
6673.6
318
324
NA
NA
NA
1019
42.06
NA

709
0.31
2309.4
388
321
NA
NA
NA
827
64.6
NA

649
0.07
9140.8
328
321
NA
NA
NA
979
50.39
NA

679
0.68
993.6
363
316
NA
NA
NA
871
64.21
NA

526
0.13
4109.4
273
253
NA
NA
NA
927
60.08
NA

659
0.19
3525.9
345
314
NA
NA
NA
910
73.44
NA

568
0.16
3579.1
287
281
NA
NA
NA
979
56.34
NA

687
0.91
751.4
361
326
NA
NA
NA
903
27.07
NA

696
7.31
95.3
415
281
NA
NA
NA
677
58.05
1

9697
13.23

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

92

118

123

1665

Trade and
Commerce

Trade and
Commerce

Trade and
Commerce

Small HH
level units

NA
111

112
130
111
99
115
107
small acale HH small acale HH small acale HH small acale HH small acale HH small acale HH
or
or
or
or
or
or
manufacturing manufacturing manufacturing manufacturing manufacturing manufacturing
indistries
indistries
indistries
indistries
indistries
indistries

96

126
120
98
107
small acale HH small acale HH small acale HH small acale HH
or
or
or
or
manufacturing manufacturing manufacturing manufacturing
indistries
indistries
indistries
indistries

Primary occupation
(Majority)

Farming

Seconday occupation

Trade and
Commerce

Trade and
Commerce

Trade and
Commerce

Trade and
Commerce

Trade and
Commerce

Farming

Farming

small acale HH
or
manufacturing
indistries

Trade and
Commerce

Farming

Trade and
Commerce

Trade and
Commerce

Tertiary occupation

small acale HH
or
manufacturing
indistries

Farming

Farming

Farming

Farming

Trade and
Commerce

Trade and
Commerce

NA

Farming

Trade and
Commerce

Farming

Farming

Farming

small acale HH small acale HH small acale HH


or
or
or
manufacturing manufacturing manufacturing
indistries
indistries
indistries
Farming

Farming

5109
4588
1751
752
NA
903
57.63
3

Trade and
commerce

Farming

Farming

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Small scale
industries
such as bidi,
soap, pickles,
etc. at HH
scale. No
Major
industries.

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

*
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

*
NA
NA

*
NA
NA

*
NA
NA

NA
NA
NA

NA
NA
NA

*
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

*
NA
NA

*
NA
NA

NA
2264
NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

384

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Nil

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

NA
NA
NA

5
78
2

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

0.65

No. of Individual Toilets

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

No. of Individual Septic


tanks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

No. of Community Septic


tanks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

No. of Community toilets

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

% of population NA Open
defecation

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

75 % HH
(7272 person)

No. of SS/LS industrial


units

No. of Commercial
establishments
No. of Slum pockets
Slum population
No. of Slum Households
No. of Individual water
connections in the ward
No. of Community water
connections
No. of Commercial water
connections
No. of Tubewells
No. of Handpumps
No. of OHTs
% Coverage of piped water
supply

City Profile (Ward Wise)


Ward #
Name of ward
No. of Dust bins

Ward 1

Ward 2

Ward 3

Ward 4

Ward 5

Ward 6

Ward 7

Ward 8

Ward 9

Ward 10

Ward 11

Ward 12

Ward 13

Ward 14

Ward 15

Total

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Wardwise Waste generated


(Kgs)
Road sweeping (1 time or 2
times)
Total no. of sanitary
workers in the ward

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Length of Pucca road (Mts)

700

650

650

500

500

700

600

600

300

400

500

100

930

550

300

7980

Length of Kuccha road


(Mts)

970

500

300

300

400

300

300

300

800

500

950

5620

Length of State Highway

506

958

305

217

282

219

996

462

904

285

346

5480

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Length of Natural drains


(Nallah) Kuttcha (Mts)

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

No. of Streetlights

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

407

No. of Electricity
connections

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

1502

Name of Tourist site if any

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Length of National
Highway
Length of Road side drains
Pucca (Mts)
Length of Natural drains
(Nallah)
Pucca/Channelized (Mts)

41.16

43.75

51.17

45.71

38.5

51.45

44.94

49.63

45.43

47.53

36.82

46.13

39.76

48.09

48.72

678.79

NA

Name of Heritage site if


any

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Bus stop (No.)


Bus stand(No.)
Parks (No.)
Playground(No.)

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

NA
NA
NA
NA

Govindgarh
fort, Hindu
temples etc.
NA
NA
NA
NA

No. of Residential
properties

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Available Government
land (Sq kms)

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Remarks

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

No. of Commercial
properties
Total Property tax
collection (in Rs.)
Property tax coverage(in
%)

Note: Population data has been given as per the Census-2001. As per the discussion with RGI Census Data for 2011 has not published, which will publish by July 2013.

Sectoral Analysis
Source

Sewerage
Drainage
SWM

Physical Infrastructure

Water Supply

No. of Tubewell / River / Well


Water Supplied by Tubewell /
River / Well in MLD

Existing Source
Tubewell/Ha
Well
ndpump
5 Tubewell /
78
Handpumps
2.85 Lakh
MLD

River/Lake/Talab
Raja talab and Raghuraj talab

75, 000 MLD

Total water supply in the town (MLD)


Existing Supply rate (LPCD) considering distribution
37.2 lpcd
losses
Water Charges per household per month (Rs.)
Rs 45/- monthly
Flat/Metered
% Coverage under paid water supply
23%
Whether any treatment plant exists (Y/N),If yes mention
No
capacity (MLD)
Proposed source (Surface)
No
Total sewage generation (MLD)
1.24 MLD
Whether any treatment plant exists (Y/N),If yes mention
No
capacity
Total no. of individual septic tanks
NA
Total no. of community septic tanks
NA
Total no. of Sewage/Mud pumps available with the ULB
NA
Frequency of Cleaning Individual Septic tanks
NA
Frequency of Cleaning Community Septic tanks
NA
Name of natural nallah (Storm water drain)
NA
Length of natural nallah (Storm water drain) Kms
NA
Ultimate disposal point of nallah
Raja and Rani talab
Length of road side drain (Kms)
NA
Coverage of road side drainage w.r.t roads (%)
NA
Ultimate disposal point of Road side drains
Talab or Water bodies
Any treatment plant/procedure adopted
No
Per capita Solid waste generation (Considering Standards)
70 Grams per capita per day
(in gms)
Total SW generation (in Tons)
67.68 Tons per day
Frequency of SW collection by the ULB (1 time per day/2
Once in 2 days
times per day)
Collection efficiency of the ULB (%)
Not good
Any initiative for DTDC (Yes /No)
No
Any initiative for scientific disposal of waste
No
Name of dumping/ landfill site
No site has been identified
Is the existing site Dumping site or allotted site for
NA
Scientific disposal
Area of allotted landfill site for Scientific disposal
NA
Distance of the Dumping site/landfill site from main
NA
settlement area (Kms)
No. of Tractor trolleys/vehicles available with the ULB for 1 Tractor/ 1 Trolley/ 7 Dust bins / 10 Hand
carrying Solid waste to the LF site
pulled cart / 2 Thela
If site for Scientific disposal is not allotted then whether
NA
formally requested by the ULB

Roads

Sectoral Analysis
Name of National Highway passing from or nearby from
the town (NHNAXYZ)

NA

Distance of National Highway if nearby from the town


(NHNAXYZ) in Kms

NA

Name of State Highway passing from or nearby from the


town (SHNAXYZ)

SH 9 & SH 52 (5.48 km passing through the


Town)

Distance of State Highway if nearby from the town


(SHNAXYZ) in Kms
CC
WBM
Total (kms)

13.46 Km

Total length of Kuccha roads (kms)

(kms)

5.62 Km

Gap w.r.t Standards

(kms)

Surplus of 1 Km by 2035

Traffic & transportation

Total length of Pucca roads (Kms)

Total no. of vehicles in the town

Street lighting

NA

4000 (Estimated)

Bus stand (yes/No)

Yes

Any intracity mass transport mode (yes/no)

No

Name of locations facing major traffic issues

1
2
3

Name of the street beautified as per the


instructions of UADD

NA

Total no. of street lights

559 poles

No. of Streetlights under working condition

407

No. of Streetlights having Tubes

162

No. of Streetlights having CFL

97

No. of Streetlights having Incandescent bulbs

NA

No. of Streetlights having LED

NA

No. of Streetlights having Sodium lights

148

No. of Streetlights having LPS

NA

Location of Substation
http://www.mptransco.nic.in
Power

Physical Infrastructure

NA

33/11KV

NA
NA
NA

Total no. of residential connections

1502

Total no. of Commercial connections

NA

Any subsidy for BPL (Y/N)

NA

Duration of Electricity supply per day (in Hrs)

NA
5

Heritage & tourism


Environment

Heritage & tourism

Sectoral Analysis
Name of Heritage site/s
Ownership/agency
Prevailing Heritage Act/s

Govindgarh fort
NA
NA
Govindgarh fort, shiva tample, Hanuman
temple, Govinf temple' Lal bagh etc.
NA

Name of Tourist site/s


Ownership/agency
Total no. of Pilgrims/ Tourists visiting town per day

NA

Name of River/Lake/Forest range/Any specific species


Prevailing Environmental Act/s
Areas facing threats

NA
NA

No. of Primary Health centres/Dispensary

2
Government

Beds
Private
Beds

NA
NA
NA

Health

No. of Hospitals

Multispeciality hospital if any (Y/N)

Education

Name of Nearby town reffered for Treatment

No
Name of
town
Distance
(Kms)

Rewa
~20 Km

No. of Primary schools

No. of Secondary/High schools

No. of Colleges
No. of ITI

0
0

No. of Beneficiaries under SJSRY (Street Vendor)


Social security schemes

Social Infrastructure

Rani talab, Raja talab & Lal bagh

No. of Beneficiaries under Haath thela/Rickshaw chalak


yojna
No. of Rain Basera/Night Shelter
Ownership of Rain Basera (with ULB/Rental)
No. of Beneficiaries under Gharelu Kamkaji Mahila
Yojana
Name of other Social security schemes

0
0
NA
NA
No
NA
NA
The social security pension scheme for old
age, physically challenged and widows etc.

Sectoral Analysis
Slums & Urban Poor
Name of Slum
Ward
pocket/
Notified/ UnNo
reference
notified
name

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Total

Ward no. 1
Ward no. 2
Ward no. 3
Ward no. 4
Ward no. 5
Ward no. 6
Ward no. 7
Ward no. 8
Ward no. 9
Ward no. 10
Ward no. 11
Ward no. 12
Ward no. 13
Ward no. 14
Ward no. 15
Note:

Un-Notified
Un-Notified
Un-Notified
Notified
Un-Notified
Notified
Notified

Slum
Individual
No. of
No. of
No. of
No. of
Ward
population
Slum
water
Community Handpump Individual Community
population of Notified population
connections
taps
s
toilets
toilets
slums

588
NA
NA
NA
625
NA
NA
NA
731
NA
NA
NA
653
NA
NA
NA
550
NA
NA
NA
735
NA
NA
NA
642
NA
NA
NA
709
NA
NA
NA
649
NA
NA
NA
679
NA
NA
NA
526
NA
NA
NA
659
NA
NA
NA
568
NA
NA
NA
687
NA
NA
NA
696
NA
NA
NA
9697
*2025
2264
* Mark shows the Total slum population of notified slums.
Box shows ward having slum population

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

No. of
Pucca
houses

No. of Semi
pucca
houses

No. of
Kuccha
houses

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

No. of
No. of
Permanent Temporary
pattas
pattas
distributed distributed

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

No. of
Primary
school in
the slum
pocket

No. of
Primary
Health
centres in
the slum
pocket

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Beneficiari
Any
es under interventio
social
ns under
security
IHSDP
schemes
(Y/N)

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

SECTORIAL GOALS
YEAR

SEWERAGE & SANITATION


SWM

PHYSICAL INFRASTRUCTURE

DRAINAGE

WATER SUPPLY

Components

2015

2025

2035

City specific Strategies

Preliminary
estimate

Implementing agency

Mode of Implementation (PPP etc.)


Contract basis

Network coverage to households

40%

100%

100%

GNP, UADD, Govt. of M.P.

Per capita supply as per norms (135


lpcd)

135

135

135

GNP, UADD, Govt. of M.P.

24/7 water supply

40%

Quality of water

As
per
Standards

Non revenue water

25%

15%

Consumer metering

80%

100%

Cost recovery

100%

100%

Roof water harvesting

40%

80%

100%

Private sector participation


Storm water drainage network
coverage

10%

70%

100%

80%

100%

100%

Rehabilitation of existing pucca drains


Rehabilitation of existing primary
nallahs and water bodies
Flood prone areas

100%
WHO As per
Standards

By 2035, 24x7 hours water


100%
supply as per the standard
WHO As per WHO and full network coverage,
water harvesting,
748 Lakhs
Standards
consumer metering and Including slum area
5%
low cost water treatment
plant (Rapid Sand
100%
filteration).
100%

100%

100%

100%

100%

100%

100%

GNP, UADD, Govt. of M.P.


GNP, UADD, Govt. of M.P.
GNP, UADD, Govt. of M.P.
GNP, UADD, Govt. of M.P.

Contract basis

GNP, UADD, Govt. of M.P.


GNP, UADD, Govt. of M.P.
Yes

Preparation of master plan,


190 Lakhs
rehabilitation and
Including slum area
improvement programmes.

GNP, UADD, Govt. of M.P.

PPP

GNP, UADD, Govt. of M.P.

PPP

GNP, UADD, Govt. of M.P.

PPP

100%

100%

GNP, UADD, Govt. of M.P.

Sewer network coverage to households 60%

100%

100%

GNP, UADD, Govt. of M.P.

PPP

Sewage Treatment and disposal


arrangements

80%

100%

GNP, UADD, Govt. of M.P.

PPP

Sewage Recycling and reuse

60%

GNP, UADD, Govt. of M.P.

PPP

Cost recovery (as a % of O&M )

As
per
Standards

GNP

PPP
PPP

100%

80%
WHO As per
Standards

To provide 100% sewerage


system with low cost
sanitation projects, proper
422 Lakhs
100%
treatment before disposal Including slum area
WHO As per WHO with Root zone treatment
system and DEWATS.
Standards
100%

Safe sanitation facilities (with focus on


80%
Urban poor)

100%

100%

GNP, UADD, Govt. of M.P.

Door-to-door collection system


Source segregation

80%
100%

100%
100%

100%
100%

GNP
GNP

Improve waste collection efficiency

100%

100%

100%

Mechanized waste handling


Scientific waste disposal
Landfill site adequacy
Cost recovery of O&M
Private sector participation

Partial
Partial
Partial
80%
70%

Full
Full
Full
100%
100%

Full
Full
Full
100%
100%

Implementation of
Integrated waste
management system.

GNP
241 Lakhs
Including slum area

GNP
GNP
GNP
GNP
GNP, PWD

PPP

ENVIRONMENT

HERITAGE & TOURISM

FIRE
FIGHTIN
G

POWER

STREET
LIGHTNING

ROADS & TRAFFIC MANAGEMENT

PHYSIC
HEREITAGE & TOURISM

New road formations

100%

100%

Road upgradations

50%

100%

100%

Widening/ strengthening

50%

100%

100%

ROBs/flyovers

Development of bus terminus

60%

100%

100%

Development of truck terminus

70%

100%

100%

Junctions and traffic signal


improvements

100%

100%

100%

Mass transit system

30%

60%

100%

GNP, PWD

BOOT

Parking facilities
New Installation
Upgradation
Underground cabling

100%
30%
100%
-

100%
70%
100%
70%

100%
100%
100%
100%

GNP, PWD
GNP
GNP
GNP

Contract
Contract
Contract
Contract

Energy savings

70%

100%

100%

GNP

Contract

24/7 electricity supply

100% *
100% *

100 % electricity supply


Development of alternative energy
sources

Road upgradation and


development,
development of bus &
truck terminal, signalised
830 Lakhs
junctions, provision of Including slum area
parking facilities and
strenthening Public
transport.

Installation of solar street


lights with CFL & LED lights
to save energy.

Development of
underground cabling.

100% Fire safety coverage

100%

100%

100%

Fully equipped fire station

100%

100%

100%

340 Lakhs
Including slum area

GNP, PWD

BOOT

GNP, PWD

PPP

GNP, PWD

PPP

GNP, PWD

GNP, PWD

BOOT

GNP, PWD

BOOT

GNP, PWD

PPP

GNP
GNP
GNP
GNP

provision of well equipped


fire station.

100% *

Tourist accommodation adequacy

100% *

Tourist attraction and circuits regional


and city level

100% *

GNP, State tourism Dept.,

Clean and healthy environment

100% *

GNP

Conserved natural environment - water


bodies
Eco-friendly vehicles

100% *

100% *
100% *

Desilting of nallahs

100% *

Incineration of bio-medical waste


Implementation of norms/standards
for pollution control

100% *

GNP

1100 Lakhs

GNP, State tourism Dept.,

GNP & State Tourism Dept.

GNP, State tourism Dept.,

PPP

GNP, State tourism Dept.,

PPP

GNP, State tourism Dept.,

100% *

Disposal of treated sewage in nallahs

PPP

GNP

Identify archaeological resources in the


city (Heritage listing)
Development of green areas as per
norms
Water bodies
preservation/Conservation

Development of
Govindgarh as transit point
for surrounding tourist
points, development of
water fronts, improvement
of connectivity of tourist
places.

State dovt.

PPP

PPP
Development of water
bodies, plantation,
checking of pollution level,
use of eco-friendly
vehicles, treatment
facilities for wastes etc.

GNP, GoMP

PPP

GNP
GNP

PPP

GNP

PPP

GNP

GNP

HEALTH
EDUCATION
RECREATIONAL

SOCIAL INFRASTRUCTURE

100% doctor-patient ratio


100% patient-bed ratio

100% *
100% *

Effective implementation of health


programmes and related services in the
slum areas of the city

100% *

Regular checks for water


contamination in all water bodies of
the city

100% *

Literacy rates

100% *

Ensure 100% enrollment in primary


schools

100% *

100% Teacher student ratio

100% *

Technical, engineering & medical


education in the city
Developed existing parks
Area coverage under recreational
facilities
Playing facilities
Provision for green-belts in future
development plans
Sufficient infrastructure at
mela/exhibition ground

Strenthening
infrastructures in health
275 Lakhs
centers and to run health Including slum area
initiative programs.

Provision of co-education,
strengthning of education
740 Lakhs
infrastructures and
Including slum area
opening of vocational
training centres.

Social security schemes


SLUMS & URBAN POOR

GNP, health dept.

Contract

GNP, health dept.

Contract

Edu. Dept of M.P. and GNP


Recruitment

100% *

Edu. Dept of M.P. and GNP

PPP

100% *

GNP

Contract / PPP

100% *
100% *
100% *

Development of water
bodies, mini-stadium,
exibition ground,
community halls, public
library etc.

GNP
Included in tourism

100% *

GNP
GNP
GNP

contract

MPHB, GNP

100% *

Pucca housing for urban poor

SLUMS & URBAN POOR

Recruitment
Contract

Edu. Dept of M.P. and GNP

Security of tenure for urban poor


Inclusion of 100% urban poor
population under various central and
state govts social sectors schemes like
old-age pension schemes, Scheme for
handicapped persons, deen-dayal
antyoday yojana, mid-day meals
schemes, etc

GNP, health dept.


GNP, health dept.

4000 Lakhs

PPP

Access to water connection


Access to public toilets and urinal
facilities for all slum households
Access to dustbins and secondary
storage points
Upgradation of kutcha roads to PCC
roads in slums
Improved drainage systems

100% *

GNP

100% *

GNP

Contract / PPP

GNP

Contract / PPP

GNP

PPP

GNP

PPP

Adequate street lighting facilities

100% *

GNP

PPP

GNP
GNP
GNP
MPHB, GNP

PPP
PPP
PPP

Education facilities
Community halls etc.
Adequate health facilities
Security of tenure for urban poor
Note:

100% *
100% *
100% *

Provision of Land
ownership, improvement
schemes, relocation of
hazardous slums, pucca
drain network, financial
support for the
construction of houses

Investment
included in other
sectors

100% *
100% *
100% *
100% *
* Marks - project has to be done till year 2035 by GNP, depending upon city need and available resources.

10

Capital Expenditures

Revenue Expenditure

Capital
Receipts

Revenue Income

Municipal Finance (Should be filled carefully and it should be checked whether the capital income is factual or based on assumption
Year
Rates and Tax Revenue
Assigned Revenues & Compensation
Rental Income from Municipal Properties
Fees & User Charges
Sale & Hire Charges
Revenue Grants, Contribution and Subsidies
Income from Investments
Interest Earned
Tax
Non-Tax
Other Income
Total - Revenue Income
Grants, Contribution for specific purposes
Secured Loans
Unsecured Loans
Deposits
Deposit works
Total Capital Receipts
Establishment Expenses
Administrative Expenses
Operations & Maintenance
Interest & Finance Charges
Programme Expenses
Revenue Grants, Contribution and Subsidies
Miscellaneous Expenses
Transfer to Fund
Other
Total - Revenue Expenditure
Fixed Assets
Capital Work-in-Progress
Investments -General Fund
Investments-Other Funds
Stocks/Inventory
Loans, Advances and Deposits
Other Assets
Miscellaneous Expenditure
Total Capital Expenditure
Total Income
Total Expenditure

2005-06
-

2006-07
-

2007-08
-

2008-09
32000
172137
10531216
10735353
7334292
42240
2975037
10351569
-

2009-10
35190
264232
13875928
14175350
9112660
34000
9146660
-

2010-11
34000
340000
17107926
17481926
12697908
33000
894741
13625649
-

Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.
11

Reforms Action Plan


Reforms

Achieved
(Y/N)

Timeline to achieve reforms till 2015

2012-13
Full migration of double accounting System

Property tax reforms, 85% coverage ratio and


90% collection ratio
Levy of user charges : full recovery of O & M
charges for sewerage, water supply and SWM

Internal earmarking of basic services to urban


poor
E-governance & Capacity Building
Provision of basic services to urban poor
including security of tenure at affordable
prices, improved existing housing, water
supply, sanitation

Any City specific


Strategies
adopted

2013-14

2014-15

Preliminary
estimate (if any)
for
implementation

Implementing
agency

2015-16

25%

50%

75%

100%

No

Not Available

UADD

25%

50%

75%

100%

No

Not Available

Nagar Parishad

25%

50%

75%

100%

No

Not Available

Nagar Parishad

25%

50%

75%

100%

No

Not Available

67%

33%

100%

No

30 lakh

50%

75%

100%

No

Not Available

N
N

25%

Nagar Parishad &


UADD
UADD
Nagar Parishad &
UADD

12

City Development Plan, Govindgarh, M.P.

City Development Plan


Govindgarh, Madhya Pradesh

SUBMITTED TO:Urban Administration and Development Department


Government of Madhya Pradesh

PROJECT CO-ORDINATION
City Managers' Association Madhya Pradesh

CONSULTANT:DMG Consulting Pvt. Ltd.


A-81, Sector- 65, NOIDA (UP)
Chief Municipal Officer
Govindgarh

DMG Consulting Pvt. Ltd., Noida

Sub Engineer
Govindgarh

Page i

City Development Plan, Govindgarh, M.P.

TABLE OF CONTENTS
LIST OF TABLES ------------------------------------------------------------------------------------------------------------------------- VII
LIST OF FIGURES ------------------------------------------------------------------------------------------------------------------------ XI
LIST OF GRAPHS ---------------------------------------------------------------------------------------------------------------------- XIII
EXECUTIVE SUMMARY -------------------------------------------------------------------------------------------------------------- XIV
1.

INTRODUCTION --------------------------------------------------------------------------------------------------------- 2

1.1
1.2
1.3
1.4
1.5
1.6

BACKGROUND -------------------------------------------------------------------------------------------------------------- 2
CONCEPT AND PRINCIPLE OF CITY DEVELOPMENT PLAN ---------------------------------------------------------------- 2
OBJECTIVE OF THE ASSIGNMENT ------------------------------------------------------------------------------------------ 3
UNDERSTANDING OF TERMS OF REFERENCE VIS A VIS METHODOLOGY OF THE STUDY ------------------------------- 3
APPROACH AND METHODOLOGY FOR PREPARATION OF CDP ---------------------------------------------------------- 3
SCOPE OF WORK ----------------------------------------------------------------------------------------------------------- 5

2.

INTRODUCTION TO GOVINDGARH ------------------------------------------------------------------------------ 12

2.1
2.2
2.3
2.4
2.5
2.4.1
2.4.2
2.6
2.7

INTRODUCTION TO REWA ------------------------------------------------------------------------------------------------ 12


ADMINISTRATIVE BOUNDARY-------------------------------------------------------------------------------------------- 12
LOCATION AND CONNECTIVITY ------------------------------------------------------------------------------------------ 13
STUDY AREA -------------------------------------------------------------------------------------------------------------- 15
PHYSICAL CHARACTERISTICS --------------------------------------------------------------------------------------------- 16
TOPOGRAPHY & GEOLOGY ---------------------------------------------------------------------------------------------- 16
CLIMATE ------------------------------------------------------------------------------------------------------------------ 16
AGRICULTURE, INDUSTRY, MINERALS, FLORA & FAUNA -------------------------------------------------------------- 17
SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 18

3.

DEMOGRAPHIC PROFILE OF THE TOWN ----------------------------------------------------------------------- 20

3.1
3.2
3.3
3.4
3.5
3.5.1
3.5.2
3.5.3

BACKGROUND ------------------------------------------------------------------------------------------------------------ 20
POPULATION TREND AND URBANIZATION ------------------------------------------------------------------------------ 20
POPULATION DENSITY --------------------------------------------------------------------------------------------------- 21
POPULATION PROJECTIONS ---------------------------------------------------------------------------------------------- 23
METHODOLOGY ADOPTED TO ESTIMATE POPULATION ---------------------------------------------------------------- 23
ARITHMETIC PROGRESSION METHOD ----------------------------------------------------------------------------------- 23
GEOMETRICAL PROGRESSION METHOD -------------------------------------------------------------------------------- 24
INCREMENTAL INCREASE METHOD -------------------------------------------------------------------------------------- 25
DMG Consulting Pvt. Ltd., Noida

Page i

City Development Plan, Govindgarh, M.P.


3.6
3.7
3.8
3.9
3.10

SUMMARY OF POPULATION PROJECTION THROUGH VARIOUS METHODS-------------------------------------------- 26


SCHEDULE CASTE & SCHEDULE TRIBE POPULATION ------------------------------------------------------------------- 26
LITERACY RATE ----------------------------------------------------------------------------------------------------------- 26
SEX RATIO ---------------------------------------------------------------------------------------------------------------- 28
SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 29

4.

SOCIO-ECONOMIC PROFILE OF THE TOWN ------------------------------------------------------------------- 31

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.8.1
4.9
4.10
4.11

BACKGROUND ------------------------------------------------------------------------------------------------------------ 31
SEX RATIO ---------------------------------------------------------------------------------------------------------------- 31
LITERACY RATE ----------------------------------------------------------------------------------------------------------- 31
AVERAGE HOUSEHOLD SIZE --------------------------------------------------------------------------------------------- 31
WORKFORCE PARTICIPATION -------------------------------------------------------------------------------------------- 31
WORKFORCE DISTRIBUTION --------------------------------------------------------------------------------------------- 31
DEPENDENCY RATIO------------------------------------------------------------------------------------------------------ 32
INDUSTRIAL ACTIVITIES -------------------------------------------------------------------------------------------------- 34
INFORMAL BUSINESS AND LOCAL ECONOMY (TRADE & COMMERCE) ------------------------------------------------ 35
HERITAGE AND TOURISM ------------------------------------------------------------------------------------------------ 35
SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 39
ISSUES --------------------------------------------------------------------------------------------------------------------- 39

5.

PHYSICAL PLANNING AND GROWTH MANAGEMENT ------------------------------------------------------ 41

5.1
5.2
5.3
5.4
5.5
5.5.1
5.5.2
5.5.3
5.5.4
5.5.5
5.5.6
5.5.7
5.5.8
5.6
5.7
5.8

BACKGROUND ------------------------------------------------------------------------------------------------------------ 41
SPATIAL GROWTH TRENDS ---------------------------------------------------------------------------------------------- 41
SPATIAL DISTRIBUTION OF POPULATION -------------------------------------------------------------------------------- 41
LAND-USE ANALYSIS ----------------------------------------------------------------------------------------------------- 42
HOUSING SCENARIO ----------------------------------------------------------------------------------------------------- 44
INTRODUCTION ----------------------------------------------------------------------------------------------------------- 44
HOUSING STOCK---------------------------------------------------------------------------------------------------------- 44
DISTRIBUTION OF HOUSES BY TYPES ------------------------------------------------------------------------------------ 44
CATEGORIES OF HOUSING STRUCTURE --------------------------------------------------------------------------------- 45
DISTRIBUTION OF HOUSES BY USE--------------------------------------------------------------------------------------- 46
OWNERSHIP STATUS ----------------------------------------------------------------------------------------------------- 46
PRESENT AND FUTURE HOUSING DEMAND----------------------------------------------------------------------------- 46
HOUSING GAP ASSESSMENT--------------------------------------------------------------------------------------------- 48
FUTURE GROWTH POSSIBILITIES ---------------------------------------------------------------------------------------- 48
SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 49
CITY SPECIFIC STRATEGIES AND ACTION PLAN-------------------------------------------------------------------------- 50

6.

URBAN INFRASTRUCTURE SERVICES ---------------------------------------------------------------------------- 52


DMG Consulting Pvt. Ltd., Noida

Page ii

City Development Plan, Govindgarh, M.P.


6.1
INTRODUCTION ----------------------------------------------------------------------------------------------------------- 52
6.2
PHYSICAL INFRASTRUCTURE --------------------------------------------------------------------------------------------- 52
6.2.1
WATER SUPPLY ----------------------------------------------------------------------------------------------------------- 52
PROJECT IDENTIFICATION & COSTING--------------------------------------------------------------------------------------------------- 62
6.2.2
SEWERAGE AND SANITATION -------------------------------------------------------------------------------------------- 63
PROJECT IDENTIFICATION & COSTING--------------------------------------------------------------------------------------------------- 68
PROJECT IDENTIFICATION & COSTING--------------------------------------------------------------------------------------------------- 79
6.2.3
SOLID WASTE MANAGEMENT ------------------------------------------------------------------------------------------- 79
PROJECT IDENTIFICATION & COSTING--------------------------------------------------------------------------------------------------- 87
6.2.4
TRAFFIC AND TRANSPORTATION----------------------------------------------------------------------------------------- 88
PROJECT IDENTIFICATION & COSTING--------------------------------------------------------------------------------------------------- 96
6.2.5
STREET LIGHTING AND FIRE FIGHTING ---------------------------------------------------------------------------------- 97
PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 101
6.2.6
URBAN POOR AND THEIR ACCESSIBILITY TO BASIS SERVICES -------------------------------------------------------- 102
6.2.7
GENERAL CHARACTERISTICS OF SLUM -------------------------------------------------------------------------------- 103
6.2.8
URBAN BASIC SERVICES IN SLUMS (IN LINE WITH JNNURM 7 POINT CHARTER)----------------------------------- 103
6.2.9
PRESENT AND FUTURE HOUSING DEMAND--------------------------------------------------------------------------- 105
6.2.10
COMPARATIVE ANALYSIS WITH THE UDPFI, CPHEEO GUIDELINES ------------------------------------------------ 106
6.2.11
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 107
6.2.12
ISSUES ------------------------------------------------------------------------------------------------------------------- 107
6.2.13
CITY SPECIFIC STRATEGIES AND ACTION PLANS ---------------------------------------------------------------------- 108
PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 108
6.3
SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 108
6.3.1
HEALTH ----------------------------------------------------------------------------------------------------------------- 108
6.3.2
EDUCATION ------------------------------------------------------------------------------------------------------------- 109
6.3.3
RECREATION AND ENTERTAINMENT ----------------------------------------------------------------------------------- 111
6.3.4
FIRE FIGHTING SERVICES ----------------------------------------------------------------------------------------------- 112
6.3.5
COMPARATIVE ANALYSIS WITH THE UDPFI GUIDELINES ------------------------------------------------------------ 112
6.3.6
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 115
6.3.7
ISSUES ------------------------------------------------------------------------------------------------------------------- 116
6.3.8
CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 116
PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 117
6.4
ENVIRONMENT --------------------------------------------------------------------------------------------------------- 118
6.4.1
FLORA AND FAUNA ----------------------------------------------------------------------------------------------------- 118
6.4.2
POLLUTION LEVELS (AIR, WATER AND SOIL) ------------------------------------------------------------------------- 118
6.4.3
CITY GREEN SPACES ---------------------------------------------------------------------------------------------------- 119
6.4.4
WATER FRONT DEVELOPMENT AND CONSERVATION ---------------------------------------------------------------- 119
6.4.5
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 119
6.4.6
ISSUES ------------------------------------------------------------------------------------------------------------------- 119
6.4.7
CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 119
6.5
HERITAGE AND CONSERVATION --------------------------------------------------------------------------------------- 120
6.5.1
IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ---------------------------------------------------------------- 120
6.5.2
IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL AND REGIONAL LEVEL --------------------------------------- 118
DMG Consulting Pvt. Ltd., Noida

Page iii

City Development Plan, Govindgarh, M.P.


6.5.3
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 120
6.5.4
ISSUES ------------------------------------------------------------------------------------------------------------------- 121
6.5.5
CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 121
PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 121
7.

TOURISM AND HERITAGE CONSERVATION ----------------------------------------------------------------- 123

7.1
BACKGROUND ---------------------------------------------------------------------------------------------------------- 123
7.2
MADHYA PRADESH TOURISM AND HERITAGE POLICY --------------------------------------------------------------- 123
7.3
PLACES OF TOURIST INTEREST IN AND AROUND THE CITY ----------------------------------------------------------- 124
7.4
TOURIST PLACES NEARBY GOVINDGARH ------------------------------------------------------------------------------ 125
7.5
ARTS & CRAFTS--------------------------------------------------------------------------------------------------------- 126
7.6
EXISTING STATUS OF MAJOR TOURIST DESTINATIONS --------------------------------------------------------------- 127
7.7
EFFORTS FOR CONSERVATION OF HERITAGE SITES ------------------------------------------------------------------- 128
7.8
ASSESSMENT OF TOURISM SUPPORTED INFRASTRUCTURE ---------------------------------------------------------- 129
7.9
KEY CONCERN AREAS FOR TOURISM DEVELOPMENT ---------------------------------------------------------------- 129
7.10
TOURISM DEVELOPMENT OPTION & STRATEGIES-------------------------------------------------------------------- 130
7.11
RECOMMENDED TOURISM DEVELOPMENT PROPOSALS ------------------------------------------------------------- 132
7.12
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 134
7.13
BEST PRACTICE --------------------------------------------------------------------------------------------------------- 134
7.14
SUMMARY OF PROJECTS ----------------------------------------------------------------------------------------------- 135
PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 136
8.

EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT ----------------------------------------- 138

8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9

URBAN LOCAL BODY STRUCTURE ------------------------------------------------------------------------------------- 138


TOWN AND COUNTRY PLANNING DEPARTMENT --------------------------------------------------------------------- 139
DEVELOPMENT AUTHORITY-------------------------------------------------------------------------------------------- 140
PUBLIC HEALTH ENGINEERING DEPARTMENT ------------------------------------------------------------------------ 140
MADHYA PRADESH HOUSING AND INFRASTRUCTURE BOARD------------------------------------------------------- 140
MADHYA PRADESH POLLUTION CONTROL BOARD ------------------------------------------------------------------- 141
ROLE OF PRIVATE SECTOR IN INFRASTRUCTURE SERVICE PROVISION ----------------------------------------------- 141
ISSUES ------------------------------------------------------------------------------------------------------------------- 141
CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 141

9.

INVESTMENT PLAN AND FINANCING STRATEGIES -------------------------------------------------------- 144

9.1
9.1.1
9.1.2
9.2
9.3

REVENUE ACCOUNTS--------------------------------------------------------------------------------------------------- 144


KEY ASSUMPTIONS ----------------------------------------------------------------------------------------------------- 144
NON TAX SOURCES----------------------------------------------------------------------------------------------------- 144
REVENUE INCOME ------------------------------------------------------------------------------------------------------ 144
GROWTH IN INCOME --------------------------------------------------------------------------------------------------- 145
DMG Consulting Pvt. Ltd., Noida

Page iv

City Development Plan, Govindgarh, M.P.


9.4
9.5
9.6
9.6.1
9.6.2
9.7
9.7.1
9.7.2
9.8
9.8.1
9.9
9.10

OBSERVATIONS --------------------------------------------------------------------------------------------------------- 145


REVENUE EXPENDITURE------------------------------------------------------------------------------------------------ 145
CAPITAL ACCOUNT ----------------------------------------------------------------------------------------------------- 146
CAPITAL INCOME ------------------------------------------------------------------------------------------------------- 146
CAPITAL EXPENDITURE ------------------------------------------------------------------------------------------------- 147
KEY FINANCIAL INDICATORS ------------------------------------------------------------------------------------------- 147
REVENUE INDICATORS ------------------------------------------------------------------------------------------------- 147
EXPENDITURE INDICATORS --------------------------------------------------------------------------------------------- 148
INCOME, EXPENDITURE AND SURPLUS DEFICIT ANALYSIS ----------------------------------------------------------- 148
FINANCIAL STATUS AT A GLANCE -------------------------------------------------------------------------------------- 148
KEY ISSUES AND CONCLUSION ----------------------------------------------------------------------------------------- 149
CITY SPECIFIC STRATEGIES AND ACTION PLAN------------------------------------------------------------------------ 150

10.

INVESTMENT PRIORITIZATION PLAN ------------------------------------------------------------------------- 152

10.1
10.1.1
10.1.2
10.1.3
10.2
10.3
10.4
10.5
10.5.1
10.5.2
10.5.3
10.5.4
10.5.5
10.6
10.6.1
10.6.2
10.6.3
10.6.4
10.6.5
10.7

PROJECT IDENTIFICATION ---------------------------------------------------------------------------------------------- 152


PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------------------------- 152
SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 155
HERITAGE AND TOURISM ---------------------------------------------------------------------------------------------- 156
BASIS FOR PROJECT IDENTIFICATION ---------------------------------------------------------------------------------- 157
PROJECTS FOR SYSTEM AND INFRASTRUCTURE AUGMENTATION --------------------------------------------------- 158
PROJECTS FOR SYSTEM AND INFRASTRUCTURE REFURBISHMENT --------------------------------------------------- 159
SECTOR WISE PROJECT IDENTIFICATION AND COSTING -------------------------------------------------------------- 159
PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------------------------- 159
SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 163
OTHER COMPONENTS-------------------------------------------------------------------------------------------------- 165
URBAN REFORMS & CAPACITY BUILDING ---------------------------------------------------------------------------- 165
SECTOR WISE TOTAL COST --------------------------------------------------------------------------------------------- 166
PHASING OF INVESTMENT --------------------------------------------------------------------------------------------- 166
CITY INVESTMENT PLAN FOR 2012- 2015 (PHASE I) --------------------------------------------------------------- 167
CITY INVESTMENT PLAN FOR 2016- 2020 (PHASE II)--------------------------------------------------------------- 169
CITY INVESTMENT PLAN FOR 2021- 2025 (PHASE III) -------------------------------------------------------------- 171
CITY INVESTMENT PLAN FOR 2026- 2030 (PHASE IV)-------------------------------------------------------------- 171
CITY INVESTMENT PLAN FOR 2031- 2035 (PHASE V) -------------------------------------------------------------- 172
FINANCIAL PLAN -------------------------------------------------------------------------------------------------------- 173

11.

URBAN REFORMS -------------------------------------------------------------------------------------------------- 181

11.1
11.2
11.3
11.4

BACKGROUND ---------------------------------------------------------------------------------------------------------- 181


OBJECTIVES OF REFORMS ---------------------------------------------------------------------------------------------- 181
NEED FOR REFORM INITIATIVES---------------------------------------------------------------------------------------- 181
STRUCTURE OF REFORMS ---------------------------------------------------------------------------------------------- 182
DMG Consulting Pvt. Ltd., Noida

Page v

City Development Plan, Govindgarh, M.P.


11.5
11.6
11.7
11.8
11.9

MANDATORY REFORMS ------------------------------------------------------------------------------------------- 182


OPTIONAL REFORMS (STATE AND ULB/PARA-STATAL LEVEL) -------------------------------------------------- 183
STATUS OF MANDATORY & OPTIONAL REFORMS: ------------------------------------------------------------------- 183
ISSUES ------------------------------------------------------------------------------------------------------------------- 186
TOWN SPECIFIC STRATEGIES AND ACTION PLAN --------------------------------------------------------------------- 186

12.

TOWN VISION ------------------------------------------------------------------------------------------------------- 188

12.1
12.2
12.3

SUMMARY OF SECTORAL STRATEGIES: -------------------------------------------------------------------------------- 188


TOWN VISION ---------------------------------------------------------------------------------------------------------- 199
TOWN POSITIONING --------------------------------------------------------------------------------------------------- 199

13.

ANNEXURE ----------------------------------------------------------------------------------------------------------- 202

DMG Consulting Pvt. Ltd., Noida

Page vi

City Development Plan, Govindgarh, M.P.

LIST OF TABLES
Table 2.3.1: Study Area -------------------------------------------------------------------------------------------------------------- 15
Table 2.4.1: Average Annual Rainfall in Govindgarh -------------------------------------------------------------------------- 17
Table 3.2.1: Comparative Assessment of Urban Population ---------------------------------------------------------------- 20
Table 3.2.2: Population Growth Trends ------------------------------------------------------------------------------------------ 21
Table 3.3.1: Population Density Trends ------------------------------------------------------------------------------------------ 22
Table 3.3.2: Demographics of the Town Govindgarh----------------------------------------------------------------------- 22
Table 3.5.1: Trend of Population Growth in Govindgarh Town ------------------------------------------------------------ 24
Table 3.5.2: Projected Population Arithmetic Progression Method ---------------------------------------------------- 24
Table 3.5.3: Projected Population Geometrical Progression Method -------------------------------------------------- 25
Table 3.5.4: Calculation of Population Projection Incremental Increase Method----------------------------------- 25
Table 3.5.5: Projected Population Incremental Increase Method ------------------------------------------------------ 25
Table 3.7.1: Comparative Assessment of Urban SC & ST Population ----------------------------------------------------- 26
Table 3.8.1: Comparative Assessment of Literacy Rate Govindgarh, M.P. -------------------------------------------- 26
Table 3.8.2: Ward Wise Comparative Assessment of Literacy Rate Govindgarh, M.P. ---------------------------- 27
Table 3.9.1: Comparative Assessment of Sex Ratio --------------------------------------------------------------------------- 28
Table 3.9.2: Ward Wise Comparative Assessment of Sex Ratio Govindgarh, M.P. --------------------------------- 29
Table 4.4.1: Comparative Assessment of Household Size ------------------------------------------------------------------- 31
Table 4.5.1: Comparative Assessment of WFPR ------------------------------------------------------------------------------- 31
Table 4.6.1: Ward Wise Comparative Assessment of WFPR & Work Force Distribution ---------------------------- 32
Table 4.7.1: Comparative Assessment of Non-working Population ------------------------------------------------------- 33
Table 4.7.2: Ward Wise Comparative Assessment of Dependent Population & Dependency Ratio -------------- 33
Table 4.8.1: List of Important Industries in Rewa District and in its surrounding Districts ------------------------- 34
Table 4.9.1: List of Important Centres/Spots for Tourists in Town and in its Proximity ------------------------------ 37
Table 5.3.1: Ward Wise Distribution of Population Density ---------------------------------------------------------------- 41
Table 5.4.1: Existing Landuse Distribution; 2011 Govindgarh------------------------------------------------------------- 42
Table 5.5.1: Comparative Assessment of Household Size ------------------------------------------------------------------- 44
Table 5.5.2: Ward Wise Present Housing Demand and Gap ---------------------------------------------------------------- 47
Table 5.5.3: Present and Future Housing Demand and Gap ---------------------------------------------------------------- 47
Table 6.2.1: Main Sources of Water Supply ------------------------------------------------------------------------------------- 52
Table 6.2.2: Silent Feature of Water Supply System in Govindgarh------------------------------------------------------- 53
DMG Consulting Pvt. Ltd., Noida

Page vii

City Development Plan, Govindgarh, M.P.


Table 6.2.3: Projected Future demand Water Supply ---------------------------------------------------------------------- 55
Table 6.2.4: Present and Future Requirement/Demand and Gap Assessment Water Supply ------------------- 56
Table 6.2.5: Performance Indicators Water Supply ------------------------------------------------------------------------- 56
Table 6.2.6: Goals & Services Outcomes for different Horizon Years----------------------------------------------------- 58
Table 6.2.7 Proposed work, Project cost and Implementing Agencies for Water Supply --------------------------- 63
Table 6.2.8: Present and Future Demand and Supply Gaps Sewerage System -------------------------------------- 64
Table 6.2.9: Performance Indicators Sewerage System ------------------------------------------------------------------- 65
Table 6.2.10: Goals & Services Outcomes for different Horizon Years --------------------------------------------------- 67
Table 6.2.11 Proposed Project, Project Cost and Implementing Agencies for Sewerage and Sanitation -------- 68
Table 6.2.12: List of Major Water Bodies and Drains ------------------------------------------------------------------------- 76
Table 6.2.13: Present and Future Demand and Supply Gaps for Drainage System ----------------------------------- 77
Table 6.2.14: Goals & Services Outcomes for different Horizon Years --------------------------------------------------- 78
Table 6.2.15 Proposed Project, Project Cost and Implementing Agencies for Storm Water Drainage ----------- 79
Table 6.2.16: Ward Wise Municipal Solid Waste Generation Govindgarh Town ------------------------------------ 80
Table 6.2.17: List of Vehicles and Equipments available with GNP for Solid Waste Collection & Transportation
--------------------------------------------------------------------------------------------------------------------------------------------- 82
Table 6.2.18: Present and Future Demand and Supply Gaps of Waste Collection Govindgarh Town ---------- 82
Table 6.2.19: Performance Indicators Solid Waste Management ------------------------------------------------------- 82
Table 6.2.20: Goals & Services Outcomes for different Horizon Years --------------------------------------------------- 84
Table 6.2.21: Proposed Project, Project Cost and Implementing Agencies for Solid Waste Management------ 87
Table 6.2.22 Availability of Public Transport to Important Destinations ------------------------------------------------ 88
Table 6.2.23: Types of Roads and Lengths in Govindgarh Town ----------------------------------------------------------- 90
Table 6.2.24: Ward Wise Detail of Road Length in Govindgarh Town ---------------------------------------------------- 90
Table 6.2.25: Major Roads of the Town ------------------------------------------------------------------------------------------ 91
Table 6.2.26: Present and Future Demand and Supply Gaps Traffic and Transportation ------------------------- 93
Table 6.2.27: Space Standards of Roads ----------------------------------------------------------------------------------------- 93
Table 6.2.28: Desirable of Footpaths --------------------------------------------------------------------------------------------- 94
Table 6.2.29: Goals & Services Outcomes for Different Horizon Years --------------------------------------------------- 95
Table 6.2.30 Proposed Project, Project Cost and Implementing Agencies for Traffic and Transportation ------ 96
Table 6.2.31: Street Lighting in Govindgarh Nagar Parishad ---------------------------------------------------------------- 97
Table 6.2.32: Present and Future Demand and Supply Gaps Street Lighting----------------------------------------- 98
DMG Consulting Pvt. Ltd., Noida

Page viii

City Development Plan, Govindgarh, M.P.


Table 6.2.33: Present and Future Demand of Equipment (vehicles) and Man Power for Street Lighting and Fire
Fighting ----------------------------------------------------------------------------------------------------------------------------------- 98
Table 6.2.34: Performance Indicators Street Lighting ---------------------------------------------------------------------- 99
Table 6.2.35: Sources of Lighting at Household Level in Govindgarh ----------------------------------------------------- 99
Table 6.2.36: Type of Cooking Fuel Used at Household Level in Govindgarh ------------------------------------------- 99
Table 6.2.37: Goals & Services Outcomes for Different Horizon Years ------------------------------------------------- 100
Table 6.2.38 Proposed Project, Project Cost and Implementing Agencies for Street Lighting and Fire Fighting
------------------------------------------------------------------------------------------------------------------------------------------- 101
Table 6.2.39: Present and Future Housing Demand and Gap for Slum Population --------------------------------- 105
Table 6.2.40 Proposed Project, Project Cost and Implementing Agencies for Urban Poor ----------------------- 108
Table 6.3.1: Comparative Assessment of Literacy Rate Govindgarh, M.P. ------------------------------------------ 110
Table 6.3.2: Ward Wise Comparative Assessment of Literacy Rate Govindgarh, M.P. -------------------------- 110
Table 6.3.3: Comparative Analysis with UDPFI Guidelines Social Infrastructure ---------------------------------- 112
Table 6.3.4: Present and Future Demand and Supply Gaps Social Infrastructure --------------------------------- 113
Table 6.3.5 Proposed Project, Project Cost and Implementing Agencies for Health Facilities ------------------- 117
Table 6.3.6: Proposed Project, Project Cost and Implementing Agencies for Education Facilities -------------- 117
Table 6.5.1: List of Important Tourist Spots in Town ----------------------------------------------------------------------- 120
Table 6.5.2: List of Important Tourist/Destination Spots at Regional Level ------------------------------------------- 118
Table 6.5.3 Proposed Project, Project Cost and Implementing Agencies for Tourism ------------------------------ 121
Table 7.6.1: Assessment of tourist destination in & around the city --------------------------------------------------- 127
Table 7.6.2: Present status of heritage sites in Govindgarh--------------------------------------------------------------- 128
Table 7.7.1: Number of visitors to these three major destinations in the region during 2005-08.-------------- 128
Table 7.9.1: Key Concern Areas and related issues ------------------------------------------------------------------------- 129
Table 7.14.1 Proposed Project, Project Cost and Implementing Agencies for Tourism --------------------------- 136
Table 8.1.1: Power and Functions of Govindgarh Nagar Parishad------------------------------------------------------- 138
Table 9.9.6.1: Year Wise Income of Govindgarh Nagar Parishad from Various Sources --------------------------- 146
Table 9.6.2: Year Wise Expenditure of Govindgarh Nagar Parishad ---------------------------------------------------- 147
Table 9.9.8.1: Total Revenue Income and Expenditure of GNP ---------------------------------------------------------- 148
Table 10.5.1: Proposed work, Project cost and Implementing Agencies for Water Supply ----------------------- 159
Table 10.5.2: Proposed Project, Project Cost and Implementing Agencies for Sewerage and Sanitation ----- 160
Table 10.5.3: Proposed Project, Project Cost and Implementing Agencies for Solid Waste Management---- 160
DMG Consulting Pvt. Ltd., Noida

Page ix

City Development Plan, Govindgarh, M.P.


Table 10.5.4: Proposed Project, Project Cost and Implementing Agencies for Storm Water Drainage -------- 161
Table 10.5.5: Proposed Project, Project Cost and Implementing Agencies for Traffic and Transportation --- 162
Table 10.5.6: Proposed Project, Project Cost and Implementing Agencies for Street Lighting and Fire Fighting
------------------------------------------------------------------------------------------------------------------------------------------- 162
Table 10.5.7: Proposed Project, Project Cost and Implementing Agencies for Urban Poor----------------------- 163
Table 10.5.8: Proposed Project, Project Cost and Implementing Agencies for Health Facilities ----------------- 163
Table 10.5.9: Proposed Project, Project Cost and Implementing Agencies for Education Facilities ------------ 164
Table 10.5.10: Proposed Project, Project Cost and Implementing Agencies for Tourism ------------------------- 165
Table 10.5.11: Proposed Project, Project Cost and Implementing Agencies for Other Development works - 165
Table 10.5.12: Proposed Project, Project Cost and Implementing Agencies for Urban Reforms and Capacity
Buildings ------------------------------------------------------------------------------------------------------------------------------- 165
Table 10.5.13: Sector wise Proposed Project and their Cost ------------------------------------------------------------- 166
Table 10.6.1: Sector wise Project cost and Yearly Schedule of Expenditure (Phase I) ------------------------------ 167
Table 10.6.2: Sector wise Project cost and Yearly Schedule of Expenditure (Phase II) ----------------------------- 169
Table 10.6.3: Sector wise Project cost and Yearly Schedule of Expenditure (Phase III) ---------------------------- 171
Table 10.6.4: Sector wise Project cost and Yearly Schedule of Expenditure (Phase IV) ---------------------------- 172
Table 10.6.5: Sector wise Project cost and Yearly Schedule of Expenditure (Phase V) ----------------------------- 172
Table 10.7.1: Overall financing plan of investment plans:----------------------------------------------------------------- 178
Table 10.7.2: Revenue Collection from 2008-2035 at Normal Growth rate of 12%--------------------------------- 122
Table 10.7.3: Revenue Collection from 2008-2035 at Normal Growth rate of 14%--------------------------------- 122

DMG Consulting Pvt. Ltd., Noida

Page x

City Development Plan, Govindgarh, M.P.

LIST OF FIGURES
Figure 1-1: Specific Objectives of CDP .................................................................................................................. 4
Figure 1-2: Stage 1: Inception ............................................................................................................................... 6
1-3 Kick-off workshops at nagar parishad ............................................................................................................ 7
Figure 1-4: Stage 2: Sector Assessment and City Profile ...................................................................................... 7
Figure 1-5: Stage 3: City Vision and Development Objectives ............................................................................. 9
Figure 1-6: Stage 4: Draft CDP .............................................................................................................................. 9
Figure 1-7: Schematic Diagram for Methodology of City Development Plan Preparation ................................ 10
Map 2-1: Location of Govindgarh ....................................................................................................................... 14
Map 2-2: Regional Connectivity Govindgarh, M.P. ......................................................................................... 15
Map 2-3: Ward Map Govindgarh Nagar Parishad ........................................................................................... 16
Map 3-1: Ward Wise Population Density Govindgarh, M.P. .......................................................................... 23
Map 3-2: Ward Wise Literacy Rate Govindgarh, M.P. ..................................................................................... 27
Map 3-3: Ward Wise Sex Ratio Govindgarh, M.P. .......................................................................................... 28
Figure 4.4-1: Workforce Distribution Govindgarh, M.P. ................................................................................. 31
Figure 4.4-2: Gender Wise Dependency Ratio Govindgarh, M.P. ................................................................... 33
Figure 4.4-3: Rani Talab and Raja Talab in the town near Govindgarh Fort ...................................................... 36
Map 4-4: Tourism in and around Govindgarh Town ......................................................................................... 38
Map 4-5: Tourism in and around Govindgarh Town ......................................................................................... 38
Figure 5-1: Landuse Distribution-I Municipal Area .......................................................................................... 42
Figure 6-1: Water Supply Distribution Arrangements ........................................................................................ 53
Figure 6-2: Concept of Rain Water Harvesting ................................................................................................... 59
Figure 6-3 A view of the bus in Govindgarh passengers boarding on the road ................................................. 88
Figure 6-4 A view of the encroachment along road ........................................................................................... 90
Figure 6-52: Street Light at Old Chowk - Govindgarh ......................................................................................... 97
Figure 6-6: Schools in Govindgarh .................................................................................................................... 109
Map 6-7: Social Infrastructure of Govindgarh ................................................................................................. 111
Figure 4.6-85: Rani Talab and Raja Talab in the town near Govindgarh Fort .................................................. 117
Figure 7-1: Gurh Forest..................................................................................................................................... 125
Figure 8-1: Institutional Setup Govindgarh Nagar Parishad .......................................................................... 138
Figure 9.9-1: Year Wise Total Income, Govindgarh Nagar Parishad................................................................. 145
DMG Consulting Pvt. Ltd., Noida

Page xi

City Development Plan, Govindgarh, M.P.


Figure 9.9-2: Total Expenditure Govindgarh Nagar Parishad ........................................................................ 146
Figure 9.9-3: Income from Various Sources - GNP ........................................................................................... 147
Figure 9.9-4: Year Wise Revenue Income, Expenditure and Surplus - GNP ..................................................... 149

DMG Consulting Pvt. Ltd., Noida

Page xii

City Development Plan, Govindgarh, M.P.

LIST OF GRAPHS
Graph 3.1: Population Govindgarh, M.P. -------------------------------------------------------------------------------------- 20
Graph 3.2: Decadal Growth of Population Govindgarh, M.P. ------------------------------------------------------------ 21
Graph 4.1: Gender Wise Work Force Distribution in Different Sectors of Economy ---------------------------------- 32
Graph 2: Financing Option- Water Supply ------------------------------------------------------------------------------------- 174
Graph 3: Financing Option- Sewerage & Sanitation ------------------------------------------------------------------------ 174
Graph 4 Financing Option- Solid Waste Management --------------------------------------------------------------------- 174
Graph 5: Financing Option- Strom water Drainage ------------------------------------------------------------------------- 175
Graph 6: Financing Option-Traffic & Transportation ----------------------------------------------------------------------- 175
Graph 7: Financing Option: Street Lighting & Fire Fighting --------------------------------------------------------------- 175
Graph 8: Financing Option- Urban Poor --------------------------------------------------------------------------------------- 176
Graph 9: Financing Option- Health facility ------------------------------------------------------------------------------------ 176
Graph 10: Financing Option- Education Sector------------------------------------------------------------------------------- 176
Graph 11: Financing Option- Tourism ------------------------------------------------------------------------------------------ 177
Graph 12: Financing Option- Other Components---------------------------------------------------------------------------- 177
Graph 13: Financing Option- Urban Reforms & Capacity Building ------------------------------------------------------ 177
Graph 14: Structure of Reforms-------------------------------------------------------------------------------------------------- 182

DMG Consulting Pvt. Ltd., Noida

Page xiii

City Development Plan, Govindgarh, M.P.

EXECUTIVE SUMMARY
Introduction
To meet the requirements of the increasing population of towns, Government of India and government of
Madhya Pradesh have initiated number of programs to deliver the basic services and infrastructure facilities.
Two prominent schemes for the development of small and medium towns are Urban Infrastructure
Development scheme for small and medium towns (UIDSSMT) and Integrated Housing and Slum
development Programme (IHSDP). Other than these there are several programs have been initiated for the
development of urban areas by the Central and State governments.
Under the JnNURM Scheme preparation of City Development Plan is necessary for the sustainable
development of a town. Preparation of a CDP is a planning process and a vision for the future development
of a city which builds and improves the coordination between various stakeholders for efficient and proper
delivery and management of basic services, facilities and resources. DMG Consulting (P) Ltd. has adopted the
process of Targeted Focus Group discussion which will strengthen inclusive planning process for the
development of cities.
This is the Phase-II assignment of GoMP where they are preparing City Development plans (CDP) for 258
towns. In the phase-I stage they already done CDPs for 258 towns. In this Phase DMG Consulting Pvt. Ltd did
CDPs for 7 towns out of the 258 towns.
Based on this programme, GoMP launched Mukhyamantri Sahari Adhusanrachna Bikas Yojana, which is going
to be, funded all the projects proposed in the CDPs to the respective ULB.
Objectives and scope of the Assignment
Behind this exercise major objectives are to involve the local residents in the city development, to find out
the existing problems and issues and their views about improvements and proposals; and efficient
mobilisation of existing resources.
For the preparation of the CDP, scope has been divided in to 4 stages: A) inception: it is the initial stage in
which introduction of CDP and its concept, purpose & outcomes were discussed. This stage also includes
current financial and administrative context and unique features of the city. To find out the issues and
problems different steps had been taken like stakeholder meetings, field reconnaissance, kick-off workshop,
secondary data analysis etc. B) Sectoral assessment and preparation of city profile: In this stage, based upon
survey and interaction with stakeholders, detail sector analysis has been done for different sectors like
transportation, infrastructure, housing, environment, heritage, tourism, socio-economic analysis,
demographic study etc. this stage also includes studies for finding the emerging issues, SWOT analysis,
present gap and future demands of housing, infrastructure, basic services etc. C) Preparation of city vision
and identification of development objectives: in this stage a city vision for 25 years was developed, for the
participation of government and people in the CDP process. To achieve the desired goals and objectives for
the development of city, different strategies and required programmes have been identified for each sector
and for implementation of the project; financial aspect has been seen at sector level. For financial strategy,
resource mobilisation plan has been prepared for remunerative and non-remunerative projects. Sources of
financial support have been identified as government, private-partnership, financial institutions etc. and their
financial sharing in the projects for each sectors has been done. D) Preparation of the final CDP Report:
After incorporating the feedbacks and inputs from stakeholders, the third workshop has been organised for
DMG Consulting Pvt. Ltd., Noida

Page xiv

City Development Plan, Govindgarh, M.P.


the finalisation of CDP with ULB and all stakeholders. This document has been presented and submitted to
council for resolution.
Physical Features of the Town: this town is a semi-urban area and is located in the north-eastern part of the
Rewa district; it is well connected to the rest of the towns of M. P. and U.P. by road. Two state highways are
passing through this town i.e. SH-9 and SH-52. The nearest railway station is Rewa junction at a distance of
19 km. This town is known for the birth place of white tigers and having royal history.
Total population of Govindgarh Nagar Parishad is 10535 persons as per the Census-2011; spread over an area
of 13.25 Sq.Km. GNP has been divided in to 15 wards for better administration and management. This town
is located at an altitude of 330 meter, in Bhaghelkhand region which is a hilly terrain. Soil type of this region
is medium deep black soil which is highly productive. The climate of this area is hot and dry summers and
mild winters and rainfall is varies from 1000 to 1500 mm. People are dependent on agriculture. Major crops
are rice, millets, wheat, soyabean, grain and masoor. This region is full of minerals like bauxite, coal, lime,
basalt, iron ore etc.
Demographic profile of the town: as per the Census-2011 total population of this town was 10535, including
5418 male and 5117 female. In Census 2001 population was 9697 which increased to 10535 in Census 2011
by 8.64% of decadal growth rate. Due to the lack of job opportunity and education facility people are
migrating to nearest large cities for better livelihood thus decadal population growth rate of this town has
been decreased in last 2 decades from 14.93% in 1991-2001 to 8.64% in 2001-11.
Gross Population density of the town was 7 people per hectare, which was increasing due to the natural
growth. Some wards along the major roads having high density because of the development occurred along
the roads. The average household size of the town was 5.8 people as per the Census 2001. Literacy rate has
been increased from 57.45% in Census 2001 to 66.55% in Census 2011. In comparison to the nation, state
and district, town has lower literacy rate during Census 2001 and 2011. Average sex ratio was 898 females
per 1000 males which were varying from 667 to 1019 among wards. Percentage of SC and ST population was
18.05 and 7.75% respectively, which were high in comparison to urban India.
Socio-Economic Profile of the Town: Since this is a semi-urbanised town, People of this town are majorly
dependent on agro based economy. As per the Census 2001, work force participation rate was 38.66% i.e.
3749 workers out of which 55% of workers were involved in informal business and local economy (commerce
and trade), 16% worker were involved in agro based activities and rest 29% were involved in small scaled
household or manufacturing units. There are few agro based small industries for bidi, soap etc. And some
cement factories in nearby area. For work Labours of tertiary sector had to go to the surrounding areas
where large scaled industries exist. Town has some small Mandi or markets at the junction or along the roads
for informal business.
Since the Baghelkhand region is rich of minerals and high cultivable land which can be developed for major
industrial activities that can further provide job opportunity to the local people.
Heritage and Tourism: this town is famous for the Govindgarh fort and as a birth place of white tigers. But
due to the lack of awareness among local people and ignorance of local governing bodies, town was losing its
character of tourism. There are 5 Hindu temples, surrounding areas can be further developed to generate
livelihood to the local people. There are two ponds, which can be developed for recreation purpose as water
front parks. The Department of Tourism, Government of Madhya Pradesh State has recently leased out
Govindgarh Fort to a Delhi based Company for converting into a Heritage Hotel & Resort and developing
other tourism related activities on the related lands. There are many sites within the proximity which can be
developed as a tourist destination, can serve to the tourist of Allahabad and Varanasi. To improve the
DMG Consulting Pvt. Ltd., Noida

Page xv

City Development Plan, Govindgarh, M.P.


existing temple areas and water bodies it is necessary to provide pucca roads. Linking of all tourist spots
should be done by the roads.
Physical Planning and Growth Management: The development took place along the state highways passing
through the city. Commercial and residential activities grew along the highways only; rest area is
undeveloped or used for agro based activities. Within the town 43% of area has been developed and rest
57% area is undeveloped. Along these two highways population density was high in comparison to other
portion of the town.
At present the total Nagar Parishad area of Govindgarh town is 1323 Ha out of which developed area is
572.68 Ha. (43.28%) and undeveloped or agricultural land is 750.59 Ha. (56.72%). This undeveloped area
consists of recreational and agricultural spaces. Out of total developed area 19.06 % land-use is residential,
72.16 % of the total land-use is under water body followed by 6.42 % under agriculture, 0.54 % as
commercial, and 0.12 % as public and semi-public area while 0.07 %area is under industrial use.
As per the Census 2001 total households were 1655 with the HH size 6.5. For the projected population in
2035, housing requirement will be 2777 extra number of houses need to be build is 1809 which includes 389
houses for EWS/Slum people and rest for non-slum population.
The future growth possibilities and directions have been discussed with respect to five aspects that include
existing a) urban growth, b) the transportation lines, c) availability of abundant agricultural land in GNP, d)
natural and e) the proposed economic activities. For the upcoming population it is necessary to strengthen
the basic infrastructure of the town.
Infrastructure: Basic infrastructures are the key element for the better city environment and life of the
people. It can also helpful in the efficient and effective development of all the sectors. For this purpose it is
necessary to supply quality services.
Water Supply: for drinking water GNP dependent on ground water. There were two water tankers with the
capacity of 90000 litres each, two ponds, 5 tube wells and 78 hand pumps used as the source of water
supply. Quality of available underground water supply was good. 65% of GNP area was covered with water
supply network which mainly along the major roads. Total Water supply in GNP area was 570 Lakh litres; Per
capita water supply was 37.2 litres. As per the Census 2001 out of 1697 households, 31% of households had
water connection within their premises, 33% of HHs had near the premises and rest households had source
of water away from house. There was no water treatment plan, chlorination was happening once in 2 weeks.
By the year 2035 total water demand will be 2.04 MLD for 13883 people; this amount includes fire demand,
industrial demand and losses in handling.
Sewerage and Sanitation: In GNP area households are disposing waste directly to the storm water drain or in
unused open area. There was no underground sewerage system to serve the town population. Sewerage and
sanitation within the town area was very poor. Sewage disposal in the town was mainly individual type.
People also used to go for open defecation. The households in the new settlement areas which have their
own septic tanksare cleaned through mud pumps. Due to the poor sewerage and sanitation, there was high
chance of contamination of ground water. As per the sanitation survey conducted in 2008, 30.8% of HHs had
water closet latrine, 30.15% of HHs had pit toilets and 39.30.05% HHs had other toilet facilities. Majority of
houses (around 84.7%) had no toilet facilities within their premises. There were only two public toilets, which
were not getting clean on regular basis. There was need of around 15 public toilets. The sewerage system in
town needs to develop with 60% sewer network coverage to households by the year 2015 and 100% by 2025.
By the year 2015, 80% waste water should be treated followed by 100% by 2025. In addition to that, 60-70%
DMG Consulting Pvt. Ltd., Noida

Page xvi

City Development Plan, Govindgarh, M.P.


O & M cost recovery will be achieved by the year 2015 followed by 80-90% by 2025 and 100% by the year
2035.
Drainage System: Town had no proper drainage system, along the SH-9, SH-52 and major roads, drains were
constructed but due to the lack of proper maintenance by GNP, it was blocked by waste dumping, means
there was no proper cleaning system. During rainy season blocked waste flows to big water bodies existing in
the town. GNP is responsible for operation and maintenance of drainage system in the town. Major portions
of these drains require de-silting and repairs. Due to the lack of proper drainage channel and direct disposal
of waste, surface water available within the premises was getting polluted. During rainy season these water
bodies were the main cause of flooding in the town and surrounding areas. All drains were open and blocked,
making foul smell.
Solid Waste Management: Govindgarh is a semi-urban area, in which generated solid waste was 0.74 MT per
day or in another word, 70 grams per capita per day. Generally, waste coming from all sources were mixed to
municipal waste or dumped in to an un0used open land. Like other medium size town, constituent of solid
waste in GNP area were mix of organic and inorganic. There were not any kinds of system through which
waste can be separated in organic, inorganic, recyclable, non-recyclable, degradable and non-degradable
matter. There was no door to door waste collection system. There was no area which had been identified for
the disposal of solid waste, waste collected from all the sources were dumped in the illegal low lying land.
For the storage of solid waste, 7 dustbins had been provided. There was no processing unit for the collected
waste. Generally waste metals and plastics were collected by slum people and they sell it to scrap dealers.
For handling of solid waste GNP has some motorised and non-motorised vehicles like one tractor, one trolley,
7 dust bins, ten hand-pulled cart and two thela or tricycles. For the projection year 2035 waste generated
waste per capita will be 3.47 MT per day.
Traffic and Transportation: for growing town like Govindgarh, it is necessary handle traffic at its initial stage.
Two state highways are passing through this city i.e. SH-9 and SH-52, which bring traffic from surrounding
cities connected with these two state highways. Frequency of jeeps and auto-rickshaws were more than bus
and other modes. This town is well accessible through roads only. Within the GNP area estimated numbers of
vehicles were bicycle: 4000, two wheelers: 600-700, cars: 10-15, trucks: 20-25, jeeps: 40, auto-rickshaws: 20,
hand pulled-cart: 30-35.
The traffic system is regulated under the Rewa District Office of Madhya Pradesh Transport Department.
Whole traffic and transportation can be divided into two categories - inter-city and intra-city based on the
influence of area. Mostly people were using private and intermediate public transport mode in comparison
to bus due to the less frequency of buses. Total road length was 19.08 km which constitutes pucca roads 13.5
km and kutcha road 5.58 km. Due to the lack of parking and proper traffic management, generally people
park their vehicle on roads thus roads were getting congested. Traffic movement were slow due to the mix
nature of traffic i.e. pedestrian and vehicles.
For proper traffic movement GNP should expand and widen the roads, sufficient parking space should be
provided for the growing population and the vehicle growth.
Street Lighting and Fire Fighting: within the GNP area along the major roads, street lighting was in working
condition, town has nearly 559 street light poles. Out of the total street light poles, there is some sort of
street light on 407 poles. Out of the 407, 148 poles have sodium vapour lamps, 162 poles have energy tube
lights and 97 have bulbs.
There was no separate office which deals with the fire fighting; GNP was taking help from Rewa town in case
of emergency.
DMG Consulting Pvt. Ltd., Noida

Page xvii

City Development Plan, Govindgarh, M.P.


As per the UDPFI Guidelines, Govindgarh Nagar Parishad at present has surplus of street light and expected
to maintain the future requirement by 2035 which will be around 45.
Education: in GNP area there were 5 government schools, out of which 3 were primary, 1 was boys high
school and a higher secondary school for girls. There were 4 private schools. All schools were having basic
facilities like toilets, drinking water and playground. The town had 1 Anganwadi in each ward. As already
mentioned that town had 57.45% of literacy rate in Census 2001 which increased to 66.55% in Census 2011,
but town has lower literacy rate in comparison to district.
Medical: GNP was active in maintaining the environment clean and hygiene. There was one Community
Health Centre (CHC) with 30 beds and two Primary Health Centres (PHCs) in surrounding Gram Panchayats
Rehat and Tikar. There are five doctors, five nurses, two assistant nurses and two supporting staff. The
prevalent diseases in town are malnutrition, viral diarrhoea, dysentery, malarial fever and tuberculosis. There
was an ambulance for emergency. During the time of rainy season and the time of communicable disease
vaccination is arranged by the GNP. The department of public health and family welfare is responsible for
health related factors in the state of Madhya Pradesh, this department also organises campaign and health
awareness programmes. Basic health facilities were provided by the health centres.
Recreational facilities and Sports Facilities: There were no such recreational spaces for town people. There
was a Ramlila ground which was used once in a year during Ramlila festival. For the recreational spaces, GNP
should identify the different location like temples surroundings, front area of ponds etc. As per the UDPFI
guidelines town needs 0.8 Ha of land for recreational purpose.
Urban Poor: Like other towns or cities, Govindgarh had poor people; around 21.5% of the total population
were in slum. They were basically involved in informal activities, giving services to the resident people and
working as lower level staff in government offices. In the slum area there was no basic services, like
municipal water supply, solid waste management, drainage network, poor housing condition, no proper
electricity etc. There were slums in 7 wards out of which slums of 3 were notified as a slum wards. All slums
were settled on unused government land, for legal ownership of the slum dwellers government had been
given land to them on patta basis. Houses in the slums were kutcha type made up of mud, mud tiles, iron
sheet roofs, thatch, bamboo etc. Most of these houses were lack of toilet, power, security, water etc. Slum
dwellers were dependent for water on open well, municipal supply. All drain lines were hand made and
kutchha type was made by the digging out the soil. For sanitation purpose slum dwellers were using pit
latrine, few houses had water closets with septic tank and people were also going for open defecation. In
slums, mostly roads were kutchha type and narrow, low provisions of street lighting, people were dumping
solid waste in open areas. In terms of social infrastructures, children were going to the Government School
far from the slums, schools also had lack of basic facilities, there was no health facilities, near to the slums,
people had to go to the community health centre around 1.5 km far from their houses. For the projected
population of slums there was a shortage of 389 houses for the projected population of 2983.
To improvement of slum conditions within the city main strategies are to include slum people participation in
the improvement programmes, proper waste collection and bin should be provided in the slums, relocation
of hazardous slums to the safe place, legal land ownership to the family, provision of employment based
education and health centres, employment opportunity to the young people. Etc.
Environment: There was no flora fauna or forest within the GNP area. At regional level the region is rich in
minerals, different types of forest; these forests are protected by the villagers. Predominant trees in the
forest are Neem, jamun, mango, eucalyptus, sagon, sal, tendu, shishum, teak, palas, saja, mahua, bamboo
etc. The Rewa district is famous for white tiger, beers, panther, sambar, chinkara, and other species.

DMG Consulting Pvt. Ltd., Noida

Page xviii

City Development Plan, Govindgarh, M.P.


For pollution checking there was no such monitoring facility in GNP, monitoring of pollution was done by the
Pollution Control Board located in Rewa.
Existing institutional Framework for Development: the main organising body in the town was Govindgarh
Nagar Parishad, which provides all the civic services, levies local taxes and maintains the all information
regarding births, death etc. GNP has the power to make byelaws, dealing of properties related issues, budget
preparation, to establish the fund for Municipal Corporation, to increase or decrease the different taxes, to
make rules and regulations etc.
The main function and activities of Town & Country planning department are governed by MP Nagar tatha
Gram Nivesh Adhiniyam 1973 and rules prepared there-under e.g. MP Nagar tatha Gram Nivesh Niyam 1975
and MP Bhumi Vikas Niyam 1984. The main functions are: preparation of Town Development Plan, Review
Evaluation and Modification of existing Development Plan, Preparation of Regional Development Plan,
Monitoring and Enforcement of various schemes such as Integrated Development Plan of Small and Medium
Towns (IDSMT) and Urban Infrastructure Development scheme for Small & Medium Towns (UIDSSMT),
Control on unauthorized development in towns and functions of State Nodal Agency for National Urban
Information System Scheme. The activities of the department include preparation of development plan for
investment areas of towns, preparation of regional plans for investment regions, control and inspection of
planning for uniform development of small and medium-sized cities, development of infrastructure of towns,
guidance in execution of development plans, check on unauthorized development of cities, guidance in policy
making to development authorities/ special zone development authorities/ housing board and other
institutions, guidance and assistance to state government and other institutions for management/ land
planning/ selection of place and state nodal agency for nation urban information.
Within the state, housing and infrastructure related issues are dealt by the Madhya Pradesh Housing and
Infrastructure Board. This housing board does not receive any subsidy from the government. The main
objective of this board is to provide affordable housing to all the needy people. The housing board
contributes around 10,000 plots and 6,000 houses per year to the housing stock in the state. It has invested
around Rs. 2,000 crores in construction and housing sector. In the M.P. state housing board is working
successfully.
M.P. pollution control board (MPPCB) is dealing all the environment issues and major responsibilities of the
board are to reduce, control and monitor the environmental pollution.
Investment Plan: For GNP revenue account comprises tow components: revenue income and revenue
expenditure. Revenue income generates from the taxes, state and central governments, financial institutions.
Revenue expenditure means the expenditure incurred on salaries, operation and maintenance cost,
contribution in the projects, donations and debt servicing etc.
Total income of Govindgarh in the financial year 2008-09 was 107.33 lakhs, in 2009-10 was 141.75 Lakhs and
it was 174.81 Lakhs in the financial year 2010-11. Total income of Govindgarh is increasing every year
because of increasing Property as well as resources of taxes and grants. Total expenditure in the financial
year2008-09 was 103.5 lakhs, in 2009-10 was 91.5 lakhs and in 2010-11 was 136.25 lakhs.
Revenue collection should be computerised, e-governance should be incorporated, preparation of demand
collection balance at ward level etc.
For the prioritisation of finance, issues and problems and regarding that possible proposals had been
identified at sector wise, as per the strength of problems sharing of funding has been done for different
financial bodies (i.e. central, state and local government and private sectors). Financial Sharing in the project
DMG Consulting Pvt. Ltd., Noida

Page xix

City Development Plan, Govindgarh, M.P.


within the GNP area has been classified as 30% by the central govt., 40% by the state govt., 20% by the
municipal body and 10% by the private sectors.
Urban Reforms: The main objective behind the development strategies is to improve the urban governance
so that the local governing bodies will be financially sound with enhanced credit rating and to access the
market capital for undertake the programmes and expansion of services. This model also allows the private
sectors to work with public sectors in the development sectors. There are two types of reform mandatory
reforms and optional reforms.
The mandatory reforms will be done at ULBs and state level. At ULBs level adoption of accrual-based double
entry system, introduction of e-governance, GIS & MIS etc. IT applications, to levy of reasonable user
charges, reforms of property taxes, provision of basic and effective services to the all section of society. At
the state level implementation of de-centralised measures for the planning functions, delivery of services and
enactment of community participation etc.
Optional reforms also will be on state and ULBs level. This reform includes enactment and revision of rules,
regulations and laws, earmarking of developed land for the poor category of society, introduction of IT,
encouraging PPP model etc.
City Vision: The town vision includes several aspects for the sustainable development of a town. It includes
vibrant economy, vibrant commercial hub, sustainable ecology and pleasing environment. Major emphasis
has been given on agro-based economy and tourism to make town life more pleasing and ecologically better.
There are potentials within the town for such developments in the form of religious places or structures,
water bodies, bio-diversities etc. For improvement of slums different steps should be done as per the central
schemes. In urban governance special training related to the computers, latest software and technologies
will be given to the all staff.
To achieve the Goals of CDP, it is necessary to supply all infrastructure facilities according to the population
growth rate of the town. Common problems of growing Indian town are lack of basic infrastructures,
employment, affordable housing and education, vehicular congestion; lack of open spaces etc. which further
can
support
the
floating
population.

DMG Consulting Pvt. Ltd., Noida

Page xx

City Development Plan, Govindgarh, M.P.

CHAPTER 1
INTRODUCTION

DMG Consulting Pvt. Ltd., Noida

Page 1

City Development Plan, Govindgarh, M.P.

1.

INTRODUCTION

1.1 Background
Madhya Pradesh is urbanizing at a fast pace and the Urban Local Bodies of the state are facing the challenge
of meeting the requirements of the growing population with limited technical and financial resources.
Government of India (GoI) as well as the Government of Madhya Pradesh (GoMP) have initiated a number of
programmes to meet the growing demands of infrastructure and service delivery. Two prominent schemes of
the GoI are: Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) and
Integrated Housing and Slum Development Programme (IHSDP), while the GoMP has initiated DFID funded
MPUSP which links reform with investment in infrastructure for the poor. Other than these there are several
programmes that have been launched by the GoI and GOMP.

1.2 Concept and Principle of City Development Plan


A CDP is a planning process and a vision for future development of the city, which builds and improves the
partnership between various stakeholders groups viz. citizens from various social groups including slum
dwellers & senior citizens, trade bodies, citizen forums, professionals, freedom fighters, journalists, informal
business entities etc. and line agencies or government departments/organizations for efficient and improved
delivery & management of various urban basic services within the city.
The consultative approach based CDP preparation assures realistic demand-based infrastructure
development, its spatial distribution and equity in services delivery. This process confirms better asset
management, improved delivery of services towards urban poor and good governance. It also encourages
the people to think about the direction and pace of development of their city thereby evolving and defining
the development strategies to translate the vision into strategic plans incorporating sectoral investment plan
that give an impetus to economic growth and poverty reduction.
There are ways and means to undertake a consultative process in a given situation in a city. Therefore, DMG
Consulting (P) Ltd. has adopted the process of targeted focus group discussion in a cluster of wards at a
centrally located destination to document public views in a structured manner. This has brought two aspects
to the notice of the consultant; one, divergent views of the public and the other, spatial disparity in terms of
municipal services delivery. The consultant has undertaken the process of consultation with various
stakeholder groups like urban poor, women, senior citizens, traders etc. These groups bring their issues,
needs, suggestions and aspirations. Such issues and suggestions are reviewed by the CDP Consultant team
before incorporating and mainstreaming them in CDP preparation. This approach will strengthen inclusive
planning process and will be more inclined towards urban poor, gender-mainstreaming issues etc. resulting
in strategic and sustainable development of the city in the future.
The essence of planning is efficient use of public resources and demand driven services delivery approach. It
establishes a logical and consistent framework for evaluation of investment decisions. The DMG Consulting
(P) Ltd. accesses, analyzes and presents the current stage of the citys development and sets out the
directions of change. It also identifies the thrust areas based on vision of common man and marketing the
city economy for developing a sustainable city development plan, suggests alternative strategies and
interventions for bringing about the desired change and also provides a framework of projects which need to
be identified and implemented on priority basis.
The principle of CDP is to develop a sustainable city with quality life & infrastructure, improved economic
environment and competitiveness of Nagar Parishad in industry & services sector with efficient and
transparent city management.

DMG Consulting Pvt. Ltd., Noida

Page 2

City Development Plan, Govindgarh, M.P.


The preparation of CDP will present both a vision of a desired future perspective for the city and the ULBs
strategic framework and investment interventions for the identified sectors, which intends to work towards
achieving their long-term vision in the next twenty five years.

1.3

Objective of the Assignment

The following objectives have been framed to achieve the goal of City Development Plan:

1.4

To identify the challenges of the city

To prepare a perspective and Vision for the future development of the city.

To improve and strengthen the municipal services including their delivery and management system and
making them self-sustaining

To focus on the development of economic and social infrastructure

To suggest policies and programmes that specifically address the issues of urban poor

It is expected that the CDP will serve the requirements of the UIDSSMT and IHSDP programmes as well
as JNNURM and other development schemes

To assist the State government to undertake such urban sector reforms, which facilitate flow of
investments into city based infrastructure

To strengthen the municipal governments, their financial management and accounting processes,
thereby promoting transparency in their functioning.

Understanding of Terms of Reference Vis a Vis Methodology of the Study

The understanding of terms of reference under city development plan refers to broad contours of the
assignment including status of the existing infrastructure, supply and demand gap assessment, key issues
and concerns of city development, major economic drivers & opportunities, city vision and positioning of the
city, identifying key projects to achieve the city vision and aspiration of citizens, preparing city investment
plans and phasing of implementation framework including capacity building and reforms to be undertaken
to achieve the envisaged city development goals and vision.
The methodology will document and bring a stepwise process and sequential arrangement of tasks and
activities. These activities will have a set of processes to follow and guidelines to adhere so that the broad
objectives and goals of the study are achieved. In other words, methodology is a set of methods and
techniques employed to achieve the targeted goals/objectives of the proposed study. The understanding of
Terms of Reference is crucial to derive and plan a proper methodology to achieve broad objectives and goals
of the study. Therefore the Terms of Reference (ToR) and methodology are complementary and mutually
inclusive in nature.

1.5

Approach and Methodology for Preparation of CDP

The CDP preparation is both a perspective and a vision for the future development of a city captured through
a consultative process. It presents the current stage of the citys development where we stand now? It sets
out the directions of change where do we want to go? It identifies the thrust areas -- what do we need to
address on a priority basis? It also suggests alternative routes, strategies, and interventions for bringing
about the change what interventions do we make in order to attain the vision? It provides a framework and
vision within which projects need to be identified and implemented. It establishes a logical and consistent
framework for the evaluation of investment decisions.

DMG Consulting Pvt. Ltd., Noida

Page 3

City Development Plan, Govindgarh, M.P.


The CDP clearly defines how the Nagar Parishad of Govindgarh will serve its citizens, for example how it
intends to guarantee a basic level of urban services to all citizens, make urban planning responsive to
emerging needs and become responsive to the needs of and improve its services to local businesses .
The CDP also explains how Nagar Parishad of Govindgarh will run its business, e.g. how it intends to manage
public finance in an efficient and transparent way, execute urban planning and governance in line with an
established framework, become more responsive and cost and time efficient by integrating technology in its
governance and service delivery processes.
Finally, the CDP lays down Nagar Parishad Govindgarhs strategy to manage its resources, for example using
performance indicators - physical, financial and institutional, i.e. it details the corporations intensions to
increase revenue and expand its tax base to allow for self-sustaining urban service delivery, improve its
creditworthiness and recruit and retain a skilled workforce. This will involve capacity building and includes
Training Needs Assessment (TNA), job holders analysis i.e. who has to do what? Business Plan Preparation for
monitoring implementation will include development of performance indicators Physical, Financial and
Institutional.
The process of CDP preparation has been initiated with a Kick Off workshop which reveals the process,
purpose and outcomes including steps of CDP preparation, a public consultation, focused group meetings
with concerned stakeholders and one to one meetings with Nagar Parishads departmental heads and with
the line departments elected representatives viz. MP/MLA and business - including trade bodies and
professionals. This forms the basis of all stages of CDP from vision statement, identification of goals and
issues , strategy for development, preparation of priority matrix for project identification, sequential phasing
of projects including city investment plan and long term perspective plan up-to year 2035.
The diagnostic exercise, inception, city profile and sector analysis includes detailed assessment of the existing
situation of the city. The purpose of this analysis is to make a realistic assessment of where the city is, i.e. its
current status, the direction in which it has been moving and its strengths and weaknesses. It covers the
citys demographic, economic, financial, infrastructural (specifically service delivery), physical and
environmental profile. It also considers the citys institutional framework, innovation in management, if any,
and e-governance initiatives underway and status of e-readiness of Nagar Parishad Govindgarh.
The overall objective of the consultation process is to get the viewpoints of the stakeholders in the
identification of issues as well as vision formulation. Specific objectives are:

To involve local residents in the CDP process

To enable stakeholders to express their views


about existing problems and proposals
To create a shared flow of information
To enable local ownership of the city
development plan
Figure 1-1: Specific Objectives of CDP

DMG Consulting Pvt. Ltd., Noida

Page 4

City Development Plan, Govindgarh, M.P.


1.6

Scope of Work

The scope or work of preparation of CDP has been divided into four stages: Inception, Sectoral Assessment
and preparation of City profile, preparation of city vision and identification of development objectives, and,
drafting and submission of the City Development Plan. DMG Consulting Pvt. Ltd. has prepared the CDP in
conformity with the scope defined in the ToR, in close collaboration with the concerned ULB.

Stage 1: Inception
The review and analysis of the current status and unique features of the city with regard to the state of its
development, systems and procedures, as well as its institutional and financial context is taken-up at the
initial stage also known as the inception stage. The main activities include introduction of CDP concept,
purpose and outcome to public representatives like MLA, President, Ward Councillors, citizens forming the
city, along with Chief Municipal Officer - Heads of Nagar Parishad Govindgarh, Departmental Heads and other
personnel involved in the project. Associated tasks involve familiarity visit to city and review of its growth
pattern, identification of growth corridors, collection and collation of information and data from Nagar
Parishad and other line Departments/Agencies/Organizations, . This stage will identify the strengths,
weaknesses and opportunities in the city for its development and will provide an understanding of what
hampers the service delivery and management within the existing set-up and how can it better contribute to
efficient and self-sustaining service provision. This stage involves the following activities.
The assignment commenced with the preliminary meeting with the officials of the Nagar Parishad
Govindgarh to understand their requirements from this assignment.

The Major Activities during Inception Stage were as follows:

Reconnaissance

The CDP consultant has conducted introductory meetings with the President, Chief Municipal Officer, Head
of Departments, Councillors, representatives of ongoing urban programmes, etc. to understand the dynamics
and divergent views about the city and to gather secondary information such as - expansion of the city in
respect to the city boundary including land-use or base map for the Nagar Parishad Govindgarh, demographic
profile of the city including data on slums/urban poor, Socio-economic profile, ULBs status in terms of its
functions, strength and composition of various departments, ULBs annual budget reports, ULBs budget
allocations/proposal for coming financial years, other ongoing projects under past and current urban
development programmes , reports giving status of service delivery, relevant documents on heritage listing
and government policy documents etc.
CDP Consultant has had interactions with various institutions, organizations and key stakeholders such as
PHED, Town and Country Planning Department, local residents of various social groups, local NGOs, CBOs
etc. and other line departments, that have any role and responsibility in city planning and administration
with reference to development, delivery and maintenance of urban basic service to the citys population.
Detailed secondary data on the urban infrastructures and services viz. Drinking Water Supply, Drainage,
Sewerage, Sanitation, Solid Waste Management, Roads and street lighting etc was collected through
available documents and reports.
A field reconnaissance has been done with regard to up gradation of base map and various characteristics of
the town such as growth corridors, growth patterns, major physical constraints which limit the citys spatial
growth, major land-use type of the city, exiting planning issues and challenges , housing typology,
development undertaken under public and private sectors including entrepreneur builders, selfconstruction, slum growth and locations, corridors of major development potential, regulations, overview of
urban basic services - drinking water supply system, drainage & sewerage network, sanitation, solid waste
DMG Consulting Pvt. Ltd., Noida

Page 5

City Development Plan, Govindgarh, M.P.


management, street lighting, traffic and transportation including- road networks system, pedestrian, public
transportation system, mode of transportation, business and economy, informal and urban haats, major
environmental hot spots, heritage & cultural landscape including monuments, management of religious
places and places of worship and public places management including parks and open spaces. Identification
of major economic and services sector drivers Vis a Vis thrust and potential sectors to identify for special
papers preparation under city development plan of Govindgarh.
At the same time with due consultation with President Nagar Parishad Govindgarh, Chief Municipal Officer
and other ULB Officials, consultant has accessed/determined the feasibility and composition of City Level
Steering Group (comprising of Citizen Forum) for the formulation of CDP.

Kick-off Workshop

The kickoff workshop is a formal entry level activity to start the city development plan. The consultant
proposed to have one to one meetings with the Mayor, head of Nagar Parishad and heads of the various
departments of the ULB to fix a date, time and venue for a one day kick-off workshop with the identified
various stakeholders to familiarize them with the purpose, process and expected outcomes of the CDP and
build enthusiasm, understanding and commitment to the CDP. A one day kick-off workshop with Nagar
Parishad Govindgarhs support was organized (Dated-21/11/2011).
The kick off workshop helped in deriving a consensus along with the stakeholders firming the process and
agreeing upon a structured programme to take the CDP forward. The formation of the Steering Group will
also be announced as well as the sectors for which detailed analysis will be carried out.

Figure 1-2: Stage 1: Inception

Stakeholders for the Kick-off workshop include:


Elected representatives such as President and councillors, Line Departments of the state government such as
pollution control board, departments of transport, industries, health, tourism, public health engineering, land
revenue, etc., non-governmental and community based organizations, representatives of the poor
communities, representatives of media, academic institutions, etc.

Preliminary Situational Analysis


Preliminary analysis was done on the basis of secondary data and stakeholder consultations. The analysis and
assessment included:
Regional setting, administrative boundary, demography, economy, urban growth, land use change
etc.
Urban basic services: water supply, sanitation, municipal solid waste, drainage, roads/urban
transport, urban environment, health and education, fire services, etc.
DMG Consulting Pvt. Ltd., Noida

Page 6

City Development Plan, Govindgarh, M.P.


Institutional arrangements of key stakeholders and their role and responsibilities in city planning with
reference to delivery and management of urban basic services
Financial framework of key stakeholder agencies involved in service delivery and O & M.

Figure 1-3 Kick-off workshops at Nagar Parishad

Stage 2: Sectoral Assessment and City/Town Profile

Sector Analysis

The sector analysis was carried out in consultation with the local counterparts. Interaction with various
stakeholder groups (meetings, workshops, focus group discussions, etc.), reviewing relevant publications,
reports, GOs, resolutions, procedures, laws etc. to analyse the current situation in each of the identified
sectors. Detailed analysis at this stage included study of physical and demographic characteristics of the
town, socio-economic analysis, infrastructure services, housing and slums, traffic and transportation sector,
environment and forests, heritage conservation and tourism etc.

City/Town Profile

The findings from the sector analysis have been used in preparing the City Profile consisting of assessment of
the existing situation in all the identified sectors, emerging issues, SWOT analysis and analysis of the present
gaps and future requirements.
The framework of parameters includes issues relating to demography, economic base, finance, physical and
environmental issues, infrastructure, and institutions and universalize of services especially for the poor.

Figure 1-4: Stage 2: Sector Assessment and City Profile

DMG Consulting Pvt. Ltd., Noida

Page 7

City Development Plan, Govindgarh, M.P.


Stage 3: City Vision and Development Objectives
Under this stage a city vision for 25 years was developed and the major actions required for long term and
short term need of the city were discussed. This stage outlined the nature of consultation activities
conducted by the project team as part of goals, city vision and strategy for development of the CDP.
Consultations with local communities, local government and state government were held by the Consultant
to provide an opportunity for community and government participation in the CDP process. These activities
aimed to form an open and cooperative communication process between the team of CDP preparation and
all stakeholders.

Development of Strategies and Priority Actions


This task involves a strategy for bridging the gap between where the city is and where it wishes to go.
Strategies and interventions were identified for attaining the vision and future development perspectives.
The chosen strategies were translated into programmes and projects in this stage.
Development of strategies and prioritization involves identification of specific programs and projects in each
development area and a brief description of each of them covering an overview of the proposed
program/project including their goals, objectives, broad financial implications and contribution to the vision
actualization.

2nd ULB Level Workshop


At the completion of this phase the DMG consulting Pvt. Ltd. will organise 2nd ULB level workshop.
The 1st Stage presentation at the District Level would be organized in front of a Committee Headed by the
District Collector, to monitor the progress of the project.
The 1st Stage discussion at the State Level would be organised at the Directorate of Urban Administration
and Development, Bhopal to monitor the progress of the project.
Preparing a City Investment Plan (CIP) and a Financing Strategy
The consultant will prepare a resource mobilization plan for Remunerative and non remunerative projects
both. Remunerative projects are mainly commercial in nature based on borrowed fund and cost of the fund
is included in the project feasibility. It is mainly bankable projects like shopping complex, housing. However
the non bankable projects are cross subsidized or budget supported which are produced as public goods
(parks, water, drainage etc) under grant and internal revenue accrual mix resource format.
Project costing and determination of funding sources: Determination of types and sources of financing for
priority projects from internal resources, state and central governments, local financial institutions, donors,
and through public-private partnerships.
The Project Scheduling is in phased manner based on scores of priority projects, it will form actions phasing
(5 and 25 years period) and developing a City Investment Plan (CIP).

DMG Consulting Pvt. Ltd., Noida

Page 8

City Development Plan, Govindgarh, M.P.

Figure 1-5: Stage 3: City Vision and Development Objectives

Stage 4: Drafting Final CDP

Third workshop on Draft CDP

DMG consulting Pvt. Ltd. with support from ULB will organize third workshop involving all the stakeholders,
who have been part of the CDP preparation process. The workshop will seek an endorsement of the City
Development Plan from the stakeholder group present and agree on procedures for performance
monitoring.
The 2nd Stage presentation at the District Level would be organised
The 2nd Stage discussion at the State Level would be organised at the Directorate of Urban Administration
and Development, Bhopal to monitor the progress of the project.

Preparing a City Investment Plan (CIP) and a Financing strategy

Figure 1-6: Stage 4: Draft CDP

Submission of Final CDP Document


Following the third and final workshop, DMG consulting Pvt. Ltd. will finalize the CDP document
incorporating the feedback from the workshop and the inputs received at the 2nd Stage State Level
discussion.

The 3rd Stage presentation at the ULB Level would be organised.


This document will be presented and submitted to council for resolution, along with a summary of the CDP
for publication and wider dissemination by the ULB.
DMG Consulting Pvt. Ltd., Noida

Page 9

City Development Plan, Govindgarh, M.P.

Figure 1-7: Schematic Diagram for Methodology of City Development Plan Preparation

DMG Consulting Pvt. Ltd., Noida

Page 10

City Development Plan, Govindgarh, M.P.

CHAPTER 2
Introduction to Govindgarh

DMG Consulting Pvt. Ltd., Noida

Page 11

City Development Plan, Govindgarh, M.P.

2.

INTRODUCTION TO GOVINDGARH

2.1

Introduction to Rewa

Rewa district is situated in the north-eastern part of the state of Madhya Pradesh in India. It was a princely
state of Vindhya Pradesh. The city lies about 420 kilometres northeast of the state capital Bhopal and 130
kilometres south of the city of Allahabad.
It lies between 240 18 and 250 12 north latitudes and 810 2 and 820 18. The district is bounded on the north
by Uttar Pradesh, on the east and southeast by Sidhi on the south by Shahdol and on the west by Satna.
The district has a varied terrain that includes alluvial plains, hills, ravines, scarp, rivers, and water-falls. The
rain-water of the district flows out along two tributary rivers of the Ganges the Tamas and the Son.
According to the 2011 census, Rewa District has a population of 2,363,744, roughly equal to the nation of
Latvia or the US state of New Mexico. This gives it a ranking of 191st in India (out of a total of 640). The
district has a population density of 374 inhabitants per square kilometre. Its population growth rate over the
decade 2001-2011 was 19.79%. Rewa has a sex ratio of 930 females for every 1000 males and a literacy rate
of 73.42%.
A limestone belt runs through the Rewa district and coal is found in the nearby districts of Shahdol, Umaria,
Sidhi and Singrauli. Cement factories are located in nearby Naubasta, Bela (Satna district) and Bhagwar (Sidhi
district). The Jaypee Group has built a township known as Jaypee Nagar in Rewa. Asia's biggest cement
factory, Prism cement (previously Rasi Cement), operates near Rewa in Satna district. Various Birla Group
Companies, such as Vindhya Tele Links and Birla Ericson Ltd., are also located there.
In 2006, the Ministry of Panchayati Raj named Rewa one of the country's 250 most backward districts (out of
a total of 640 districts in India). It is one of the 24 districts in Madhya Pradesh currently receiving funds from
the Backward Regions Grant Fund Programme (BRGFP).

2.2

Administrative Boundary

Govindgarh, the summer capital of Maharaja Rewa, is about 19 kilometres from Rewa in Madhya Pradesh.
Govind Garh is also known as `Mini Vrindavan` and a large number of famous temples are situated in the
region. Major temples are Ram Govind Temple, Panchmukhi Temple, Chowandi Temple, Shiva Temple and
Hanuman Temple. All these temples are within the vicinity of the famous Govind Garh Fort. It is also believed
that the name Govind Garh was based on the Govind Temple; build by Maharaja Venkat Raman Pratap Singh,
now situated within the Govind Garh Fort Premises.
The town also holds an important place in the history of India. It is famous for its royal history and structures
such as Govindgarh Fort. Besides being known for its various monuments and history the city has also been
known for its agricultural and some economic activities.
Geographically, the town lies at 2422 north latitude and 8117 east longitude at an altitude of about 330
meter above mean sea level in Baghelkhand Region. The town is divided into 15 wards.

DMG Consulting Pvt. Ltd., Noida

Page 12

City Development Plan, Govindgarh, M.P.


2.3

Location and Connectivity

Located in the North-eastern part of Rewa District, Govindgarh town is well connected to the rest of the
towns of M.P. and U.P. by Road. Govindgarh is famous as the birth place of White tiger. The famous Sunderja
mango variety is a medal winner variety. The town forms the valley of the Chhuiya hill.

Roadways
Two state highways i.e. State Highway 9 and 52 pass through the town making it accessible to the other
nearby areas. The town is also well connected to rest of the towns of by other major district roads at regional
level.

Railway Linkage: Govindgarh town is not directly linked to other places directly by the Indian Railway
System; the nearest railway station being Rewa Junction, the district headquarters at a distance of 19
kilometres followed by Allahabad at a distance of 148 km.

Airways: The nearest airport is Satna Airport at a distance of 54 km. which has an airstrip but is however not
in use for regular fights followed by Bamrauli (Defence Air Base) near Allahabad in Uttar Pradesh which is
approximately 161 km. from Govindgarh.

DMG Consulting Pvt. Ltd., Noida

Page 13

City Development Plan, Govindgarh, M.P.

Map 2-1: Location of Govindgarh

DMG Consulting Pvt. Ltd., Noida

Page 14

City Development Plan, Govindgarh, M.P.

Map 2-2: Regional Connectivity Govindgarh, M.P.

2.4

Study Area

The study area Govindgarh Town covers an area of about 13.25 sq. Km. under the jurisdiction of
Govindgarh Nagar Parishad (GNP). For the administration and management of civic needs & services for a
total population of about 10535 (as per Census - 2011), the town is divided into 15 wards represented by
ward councillors elected by the citizens. Figure 2.3 describes the Study Area: Govindgarh Nagar Parishad.
Table 2.4.1: Study Area

Administrative Body
Govindgarh
Parishad.

Area (Sq. Km.)

Nagar 13.25

DMG Consulting Pvt. Ltd., Noida

Area (HA)
1325.00

Remarks
Semi-Urban Area
Most of the area under GNP is agricultural
and recreational spaces.
The area has lot of potentials for the
development.

Page 15

City Development Plan, Govindgarh, M.P.

Map 2-3: Ward Map Govindgarh Nagar Parishad

2.5

Physical Characteristics

2.5.1. Topography & Geology


The town is located at an altitude of about 330 meter above mean sea level in Baghelkhand Region. The
terrain of the region is typified as hilly. The whole of Rewa District is located on the Vindhya Range of hills.
Govindgarh forms the south-western plain of Vindhya Range and Kaimur Ranges gently sloping towards
north. The medium deep black soil is intensively cultivated and highly productive. The soil is cavernous,
slightly alkaline and shows swell and shrink properties.

2.5.2. Climate
The climate of this zone can be divided into three distinct seasons, namely,

Monsoon lasting from mid June to September

Winter from November to February

Summer from March to June.

The climate of the area is characterised by hot and dry summers and mild winters. Annual precipitation in the
town ranges from 1000 to 1500 mm.

DMG Consulting Pvt. Ltd., Noida

Page 16

City Development Plan, Govindgarh, M.P.


Table 2.5.1: Average Annual Rainfall in Govindgarh

Sl. No.

Year

Average Annual Rainfall (in mm)

1999

1484

2000

1478

2001

1478

2002

1015

2003

1492

2004

1774

2005

780

2006

1063

2007

1063

Source: Project Report of IHSDP

The rainfall distribution pattern is irregular. Approximately 90% of all rainfall in the region caused by the
monsoon falling from June to October accounts for average annual rainfall of about 950-1100 mm but most
of it gets lost due to runoff. July and August are the months of maximum rainfall. April is the driest month of
the year, the scant winter rainfall is useful for the cultivation of Rabi crops but is usually inadequate without
access to supplementary irrigation purposes.

2.6

Agriculture, Industry, Minerals, Flora & Fauna

The main crops of the region are rice, millets and wheat. More than one-third of the area is covered with
forests, yielding timber and there are some cement factories as well in the vicinity of Govindgarh.
The chief means of subsistence of the people in this region is agriculture. The area has a very high yield of
Soyabean, Grain and Masoor. Wheat is the other major crop produced in this region.
The town has small scale manufacturing industries such as Bidi making works etc. There are not many big or
large scale industries in Govindgarh town producing industrial products.
At regional level, the region is rich in valuable minerals, forests and wild animals. Bauxite, coal, lime, basalt,
iron ore, etc are some of the minerals available in abundance in this region. A rich store of fuel exists in the
coal-seams of the Barakar group in the Gondwana series. The colliery at Umaria has been successfully
worked for many years, and the Johilla coal field contains coal of even better quality.
The prevalent trees in the forests of Rewa District are sagon, sal, tendu, shishum, bambaoo etc. The
brushwood consists mainly of the species Grewiazizyphus, Casearia, Antidesma, Woodfordia, Flueggia,
Phyllanthus, Bosewellia and Buchanania with occasional trees of mahua (Bassialatifolia).
Govindgarh or can be said the district Rewa is famous for white tigers. The first white tiger Mohan was
captured in 1951 in the nearby jungles was kept in this palace till his death. The unusual coloration of white
tigers has made them popular in zoos and entertainment showcasing exotic animals. The magicians Siegfried
& Roy are famous for breeding and training two white tigers for their performances, referring to them as
"ROYAL WHITE TIGERS", referring to the white tiger's association with the Maharaja of Rewa.
Rewa Maharaja Martand Singh first observed male white tiger Mohan during his visit to Govindgarh jungle at
Rewa, Madhya Pradesh. After hunting for months, he was able to capture the first living white tiger seen in
nature. With the help of veterinary experts, he unsuccessfully tried to breed the white tiger with coloured

DMG Consulting Pvt. Ltd., Noida

Page 17

City Development Plan, Govindgarh, M.P.


female tigers. Eventually, however, he succeeded in creating a second generation of white tigers. In time, it
expanded around the world.
At a recent meeting of the Central Zoo Authority (CZA), Environment Minister Jairam Ramesh has given a goahead to the state governments proposal to start a zoo, rescue centre and captive breeding of highly
endangered white tigers at Maand reserve near Govindgarh Fort.

2.7

SWOT Analysis
STRENGTH

Govindgarh is well connected to all major towns


and cities at regional level through state highways
State highway 9 and 52 pass through the centre of
the town
Natural Drainage Slope
The medium deep black soils highly potential
The average annual rainfall is 1100 mm.
The town has some historical monuments such as
Govindgarh fort and some temples.

WEAKNESS
The town is not directly linked with Indian
Railway System
No initiatives for River front development
Development is mainly confined along the
state highway 9 and 52 and important roads
passing through the city.

OPPORTUNITY

THREAT

Lake named Raja Talab of the city has a great


potential for the development of tourist activities
Good road connectivity and abundant agricultural
land can induce and uphold the development of
Agro-based industries and townships.
Being situated in the Baghelkhand Region the town
has rich potential of flora and fauna species.

City may face environmental problems due to


tourist inflow.
The historical monuments are not conserved.

DMG Consulting Pvt. Ltd., Noida

Page 18

City Development Plan, Govindgarh, M.P.

CHAPTER 3
Demographic Profile of the Town

DMG Consulting Pvt. Ltd., Noida

Page 19

City Development Plan, Govindgarh, M.P.

3.
3.1

DEMOGRAPHIC PROFILE OF THE TOWN


Background

A demographic profile has been prepared based on analysis of census data, data from GNP and other
secondary sources and discussion with GNP. The analysis covers, apart from the population growth and
trends in the town, an assessment of the other social characteristics of the population including literacy,
education, gender etc. These analyses, together with the economic base will form the basis for working out
the growth scenarios for the town.

3.2

Population Trend and Urbanization

As per the Census of India, 1991 the total population of Govindgarh town was about 8437 which increased to
9697 in year 2001 with decadal growth rate of 14.93 %. This population increased to 10535 in the year 2011
with a decadal growth rate of 8.64 %. This decreased decadal growth rate is very significant for an emerging
town like Govindgarh. It gives an inference that the population of the town is increasing but at a lower rate
which means the thinking and perception of the public is changing toward the population increment.
Alternatively, it can also be surmised that there is considerable outflow of the population to other areas; a
reflection of lesser economic opportunities in the Nagar Parishad area.
Table 3.2.1: Comparative Assessment of Urban Population

Area

Total Population
Urban
Population

Male

Female

Decadal Growth
Rate 2001-2011

Urban India

37,71,05,760

19,58,07,196

18,12,98,564

31.80%

Madhya Pradesh (Urban)

2,00,59,666

1,04,70,511

95,89,155

25.63%

Rewa District (Urban)

3,95,487

2,07,771

1,87,716

23.40%

Govindgarh Nagar Parishad

10,535

5,418

5,117

8.64%

Source: Provisional Population, Census of India, 2011

Population
12000
10000

9697

10535

8437

8000
6000
4000
2000
0
1981 to 1991

1991 to 2001

2001 to 2011

Graph 3.1: Population Govindgarh, M.P.

DMG Consulting Pvt. Ltd., Noida

Page 20

City Development Plan, Govindgarh, M.P.


Table 3.2.2: Population Growth Trends

Year

Population
GNP

Decadal Growth Rate (%)

Rewa District

GNP

Rewa District

1951 - 1961

7,72,925

1961 - 1971

9,77,782

26.50

1971 - 1981

12,07,598

23.50

1981 - 1991

8437

15,54,987

28.77

1991 - 2001

9697

19,72,333

14.93

26.84

2001 - 2011

10535

23,63,744

8.64

19.85

Source: Census of India; Provisional Population Figure Census 2011

At district level the decadal population growth rate is also highly skewed during the period 1961-2011. The
average decadal growth rate during 1961-1971 was 26.5% which declines to 23.50% in 1971-1981 and
increased to 28.77% in 1981-1991 and subsequently declined to 26.84% during 1991-2001 and 19.85% in
2001-2011. This is because of out migration in search of livelihood as the Rewa District itself does not have
much potential in terms of education & health facilities, economic opportunities to cater the growing
population.

DECADAL POPULATION GROWTH


35
28.77
30

26.84

25
19.85
20
14.93
15
8.64

10
5
0
0
1
Decadal Growth Rate (%) GNP

Decadal Growth Rate (%) Rewa District

Graph 3.2: Decadal Growth of Population Govindgarh, M.P.

3.3

Population Density

As per the Census of 2001, the gross density of Govindgarh town is 7 persons per hectare which is increasing
continuously.

DMG Consulting Pvt. Ltd., Noida

Page 21

City Development Plan, Govindgarh, M.P.


Table 3.3.1: Population Density Trends

Year

Population

Area in Hectare

Area (in Sq. Km.)

Density (pph)

Density (pp sq. Km.)

1991

8,437

1323.00

13.23

638

2001

9,697

1323.00

13.23

733

2011

10,535

1323.00

13.23

796

Source: Census of India; Provisional Population, Census of India, 2011

As far as distribution of population within the town is concerned, ward number 3, 6 and 8 have the maximum
concentration of population as per Census 2001. Only ward no. 3, 4, 6, 8, 10 and 14 accounts for more than
43% of total population of GNP. As far as population density is concerned, the core and old areas of the town
including some outer areas are densely populated. The lowest is 1 person per hectare in ward no. 15 because
it has more agricultural area and water bodies while the highest is 91.41 persons per hectare in ward no. 9.
Ward No. 4 and 7 have high population density with more than 50 persons per hectare. According to the
UDPFI guidelines, a small town should have an average population density of 75-125 population per hectare.
But in this town population density is only 8 persons per hectare.
The average household size for the town is 5.8 persons in 2001. At ward level, the average household size is
less than the towns average in all the wards except ward no. 4, 6, 7, 8, 12 and 13. The average household
size is lowest in ward no. 9 i.e. 5.2 persons while ward no. 8 have the highest i.e. 7.4. The Ward Wise
Demographics of the town is given below.
Table 3.3.2: Demographics of the Town Govindgarh

Ward No.

Ward No.1
Ward No.2
Ward No.3
Ward No.4
Ward No.5
Ward No.6
Ward No.7
Ward No.8
Ward No.9
Ward No.10
Ward No.11
Ward No.12
Ward No.13
Ward No.14
Ward No.15
Total

No. of HH

111
112
130
111
99
115
107
96
126
120
98
107
92
118
123
1665

Population
Male

Female

Total

303
338
367
337
305
381
318
388
328
363
273
345
287
361
415
5109

285
287
364
316
245
354
324
321
321
316
253
314
281
326
281
4588

588
625
731
653
550
735
642
709
649
679
526
659
568
687
696
9697

Avg.
HH Size
5.3
5.6
5.6
5.9
5.6
6.4
6.0
7.4
5.2
5.7
5.4
6.2
6.2
5.8
5.7
5.8

Area
(in ha.)
28.2
74.15
94.41
11.78
75.3
54.31
9.62
30.7
7.1
68.34
12.8
18.69
15.87
91.43
730.5
1323.20

Population
Density (pph)
21
8
8
55
7
14
67
23
92
10
41
35
36
8
1
8

Source: Census of India, 2011

DMG Consulting Pvt. Ltd., Noida

Page 22

City Development Plan, Govindgarh, M.P.

Map 3-1: Ward Wise Population Density Govindgarh, M.P.

3.4

Population Projections

The population growth rate of the town has started declining since 1991 as per Census of India. The average
decadal growth rate of Govindgarh town for past 3 decades is 117.6%. The design populations for the next 25
years have been forecast for Govindgarh. The exercise has been done taking into account the population of
past decades and as per the guidelines detailed out in CPHEEO Manual. Looking to the factors governing the
future growth and development of Govindgarh Town like location, educational, industrial, commercial
(including investment from outside), tourism, social and administrative aspects, it is felt that the most
suitable method for population projection will be Geometrical Progression Method. However, other
methods suggested have also been followed.

3.5

Methodology Adopted to Estimate Population

For populations projection Plan Period three methods i.e. Arithmetic Progression Method, Geometrical
Progression Method and Incremental Progression Method were adopted.

3.5.1 Arithmetic Progression Method


Generally, the arithmetic progression method is applicable to large & old cities. This method usually gives
lower population & should be adopted when the future growth of the city is expected to be very slow. In this
method the decadal increase in population is calculated and the total increase in population is worked out by
dividing total increase in population in overall decades.

DMG Consulting Pvt. Ltd., Noida

Page 23

City Development Plan, Govindgarh, M.P.


Table 3.5.1: Trend of Population Growth in Govindgarh Town

Years
1991
2001
2011

Population
8437
9697
10535

Source: Census of India

The average increase of population between successive decades:


Present first decade:

10535 9697

= 838

First & second decades:

9697 8437

= 1260

TOTAL: 6039
Average increase per decade

= 1049

Average increase per year

= 699

Formula = (Recent year population + Average increase per five year) Taking this into consideration the future
population will be:
Table 3.5.2: Projected Population Arithmetic Progression Method

Years
2011 (Base Year)
2012
2013
2014
2015
2020
2025
2030

Population
-2012
4025
6039
8054
10074
12099
14129

2035

16164

Source: DMG Assessment (Arithmetic Progression Method)

3.5.2 Geometrical Progression Method


Geometric means is calculated for finding the growth rate. This method is suitable to project population for
fast growing/developing town and city. It usually gives higher population figure.
Present & first decade:

(10535 9697) *100/9697

= 8.6 %

First & second decade:

(9697 8437)*100/8437

= 14.93 %

TOTAL:

= 97.53%

Average increase per decade

= 117.6 %

Average increase per five year

= 16.25%

Average increase per year

= 11.76 %

Formula: (Recent year population + (Recent year population * Average increase per five year)

DMG Consulting Pvt. Ltd., Noida

Page 24

City Development Plan, Govindgarh, M.P.


Table 3.5.3: Projected Population Geometrical Progression Method

Years
2011 (Base Year)
2012
2013
2014
2015
2020
2025
2030
2035

Population
10535
10659
10785
10912
11041
11691
12380
13110
13883

Source: DMG Assessment (Geometrical Progression Method)

3.5.3 Incremental Increase Method


In this method, the increment in arithmetical increase is determined from the past decades and the average
of that increment is added to the average increase. This method increases the figures by obtained by
arithmetical increase method.
Table 3.5.4: Calculation of Population Projection Incremental Increase Method

Year

Population

1981
0
1991
8437
2001
9697
2011
10535
TOTAL
Average per decade
Average per five years
Average per year
Total five year (1006.5 92)
Total per year (201 18.4)

Increment per Decade


0
0
1260
838
2098
1049
524.5
105
314
63

Incremental Increase
0
0
0
-422
-422
-422
-211
-42.2

Source: DMG Assessment

Formula: (Average Arithmetic Increase = n* Average Incremental Increase)


Where n is numeric value that keep increasing with every projected year like 1, 2, 3, 4, 5 etc.
Table 3.5.5: Projected Population Incremental Increase Method

Years
2011 (Base Year)
2012
2013
2014
2015
2020
2025
2030
2035

Population
10535
10598
10660
10723
10786
11099
11413
11726
12040

Source: DMG Assessment (Incremental Increase Method)

DMG Consulting Pvt. Ltd., Noida

Page 25

City Development Plan, Govindgarh, M.P.


3.6

Summary of Population Projection through Various Methods

From the population projections c of Govindgarh Town it is calculated that;

Incremental Increase method followed by Arithmetic Progression Method has given very less
population and is not the suitable method for a town like Govindgarh which has very good prospects
of growth in near future.
Geometric Progression Method gives higher population as compared with Incremental Increase
through arithmetical progression method and is suitable & closer to reality as the town with
abundant agricultural land is located very much closer to district headquarters Rewa and has
substantial investment opportunity in various sectors escorting the development of town.

Thus the population has been taken as calculated by Geometric Progression Method.

3.7

Schedule Caste & Schedule Tribe Population

As per 2001 Census, out of the total population the Govindgarh Nagar Parishad had 18.05% (1751) of
Schedule Caste (SC) Population which is more than the National Average and District Average while 7.75 % of
total population accounts for Schedule Tribe (ST) Population in the town.
Table 3.7.1: Comparative Assessment of Urban SC & ST Population

Area

Urban India
Madhya Pradesh
Rewa District
Govindgarh Nagar Parishad

Total Urban Population


Urban
SC
ST
Population
Population
Population
286,119,689 3,36,24,822 69,87,643
1,59,67,145 37,87,827
7,87,026
3,20,563
37,413
19,836
9,697
1,751
752

% of SC
Population
11.75%
23.72%
11.67%
18.05 %

% of ST
Population
2.44%
4.93%
6.19%
7.75 %

Source: Census of India, 2011

3.8

Literacy Rate

Literacy, being an important indicator of social development, affects the demographic characteristics and
work force participation.
As per 2001 Census, the average literacy rate of Govindgarh town was 57.45 % which has increased to
66.55% as per 2011 Census but it is lower as compared to the District Average of 73.42 %. The male literacy
rate as per census 2011 is high as 75.97 % while female literacy rate is a significant 56.58 %. The status of
women in terms of literacy has been significantly low at town level; this lower literacy rate may be due to the
absence of proper education facilities and the backwardness of the area. The lower female literacy rate may
be due to absence of social awareness. But due to pace of time the literacy rate has increased from the
previous decade, because of introduction of schemes to promote the education system in MP, like,
Improvement in Science Education Scheme, Modernisation Scheme of Madarsa Education, Integrated
Education for Disabled Children, Computer Literacy and Study Scheme in Schools, District Primary Education
Programme, Sarva Shiksha Abhiyan, Education Gaurantee Scheme etc.

Table 3.8.1: Comparative Assessment of Literacy Rate Govindgarh, M.P.

Area

Urban India
Madhya Pradesh

Literacy Rate (in %age)


Total
Male
2001
2011
2001
79.92
84.98
86.27
79.39
84.90
87.39

DMG Consulting Pvt. Ltd., Noida

2011
89.67
90.24

Female
2001
72.86
70.47

2011
79.92
77.39
Page 26

City Development Plan, Govindgarh, M.P.


Rewa District
Govindgarh Nagar Parishad

62.01
57.45

73.42
66.55

75.65
69.58

83.67
75.97

47.58
43.94

62.49
56.58

Source: Census of India, 2001 & Provisional Figure, Census of India 2011.

Map 3-2: Ward Wise Literacy Rate Govindgarh, M.P.


Table 3.8.2: Ward Wise Comparative Assessment of Literacy Rate Govindgarh, M.P.

Ward No.
Ward No.1
Ward No.2
Ward No.3
Ward No.4
Ward No.5
Ward No.6
Ward No.7
Ward No.8
Ward No.9
Ward No.10
Ward No.11
Ward No.12

Literacy Rate (in %age)


Total

Male

Female

47.79
63.20
54.58
70.90
73.82
57.96
42.06
64.60
50.39
64.21
60.08
73.44

59.08
76.63
67.57
85.46
82.30
69.03
54.72
76.80
66.16
75.48
71.43
82.61

35.79
47.39
41.48
55.38
63.27
46.05
29.63
49.84
34.27
51.27
47.83
63.38

DMG Consulting Pvt. Ltd., Noida

Page 27

City Development Plan, Govindgarh, M.P.


Ward No.13
Ward No.14
Ward No.15
Average

56.34
27.07
58.05
57.45

72.47
34.07
70.60
69.58

39.86
19.33
39.50
43.94

Source: Census of India, 2011

3.9

Sex Ratio

The ratio between the number of males and the number of females is expressed in number of females per
1000 males. The sex ratio measures the extent of prevailing equity between males and females in the
project area.
Table 3.9.1: Comparative Assessment of Sex Ratio

Area

Sex Ratio

Sex Ratio
(0-6 Age Group)

Sex Ratio (SC)

Sex Ratio (ST)

2001

2011

2001

2011

2001

2011

2001

2011

Urban India

900

926

906

902

923

944

Madhya Pradesh

898

916

907

895

907

912

Rewa District

941

930

926

883

939

924

Govindgarh Nagar Parishad

903

944

937

716

845

Source: Census of India, 2001 & Provisional Figure, Census of India 2011.
Map 3-3: Ward Wise Sex Ratio Govindgarh, M.P.

DMG Consulting Pvt. Ltd., Noida

Page 28

City Development Plan, Govindgarh, M.P.


At town level, as per 2001 Census, ward no. 7 has the highest sex ratio i.e. 1019 females per 1000 males
while the lowest is 677 females per 1000 males in ward no 15. Wards with more than 900 females per 1000
males are 1, 3, 4, 6, 7, 8, 11, 12, 13 and 14. The sex ratio among children (0-6 age group) is very low i.e. 922
females per 1000 males, discouraging girl child birth in the town.
Table 3.9.2: Ward Wise Comparative Assessment of Sex Ratio Govindgarh, M.P.

Ward No.

Sex Ratio

Sex Ratio (0-6 Age Group)

Ward No.1
Ward No.2
Ward No.3
Ward No.4
Ward No.5
Ward No.6
Ward No.7
Ward No.8
Ward No.9
Ward No.10
Ward No.11
Ward No.12
Ward No.13
Ward No.14
Ward No.15
GNP

941
849
992
938
803
929
1019
827
979
871
927
910
979
903
677
898

1089
872
1119
1179
773
750
942
864
917
885
833
932
1294
947
655
922

Source: Census of India, 2011

3.10 SWOT Analysis


STRENGTH
Literacy Rate is high and has been increasing
continuously over the years.
High literacy rate has resulted into awareness
about family planning.

WEAKNESS
Literacy rate among females is low as compared
to males.
Sex Ratio of Town is less than the average of
District, M.P and Urban India which means town
has out-migration trend due to lack of job
opportunities.
Sex-ratio among 0-6 age group is declining,
discouraging girl child birth.

OPPORTUNITY

THREAT

Mining and other major industrial activities in


the South-western and south-eastern side of the
region.

Decline in population growth rate may slow


down the local economy.
Excessive out-migration may harm the economic
fabric of the town.

DMG Consulting Pvt. Ltd., Noida

Page 29

City Development Plan, Govindgarh, M.P.

CHAPTER 4
Socio - Economic Profile of the Town

DMG Consulting Pvt. Ltd., Noida

Page 30

City Development Plan, Govindgarh, M.P.

4.

SOCIO-ECONOMIC PROFILE OF THE TOWN

4.1

Background

Socio-economic profile reflects the sociological and economical characteristics of the city, which may include

Sex-ratio
Literacy rate
Household characteristics
Workforce participation rate

Industrial activities
Trade and commerce
Tourism etc.

In this section, an analysis has been done to identify the socio-economic profile of Govindgarh and major
issues have been addressed. No data assessment of the economic base of the city is possible as, essential
town-wise economic information is not readily available. It can, however, be conjectured that the dominant
sector of the economy of Govindgarh is the primary sector followed by tertiary and secondary sectors.

4.2

Sex Ratio

The ratio between the number of males and the number of females is expressed in number of females per
1000 males. The sex ratio measures the extent of prevailing equity between males and females in the project
area.
As per the Census 2001, the sex ratio in the Govindgarh Town is 898 females per 1000 males which increased
to 944 females per 1000 males in 2011. The average national sex ratio for urban India, Madhya Pradesh and
Rewa District are 926, 916 and 930 female per 1000 males respectively as per the Census 2011.

4.3

Literacy Rate

Literacy, being an important indicator of social development, affects the

Demographic characteristics
Participation in labour

As per the Census 2011, the average literacy rate of Govindgarh town has increased to 66.55 % from 57.45 %
in 2001 Census. The status of women in terms of literacy has been significantly low. The male literacy rate as
per 2011 Census is high as 75 % while female literacy rate is significant at 69%.

4.4

Average Household Size

The total number of households in Govindgarh Town as per Census 2001 is 1665. The average household size
in Govindgarh Town is 5.6 persons. A comparative assessment of urban population indicates that the average
household size of the town is higher than the district average of 5.44 and national average of 5.12. The state
average is also higher at 7.27 persons per household.
Table 4.4.1: Comparative Assessment of Household Size

Area

Total Population

Household

Average HH Size

Urban India

28,61,19,689

5,58,32,570

5.12

Madhya Pradesh (Urban)

1,59,67,145

21,95,725

7.27

3,62,657

5.44

1665

5.6

Rewa District
Govindgarh Nagar Parishad

9697

Source: Census of India, 2011

DMG Consulting Pvt. Ltd., Noida

Page 31

City Development Plan, Govindgarh, M.P.


4.5

Workforce Participation

As per the 2001 Census, Govindgarh Nagar Parishad has a normal Work Force Participation Rate (WFPR) and
it is recorded at 38.66 % indicating low dependency ratio, while the National Urban average accounts for
32.25%.
Table 4.5.1: Comparative Assessment of WFPR

Area

Total
population

Workers
Total

Male

Female

Urban India

28,61,19,689

9,22,78,654

7,61,75,323

16,103,331

32.25

Madhya Pradesh (Urban)

1,59,67,145

48,93,293

39,88,452

9,04,841

30.65

Rewa District

19,73,306

8,62,959

5,02,107

3,60,852

43.73

3749

2428

1321

38.66

Govindgarh
Parishad

Nagar 9697

WFPR (%)

Source: Census of India, 2011

4.6

Workforce Distribution

Work force distribution indicates the economic base of any city or town. There are a total of 3749 workers in
the town as per the Census 2011 and majority of workers are engaged in tertiary activities such as trade &
commerce. The share of work force involved in trade & commerce (tertiary sector) is 55%. The primary sector
(including cultivators & agricultural labourers) and secondary sector (small scale house hold or manufacturing
industries) constitutes 16% and 29% of total work force respectively.

Work Force Distribution


7%

9%

Cultivators

Agricultural
Laborers

55%

House Hold
Industries

29%

Others

Figure 4.4-1: Workforce Distribution Govindgarh, M.P.

DMG Consulting Pvt. Ltd., Noida

Page 31

In Percentage

City Development Plan, Govindgarh, M.P.

90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00

Total WFPR

Primary

Secondary

Tertiary

Male

64.76

50.82

40.38

81.39

Female

35.24

49.18

59.62

18.61

Graph 4.1: Gender Wise Work Force Distribution in Different Sectors of Economy
Table 4.6.1: Ward Wise Comparative Assessment of WFPR & Work Force Distribution

Ward No.

Total
Population

Total Working Population

Work Force Distribution (%)

108

Total
WFPR
(%)
41.16

Total

Male

Female

588

242

134

625

238

158

80

731

301

167

653

263

550

Primary

Secondary

Tertiary

67.77

23.97

8.26

38.08

7.56

34.87

57.56

134

41.18

1.99

43.85

54.15

176

87

40.28

11.03

29.66

59.32

168

124

44

30.55

0.60

30.36

69.05

735

251

178

73

34.15

15.94

5.98

78.09

642

264

155

109

41.12

38.26

2.65

59.09

709

240

160

80

33.85

64.17

0.00

35.83

649

274

146

128

42.22

10.22

34.31

55.47

10

679

166

146

20

24.45

9.64

6.02

84.34

11

526

207

134

73

39.35

2.90

33.82

63.29

12

659

205

150

55

31.11

3.41

26.34

70.24

13

568

269

155

114

47.36

5.58

63.20

31.23

14

687

373

217

156

54.29

2.95

58.71

38.34

15

696

288

228

60

41.38

4.86

8.33

86.81

Govindgarh

9697

3749

2428

1321

38.66

16.27

28.41

55.32

Source: Census of India, 2011

4.7

Dependency Ratio

The average dependency ratio for Govindgarh Town is 61.34 % which indicates that GNP has higher level of
dependent population in comparison to District Average. Like most of the cities or town, females constitute
higher proportion of dependent population of more than 60 % of total number of non-working population.

DMG Consulting Pvt. Ltd., Noida

Page 32

City Development Plan, Govindgarh, M.P.


Table 4.7.1: Comparative Assessment of Non-working Population

Area

Total
population

Non-Workers
Total

Male

Female

Urban India

286119689

193841035

74378775

119462260

67.74

Madhya Pradesh (Urban)

15967145

11073852

4424107

6649745

69.35

Rewa District

1973306

862959

502107

360852

56.27

5948

2681

3267

61.34

Govindgarh
Parishad

Nagar 9697

Dependency
Ratio (in %)

Source: Census of India, 2011

The dependency ratio within the town indicates that Ward Nos. 2, 5, 6, 8, 11 and 12 have 60% or more
dependent population.
This dependency may be due to the presence of children and old age people as they come under nonworking population.

45%
Male

55%

Female

Figure 4.4-2: Gender Wise Dependency Ratio Govindgarh, M.P.


Table 4.7.2: Ward Wise Comparative Assessment of Dependent Population & Dependency Ratio

Ward No.

Total
Population

Total Non-Working Population

Dependency Ratio (%)

Total

Male

Female

Total

Male

Female

588

346

169

177

58.84

48.84

51.16

625

387

180

207

61.92

46.51

53.49

731

430

200

230

58.82

46.51

53.49

653

390

161

229

59.72

41.28

58.72

550

382

181

201

69.45

47.38

52.62

735

484

203

281

65.85

41.94

58.06

642

378

163

215

58.88

43.12

56.88

709

469

228

241

66.15

48.61

51.39

649

375

182

193

57.78

48.53

51.47

DMG Consulting Pvt. Ltd., Noida

Page 33

City Development Plan, Govindgarh, M.P.


10

679

513

217

296

75.55

42.30

57.70

11

526

319

139

180

60.65

43.57

56.43

12

659

454

195

259

68.89

42.95

57.05

13

568

299

132

167

52.64

44.15

55.85

14

687

314

144

170

45.71

45.86

54.14

15

696

408

187

221

58.62

45.83

54.17

Govindgarh

9697

5948

2681

3267

61.34

45.07

54.93

Source: Census of India, 2011

4.8

Industrial Activities

The town has no major industries within its vicinity. There are some cement factories in the nearby area.
Apart from Small Scale Household Industries, there are some large industrial units within Rewa District and
also in the surrounding districts which providing direct and indirect employment to the residents of the town.
The important industries found in and around Rewa District have been listed in the table below includesTable 4.8.1: List of Important Industries in Rewa District and in its surrounding Districts

District/Town
Rewa
Satna

Sidhi

Singrauli

Allahabad

Important Industries

Cement Manufacturing Industries


Cottage Based and Handloom Weaving Industries
Mining Industries
Cement, Tiles and Stone Manufacturing Industries
Agricultural Produce and Agro-based industries Flour, Oilseed milling, pulses, rice
etc.
Handloom Weaving Industries
Cable Manufacturing Industries
Steel Fabricators & Transformer Repairing Industries
Automobile Industries
Engineering Industries
Other Manufacturing Industries
Agricultural Produce and Agro-based industries
Coal Mining Industries
Forest Produced Industries Timber as well as Non-timber.
Coal Mining Industries NCL
ElectricalEnergy/Power Industries NTPC
Chemical and Cement Manufacturing Industries
Other Manufacturing Industries
Glass and Wire based industries
Indian Telephone Industries Limited for manufacturing of transmission equipment
in Naini
Manufacturing Industries Hindustan Cables (HCL), GEEP Battery,
Indian Farmers Fertilizer Co-Operative (IFFCO) in Phulpur
Drug Industry - Baidyanath Ayurved has its unit in Naini
Agricultural Produce and Agro-based industries
Indian Telephone Industries ltd.
Bharat Pumps and Compressors ltd.

DMG Consulting Pvt. Ltd., Noida

Page 34

City Development Plan, Govindgarh, M.P.

Chitrakut
Mirzapur

Recron
Farming, Agricultural Produce and Agro-based industries.
Carpets and Cotton Durries Manufacturing Industries
Metal Pots (Brass) Manufacturing Industries
Cement Manufacturing Industry established by JAYPEE group at Chunar
Mineral Based Industries
Agricultural Produce and Agro-based industries

Source: DMG Assessment

4.8.1 Informal Business and Local Economy (Trade & Commerce)


In GNP a large number of populations are engaged in primary and tertiary activities. The town consists of
some medium sized market and commercial areas, which lie across the major roads crossing through the
residential area. Most of the working population consists of Agricultural workers and labours.
The town also has one sub Mandi, which can also be called as Haat which acts as a very small commercial
centre for the town.
The development of other commercial activities (both formal and informal) is also observed along the major
roads of the town such as State Highway 52. The informal markets/shops predominantly include vegetables,
fruits, cloths and garments, hardware, groceries items etc.

Figure 4.3: Major Markets/Commercial and Wholesale Trading Areas of the Town

4.9

Heritage and Tourism

At town level, Govindgarh has many tourist destination and heritage buildings along with some natural
elements such as nallah, pond and water bodies.
HERITAGE:
1) Govindgarh fort
RELIGIOUS:
1) Ram Govind Temple
DMG Consulting Pvt. Ltd., Noida

2) Khando Devi temple


Page 35

City Development Plan, Govindgarh, M.P.


3) Panchmukhi Temple
4) Chowandi Temple
NATURAL SCENIC AREA:

5) Shiva Temple
6) Hanuman Temple

1) Raja Talab
2) Nallah and pond
The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands. It is a small Island within the lake which is known for its scenic beauty and lush
green surroundings. The Sunderja Mangoes of the Govindgarh are famous in the country. The people of the
area are decent and have higher human values. The law and order situation of the area is also good. This is
being developed as a future tourist destination to attract International Tourists.
Govindgarh is also known as `Mini Vrindavan and a large number of famous temples are situated in the
region. Major temples are Ram Govind Temple, Panchmukhi Temple, Chowandi Temple, Shiva Temple and
Hanuman Temple. All these temples are within the vicinity of the famous Govindgarh Fort. It is also believed
that the name Govindgarh was based on the Govind Temple now situated within the Govind Garh Fort
Premises. Khando Devi temple is another destination for the tourists in Govindgarh, which was founded by
Maharan Pratap.

Figure 4.4-3: Rani Talab and Raja Talab in the town near Govindgarh Fort

DMG Consulting Pvt. Ltd., Noida

Page 36

City Development Plan, Govindgarh, M.P.


Table 4.9.1: List of Important Centres/Spots for Tourists in Town and in its Proximity

Tourist Spot

Location

Sites within the Town


Lal Bagh
Raja Talab

The area famous for its Sunderja Mango garden


Located just behind the Govindgarh Fort. It is pond with a
nalah which flows in the town
Govindgarh Fort
The Gobindgarh palace used to have security like a well
protected fort. The stately palace of Gobindpur, on the banks
of the Lake, houses a police training school and Baghela
museum now
The island, nestled in the Lake, also showcases a wonderful
palace. The doorway of this beguiling palace, however, is
closed for the general public
An underground tunnel is also there which was used as a
secret path for kings between Govind Garh & Rewa
Ram Govind Temple, Panchmukhi All the mentioned temples are located nearby Govindgarh Fort
Temple, Chowandi Temple, Shiva It is also believed that the name Govindgarh was based on the
Temple, Hanuman Temple.
Govind Temple now situated within the Govind Garh Fort
Premises
Place
Distance from Specialty
Town
Sites within its proximity
Khando Devi Temple
2 Km
Khando Devi Temple
Cave under Vindhyahal 8-9 Km
Kamayini Devi Mandir
Mountain Range
Deorkothar (Tyonthar 25-30 Km
Buddhist Stupas and Rock Paintings declared a monument of
national importance in 1988 by the Govt. of India and is being
tehsil)
preserved and conserved by Archaeological Survey of India,
Bhopal.
Kyunti Water Fall
40-45 Km
Can be developed as tourist spot.
Rewa
80 Km
Rewa Fort, Rewa Fort Museum; Venkat Bhawan and Shiva
Temple, Rani Talab Temple
Gurh
110 Km
Big statue of God Shiva called "Bhairom BaBa"; Famous
Temple of "Shiva Ji & Alliad Gods"; Natural Lake called "
Kudia"; Famous Pond of "Rani Ka Talab" & Maharua Ka
Talab.
Prayag and Allahbad
45 km
Sangam a place of religious importance and the site for
historic Kumbh Mela held every 12 years.
Allahabad Fort built in 1583 by Emperor Akbar, stands on the
banks of the Yamuna near the site of confluence with the river
Ganges.
Varanasi
165 Km
A Holly City Temples and Ghats
Source: DMG Assessment

DMG Consulting Pvt. Ltd., Noida

Page 37

City Development Plan, Govindgarh, M.P.

Map 4-4: Tourism in and around Govindgarh Town

Map 4-5: Tourism in and around Govindgarh Town

DMG Consulting Pvt. Ltd., Noida

Page 38

City Development Plan, Govindgarh, M.P.


The overall economy of the town is highly localized and confined to only low economic activities of the
hinterland. Tourism is also not contributing too much to the economic development of the town, it is
concluded that tourism and industrial development together contribute to development of the region as a
whole.

4.10 SWOT Analysis


STRENGTH

WEAKNESS

Literacy rate of town is increasing continuously


over the years
Abundance of good agricultural land
Town is rich in heritage and natural beauty
Matsya Palan, Pisces-culture, is emerging as new
activity in the town.

Female literacy rate is low as compared to male


Shifting of workers from primary to tertiary
Lack of conservation & management of tourist
resources
Lack of awareness and management techniques of
heritage and natural elements.

OPPORTUNITY

THREAT

Existing water body can be developed and


conserved as major tourist site for the locals as
well as for domestic tourism
Literacy level could be harnessed to develop the
town as a centre for medium and small scale
industry
Town has potential of developing as a service
centre for its hinterland
Town is having huge agricultural ground for
cultivation where agro-based industries can be
developed
Town has a great royal history which can be used
in some perspective.

Shifting of workers from primary to tertiary might


resulted into reduction in agricultural production
Lower sex ratio among 0-6 age group may
discourage girl child birth
Improper infrastructure services, local awareness
and un-developed lake front etc. are major
hindrance for the development of the tourism
Disposal of solid waste into the Talab (lake).

4.11 Issues
The overall population of Govindgarh is increasing but decadal population growth rate is decreasing from
last three decade because the town has lack of economic activities which causes migration of people to
other cities.
Town is rich in natural and architectural heritage but there is no management of these resources. In other
words, there is a lack of conservation in the town.
Town does not have a dumping site as a result of which, waste is disposed into open drains and along the
roads. It is a cause of pollution in water bodies.
o
o
o
o
o

Lack of economic activities which causes migration of people to other cities.


Rich natural and architectural heritage (Govindgarh Fort) without proper management.
Lack of conservation of the heritage structure of the town i.e. Govindgarh Fort.
Town doesnt have a dumping site, as a result waste is disposed into open drains and along
the roads (along SH-52). It is a cause of pollution in water bodies.
Lack of Tourist Infrastructure i.e. hotels, market, information centres, parking etc.

DMG Consulting Pvt. Ltd., Noida

Page 39

City Development Plan, Govindgarh, M.P.

CHAPTER 5
Physical Planning and Growth
Management

DMG Consulting Pvt. Ltd., Noida

Page 40

City Development Plan, Govindgarh, M.P.

5.
5.1

PHYSICAL PLANNING AND GROWTH MANAGEMENT


Background

Urban land-use planning, attempts to achieve an optimal spatial coordination of different human activities
for enhancement of quality of life. It plans for community growth and development based on optimal landuse planning, urban design, economic and environmental planning principles. This chapter highlights the
analysis of general spatial growth pattern, directions and land-use distribution of the town.

5.2

Spatial Growth Trends

The total area of Govindgarh Nagar Parishad is about 13.25 sq. Km. with a population of about 10,535 as per
2011 Census. Out of the total area, the town has approximately 43 % developed area and 57 % undeveloped
area or agricultural land.
The spatial growth pattern suggests that the town is predominantly developing along the state Highway 52
and State Highway 9. The development has also occurred along Rewa road; Ameen Road. These areas have
high density across the road with residential and commercial landuse. Half of the area of Govindgarh is
undeveloped and is categorised under recreational spaces in the form of Govindgarh Fort, Sundar-van, Raja
Talab etc.

5.3

Spatial Distribution of Population

As per Census 2001, Govindgarh had a total population of 9697 which has increase to 10535 in 2011 and this
population distribution is uneven in the whole area. The development pattern is apparent in the density
pattern of the municipal area. Gross density of Govindgarh town is 7 persons per hectare and net density is
18 persons per hectare.
Density varies from one ward to the other and the core or inner areas of the town are densely populated. It is
evident that the pressure of development is more along the State Highway 52 and 9.
Table 5.3.1: Ward Wise Distribution of Population Density

Ward No.

Area in Hectare

% to Total Area

Total Population

Population
(pph)

Ward No.1
Ward No.2
Ward No.3
Ward No.4
Ward No.5
Ward No.6
Ward No.7
Ward No.8
Ward No.9
Ward No.10
Ward No.11
Ward No.12
Ward No.13
Ward No.14
Ward No.15
Total

28.2
74.15
94.41
11.78
75.3
54.31
9.62
30.7
7.1
68.34
12.8
18.69
15.87
91.43
730.5
1323.2

2.13
5.60
7.13
0.89
5.69
4.10
0.73
2.32
0.54
5.16
0.97
1.41
1.20
6.91
55.21
100.00

588
625
731
653
550
735
642
709
649
679
526
659
568
687
696
9697

21
8
7
55
7
14
67
23
91
10
41
35
36
8
1
7

Density

Source: Census of India, 2011

DMG Consulting Pvt. Ltd., Noida

Page 41

City Development Plan, Govindgarh, M.P.


5.4

Land-use Analysis

The study of land-use pattern would enable us to understand the city as envisaged in the past and the
direction of its future growth and development. A change in land-use is inevitable over time and reflects the
needs and demands of the residents of the city. This section deals with the existing land-use of the town.
At present the total municipal area of Govindgarh town is 1323 Ha out of which current developed area is
572.68 Ha. (43.28 %) and 750.59 Ha. (56.72 %) area is undeveloped or agricultural land. This undeveloped
area consists of recreational and agricultural spaces. In the case of Govindgarh this undeveloped area is not a
bad situation rather it is a potential for the area.
The table below highlights the existing land-use pattern of the municipal area which has been tentatively
carried out by DMG based on Google image, town map provided by the Nagar Parishad followed by survey in
due consultation with officials of Govindgarh Nagar Parishad.
Table 5.4.1: Existing Land use Distribution; 2011 Govindgarh

Land use

Area in Hectare

Percentage

Remarks

Residential

109.12

19.06

Commercial

3.1

0.54

% out of the Total


Developed Area

Industrial

0.4

0.07

Public/Semi public and Public Utilities

0.7

0.12

Recreational

9.35

1.63

Circulation

36.74

6.42

Water Body

413.21

72.16

Total Developed Area

572.6

43.28

Undeveloped Area/ Agricultural Land

750.59

56.72

Total Municipal Area

1323.21

100.00

% out of the Total


Municipal Area

Source: DMG Assessment

With existing developed area, 19.06 % of the total land-use is residential. A large area (72.16 % of the total
land-use) is under water body followed by 6.42 % under agriculture, 0.54 % as commercial, and 0.12 % as
public and semi-public area while 0.07 %area is under industrial use.

43%
developed area

57%

undeveloped area

Figure 5-1: Land use Distribution-I Municipal Area

DMG Consulting Pvt. Ltd., Noida

Page 42

City Development Plan, Govindgarh, M.P.

Landuse Distribution
19%

1%
0%

0%
2%
6%

Residential
Commercial
Industrial
Public/Semi public and Public
Utilities
Recreational

72%

Circulation

Figure 5.2: Land use Distribution-II Municipal Area

Map 5.1: Existing Land use Map; 2011 Govindgarh Nagar Parishad

DMG Consulting Pvt. Ltd., Noida

Page 43

City Development Plan, Govindgarh, M.P.


5.5

Housing Scenario
5.5.1 Introduction

Housing is a basic social need of each and every individual. It is an important determinant of the quality of life
of the people thus it needs to be addressed properly and judiciously. Adequacy of housing stock,
construction quality, the number of occupants in proportion to the number of rooms and the provision of
basic amenities are all important determinants of development. Hence, tackling housing needs to fulfil the
demand for the same is an important component of any city Development Plan. In Govindgarh housing
development is done by Madhya Pradesh Housing Board (MPHB) and private builders.

5.5.2 Housing Stock


As per Census of India 2001, there are 1655 households in Govindgarh Nagar Parishad (GNP) with an average
household size of 6.5 persons which is higher as compared to average national urban household sizes.
Table 5.5.1: Comparative Assessment of Household Size

Area

Total Population

Household

Average HH Size

Urban India

28,61,19,689

5,58,32,570

5.12

Madhya Pradesh (Urban)

1,59,67,145

21,95,725

7.27

Govindgarh Nagar Parishad

9697

1655

6.5

Source: Census of India, 2011

5.5.3 Distribution of houses by Types


In the town out of the total number of houses more than 39 % are permanent in nature while 61 % are semipermanent.

39%

permanent
61%
semi-permanent

Figure 5.3: Housing Types in Govindgarh Nagar Parishad

DMG Consulting Pvt. Ltd., Noida

Page 44

City Development Plan, Govindgarh, M.P.


5.5.4 Categories of Housing Structure
Distribution of Houses by Predominant Material of Wall
Out of the total number of houses in the town, 40.86 % of the houses are categorized walls made up of
burnt bricks. Walls in 55.31 % of house are made up of mud or un-burnt bricks followed by 3.37 % of grass,
thatch, bamboo and 0.09 % of wood. Remaining houses include walls made up of stone, concrete, asbestos
sheets, plastic, polythene and other materials.
3.37%

0.05%

0.00%

0.18%

0.00%
Grass, Thatch, Bamboo etc.
Plastic, Polythene
Mud, Unburnt Brick

40.86%

Wood

55.31%

G.I., Metal, Asbestos Sheets


Burnt brick
Stone
Concrete
Any other material

0.14%
0.09%

Figure 5.4: Distribution of Houses by Predominant Material of Wall

Distribution of Houses by Predominant Material of Roof


In Govindgarh town, out of the total number of houses more than 68 % of the houses have roofs made up of
tiles. Roof in 17.5 % of houses is made up of concrete followed by 11 % of stone; 0.09 % of G.I, metal,
asbestos sheets and 0.99% of stone indicating most of the houses are pucca. Remaining houses include roof
made up of grass, thatch, bamboo mud, wood, plastic, polythene, stone, concrete, asbestos sheets, slate and
other materials.
17.50%

0.14%

Grass, Thatch, Bamboo, Mud, Wood


etc.
Tiles

11.36%

Slate
0.09%

G.I., Metal, Asbestos, sheets

2.59%

0.05%
68.28%

Brick

Figure 5.5: Distribution of Houses by Predominant Material of Roof

DMG Consulting Pvt. Ltd., Noida

Page 45

City Development Plan, Govindgarh, M.P.


Distribution of Houses by Predominant Material of Floor
Out of the total number of houses, 74 % of the houses do not have pucca floor. 25.58 % of houses have pucca
floor made up of cement. Floors in remaining houses include 0.28 % made up of bricks; 6.09 % of stone; 0.46
% of mosaic, floor tiles and rest are of wood & bamboo indicating pucca or semi-pucca in nature.
0.46%

0.00%

25.58%
67.59%
6.09%
0.28%
0.00%

Mud
Wood, Bamboo
Brick
Stone
Cement
Mosaic, Floor tiles
Any other material

Figure 5.6: Distribution of Houses by Predominant Material of Floor

5.5.5 Distribution of houses by Use


In the town, all along the major roads and in commercial areas/bazaar areas most of the houses are used for
both residential as well as for commercial purposes. Only in the inner side of the wards houses are mainly
used for residential purpose.

5.5.6 Ownership Status


In town, 93.87 % houses are owned, 3.36 % are rented and remaining fall into other types of ownership
status. Thus indicating about most of the people residing in the town has their own land.
3.36%

2.77%

Owned
Rented
Others

93.87%
Figure 5.7: Housing Ownership Status Govindgarh Nagar Parishad

5.5.7 Present and Future Housing Demand


As per Census of India 2011, the average household size in the town is 5.6 which are higher than the national
urban average of 5.12. Since the town is in transition phase of development (rural to urban), it is semi-urban
in nature. The present and future housing demand for the town has been estimated by taking into account
the ideal size of a household / dwelling unit (DU) as 5.0. The average household size in most of the wards is
higher than the ideal household size.

DMG Consulting Pvt. Ltd., Noida

Page 46

City Development Plan, Govindgarh, M.P.


Table 5.5.2: Ward Wise Present Housing Demand and Gap

Ward No.

Total No. of HH

Total
Population

Avg. HH Size

Housing
Demand

Housing
Gap

Ward No.1

111

588

5.3

118

Ward No.2

112

625

5.6

125

13

Ward No.3

130

731

5.6

146

16

Ward No.4

111

653

5.9

131

20

Ward No.5

99

550

5.6

110

11

Ward No.6

115

735

6.4

147

32

Ward No.7

107

642

6.0

128

21

Ward No.8

96

709

7.4

142

46

Ward No.9

126

649

5.2

130

Ward No.10

120

679

5.7

136

16

Ward No.11

98

526

5.4

105

Ward No.12

107

659

6.2

132

25

Ward No.13

92

568

6.2

114

22

Ward No.14

118

687

5.8

137

20

Ward No.15

123

696

5.7

139

16

Total

1665

9697

5.6

1940

276

Source: Census of India, 2011 and DMG Assessment

Based on the above assumptions, at present there is a demand supply gap in housing, there is a shortfall of
276 houses. This indicates that there is a demand for housing. The demand gap is highest in ward no. 8, 6 and
14 located in periphery and core areas of the town.
Table 5.5.3: Present and Future Housing Demand and Gap

Year

Total Population

Existing Supply

Housing Demand

Housing Gap

2011
2012
2013
2014
2015
2020
2025
2030

Non-Slum
8271
8369
8467
8567
8668
9179
9720
10293

Slum
2264
2291
2318
2345
2373
2512
2661
2817

Non-Slum
760
760
760
760
760
760
760
760

Slum
208
208
208
208
208
208
208
208

Non-Slum
1654
1674
1693
1713
1734
1836
1944
2059

Slum
453
458
464
469
475
502
532
563

Non-Slum
894
914
933
953
974
1076
1184
1299

Slum
245
250
256
261
267
294
324
355

2035

10899

2983

760

208

2180

597

1420

389

Total
Total
Demand Gap
2107
2132
2157
2182
2208
2338
2476
2622

1139
1164
1189
1214
1240
1370
1508
1654

2777

1809

Source: DMG Assessment based on Projected Population


Note: Present and Future Housing Demand and Gap for Slum has been calculated by taking the present percentage of
slum population to the total population.

DMG Consulting Pvt. Ltd., Noida

Page 47

City Development Plan, Govindgarh, M.P.


5.5.8 Housing Gap Assessment
Present Housing Stock (Pucca House)
Present Housing Demand for Non-Slum
Present Housing Demand for EWS/Slum
Present Housing Gap

=
=
=
=

968
1654
453
274

Present Housing Gap for Non-Slum


Present Housing Gap for EWS/Slum
Total Future Requirement of Housing in year 2035

=
=
=

894
245
2777

Future Requirement of Housing for Non-Slum in Year 2035


Future Requirement of Housing for EWS/Slum in Year 2035
Total Future Gap of Housing in year 2035

=
=
=

2180
597
1809

Future Gap of Housing for Non-Slum in Year 2035


Future Gap of Housing for EWS/Slum in year 2035

=
=

1420
389

5.6

Future Growth Possibilities

The future growth possibilities have been envisaged based on the existing growth pattern and the population
projection.
The present growth is mainly along the State Highway 52 and 9 and this will continue as this network is the
backbone of the town. Future growth can also be assumed along these major roads. The future development
of Govindgarh also depends upon the existing water bodies of the town such as Raja Talab, nallah, and two
other small ponds.
The future development will be in ward number 14, 13, 3, 5 and 6 for residential land-use. Commercial
development may occur in the form of tourism industry in ward number 15 due to the presence of the
heritage and religious structures as well as natural scenic beauty. This growth will be directed in the southeast and north-east direction due to the presence of connectivity and natural resources.
The future growth possibilities and directions have been discussed with respect to five aspects that include
existing urban growth, the transportation lines, availability of abundant agricultural land in GNP, natural and
the proposed economic activities. Municipal body should ensure the future development of town in a
planned manner as per these identified zones along with detailed layout master/development plans
prepared by TCP Department, Rewa.

DMG Consulting Pvt. Ltd., Noida

Page 48

City Development Plan, Govindgarh, M.P.


Future Growth Possibilities/Direction - 2035

Map 5.2: Govindgarh: Future Growth Possibilities/Direction with Proposed Sectoral Zones - 2035

5.7

SWOT Analysis
STRENGTH

Most of the people have their own houses, which


are pucca in nature
Cheaply available abundant agricultural land for
new developments
Strength of the town lies in its heritage, natural
scenic beauty and religious spots which have a
good tourist potential and can be developed as
tourism industry
The town has good connectivity, making it an
emerging town
Town has potential in terms of its history
Town is also famous for its flora and fauna.

DMG Consulting Pvt. Ltd., Noida

WEAKNESS
Average household size is more than the national
urban average
More than 50% of the houses do not have pucca
floor
Low and slow growth pattern
Development is concentrated mainly along the
transportation line i.e. SH 52 & 9
Half of the area in the town is undeveloped
No existing norms and guidelines for water bodys
conservation
No existing norms and guidelines for heritage
conservation and exploitation.

Page 49

City Development Plan, Govindgarh, M.P.


OPPORTUNITY

THREAT

High literacy level could be harnessed to develop


the town as a centre for medium and small scale
industry
Development of Water front and recreational
spaces
Good possibilities of residential development due
to presence of suitable agricultural land, social
infrastructure and commercial centres
Development of agro-based industries can create
housing demand
Better quality housing demand and cheap land
values can attract real estate developers for
development of new townships in peripheral
areas
Opportunity of tourism sector in the town is very
high and it can generate income for local people.

Land encroachments are practicing.


Unplanned water front development may result
into water logging and other issues in the nearby
areas
Because of lack of basic amenities, the quality of
residential areas is very poor
Absence of Urban Land Management Policy
Threat to the forest and wild life existing in the
town
Threat to the sculptures and heritage due to
slackness
Threat to the water body; if not conserved will
spoil the beauty of the Southern Part of the town.

5.8

City Specific Strategies and Action Plan

S. No.

Aspects

Issues

Strategies and Action Plan

1.

Spatial
Growth

Linear growth All residential and Development of more commercial


centres in the town, especially in
commercial
development
is
southern part of the town to promote
concentrated along the SH 52 & 9.
equitable growth throughout the
town.
The concentration of all the major
commercial establishments is in
Encourage
new
planned
core area of the town.
developments/townships away from
the core area in all direction in
between the major roads.

2.

Density
Pattern

High density is concentrated in core Decongest high density wards and


promote planned development in
areas of town.
sparsely developed wards.

3.

Large percentage of land is still not


Land-use
Low and slow growth pattern
developed, real estate developers can
Distribution The urban poor/ slums are mainly
play important role in development
concentrated in the core area.
of potential areas within the
municipal limit
EWS and LIG colonies with a focus or
poverty eradication should be
planned on the basis of future growth
possibilities.

4.

Housing

Average household size is higher As per the demand construction of


1809 houses under LIG, MIG and HIG
than the national urban average
schemes should be planned by MPHB.
The demand for housing is high.

DMG Consulting Pvt. Ltd., Noida

Page 50

City Development Plan, Govindgarh, M.P.

CHAPTER 6
Urban Infrastructure Services

DMG Consulting Pvt. Ltd., Noida

Page 51

City Development Plan, Govindgarh, M.P.

6.
6.1

URBAN INFRASTRUCTURE SERVICES


Introduction

The infrastructure profile of a town makes a direct reference on the quality of life within it. It is one of the
crucial considerations for the towns economic development and its investment climate. Infrastructure
services and its adequacy require an assessment be made of its coverage, quantity and quality, as also the
demand supply gap. This chapter presents the existing status and estimates the present and future gaps by
the year 2035. It includes all the major sectors/aspects including Water Supply; Sewerage and Sanitation;
Solid Waste Management; Drainage; Urban Transport; Community Facilities covered under both Physical
and Social Infrastructure.

6.2

Physical Infrastructure

6.2.1

Water Supply

Sources of Water Supply


The water supply system in Govindgarh Nagar Parishad is predominantly dependent on ground water. The
Raja Talab, Raghuraj Saga Talab, 5 tube wells and 78 hand pumps are the various sources of water supply in
the town. The quality of water drawn from all sources is fairly good. There is no detectable odour & taste and
the colour is found to be turbid.
Other than these sources 2 water tankers of capacity 90000 lt. are available with GNP.
Ward number 7 is completely devoid of municipal water supply while other wards have access to public
water supply system.
There are 2 OHT in the city and approximately 65 % population is covered by household supply system. At
present water supply is done through 384 household connections, 78 hand pump and 10 public taps in the
town.
Table 6.2.1: Main Sources of Water Supply

Water Sources

Capacity (MLD)

Tube wells

2.85 lack litres (90 %)

Surface water (Ponds)

75 thousand litres (10 %)

Source: Govindgarh Nagar Parishad (GNP)

Water Distribution System


The present water distribution system includes mainly three sources in the town i.e. tube well, hand pumps
and water pipelines. At present 65 % area of the town is covered with water supply. Total capacity of water
supply in the town is 570 lack litres of which 352 lack litres is supplied through taps, i.e. piped water supply.
There are around 384 individual water connections. There are around 140 number of household covered
with public taps, around 1453 number of household covered with hand pumps and around 50 number of
household with no accessibility to water.
At present there are 2 OHTs in the town of capacities 4.06 and 1.78 lack litres which are located in ward no.
10. Ward number 14 needs an OHT. At present the town does not have facility of water treatment plant.
Water is distributed everyday for 1 hour, approximate 25 % of the water is unaccounted due to damage of
pipelines.
DMG Consulting Pvt. Ltd., Noida

Page 52

City Development Plan, Govindgarh, M.P.


Thus, the town gets majority of water supply directly from these tube wells located in various part of town
without any treatment. The per capita supply of 37.2 litres per day is estimated under the existing supply
system which is very low as compared to the prevalent national standards of 135 lpcd.
These figures however, represent only the production from all sources. Actual quantity reaching the
consumers is even lower due to high Unaccounted Water Flow (UWF) per day. Thus, there is huge scarcity of
water and the water supply system in the town requires augmentation schemes on urgent basis.

Other Sources
In addition to the main sources, a significant volume of ground water is also extracted through hand pumps
and wells installed at various locations, which help in meeting the demand of the weaker sections of the
society.

Water Distribution Arrangements


The present water distribution system includes water pipelines system which is not sufficient. The water
distribution arrangement includes - 2 OHTs in town but are not working properly. The town gets majority of
water supply through the network of pipelines laid down in different part of the town.
There are total 384 residential water connections in town. The monthly charge for residential connection is
Rs. 45/- . Water during summer seasons or in emergencies and other occasions/functions are also supplied
through Water Tankers. Presently there are 2 Water Tankers with Nagar Parishad.
Table 6.2.2: Silent Feature of Water Supply System in Govindgarh

Description
Sources of Water Supply
No. of Tube Wells
Water Treatment Plant
-Description regarding Storage
2 OHT
Description regarding Connections
Residential
Commercial
Total Connections
No. of Hand pumps

Details
Tube Wells and Hand Pumps
5 Nos.
Capacity in Lakh Litres
-Capacity in Lakh Litres
4.06 LL, 1.78 LL (Ward 10)
Nos. of Connections
384
Nil
384
78

Source: Govindgarh Nagar Parishad (GNP)

Internal Distribution Network


As far as the internal distribution network for water
supply is concerned, the water pipelines has been
laid down in ward no. 1, 2, 4, 5, 6, 7, 8, 9, 10, 11 and
12 but mainly along the sides of the major roads. .
There is no water supply through pipelines in the
inner areas.
Figure 6-1: Water Supply Distribution Arrangements

DMG Consulting Pvt. Ltd., Noida

Page 53

City Development Plan, Govindgarh, M.P.


The water distribution network for Govindgarh provides a total of 384 water connections with 1 hour of
supply per day. As ward No. 13, 14 and 15 are across the river in the south, they do not have piped water
supply system. Hand pumps and own wells & tube wells are the major sources of water in these wards.
As per the Census 2001, out of total 1697 households, more than 50% of households have wells as the source
of water supply followed by almost 40 % through hand pump. Out of the above, 2 % houses have tube wells
for domestic water consumption, 31 % houses have water source within their premises, 33 % have near their
premises and for the rest source of water is away from house.
1%
0%

4% 1%

Tap

0%

Handpump
Tubewell

40%

Well
Tank, Pond, Lake

52%

River, Canal
Spring
Any other

2%

Figure 6.1: Distribution of houses by sources of water

31%

36%

Within Premises
Near Premises
Away

33%

Figure 6.2: Distribution of houses by location of tapped water

This shows that half of the total households in town are dependent on other means/sources of water supply
such hand pumps, own tube wells and wells etc.

Water Treatment Facilities


At present, the town does not have the facility of water treatment plant. The quality of water is fairly good
and direct water supply is also done through tube wells in the town. Chlorination is done in the water supply
with the chlorinator once in two weeks.

DMG Consulting Pvt. Ltd., Noida

Page 54

City Development Plan, Govindgarh, M.P.

Map 6.1: Water Supply Lines - Govindgarh

Present and Future Demand and Supply Gaps


As per the provisional figures of census 2011, Govindgarh Nagar Parishad had a total population of 10535.
According to the existing system a large percentage of population is dependent on hand pumps, wells and
other sources for day to day need of water. As per the projected population the water demand has been
estimated till 2035.
Table 6.2.3: Projected Future demand Water Supply

S. No.

Years

Population

Present
(MLD)

1
2
3
4
5
6
7
8
9

2011 (Base Year)


2012
2013
2014
2015
2020
2025
2030
2035

10535
10659
10785
10912
11041
11691
12380
13110
13883

0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41

Supply Supply (@ LPCD)


135
135
135
135
135
135
135
135
135

Water
(MLD)

Required

1.42
1.44
1.46
1.47
1.49
1.58
1.67
1.77
1.87

Source: Population Projection & DMG Assessment as per UDPFI Guidelines

DMG Consulting Pvt. Ltd., Noida

Page 55

City Development Plan, Govindgarh, M.P.


Table 6.2.4: Present and Future Requirement/Demand and Gap Assessment Water Supply

Sr.
No.

Years

Population

Fire
Demand
(1%) (MLD)

Industrial
Demand
(3%)

Considering
Losses (5%)

Total
Demand
(MLD)

Supply
Gaps (MLD)

1
2
3
4
5
6
7
8
9

2011
2012
2013
2014
2015
2020
2025
2030
2035

10535
10659
10785
10912
11041
11691
12380
13110
13883

0.014
0.014
0.015
0.015
0.015
0.016
0.017
0.018
0.019

0.043
0.043
0.044
0.044
0.045
0.047
0.050
0.053
0.056

0.071
0.072
0.073
0.074
0.075
0.079
0.084
0.088
0.094

1.55
1.57
1.59
1.61
1.62
1.72
1.82
1.93
2.04

-1.14
-1.16
-1.18
-1.20
-1.21
-1.31
-1.41
-1.52
-1.63

Source: Population Projection & DMG Assessment as per UDPFI Guidelines


Note: The demand of water for fire fighting, industries and losses has been assessed by taking %of water required,
calculated in table 6.3

Comparative Analysis with UDPFI, CPHEEO Guidelines


Presently under the existing water supply system, the per capita supply of 37.2 litres per day is estimated for
town which is very low as compared to the prevalent national standards of 135 lpcd (UDPFI Guidelines).
These figures however, represent only the production from all sources. Actual quantity reaching the
consumers is even lower as 27.9 lpcd due to high Unaccounted Water Flow (UWF) of 15,000 litres per day.
Thus, the water supply system in the town requires augmentation schemes on urgent basis.
Table 6.2.5: Performance Indicators Water Supply

S.
No.

Indicators

Unit

Current
Status

Normative
Standard

Daily per capita supply

Litres

27.9

135

Storage capacity with respect to current supply

Percent

40.00

100

Storage capacity with respect to proposed supply Percent


for the next fifteen year period.

0.00

100

Available treatment capacity with respect to supply

Percent

0.00

100

Assessment covered by service connections

Percent

36.24

85

Proportion of non domestic service connection

Percent

>5

Source: Computed based on the data collected from Govindgarh Nagar Parishad

SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.

DMG Consulting Pvt. Ltd., Noida

Page 56

City Development Plan, Govindgarh, M.P.


STRENGTH

WEAKNESS

Good quality of water is available from all the The water distribution system is very old and has
leakage problem due to which pressure remains
sources
low
Surface water (Raja Talab and Rani Talab) is

About 15,000 litres of water remains unaccounted


available throughout the year to fulfil the water
indicating distribution loss of 25% of the total
supply needed by town
supply
Ground water level is good and the average

The distribution system has limited coverage.


annual rainfall is also good.
Pipelines are mainly laid along the major roads,
there are no distribution lines in internal areas
Both the OHTs are not functional due to leakage
problem
Lack of technical/ skilled man power to handle the
system
Detailed layout plans and drawings of water
supply distribution lines are not available, making
future planning difficult
Present per capita supply is 27.9 lpcd, which is
very less as compared to the standard of 135 lpcd
as per UDPFI Guidelines
Inadequate water supply connections at
household level, only 384 household have tapped
water supply.
OPPORTUNITY

THREAT

Water revenue demand can be enhanced There are several drains/ storm water drains out
falling in the Raja Talab and Rani Talab.
through drive of new house connection, and
discourage limited stand post installation.
Surface water is available throughout the year
Two over head tanks are present which can be
repaired, thereby increasing the storage capacity
Supply of water 24 hours a day and better
services with revised tariff will be acceptable to
the people
Rain water harvesting can be introduced.

Issues

The water distribution system is very old and has leakage problem due to which pressure remains
low
Both the existing OHTs are not functional due to leakage problem
About 15,000 litres of water remains unaccounted leading to distribution loss of 25% of the total
supply
There is lack of technical/ skilled man power to handle the system
The distribution system has limited coverage. As the pipelines are mainly laid along the major roads,
is a major constraint in distributing water to the end user in internal areas
There is a large scale demand and supply gap, which is likely to increase drastically in future with
respect to increase in population if no measures are taken to augment the water supply system
DMG Consulting Pvt. Ltd., Noida

Page 57

City Development Plan, Govindgarh, M.P.

Per capita supply is low (27.9 lpcd) against the standard norm of 135 lpcd
Though the tapped water facility has coverage of about 48% in the town, t out of total households,
only 33.2% houses have tapped water facility within premises. This indicates that majority of
households draw water from community stand post, hand pumps, wells and other means
The tariff collection efficiency of water charges is low.

City Specific Strategies and Action Plan


Goals and Service Outcomes
Considering the above issues and challenges, the following goals for different horizon years have been
identified in the following table. The water supply coverage and access to piped water supply in Govindgarh
Nagar Parishad needs to be enhanced to 100% by the year 2035. The per capita water supply should be
maintained as per the norm of 135 lpcd at an acceptable level by increasing hours of supply to 4-6 hours a
day by 2015, 8-10 hours daily by 2025 and subsequently achieve 24 hours water supply/day by 2035
promoting together the water storage facility at household level. There is an urgent need to lower the nonrevenue to 25% by the year 2015, 15% by 2025 and 10% by 2035 by implementing 100% consumer metering
system by 2015 and achieve 100% O & M cost recovery by the year 2035.
Table 6.2.6: Goals & Services Outcomes for different Horizon Years

S. No.

Components

1
2
3
4

Network Coverage to Households


Per Capita Supply as per norms (135 lpcd)
24/7 Water Supply
Quality of Water

5
6
7
8
9

Non Revenue Water


Consumer Metering
Cost Recovery
Roof Water Harvesting
Private Sector Participation

Horizon Period
2015
40%
135
40%
As per WHO
Standards
25%
80%
100%
40%
10%

2025
100%
135
100%
As per WHO
Standards
15%
100%
100%
80%
70%

2035
100%
135
100%
As per WHO
Standards
5%
100%
100%
100%
100%

Strategies and Action Plan

Raja Talab could be the source of water in Govindgarh town after its water treatment
It is proposed to prepare a fresh Detailed Project Report (DPR) for the development of Water Supply
System in Govindgarh Nagar Parishad
Water treatment plant as per the future demand based on projected population
Leakage detection studies; repair, replacement or rehabilitation of old/defunct system including 2
OHTs should be undertaken to enhance the present water distribution system
Extension of water pipelines to un-serviced/ internal areas, thereby ensuring 100% water supply
network coverage
Implementation of 100% consumer metering system via monitoring and disconnection of illegal
water connections
Awareness programme for judicious use of water; recycling and recharging to prevalent water loss,
thereby encouraging Rain water harvesting at household level
Tariff planning to make water supply a self sustaining project
DMG Consulting Pvt. Ltd., Noida

Page 58

City Development Plan, Govindgarh, M.P.

Use of recycled water for meeting agricultural and cooling demands


Widespread investments in the water supply sector without sufficient attention to human resource
development results in poor sustainability of system. Recognizing the urgent need for capacity
building at different levels in water supply sector, GNP should propose to develop human resources
in their organization
Detailed operation and maintenance programme.

Figure 6-2: Concept of Rain Water Harvesting

Best Practices
1

Macau Water Supply Concession, China

Macau Water Supply Concession (MWSC)


Background:
Macau, China has a total area of just under 21 square kilometres, which includes the Macau peninsular and
the islands of Taipa and Coloane. It is situated on the western edge of the delta formed by the Pearl River
Delta (Zhu Jiang) and the West River (Xi Jiang).
By the early 1980s, Macau, Chinas water supply had deteriorated to the extent that:
Unaccounted-for-water was at high levels and the water utility was operating at a loss.
Water quality was extremely poor with high salinity and turbidity. This was due to the poor quality of the raw
water drawn from the eastern tributary of the Pearl River, a treatment plant working at overload capacity and
DMG Consulting Pvt. Ltd., Noida

Page 59

City Development Plan, Govindgarh, M.P.


a lack of scientific management and technology.
In 1982, Water supply in Macau, China has had Private Sector Participation. A private company took over the
operations of the Macau Water Supply Company, commonly known as Sociedad de Abastecimento de Aguas
de Macau (SAAM), in 1982. It initiated to work as replacing meters to increase income. The company also put
in place to improve utilitys management and financial systems. The basic idea behind the replacement of
water meters was to reduce the unaccounted-for-water from 40.3 percent in 1982 to 24.5 percent in 1984.
Key Activities Undertaken:
In addition to securing a new source of raw water, the concessionaire has undertaken an on-going program of
investments. These include:
Upgrading and extending water treatment plants.
Replacement of major pipelines.
Reservoir construction and post-chlorination stations.
Leakage detection activities and related investments.
Introduction of a computerized Supervisory Control and Data Acquisition (SCADA) system.
Introduction of an automated water production control system.
On-going upgrading or replacement of meters.
Out Comes:
Within three years of signing the concession contract, Macau, Chinas water quality was brought up to the
European Union standard.
Macau, China citizens now receive consistently good quality potable water at a pressure and output that
meets all customers needs 24 hours. Designed water treatment capacity now exceeds maximum daily
demand by over 20 percent.
Unaccounted-for-water from leakages has also declined. The program of meter installation and repair
instigated by New World prior to the concession led to a dramatic reduction in unaccounted-for-water from
40.3 percent in 1982 to 20.2 percent when the concession commenced in 1985.
Lesson Learned:
Public private partnership now playing a key role in the success of many infrastructural projects.
There is a positive two-way interaction or relationship between water supply improvements and economic
growth. A good quality water supply encourages, or at least facilitates growth in economic activity.
The existence of a new high quality and abundant source of raw water helped contribute to Macau, Chinas
water supply achievements.

Public Private Partnership in water supply in Tirupur, Tamil Nadu

Public Private Partnership in water supply in Tirupur, Tamil Nadu (India)


The Context:
State Government has implemented the project on a commercial format on Public Private Partnership basis
along with IL&FS. AnMoU was signed between GoTN, IL&FS and Tirupur Exporters Association (TEA) in
DMG Consulting Pvt. Ltd., Noida

Page 60

City Development Plan, Govindgarh, M.P.


August 1994, for formulation and development of the project and its implementation.
The project was the first integrated water supply proposed to be undertaken in India in the water sector on
PPP basis.
The scope of the project (the Project) covers the water and wastewater treatment components. The
project also includes provision of low cost sanitation facilities at 100 slums in Tirupur
Shortage of water supply and inadequate infrastructure for collection, treatment and disposal of industrial /
domestic wastewater were the major bottlenecks for the growth of the industries.
Achievements:
Formation of the NTADCL (New Tirupur Area Development Corporation Ltd.) upfront in the process served
as the platform for information exchange, resolution of conflicts and facilitated decision-making in a
transparent manner.
Innovative Insurance Application for Risk Mitigation
Improved Water Supply to Industries and Households
It is estimated that the project would also create employment for about 2 lakh people
Lesson Learned:
PPP has now playing a major role in infrastructural development projects.
A successful implementation of project needs an Innovative Financial Structuring & Insurance Application for
Risk Mitigation.
Note: Govindgarh can learn lessons from Khandwa and Dewas water supply PPP projects under
implementation. The Govindgarhs problem of quality of network can be a point of caution and other lessons
are documented and available with UADD Government of M.P.

Low Cost Water Treatment Plant


Water to be supplied for public use must be potable i.e., satisfactory for drinking purposes from the
standpoint of its chemical, physical and biological characteristics. Drinking water should, preferably, be
obtained from a source free from pollution. The raw water normally available from surface water sources is,
however, not directly suitable for drinking purposes. The objective of water treatment is to produce safe and
potable drinking water. Some of the common treatment processes used in the past include; Plain
sedimentation, Slow Sand filtration, Rapid Sand filtration with Coagulation-flocculation units as essential pretreatment units.

Rapid Sand Filtration


The rapid sand filter or rapid gravity filter is a type of filter used in water purification and is commonly used in
municipal drinking water facilities as part of a multiple-stage treatment system. Rapid sand filters were
widely used in small and large municipal water systems, because they required smaller land areas compared
to slow sand filters.
Rapid sand filters use relatively coarse sand and other granular media to remove particles and impurities that
have been trapped in a floc through the use of flocculation chemicals--typically salts of aluminium or iron.
Water and flocs flows through the filter medium under gravity or under pumped pressure and the flocculated
material are trapped in the sand matrix.

DMG Consulting Pvt. Ltd., Noida

Page 61

City Development Plan, Govindgarh, M.P.


Mixing, flocculation and sedimentation processes are typical treatment stages that precede filtration.
Chemical additives, such as coagulants, are often used in conjunction with the filtration system.
A disinfection system (typically using chlorine or ozone) is commonly used following filtration. Rapid sand
filtration has very little effect on taste and smell and dissolved impurities of drinking water, unless activated
carbon is included in the filter medium.

Figure 6.4: Typical rapid sand filter water treatment with components

Figure 6.4: Typical rapid sand filter water treatment with components

Project Identification & Costing


With a vision to provide adequate amount of treated water to the projected population of 2035, the
following projects are identified to achieve the goal in the sector:

DMG Consulting Pvt. Ltd., Noida

Page 62

City Development Plan, Govindgarh, M.P.


Table 6.2.7 Proposed work, Project cost and Implementing Agencies for Water Supply

Code No.

Projects proposed

Project Cost Department


(in Lakh)
WS 1
Preparation of DPR for Water Supply System for the
UADD, Govt. of M.P.
5.00
entire town.
and GNP
WS 2
Rehabilitation/ replacement of present pipe line
Govt. of M.P.
30.00
system (2 km) 150 dia (cost @ Rs1471)
WS 3
Extension of present distribution line to cover the
Govt. of M.P.
51.50
whole of the city (3.5 km) 150 dia (cost @ Rs1471)
WS 4
Construction of 2 OHT each of capacity 4 MLD by 2013
Govt. of M.P.
300.00
and 2015 years
WS 5
Construction of Filtration Plant/ Water Treatment
Govt. of M.P.
235.00
Plant of capacity 4 MLD in ward no. 15
WS 6
Construction of intake well, pump house with electrical
Govt. of M.P.
250.00
pumping machinery
WS 7
Construction of treatment plant i.e. electrical,
Govt. of M.P.
50.00
mechanical equipments
WS 8
Laying of 450 mm dia Pumping mains intake to
Govt. of M.P.
30.00
treatment plant
WS 9
Laying of 250 mm Pumping main from rest house to
Govt. of M.P.
15.00
OHT
WS 10
Water Meter Connection in all Dwelling Units 2135 by
Govindgarh Nagar
30.00
2035 (@ Rs. 150/connection)
Parishad
WS 11
Training and Capacity Building of Staff
Govindgarh Nagar
5.00
Parishad
Sub Total Cost (A)
1001.50
* PWD (SOR) April 2011

6.2.2

Sewerage and Sanitation

Existing Sewerage System


Sewerage and sanitation has become a yardstick of socio-cultural development of the nation. Improved
sanitation results in improvement of health, reduced child mortality/ morbidity, improved water quality,
environment and economic growth of any city/town.
Presently the town does not have underground sewerage system to serve a population of 10535 residing in
15 wards. The sewage from households and other commercial establishments flows along with storm water
in common open drains, which is mainly governed by the topography and direction of slope in town.

Means of Sewage Disposal


Sewerage and sanitation condition in the town is poor. The sewage disposal system in the town mainly
consists of individual disposal system that includes water closet, soak pits or pit type latrines and open
drains. Some residents also go for open defecation as they do not have any proper in-house sewage disposal
facility. Residents in old areas use dry-type latrines. New developments have individual septic tanks for
sewage disposal. The pour flush latrines and toilets blocks are usually connected to a septic tank and then
connected to drains or nallah.
DMG Consulting Pvt. Ltd., Noida

Page 63

City Development Plan, Govindgarh, M.P.


Therefore, the current practice indicates that the sewage flows through open channel, nallah in town and
disposes into the Talab. This is a cause of concern as there is a possibility of contamination of underground,
well and Talab water.

Household Toilets (Dry Latrines and Flush Latrines)


Sanitation condition in the town is poor. As per the city sanitation survey conducted in 2008, only 30.79 %
households have water closet latrines connected to septic tank, 30.15 % pit toilet and 39.07 % have other
toilet facility. Majority of households do not have toilet facility within their premises.
Distribution of Houses as per toilet Facility

15.33%
30.79%

Toilet within
house
84.67%

Other latrine

39.07%

Pit latrine
30.15%

No Toilet

Water closet

Figure 6.5: Facility and Types of Latrines

Public Toilets
The Govindgarh Nagar Parishad is responsible for the provision of public toilets in town. But in Govindgarh
there is very little effort from the civic body in providing public toilets and public urinals. As on today there
are only 2 public toilets in ward number 10 and 12 which are functioning but not in good condition. Public
toilets are very much required in the town.
As per the city sanitation survey conducted in 2008, mostly people (about 81% of households) demand for
individual toilets but only about 20% of households are willing to pay for development and operation and
41% for maintenance of toilet and urinal services.

Present and Future Demand and Supply Gaps


On the basis of projected population for 2035 and taking 80% of water supply to come back as sewage, the
present and future demand and supply gaps for various components of Sewerage and Sanitation Sector has
been worked out for Govindgarh town in the table given below.
Table 6.2.8: Present and Future Demand and Supply Gaps Sewerage System

COMPONENTS

YEARS

Sewage Generation (in MLD)

2011

2012

2013

2014

2015

2020

2025

2030

2035

Total Water Demand

1.55

1.57

1.59

1.61

1.62

1.72

1.82

1.93

2.04

Govindgarh Sewage Generation

1.24

1.25

1.27

1.28

1.30

1.38

1.46

1.54

1.63

Existing Sewage Collection

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Gaps

1.24

1.25

1.27

1.28

1.30

1.38

1.46

1.54

1.63

STP capacity (in MLD)

2011

2012

2013

2014

2015

2020

2025

2030

2035

Govindgarh Sewage Generation

1.24

1.25

1.27

1.28

1.30

1.38

1.46

1.54

1.63

DMG Consulting Pvt. Ltd., Noida

Page 64

City Development Plan, Govindgarh, M.P.


Existing Capacity of Treatment 0.0
Plant

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Capacity
Demand

Plant 1.24

1.25

1.27

1.28

1.30

1.38

1.46

1.54

1.63

Gaps

1.24

1.25

1.27

1.28

1.30

1.38

1.46

1.54

1.63

Sewer Connection (in Nos.)

2011

2012

2013

2014

2015

2020

2025

2030

2035

Existing Connections

Demand for Sewer Connections

2107

2132

2157

2182

2208

2338

2476

2622

2777

Gap

2107

2132

2157

2182

2208

2338

2476

2622

2777

Sewer Network (in Kms.)

2011

2012

2013

2014

2015

2020

2025

2030

2035

Road Length Demand

15.80 15.99 16.18 16.37 16.56 17.54 18.57 19.67 20.82

Existing Sewerage Network

0.0

Sewerage Network Demand

15.80 15.99 16.18 16.37 16.56 17.54 18.57 19.67 20.82

Gap

15.80 15.99 16.18 16.37 16.56 17.54 18.57 19.67 20.82

of

Treatment

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Source: Population Projection & DMG Assessment as per UDPFI Guidelines

As there is complete absence of underground Sewerage Network, the sewage flows through open drains
which ultimately flow into the existing water bodies i.e. Raja Talab & Rani Talab. There is no form of
treatment before or after disposal. Only 25 % percent of households commonly use septic tanks or pits for
sewage disposal while the rest do not have in-house toilet facilities. They either use public toilet or go for
open defecation in town. Thus, the town requires immediate action regarding provision of sewerage and
sanitation facility (Low Cost Sanitation Projects) with 100% network coverage.

Comparative Analysis with the UDPFI, CPHEEO Guidelines


As per CPHEEO manual and UDPFI guidelines wastewater generation of 80% of the water supply rate i.e. 108
lpcd has been adopted.
UDPFI guidelines suggest small and medium towns may be encouraged for adopting low cost sanitation
technologies with technical assistance from urban local bodies and involvement of NGOs in actual
implementation of such programmes. Low cost sanitation projects can be encouraged in Govindgarh as there
is no underground sewerage network and majority of households do not have in-house toilet facility. In this
context, provision for sewerage network and low cost sanitation has been made in the City Investment Plan.
Table 6.2.9: Performance Indicators Sewerage System

S. No.
1
2
3
4
5
6
7
8
9

Performance Indicator
Coverage of Toilets
Coverage of Sewerage Network
Collection Efficiency of Sewerage Network
Adequacy of Sewerage Treatment Capacity
Quality of Sewage Treatment
Extent of Reuse and Recycling of Sewage
Extent of Cost Recovery in Wastewater Management
Efficiency in redressal of Customer Complaints
Efficiency in Collection of Sewage Water Charges

Benchmark
100%
100%
100%
100%
100%
20%
100%
80%
90%

Status
15.33%
0%
0%
0%
0%
0%
0%
0%
0%

Source: DMG Assessment as per UDPFI Guidelines

DMG Consulting Pvt. Ltd., Noida

Page 65

City Development Plan, Govindgarh, M.P.


SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
Town has good natural slope
Land availability for sewerage treatment plant

WEAKNESS
There is no underground sewerage system for the
town
There is no treatment plant for treating the
sewage generated
Limited number of public toilets. There is need of
around 15 public toilet
The income prohibits urban poor to make capital
expenditure on development of toilet units and
their maintenance.

OPPORTUNITY
There are substantial number of urban poor who
have land and houses without toilets
There is scope for development of low cost
sanitation projects
New sewerage schemes to increase the
sewerage coverage to 100 %.
New sewerage system is to be developed,
Opportunity to select latest modern
technology for treatment.

THREAT
Sewage flows through open drains, channels &
nalas in town and disposes into the talabs/nalahs
causing underground and surface water
contamination, the major sources of water supply
Environment and health of sanitary workers is at
risk.
Danger of ground water pollution.
Risk of spreading epidemic.

Issues

All the grey matter of the sewerage is disposed off in the Nalah which flows into Raja Talab and
contaminates the water of the lake.
There is absence of hygienic and safe method of sewerage disposal system i.e. underground
Sewerage Disposal System in the town
The pour flush latrines and toilet blocks are usually connected to a septic tank and then connected to
drains, channels or nallas ultimately falling into the Talab causing contamination of the main sources
of water supply
There is no form of treatment before or after disposal
Town lacks public conveniences/ sanitation facilities such as - community or public toilet which are
limited in number
The service level cost recovery is going to be the major challenge for GNP as most of the households
are not willing to pay for development and maintenance of facilities
Widespread practice of open defecation as about 84% of households does not have in-house toilet
facility.

DMG Consulting Pvt. Ltd., Noida

Page 66

City Development Plan, Govindgarh, M.P.


City Specific Strategies and Action Plans
Goals and Service Outcomes
Considering the above issues and challenges, the following goals for different horizon years have been
identified in the following table. The sewerage system in town needs to develop with 60% sewer network
coverage to households by the year 2015 and 100% by 2025. By the year 2015, 80% waste water should be
treated followed by 100% by 2025. In addition to that, 60-70% O & M cost recovery will be achieved by the
year 2015 followed by 80-90% by 2025 and 100% by the year 2035.
Table 6.2.10: Goals & Services Outcomes for different Horizon Years

S. No.

Components

Horizon Period
2015

2025

2035

to 60%

100%

100%

Disposal 80%

100%

100%

80%

100%

Sewer
Network
Households

Coverage

Sewage Treatment
Arrangement

and

Sewage Recycling and Reuse

60%

Cost Recovery (as a % of O & M)

As per WHO As per WHO As per WHO


Standards
Standards
Standards

Safe Sanitation Facility (With Focus on 80%


Urban Poor)

100%

100%

Strategies and Action Plan


Considering the current issues, challenges and identified goals, a robust strategy for sewerage is adopted to
achieve 100% sewerage system. The following is the brief outline of the projects which have to be taken up:
1. Low Cost Sanitation Projects:
Exploring the USAB Technology which requires less land and O&M Costs are minimal
Government intervention should be emphasized in providing toilet facilities in urban poor
areas by developing community toilet blocks
Sulabh Complex or public toilets near market places, bus stands and other such public areas
Community participation should be encouraged for design, construction and maintenance of
public toilets
Cost recovery through collection of well defined user charges.
2. Intercept all drains that flow in-to the Talab; including the water front development & plantation
on flood zone. (both sides of the Nala)
3. Comprehensive Sewerage Master Plan:
To meet the current gap and future requirements for Govindgarh town, it is proposed to carry
out detailed studies and prepare a comprehensive Sewerage Master Plan including network
lines and STP.
4. Sewerage Quality Studies and Monitoring:
DMG Consulting Pvt. Ltd., Noida

Page 67

City Development Plan, Govindgarh, M.P.

The sewerage quality analysis needs to be undertaken. It is proposed to purchase latest


equipments to establish laboratories for analysis of chemical and heavy metals.

5. Human Resource Development:


Widespread investment in the sewerage sector without sufficient attention to human resource
development results in poor sustainability of system. Recognizing the urgent need for capacity
building at different levels in sewerage sector, it is proposed to develop human resource in
their organization.

Project Identification & Costing


Presently there is no sewage disposal system in the city. The in-house sanitation is about 30% for the city and
is limited to many users. Therefore efforts should be made to have 100 percent coverage on the sewerage
sector to minimize the sanitation problem of the city. In this regard, the following projects have been
identified:
Table 6.2.11 Proposed Project, Project Cost and Implementing Agencies for Sewerage and Sanitation

Code
No.

Projects proposed

Project Cost
(in Lakh)

Department

SS 1

Preparation of DPR/Comprehensive Master Plan for


underground Sewerage System for entire town

5.00

UADD, Govt. of
M.P. and GNP

SS 2

Construction of DEWATS in each wards Rs 2000 per sq m


of land underwet land. Each plant need around 500 sp. m

150.00

Govt. of M.P

SS 3

Construction of treatment plant support electrical,


mechanical equipments

150.00

Govt. of M.P

SS 4

Construction of eco-toilets in slum areas and public place.


(Rs 15000 per toilet)

171.00

Nagar Parishad

SS 5

Construction of 20 public urinals (@ Rs5000)

3.00

Nagar Parishad

SS 6

Construction of individual
subsidies for 1300 units)

52.00

ULB's, Govt. of
M.P.

toilet (Support in terms f

Sub Total Cost (B)

531.00

* PWD (SOR) April 2011

DMG Consulting Pvt. Ltd., Noida

Page 68

City Development Plan, Govindgarh, M.P.


Best Practices
Box:6.2.1: Slum Sanitation in Pune

Background:
Pune city, the educational and cultural capital of the State of
Maharashtra has a population of 28 lakhs, of whom about 40% live
in slums. There are 503 slum pockets, out of which only 348 are
notified slums in the city. Pune Municipal Corporation has
Conservancy Department the duty of which is to clean and
maintain toilet blocks in the city. But, as in other cities, the
municipal staffs are not performing their duties including
construction and maintenance of toilets and city sanitation. Since
the local community does not have any control over the sanitation
staff, the latter do not respond to their concerns.
Since 1992, only 22 pay and use toilet blocks had been built in the
city. In 1992, Municipal Commissioner himself took initiatives and a massive programme of building toilets
in slums through community participation by giving contracts to non-governmental organizations (NGOs)
was started. There were 8 NGOs which were selected to carry out the first phase of the programme. First
priority was given to those settlements with a minimum population of 500 but had no toilet facilities.
Key Components of the Project:
Construction: The Slum Sanitation Program was implemented in phased manner which are as follows;
Phase-1 (1999-2000): In the first phase, it was decided to construct 220 toilet blocks with about 3500 toilet
seats through NGOs. The expenditure incurred on the first phase was Rs.22.5 crores.
Phase-11 (2000 -2001): On completion of the second phase (planned for another 220 blocks between),
more than 400 blocks or more than 10,000 toilet seats was supposed to be constructed at a cost of more
than Rs.40 crores and benefiting more than 5 lakh slum dwellers.
Maintenance: In the bid itself, a guarantee was also to be given that the NGOs and the community would
maintain the toilet block for 30 years by collecting contributions from the community. The programme
envisaged the collection of Rs.20 per family per month to fund the appointment of a caretaker and for
cleaning materials. The caretaker is to be accountable to the community and is supervised by them.
Implementation: During construction, the Municipal Commissioner was himself holding a weekly meeting
to monitor the progress of the work with the highest priority and, as a result, people worked day and night
to complete the programme in a few months.
Lesson Learned: Slum dwellers are not expected to pay anything at all when they use the toilets, they are
expected to pay a general tax for the facilities they are given. However, even if public sanitation is free, it is
not of much use because it is hardly functional.
The relationship between the Corporation, NGOs and communities has been reconfigured. NGOs and
communities are not cast in the roles of clients or supplicants but rather are treated as partners by the
Corporation.
When grassroots democracy is in place, the accountability of institutions is ensured.

Low Cost Waste Water Treatment Options


Municipal wastewater refers to wastewater that is discarded from households. Also referred to as sanitary
sewage, such water contains a wide variety of dissolved and suspended impurities. It amounts to a very small
fraction of the wastewater by weight. But, it is large by volume and contains impurities such as organic
materials and plant nutrients that tend to rot. The main organic materials are food and vegetable waste,
human waste, plant nutrient, organic waste from soaps, washing powders, etc.

DMG Consulting Pvt. Ltd., Noida

Page 69

City Development Plan, Govindgarh, M.P.


To treat and reuse the waste water has become imperative in the current scenario of scarcity of water in
coming future due to increase in demand with development and decreasing ground water recharge due to
reclaiming of the pond and low lying areas of the town.
Conventional sewage treatment may involve three stages, called primary, secondary and tertiary treatment.
Primary treatment consists of temporarily holding the sewage in a basin where heavy solids can settle to the
bottom while oil, grease and lighter solids float to the surface. The settled and floating materials are removed
and the remaining liquid may be discharged or subjected to secondary treatment.
Secondary treatment removes dissolved and suspended biological matter. Secondary treatment is typically
performed by indigenous, water-borne micro-organisms in a managed habitat. Secondary treatment may
require a separation process to remove the micro-organisms from the treated water prior to discharge or
tertiary treatment.
Tertiary treatment is sometimes defined as anything more than primary and secondary treatment. Treated
water is sometimes disinfected chemically or physically prior to discharge into a stream, river, bay or
wetland, or it can be used for the irrigation of street side vegetation, a golf course, green way or park. If it is
sufficiently clean, it can also be used for groundwater recharge or agricultural purposes.
Root Zone Treatment System
Root Zone Systems are artificially prepared wetlands comprising of clay or plastic lined excavation and
emergent vegetation growing on gravel/sand mixtures and is also known as constructed wetland. This
method combines mechanical filtration, chemical precipitation and biological degradation in one step for the
treatment of wastewater. A number of factors like low operating cost, less energy requirement and ease of
maintenance attribute to making root zone system an attractive alternative for wastewater management.
The Process:
The process in a root zone system to treat the sewage begins with passing the raw effluent (after removing
grit or floating material) horizontally or vertically through a bed of soil having impervious bottom. The
effluent percolates through the bed that has all the roots of the wetland plants spread very thickly, nearly
2,500 types of bacteria and 10,000 types of Fungi, which harbour around roots, get oxygen from the weak
membranes of the roots and aerobically oxidize the organic matter of the effluent. The characteristics of
plants of absorbing oxygen through their leaves and passing it down to roots through their stems which are
hollow, is utilized as a bio-pump. Away from the roots, anaerobic digestion also takes place. The filtering
action of the soil bed, the action with fungi etc. and chemical action with certain existing or added inorganic
chemicals help in finally obtaining very clear and clean water. The system of plants regenerates itself as the
old plants die and form useful humus. Hence, the system becomes maintenance free and can run up to 50 to
60 years without any loss of efficiency.

DMG Consulting Pvt. Ltd., Noida

Page 70

City Development Plan, Govindgarh, M.P.

Advantages:

With no use of machinery and associated maintenance, the root zone system provides for low
maintenance cost and negligible attendance for operation and monitoring
It enhances the landscape and gives the site a green appeal
It provides natural habitat for birds and after a few years gives an appearance of a Bird sanctuary.
It is a green zone, it does not have mosquito problem
Salinity may not be a problem for a survival or operations of reed beds
It is recommended to combine vertical flow and then horizontal flow of sewage with a soil having
impervious bottom
In the horizontal flow system, the sewage percolates through bed and that has all roots of the
wetland plants spread very thickly nearly with 2500 types of bacteria and 10,000 types of fungi and
aerobically oxidized organic matter of the effluent
Root zone system gives a very good performance of removing 90% BOD and 63% Nitrogen.

The Root Zone Treatment system (RZTS) also known as the reed bed system or constructed wetland system is
a sealed filter bed consisting of a sand / gravel/ soil system, occasionally with a cohesive element, planted
with vegetation that can grow in wetlands. After removal of coarse and floating material, the wastewater
passes through the filter bed where biodegradation of the wastewater takes place. The functional
mechanisms in the soil matrix that are responsible for the mineralization of biodegradable matter are
characterized by complex physical, chemical and biological processes, which result from the combined effects
of the filter bed material, wetland plants, micro-organisms and wastewater.
The treatment processes are based essentially on the activity of microorganisms present in the soil. The
oxygen for microbial mineralization of organic substances is supplied through the roots of the plants,
atmospheric diffusion and in case of intermittent wastewater feeding, through suction into soil by the outflowing wastewater. RZTS contain aerobic, anoxic and anaerobic zones. This causes the presence of a large
number of different strains of microorganisms and consequently a large variety of biochemical pathways are
formed. This explains the high efficiency of biodegradation of substances that are difficult to treat.
Conversion of nitrogen compounds (nitrification / De-nitrification) occurs due to planned flow of wastewater
through anaerobic and aerobic zones. Reduction of phosphorous depends on the availability of acceptors
like iron compounds and the redox potential in the soil. The filtration by percolation through the bed
DMG Consulting Pvt. Ltd., Noida

Page 71

City Development Plan, Govindgarh, M.P.


material is the reason for the very efficient reduction of pathogens, depending on the size of grain of the bed
material and thickness of filter, making the treated effluent suitable for reuse. It should be noted that no
other treatment system, without the use of additional chemicals or physical processes, can ensure the
extensive elimination of pathogenic germs.
Root Zone Treatment systems have the following salient features:

Require simple construction methods


No machinery (pumps, aerators, etc.) and no inputs of energy or chemicals are required for the
treatment process
In the root zone treatment process no sludge is generated, therefore the sludge handling and
disposal problem is restricted only to primary sludge-this is a unique and remarkable feature of
RZTSs
Can accommodate significant variations in hydraulic and pollution loads without significant loss of
efficiency
Can handle a large variety of pollutants
Does not require skilled personnel for operation maintenance
Low operation and maintenance costs; typically in root zone systems; these are less than 1% of the
cost of the system per year
Can be built to suit both decentralized and centralized sewage treatment systems; in decentralized
situations considerable drainage costs may be saved
Can be easily and cost-effectively expanded to accommodate increased loads
High efficiency in removal of pathogens; no other treatment system, without the use of additional
chemicals or physical processes can ensure the extensive elimination of pathogenic germs
Allows re-cycling and safe re-use of waste water
Conversion of wastes into re-usable high quality plant biomass (reeds)
Capital costs comparable to other similar wastewater treatment systems
Long life span of systems
Large re-use of materials when system is decommissioned.

Thus root zone systems are not only eco-friendly but have low operational costs, producing high water
quality (up to bathing water standards) suitable for re-use. These features make RZT systems low-cost,
environment-friendly, and reliable in both the short and long term.

DMG Consulting Pvt. Ltd., Noida

Page 72

City Development Plan, Govindgarh, M.P.


DEWATS: Decentralized Wastewater Treatment

Figure: 6-6 Main DEWATS modules for physical and biological wastewater treatment

DEWATS stands for Decentralized Wastewater Treatment Systems and represents a technical approach
rather than merely a technology package.
DEWATS applications are designed to be low-maintenance: most important parts of the system work without
technical energy inputs and cannot be switched off intentionally.
DEWATS applications provide state-of-the-art technology at affordable prices because all of the materials
used for construction are locally available.
DEWATS applications provide treatment for both domestic and industrial sources
Systems can be designed to handle organic wastewater flows from 1-1000 m3 per day
Systems are built to be reliable, long lasting and tolerant towards fluctuations in loads
DEWATS applications do not require sophisticated maintenance
Without considering facilities for necessary chemical pre-treatment of wastewater from industries, DEWATS
applications are designed with four basic technical treatment modules which are combined and configured to
provide a custom solution for a given sanitation/wastewater challenge:

Primary treatment: sedimentation and floatation


Secondary anaerobic treatment in fixed-bed reactors: baffled upstream reactors or anaerobic filters
Tertiary aerobic treatment in sub-surface flow filters
Tertiary aerobic treatment in polishing ponds

DEWATS applications are designed and dimensioned in such a way that treated water meets requirements
stipulated in environmental laws and regulations.
Advantages of DEWATS technology:

Provides treatment for domestic and industrial wastewater


Low initial investment costs as no imported materials or components are needed
Efficient treatment for daily wastewater flows of up to 1000m3
Modular design of all components
DMG Consulting Pvt. Ltd., Noida

Page 73

City Development Plan, Govindgarh, M.P.

Tolerant towards inflow fluctuations


Reliable and long-lasting construction design
Low maintenance costs

DEWATS technology is an effective, efficient and affordable wastewater treatment solution for small and
medium sized towns. At locality level, this system is very efficient.

Figure 6-7 Use of the biogas generated from the DEWATS

Benefits of DEWATS

Establishment of multi-stakeholder networks to combat water pollution


Increases implementation capacity at various levels
Provides treatment for both, domestic and industrial wastewater at affordable price
Fulfilment of discharge standards and compliance with environmental laws
Wastewater pollution reduction by up to 90% from pre-DEWATS levels
Provides treatment for wastewater flows up to 1000 m3 / day
Reliable and long lasting applications
Tolerant towards inflow and load fluctuation
Materials/ inputs used for construction are locally available
Minimal maintenance and long de-sludging intervals
Low operation and maintenance costs
Resource efficiency and non-dependence on energy
Resource recovery through wastewater re-use and biogas generation

Existing Drainage System


Drainage is the natural or artificial removal of surface and sub-surface water from an area. At present the
town does not have a comprehensive and effective drainage system and facility of treatment plant. Along the
SH 9, 52 and other major roads of the town, drains have been constructed in all wards. The drainage
DMG Consulting Pvt. Ltd., Noida

Page 74

City Development Plan, Govindgarh, M.P.


condition survey in the town indicates that the drainage network in Govindgarh is open and unorganized.
Most of the drains do not have capacity to flow the waste water as they are damaged and remain chocked
due to presence of gray matter and disposal of solid waste in it. This leads to un-channelized flow during the
rainy season.
In ward 10 and 15, the waste water from adjoining area spills over the road and creates unhygienic
conditions. The situation is further aggravated in the town due to lack of sewerage system resulting in
sewage flow in the storm water drains which finally get discharged into the Raja Talab and in agricultural
lands.

Figure 6.8: Drainage System in Govindgarh

DMG Consulting Pvt. Ltd., Noida

Page 75

City Development Plan, Govindgarh, M.P.


At present GNP is responsible for operation and maintenance of drainage system in the town. Major portions
of these drains require de-silting and repairs.

Map 6.2: Existing and Proposed Drainage Map Govindgarh

Major Water Bodies


Raja Talab (lake) is the only major water body in the town and has perennial storage of good quality water.
Apart from the river, there are two nallahs.

Primary, Secondary and Tertiary Drains


The Rani Talab which is actually is in the form of nallah, flows in east-west direction and another small nallah
flows from south to north in the southern part of town. Together they act as primary drains which ultimately
fall into Raja Talab from east to west side respectively. The primary drains are mainly kutcha drains collecting
the waste water from houses throughout the town through secondary and tertiary drains and disposing into
major water body i.e. Raja Talab.
Table 6.2.12: List of Major Water Bodies and Drains

S. No.

Name of Water Bodies/ Drains

1
2
3

Raja Talab
Rani Talab
Nallah along Rani Talab

Source: Govindgarh Nagar Parishad

DMG Consulting Pvt. Ltd., Noida

Page 76

City Development Plan, Govindgarh, M.P.


Flood-Prone Areas
As the Raja Talab and Rani Talab are located in the southern part of the town and the storm water from the
city and hilly area also flows in these Talab, all the low lying areas in ward nos. 10, 11, 12,13, 14 and 15 in the
southern side of the town Govindgarh are major flood prone areas of town.

Flooding in Catchment Area of Major Nallahs


In the catchment areas of these nallahs, due to lack of sewerage system most of the sewage flows into the
storm water drains. This, together with damaged and chocked drains due to the presence of gray water and
solid waste disposal, leads to un-channelized flow during the rainy season. Thus, the whole town faces
problem of flooding and spill over of waste water during the monsoon season causing various diseases.

Present and Future Demand and Supply Gaps


Table 6.2.13: Present and Future Demand and Supply Gaps for Drainage System

Project Components/ Service Unit

Ward No.

Drains construction is needed

In all the wards as they do not have sufficient drainage network and
mainly in ward no. 10 where no drains is there of any form.

Source: DMG Assessment

Channelization of nallahs and primary & secondary drains are required


A fresh drainage system is required in Parishad
Construction of new drains and converting the open ones to closed type.

Comparative Analysis with the UDPFI, CPHEEO Guidelines


There are no particular quantitative features in the standards laid out in UDPFI guidelines. But generally, the
storm water drainage should be laid along the road to carry the surface run off and maximum pucca nallahs
should be there for drainage purpose.

SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.

STRENGTH
Strong citizens desire to develop a fresh drainage
system for the town
Favourable natural slope for development of
drainage system which will also help in cost
reduction
Town has a natural slope towards north east to
south west.
OPPORTUNITY

DMG Consulting Pvt. Ltd., Noida

WEAKNESS
Absence of proper drainage system in town
Most of the pucca drains are damaged and open
Reduction in flow capacity of existing drains due
to dumping of solid waste and presence of gray
matter
Detailed layout drawings of drainage network are
not available, making future planning difficult.
THREAT

Page 77

City Development Plan, Govindgarh, M.P.


Making rainwater harvesting in commercial and Health hazards due to negligence of cleanliness
residential plots mandatory
Flooding and spill-over of waste water during the
Scope for development of good drainage system
monsoon season in internal areas and in low lying
areas
Availability of land for the development of waste
water treatment plant.
Contamination of lake water due to discharge of
untreated waste water along with sewage.

Issues

Less capital investment


Lack of a comprehensive and effective drainage system and facility of treatment plant
Secondary and tertiary drains are linked with primary drains i.e. nallahs causing mixing of waste
water including sewage directly with the lake water. This further aggravates the problem of pollution
of a potential source of water supply to town
Disposal of solid waste in drains has reduced the flow capacity of drains
Damaged and chocked drains lead to problem of flooding and over-spilling in internal areas and in
low lying areas of towns.

City Specific Strategies and Action Plan


Goals and Service Outcomes
To enhance the coverage of storm water drains, following goals have been identified for different horizon
years.
Table 6.2.14: Goals & Services Outcomes for different Horizon Years

S. No.

Components

Strom Water Drainage Network Coverage

Horizon Period
2015
2025
80%
100%

2
3
4

Rehabilitation of Existing Pucca Drains


Rehabilitation of Existing Primary Nallahs and Water Bodies
Flood Prone Areas

100%
100%
100%

100%
100%
100%

2035
100%
100%
100%
100%

Strategies and Action Plan


In order to address the above discussed issues and achieve the desired outcomes in each of the components
of drainage system, strategies for improvement are elaborated below:
1. Preparation of Master Plan/ Detailed Project Report:
The drains are inadequate to carry the waste water as they are not systematically designed and are
damaged in some sections. A significant reduction in depth and width are noticed due to
encroachments. To overcome the situation with 100% Storm Water Drainage Network in town it is
proposed that GNP should prepare a Master Plan/ Detailed Project Report (DPR) for development of 100%
Storm Water Drainage Network as per the standards by
o Laying new pucca drainage network in all wards where no drainage is available all
along the roads
o Providing drainage system in flood prone areas
o Widening & deepening of existing drains of town

DMG Consulting Pvt. Ltd., Noida

Page 78

City Development Plan, Govindgarh, M.P.

This will also ensure Institutional strengthening and human resources development leading
to overall capacity building including assets required for the operation and maintenance of
drains.
2. Drains Rehabilitation and Improvement Programme: The programme would aim at the following to
channelize the flow and minimize the localized flooding and over-spilling:
Regular Cleaning of Drains removal of garbage and gray matter to ensure natural flow of
drains
De-silting, lining and repair of drains
Removal of encroachment along drains
Educating people for minimization of sewage and domestic waste discharge into drains
Construction of side walls to confirm to uniform cross-section in built up areas.
3. Rehabilitation of Primary Nallah/ Drains and Water Bodies:
Trapping of nallahs
Converting the Kutcha Nallahs to pucca one by lining and constructing side walls
Regular Cleaning of Drains desilting and removal of garbage and gray matter to ensure
natural flow of nallahs
Protection of environmental resources such as - open spaces, water bodies i.e. Raja Talab
should be carried out in co-ordinated way.

Project Identification & Costing


Presently the coverage of the storm water drainage is poor in the city. So the following projects have been
identified to minimize the adverse effect of the inadequate drainage system of the city.
Table 6.2.15 Proposed Project, Project Cost and Implementing Agencies for Storm Water Drainage

Code No.

Projects proposed

D1

Preparation of DPR for Storm Water Drainage 1.90


System for entire town

UADD, Govt. of M.P. and


GNP

D2

Construction of new storm water drainage 120.00


network to cover the whole town (3 kms.)
(@Rs44 lakh/km)

Govt. of M.P

D3

Converting the Kutcha Nallahs to pucca one by 70.00


De-silting, lining and constructing side walls.
3.5km (@Rs20 lakh/km)

Nagar Parishad

Sub Total Cost (D)

Project Cost Department


(in Lakh)

191.90

* PWD (SOR) April 2011

6.2.3

Solid Waste Management

Solid Waste Generation


The total quantity of solid waste generated in Govindgarh town is approximately 0.74 MT per day. This works
out to 70 grams per capita per day, which is relatively less than the standards considered in CPHEEO Manual
for small towns of 250 gm per capita per day. This is because of town basic character which is in transitional
phase of rural to semi-urban.
DMG Consulting Pvt. Ltd., Noida

Page 79

City Development Plan, Govindgarh, M.P.


At present in the absence of any incineration unit, waste from medical/healthcare establishments are either
mixed with municipal waste or indiscriminately dumped.
Table 6.2.16: Ward Wise Municipal Solid Waste Generation Govindgarh Town

Ward No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Total

Total Population
588
625
731
653
550
735
642
709
649
679
526
659
568
687
696
9697

Solid Waste Generation


(in KG)
41.16
43.75
51.17
45.71
38.5
51.45
44.94
49.63
45.43
47.53
36.82
46.13
39.76
48.09
48.72
678.79

(in Grams/Person)
41160
43750
51170
45710
38500
51450
44940
49630
45430
47530
36820
46130
39760
48090
48720
678790

(in MT/Day)
0.04
0.04
0.05
0.05
0.04
0.05
0.04
0.05
0.05
0.05
0.04
0.05
0.04
0.05
0.05
0.68

Source: Govindgarh Nagar Parishad, 2011

Constituent of Municipal Waste


There is no information available on constitution of municipal solid waste as such from GNP. But after
discussions with officials of GNP it was perceived that waste generated in town includes - vegetable and fruit
market waste, paper, polythene, packing materials, glass, metal iron scrap; aluminium scrap, domestic
animal excreta and ash from domestic Chula indicating that most of the quantity of waste generated is
organic in nature and comes from residential and commercial uses.

Current Practice of Solid Waste Management


Primary and Secondary Collection
Presently there is no Door-to-Door solid waste collection system from the individual households and other
establishments as primary collection.
The collection efficiency of these wastes is very low. Municipal wastes from core areas of town including
commercial & wholesale vegetable Mandi gets collected either on a daily basis or once in 2 days, while in
peripheral areas once in a week depending on situation.
There is no area or site designated for disposal of municipal waste. Waste collected from the all the sources
whether it is domestic, commercial or institutional is dumped at various illegal dumping sites in low-lying
areas. The dumping site at present is the end of the Sindhi Road, outside Nagar Parishad Boundary.

DMG Consulting Pvt. Ltd., Noida

Page 80

City Development Plan, Govindgarh, M.P.


Figure 6.9: Drainage System in Govindgarh

Dustbins in the town

Dumping along the roads

Collection and conveyance of Solid


waste

Waste Storage and Segregation


Presently municipal waste is being collected from all the 15 of wards, but none of these wards have Door-toDoor collection and waste generation practices. Segregation of waste, both at sources level (primary
collection) and at secondary level is not in practice. For the storage of waste dustbins are provided at some
places.
There are 7 waste collection bins placed by GNP at some locations in the town. Waste generated from all the
sources is disposed mainly in open spaces along the road side together with dirt and sludge from street
sweeping and drainage cleaning throughout the town except in some areas.
Primary collection system is necessary to ensure that waste stored and segregated at source is collected
regularly and it is not disposed on the streets, drains, water bodies etc. However, the latter step has to
synchronize well with the first step i.e. storage of waste at source.

Processing and Disposal


There is no prevailing mechanism in the town for processing or disposal of waste. As the wastes not
segregated, there is no processing of the collected wastes. There is no provision of incineration facilities for
hospital wastes. There is no area or site designated for scientific disposal of Municipal Solid Waste. All types
of wastes whether it is hospital waste or household waste are disposed or dumped all together at various
illegal dumping sites in low-lying areas along the river side near the old bridge and in the outskirts of the
town.

Reuse and Recycling


Basically metals and plastics are collected by the slum dwellers, which provide a source of income for them. It
is further marketed by scrap dealers.

Vehicles for Solid Waste Collection and Transportation


For proper solid waste management, suitable equipment in sufficient number is necessary for handling,
lifting, and transportation. Loading and unloading of municipal solid waste is done manually and waste is
transported through thela or tricycle pulled by sanitary workers. GNP also has one tractor with a trolley.
However, in general, GNP is not properly equipped with solid waste handling and transportation equipments.
The equipment available with GNP for S.W.M in town is listed below:

DMG Consulting Pvt. Ltd., Noida

Page 81

City Development Plan, Govindgarh, M.P.


Table 6.2.17: List of Vehicles and Equipments available with GNP for Solid Waste Collection & Transportation

S. No.
1
2
3
4
5

Vehicle and Equipment


Tractor
Trolley
Dust Bins
Hand-pulled Cart
Thela/Tricycle

Numbers
1
1
7
10
2

Source: Govindgarh Nagar Parishad, 2011

Estimation of Waste Collection


Since the GNP is not properly equipped with latest solid waste handling and transporting equipments, the
waste is collected and transported manually through hand-pulled cart and tricycles. Therefore, the waste
collection efficiency is very low. (As per the discussions with officials of GNP and based on the strength of
sanitary workers and equipment available to them.)

Present and Future Demand and Supply Gaps


On the basis of waste generated by per capita per day, the projected waste generation by 2035 has been
worked out to be 3.47 MT/Day. As stated earlier, at present the total waste generation in town is about 0.74
MT/Day with a rate of 70 grams per capita per day. Out of this total waste only 25% (0.66 MT/Day) of waste
is being collected creating a gap of 0.55 MT/Day in collection. As such, the waste treatment facility must be
put in place to handle the large volume of waste disposal.
Table 6.2.18: Present and Future Demand and Supply Gaps of Waste Collection Govindgarh Town

Years

Total
Population

Standard as per UDPFI


Guidelines (Grams/Person)

Waste Generation
(MT/Day)

Waste Collection
(MT/Day)

Gaps
(MT/Day)

2011
2012
2013
2014
2015
2020
2025
2030
2035

10535
10659
10785
10912
11041
11691
12380
13110
13883

*70
250
250
250
250
250
250
250
250

*0.74 2.63
2.66
2.70
2.73
2.76
2.92
3.10
3.28
3.47

0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

2.45
2.48
2.52
2.55
2.58
2.74
2.92
3.1
3.29

250

Source: DMG Assessment as per Population Projection and UDPFI Guidelines


*Present Situation of town

Comparative Analysis with the UDPFI, CPHEEO Guidelines


As per the data provided by the GNP, the total waste generation in the town is about 0.74 MT/Day. This
works out to 70 grams per capita per day, which is relatively less than the standards considered in CPHEEO
Manual for small towns of 250 gm per capita per day. This is because the town is in transitional phase of rural
to semi-urban. The following table provides the comparative analysis with UDPFI and CPHEEO guidelines:
Table 6.2.19: Performance Indicators Solid Waste Management

S. No.

Indicators
DMG Consulting Pvt. Ltd., Noida

Units

Current Status

Normative Standard
Page 82

City Development Plan, Govindgarh, M.P.


1.
2.
3.
4.
5.

Waste Generation per Capita per day


Waste Collection Efficiency
Door-to-Door Waste Collection Efficiency
Conservancy Staff per km (including
temporary workers)
% capacity of fleet vehicle to waste
generated

Grams
Percent
Percent
Persons

70
25
Nil
0.26

Percent

Nil

250
100
100
2

Source: DMG Assessment based on the Data Collected from GNP

SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
Strong citizens desire for Govindgarh to be a
clean town
Enough biodegradable part is solid waste for
vermin composting
Availability of land for development of sanitary
land fill site of MSW.

OPPORTUNITY

WEAKNESS
GNP does not in compliance with MSW handling
rules, 2000.
Low collection efficiency
Door-to-Door waste collection system is not in
practice in town
Segregation of waste is not in practice, neither at
primary collection level nor at final disposal level
Lack of dhallaos and bins for waste storage
No incineration unit is available for biomedical
waste
Lack of man power and sufficient modest
equipments for collection, transportation of MSW.
Lack of capital to develop facilities.
THREAT

Scope of PPP in terms of waste collection, Lack of public awareness for use of polythene
transportation and disposal of waste by Health hazards fur to negligence for cleanliness
involving NGOs in town
Waste is been disposed of in low lying areas
To generate revenue by imposing levy on waste
throughout the town.
generators
Training and capacity building.

Issues
1. Govindgarh Nagar Parishad is not in compliance with MSW handling rules, 2000
Town has not adopted Door-to-Door Collection system and segregation of wastes at source level.
Lack of dhallaos and bins for storage of waste at primary level. Limited numbers of bins have been
provided at some places.
Inadequacy of man-power and modest equipments (including vehicle for transportation) with GNP
for Solid Waste Management from collection to its final disposal.
At present town does not have any designated sanitary land fill site as per the normative standard.
DMG Consulting Pvt. Ltd., Noida

Page 83

City Development Plan, Govindgarh, M.P.


2. GNP has not conducted any study in the town for determining the composition and characteristics of the
solid waste.
3. Collection efficiency is very low.
4. Lack of capital/funds with GNP for the development of SWM facilities.
5. Waste collected by sanitary worker is being disposed of in low lying areas of the town including Talab
leading to contamination or pollution of Talab water which is one of the major sources of water for the
town.

City Specific Strategies and Action Plan


Goals and Service Outcomes
The local body should effectively involve the private sector in delivering solid waste management services.
The rationale for private sector participation includes attracting project funding, new technology, cost saving
and service delivery improvements.
Table 6.2.20: Goals & Services Outcomes for different Horizon Years

S. No.

Components

Horizon Period
2015

2025

2035

Door-to-Door Collection System

80%

100%

100%

Source Segregation

100%

100%

100%

Improve Waste Collection Efficiency

100%

100%

100%

Mechanized Waste Handling

Partial

Full

Full

Scientific Waste Disposal

Partial

Full

Full

Landfill Site Adequacy

Partial

Full

Full

Cost Recovery O & M

80%

100%

100%

Private Sector Participation

70%

100%

100%

Strategies and Action Plan


In order to achieve the above outcomes, and to address the above discussed issues in each of the solid waste
management components, strategies for improvement are elaborated below:
1. Segregation of Waste at Source:
Highest priority has to be accorded to storage and segregation of waste at source irrespective
of the area of generation so as to facilitate an organized and environmentally acceptable waste
management measure
A number of campaigns/ community awareness programmes should be organized for
introducing segregation of wastes at sources
Segregation of hazardous wastes like bio-medical waste, bio degradable waste etc.
2. Primary Collection of Waste: The following measures have been recommended for improving the
primary collection practices of Govindgarh.

DMG Consulting Pvt. Ltd., Noida

Page 84

City Development Plan, Govindgarh, M.P.

Phased implementation of Door-to-Door collection system through community organizations on


PPP basis by mobilizing, facilitating, organizing and supporting community activities with the
help of local NGOs
Encourage performance based incentives to enhance efficiency and output
Installation of Community Storage Bins in all areas where house-to-house collection cannot be
implemented
Voluntary Garbage Disposal Scheme should be introduced for restaurants/ hotels and
commercial establishments
Placement of containers or bins in sufficient number and of appropriate size at markets for
ensuring that all the vendors place the waste in containers
Bio-medical wastes and other hazardous wastes to be segregated and collected from municipal
solid wastes for separate incineration as per the guidelines of Ministry of Environment and
Forest 1998 and 1989 respectively.
Cost recovery through collection of well defined user charges.

Manual waste handling operation should be minimized. Primary collection system should be
initiated by introducing Multi-bin-carts (Push carts/ tricycles), semi mechanized systems like refuse
collectors etc. Separate collection vehicles should collect the non-bio-degradable waste stored in
separate bins. Thus, Primary collection should cover all areas of the town with even innovative but
safe transporting arrangements as per the MSW handling rules 2000.
3. Secondary Waste Collection and Transportation: At present, the GNP has inadequate number of
sanitary workers and equipments for loading, unloading and transportation vehicles (including bins)
for secondary collection and transportation of wastes. Therefore, it is recommended that GNP should involve private sector participation in secondary collection, transportation and
treatment of MSW facilities
GNP should purchase sufficient number of modest equipments including vehicles - such as
loader, un-loader, hydraulic closed truck/waste carrier for transportation and disposal of waste
Construction or demolition wastes / debris to be separately collected and disposed off in
separate landfill site for future use
GNP should prepare a Detailed Project Report (DPR) for Municipal Solid Waste Management for
the town, ensuring the quantity and quality of required modest equipments, techniques and
vehicles for collecting, processing and transporting MSW. This will also ensure Institutional
strengthening and human resources development leading to overall capacity building.
4. Processing and Disposal: The characteristics and quality of solid waste generated in the city primarily
influence the disposal options. Considering these aspects, it is recommended to develop a landfill site
for safe disposal of solid waste. The disposal strategy for Govindgarh town for short term at town
level will be Compost the organic fraction of the waste
Encourage aerobic vermin-composting at local level
Sanitary land filling of inorganic fraction of waste and the compost rejects
Educating the community on 4R strategy (Reuse, Recover, Recycle and Reduce) that can help
ease pressure on compost sites and affords resource recovery.
For the long term, it is further proposed that Govindgarh Nagar Parishad should co-ordinate with the
State Government for clustering in regional engineered landfill site for waste disposal involving
other neighbouring ULBs. This also ensures the scale and viability to the private partnership mode.

Best Practices
DMG Consulting Pvt. Ltd., Noida

Page 85

City Development Plan, Govindgarh, M.P.


Box: Solid waste Management in Surat
Background:
Surat city is largely recognized for its textile and diamond businesses. It
is also known for a complete transformation from one of the filthiest
cities to one of the cleanest cities in the country. In September 1994,
the city faced an unprecedented crisis when the killer disease PLAGUE
broke out in the city. However, in May 1995, a new programme was
launched by Surat Municipal Corporation (SMC) to clean the city
through waste management. The programme created an enormous
impact on the cleanliness, which resulted in a significant improvement
in the health status and quality of living environment, so much so that
Surats image was transformed from one of the filthiest to the second
cleanest city in the country.
Key Components of the program
The SMC adopted multi-pronged strategies to achieve the programme goals, include:

Streamlining of functional, administrative, financial and technological aspects within SMC


Awareness creation and capacity building of the municipal staff and city population, especially weaker
section
Inviting private sector participation in garbage management
Introduction of a very well orchestrated garbage removal and disposal schedule
Educating the public and issuing of instruction for the correct way of garbage disposal.

Private Sector Participation


Involving Private sector on a temporary basis during the plague epidemic to cleanse the filth and remove
dead carcasses accumulated in the water-logged areas. It was also strengthened and regulated in the postplague period in (i) hiring of private vehicles with driver for garbage collection, ii) contracting-out cleaning
of certain roads and iii) employing private sweepers for transporting municipal refuse from collection
points to disposal sites.
Private contractors, at present, handle almost 40 per cent of the solid waste generated in the city every
day. However, private contractors work under strict supervision of the municipal staff and penalties are
imposed on them for not performing their assigned work.
Enforcing Sanitation standard
The SMC started to enforce strict hygiene and sanitation standards in eating houses, sweetshops, fruit, and
vegetable shops.
Levy of fines for littering of the public places was instituted. Under this system, the grievances were
categorized. For ensuring feedback, a Reply Card system has been introduced.
A Public Health Mapping exercise was initiated in 1995 by the city government, with a major focus on
preventive and primitive health care.
Streamlining the function of the SMC
The administrative setup for solid waste management was modified and the six zones were sub-divided
into 52 sanitary districts for better waste collection efficiency.
A daily monitoring system was introduced. At the macro-level, the entire administrative and financial
management system of Surat Municipal Corporation was revamped.
DMG Consulting Pvt. Ltd., Noida

Page 86

City Development Plan, Govindgarh, M.P.


A network of about 274 surveillance centres, 90 percent of which are located in slums. This network
includes two municipal hospitals, health centres, major private hospitals and private medical practitioner.
Impact
The programme has created tangible impact on cleanliness, living environment and awareness level
leading to significant improvement in the mortality and morbidity. A partnership approach between public
and private sector, citizens and community is slowly emerging.
Lesson Learned:
Decentralize governance can play a vital role for the decision making and good governance.
Micro- planning is a very necessary tool for the plan implementation.
Public support facilitates innovations in urban environment management.
Political will is extremely important for successful public policy changes.
Media support plays a dominant role in the creation of public awareness and acceptance of change.

Project Identification & Costing


Presently there is lack of infrastructure and capital cost for solid waste management in the city. So the
following projects have been identified to achieve the future goals for solid waste management in the city:
Table 6.2.21: Proposed Project, Project Cost and Implementing Agencies for Solid Waste Management

Code No.

Projects proposed

SWM 1

Preparation of Detailed Project Report 5.00


for Municipal Solid Waste Management
for entire town.

UADD, Govt. of M.P. and


GNP

SWM 2

Construction maintenance of Sanitary 136.00


Landfill Site with other infrastructure
facility in ward no. 14 (@Rs1000/ton of
waste) exclusive of land cost

Nagar Parishad

SWM 3

Providing equipments and machines to 30.00


support the SWM system

Nagar Parishad

SWM 4

Enhancing the capacity of municipality 75.00


by providing Transportation vehicles (2) ,
Container (30) and & Handcart (10)

Nagar Parishad

Sub Total Cost (C)

Project Cost Department


(in Lakh)

246.00

* PWD (SOR) April 2011

DMG Consulting Pvt. Ltd., Noida

Page 87

City Development Plan, Govindgarh, M.P.


6.2.4

Traffic and Transportation

Background
Urban economy is seen to improve with urban transport infrastructure. Roads and circulation is an important
city land-use allowing efficient function of any city or towns activities. Conversely, it can drag down and
prove detrimental to its GDP. The objective of studying town level transportation is to understand and
analyze the present level travel scenario of the town and to focus on existing potential and scope of
development.

Existing
Scenario

Traffic

and

Transportation

Traffic on the roads has been one of the key


transportation problems of any growing town or
city. Investigation into the existing traffic
scenario of the town provides insights on how
well the local government (Govindgarh Nagar
Parishad) and other agencies (PWD and NHAI)
are coping with and managing the growing
population and increased economic activities.
The town can be reached by bus, jeep and autoFigure 6-3 A view of the bus in Govindgarh passengers
rickshaw. The frequency of bus plying on the
boarding on the road
road adjoining the town is about half an hour.
People prefer to go there by jeep/commander
and auto-rickshaw whose frequency of plying is around 10-15 minutes.
There is no direct railways connectivity to the town and the nearest railway station is in the district
headquarter which is Rewa around 20 km through SH 9.
The following table gives the destinations, mode of transport and number of vehicles plying daily to and fro
and through Govindgarh.
Table 6.2.22 Availability of Public Transport to Important Destinations

Destination

Mode of Transport

No. of vehicles

Rewa

Jeep

40

Bela

Auto-rickshaw

20

Bela

Commander

13

Satna

Bus

15

Singrauli

Bus

15

Ramnagar/ Jigina

Jeep

10

Source: DMG assessment from primary survey


As the town is small there is no major traffic and transportation problem but for future it is advisable to plan
better and more efficient traffic junctions and bus and auto-rickshaw stands.

DMG Consulting Pvt. Ltd., Noida

Page 88

City Development Plan, Govindgarh, M.P.


Vehicle Population
Most of the vehicles are buses, tractors, scooters, jeeps and cars. The estimated number of vehicles is: 4000
cycles, 600-700 two wheelers, 10-15 cars, 20-25 trucks, 40 jeeps, 20 auto-rickshaws and 30-35 hand- pulled
carts.
The traffic system is regulated under the Rewa District Office of Madhya Pradesh Transport Department.
Whole traffic and transportation can be divided into two categories - inter-city and intra-city based on the
influence of area.

The inter city public transport system for the town can be categorized into two parts i.e. State
Carriage and Private Carriage. State carriage includes buses by the State Government with fixed
routes and fare. The Private Carriage in under purely private domain and includes buses, jeeps,
matadors etc. operated by private operators.
At present there is no intra city public transport system in Govindgarh. As the town is very small and
all the important places such as major commercial and market areas, bus stands, hospitals etc. are in
the vicinity, most of the local people generally use cycle, scooter, motorcycle and walking etc. as
mode of travel for short trips.

Travel Characteristics
The travel characteristic of a town generally depends on the social status of citizens, types and location of
economic activities which give rise to diverse traffic modes. The predominant mode of travel in town is
motorized vehicles such as two- wheeler (Scooter & Motorcycle) and private transport which includes three
Wheelers (20 nos.) and four wheelers (Jeeps, cars etc.)Which are about 20 in number as the town is semiurban in nature all the important place are in vicinity. Thus, only major working population uses their own
means of transport such as cycles, scooters, motorcycle, and cars etc. for their workplace and other places
for day to day needs. Rest of the population prefers to walk for various purposes.

Public Transport/Mass Transit


State-transport as well as privately owned buses runs throughout
Madhya Pradesh. Buses, jeeps and auto-rickshaws are available for
commuting from one city/town to the other town.
The town also has one bus stand which has a capacity of around 5
buses. Most of these buses run on daily basis. Private Jeeps and
auto-rickshaws apart from buses also offer services from one town
to the other of shorter distance.
The major working class population uses their own vehicles cycle,
scooter, motorcycle for commuting in the town. There are few
shared auto rickshaw and jeep etc. operated by private operators which caters to the population residing in
nearby villages. There is one taxi stand.

Traffic Management and Circulation


Planning for traffic and transportation in Govindgarh is under a number of agencies including Nagar Parishad,
PWD and NHAI. The Govindgarh Nagar Parishad is responsible for development and maintenance of street
network (City Roads), traffic management and circulation system, public transportation system, control of
IPT, development of parking spaces etc. This can be categorised into two types:

DMG Consulting Pvt. Ltd., Noida

Page 89

City Development Plan, Govindgarh, M.P.


1. State Highways: This category includes the SH 52 and 9 (accounting for 5.36 km of road length of
town) connecting Sidhi to Rewa and Satna.
2. City Road: This category includes all the local roads at ward level and main road. It falls under the
jurisdiction of Govindgarh Nagar Parishad.
Table 6.2.23: Types of Roads and Lengths in Govindgarh Town

S. No.

Type of Roads

Length of Road (Km)

1.

Pucca Road (SH-52 & SH-9)

5.48

3.

Pucca Road (Local Roads within Wards)

7.98

4.

Kutcha Road (Local Roads within Wards)

5.62

Total

19.08

Source: Govindgarh Nagar Parishad

Ward wise breakup of the above discussed road length and its indicators are shown below in table 6.21.
Table 6.2.24: Ward Wise Detail of Road Length in Govindgarh Town

Ward
No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Total

Length of Roads (in kms.)


Pucca
Kutcha
S.H. 52 &
Road
Road
9
(in
(within
(within
meters)
Ward) in Ward)
meters
700
970
506
650
500
958
650
300
0
500
0
305
500
0
217
700
300
282
600
400
219
600
300
996
300
300
462
400
0
904
500
300
285
100
0
0
930
800
0
550
500
0
300
950
346
7980
5620
5480

Total
Total
Length of Population
Roads (in 2011
kms.)

Area
Road
in Sq. Density
Km.
(per sq.
km.)

Per Capita
Road
Length (in
meter.)

2.21
2.11
0.95
0.81
0.72
1.28
1.22
1.90
1.06
1.30
1.09
0.10
1.80
1.05
1.75
19.33

0.28
0.74
0.95
0.11
0.77
0.56
0.09
0.3
0.07
0.66
0.12
0.18
0.16
0.94
7.3
13.23

3.75
3.37
1.30
1.23
1.30
1.74
1.90
2.67
1.64
1.92
2.06
0.15
3.17
1.53
2.51
1.99

588
625
731
653
550
735
642
709
649
679
526
659
568
687
696
9697

7.88
2.85
1.00
7.32
0.93
2.29
13.54
6.32
15.17
1.98
9.04
0.56
11.25
1.12
0.24
1.46

Source: Area and Road Length Computed from Govindgarh Digitized Map by DMG
Consultant and Population as per Census 2011.

Proper road width and spacing are important


for smooth traffic flow on the
roads. Unfortunately many of the important roads in the town have become so
narrow that they are unable to facilitate the increasing flow of vehicles. The
small stretch of the road within the town has some degree
DMG Consulting Pvt. Ltd., Noida

Figure 6-4 A view of the encroachment along road

Page 90

City Development Plan, Govindgarh, M.P.


of encroachment which hampers the smooth flow of the traffic in the town. The given figure will make the
ground realities for clear.

Map 6.3: Existing and Proposed Road Network of Govindgarh Town


Table 6.2.25: Major Roads of the Town

S. No.

Name of the Roads

Existing Width (in mt.)

1.

State Highway 52

10.5

2.

State Highway 9

9.73

Source: Govindgarh Nagar Parishad and Draft Master Plan Govindgarh 2021

Figure 6 51 View of the road without proper shoulder, narrow internal road and kacha road in the town

DMG Consulting Pvt. Ltd., Noida

Page 91

City Development Plan, Govindgarh, M.P.


The overall condition of these existing roads is not good having ditches in many places with no proper
drainage, road furniture and signage for guidance of commuters. On the contrary, the electric poles situated
on both side of the roads at some places does not permit the traffic to use shoulders and further reduces
effective width of road.
At present both sides of the road is full of ribbon development. However, with increasing concentration of
activities in and around the core area of the town, pressure of traffic is increasing on all the major roads of
the town.
Furthermore, important centres such as Police Station, Educational Institutions, Nagar Parishad Office and
commercial establishments are located in the core area of the town which are the traffic generating centres
of the town since major administrative and commercial activities take place in this area.

Inter-City Bus Transport


The inter-city bus facility covers almost all the important centres within the district as well as other
surrounding districts. Madhya Pradesh State Road Transport Corporation provides transit services to the
passenger. It runs regular services intercity services and interstate services connecting to the neighbouring
states with fixed routes and fares. For smaller towns in Madhya Pradesh it differs in terms of the provider
and the type of facility or bus frequency available to the passengers.
The Private Carriage in under purely private domain and includes buses, jeeps, matadors etc. operated by
private operators.

Intermediate Public Transport


At present Govindgarh town has jeeps and auto-rickshaws as the Intermediate Public Transport System
(IPTs). As the town is very small all the important places such as major commercial and market areas, bus
stands, hospitals etc. are in the vicinity.
Most of the local people generally use cycle, scooter, motorcycle and walking etc. as mode of travel for short
trips or intra zone trips. Shared three-wheelers auto-rickshaws, four wheelers such as jeeps, matadors and
other such vehicles are often found in the town as public transport.

Parking Requirement
There is no provision for organized on-street parking and off-street parking at major commercial centres of
the town. The core market area of the town is characterized by narrow roads with slow moving traffic.
Unorganized on-street parking and informal shops leads to encroachment on the ROW and absence of
footpath force the pedestrians to walk on the carriageway.
Thus, the capacity of the road is further reduced resulting in conflict between pedestrians and vehicular
traffic. Therefore, there is urgent need/requirement of authorized parking as per the standards for major
commercial areas and in other important areas such as along SH 52 and SH9 of the town.

Present and Future Demand and Supply Gaps


The present and future demand of road (in km) is calculated considering the per capita demand as 1.5 m. The
demand for road by 2035 will be around 18 km. The current total length of road is 19.08 km which gives a
total surplus of around 1 km by 2035. The consideration is also made for converting 5.62 km of kutcha roads
into pucca ones until 2015. Regarding infrastructure augmentation, it is required to construct/develop a
Transport Nagar by 2020, a bus stand with basic amenities by 2015 and provision of on-street parking with
pavement on major roads by 2015.

DMG Consulting Pvt. Ltd., Noida

Page 92

City Development Plan, Govindgarh, M.P.


Table 6.2.26: Present and Future Demand and Supply Gaps Traffic and Transportation

COMPONENTS

YEARS

Projected
Population
Govindgarh

2011 2012 2013 2014 2015 2020 2025 2030 2035


for 10535 10659 10785 10912 11041 11691 12380 13110 13883

Road Network (in Km)

2011

2012

2013

2014

2015

2020

2025

2030

2035

Existing Road Network(in km)

19.33

19.33

19.33

19.33

19.33

19.33

19.33

19.33

19.33

Road Length Demand

15.8

16.0

16.2

16.4

16.6

17.5

18.6

19.7

20.8

Gaps

-3.5

-3.3

-3.2

-3.0

-2.8

-1.8

-0.8

0.3

1.5

Up-gradation of Roads (in Km)

2011

2012

2013

2014

2015

2020

2025

2030

2035

Up-gradation of Kutcha Roads 0


to Pucca Roads

1.62

Widening of Important roads

Improvement of Junctions

Other Infrastructure Facilities 2011


(in nos.)

2012

2013

2014

2015

2020

2025

2030

2035

Development of Transport Nagar (Truck Terminal)

Development of Bus Stand

On-street Parking Provision with pavement.

Footpath (Sidewalk) in km

Source: Population Projection & DMG Assessment as per IRC and UDPFI Guidelines

Comparative Analysis with UDPFI and Other Guidelines


The above demand and supply are calculated as per the manual of Indian Road Congress and service level
benchmarking for Urban Transport issued by Ministry of Urban Development, Government of India.
Table 6.2.27: Space Standards of Roads

Type of Roads

Norms

Current Status

ROW

Carriage Way

ROW

Carriage Way

Arterial Road

50 60 m

21 m

10.5

7.5

Sub-Arterial Road

30 40 m

14 m

9.73

7.5

Collector Road

20 30 m

10.5 m

Local Street

10 20 m

7.5 m

Source: DMG Field Survey and UDPFI Guidelines

DMG Consulting Pvt. Ltd., Noida

Page 93

City Development Plan, Govindgarh, M.P.

Footpath (Sidewalk)

The minimum width of footpath should be 1.5 m. The width should be increased by 1m in major commercial
or market areas to allow for dead width. Footpath adjoining shopping frontage should be at least 3.5 m.
Table 6.2.28: Desirable of Footpaths

Capacity (Persons)

Required Width of Footpath (m)

All in one Direction

In both Directions
800
1600
2400
3200
4000

1220
2400
3600
4800
6000

1.5
2.0
2.5
3.0
4.0

Source: UDPFI Guidelines

SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH

Govindgarh is well connected with SH-52 & SH9


Town has good road network and accessible from

all directions
There are inter-city and intra-city movements
which provide opportunity for improvement of

transportation system.

WEAKNESS
Roads are narrow if concerned with future
demand
Pressure on major roads in core areas, due to
encroachment by informal establishment etc.
reduce the effective width of carriageway
No organized parking provisions at major
commercial centres, on-street parking is common
in town
Lack of pedestrian facilities
Lack of appropriate terminals further adds to the
congestion of the arterial roads
Lack of proper traffic management system &
infrastructure facilities such as automated signals
etc. in the town.

OPPORTUNITY

THREAT

Land availability for major projects like In the absence of adequate public transportation
systems in town, individual and personalized
development of Bus Terminal, Transport Nagar for
modes of transport would increase
goods carriers and parking facilities

Fund unavailability for road construction and


PPP participation for development and
maintenance.
maintenance of Bus Terminal, Transport Nagar
and Parking facilities.

Issues

Town lacks proper traffic and transportation management system


DMG Consulting Pvt. Ltd., Noida

Page 94

City Development Plan, Govindgarh, M.P.

There is absence of public transportation system, which leads to increase in the number of
personalized modes of transportation and results in traffic congestion in many part of the city in busy
hours
There is great pressure on major roads, since all the major commercial activities, important
institutions etc. are concentrated long these roads
Rampant encroachment, on-street parking on all major roads leads to congestion thereby reducing
the ROW and carriageway resulting in slow movement of traffic in core area
The town lacks proper transport, utility/infrastructure systems such as Bus Terminal, Transport
Nagar (Truck Terminal), organized and adequate parking spaces in important areas to properly
facilitate movement of vehicles in the town and improve the traffic situation
Currently the existing bus terminal is very small; it is not being used by bus operators because of
paucity of space in making entry and exit due to informal development, inefficient road width.
Hence, it is being used as taxi stand
Narrow streets in the core areas of the town need to be widened through proper planning and
addressing the encroachment problems
Gomati Chouraha is a congested area and needs junction improvement.

City Specific Strategies and Action Plan


Goals and Service Outcomes
To improve the status of traffic and transportation system in the town following goals have been identified
for different horizon years
Table 6.2.29: Goals & Services Outcomes for Different Horizon Years

Sr.
No.

Components

New Road Formation/Development (5.62 km in different


location as per the development of town)
Road Up-gradation (Widening / Strengthening, footpath)
Development of Bus Terminal
Development of Truck Terminal (Transport Nagar)
Junction and Traffic Signal Improvement
Mass Transit System/Public Transport System
Parking Facilities

2
3
4
5
6
7

Horizon Period
2015

2025

2035

100%

100%

50%
60%
70%
100%
30%
100%

100%
100%
100%
100%
60%
100%

100%
100%
100%
100%
100%
100%

Source: DMG Analysis

Strategies and Action Plan


In order to address the above discussed issues and achieve the desired outcomes in each of the components
of traffic and transportation in the town, strategies under short term measures, medium term and long term
action plans are elaborated below:
1. Short Term Measures: Short term measures include immediate trouble shooting and traffic
management actions such as Intersection or junction improvement in the core and accident prone areas to town.
Traffic signalization at major intersections or junctions and road stretch.
Removal of encroachments on major roads & pavements to provide free flow of traffic.
DMG Consulting Pvt. Ltd., Noida

Page 95

City Development Plan, Govindgarh, M.P.

Conversion of existing bus stand into taxi or auto rickshaw stand.


Establishment of Traffic Police Stations and Traffic Management Centres.

These measures should be taken-up on a continuous basis.


2. Medium Term Action Plan: This aims at the development of transport infrastructure over a
perspective plan period of 5 15 Years to bring about coordinated development among different
components. These measures typically will include various infrastructure projects including network
improvements such as Road up-gradation - Improvement of all existing major roads connecting town to peripheral
areas through widening, strengthening and developing footpaths in phase manner
Up-gradation of existing kutcha roads into pucca ones.
New road formation/development for a total length of 5.62 km in different areas of the town
as per the future development of town
Development, Operation and Maintenance of parking lots with payment on major roads and
commercial areas of town on PPP base
Development of Bus Stand/Terminal on BOOT basis
Development of Truck Terminal/ Transport Nagar on BOOT basis.
For Monitoring and Evaluation: Preparation of a detailed road register and designing and
implementing a system to update the same on a regular basis, including details of construction and
repair/maintenance history.
3. Long Term Action Plan: The long term action plan aims at the development of structure plan for the
town with transit as one of the lead components, which will direct the urban growth so as to bring
about a structural fit between transit infrastructure and urban growth. This will include the
introduction of eco-friendly intra-city public transport system and also examine a comprehensive
multi-modal Public Transport System to bring about the most optimal mix of commuting within the
town and thus providing a sustainable transit solution.

Project Identification & Costing


The creation of a reliable, comfortable, attractive and affordable traffic management system is the long-term
solution for solving the traffic problems in the city. Thus, construction of new bus stand to provide a high
quality transit system, and provision of parking facilities are envisaged to solve parking problem and
congestion in core areas. To achieve the goals in this sector the following projects have been identified:
Table 6.2.30 Proposed Project, Project Cost and Implementing Agencies for Traffic and Transportation

Code No.

Projects proposed

TT 1

Development of new Bus Stand with proper ISBT on 500.00


BOOT basis in ward no. 12
Development of road in ward 14 (2km)
100.00

Nagar Parishad

TT 3

Development of footpath/pedestrian along the major 25.00


roads. (for 5 km)

Nagar Parishad

TT 4

Construction of 5 parking lots along main roads and in 25.00


commercial or market areas
Road Widening from 3 m to 4.5 m (major district roads 90.00
for 6km.)

Nagar Parishad

TT 2

TT 5

DMG Consulting Pvt. Ltd., Noida

Project Cost Department


(in Lakh)

Nagar Parishad

PWD

Page 96

City Development Plan, Govindgarh, M.P.


TT 6

Improvement of traffic junctions, rotary development 90.00


including installation of traffic light/signals.

Sub Total Cost (E)

Nagar Parishad

830.00

* PWD (SOR) April 2011

6.2.5

Street Lighting and Fire Fighting

Existing Situation of Street Lights


Providing full coverage by street light is important in the development of town as it facilitates urban
movement and safeguards life and property.
At present the town has nearly 559 street light poles. Out of the total street light poles, there is some sort of
street light on 407 poles. Out of the 407, 148 poles have sodium vapour lamps, 162 poles have energy tube
lights and 97 have bulbs. As per the primary survey, street light on all the major roads and streets of the town
is in working condition. The Parishad is switching over to the energy saving CFL bulb.
Table 6.2.31: Street Lighting in Govindgarh Nagar Parishad

S. No.
1.
2.
3.
Total

Equipment
Poles with Tube Lights
Poles with CFL Bulb
Poles with Sodium Light

Total Number
162
97
148
407

Percentage to Total
40%
24%
36%
100.00%

Source: Govindgarh Nagar Parishad

Figure 6-52: Street Light at Old Chowk - Govindgarh

Fire Service
There is no separate office for the fire fighting operations in the town and no fire tender in the town. In case
of incidents of fire, fire tenders come from Rewa.
DMG Consulting Pvt. Ltd., Noida

Page 97

City Development Plan, Govindgarh, M.P.

Present and Future Demand and Supply Gaps Street Lighting


The present and future demand and supply gap for horizon year 2035 under street lighting sector for
Govindgarh has been worked out according to the length of roads and as per the UDPFI guidelines and is
tabulated below:
Table 6.2.32: Present and Future Demand and Supply Gaps Street Lighting

COMPONENTS
Street Light (in nos.)
Existing Street Light
Road Length Demand (in km)
Street Light Demand @ 1 light per
40 m spacing on one side of road
(within wards)
Gaps

YEARS
2011
407
15.8
395

2012
407
16.0
400

2013
407
16.2
404

2014
407
16.4
409

2015
407
16.6
414

2020
407
17.5
438

2025
407
18.6
464

2030
407
19.7
492

2035
407
20.8
521

-12

-7

-3

31

57

85

114

Source: Population Projection & DMG Assessment as per UDPFI Guidelines

As per the UDPFI Guidelines, Govindgarh Nagar Parishad at present has surplus of street light and expected
to maintain the future requirement by 2035 which will be around 45. In some areas, spacing of street light
poles is irregular.

Present and Future Demand and Supply Gaps Fire Fighting


The present and future demand and supply gaps for horizon year 2035 under fire fighting sector for
Govindgarh has been worked out tentatively and is tabulated below:
Table 6.2.33: Present and Future Demand of Equipment (vehicles) and Man Power for Street Lighting and Fire Fighting

S. No.

Required Vehicles and Man Power

1.
2.
3.
4.
5.
Total

1 fire tenders
1 electric pole vehicle
1 Fire Men
4 Helper
2 Driver

Salary Per Month per prevalent Annual Salary (in Rs.)


pay scale
----18,000
216000
10,000
480000
12,000
288000
40,000
984000

Source: Population Projection & DMG Assessment

Hence for operating one fire fighting vehicle and one electric pole vehicle there will be a requirement of 7
men with a total annual salary of Rs. 9, 84,000/- to deliver the service effectively as and when required in the
town.

Comparative Analysis with the UDPFI and Other Guidelines


Following table provides the performance indicators for street lights estimated on the basis of norms and
standards.

DMG Consulting Pvt. Ltd., Noida

Page 98

City Development Plan, Govindgarh, M.P.


Table 6.2.34: Performance Indicators Street Lighting

S.
No.
1.
2.
3.
4.

Indicator

Unit
Meters

Current
Status
irregular

Norms/
Standards
30 - 40

Spacing between Street Light Poles in residential areas


(including kutcha roads)
Spacing between Street Lights on Major Roads
Proportion of tube lights W.R.T. Total*
Proportion of Energy Saving Lights W.R.T. Total*

Meters
Percentage
Percentage

40
39.8
23.8

40 - 50
60 - 70
100

Source: Field Survey, UDPFI Guidelines and * certain experience and thumb rules.

SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
Street light coverage 100%.
Awareness about emerging technologies of power
saving light
Political and social willingness to switch to power
saving light

WEAKNESS
Irregular spacing of street light poles within the
wards or residential areas of town
High capital cost for installation of system
Irregular availability of power
Non-availability of vehicles for street lighting and
fire fighting.

OPPORTUNITY

THREAT

Energy saving initiatives can be implemented.

Lack of monitoring and regularization


High O & M cost

Other Sources of Energy


Census data 2011 shows that majority of town residents use electricity followed by kerosene as the only
source of lighting as illustrated below. Out of total 1494 households, 253 households have no connection and
rely on other sources indicating that there is a need to provide lighting.
Table 6.2.35: Sources of Lighting at Household Level in Govindgarh

Total households
1,697

Sources of Lighting
Electricity

Kerosene

Solar Energy

Other Oil

1,502

188

Source: Census of India, 2011


Table 6.2.36: Type of Cooking Fuel Used at Household Level in Govindgarh

Type of Fuel Used

No. of Households

Firewood
Crop Residue

1556
8

DMG Consulting Pvt. Ltd., Noida

Page 99

City Development Plan, Govindgarh, M.P.


Cow dung Cake
Coal
Kerosene
LPG
Electricity
Biogas
Any other
Total

1
0
1
124
2
0
5
1697

Source: Census of India, 2011

Out of 1697 households, majority of households (1556) use firewood as a fuel for cooking purpose followed
by the LPG (124) for domestic cooking. This shows a strain on forest/wood resources which is a concern and a
threat to environment and causes depletion of natural resources.

Issues

At present the town has nearly 559 street light poles and there is some sort of street light on 407
poles.
Out of the 407 almost 148 poles have sodium vapour lamp, 162 poles have energy tube light and 97
have bulb.
As per the primary survey, there is street light on all the major roads (Rewa Road, Sidhi Road, Tamra
road etc.) and streets of the town in working condition.
The Parishad is switching over to the energy saving CFL bulb.
Inappropriate maintenance and functioning of lights. Around one-fourth of the street lights are nonfunctional.
Irregular spacing of street light poles in the residential areas of the town.
Inadequacy in number of street lights in the town.
Lack of fire fighting service facilities and staff.

City Specific Strategies and Action Plan


Goals and Service Outcomes
To improve the status of street lighting system in the town following goals have been identified for different
horizon years
Table 6.2.37: Goals & Services Outcomes for Different Horizon Years

S. No.

Components

Horizon Period
2015

2025

2035

Installation of New Street Light Poles

30%

70%

100%

Up-gradation of existing

100%

100%

100%

Underground Cabling

70%

100%

Energy Saving

70%

100%

100%

100% Fire Safety Coverage

100%

100%

100%

Fully Equipped Fire Station

100%

100%

100%

DMG Consulting Pvt. Ltd., Noida

Page 100

City Development Plan, Govindgarh, M.P.


Strategies and Action Plan
In order to address the above discussed issues and achieve the desired outcomes in each of the components
of street lighting and fire fighting in the town, strategies under short term measures, medium term and long
term action plans are elaborated below:
1. Short Term Measures: Short term measures include immediate trouble shooting actions such as Replacement of non working fixture on street light poles
Up-gradation of existing poles in terms of spacing from one to other
Strict control on illegal connection
Procurement of latest vehicles for street lighting
Procurement of 2 fire tenders for fire fighting.
These measures should be taken up on a continuous basis.
2. Medium Term Action Plan: This aims at the development of infrastructure over a perspective plan
period of 5 15 Years to bring about coordinated development among different components. These
measures typically will include various infrastructure projects including network improvements such
as Replacement of tube lights with power saving CFL and LED lights
Installation of new street light poles at standard spacing for 100% coverage
Installation of high Mast Light at important junctions, rotary and entry point of the town
Alternate Street Light options (Solar, energy saver like CFL, LED etc.) and installation of
automated control lights
Installation of solar based electric poles in public gathering places and recreational spaces
like river site
Installation of solar panels for generating solar power/electricity in institutions (such as ULB,
CHC etc.) and on identified government land within the municipal limit
Disaster Management Plan for fire-fighting
Institutional strengthening, human resources development leading to overall capacity
building of ULB for both the sector Street Lighting and Fire Fighting - including assets
required for the operation and maintenance
For Monitoring and Evaluation: Preparation of a detailed register, designing and implementing a
system to update the same on a regular basis, includes details of new installation of fixture, repair
and maintenance history.
3. Long Term Action Plan: The long term action plan aims at to the development of under-ground
cabling/utility ducts for the horizon year of 2035. This will also help in minimizing power theft.

Project Identification & Costing


With a view to cover the entire streets with lighting facilities and to handle and overcome the anthropogenic
hazards like fire in town the following projects have been identified:
Table 6.2.38 Proposed Project, Project Cost and Implementing Agencies for Street Lighting and Fire Fighting

Code No.

Projects proposed

SL 1

Installation of 218
street lights within the 75.00
wards/residential area (33230/- Solar street light pole)

DMG Consulting Pvt. Ltd., Noida

Project Cost Department


(in Lakh)
Govindgarh
Nagar Parishad

Page 101

City Development Plan, Govindgarh, M.P.


SL 2

High mast lights at entry points of the City (2 Nos.) and


in core area (2 No.) (15 lakhs/- unit)

60.00

Govindgarh
Nagar Parishad

SL 3

Procurement of 1 electric pole vehicle

25.00

SL 4

Procurement of 2 fire tenders and other equipment's 125.00


(one big and one small)

Govindgarh
Nagar Parishad
Govindgarh
Nagar Parishad

SL 5

Establishment of fire station and staff cost

50.00

Govindgarh
Nagar Parishad

SL 6

Training & capacity building of staff

5.00

Govindgarh
Nagar Parishad

Sub Total Cost (F)

340.00

* PWD (SOR) April 2011

6.2.6

Urban Poor and their Accessibility to Basis Services

Poverty in the Town


Around 21.49% (2264) of total population (10535) are slums, squatter and other poor population which
mainly resides in ward no. 1, 5, 6, 7, 10, 14 and 15 of the town. Their contribution to the citys economy has
been growing over the period. In the absence of clear policy to address their problems, the poor suffer from
many inadequacies in terms of access to basic services, socio-economic needs. It is necessary, therefore, to
articulate policies and programmes to mainstream the slum communities with the city, both in terms of
infrastructure provision and socio-economic development.

Separate Information on BPL Population and Slum Population


Out of the total slum population (2264); nearly 70% population (i.e. 1585) accounts for Below Poverty Line
(BPL) population.

Slums in the Town


Some of the densely populated areas in the city are classified as slums primarily because of lack of basic
services and also due to their unauthorized construction. Slums have kutcha houses and no open spaces.
According to the information or data provided by Nagar Parishad there are 7 wards (ward no. 1, 5, 6, 7, 10,
14 and 15) where slum population (about 2264) in Govindgarh are residing in Jhuggies/ Basti.

Figure 6.13: Housing condition in Slums in Govindgarh Town

DMG Consulting Pvt. Ltd., Noida

Page 102

City Development Plan, Govindgarh, M.P.


6.2.7

General Characteristics of Slum

Slums and squatter settlements are essentially products of poverty. In the context of basic service delivery,
almost by definition, the population living in slums lacks access to basic infrastructure services like safe
water, sanitation, solid waste collection and disposal, drainage, access roads, street lights, neighbourhood
amenities like safe play areas for children and community facilities and electricity connections.
The social composition of a majority of slums comprises SC, ST and OBC population. Most of the slums have
predominantly one caste staying in it or people from one place of origin.
A majority of the working population in slums is engaged in small scale industries or work as agricultural
labourers.
Health related obligatory functions of the Nagar Parishad are restricted and health related activities are
insufficient. Primary health is in poor conditions in the slums and lack of awareness among people.

Status of Slums (Notified/ Un-notified)


In Govindgarh there are total 15 wards, out of which 7 wards have part of slums but only three wards i.e. 7,
14 and 15 are notified as slum wards having a total slum population of approximate 2025 people.

Land Ownership and Tenure Status


Most of the slums in these 3 of wards in Govindgarh are located on government land. Government land
includes land belonging to the state or municipal govt. There are also many slums which are located on
private land belongs to individuals.
Government has from time to time issued the slum households legal ownership/ title of land/ Patta, as part
of its policy to ensure tenure security to the poor and landless.
Most of the slum dwellers have legal Land ownership. The land has been given to all the slum dwellers on
pattas. The Patta Act, 1984 & 1998 was introduced to grant leasehold rights to the landless persons
occupying urban lands. The act was amended in 1998 under Rajiv Gandhi Ashrya Abhiyan.

Unidentified Slums and Homeless Population/ Pavement Dwellers


Besides the notified slum locations there are few wards where slums exist but still they are not notified like
ward nos. 1, 5, 6 and 10.

6.2.8

Urban Basic Services in Slums (in line with JnNURM 7 point charter)

Slums within the town do not have adequate infrastructure facilities. The following analysis has been done
taking into account the seven point charter.

Status of Physical Infrastructure in Slums


Housing
The shelter conditions are very scruffy in the selected pockets. The majority of the houses in these slums area
are made of mud and wattle with burnt mud tiles (Khapra) and iron sheet roofs. These are a carry-over from
rural housing and its so-called semi-permanent houses (tin roofs plastered/ un-plastered floors with the
occasional plastered mud wall or wood and bamboo). Many of these houses lack basic amenities such as
toilet, power, water and security.

Water Supply

DMG Consulting Pvt. Ltd., Noida

Page 103

City Development Plan, Govindgarh, M.P.


In present situation most of the residents of the slum obtain their water either from improved point sources
like well or bore wells or from municipal council piped water supply system. Most of the open wells rely on
hand-drawn methods of water collection using rope and bucket. Some bore well are fitted with individual
hand pumps for local supply.

Drainage
The existing condition of surface drainage is a mess in the whole slum pocket. Most of the roads in the
selected slum areas do not have proper drainage system. During the monsoon most of these roads get
crammed with muddy water, which remain stagnant for weeks and as a result give rise to many diseases.

Sanitation
At present the main type of sanitation in these slum areas is the pit latrine. A few houses have water closets
with septic tanks which has been a major factor in ground water contamination. The sanitation alternatives
in selected sum areas also comprises of public latrine blocks, the pour flush latrines and toilet blocks which
are usually connected to septic tanks and then to nallah flowing to Raja Talab. The present condition suggests
that the public toilets are not successful in the town since a communal facility often seems to belong to no
one. Individual users have very little feelings of responsibility or commitment to keep it clean under these
circumstances. The latrines become unhygienic and in-sanitary and as a result people stop using it. Thus, the
residents who do not have access to one of these sanitation facilities have the common practice of open
defecation in open spaces.

Sewerage
In the existing scenario, the underground and protected sewerage system is absent in the entire town area.
In the slum areas sewage, sludge and storm water flows in open kuccha drains which causes serious health
and safety risks.

Road & Street Lighting


All the roads in the selected slums are narrow tracks eroded by runoff water. These roads lack drainage
which compounds the erosion problem. Only few areas in these slums have reasonably good access roads on
the periphery asphalt. In the internal areas of the slums there are largely stone paved/cemented and kuccha
roads. The problem with the existing roads in slum areas is their poor physical conditions and absence of
other supportive services.
At present street lighting in these slum areas are concerned, Nagar Parishad has provided the same to urban
poor but level of provision is low as compared to other areas of the town. Still there are few pockets in these
slum areas where street light has not been provided.

Solid Waste Management


As per the data provided by Govindgarh Nagar Parishad, there are 4 dustbins in the selected slum areas.
Most of the households dump their waste in the open or along the river side. Door-to-door collection system
is still not in practice.

Status of Social Infrastructure in Slums


Access to social infrastructure is an important factor for human development especially in slum areas. This
section highlights the availability of educational and medical facilities within the slum areas/pockets.

Educational Facilities
DMG Consulting Pvt. Ltd., Noida

Page 104

City Development Plan, Govindgarh, M.P.


As far as slums are concerned, there is only one school in ward no. 15 which is not sufficient to educate the
people including slum population at town level. Children of urban poor go to Government School located in
the bazaar area. The schools in the town do not have proper arrangement of basic requirement of drinking
water and sanitation facility for the student. More over the physical condition of the schools are not good. In
rainy seasons it becomes impossible to carry out the educational activities in the girls school.

Health Facilities
As per the survey conducted under the programme, very less percentage of slum pockets have access to
health care facilities within the distance of 100 meters to 500 meters. Most of the urban poor have to travel
more than 1.5 km distance to Community Health Centre for health care facility.

Social Security Schemes and Beneficiaries


The social security pension scheme was launched earlier in the town for Senior Citizens, Physically Challenged
and Widows, but only few peoples are getting benefited through the scheme in the selected slum
areas/pockets.

6.2.9

Present and Future Housing Demand

As per Census of India 2011, the average household size in the town is 6.5 which is higher than the national
urban average of 5.12. Since the town is in transition phase of development (rural to urban), it is semi-urban
in nature. The present and future housing demand for the town has been estimated by taking into account
the ideal size of a household / dwelling unit (DU) that is 5.0. The average household size in most of the wards
is higher than the ideal household size.

Table 6.2.39: Present and Future Housing Demand and Gap for Slum Population

Year
2011
2012
2013
2014
2015
2020
2025
2030
2035

Total Population
Non-Slum
Slum
8271
2264
8369
2291
8467
2318
8567
2345
8668
2373
9179
2512
9720
2661
10293
2817
10899
2983

Existing Supply
Non-Slum
Slum
760
208
760
208
760
208
760
208
760
208
760
208
760
208
760
208
760
208

Housing Demand
Non-Slum
Slum
1654
453
1674
458
1693
464
1713
469
1734
475
1836
502
1944
532
2059
563
2180
597

Housing Gap
Non-Slum
Slum
894
245
914
250
933
256
953
261
974
267
1076
294
1184
324
1299
355
1420
389

Source: DMG Assessment based on Projected Population


Note: Present and Future Housing Demand and Gap for Slum has been calculated by taking the present percentage of
slum population to the total population.

Based on the above assumptions, at present there is a gap for slum housing of 245 houses. This indicates that
there is a demand for housing.

Housing Gap Assessment


Present Housing Demand for EWS/Slum

453

Present Housing Gap for EWS/Slum

245

DMG Consulting Pvt. Ltd., Noida

Page 105

City Development Plan, Govindgarh, M.P.


Future Requirement of Housing for EWS/Slum in Year 2035

597

Future Gap of Housing for EWS/Slum in year 2035

389

6.2.10

Comparative Analysis with the UDPFI, CPHEEO Guidelines

1. Rajiv Awas Yojana : Guidelines for Slum-free City Planning


Slum-free City Plans of Action will require Slum Redevelopment/Rehabilitation Plans based on (a)
survey of all slums - notified and non-notified; (b) database creation of slums using geospatial
technologies; (c) integration of spatial and socio-economic data; and (d) identification of
redevelopment model proposed for each slum. It will also require policies and measure for the nonproliferation of growth of slums in the future.
States/UTs may consider the following steps for preparation of Slum-free City /Slum
Redevelopment/Rehabilitation Plans subject to the stipulation that the entire process of slum-free
city planning will have to be professionally managed and also be participatory, duly involving the
slum communities, NGOs, CBOs, elected municipal representatives, including Mayors and Municipal
Chairpersons, experts etc.
2. Guidelines for Integrated Housing & Slum Development Programme (IHSDP)
Provision of shelter including up gradation & construction of new houses
Provision of community toilets
Provision of physical amenities like water supply, storm water drains, community bath,
widening and paving of existing lanes, sewers, community latrines, street lights, etc.
Community Infrastructure like community centres to be used for pre-school education, nonformal education, adult education, recreational activities, etc.
Community Primary Health Care Centre Buildings can be provided
Social Amenities like pre-school education, non-formal education, adult education, maternity,
child health and Primary health care including immunization, etc.
Provision of Model Demonstration Projects
Sites and Services/houses at affordable costs for EWS & LIG categories
Slum improvement and rehabilitation projects.
3. Guidelines for Basic Services to the Urban Poor (BSUP)
Integrated development of slums, i.e., housing and development of infrastructure projects in
the slums in the identified cities
Projects involving development/improvement/maintenance of basic services to the urban poor
Slum improvement and rehabilitation projects
Projects on water supply/sewerage/drainage, community toilets/baths, etc.
Houses at affordable prices for slum dwellers/ urban poor/EWS/LIG categories
Construction and improvements of drains/storm water drains
Environmental improvement of slums and solid waste management
Street lighting
Civic amenities, like, community halls, child care centres, etc.
Operation and maintenance of assets created under this component
Convergence of health, education and social security schemes for the urban poor.

DMG Consulting Pvt. Ltd., Noida

Page 106

City Development Plan, Govindgarh, M.P.


6.2.11

SWOT Analysis

Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.

STRENGTH
Housing is mainly developed by individuals on plotted
development
The housing sector uses locally available cheap
materials like stone and bricks including bamboo and
woods
The land is cheap and developed land is available in
Govindgarh town
The town has scope for redevelopment for housing
transformation Kutchha to Pucca and tiles to RCC
roofs.
OPPORTUNITY

WEAKNESS
Urban poor have no tiled roof houses and
currently occupying in low lying areas
The provision of services will have difficulty
to reach at poor settlements in Govindgarh
The Kutcha houses and thatched roofs limit
scope of housing transformation for urban
poor in Govindgarh
The sites and services scheme has limited
success in town
Most of the population does not have margin
money to avail housing units under IHSDP.
THREAT

There are urban poor who have land titles, can access The urban poor have no regular jobs and
sites and services funds
faced migration to major cities
There is Government land available for relocation of The tribal prefer to stay in villages and
urban poor under IHSDP/BSUP
practice agriculture in old age
The tribal target groups have affordability to pay for The sale of property becomes difficult in case
EWS public housing especially those working in
of shifting of jobs.
Government and having regular jobs
Encouragement in land Patta distribution will increase
housing construction activities among the urban poor.

6.2.12

Issues

Most of the houses in the slums are kutcha type. There is lack of basic services and amenities in terms of
quantity and quality. Due to bad economic conditions, the urban poor are not able to contribute much into
housing. Most of the slums have land tenure ship, which can act as a potential for improvement of slums in
the city.
The shelter conditions are very scruffy in the selected pockets. The majorities of the houses in these
slums areas are made of mud and wattle with burnt mud tiles (Khapra) and iron sheet roofs.
Many of these houses lack basic amenities such as toilet, power, water, open spaces etc. and have
katcha houses.
Most of the residents of the slum obtain their water from Municipal Hand pumps.
The existing condition of surface drainage is a mess in the whole slum pocket.
At present the main type of sanitation in these slum areas is the pit latrine.
All the roads in the selected slums are narrow tracks eroded by runoff water.
There are 4 dustbins in the selected slum areas (In ward 1, 5 and 15).

DMG Consulting Pvt. Ltd., Noida

Page 107

City Development Plan, Govindgarh, M.P.


Only one school in slum areas is located (in ward no. 15) which is not sufficient to educate the people
including slum population at town level.

6.2.13

City Specific Strategies and Action Plans


Encouraging slum improvement schemes like improvement of physical i.e. water supply, drainage,
sanitation facilities as well as social infrastructure like education, health facilities in the slums
Construction of underground sewage system in the town including slum areas
Solid waste bins must be provided to all the wards and ensure the primary and secondary collection
including segregation of waste at source
Pucca drains and culverts must be provided in all wards including slum areas
Providing land ownership to the slum dwellers that are located in non-hazardous govt. land, so that
the people can invest of their own houses
For skill up-gradation and economic up-liftment various schemes should introduce, so that people
can spare for proper housing
Involvement of NGOs should be encouraged for improvement of slums
Government should act as a facilitator rather than provider for the improvement of the housing
condition of the slums
Community participation should be emphasized in every scheme launched by the government or
NGOs.
Relocation of slums from hazardous/flood prone areas.

Project Identification & Costing


Presently slum coverage is 9.25% of the city and there is lack of physical and social infrastructure in most of
the slums as well. So to make the city slum free the following projects have been identified in this sector:
Table 6.2.40 Proposed Project, Project Cost and Implementing Agencies for Urban Poor

Code No.

Projects proposed

UP 1

Construction of 1139 DUs in to solve the housing 4000.00


problems in the slums under IHSDP as per the
availability of suitable Govt. Land (@3.5 lakhs/unit)

Sub Total Cost (G)

Project Cost (in Department


Lakh)
MPHB; GNP

4000.00

*PWD (SOR) April 2011

6.3
6.3.1

Social Infrastructure
Health

Overall Health Facilities


There is general awareness among the residents about environment protection and cleanliness in the town.
The Parishad is actively engaged in maintaining cleanliness and hygiene of the town. At present, there is one
Community Health Centre (CHC) with 30 beds and two Primary Health Centres (PHCs) in surrounding Gram
Panchayats in Rehat and Tikar. There are five doctors, five nurses, two assistant nurses and two supporting
DMG Consulting Pvt. Ltd., Noida

Page 108

City Development Plan, Govindgarh, M.P.


staff. The prevalent diseases in town are malnutrition, viral diarrhoea, dysentery, malarial fever and
tuberculosis. Apparently, the existing health systems seem to be adequate to meet the local requirements of
existing population. However, the demand for health services is bound to increase along with growth in
population and there is a need for creating a specialty hospital for the growing population. There is an
ambulance to carry pregnant women to the CHC and if required to Rewa for further treatment.

Basic Health Indicators


The basic health indicators in the city are infant mortality rate, life expectancy, maternal mortality ratio,
Physicians per 10,000 population, Nurses per 10,000 population,: Professional nurses, Total Expenditure on
Health (THE) as % of Gross Domestic Product (GDP), Occurrence of epidemics etc.

Medical Facility Provided by Municipal Body


There is no medical facility provided by Govindgarh Nagar Parishad. Only vaccination is arranged time to
time, basically in rainy season or at the time of any communicable diseases like malaria or fever.

Role of Municipal Body in Health Programmes


The department of public health and family welfare is responsible for health related factors in the state of
Madhya Pradesh. This department organizes several health campaigns initiated by the state and central
government and monitors the health indicators of the state. Major role of the municipal body is to assist the
state officials in the health campaigs and awareness programmes launched for the citizens. However, basic
health facilities are provided through Community Health Centre administered by Public Health and family
Welfare Department of State Government. Looking at the development of Govindgarh and its future growth
prospects, it is important to initiate and strengthen the health facility services for municipal body itself to
provide effective health services to the citizens of the town.

6.3.2

Education

Overall Educational Facilities and Teachers in the Town


Altogether there are 5 government schools in Govindgarh. Out of this 3 are primary, 1 high school for boys
and 1 higher secondary school for girls provided by government. There are four private schools in the town.
The town has an Anganwai kendra in each ward. The schools have basic facility like toilets, urinals, drinking
water facility and playground. Further improvement in the facility is needed for a healthier environment.

Figure 6-6: Schools in Govindgarh

DMG Consulting Pvt. Ltd., Noida

Page 109

City Development Plan, Govindgarh, M.P.


Basic Education and Literacy Indicators
Basic education/ literacy indicators are Primary school enrolment ratio (females as % of males), Adult literacy
ratio (females as % of males) and Secondary school enrolment ratio (females as % of males) etc.
As per 2001 Census, the average literacy rate of Govindgarh town was 57.45 % which increased to 66.55% as
per 2011 Census but it is lower as compared to the District Average of 73.42 %. The male literacy rate as per
census 2011 is high at 75.97 % while female literacy rate is a significant 56.58 %. The status of women in
terms of literacy has been significantly low at town level; this lower literacy rate may be due to the absence
of proper education facilities and the backwardness of the area. The lower female literacy rate may be due to
absence of social awareness and up-liftment.
Table 6.3.1: Comparative Assessment of Literacy Rate Govindgarh, M.P.

Area

Literacy Rate (in %age)


Total

Male

Female

2001

2011

2001

2011

2001

2011

Urban India

79.92

84.98

86.27

89.67

72.86

79.92

Madhya Pradesh

79.39

84.90

87.39

90.24

70.47

77.39

Rewa District

62.01

73.42

75.65

83.67

47.58

62.49

Govindgarh Nagar Parishad

57.45

66.55

69.58

75.97

43.94

56.58

Source: Census of India, 2001 & Provisional Figure, Census of India 2011.
Table 6.3.2: Ward Wise Comparative Assessment of Literacy Rate Govindgarh, M.P.

Ward No.

Literacy Rate (in %age)


Total

Male

Female

Ward No.1

47.79

59.08

35.79

Ward No.2

63.20

76.63

47.39

Ward No.3

54.58

67.57

41.48

Ward No.4

70.90

85.46

55.38

Ward No.5

73.82

82.30

63.27

Ward No.6

57.96

69.03

46.05

Ward No.7

42.06

54.72

29.63

Ward No.8

64.60

76.80

49.84

Ward No.9

50.39

66.16

34.27

Ward No.10

64.21

75.48

51.27

Ward No.11

60.08

71.43

47.83

Ward No.12

73.44

82.61

63.38

Ward No.13

56.34

72.47

39.86

Ward No.14

27.07

34.07

19.33

Ward No.15

58.05

70.60

39.50

DMG Consulting Pvt. Ltd., Noida

Page 110

City Development Plan, Govindgarh, M.P.


Average

57.45

69.58

43.94

Source: Census of India, 2011

The above figure shows ward-wise distribution of literate population in Govindgarh. Most of wards have
higher literate population; ward no. 5 ranking the highest followed by ward no. 12 & 4. The wards having
literacy rate below 50% are ward nos. 1, 7 and 14.

Educational Facilities Provided by Municipal Body


There are no educational facilities provided by Govindgarh Nagar Parishad. All the schools and colleges are
administered by state education department of Madhya Pradesh except private ones.

Map 6-7: Social Infrastructure of Govindgarh

6.3.3

Recreation and Entertainment

Recreational Facilities (Parks, Playgrounds etc.)


At present there is no any designated and organized parks & playground, in the town as recreational facilities
for the citizens except the area along the pond side which is not maintained and developed. There is a
Ramlila ground near the Nagar Parishad.

Sports Facilities
Town has a polo ground with a pavilion for sports. Besides this, there is no other planned sports facility.

DMG Consulting Pvt. Ltd., Noida

Page 111

City Development Plan, Govindgarh, M.P.


6.3.4

Fire Fighting Services

There is no separate office for fire fighting operations in the town. The responsibility of fire services has been
delegated to the municipality, among other tasks but there is no formal fire fighting services available in the
town. In such anthropogenic hazards situation few water tankers are being used and GNP asks for help from
District Headquarter Rewa. Moreover there is no additional options/manpower available for rescue
operations.
Thus, the ULB urgently needs a fully fledged fire fighting department equipped with latest fire-fighting
vehicles (including operation and maintenance of assets) and well trained manpower to control the
anthropogenic hazard and fire mishap for Govindgarh Nagar Parishad.

6.3.5

Comparative Analysis with the UDPFI Guidelines

The following tables provide information on the comparative analysis with UDPFI guidelines and the demand
and supply gaps for social infrastructure in Govindgarh Nagar Parishad.
Table 6.3.3: Comparative Analysis with UDPFI Guidelines Social Infrastructure

Particulars

Standards/Norms

Current Status

Pre- Primary, Nursery School

1 for 2,500 population

Senior Secondary School

1 for 7,500 population

Integrated School with/without hostel facility

1 for 90,000-1
population

School for handicapped

1 for 45,000 population

College

1 for 1.25 lakh population

Technical Education centre

1 such centre for every 10 lakh

Educational Facilities

lakh -

Health care Facilities


Intermediate Hospital

1 for 1 lakh population capacity

Poly- clinic with some observation beds

1 for 1 lakh population

Nursing home, Child welfare and maternity 1 for 0.45 to 1 lakh Included in CHC
centre with 25 30 beds
population
Dispensary

1 for 0.15 lakh population

Community room

1 for 5,000 population

Community hall and library

1 for 15,000 population

Recreational Club

1 for 1 lakh population

Music, dance and drama centre

1 for 1 lakh population

Meditation and spiritual centre

1 for 1 lakh population

Socio-cultural Facilities

Police

DMG Consulting Pvt. Ltd., Noida

Page 112

City Development Plan, Govindgarh, M.P.


Police station

1 for 90,000 population

Police post

1 for 0.5 lakh population

1 for 2 lakh population

Fire
1 fire station or sub fire station within 1 - 3km

Table 6.3.4: Present and Future Demand and Supply Gaps Social Infrastructure

COMPONENTS
Particulars
Govindgarh
Population

YEARS
2011 2012 2013 2014 2015 2020 2025 2030 2035
Projected 10535 10659 10785 10912 11041 11691 12380 13110 13883

Health Infrastructure Demand


Particulars

2011

Intermediate
Demand

Hospital 1

2012

2013

2014

2015

2020

2025

2030

2035

Intermediate Hospital Existing

Intermediate Hospital Gaps

Poly- clinic
with some 1
observation beds Demand

Poly- clinic
with some 0
observation beds Existing

Poly-clinic Gaps

Nursing home, Child welfare 1


and maternity centre with 25
30 beds Demand

Nursing home, Child welfare 1


and maternity centre with 25
30 beds Existing

Gap for Nursing Home Child 0


welfare and Maternity Centre

No. of Dispensaries Required

No. of Dispensaries Existing

Dispensaries Gap

No. of Beds Required at CHC/ 30


nursing home or maternity
center
Bed Req. @ 1 per 500 person 21
for intermediate hospital

30

30

30

30

30

30

30

30

21

22

22

22

23

25

26

28

Bed Req. @10 per poly-clinic

10

10

10

10

10

10

10

10

10

DMG Consulting Pvt. Ltd., Noida

Page 113

City Development Plan, Govindgarh, M.P.


No. of Beds Existing at CHC, 30
nursing home or maternity
center, poly-clinic

30

30

30

30

30

30

30

30

Bed Requirement Gaps

32

33

34

34

38

43

48

54

31

Educational Infrastructure Demand


Demand of Primary School

No. of Primary School Existing

Primary School Gap

Demand for Middle & Higher 2


Secondary Schools

No. of Middle / Higher 2


Secondary Schools Existing

Gap for Middle and Higher 0


Secondary Schools

Integrated School with Hostel 1


Facility Demand

Integrated School with Hostel 0


Facility Existing

Gap for Integrated School with 1


Hostel Facility

Demand for Technical Institute

Existing Technical Institute

Gap for Technical Institute

Area Demand for Recreational 0.79


Spaces in Hectares @ 14% of
Developed Area

0.79

0.79

0.79

0.79

0.79

0.79

0.79

0.79

Parks in Hectares Existing

Gap

0.79

0.79

0.79

0.79

0.79

0.79

0.79

0.79

0.79

Community Room Demand

Community Room Existing

Gap for Community Room

Community Hall and Library 1


Demand

Community Hall and Library 0


Existing

Gap for Community Hall & 1


Library

Recreational Facilities Demand

Source: Population Projection & DMG Assessment as per UDPFI Guidelines

DMG Consulting Pvt. Ltd., Noida

Page 114

City Development Plan, Govindgarh, M.P.


6.3.6

SWOT Analysis

Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.

STRENGTH

WEAKNESS

Health
Health
There is a Community Health Centre in There is a lack of specialty/Intermediate hospital
Govindgarh which serves as a referral health
and poly-clinic in the town
centre.
No private clinics
Poor people have limited affordability to pay for
health services
Communicable and Vector borne diseases are
common in Govindgarh.
Education
Education
Govindgarh has a high literacy rate of 69.88%
The girls have to undertake household work or
support in economic activities of the family thus
Sufficient number of higher secondary school
the literacy rate among the females is low at
Govindgarh has sufficient no. of college for higher
63.17%.
education.
There is a lack of integrated school with hostel
facility and technical institute ITI in town.
Recreation and Entertainment
Recreation and Entertainment
Plenty of land is available for the development of Town does not have any designated place as park
recreational area such as park and playground in
or playground as recreational area for the citizens
the town.
except the polo ground
Absence of community room, community halls and
public library in the town for the citizens
Absence of tourist facility or picnic spots.
OPPORTUNITY
THREAT
Health
Health
There is scope for private and low cost health
infrastructure in Govindgarh
There is population without proper medical
facilities
State government commitment for health and
education services.
Education
Private sector participation in development of
education sector
State government commitment for education
service
Right of children for free and compulsory
education act will provide free education for poor
children
Recreation and Entertainment
PPP possibilities are there to develop the river
DMG Consulting Pvt. Ltd., Noida

The infrastructure in Government hospitals is


inadequate to handle the number of patients.

Education
Lack of monitoring and regularization
Lack of maintenance for educational institutions
such as government schools.

Recreation and Entertainment


Lack of monitoring and regularization.
Page 115

City Development Plan, Govindgarh, M.P.


front
Community participation
development.

6.3.7

fund

for

social

Issues

1. Health Sector
Town has insufficient facilities for hospital, poly-clinic, dispensary and doctors
Town has no intermediate/specialty hospital and specialized health care facilities for which it
depends on nearest town Rewa.
2. Education Sector
Town has insufficient number of primary schools
The physical conditions of the schools are not good
Schools do not have proper basic requirement of drinking water and sanitation facilities for
students, except private school
Inadequate teaching staff in Government Schools
Town does not have any technical/vocational training institute such as ITI.
3. Recreational and Entertainment Sector
There is no notified or designated place as open space, parks or play ground for the residents.
There are no community gathering halls or rooms, public library etc. for the citizens
Picnic spot or recreational areas like Raja Talab, Sunder Ban, Govindgarh Fort etc. are there but
its proper development has not been done.

6.3.8

City Specific Strategies and Action Plan

1. Health Sector
Extension of hospital situated in the premise of community health centre by constructing a multi
storied block
As there is poor infrastructure in health sector in the town, care should be taken by providing
land for development of new intermediate/ multi-specialty hospitals, poly-clinics, increase beds
and number of doctors in the existing hospital and health care centres
Lack of specialized medical care in the existing health care centres, so specialized medical
services should be facilitated in the town by constructing dispensaries
Municipal body can initiate the different health campaigns throughout the year and create
public awareness for prevention of diseases especially during monsoon season
By providing proper health facilities in the city, health tourism can be promoted in the area
which will serve the region and generate revenue for the city.
2. Education Sector
Facilitating provision of more number of schools at the primary and secondary education level
along with required infrastructure facilities for the sector
Reconstruction or renovation of school buildings and other infrastructure which is in dilapidated
conditions
Enhancement and maintenance of infrastructure facilities like drinking water, toilet, solid waste
management etc. in schools and other educational institutions
Establishment of vocational training institutes and ITIs
For adult skill up-gradation as well as self-employment opportunities, establishment of
vocational school should be encouraged
Public awareness programmes should be encouraged in urban poor areas as they are not willing
to educate their children

DMG Consulting Pvt. Ltd., Noida

Page 116

City Development Plan, Govindgarh, M.P.

Municipal body shall initiate the literacy campaigns and spread the awareness of education
especially in the slums.
Municipal body shall initiate awareness programmes related to Right to Education especially
for girls and its importance to all citizens to increase the literacy rate among the female.
3. Recreational and Entertainment Sector
Municipal body shall identify the place and initiate the development of community room, Rain
Basera, community halls and public library in town for the citizens as per the norms
Pond development can be done on PPP basis which can be use and conserved as major tourist
site, picnic spot or recreational area for the citizens as well as for domestic tourism
Municipal body shall identify places and designate the same as parks and play grounds for the
residents to cope with present and future development of town.
Municipal body shall identify the site for the development of Stadium/play ground for the town.

Project Identification & Costing


Health Facilities
Most of the population is not served by this because of poor medical infrastructure facilities in terms of
hospital beds and doctors. So the following projects have been identified for the overall development of the
sector:
Table 6.3.5 Proposed Project, Project Cost and Implementing Agencies for Health Facilities

Project Cost (in Department


Lakh)

Code No.

Projects proposed

H1

Extension of hospital situated in the premise of 150.00


health centre by constructing multi storied
building thereby extending the health facilities

Health
Department

H2

Construction of 1 Multi-specialty / intermediate 75.00


hospital with 44 no. of beds @1 bed per 500
person for 2035 in ward no. 10 or 13

Health
Department

H3

Construction of 1 10-bedded Poly-clinic


2035 in ward no. 13

Health
Department

Sub Total Cost (H)

for 50.00
275.00

* PWD (SOR) April 2011

Educational Facilities
Considering the emerging issues and potentials in the sector, the following projects have been identified in
the education sector:
Table 6.3.6: Proposed Project, Project Cost and Implementing Agencies for Education Facilities

Code No.

Projects proposed

DMG Consulting Pvt. Ltd., Noida

Project Cost (in Department


Lakh)

Page 117

City Development Plan, Govindgarh, M.P.


E1

Establishment of 1 Integrated School with 500.00


Hostel Facility

Education
Department, Govt.
of M.P.

E2

Establishment of 2 Informal and adult 10.00


literacy centres, Anganwadi centers in ward
no 15 & 13(@5 lakh each)

Education
Department, Govt.
of M.P.

E3

Construction of Polytechnic college/ 500.00


Vocational Training Institutes and ITIs

Education
Department, Govt.
of M.P.

E4

Renovation of school buildings which are in 50.00


bad condition

Education
Department, Govt.
of M.P.

E5

Provision of equipments and necessary 10.00


infrastructure like provision of toilets, safe
drinking water, kitchen shed and electricity
etc. in education institutions

Nagar Parishad

E6

Establishment of a Public Library

Nagar Parishad

Sub Total Cost (I)

70.00
1140.00

* PWD (SOR) April 2011

6.4

Environment

6.4.1

Flora and Fauna

As such there is no records found regarding the flora and fauna in the study area i.e. Govindgarh Nagar
Parishad.
At regional level, the region is rich in valuable minerals, forests and wild animals. Variability in climatic
conditions brings about significant difference in the forest types of the state. There are four important forest
types viz. Tropical Moist, Tropical Dry, Tropical Thorn and Subtropical broadleaved Hill forests. The status of
the forests is reserved and protected forests and forests owned and maintained by villagers that have no
protected status.
The prevalent trees in the forests of Rewa District are Mango, Neem, Jamun, Sagon, Sal, Tendu, Shishum,
Eucalyptus, Teak, Palas, Saja, Mahua bamboo etc, The brushwood consists mainly of the species
Grewiazizyphus, Casearia, Antidesma, Woodfordia, Flueggia, Phyllanthus, Bosewellia and Buchanania with
occasional trees of mahua (Bassialatifolia). The Rewa District is famous for white tigers, bears, panthers,
sambar (Cervus unicolor), Chinkara (Gazellabenetii) and other species. Wild fowl of all classes are common
throughout the area.

6.4.2

Pollution Levels (Air, Water and Soil)

1. There is no monitoring facility for pollution level in Govindgarh


2. Monitoring of pollution level is done by Pollution Control Board located in Rewa, the District
Headquarter.
DMG Consulting Pvt. Ltd., Noida

Page 118

City Development Plan, Govindgarh, M.P.


6.4.3

City Green Spaces

As per the existing land-use 2011 the town has plenty of agricultural land but does not have any designated
and organized green space or open spaces for the citizens. According to the UDPFI guidelines, the open
spaces for parks and playgrounds/ green space should be around 12-14% of the total developed area, which
shows there is a lack of planned developed open spaces in the city. The town needs developed recreational
areas of around 0.8 ha.

6.4.4

Water Front Development and Conservation

A large portion of the Parishads area lies under water. There is a perennial water body in the town. The
water body is separated into two portions known as Raja Talab and Rani Talab. The Parishad has prepared a
project for the beautification and conservation of the great water body of the town but due to delay in
sanction of the fund the project is lying unimplemented. Thus, there is a great scope for the development of
the pond.
Therefore to attract the potential domestic and national/international tourists to Govindgarh, different water
front development activities like green belt, boating, landscape along the riverside should be developed.

6.4.5

SWOT Analysis

Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
No industrial pollution as of now
Scenic beauty around the water body
Good ambient air quality

WEAKNESS
Inadequate planning efforts for provision of green
spaces
No environmental compliance system from urban
local body
Lack of monitoring system for pollution control

OPPORTUNITY

THREAT

Good potential for developing a recreational Lack of public awareness regarding environment
management.
space, tourist or picnic spot
States policy implementation for ecotourism in
Govindgarh.

6.4.6

6.4.7

Issues
There is no environmental compliance system at municipal level
Lack of air, water and soil pollution monitoring facilities for pollution level
Inadequate planning efforts regarding provision of green spaces for citizens
Public health is under threat due to absence of basic infrastructure facilities
Waste water drains directly discharge along with municipal solid waste into drains
No water body conservation and beautification has been undertaken
Informal sectors and slum settlements in open areas.

City Specific Strategies and Action Plan


Conservation and beautification of existing ponds and other water bodies
Development of designated and organized parks and playgrounds in the town as per the standards
DMG Consulting Pvt. Ltd., Noida

Page 119

City Development Plan, Govindgarh, M.P.

6.5

Conservation and plantation of appropriate tree species on the existing roadsides and along both the
sides of the river to mitigate the level of air pollutants
Promotion of rainwater-harvesting and providing more open spaces for water recharge and
plantation at the planning stage for development schemes
In order to control environmental pollution, GNP shall initiate the awareness campaigns for
plantation and other pollution control strategies
There is need of municipal level policy for urban greening of the town with review and monitoring
provisions.

Heritage and Conservation

6.5.1

Identification of Tourist Spots at Local Level

At town level, Govindgarh has many tourist destination and heritage buildings along with some natural
elements such as nallah, pond and water bodies.
HERITAGE:
1) Govindgarh fort
RELIGIOUS:
1) Ram Govind Temple
2) Panchmukhi Temple
3) Chowandi Temple

4) Shiva Temple
5) Khando Devi Temple
6) Hanuman Temple

NATURAL SCENIC AREA:


1) Raja Talab
2) Nallah and pond
The existing water bodies (i.e. Raja Talab) can be developed as recreational area for town by developing
tourist infrastructure and also as a major eco-tourism site for the locals as well as for domestic tourists.
Unfortunately, the town has not been able to capitalize its potential in this sector as the site is in undeveloped stage and lacks sufficient and efficient modes of transportation, infrastructure services such as
street lights, public drinking water, public toilets, eating places etc. that can hold the tourist.
The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands. It is a small Island within the lake which is known for its scenic beauty and lush
green surroundings. The Sunderja Mangoes of Govindgarh are famous in the country. The people of the area
are decent and have higher human values. The law and order situation of the area is also good. This is being
developed as a future tourist destination to attract International Tourists.
Table 6.5.1: List of Important Tourist Spots in Town

Tourist Spot
Raja Talab and Rani Talab

Location
Located in southern part of the town near Govind Fort

Source: DMG Assessment

DMG Consulting Pvt. Ltd., Noida

Page 120

City Development Plan, Govindgarh, M.P.


Govindgarh is also known as `Mini Vrindavan and a large number of famous temples are situated in the
region. Major temples are Ram Govind Temple, Panchmukhi Temple, Chowandi Temple, Shiva Temple and
Hanuman Temple. All these temples are within the vicinity of the famous Govindgarh Fort. It is also believed
that the name Govindgarh is derived from the Govind Temple now situated within the Govind Garh Fort
Premises.

Figure 4.6-85: Rani Talab and Raja Talab in the town near Govindgarh Fort

The above listed tourist spots such as Buddha Stupas & Rock Painting at Deorkothar, Big statue of God Shiva
called "Bhairom Baba" at Gurh, Kyunti Water Fall etc. are in un-developed stage as they lack sufficient and
efficient modes of transportation, infrastructure services - street lights, public drinking water, public toilets,
eating places etc.

Map 6.5: Tourism in and around Govindgarh Town

DMG Consulting Pvt. Ltd., Noida

Page 117

City Development Plan, Govindgarh, M.P.


6.5.2

Identification of Tourist Spots at Local Level and Regional Level

At regional level Rewa District has a major tourist and pilgrim sites which attract tourists. Rewa district has
some major religious and adventurous tourism spots including Gurh, Govidgarh, Hanumana, and Kyunti
Water Fall. It is also proud to have an ancient archeological site - Buddhist Stupas and Rock Painting at
Deorkothar declared as monument of national importance in 1988 by the Govt. of India and is being
preserved and conserved by Archaeological Survey of India, Bhopal.
Moreover the strategic location of town at the state borders provides it a status of gateway to the famous
pilgrimage center Prayag or Allahabad. Tourists coming from the holy city Prayag or Allahabad moves
straight to Orchha or Khajuraho, Maihar, Panna National Park, Bandhavgarh National Park. Thus, Govindgarh
town falls under KhajurahoPannaBandhavgarh-Chitrakoot-Allahabad tourist circuit.

Table 6.5.2: List of Important Tourist/Destination Spots at Regional Level

Tourist Spot

Location

Sites within the Town


Lal Bagh
Raja Talab

The area famous for its Sunderja Mango garden


Located just behind the Govindgarh Fort. It is pond with a
nalah which flows in the town
Govindgarh Fort
The Govindgarh palace used to have security like a well
protected fort. The stately palace of Gobindpur, on the banks
of the Lake, houses a police training school and Baghela
museum now
The island, nestled in the Lake, also showcases a wonderful
palace. The doorway of this beguiling palace, however, is
closed for the general public
An underground tunnel is also there which was used as a
secret path for kings between Govind Garh & Rewa.
Ram Govind Temple, Panchmukhi All the mentioned temples are located nearby Govindgarh Fort
Temple, Chowandi Temple, Shiva It is also believed that the name Govindgarh was based on the
Temple, Hanuman Temple.
Govind Temple now situated within the Govind Garh Fort
Premises.
Place
Distance from Specialty
Town
Sites within its proximity
Khando Devi Temple
2 Km
Khando Devi Temple
Cave under Vindhyahal 8-9 Km
Kamyni Devi Mandir
Mountain Range
Deorkothar (Tyonthar 25-30 Km
Buddhist Stupas and Rock Painting declared a monument of
national importance in 1988 by the Govt. of India and is being
tehsil)
preserved and conserved by Archaeological Survey of India,
Bhopal.
Kyunti Water Fall
40-45 Km
Can be developed as tourist spot.
Rewa
80 Km
Rewa Fort, Rewa Fort Museum; Venkat Bhawan and Shiva
Temple, Rani Talab Temple
DMG Consulting Pvt. Ltd., Noida

Page 118

City Development Plan, Govindgarh, M.P.


Gurh

110 Km

Prayag and Allahbad

45 km

Varanasi

165 Km

Big statue of God Shiva called "Bhairom BaBa"; Famous


Temple of "Shiva Ji & Alliad Gods"; Natural Lake called "
Kudia"; Famous Pond of "Rani Ka Talab" & Maharua Ka
Talab.
Sangam a place of religious importance and the site for
historic Kumbh Mela held every 12 years.
Allahabad Fort built in 1583 by Emperor Akbar, stands on the
banks of the Yamuna near the site of confluence with the river
Ganges.
A Holly City Temples and Ghats

Source: DMG Assessment

Map 6.6: Regional Tourism Destination around Govindgarh Town

The overall economy of the town is highly localized and confined to only low economic activities of the
hinterland. Tourism is also not contributing too much to the economic development of the town, it is

DMG Consulting Pvt. Ltd., Noida

Page 119

City Development Plan, Govindgarh, M.P.


concluded that tourism development and industrial development together can contribute a lot to the
development of the region as a whole.

Map 6.7: Regional Tourism Destination around Govindgarh Town

6.5.3

SWOT Analysis

Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH

WEAKNESS

Lack of conservation & management of tourist


Town is rich in heritage and natural beauty
resources
Accepting Matasya Palan as new emerging
Lack of awareness and management techniques of
activity in the town.
heritage and natural elements.
OPPORTUNITY

DMG Consulting Pvt. Ltd., Noida

THREAT

Page 120

City Development Plan, Govindgarh, M.P.


Existing water body can be developed and Improper infrastructure services, local awareness
and un-developed lake front etc. are major
conserved as major tourist site for the locals as
hindrance for the development of the tourism
well as for domestic tourism
Town has a great royal history which can be used Disposal of solid waste into the Talab.
in some perspective.

6.5.4

Issues
Town is rich in natural and architectural heritage but there is no management of these resources. In
other words, there is a lack of conservation in the town.
Town does not have a dumping site, as a result waste is disposed into open drains and along the
roads. It is a cause of pollution of water bodies.

6.5.5

City Specific Strategies and Action Plan


Water front development should be done on PPP basis along with lake and its related activities like
water sports, theme park and boating etc. to encourage tourism.
Facilitating infrastructure in terms of good means of transport, hotels and resorts to attract tourists.
Govindgarh can be developed as a rural tourist centre.
Promoting Govindgarh as a transit point for the surrounding tourist destination like Gurh, Orchha or
Khajuraho, Maihar, Panna National Park, Bandhavgarh National Park.

Project Identification & Costing


Presently the tourism industry is lacking infrastructure facilities and there is shortage of active recreational
space in the city. With a goal to enhance the tourism activities in the city the following projects have been
identified for improvement of the sector:
Table 6.5.3 Proposed Project, Project Cost and Implementing Agencies for Tourism

Code No.

Projects proposed

T1

Preparation of Detailed Project Report for Raja


Talab development including landscaping,
designing and details of infrastructure required

6.00

UADD, Govt. of M.P. and


GNP

T2

Conservation and tourism


infrastructure
Development of Govindgarh fort Development,
beautification, plantations along the raja Talab
and rani Talab

500.00

Tourism Dept. Govt. of


M.P.

T3

Development of active recreation facilities like


water sports, theme park and boating etc.

50.00

Govindgarh
Parishad

T4

Promoting Govindgarh as a transit point by


making provision for a tourist circuit and
associated tourism infrastructure for the
surrounding tourist destination.

50.00

Tourism Dept. Govt. of


M.P.

Sub Total Cost (J)

Project Cost Department


(in Lakh)

Nagar

606.00

* PWD (SOR) Ap

DMG Consulting Pvt. Ltd., Noida

Page 121

City Development Plan, Govindgarh, M.P.

CHAPTER 7
Tourism and Heritage Conservation

DMG Consulting Pvt. Ltd., Noida

Page 122

City Development Plan, Govindgarh, M.P.

7.
7.1

Tourism and Heritage Conservation


Background

Madhya Pradesh offers outstanding opportunity to indulge in various tourism options such as cultural
tourism, heritage tourism, adventure tourism, wildlife tourism and many more. A variety of traditions in each
of Madhya Pradesh's four geographical and cultural regions-Malwa, Nimad, Baghelkhand and Bundelkhand
have added color to the State's rich cultural tapestry, making it a many splendored land. There are many
deserving tourist destinations in the State widely acclaimed for its rich cultural heritage sites and wonders.
Heritage tourism is one of the most popular options of tourism appealing tourists from all over the world.
Though, heritage Tourism has great potential in Govindgarh city. It has heritage structures like Govindgarh
fort, temples with unique architecture forms, royal history, fairs and festivals, history of white tigers,
bountiful nature with Raja Talab and Rani Talab, Sunder ban, easily accessible national wild life sanctuary and
dam, etc.
Govindgarh falls under Jabalpur KhujrahoRewaGovindgarhBandhavgarhJabalpur circuit. Despite it
ideal location within the tourism circuit with rich inventory of tourism resources, this region Lacks Tourism
infrastructure such as Tourist Information Centers, transportation facilities, public conveniences such as
toilets, refreshment centers, information Centre etc. Further, being located in isolation in terms of
development, the region is facing challenges, which directly and indirectly curb the growth of tourism. The
existing infrastructure, safety & Security, local awareness and others are the major hindrance for the
development of the tourism in this region.
The Govindgarh region receives very few numbers of tourists in comparison to other destination of tourism
circuits. Despite its strategic location within the circuit, city has not been developed as a nodal Centre as base
city to cater tourist for its facilities. The existing infrastructure is inadequate to support tourism in the region
and it needs urgent up gradation. The region has wide range of tourism products, which need to be
integrated and made an intra-circuit to increase the duration of stay of the Tourists in the region. Govindgarh
city has great potential in the region to cater tourist from the circuit i.e. KhujrahoRewaGonindgarh
BandhavgarhJabalpur.
Integrating with other destination, Govindgarh can be converted as a transit zone between Khajuraho and
Varanasi or Bandhavgarh.
Hence, immense potential for developing Govindgarh as one of the destination with heritage, scenic beauty
and religious node, need to be fully exploited. In terms of improving the tourism product, in the short term
quick gains can be made by developing the destination and providing basic infrastructure facilities at various
tourist locations and at city level with high potential, which are already well connected and have a
reasonable infrastructure in place.

7.2

Madhya Pradesh Tourism and Heritage Policy

The State Tourism Policy, Heritage Tourism Policy and Eco and Adventure Tourism Policies of the State
supported with initiatives towards strengthening of infrastructure and facilities at places of tourist interests is
an important indicator of commitment of the GoMP to create an environment conducive for attracting
increased private investment in the tourism sector. In accordance with the aims and objectives of the
Tourism Policy of the State and the provisions made towards development of tourism sector, the
Government of MP, Department of Tourism has issued a Policy for the Allotment of Government Land for the
Development of Tourism in the State.

DMG Consulting Pvt. Ltd., Noida

Page 123

City Development Plan, Govindgarh, M.P.


The Madhya Pradesh Department of Tourism has, to date, sought to develop the tourism potential of the
State by involving itself in three major activities: Providing decent accommodation in areas of tourism
interest, operating a transport fleet of coaches, cars and Gypsies, and organizing package tours. Publicity and
marketing of tourist destinations and facilities has also been a major thrust activity. Apart from these efforts
undertaken by the Government, the private sector has also contributed by way of investment in hotels,
transport, and marketing of some important tourist destinations in the State. However, the efforts of the
Government and the private sector have not been dovetailed into a common developmental programme,
with the result that there has been overemphasis at certain venues, while some other important places and
activities have been neglected.
The Tourism Policy envisages creation of an environment conducive to attracting increased private
investment in the tourism sector, and a more meaningful role for the Government. The focus will be on i)
Improvement and creation of adequate basic infrastructure- land, road, water, electricity etc. ii) Up gradation
and augmentation of accommodation, catering and recreational facilities, iii) Augmentation of transport
facilities, iv) Marketing of destinations to ensure optimal use of infrastructure, v) Establishing and
strengthening institutions for the development of human resources, vi) Evolving suitable policies for
increasing foreign exchange earnings, vii) Promotion of the arts and crafts of the State.
One of the objectives of the Tourism Policy of Madhya Pradesh announced in 1995 was to convert the
heritage wealth of the State i.e. forts, palaces, havelis and kothis into heritage hotels. Later, Madhya Pradesh
Heritage Tourism Policy-2002 also envisages and set urgent needs for restoration of these beautiful buildings
are unable to attract tourists in large numbers.

7.3

Places of Tourist Interest in and Around the City

The Tourism Products in Govindgarh can broadly be classified into those based on the Heritage Tourism,
Religious Centers/ Pilgrim centres, handicraft and Wild-life Tourism in Panna National Park in the
surrounding. The city has many places for tourist attraction i.e. Govindgarh Fort, Sunder Van, Durga Temple,
Lal Bagh, Raja Talab, Rani Talab etc.
Govindgarh Fort
The Govindgarh palace used to have security like a well protected fort. The stately palace of Gobindpur on
the banks of the Lake houses, a police training school and Baghela museum is running now.
The island, nestled in the Lake also showcases a wonderful palace. The doorway of this beguiling palace
however is closed for the general public.
An underground tunnel is also there which was used as a secret path for kings between Govindgarh & Rewa.
The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands.
Lal Bagh
The Lal Bagh area is famous for its Sunderja Mango garden. The area is also known for its lush green beauty.
Lal Bagh is situated on the bank of Raja Talab near to Govindgarh Fort. The Sunderja Mangoes of the
Govindgarh are famous in the country. The people of the area are decent and have higher human values. The
law and order situation of the area is also good. This is being developed as a future tourist destination to
attract International Tourists.

DMG Consulting Pvt. Ltd., Noida

Page 124

City Development Plan, Govindgarh, M.P.


Temples in Govindgarh
Ram Govind Temple, Panchmukhi Temple, Chowandi Temple, Shiv Temple and Hanuman Temple are the
major temple in Govindgarh city. All the mentioned temples are located nearby Govindgarh Fort. It is also
believed that the name Govindgarh was based on the Govind Temple now situated within the Govind Garh
Fort Premises.
Khando Devi temple is another major temple at a distance of 2 Km. from the Govindgarh City. Khando is
famous for its beautiful topography because in rainy season the area is known for its natural beauty and it
attracts maximum tourists in this season.
Raja Talab (Lake) and Rani Talab
Raja Talab is located just behind the Govindgarh Fort. This beautiful lake was prepared by Baghela Kings. It is
a lake which is known for its scenic beauty and lush green surroundings. This lake plays an important role in
helping irrigation as well as in ground water recharge. Fish farming (pisciculture) is also done in these talabs.
Raja lake has a facility of boating at the time of Khando Devi Temple fair because it is also near to Khando
Devi Temple (2 Km.).
Famous for White Tigers
The first white tiger, Mohan, was captured in 1951 in the nearby jungles of Govindgarh, was kept in this
palace till his death. The unusual coloration of white tigers has made them popular in zoos and
entertainment showcasing exotic animals. The white tigers are known as Royal White Tigers, and this is
associated with the Maharaja of Rewa.
Rewa Maharaja Martand Singh first observed male white tiger Mohan during his visit to Govindgarh jungle at
Rewa. After hunting for months, he was able to capture the first living white tiger seen in nature. With help
from official veterinary experts, he unsuccessfully tried to breed the white tiger with colored female tigers.
Eventually, however, he succeeded in creating a second generation of white tigers. In time, it expanded
around the world.

7.4

Tourist Places nearby Govindgarh

Bandhavgarh
The Bandhavgarh National Park is located in the Vindhya
Range in central India this park was formed on 1968. The
National park holds the highest density of tigers due to its rich
evergreen forest with trees like Sal & Bamboo with well spread
water bodies & grasslands all over the park.
Bandhavgarh National Park spread in an area of 448 sq. kms. is
Figure 7-1: Govindagarh Forest
densely populated with tiger and other wildlife species of gaur, nilgai,
sambhar and barking dear. In the backdrop of the park is the old fort which has references in Shiva Purana
and Panch Ratna. The park has in all about 32 mammals, 250 species of birds and about 72 types of
butterflies. The Park of also has the archaeological relies of Sheshai Vishnu and number of caves.
The park has some basic infrastructure such as accommodation includes resorts and lodges PWD Rest House,
MPSTDC lodge and many eatery and shops. However, the destination lacks in providing safe drinking water
facilities. The water source is Open well and borewells. Hotels and Lodges have independent Borewells.
DMG Consulting Pvt. Ltd., Noida

Page 125

City Development Plan, Govindgarh, M.P.


Gurh
Gurh is situated at 40 km from Govindgarh. The major places of tourist
attraction are Gurgi (Kalchuri) Heritage Site, Khadda Shiv Temple, Khajuha
Shiv and Ram Temple, Bhairavnath Temple, garhi and many other small
desination. Gurgi Kalchuri is an important Heritage Site, has lots of
reminiscence of the Fort & temples of Kalchuri rulers (6th to 12th century).
Lots of the idols from this place have been taken to Rewa, Satna,
Tikamgarh and Bhopal museums also. Presently this place is under
archeology department.

Keonti Falls

Figure 7-2: Gurh Temple

The Keoti Falls is on the Mahana River, a tributary of Tamsa or Tons River as it comes down from the Rewa
Plateau. It has a total height of 98 meters (322 ft. The World Waterfall Database puts the height of the
waterfall at 130 meters (430 ft) is one of the major waterfall in India. It is situated at 42 km from Rewa.
Sirmaur
Sirmaur is situated at 57 km from Rewa. Kyoti Garhi is one of the
major destination in Sirmaur which made by Yuvraj Nagmal, 2nd
son of Baghel (17th ) Maharaj, Shaliwahan Singh Ju Deo between
1605-10 A.D. Presently this Garhi is with M.P. Archeological Dept.
The Garhi overlooks a 270 feet deep gauge making a water fall on
the river Mahana, but is in a very bad shape & needs to be
developed as a tourist spot as the place holds great potential.
Figure 7-3: Keonti Fall
Besides, Garhi, Laua Kothi, Dev Talab, Shiv Temple Dev Talab,
Naigarhi Kothi Naigarhi, Semaria Garhi, Laxmanbagh Temple, and Deur Kothar Buddist Stupa are other
destination.
Other Destination
There are many rocks painting Rock painting scattered around the region such as Khando samuh, Gaddi
samuh, Shivpurva samuh, Itar samuh, Badwar samuh, Jaldar samuh, Ledroghat samuh, Ginjwa samuh, Quoti
samuh, Hanuman samuh etc.

7.5

Arts & Crafts

Handicrafts / Articrafts & Other Human Resources in the Region:Madhya Pradesh is also known for its carpets where Rewa is one of the centres in the state. The toys made
out of Beatle nut are very rare and famous in this area, which cant be got anywhere else. Except these there
are many women who are involved in bangle making and other artistic works. Ahir (Yadav) & Kali are the
main folk dances of this area. Most of the dishes made in this area are based on dals (Lenten) and hence very
nutritious and less spicy in character.

DMG Consulting Pvt. Ltd., Noida

Page 126

City Development Plan, Govindgarh, M.P.


7.6

Existing Status of Major Tourist Destinations

Cleanliness in the surrounding areas is not been taken care of which effects the number of tourists visiting
the place. Landscaping, where ever open spaces are available has not been done and the spaces been left
unseen. Haphazard vegetative growth provides negative impression on the tourists. No safety measure like
provision of guards on most of the temples has been taken.
Direct discharge of sewage from domestic sources, not connected to treatment plants; eventually make its
way into existing water bodies i.e. Raja Talab and Rani Talab.
Lack of public utilities, proper information, water facility, refreshment counters and above all parking spaces
in or around most of the temple complexes affects the number of visitors at such places.
Table 7.6.1: Assessment of tourist destination in & around the city
S.No. Assessment
Major Tourist Destination/sites in and around the City
Parameters
Govindgarh
Rewa Fort Complex Bandhavgarh National

Fort
Agency
responsible
for M.P. Tourism
protection
Accessibility/ Connectivity
Fair

Visibility of the Building/Sites

Excellent

Good

Good

Condition of access road

Good

Good

Good

Site displayed Signage

Fair

Fair

Fair

Cleanliness of Surroundings

Fair

Fair

Fair

Landscaping

Fair

Fair

Fair

Safety & Security

Fair

Poor

Fair

Overall Maintenance

Fair

Good

Good

10

Parking Facilities
Bus, other
Public Toilets

11

HHMCT

Park
Forest Dept

Good

Good

2 Wheeler, Available, but Not Available


not designated
Nil
Not Available

Available,
designated

but

not

Available
12

Refreshment stalls

Not Available

Available (Pvt)

13

Information Kiosks

Not Available

Not Available

Available
Open well and bore wells

14

Drinking Water Facility

Available

Not Available

30 guides approved

15

Trained Tourist Guides

Fair

Poor

Fair

Source: DMG Consulting, Pvt. Ltd.


Presently, no major efforts have been initiated by the government in restoration of buildings which has
heritage importance. Most of the buildings are either in dilapidate status or required immediate attention for
restoration and conservation.

DMG Consulting Pvt. Ltd., Noida

Page 127

City Development Plan, Govindgarh, M.P.


Table 7.6.2: Present status of heritage sites in Govindgarh
Sr. No.

Heritage

Present Status

1.

Govindgarh Fort

Building condition of fort is good and at present, it is under


renovation. It is closed for peoples because of its renovation.

7.7

Efforts for conservation of Heritage Sites

The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands.
Tourist Arrival
Tourism has been identified as one of the key drivers of growth by the MP government. Eight million
domestic tourists and 160,000 foreigners visited the state in 2005-06. The government has approved $12.2
million for development of 17 tourist locations across the state and is also making concrete efforts to
improve air connectivity to other states. It has taken initiatives to promote eco and adventure tourism and is
keen on promoting medical/ herbal tourism in association with private parties.
There is no record for tourist visiting various temples and forts in Govindgarh. There is no entrance ticket
system prevailing either at the main entrance of forts or at any of the temples. This is the major handicap in
estimating the accurate tourists influx at Govindgarh.
Despite, presence of historical building and temple, the city does not fall within any tourism circuit in the
state. Tourism prospect of Govindgarh can be viewed with the development of city infrastructure and
existing tourism destination to make a complete circuit with the Bandhavgarh-Govindgarh-Rewa as sub
circuit of Bandhavgarh - Chitrakoot-Khujario. Chitrakoot receives maximum number of visitors i.e. 9.1 million
(2008) followed by Khajuraho (0.27 million) and Bandhagarh (0.09 million).
Table 7.7.1: Number of visitors to these three major destinations in the region during 2005-08.
Centers

Tourist
Types

2005

2006

Bandhavgarh

Year
2007

Indian
23244
38614
Foreign
4068
6812
Total
27312
45426
Chitrakoot
Indian
2673847 6096835
Foreign
460
499
Total
2674307 6097334
Khajuraho
Indian
145987
164406
Foreign
70726
73843
Total
216713
238249
Source: Perspective Tourism Pan, Govt. of India

55835
13706
69541
7952629
725
7953354
193764
84887
278651

2008
69641
24781
94422
9142009
654
9142663
201443
89169
290612

20052006
66.12
67.45
66.32
128.02
8.48
128.00
12.62
4.41
9.94

CAGR (%)
20062007
44.60
101.20
53.09
30.44
45.29
30.44
17.86
14.96
16.96

20072008
24.73
80.80
35.78
14.96
-9.79
14.95
3.96
5.04
4.29

It is assumed that a significant number of tourists will be attracted and diverted to Rewa from Khajuraho,
Chitrakoot and Bandhavgarh, if proper tourism supported infrastructure and strong marketing is done.
DMG Consulting Pvt. Ltd., Noida

Page 128

City Development Plan, Govindgarh, M.P.


7.8

Assessment of Tourism Supported Infrastructure

Tourism Development of any destination cannot be accomplished without proper development of support
infrastructure facilities including accessibility, accommodation, water supply, sanitation, power and drainage.
In Govindgarh city, very limited infrastructure is developed. Except approach road, small shops and drinking
water non on the infrastructure are available like Toilet facility, Solid waste Management, Street Lightning
etc. at the tourist spots.
Transportation
There is good network of roads connecting all the major parts of the state with Govindgarh. The State
Highway 9 and State Highway 52 connect Govindgarh with major cities of Madhya Pradesh. Govindgarh is not
directly connected to railway line. The nearest railway station is Rewa junction at a distance of 20 Km. The
nearest airport is Satna Airport at a distance of 54 km. which has an airstrip, however not in use for regular
fights followed by Bamrauli (Defense Air Base) in Uttar Pradesh which is approximately 161 km. from
Govindgarh.
Accommodations (Regional Level)
At town level, Govindgarh doesnt have any hotel facility to accommodate the peoples or tourists. But at
district headquarter Rewa; there are nearly 497 beds in 24 various categories of Accommodation. Besides
this, the Rewa city has nearly 5-6 Dharmshalas, which accommodates nearly 4-500 people in total. A three
Star level hotel namely Hotel Rewa Raj Vilas (owned by Maharaja Rewa) is situated in the heart of city.

7.9

Key Concern Areas for Tourism Development

Key concern areas for enhancement of tourism development in Govindgarh have been identified from the
analysis of existing tourist scenarios and overview of SWOT analysis. The following table shows the Key
concern areas.
Table 7.9.1: Key Concern Areas and related issues
Issues
Limited Tourist inflow

Remarks
Continued
tourism
infrastructure constraints
Information Constraints

Unexplored
Assets

Heritage

related

Once Govindgarh was very famous


for its cultural heritage and religious
importance in the state. Now they
have almost lost their charm due to
poor maintenance and Lack of
tourism supported infrastructure.
Unexplored marketing
Lack of diversified tourism activities

DMG Consulting Pvt. Ltd., Noida

Suggestions
Specifically define potential area
of tourist attractions where there
are wide ranges of tourism
products.
Enhance the attractiveness by
augmenting core activities by
providing additional activities.
Focus is to be given to identify
new tourism products
Transverse tourism circuit linking
destinations of Govindgarh with
other major tourist spots in Rewa
and other districts.

Page 129

City Development Plan, Govindgarh, M.P.

On site/offsite deficiency
of infrastructure

On site infrastructure is inadequate


Most of the sites are not equipped
with basic tourism infrastructure
facilities such as parking, en-route
facility etc.
Inadequate road widths and poor
condition of roads connecting
various tourist destinations.
Govindgarh can boast as the place of
the heritage and scenic beauty in
India.

Improve Connectivity and access by projects covering roads, rail,


and air.

Lack of Publicity

Publicity by Brochure, audiovisual, literature for various


market segments within the
country and also abroad.
Development of tourist facilities
at these localities.
Data Collection / information
collection by ticketing at entry
points of all the potential sites.
Information brochures bulletins
and package tours to be
published.
Private partner can bring in
activities such as boating facilities,
jogging track, childrens park,
theme park, water parks, and
nature walks etc. around the lake
which would help in accruing
revenue all the year round.
There should be a planned
drainage system and solid waste
management.

Inadequate information
dissemination

Limitation in tourist traffic /


monitoring tourist database and
database Management

Lack of Raja Talab/Rani


Talab (lake) Conservation

Contamination in lake water


because town doesnt have
drainage system and treatment
plan. There is also absence of solid
waste management.

7.10 Tourism Development Option & Strategies


Despite its strategic location within the tourism circuit, Govindgarh city has not been developed as a nodal
centre or as a base city to cater tourist for its facilities. In the tourism circuit of Jabalpur Bhedaghat
Mandla Kanha Bandhavgarh and Khajurahu-Panna/Bandhavgarh-Chitrakoot, Bandhavgarh and Panna is a
major Tourist node in the region after Chitrakoot and Khajurahu. Govindgarh can play a major tourist node or
base town to support tourist with its supported infrastructure. Presently, infrastructure is inadequate to
support tourism in the region, and it needs urgent upgradation. Further, an integrated circuit can be formed
considering Panna, Bandhavgarh and Sanjay National Park as part of Natural and Wildlife tourist and
Govindgarh and Rewa to support as base facilitation centre. The region has wide range of tourism products,
which need to be integrated and made an intra-circuit to increase the duration of stay of the Tourists in the
region. Govindgarh city has great potential in the region to cater tourist from the circuit. This elevated status
of Bandhavgarh as base can be retained, till a few of the tourist destinations in and around Govindgarh
region to develop their own tourist facilities. Some of the destinations like Govindgarh Fort, Khando Devi etc.
can be raised to the status of sub - nodes, with adequate improvement of infrastructure and development
of new tourism product based on Fort and the Lake. Govindgarh plays an important role in the form of
Natural & Wildlife tourism.
DMG Consulting Pvt. Ltd., Noida

Page 130

City Development Plan, Govindgarh, M.P.


The City of Govindgarh has many locations for attracting tourist of various segments including religious,
heritage tourism. In the nearest towns of Govindgarh, Rewa is one of the art and craft centre in the region
and also a major city for providing lodging and boarding facilities.
At present city is devoid of basic tourism supported infrastructure such as tourism information centre, basic
amenities at destinations within the city as well as accommodation of attracting high end tourism. Some
associated cultural activity areas like Govindgarh Fort, Raja Talab (lake) and Khando Devi Temple area can be
developed which will form an integrated cultural circuit. The immense potential for developing Govindgarh
as one of the destination with heritage and religious destination, it needs to be fully exploited. In terms of
improving the tourism product, in the short term quick gains can be made by developing the destination and
providing basic infrastructure facilities at locations with high potential, which are already well connected and
have a reasonable infrastructure in place.

Map 7-1: Major Tourist circuits around the Govindgarh city

The overall tourism development of Govindgarh Region can be segmented into two levels
a) Major Tourism Circuits -Though there are many tourism attractions scattered around the Govindgarh City
linking Rewa, Bandhavgarh National Park etc.

DMG Consulting Pvt. Ltd., Noida

Page 131

City Development Plan, Govindgarh, M.P.


b) Minor Tourism Circuits- the Cultural (Heritage) and religious tourism destinations located within the city
includes Govindgarh Fort, Ram Govind Temple, Panchmukhi temple and other temple and heritage can be
integrated within this Mega Tourism Project.
Govindgarh as a tourist needs to be a co-ordinated effort to improve the quality and range of public realm
spaces, heritage sites and temples and other facilities. The emphasis of this is on Govindgarh Nagar Parishad
for overall development of the city.
Overall Development of Govindgarh Town- Govindgarh has great potential for tourism development. Planned
tourism development in Govindgarh would significantly increase domestic and foreign tourist arrivals and
attract their long duration visits. This would result in their higher spending for various facilities and services
within the region. This would directly boost up trade and commerce, transport sectors and other service
sectors. Studies show that tourism is one sector having the highest multiplier effect. Tourism can trigger off
development in many supporting sectors and create a large number of employment opportunities.

7.11 Recommended Tourism Development Proposals


Considering all these aspects, the activities can be well planned and organised to enhance tourist attraction
by providing;
a) Site attractiveness /enhancement Projects
Conservation of Govindgarh Fort, Raja Talab and development of basic amenities to the tourist.
Development of tourist infrastructure at Khando Devi temple.
Provide large open areas and street furniture in the city.
b) Additional attractiveness
Waterfront Development
Shopping arcade with Cafeteria selling art materials, dance materials, other essential articles for
students, schools & visitors.
c) Site specific critical infrastructure project
A comprehensive Master Plan of the area needs to be prepared.
Provision of designated paid parking areas for tourist buses, cars and other vehicles.
General landscape plan for the area
Design and location for every component of street furniture
d) Development Guidelines and control
Programmes based on development guidelines and also enforcement controls.
e) Marketing
Defining Tourism Circuit in the State, adding Govindgarh as one of the cultural centre
Action Programme
The action program aims to specify and define potential areas of tourist attractions where wide ranges of
tourism products can be provided, enhancing the attractiveness by augmenting existing core activities by
providing additional activities and improve connectivity and access to already tourist attraction at a subdued
level. The objective is to support regenerate and upgrade the existing attraction through augmenting core
activities by providing additional activities.
Selective Development of Heritage site
This project should include Conservation measures, planned development and upkeep of the environment,
designed lighting facilities and provision of tourists/ visitor facilities. Govindgarh town has mainly Govindgarh
Fort which is important from heritage point of view and need to be conserved.
DMG Consulting Pvt. Ltd., Noida

Page 132

City Development Plan, Govindgarh, M.P.


Conservation Master Plan for the Govindgarh fort and environments is to be prepared. Archaeological Survey
of India (ASI) and State Archaeological Department has been mainly concentrating on the conservation it
could not make the monument attractive with proper landscaping and providing basic amenities. M.P.
Tourism in this respect can play meaningful role to refurbish it and make it very attractive. The conservation
master plan shall cover following components:
o Delineation of the Central core (Govindgarh Fort), historical temples and Raja Talab area to be
considered under Conservation Plan. Conservation of identified heritage buildings/areas and
preparation of conservation guidelines.
o Preparation of land use plan for conservation area
o General landscape plan for the area
o Design and location for every component of street furniture
o Waste management plan, which could be considered as part of town level waste management
plan.
o Architectural and Development Control Regulations (DCR)
o Development of Urban Design concept and streetscape.
Development of Govindgarh Fort and Raja/Rani Talab area- Govindgarh Fort area is to be developed as an
integrated cultural zone and this will attract tourists.
Construction of public convenience and safe drinking water facilities within the fort complex
Construction of Parking for tourist vehicles
Establishing `Light and Sound shows
Construction of Entrance Gate: The entrance Gate of monument, which helps to form the first
impression of what, is inside. An artistically designed gateway by incorporating architectural
elements should be provided at the site.
City Level Green spaces and Parks
The City lacks in proper green spaces and the presently gardens are not attractive it requires redevelopment.
There is need of park development.
i) Establishment of Regional Park- Regional Park may be developed at Khando Devi temple. The
landscape may incorporate meandering pathways, seating places, concealed low-intensity lighting,
etc. The facilities will also include Refreshment centre, Toilets, drinking water facilites and
Landscaped Garden
ii) Development of garden including landscaping- Establish Landscaped park near to Govindgarh fort
because there is availability of water from Raja talab.
Enhancement and Up-gradation of City Level Infrastructure
i.
Designated Parking facilities
a. Provision of designated paid parking areas for tourist buses, cars and other vehicles.
b. Provision of designated taxi and auto stands in at least 2 or 3 locations in the central area.
ii.
Clock rooms and pay - use toilets for men and women at a minimum of 3 locations by the side
Construct pay & use toilets in places of public assembly and also in tourist locations. It should be made
mandatory for all shopping areas and restaurants having more than a specified built up area to provide public
toilet facilities, which may also be maintained on, pay & use basis. The major roads may also be provided
with wayside coin operated toilets, at least in major urban centers. The models adopted by Sulabh
Sauchalaya in many towns and cities are worth mentioning in this context. The local self-governments, both
urban and rural, should be made to think and act on these lines.
iii.

General landscape plan for the area


DMG Consulting Pvt. Ltd., Noida

Page 133

City Development Plan, Govindgarh, M.P.


Charming garden with lush green landscape will add elegance to the whole town. The tourist complexes
should be properly landscaped in a manner compatible with the environmental character of the
surroundings. No construction should commence without having secured the consent of the appropriate
authority for the provision of infrastructural services, i.e electricity, telephone, road access, water, etc.
iv.
Design and location for every component of street furniture
Designed Electrical & telephone poles in the area should be replaced with artistically designed beautiful
ancient looking poles. Stone Benches with shade. The benches in the heritage area should be artistically
designed.
v.
Tourist Facility & Information Centre
Establish tourist facility centre including tourist information centre, toilet and drinking water facilities and
conventional shops near Govindgarh Fort.
Development of Raja/Rani Talab (lake)
The landscape in this part is exceedingly scenic and offers the potential for excellent development of Water
based tourism. Lake offers pleasure boating facilities. However, any resort that may be developed here
should follow the characteristics of the site. The architecture should respect the characteristics of vernacular
architecture, and in any way, should not cause visual conflict with the surrounding nature.
Water sports based tourism, especially related to boating. This would help in development of water sports
like water scooter, water skiing, etc. Restaurants, toilets, shops, sports gear renting outlets etc. catering to
tourists have to be developed in this area as part of the Project.

7.12 SWOT Analysis

Strength
Govindgarh having many heritage and
tourist centers.
Number of tourist increasing with time.

Opportunity
Govindgarh
falls
under
JabalpurBandhavgarhKahjurahoChitrakut
tourist circuit.
Govindgarh got good road connectivity
and it is also near to Rewa Junction.
Govindgarh having many water bodies
and religious centers also attracts tourist.

Weakness
Non- maintained heritage buildings.
No proper connectivity to some of the tourist
centers.
Poor existing infrastructure.
Threat
Un-maintained heritage site might result into
ruined structures.
Inadequate infrastructure & connectivity may
leads to decline in tourist flow.

7.13 Best Practice


Box: 7.1: Heritage Conservation Gohar mahal Restoration & Reuse as Craft centre
Background:
Bhopal is the capital of the Indian state of Madhya Pradesh and the administrative headquarters of Bhopal
Division. The city was the capital of the former Bhopal state. Bhopal is also known as the Lake City for its
various natural as well as artificial lakes and is one of the greenest cities in India.

DMG Consulting Pvt. Ltd., Noida

Page 134

City Development Plan, Govindgarh, M.P.


Gohar Mahal is situated in the banks of the magnificent Upper Lake. It is one of the
beautiful palaces in Bhopal. Gohar Mahal is an architectural marvel, which presents a
perfect blend of Hindu and Mughal Architecture.
It is constructed by Kudasia Begum in 1819 AD and due to un- maintained conditions; it
has become degraded and dilapidated.
Key Components of the Projects: To recover that condition detailed documentation
and condition assessment of the building has been done and prepared a restoration
and reuse proposal by INTACH. It also involved community in the re-development
process to know their views and perception.
The palace has been restored and maintained the original
fabric and construction details of the buildings. New
functions will be introduced to convert the complex into an
Urban Haat to showcase the local craft and a cuisine. This
project has been supported by DC H&H, Government of
India and MPHHVN, Govt. of Madhya Pradesh.
Lesson Learned:
Complete participation of the community at all
stages.
Conservation as a tool to promote development
and improve living standards.
Close partnerships with national and local government bodies as well as with international funding
agencies.

7.14 Summary of Projects


Sr. No.

Projects

1
a

Development of heritage building i.e. Govindgarh fort


Preparation of Conservation Plan for Govindgarh Fort.
Preparation of land use plan for conservation area (a) Landscape Plan of the area, b)
Development Control Regulation

b
c
d
e
f
2
a

Heritage Walk - Development of Signages


Construction of shopping arcade
Construction of public convenience and safe drinking water facilities
Construction of Parking for tourist vehicles
Establishing `Light and Sound
City Level Green spaces and Parks
Establishment of Regional Park at Khando Devi Temple area including landscaped open area for
stage and assembly area for gatherings, dinners, performances etc. including fitting and fixture of
sitting and lighting.

B
3
a
b
c

Development of local park at Govindgarh Fort.


Development of Raja/Rani Talab
Dredging/ silt controlling and cleaning of Raj/Rani Talab
Equipments for boating and Skiing
Construction of restaurants, toilets, shops, sports gear renting outlets
DMG Consulting Pvt. Ltd., Noida

Page 135

City Development Plan, Govindgarh, M.P.


4
5
6
7
8

Tourism Supported Infrastructure in the Govindgarh City and Khando devi Temple
Construction of Designated Parking facilities for taxi stand and tourist Vehicle
Establishment of Public Convenience
Design and location for every component of street furniture, signage
Tourist Facility & Information Centre- Establish tourist facility centre including tourist information
centre, toilet and drinking water facilities and conventional shops near Govindgarh Fort.

9
10

Construction of Cafeteria, Restaurants, toilets, shops etc.


Security /Police Cabins

Project Identification & Costing


Presently the tourism industry is lacking infrastructure facilities and there is shortage of active recreational
space in the city. With a goal to enhance the tourism activities in the city the following projects have been
identified for improvement of the sector:
Table 7.14.1 Proposed Project, Project Cost and Implementing Agencies for Tourism

Code No.

Projects proposed

Project Cost Department


(in Lakh)

T1

Preparation of Detailed Project Report for Raja


Talab development including landscaping,
designing and details of infrastructure required

6.00 (1% of
Project Cost)

UADD, Govt. of M.P. and


GNP

T2

Conservation and tourism


infrastructure
Development of Govindgarh fort Development,
beautification, plantations along the raja Talab
and rani Talab

500.00

Tourism Dept. Govt. of


M.P.

T3

Development of active recreation facilities like


water sports, theme park and boating etc.

50.00

Govindgarh Nagar Parishad

T4

Promoting Govindgarh as a transit point by


making provision for a tourist circuit and
associated tourism infrastructure for the
surrounding tourist destination.

50.00

Tourism Dept. Govt. of


M.P.

Sub Total Cost (J)

606.00

* PWD (SOR) April 2011

DMG Consulting Pvt. Ltd., Noida

Page 136

City Development Plan, Govindgarh, M.P.

CHAPTER 8
Existing Institutional Framework
for Development

DMG Consulting Pvt. Ltd., Noida

Page 137

City Development Plan, Govindgarh, M.P.

8.
8.1

EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT


Urban Local Body Structure

The main organization in the town is the Govindgarh Nagar Parishad which provides all the civic services,
levies local taxes and maintains registers of births and deaths. The municipality is primarily funded by local
grants and levy of property tax.

Chairman of Nagar
Parishad
Chief Municipal
Officer

Deputy Chairman

15 Ward
Councilors

Figure 8-1: Institutional Setup Govindgarh Nagar Parishad

Table 8.1.1: Power and Functions of Govindgarh Nagar Parishad

Law and Application

Madhya Pradesh Municipalities Act, 1961

Administrative Authority

Urban Administration & Development Directorate (UADD)

DMG Consulting Pvt. Ltd., Noida

Page 138

City Development Plan, Govindgarh, M.P.


Executive Authority

Chairman, Chief Municipal Officer

Functions

slum improvement and urban poverty alleviation


provision and maintenance of roads, sanitation, solid waste services,
fire services, urban forestry, street lighting, parking lots, parks &
burials
protect the environment, promote cultural, educational, aesthetic,
ecological activities
safeguarding the interests of weaker sections of the community
provision of vital statistics

Administrative Powers

to make byelaws (with approval of State Government)


to borrow money (with approval of State Government)
to acquire, hold and dispose of property
to enter into contracts
to prepare budget
establishment of Municipal Council Fund

Revenue Powers

To raise property, trades, betterment, deeds and advertisements


taxes. Property taxes to be based on annual value of property and
be updated every 5 years.

Limitations on powers

rules for imposition of taxes require approval of the State


Government
State Government may remedy, abolish, impose, raise or modify a
municipal tax
bye-laws must be confirmed by the State Government
State Government may make rules and regulations (including model
rules)
State can carry out financial audit when/if it wishes

Constraints Identified

lack of autonomy over personnel management, training,


appointments and promotions
limited powers to enforce penalties, fines too low and civil
proceedings too lengthy
Quash Judicial Power , no power to prosecute

Source: Govindgarh Nagar Parishad

8.2

Town and Country Planning Department

The main function and activities of Town & Country planning department are governed by MP Nagar Tatha
Gram Nivesh Adhiniyam 1973 and rules prepared there-under e.g. MP Nagar Tatha Gram Nivesh Niyam 1975
and MP Bhumi Vikas Niyam 1984.
The main functions are: preparation of Town Development Plan, Review Evaluation and Modification of
existing Development Plan, Preparation of Regional Development Plan, Monitoring and Enforcement of
various schemes such as Integrated Development Plan of Small and Medium Towns (IDSMT) and Urban
Infrastructure Development scheme for Small & Medium Towns (UIDSSMT), Control on unauthorized
development in towns and functions of State Nodal Agency for National Urban Information System Scheme.

DMG Consulting Pvt. Ltd., Noida

Page 139

City Development Plan, Govindgarh, M.P.


The activities of the department include preparation of development plan for investment areas of towns,
preparation of regional plans for investment regions, control and inspection of planning for uniform
development of small and medium-sized cities, development of infrastructure of towns, guidance in
execution of development plans, check on unauthorized development of cities, guidance in policy making to
development authorities/ special zone development authorities/ housing board and other institutions,
guidance and assistance to state government and other institutions for management/ land planning/
selection of place and state nodal agency for nation urban information.

8.3

Development Authority

In Govindgarh town presently there is no development authority.

8.4

Public Health Engineering Department

Public Health Engineering Department (PHED) is one of the major departments of the state of Madhya
Pradesh as it is not only responsible for the provision of public health but also carries the water supply and
sewerage and sanitation projects in the entire state. Major infrastructure projects under urban infrastructure
are implemented by public health engineering department both in the urban and rural areas.

8.5

Madhya Pradesh Housing and Infrastructure Board

The Madhya Pradesh Housing Board had been set up by the government of Madhya Pradesh as a corporate
body under the 1972 Madhya Pradesh Griha Nirman Mandal Adhiniyam Act. The Madhya Pradesh Housing
Board is the only housing board in India that does not receive any subsidy from the government. The main
objective of the housing board in Madhya Pradesh is to provide housing and basic accommodation to the
needy people in the state. In the state of Madhya Pradesh, the Madhya Pradesh Housing Board is the single
largest builder and developer of real estate. The housing board contributes around 10,000 plots and 6,000
houses per year to the housing stock in the state. It has invested around Rs. 2,000 crores in construction and
housing sector.
The various objectives of the Madhya Pradesh Housing Board are:

To construct houses for the various sections of the society that is, the low, middle, and the high
income groups
To make various schemes that provide financial help to the high and middle income groups in the
purchase of houses
To select the sites where houses are to be constructed and to decide the various facilities that are to
be provided in the houses

The various activities of the Madhya Pradesh housing board are:

To develop the infrastructure


To develop rehabilitation projects for earthquake victims
To construct public and office utility complexes
To construct hotels, public co-operatives, and hospitals
To develop community, sports, and leisure projects

The Madhya Pradesh Housing Board has been successful to a large extent in catering to the accommodation
needs of the people of Madhya Pradesh. However, there still exists significant scope for improvement and
the state government is making all possible efforts to ensure that the infrastructure provided by the Madhya
Pradesh Housing Board is efficient and utilitarian.

DMG Consulting Pvt. Ltd., Noida

Page 140

City Development Plan, Govindgarh, M.P.


8.6

Madhya Pradesh Pollution Control Board

Madhya Pradesh Pollution Control Board (MPPCB) - The Board has been vested with considerable authority
and responsibility under various environment legislations to prevent pollution. Madhya Pradesh Pollution
Control Board presently looks after the implementation of following Acts:

Water (Prevention & Control of Pollution) Act, 1974


Water (Prevention & control of Pollution) Cess Act, 1977
Air (Prevention & Control of Pollution) Act, 1981
Environmental Protection Act, 1986 (certain sections)
Public Liability Insurance Act, 1991

The main objective of Board is to maintain water, air and soil in healthy and usable condition for various
purposes. There are 10 Regional Offices, 4 Sub Regional, 3 Single Window System and 2 Monitoring Centres
equipped with trained personnel and sophisticated instruments which are constantly keeping watch on
environmental activities in the state to attain the objectives.
Major function of the board is to reduce, control and monitor the state environmental pollution in terms of
air, water and soil. It also provides consent for industries to establish and operate in order to maintain the
environmental compliance within the state.

8.7

Role of Private Sector in Infrastructure Service Provision

There is no role of private sector in service delivery mechanism or infrastructure creation at Govindgarh. The
role of private sector is restricted to social sector - education and health-care in a limited manner. Even
outsourcing of activities such as maintenance and upkeep of street light, solid waste collection and
transportation which are common among small municipalities is not practiced at Govindgarh.

8.8

Issues

8.9

Inadequate staff in Govindgarh Nagar Parishad


Lack of co-ordination between different departments of state and Govindgarh Nagar Parishad for
administration and regulation of functions and services
Absence of training and capacity building for staff in order to improve the service delivery to the
citizens
Absence of private sector role in provision of infrastructure service and delivery mechanism.

City Specific Strategies and Action Plan

Accrual-based, double-entry accounting system should be incorporated in the present governance


system
Balance sheet preparation should be started to strength the financial and governance system
Computerization of the system which mainly includes three things:
o Financial and account
o Workshop: Solid Waste management & Street lightening
o Technical Development: In Water supply, roads networking etc.
Implementation of E-governance with IT applications like GIS, MIS etc.
User charges should be applied to recover O&M cost
Basic services to the poor and security of tenure at affordable prices
Municipal Council need to gear themselves for meeting future challenges in service delivery.
Therefore, they need to initiate a process of transition by adopting various organization management
DMG Consulting Pvt. Ltd., Noida

Page 141

City Development Plan, Govindgarh, M.P.

principles such as improved accounting techniques, monitoring and evaluation of projects (including
social audit), and improved budgeting methods
Focus on skill-up-gradation of municipal staff on a regular basis. Human resources are the key to
efficient service delivery in any organization. Municipal Council will need to emphasize on developing
core skills of municipal staff in order to ensure that these skills are relevant to the ever-changing
operational environment
Decentralization of functions: Decentralization of municipal functions, particularly in service delivery,
citizen interface and planning will greatly enhance the operational capabilities of Municipal Council
Special budget should be incorporate for the target groups like urban poor, women etc. which gives
basically focus on infrastructure development, affordable housing for poor, local economic
generation etc.
Demand Collection Balance should be started at ward level.

DMG Consulting Pvt. Ltd., Noida

Page 142

City Development Plan, Govindgarh, M.P.

CHAPTER 9
Investment Plan and Financing
Strategies

DMG Consulting Pvt. Ltd., Noida

Page 143

City Development Plan, Govindgarh, M.P.

9.

INVESTMENT PLAN AND FINANCING STRATEGIES

9.1

Revenue Accounts

The revenue account comprises two components - revenue income and revenue expenditure. Revenue
income comprises internal resources and external sources of income of Govindgarh. Internal sources of
income, also referred to as own sources of income, comprise tax and non-tax items. The external resources
come in the form of shared taxes/ transfers and revenue grants from the State and Central Governments and
loans from Financial Institutions. Revenue expenditure comprises expenditures incurred on salaries,
operation & maintenance cost, contribution & donations and debt servicing.

9.1.1

Key Assumptions

Basic key assumptions are as follows;

9.1.2

Own sources of income be increased and grants, funds should be decreased.


Capital expenditure percentage should be increased and current expenditure to the total
expenditure should be reduced.
Tax sources & non tax sources, both should be increased and diversified over a period of time.

Non Tax Sources

Non tax sources are as follows:

9.2

Water supply
Rents
Sale of properties
Penalties
Interest rate

Revenue Income

The major sources of revenue income are as follows:

Municipal Rates & Taxes


Receipts under Special Acts
Income from sources other than Municipal Property Tax
Receipts from Water Tax
Miscellaneous / Others
Extra-Ordinary and Loans

Based on the Accounts procured from Govindgarh, the information in respect of Revenue Income is as under:
From the figure, it can be clearly observed that the income is increasing every year with a very high growth
rate. Total income of Govindgarh in the financial year 2009-10 was 141.75 Lakhs and it was 174.81 Lakhs in
the financial year 2010-11. Total income of Govindgarh is increasing every year because of increasing
Property as well as resources of taxes and grants.

DMG Consulting Pvt. Ltd., Noida

Page 144

City Development Plan, Govindgarh, M.P.

Total Revenue Income

Income (in Lakhs)

200
150
100
50
0
2008-09

2009-10

2010-11

Financial Years
Figure 9.9-1: Year Wise Total Income, Govindgarh Nagar Parishad

9.3

Growth in Income

As per the Budget, the contribution of Municipal Taxes and grants was 2.95 Lakhs and Rs 3.74 Lakhs for
the year 2009-10 and 2010-11, respectively. For the same year, the third contributor is income from non
tax sources which has a contributing of Rs 139.11 Lakhs and 171.07 Lakhs in the FY 2009-10 and 2010-11,
respectively. This source has a very high growth rate in comparison of other sources.

9.4

Observations

9.5

As compared to the income of Rs 107.33 Lakhs in the FY 2008-09, the income for the FY 2009-10 was
Rs 141.75 Lakhs.

Revenue Expenditure

In the FY 2009-10, total expenditure was less as compared to the previous year but in FY 2010-11 total
expenditure of Govindgarh increased due to Establishment Expenditure (Salary, Wages, Benefit and
allowance).

DMG Consulting Pvt. Ltd., Noida

Page 145

City Development Plan, Govindgarh, M.P.

Total Revenue Expenditure

Expenditure(in lakhs)

140
120
100
80
60
40
20
0
2008-09

2009-10

2010-11

Financial Year
Figure 9.9-2: Total Expenditure Govindgarh Nagar Parishad

9.6

Capital Account

The capital account comprises capital income and capital expenditure. Capital income consists of income
earned by the Govindgarh Nagar Parishad from loans raised, transfers from revenue surplus and utilization
of funds from sinking funds and grants received for undertaking capital works. Capital expenditure largely
comprises expenses incurred for creation of civic infrastructure and towards debt servicing (principal
repayments).

9.6.1

Capital Income

The major sources of capital income are as follows:

Grants received from State Government for undertaking capital works


Loans raised from Financial Institutions
Transfers of revenue surplus from internal accruals
Utilization of funds from Sinking funds
Interest earned on investment (Fixed deposits, bonds, etc)

Table 9.9.6.1: Year Wise Income of Govindgarh Nagar Parishad from Various Sources

Financial Year

Tax

Non-Tax

Transfer
grants

inc. Total

2008-09

172137

10531216

32000

10735353

2009-10

264232

13875928

35190

14175350

2010-11

340000

17107926

34000

17481926

Source: Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad

From the above table it can be clearly observed that the income is increasing every year at a very high
rate. The income of Govindgarh is driven by three main sources i.e. income from taxes (Property tax,
Water tax, Pilgrimage tax, Sewerage tax, conservancy tax) non tax sources such as (Rental from
DMG Consulting Pvt. Ltd., Noida

Page 146

City Development Plan, Govindgarh, M.P.


Municipal Properties, sale and other charge, fees) and the grant and allocations received under various
central and state government schemes such as (Revenue Grants .Contribution and subsidies, Interest earned
and other income).

Sources of Income
180
160
Income(in lakhs)

140
120
100

2008-09

80

2009-10

60

2010-11

40
20
0
Tax

Non-Tax

Transfer inc. grants

Figure 9.9-3: Income from Various Sources - GNP

9.6.2

Capital Expenditure

Capital expenditure largely comprises expenses incurred for creation of civic infrastructure and towards debt
servicing (principal repayments).
Table 9.6.2: Year Wise Expenditure of Govindgarh Nagar Parishad

Financial
Year

(Wage
& Operation and Payment
Maintenance
Interest
salary)
Establishment

Others

Total

2008-09

7334292

42240

2975037

10351569

2009-10

9112660

34000

9146660

2010-11

12697908

33000

894741

13625649

Source: Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad

9.7

Key Financial Indicators

9.7.1

Revenue Indicators
Own sources revenue to Total revenue: Higher the percentage of own sources better is the financial
health of the municipality and less dependent on the Government
Taxes and non-taxes to own revenue: It is good to have own tax revenue sources increasing in trend
which shows elasticity and increase of tax revenue in municipal budget. Increase in non-tax sources
indicate municipal services are charged and increased with increase in services consumption.
Therefore, both indicators are independently monitored in municipal finance.
DMG Consulting Pvt. Ltd., Noida

Page 147

City Development Plan, Govindgarh, M.P.

Capital revenue to Total revenue: This source of revenue indicates fund availability of capital work as
well as resources available from the higher level of government and better credit worthiness of
municipalities to access loan from market and financial institutions.

9.7.2

9.8

Expenditure Indicators
Capital expenditure to total expenditure: More capital expenditure more development, more asset
creation, better infrastructure. This is a good indicator and shows good municipality. More per capita
capital expenditure better is the municipality and vice-versa.
Revenue expenditure to total expenditure: Less the revenue per capita expenditure, better is the
financial health of the municipality. It shows that the municipality does not have surplus money for
capital and infrastructure work and this is bad for the municipal finance.

Income, Expenditure and Surplus Deficit Analysis

For the financial assessment, three year financial data pertaining to the years 2008-09 to 2010-11 have been
used. At present, Govindgarh follows a cash-based single entry accounting system, where income and
expenditure heads are maintained on a cash inflow and outflow basis. In order to gauge the correct financial
picture of Govindgarh, it is critical to recast accounts in a standard accounting format with appropriate heads.
Govindgarh accounts have, therefore, been recast appropriately. The financial assessment has then been
done by looking at the annual growths of various components of income and expenditure, the sectoral
makeup of the finances, the extent of Govindgarhs dependence on the State and Central government grants
and reimbursements, the status of debt servicing, performance indicators and so on.
In this exercise, all the revenue earned by Govindgarh from taxes, fees, shared income etc. have been treated
as revenue income and the income from loans and revenue grants has been treated as a capital income.
Similarly, all expenses towards regular maintenance are treated as revenue expenses, while expenses on any
asset creation have been treated as capital expenses. The financial assessment thus undertaken is discussed
in the following sections.

9.8.1

Financial Status at a Glance

The assessment of the income and expenditure statement of Govindgarh, at aggregate level, reveals that
from all the years reviewed, in 2008-10 it shows buffer margin but in the year 2010-11 it turns into deficit
margin due to more Capital expenditure.
Table 9.9.8.1: Total Revenue Income and Expenditure of GNP

Financial
Year

Revenue Income

Revenue Expenditure

Surplus (Buffer Margin)

2008-09

10735353

10351569

383784

2009-10

14175350

9146660

5028690

2010-11

17481926

13625649

3856277

Source: Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad

DMG Consulting Pvt. Ltd., Noida

Page 148

City Development Plan, Govindgarh, M.P.

Lakhs

Year wise Revenue Income & Expenditure


200
180
160
140
120
100
80
60
40
20
0

Revenue Income
Revenue Expenditure
Buffer Margin

2008-09

2009-10

2010-11

Financial Year
Figure 9.9-4: Year Wise Revenue Income, Expenditure and Surplus - GNP

From the table of income and expenditure it can be analysed that there is a balance between income and
expenditure of Govindgarh. Only in the financial year 2010-11, there was more expenditure in comparison to
income. The analysis has been conducted, keeping in mind the limitation arising out of limited total income in
general, and internal revenue generation in particular. The spending pattern of Govindgarh suggests high
spending, as compared to the total income, leaving a very small buffer margin. However, a buffer margin is
maintained as Closing Balance (CB) with a major help of grants & aids. Generating internal resources is a
must to sustain development activities for a longer time.
Since the job of Govindgarh Nagar Parishad happens to be a non-commercial one, it is not expected and
right to have a much lower total expenditure as compared to the total income. Income is generated to fulfil
the requirements of society and community by spending as much as possible on the development front.
However, a buffer margin should always be kept for any contingency and emergency situation. This buffer
margin takes care of any unplanned project, which at times crops-up as urgent due to uncertainties in life.
Hence, if the income is good then a relatively narrow buffer margin can also be kept. Therefore it is desirable
to increase the spending by increasing the income first as higher income is important for high spending.

9.9

Key Issues and Conclusion

The key issues and conclusions drawn on the basis of above financial analysis are as follows:
The income and expenditure of Govindgarh runs neck to neck, which creates limitations
The potential sources of internal revenue generation should be spruced-up and larger accruals
should be made
There is a need to properly account all the properties and tax them with adequate rates
Income from Water Tax & Charges also needs to be augmented with increasing number of built-in
area and increase in population and households
Expenditure should be made proportionate to the internal revenue generation capacity of
Govindgarh

DMG Consulting Pvt. Ltd., Noida

Page 149

City Development Plan, Govindgarh, M.P.


9.10 City Specific Strategies and Action Plan

Revenue collection needs to be computerized so that data is clearly monitored and defaults can be
identified on a periodic basis. Computerization of the system mainly includes three things:
o Financial and account
o Workshop: Solid Waste management & Street lightening
o Technical Development: In Water supply, roads networking etc.
Revision of user charges, property tax collection
Introduction of Asset Evaluation and Inventory Management System
Preparation of Demand Collection Balance at ward level
Funds for identified Towns/Cities would be released to the designated State Nodal Agency, which in
turn would leverage additional resources from the State Government
A revolving fund would be created to take care of operation and maintenance of various assets
created under the Mission
Arrangement of well-equipped necessary systems for implementing reforms and improving efficiency
of Govindgarh, which may include new methods of register maintenance, data storage and retrieval,
etc.
e- Governance should be incorporated in grievance redressal system.

DMG Consulting Pvt. Ltd., Noida

Page 150

City Development Plan, Govindgarh, M.P.

CHAPTER 10
Investment Prioritization Plan

DMG Consulting Pvt. Ltd., Noida

Page 151

City Development Plan, Govindgarh, M.P.

10. INVESTMENT PRIORITIZATION PLAN


10.1 Project Identification
The sector wise present shortfall and the future requirements by the year 2035 are analyzed to identify the
priority projects under different sectors.

10.1.1

Physical Infrastructure

Water Supply
Sector

Problems / Requirements in 2035

Water Supply

- Present water supply is 28 lpcd


which is very less in comparison to
135 lpcd of UDPFI standards
- Water distribution system is old and
has limited coverage
- Town does not
have water
treatment plant facility
- All the existing OHTs are not
functional due to leakage problem
- Lack of technical/ skilled man power
to handle the system.

Proposed Projects
- Raja Talab could be used as
source of potable water in the
town after its treatment
- Water Supply / Renewal Works
- Water Supply Distribution
Network
- Replacement of older OHT and
construction of newer ones
- Up-gradation and extension of
WTP with an enhanced capacity
as per the future demand
- Metered Water Connection in
all Dwelling Units 2135 by 2035
- Employing skilled man-power
for
water
supply
and
maintenance works
- Preparation of fresh DPR for
Water Supply System for the
town.

Drainage
Sector
Drainage

Problems / Requirements in 2035


-

No proper drainage system. The


present drainage systems are
basically open type
Disposal of solid waste in drains
has reduced the flow capacity of
drains.

Proposed Projects
-

DMG Consulting Pvt. Ltd., Noida

Channelization of nallahs
and major drains by desilting, lining and repair
works
Converting
the
Kutcha
Nallahs to pucca one by Desilting,
lining
and
constructing side walls
Construction of new drains
in all wards and converting
the open ones to covered
type.
Page 152

City Development Plan, Govindgarh, M.P.


Sewerage and Sanitation
Sector

Problems / Requirements in 2035

Sewerage
Sanitation

and

There
is
no
underground
sewerage system in the town
Contamination of river water due
to outfall of drains/nallahs
carrying sewage from households
through septic tank
Considering
the
sanitation
coverage of the city, presently
more than 70% of households do
not have in-house facilities
Unmaintained limited number of
public urinals
No community toilets for
exclusive women complex.

Proposed Projects
-

Construction and renovation


of Public Toilets & Urinal like
Sulabh Complex in urban
poor areas & commercial/
market
areas
and
construction of some of the
units especially for women
Intercept all drains to flow
in Raja Talab; including
water front development &
plantation on flood zone
Preparation of fresh DPR/
comprehensive master plan
for Sewerage and Drainage
System of the town
Construction of one STP and
Network lines.

Solid Waste Management


Sector

Problems / Requirements in 2035

Solid
management

waste

Segregation & storage at source does


not exist
No proper dumping yard
Lack of infrastructure in terms of
solid waste carrying vehicles and
sweepers
Lack of waste disposal depots and
dustbins
No designated sanitary land fill site.

Proposed Projects
-

DMG Consulting Pvt. Ltd., Noida

Formation
of
ward
samiti/committee
to
ensure
the
primary
collection and disposal of
waste on PPP basis
Provision of vehicles and
sweepers
in
the
municipality
Identification of proper
dumping yard and working
out management plan.
Provision of dustbins and
construction of waste
depots in all wards
Preparation of a Detailed
Project Report (DPR) for
Municipal Solid Waste
Management for the town,
ensuring the design, size
and type of Land fill site
and quantity & quality of
required
modest
equipments,
techniques
Page 153

City Development Plan, Govindgarh, M.P.

and vehicles for collecting,


transporting,
processing
and dumping of MSW
Development of a scientific
Waste disposal site.

Traffic and Transportation


Sector

Problems / Requirements in 2035

Roads
Transportation

and

Lack of proper traffic and


transport management system
Absence of eco-friendly intra-city
Public Transport System
Lack of proper road network to
accommodate intra & inter-city
transportation
Congestion
in
commercial/
market areas due to rampant
encroachment, on-street parking
Improper road geometry and
surfacing
Transportation infrastructure will
be under acute strain
Existing bus stand is used as taxi
stand
Lack of designated and organized
on-street parking in town.
Street furniture, road and tourism
signage are also insufficient in the
city.

Proposed Projects
-

DMG Consulting Pvt. Ltd., Noida

Establishment of Traffic
Police Station and Traffic
Management Centre
Construction of new bus
stands to a newer location
with proper ISBT on BOOT
basis
Construction
of
Truck
Terminal/Transport Nagar
on BOOT basis
Removal of encroachment,
Road Widening & Junction
improvement in core and
accident prone areas
Development
of
footpath/pedestrian
pathways along the major
roads
Construction of parking lots
in main roads including
O&M on PPP basis
Up-gradation of existing
kutcha roads into pucca
ones
Construction of new roads
by 2035 to cover all areas of
the town
Introduction of eco-friendly
Intra-city Public Transport
System
Improved Street Lighting
covering the whole of the
street length
High mast lights at entry
points of the City.

Page 154

City Development Plan, Govindgarh, M.P.


Urban Poor
Sector

Problems / Requirements in 2035


-

Urban Poor

Presently slum population is


around 21.49% of the total
population and covers 7 wards of
the city.
Lack of physical as well as social
infrastructure
Degraded
environmental
conditions
Encroachment of vacant public
spaces near to rivers.

Proposed Projects
-

10.1.2

Slum
Improvement
Programmes
Provision of security of
tenure
Skill
up-gradation
and
economic
up-liftment
schemes
Improvement of shelters
Development of EWS and
LIG colonies by MPHB with a
focus or poverty eradication
in identified sectoral zones
especially for urban poor
under IHSDP
Relocation of slums from
hazardous areas.

Social Infrastructure

Health Facilities
Sector

Problems / Requirements in 2035

Health facilities

Lack of specialty/intermediate
hospitals in the town
No
specific
government
programmes for health sector
other than Family planning, RCH
and Immunization etc.
Infrastructures in government
hospitals are inadequate in terms
of facilities and number of
doctors.

Proposed Projects
-

Increase in bed capacity of


existing
hospitals
and
construction
of
new
hospitals
Providing
essential
infrastructure for better
health facilities
Construction
of
Multispecialty/intermediate
hospitals
Construction of Poly-clinic

Educational Facilities
Sector

Problems / Requirements in 2035

Education facilities

Insufficient number of primary


schools
Poor infrastructure in education
sector
No public library
Lack of Vocational or skill

DMG Consulting Pvt. Ltd., Noida

Proposed Projects
-

Development of few more


no. of primary school
Development
of
Middle/Higher Secondary
School
Development of 1
of
Page 155

City Development Plan, Govindgarh, M.P.


improvement education
Low rate of female attendance.

Integrated School with


Hostel Facility
Reconstruction
and
renovation
of
school
building which are in bad
condition
Establishment of Informal
and adult literacy centres
Establishment of vocational
training institutes and ITIs
Provision of equipments
and necessary infrastructure
like provision of toilets, safe
drinking water, kitchen shed
and electricity etc.
Public
awareness
programmes related to
Right to Education and
others for urban poor and
other citizens
Development of Public
Library in the ward no-12.

Recreation and Entertainment


Sector

Problems / Requirements in 2035

Recreation
Entertainment

and

10.1.3

Proposed Projects
-

No notified or designated place as


open space, parks and play
grounds for the residents
No community gathering halls or
room
No proper development of Raja
Talab as picnic spot or
recreational area for town.

Development of Community
Halls and Rooms
Development of Rain Basera
Development of Parks and
Playgrounds
Development of Stadium
Raja Talab Development
with tourist infrastructure.

Heritage and Tourism

Sector

Problems / Requirements in 2035

Heritage and Tourism

Conservation has not been


taken-up at Govindgarh Fort
Lack of infrastructure support
for tourism development
No active recreation facility like
Water Front Development
Waste water is discharged in
Raja Talab.

Proposed Projects
-

DMG Consulting Pvt. Ltd., Noida

Water Front Development


with tourist infrastructure by
preparing a Detailed Project
Report including landscaping
designing and details of
infrastructure required
Development, beautification,
plantations
along
the
Govindgarh Fort and lake
Development
of
active
Page 156

City Development Plan, Govindgarh, M.P.

recreation facilities like water


sports, theme park and
boating etc.
Promoting Govindgarh as a
transit point by making
provision for a tourist circuit
and
associated
tourism
infrastructure
for
the
surrounding
tourist
destination like Gurh, Orchha
or Khajuraho, Maihar, Panna
National Park, Bandhavgarh
National Park.

10.2 Basis for Project Identification


The projects have been identified on the basis of rapid assessment of all the sectors, discussions with local
authorities, stakeholder consultations and long term perspective in various sectors covered under CDP.

NGOs
Govt. and
Municipal
Bodies

Religious
bodies

Industry

Womens
Group

Assoc.

Stakeholder
Group

Prominent
Local
citizen

RWAs

Students

Slum
People

Figure 10.1: Involvement of Different Stakeholders in the Consultation Process Govindgarh

Based on stakeholder consultations, the prioritization of projects was done so that the views, aspirations and
felt needs of the local officials, residents, experts, NGOs, elected representatives and others are given due
cognizance. The sectoral priority to the projects is assigned on the basis of various consultations and
discussions held with the government departments involved in the implementation of CDP. It also takes into
account the aspirations of the residents of Govindgarh expressed in a workshop, informal discussions and
meetings held for the purpose.
DMG Consulting Pvt. Ltd., Noida

Page 157

City Development Plan, Govindgarh, M.P.


The sector wise present shortfall and the future problems by the year 2035 are given in the following tables
for each sector. The future requirement of the city is meant to take care by the year 2035 for an estimated
population of 34,750 (as projected for 2035). Thus, the various projects have been identified for meeting the
demand in each sector by the year 2035 and the present shortfall.

10.3 Projects for System and Infrastructure Augmentation

Preparation of fresh DPR for Water Supply System for the town.
Construction of Water Supply Distribution Network for extension of present distribution system.
Construction of Water Treatment Plant of capacity of 4 MLD.
Construction of intake well, pump house with electrical pumping machinery.
Construction of 2 OHT each of capacity of 2 MLD (one in southern part of the town and other one in
northern part of the town).
Preparation of DPR/Comprehensive Master Plan for Sewerage and Drainage System for the entire
town.
Construction of one STP of 3 MLD capacities.
Construction of underground sewerage network for 35 km to cover the entire town.
Construction of 5 Community/Public Toilets of 20 Seats like Sulabh Complex & 10 Urinals of 5 seats in
urban poor areas & commercial/ market areas.
Construction of some Community/Public Toilets especially for women.
Construction of new storm water drainage network to cover the whole town (for 65 Kms - including
both the sides of roads).
Converting the Kutcha Nallahs to pucca one by De-silting, lining and constructing side walls.
Preparation of a Detailed Project Report for Municipal Solid Waste Management with required
infrastructure and modest equipment.
Provision of dustbins and construction of waste depots in all wards.
Development/construction of Scientific Waste Disposal Site.
Construction of a new bus stand to a newer location with proper ISBT on BOOT basis.
Construction of a Truck Terminal/Transport Nagar on BOOT basis.
Construction of new roads of total length of 14 km by 2035 in different areas of town.
Development of footpath/pedestrian walkways along the major roads (for 20 kms).
Construction of 5 parking lots in main roads/commercial or market areas including O&M on PPP
basis.
Development of EWS and LIG colonies by MPHB with a focus on poverty eradication in identified
zones especially for urban poor under IHSDP.
Establishment of 3 more primary school by 2035.
Establishment of 1 Integrated School with Hostel Facility in ward no 8.
Establishment of vocational training institutes and ITIs.
Development of 1 Public Library.
Construction of Multi-specialty/Intermediate hospital.
Construction of one 10 bedded Poly-clinic for 2035.
Development of one Community Hall.
Development of a Rain Basera in ward numbers 7, 14 and 15.
Development of Parks and Playgrounds.
Development of Stadium.
Preparation of Detailed Project Report for Raja Talab development including landscaping, designing
and details of infrastructure required.

DMG Consulting Pvt. Ltd., Noida

Page 158

City Development Plan, Govindgarh, M.P.


10.4 Projects for System and Infrastructure Refurbishment

Renewal and repairing of Water Supply Networks.


Replacement or retrofitting of older OHT.
Water Metered Connection in all Dwelling Units by 2035.
Renovation of existing public urinals.
Converting the open drains to covered type.
Road Widening & Junction improvement.
Improved Street Lighting and covering the whole of the street length.
Improvement of shelter for urban poor.
Renovation of school buildings which are in bad condition.
Provision of equipments and necessary infrastructure like provision of toilets, safe drinking water,
kitchen shed and electricity etc. in education institutions.
Increase the capacity of bed in the existing hospitals.
Development, beautification, plantations along the Talab.
Provision for special Hawker zone in the ward no- 4.

10.5 Sector Wise Project Identification and Costing


Sector-wise project identification and costing has been done on the basis of the sector analysis and quantum
of investment required for various sectors in the City Development Plan over a specified time frame to attain
the sustainable growth and to achieve the Mission goals.

10.5.1

Physical Infrastructure

Water Supply
With a vision to provide adequate amount of treated water to the projected population of 2035, the
following projects are identified to achieve the goal in the sector:
Table 10.5.1: Proposed work, Project cost and Implementing Agencies for Water Supply

Code No.
WS 1
WS 2
WS 3
WS 4
WS 5
WS 6
WS 7
WS 8

Projects proposed

Project Cost Department


(in Lakh)
Preparation of DPR for Water Supply System for the
UADD, Govt. of M.P.
5.00
entire town.
and GNP
Rehabilitation/ replacement of present pipe line
Govt. of M.P.
30.00
system (2 km) 150 dia (cost @ Rs1471)
Extension of present distribution line to cover the
Govt. of M.P.
51.50
whole of the city (3.5 km) 150 dia (cost @ Rs1471)
Construction of 2 OHT each of capacity 4 MLD by 2013
Govt. of M.P.
300.00
and 2015 years
Construction of Filtration Plant/ Water Treatment
Govt. of M.P.
235.00
Plant of capacity 4 MLD in ward no. 15
Construction of intake well, pump house with electrical
Govt. of M.P.
250.00
pumping machinery
Construction of treatment plant i.e. electrical,
Govt. of M.P.
50.00
mechanical equipments
Laying of 450 mm dia Pumping mains intake to
Govt. of M.P.
30.00
treatment plant
DMG Consulting Pvt. Ltd., Noida

Page 159

City Development Plan, Govindgarh, M.P.


WS 9
WS 10
WS 11

Laying of 250 mm Pumping main from rest house to 15.00


OHT
Water Meter Connection in all Dwelling Units 2135 by 30.00
2035 (@ Rs. 150/connection)
Training and Capacity Building of Staff
5.00

Sub Total Cost (A)

Govt. of M.P.
Govindgarh
Parishad
Govindgarh
Parishad

Nagar
Nagar

1001.50

* PWD (SOR) April 2011

Sewerage and Sanitation


Presently there is no sewage disposal system in the city. The in-house sanitation is about 30% for the city and
is limited to many users. Therefore efforts should be made to have 100 percent coverage on the sewerage
sector to minimize the sanitation problem of the city. In this regard, the following projects have been
identified:
Table 10.5.2: Proposed Project, Project Cost and Implementing Agencies for Sewerage and Sanitation

Code No.

Projects proposed

SS 1

Preparation of DPR/Comprehensive
Master Plan for underground Sewerage
System for entire town

5.00

SS 2

Construction of DEWATS in each wards


Rs 2000 per sq m of land underwet
land. Each plant need around 500 sp. m

150.00

Govt. of M.P

SS 3

Construction of treatment plant support


electrical, mechanical equipments

150.00

Govt. of M.P

SS 4

Construction of eco-toilets in slum areas


and public place. (Rs 15000 per toilet)

171.00

Nagar Parishad

SS 5

Construction of 20 public urinals (@


Rs5000)

3.00

Nagar Parishad

SS 6

Construction of individual
toilet
(Support in terms f subsidies for 1300
units)

52.00

ULB's, Govt. of M.P.

Sub Total Cost (B)

Project Cost Department


(in Lakh)
UADD, Govt. of M.P. and
GNP

531.00

* PWD (SOR) April 2011

Solid Waste Management


Presently there is lack of infrastructure and capital cost for solid waste management in the city. So the
following projects have been identified to achieve the future goals for solid waste management in the city:
Table 10.5.3: Proposed Project, Project Cost and Implementing Agencies for Solid Waste Management

DMG Consulting Pvt. Ltd., Noida

Page 160

City Development Plan, Govindgarh, M.P.


Code No.

Projects proposed

SWM 1

Preparation of Detailed Project Report 5.00


for Municipal Solid Waste Management
for entire town.

UADD, Govt. of M.P. and


GNP

SWM 2

Construction maintainance of Sanitary 136.00


Landfill Site with other infrastructure
facility in ward no. 14 (@Rs1000/ton of
waste) exclusive of land cost

Nagar Parishad

SWM 3

Providing equipments and machines to 30.00


support the SWM system

Nagar Parishad

SWM 4

Enhancing the capacity of municipality 75.00


by providing Transportation vehicles (2) ,
Container (30) and & Handcart (10)

Nagar Parishad

Sub Total Cost (C)

Project Cost Department


(in Lakh)

246.00

* PWD (SOR) April 2011

Storm Water Drainage


Presently the coverage of the storm water drainage is poor in the city. So the following projects have been
identified to minimize the adverse effect of the inadequate drainage system of the city.
Table 10.5.4: Proposed Project, Project Cost and Implementing Agencies for Storm Water Drainage

Code No.

Projects proposed

D1

Preparation of DPR for Storm Water 1.90


Drainage System for entire town

UADD, Govt. of M.P. and


GNP

D2

Construction of new storm water 120.00


drainage network to cover the whole
town (3 kms.) (@Rs44 lakh/km)

Govt. of M.P

D3

Converting the Kutcha Nallahs to pucca 70.00


one by De-silting, lining and constructing
side walls. 3.5km ((@Rs20 lakh/km)

Nagar Parishad

Sub Total Cost (D)

Project Cost Department


(in Lakh)

191.90

* PWD (SOR) April 2011

Traffic and Transportation

DMG Consulting Pvt. Ltd., Noida

Page 161

City Development Plan, Govindgarh, M.P.


The creation of a reliable, comfortable, attractive and affordable traffic management system is the long-term
solution for solving the traffic problems in the city. Thus, construction of new bus stand to provide a high
quality transit system, and provision of parking facilities are envisaged to solve parking problem and
congestion in core areas. To achieve the goals in this sector the following projects have been identified:
Table 10.5.5: Proposed Project, Project Cost and Implementing Agencies for Traffic and Transportation

Code No.

Projects proposed

TT 1

Development of new Bus Stand with 500.00


proper ISBT on BOOT basis in ward no.
12

Nagar Parishad

TT 2

Development of road in ward 14 (2km)

Nagar Parishad

TT 3

Development of footpath/pedestrian 25.00


along the major roads. (for 5 km)

Nagar Parishad

TT 4

Construction of 5 parking lots along main 25.00


roads and in commercial or market areas

Nagar Parishad

TT 5

Road Widening from 3 m to 4.5 m (major 90.00


district roads for 6km.)

PWD

TT 6

Improvement of traffic junctions, rotary 90.00


development including installation of
traffic light/signals.

Nagar Parishad

Sub Total Cost (E)

Project Cost Department


(in Lakh)

100.00

830.00

* PWD (SOR) April 2011

Street Lighting and Fire Fighting


With a view to cover the entire streets with lighting facilities and to handle and overcome the anthropogenic
hazards like fire in town the following projects have been identified:

Table 10.5.6: Proposed Project, Project Cost and Implementing Agencies for Street Lighting and Fire Fighting

Code No.

Projects proposed

SL 1

Installation of 218 street lights within 75.00


the wards/residential area (33230/Solar street light pole)

Govindgarh
Parishad

Nagar

SL 2

High mast lights at entry points of the 60.00


City (2 Nos.) and in core area (2 No.) (15
lakhs/- unit)

Govindgarh
Parishad

Nagar

DMG Consulting Pvt. Ltd., Noida

Project Cost Department


(in Lakh)

Page 162

City Development Plan, Govindgarh, M.P.


SL 3

Procurement of 1 electric pole vehicle

SL 4

Govindgarh
Parishad

Nagar

Procurement of 2 fire tenders and other 125.00


equipment's (one big and one small)

Govindgarh
Parishad

Nagar

SL 5

Establishment of fire station and staff 50.00


cost

Govindgarh
Parishad

Nagar

SL 6

Training & capacity building of staff

Govindgarh
Parishad

Nagar

Sub Total Cost (F)

25.00

5.00
340.00

* PWD (SOR) April 2011

Urban Poor
Presently slum coverage is 9.25% of the city and there is lack of physical and social infrastructure in most of
the slums as well. So to make the city slum free the following projects have been identified in this sector:
Table 10.5.7: Proposed Project, Project Cost and Implementing Agencies for Urban Poor

Code No.

Projects proposed

UP 1

Construction of 1139 DUs in to solve the 4000.00


housing problems in the slums under IHSDP as
per the availability of suitable Govt. Land (@3.5
lakhs/unit)

Sub Total Cost (G)

Project Cost Department


(in Lakh)
MPHB; GNP

4000.00

*PWD (SOR) April 2011

10.5.2

Social Infrastructure

Health Facilities
Most of the population is not served by this because of poor medical infrastructure facilities in terms of
hospital beds and doctors. So the following projects have been identified for the overall development of the
sector:
Table 10.5.8: Proposed Project, Project Cost and Implementing Agencies for Health Facilities

Project
Department
Cost
(in
Lakh)

Code No.

Projects proposed

H1

Extension of hospital situated in the 150.00


premise of health centre by constructing
multi storied building thereby extending
the health facilities

DMG Consulting Pvt. Ltd., Noida

Health Department

Page 163

City Development Plan, Govindgarh, M.P.


H2

Construction of 1 Multi-specialty / 75.00


intermediate hospital with 44 no. of
beds @1 bed per 500 person for 2035 in
ward no. 10 or 13

Health Department

H3

Construction of 1 10-bedded Poly-clinic 50.00


for 2035 in ward no. 13

Health Department

Sub Total Cost (H)

275.00

* PWD (SOR) April 2011

Educational Facilities
Considering the emerging issues and potentials in the sector, the following projects have been identified in
the education sector:
Table 10.5.9: Proposed Project, Project Cost and Implementing Agencies for Education Facilities

Project Cost Department


(in Lakh)

Code No.

Projects proposed

E1

Establishment of 1
with Hostel Facility

E2

Establishment of 2 Informal and adult 10.00


literacy centres, Anganwadi centers in
ward no 15 & 13(@5 lakh each)

Education Department,
Govt. of M.P.

E3

Construction of Polytechnic college/ 500.00


Vocational Training Institutes and ITIs

Education Department,
Govt. of M.P.

E4

Renovation of school buildings which 50.00


are in bad condition

Education Department,
Govt. of M.P.

E5

Provision of equipments and necessary 10.00


infrastructure like provision of toilets,
safe drinking water, kitchen shed and
electricity etc. in education institutions

Nagar Parishad

E6

Establishment of a Public Library

Nagar Parishad

Integrated School 500.00

Sub Total Cost (I)

70.00

Education Department,
Govt. of M.P.

1140.00

* PWD (SOR) April 2011

Tourism
Presently the tourism industry is lacking infrastructure facilities and there is shortage of active recreational
space in the city. With a goal to enhance the tourism activities in the city the following projects have been
identified for improvement of the sector:
DMG Consulting Pvt. Ltd., Noida

Page 164

City Development Plan, Govindgarh, M.P.


Table 10.5.10: Proposed Project, Project Cost and Implementing Agencies for Tourism

Code No.

Projects proposed

Project Cost Department


(in Lakh)

T1

Preparation of Detailed Project Report for Raja


Talab development including landscaping,
designing and details of infrastructure required

6.00 (1% of
Project Cost)

UADD, Govt. of M.P. and


GNP

T2

Conservation and tourism


infrastructure
Development of Govindgarh fort Development,
beautification, plantations along the raja Talab
and rani Talab

500.00

Tourism Dept. Govt. of


M.P.

T3

Development of active recreation facilities like


water sports, theme park and boating etc.

50.00

Govindgarh Nagar Parishad

T4

Promoting Govindgarh as a transit point by


making provision for a tourist circuit and
associated tourism infrastructure for the
surrounding tourist destination.

50.00

Tourism Dept. Govt. of


M.P.

Sub Total Cost (J)

606.00

* PWD (SOR) April 2011

10.5.3

Other Components

Other than the above stated sectors, some other projects have also been identified for the development of
the city.
Table 10.5.11: Proposed Project, Project Cost and Implementing Agencies for Other Development works

Code No.

Projects proposed

O1

Development of Entrance Gates to town (2 in 60.00


Nos.) one towards north side and other towards
south. (@30 lakh/unit)

Govindgarh Nagar Parishad

O2

Development of hawker zone

10.00

Govindgarh Nagar Parishad

O3

Development of organized playground/stadium

50.00

Govindgarh Nagar Parishad

O4

Construction of one Community Hall and two 50.00


Rooms

Govindgarh Nagar Parishad

Sub Total Cost (K)

Project Cost Department


(in Lakh)

170.00

* PWD (SOR) April 2011

10.5.4

Urban Reforms & Capacity Building

Table 10.5.12: Proposed Project, Project Cost and Implementing Agencies for Urban Reforms and Capacity Buildings

Code No.

Projects proposed

DMG Consulting Pvt. Ltd., Noida

Project Cost Department


(in Lakh)

Page 165

City Development Plan, Govindgarh, M.P.


UR 1

Computerization of property tax & other 20


assets

Govindgarh
Parishad

Nagar

UR 2

Billing s/w & collection


hardware & software

systems; 5

Govindgarh
Parishad

Nagar

UR 3

Training/Manpower Assistance

Nagar

UR 4

Strengthening
Engineering
AUTOCAD, all h/w & s/w)

(MIS, 5

Govindgarh
Parishad
Govindgarh
Parishad

UR 5

Other Management Supports training for 5


supervisory & staff

Govindgarh
Parishad

Nagar

Sub Total Cost (L)

Nagar

40

* PWD (SOR) April 2011

10.5.5

Sector wise Total Cost

Table 10.5.13: Sector wise Proposed Project and their Cost

Physical Infrastructure
Sub Total Cost (A)

Water Supply

1001.50

Sub Total Cost (B)

Sewerage and Sanitation

531.00

Sub Total Cost (C)

Solid Waste Management

191.90

Sub Total Cost (D)

Storm Water Drainage

246.00

Sub Total Cost (E)

Traffic and Transportation

830.00

Sub Total Cost (F)

Street Lighting and Fire Fighting

340.00

Sub Total Cost (G)

Urban Poor

4000.00

Sub Total Cost (H)

Health Facilities

275.00

Sub Total Cost (I)

Educational Facilities

1140.00

Sub Total Cost (J)

Tourism

606.00

Sub Total Cost (K)

Other Components

170.00

Sub Total Cost (L)

Urban Reforms & Capacity Building

40.00

Social Infrastructure

Total Cost (L)

9371.40

10.6 Phasing of Investment


The city investment plan will be phased in five phases as follows:

Phase I (2012-2015)
Phase II (2016-2020)
Phase III (2021-2025)
Phase IV (2026-2030)
DMG Consulting Pvt. Ltd., Noida

Page 166

City Development Plan, Govindgarh, M.P.

10.6.1

Phase V (2031-2035)

City Investment Plan for 2012- 2015 (Phase I)

These projects are to be implemented over the plan period for first phase ( 2012- 2015) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.
Table 10.6.1: Sector wise Project cost and Yearly Schedule of Expenditure (Phase I)

2013-14

2014-15

Cost of Project (in Schedule of Expenditure (% of


Lakhs)
project cost)

2012-13

Project Code

WS 2

30

50

50

WS 4

300

50

50

WS 5

235

100

WS 6

100

WS 7

50

50

WS 8

30

100

WS 9

15

100

WS 10

30

30

10

WS 11

50

50

Water Supply

50

Sewerage and Sanitation


SS 2

150

13.3

SS 3

100

50

SS 4

171

50

50

SS 5

100

136

Solid Waste Management


SWM 2

DMG Consulting Pvt. Ltd., Noida

Page 167

City Development Plan, Govindgarh, M.P.


SWM 3

30

50

SWM 4

75

30

TT 1

500

70

TT 2

100

50

TT 3

25

TT 4

25

TT 5

90

25

TT 6

90

16.6

SL 1

75

SL 2

60

16.6

16.6

SL 3

25

100

SL 4

125

SL 5

50

SL 6

100

4000

20

Traffic and Transportation

20

20
20
25

Street Lighting and Fire Fighting

30
10

20

20

Urban Poor
UP 1

20

Health Facilities
H1

150

33.3

E2

500

50

E3

10

E4

50

E5

10

Educational Facilities

100
20

20

20

50

50

Tourism
T3

500
DMG Consulting Pvt. Ltd., Noida

20
Page 168

City Development Plan, Govindgarh, M.P.


T4

50

T5

50

50
50

Other Components
O1

60

100

O2

10

100

UR 1

20

50

UR 2

100

UR 3

50

UR 4

100

UR 5

50

Urban Reforms and Capacity Building

10.6.2

50

50

50

City Investment Plan for 2016- 2020 (Phase II)

These projects are to be implemented over the plan period for first phase ( 2016- 2020) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.
Table 10.6.2: Sector wise Project cost and Yearly Schedule of Expenditure (Phase II)

50

50

WS 4

300

50

WS 9

15

10

10

SS 2

150

13.3

13.3

SS 3

100

50

2019-20

51

2018-19

WS 3

2017-18

2016-17

Cost of Schedule of Expenditure (% of project cost)


Project
(in
Lakhs)
2015-16

Project Code

13.3

13.3

13.3

Water Supply

Sewerage and Sanitation

DMG Consulting Pvt. Ltd., Noida

Page 169

City Development Plan, Govindgarh, M.P.


Solid Waste Management
SWM 2

136

SWM 3

30

SWM 4

75

50
20

30

Storm Water Drainage


D2

120

D3

70

25
30

30

30

10

Traffic and Transportation


TT 1

500

15

15

TT 2

100

50

TT 3

25

20

TT 4

25

TT 5

90

25

25

TT 6

90

16.6

16.6

16.6

SL 1

75

SL 2

60

16.6

16.6

16.6

16.6

SL 4

125

SL 5

50

20

20

20

4000

20

20

20

H1

150

33.3

33.3

H3

50

20

20
20

16.6

Street Lighting and Fire Fighting


10

70

Urban Poor
UP 1
Health Facilities

100

Educational Facilities
E2

10

DMG Consulting Pvt. Ltd., Noida

50

Page 170

City Development Plan, Govindgarh, M.P.


E4

50

20

E6

70

100

T3

500

20

T4

50

50

20

Tourism
20

20

20

Other Components
O3

50

O4

50

10.6.3

100
100

City Investment Plan for 2021- 2025 (Phase III)

These projects are to be implemented over the plan period for first phase ( 2021- 2025) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.
Table 10.6.3: Sector wise Project cost and Yearly Schedule of Expenditure (Phase III)

2024-25

2023-24

2022-23

2021-22

Cost of Schedule of Expenditure (% of project cost)


Project
(in Lakhs)
2020-21

Project Code

Water Supply
WS 10

30

10

Sewerage and Sanitation


SS 2

150

13.3

50

50

6.6

Tourism
T5

10.6.4

City Investment Plan for 2026- 2030 (Phase IV)

These projects are to be implemented over the plan period for first phase ( 2026- 2030) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.

DMG Consulting Pvt. Ltd., Noida

Page 171

City Development Plan, Govindgarh, M.P.


Table 10.6.4: Sector wise Project cost and Yearly Schedule of Expenditure (Phase IV)

2027-28

2028-29

2029-30

2026-27

Cost
of Schedule of Expenditure (% of project cost)
Project (in
Lakhs)
2025-26

Project Code

Water Supply
WS 10

30

10

Solid Waste Management


SWM 2

136

Storm Water Drainage


D2

120

25

Traffic and Transportation


TT 4

25

40

Street Lighting and Fire Fighting


SL 1

75

Educational Facilities

10.6.5

City Investment Plan for 2031- 2035 (Phase V)

These projects are to be implemented over the plan period for first phase ( 2031- 2035) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.
Table 10.6.5: Sector wise Project cost and Yearly Schedule of Expenditure (Phase V)

2034-35

2033-34

2032-33

2031-32

Cost
of Schedule of Expenditure (% of project cost)
Project (in
Lakhs)
2030-31

Project Code

Water Supply
WS 10

30

10

10

Solid Waste Management

DMG Consulting Pvt. Ltd., Noida

Page 172

City Development Plan, Govindgarh, M.P.


SWM 2

136

176

25

Storm Water Drainage


D2
Traffic and Transportation
TT 4

25

20

Street Lighting and Fire Fighting


SL 1

148

Health
H2

75

100

Educational Facilities
E1

100

100

10.7 Financial Plan


As stated above, the required projects have been categorized under various sectors. Each sector comprises of
a number of projects. Financing options for the projects in each sector could be either one or a combination
of the following:

Central Governments Grants: Under Central Government funding there are many scheme are
sponsored by the Government of India like JNNURM, NUIS, UIDSSMT, and Urban Statistics for HR &
Assessment, Rajiv Awas Yojana etc.

State Governments Grants & Loans: State Government also transfers funds to municipal body based
on stamp revenue share, Transport and other funds.

International Funding Agency: International funding agency include multilateral bodies like World
Bank, Asian development Bank etc.

Municipal body: Under domestic funding agency mainly Urban Local Bodies comes.

Financing Institutions: Financing Institutions includes majorly Banks etc.

Private Operator: Under this category mainly private sectors are included.

Based on the availability of funds with each of the above and their willingness to provide grants/loans, the
projects could be funded.
The suggested pattern of funding is as under:

DMG Consulting Pvt. Ltd., Noida

Page 173

City Development Plan, Govindgarh, M.P.


Graph 1: Financing Option- Water Supply

Private Operator

Graph 2: Financing Option- Sewerage & Sanitation

Private
Operator

Graph 3: Financing Option- Solid Waste Management

Private Operator

DMG Consulting Pvt. Ltd., Noida

Page 174

City Development Plan, Govindgarh, M.P.

Graph 4: Financing Option- Strom water Drainage

Private Operator

Graph 5: Financing Option-Traffic & Transportation

Graph 6: Financing Option: Street Lighting & Fire Fighting

20%
35%

State
Governments
Grants
Central
Governments
Grants

45%

DMG Consulting Pvt. Ltd., Noida

Private Operator

Page 175

City Development Plan, Govindgarh, M.P.

Private Operator

Graph 7: Financing Option- Urban Poor

Graph 8: Financing Option- Health facility

Private Operator

Graph 9: Financing Option- Education Sector

DMG Consulting Pvt. Ltd., Noida

Page 176

City Development Plan, Govindgarh, M.P.

Municipal Council

Private Operator

Graph 10: Financing Option- Tourism

Graph 11: Financing Option- Other Components

Private Operator

Graph 12: Financing Option- Urban Reforms & Capacity Building

DMG Consulting Pvt. Ltd., Noida

Page 177

City Development Plan, Govindgarh, M.P.


Table 10.7.1: Overall financing plan of investment plans:

Funding agencies

Rs. (In Lakhs)

Rs. (In Percentage)

Central Government

2728.8

30%

State Government

3638.4

40%

Municipal Body

1819.2

20%

Private sector

909.6

10%

TOTAL

9096

100%

DMG Consulting Pvt. Ltd., Noida

Page 178

City Development Plan, Govindgarh, M.P.

Normal Growth (12%)


Table 10.7.2: Revenue Collection from 2008-2035 at Normal Growth rate of 12%
Year
Income
(in
lakhs)

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2019-20

2020-21

2021-22

2022-23

2023-24

2024-25

2025-26

2026-27

2027-28

2028-29

2029-30

2030-31

2031-32

2032-33

2033-34

107.03

141.40

174.48

195.42

218.87

245.13

274.55

307.49

344.39

385.72

432.00

483.84

541.91

606.93

679.77

761.34

852.70

955.02

1069.63

1197.98

1341.74

1502.75

1683.08

1885.05

2111.25

2364.60

2034-35

2648.36

Performing Growth (14%)


Table 10.7.3: Revenue Collection from 2008-2035 at Normal Growth rate of 14%
Year

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2019-20

2020-21

2021-22

2022-23

2023-24

2024-25

2025-26

2026-27

2027-28

2028-29

2029-30

2030-31

2031-32

2032-33

2033-34

Income
(in
lakhs)

107.03

141.40

174.48

198.91

226.75

258.50

294.69

335.94

382.98

436.59

497.72

567.40

646.83

737.39

840.62

958.31

1092.48

1245.42

1419.78

1618.55

1845.15

2103.47

2397.95

2733.67

3116.38

3552.67

2034-35

4050.05

From the above projection of income of the Municipal Council from major sources of income except income of aids and grants, it is clear that under normal condition of growth the income of the Parishad will rise to 2648.36 lakhs, under
the performing growth rate, the income of the Parishad would be 4050.05 lakhs.

DMG Consulting Pvt. Ltd., Noida

Page 122

City Development Plan, Govindgarh, M.P.

CHAPTER 11
Urban Reforms

DMG Consulting Pvt. Ltd., Noida

Page 180

City Development Plan, Govindgarh, M.P.

11. URBAN REFORMS


11.1 Background
The main thrust of the development strategies is to ensure improvement in urban governance so that Urban
Local Bodies (ULBs) and para-statal agencies become financially sound with enhanced credit rating and ability
to access market capital for undertaking new programmes and expansion of services. In this improved
environment, public-private participation models for provisioning of various services would also become
feasible. To achieve this objective, State Governments, Urban Local Bodies and para-statal agencies will be
required to accept implementation of an agenda of reforms. The proposed reforms shall broadly fall into
two categories:-

Mandatory reforms

Optional reforms

All the mandatory and optional reforms shall be implemented by the State/ULB/Para-Statals within the
Scheme period.

11.2 Objectives of reforms

Improvement of urban governance

To make ULBs financially sound

To enable ULBs to access market capital

To enable ULBs to undertake new programs and expand services

11.3 Need for reform initiatives

Harnessing the Potential of Reforms in Urban Infrastructure


o reforms to meet development objectives
o investor create an investor-friendly environment

National Need for National-Reform level

Reform-Linked Investments
o Reform linked assistance to State Governments and ULBs.
o Integrate reform initiatives to catalyze investments in urban infrastructure.

Need for Sustainable Infrastructure Development


o link between asset creation and management through reforms
DMG Consulting Pvt. Ltd., Noida

Page 181

City Development Plan, Govindgarh, M.P.

Need for Efficiency Enhancement.

11.4 Structure of reforms


Graph 2: Structure of Reforms

Reforms

Mandatory

State
Government

ULBs & ParaStatal

Optional

State
Government

ULBs & ParaStatal

11.5 MANDATORY REFORMS


Urban Local Body Reforms (at ULB Level)
i) Adoption of modern, accrual-based double entry system of accounting in Urban Local Bodies.
ii) Introduction of system of e-governance using IT applications like GIS and MIS for various services provided
by ULBs.
iii) Reform of property tax with GIS, so that it becomes major source of revenue for Urban Local Bodies
(ULBs) and arrangements for its effective implementation so that collection efficiency reaches at least 85%
within the Mission period.
iv) Levy of reasonable user charges by ULBs/Para-statals with the objective that full cost of operation and
maintenance is collected within the Mission period
v) Internal earmarking within local body budgets for basic services to the urban poor.
vi) Provision of basic services to urban poor including security of tenure at affordable prices, improved
housing, water supply, sanitation and ensuring delivery of other already existing universal services of the
government for education, health and social security.

State Level Reforms


i) Implementation of decentralization measures as envisaged in Seventy Fourth Constitutional Amendment.
States should ensure meaningful association/engagement of ULBs in planning function of Para- statals as well
as delivery of services to the citizens.
DMG Consulting Pvt. Ltd., Noida

Page 182

City Development Plan, Govindgarh, M.P.


ii) Rationalization of Stamp Duty to bring it down to no more than 5% within the Mission period.
iii) Enactment of community participation law to institutionalize citizen participation and introducing the
concept of the Area Sabha in urban areas.
iv) Assigning or associating elected ULBs into town planning function over a period of five years;
transferring all special agencies that deliver civic services in urban areas and creating accountability platforms
for all urban civic service providers in transition.

11.6 OPTIONAL REFORMS (State and ULB/Para-statal level)


i) Repeal of Urban Land Ceiling and Regulation Act.
ii) Amendment of Rent Control Laws balancing the interest of landlords and tenants.
iii) Enactment of Public Disclosure Law to ensure preparation of medium-term fiscal plan of ULBs and release
of quarterly performance information to all stakeholders.
iv) Revision of bye-laws to streamline the approval process for construction of buildings, development of
sites, etc.
v) Simplification of legal and procedural frameworks for conversion of agricultural land for non-agricultural
purposes.
vi) Introduction of Property Title Certification System in ULBs.
vii) Earmarking at least 20-25% of developed land in all housing projects (both Public and Private Agencies)
for EWS/LIG category with a system of cross subsidization.
viii) Introduction of computerized process of registration of land and property.
ix) Revision of bye-laws to make rain water harvesting mandatory in all buildings to come up in future and for
adoption of water conservation measures.
x) Bye-laws on reuse of recycled water.
xi) Administrative reforms, i.e., reduction in establishment by bringing out voluntary retirement schemes,
non-filling up of posts falling vacant due to retirement etc., and achieving specified milestones in this regard.
xii) Structural reforms
xiii) Encouraging Public-Private partnership.

11.7 Status of Mandatory & optional Reforms:


A.

Mandatory Reforms

1.

Urban Local Body Reforms (at ULB level)

i.

Adoption of modern, accrual-based double entry system of Not yet implemented.


accounting in Urban Local Bodies
DMG Consulting Pvt. Ltd., Noida

Page 183

City Development Plan, Govindgarh, M.P.

ii.

Introduction of system of e-governance using IT applications like GIS Not yet implemented.
and MIS for various services provided by ULBs

iii.

Reform of property tax with GIS, so that it becomes major source of Computerized
revenue for Urban Local Bodies (ULBs) and arrangements for its property tax system is
effective implementation so that collection efficiency reaches at least yet to be introduced.
85% within the mission period.

iv.

Levy of reasonable user charges by ULBs/ Para-statal with the


objective that full cost of operation and maintenance is collected
within the mission period. However, cities/ towns in North East and
other special category states may recover at least 50% of operation
and maintenance charges initially. These cities / towns should
graduate to full O&M cost recovery in a phased manner.

O&M charges
have
been
implemented.

User charges
like in water
billing
etc.
have
been
started.

v.

Internal earmarking within local body budgets for basic services to the It is implemented.
urban poor.

vi.

Provision of basic services to urban poor including security of tenure It is implemented.


at affordable prices, improved housing, water supply, sanitation and
ensuring delivery of other already existing universal services of the
government for education, health and social security.

2.

State Level Reforms

i.

Implementation of decentralization measures as envisaged in Seventy It is implemented.


Fourth Constitutional Amendment. States should ensure meaningful
association / engagement of ULBs in planning function of Parastatals
as well as delivery of services to the citizens.

ii.

Rationalization of Stamp Duty to bring it down to no more than 5% Not implemented yet.
within the mission period

iii.

Enactment of Public Disclosure law to ensure preparation of medium- It


is
term fiscal plan of ULBs release of quarterly performance information consideration.
DMG Consulting Pvt. Ltd., Noida

under

Page 184

City Development Plan, Govindgarh, M.P.


to all stakeholders.

iv.

Enactment of community participation law to institutionalize citizen It


is
participation and introducing the concept of the Area Sabha in urban consideration.
areas

under

v.

Assigning or associating elected ULBs into town planning function It is implemented.


over a period of five years; transferring all special agencies that
deliver civic services in urban areas and creating accountability
platforms for all urban civic service providers in transition.

B.

Optional Reforms

i.

Repeal of Urban Land Ceiling and Regulation Act.

ii.

Amendment of Rent Control Laws balancing the interest of landlords It is implemented.


and tenants.

iii.

Revision of bye-laws to streamline the approval process for


construction of buildings, development of sites, etc.

It is implemented.

It
is
implemented.

NIC is working
under
the
Town
&
Country
Planning.

iv.

Simplification of legal and procedural frameworks for conversion of It


is
agricultural land for non-agricultural purposes.
consideration.

v.

Introduction of Property Title Certification System in ULBs.

vi.

Earmarking at least 20-25% of developed land in all housing projects It is implemented.


(both Public and Private Agencies) for EWS/LIG category with a
system of cross subsidization.

vii.

Introduction of computerized process of registration of land and Not yet started.


property.

viii.

Revision of bye-laws to make rain water harvesting mandatory in all It is implemented.


buildings to come up in future and for adoption of water conservation
measures.

ix.

Bye-laws on reuse of recycled water.

x.

Administrative reforms, i.e., reduction in establishment by bringing It is implemented.


out voluntary retirement schemes, non-filling up of posts falling
vacant due to retirement, etc., and achieving specified milestones in
this regard.

DMG Consulting Pvt. Ltd., Noida

under

Not yet implemented.

Not yet stated.

Page 185

City Development Plan, Govindgarh, M.P.


xi.

Structural reforms

It is under process.

xii.

Encouraging Public-Private partnership

It is implemented.

11.8 Issues

There have been no mandatory reforms laid down for the town.
The municipal staff lacks in adequate awareness of the reform agenda and technical advancement.
The Nagar Parishad is not well equipped with the necessary systems for implementing reforms and
improving efficiency. Systems include new methods of register maintenance, data storage and
retrieval, etc. Most of the work happens in an ad-hoc manner without laid out procedures.
The Nagar Parishad needs to coordinate with Para-statals such as, Public Health Engineering
Department, Housing Board etc.
It has been found that while the local people have lots of problems and they want to participate and
bring to the notice to the authorities for their problems, the absence of a proper grievance redressal
system has made it very difficult for the local.
Low Efficiency of service delivery in various aspects such as extent of collection of property tax and
other taxes, poor maintenance of roads, poor sanitary conditions, inappropriate solid waste
management practices, inadequate street light provision, etc.
Lack of data/Information Base which could help in the development of area.

11.9 Town Specific Strategies and Action Plan

Private Sector Participation in development, management and financing of Urban Infrastructure


would be clearly delineated.
Funds for identified Towns/Cities would be released to the designated State Nodal Agency, which in
turn would leverage additional resources from the State Govt.
A revolving fund would be created to take care of operation and maintenance of various assets
created under the Mission.
Some demonstration/ presentation should be started to awareness municipal staff about reform
agenda and reforms.
Arrangement of well-equipped necessary systems for implementing reforms and improving efficiency
of Nagar Parishad, which may include new methods of register maintenance, data storage and
retrieval, etc.
A well framed coordinate system between Nagar Parishad and Para-statals should be designed for
better management.
e- Governance should be incorporated in grievance redressal system.
A rich Data/Information base arrangement should be maintain to address the specific problems and
solution for the same.

DMG Consulting Pvt. Ltd., Noida

Page 186

City Development Plan, Govindgarh, M.P.

CHAPTER 12
City Vision

DMG Consulting Pvt. Ltd., Noida

Page 187

City Development Plan, Govindgarh, M.P.

12. Town Vision


12.1 Summary of Sectoral Strategies:
Water Supply:

100 percent
population
coverage of
treated water

Quantity of
supply to be
135
lpcd, Quality
as per
standards

Provision of
community stand
posts in all slum
areas, public
places, parks, temples

100 percent water supply coverage which includes the present as well as the future demand by 2035.

Quality and quantity should be ensured as per the standards for the future population. The coverage
of the water supply system can be enhanced by providing community taps or stand posts in all slum
areas, public places and in recreation areas.

DMG Consulting Pvt. Ltd., Noida

Page 188

City Development Plan, Govindgarh, M.P.


Waste Water Management:

100 percent
population
coverage by
sewerage
system

Provision of
community
toilet blocks
near public
places to ensure
sanitation

Decentralised
waste water
treatment

Presently there is no sewage disposal system in the town or most of the households have their own
arrangements for the disposal. Therefore for future efforts should be made to have 100 percent coverage for
waste water to minimize the sanitation problem of the town. In this regards, the following steps can
considered:

Community toilet blocks should be provided near riverside, market places, in slum areas and core
town areas where there is limited scope of expansion of the dwelling units to have toilet in it.

Provision of toilets in each house.

Sewage treatment system for treatment of the sewage before disposal.

There should be government interventions in providing toilets in urban poor settlements, in which
the government can act as a facilitator or provider.

DMG Consulting Pvt. Ltd., Noida

Page 189

City Development Plan, Govindgarh, M.P.

Storm Drainage:

Flood control measures


in low lying areas
Lining of all
natural drains or
nalas
100 percent
coverage of the
city

Covering of all
open drains or
nalas

Considering the present drainage system, the following goals would be set to minimize the adverse effect of
poor drainage system:

100 percent coverage of the town through proper drainage system by 2035.

Converting the kutcha nallas to pucca ones, covering of all open drains and lining of all natural drains
and nallas.

Encroachment on the low lying natural drainage channel should be minimized so that flow of water
will not be blocked.

DMG Consulting Pvt. Ltd., Noida

Page 190

City Development Plan, Govindgarh, M.P.


Solid Waste Management:

Provision of
sweepers, vehicles and
equipment as per
standards
100 percent
coverage of the
city

Sanitary land fill


and virmicomposting of
organic wastes

Treatment of solid
waste before disposal

Present solid waste system is not covering all parts of the town. So the future direction for solid waste
management would be as follows:

Covering the whole part of the town including the present as well as the future developments.

Special care should be given to manage wastes that are generated on any auspicious days on river
beds.

Segregation of hazardous wastes like bio medical waste, bio degradable waste etc. and treatment of
solid waste before disposal.

Encourage participation of NGOs or CBOs in solid waste management.

DMG Consulting Pvt. Ltd., Noida

Page 191

City Development Plan, Govindgarh, M.P.


Street Lighting:

Special lighting
at
Lake, rivers, m
onuments and
other public
100 percent
coverage of the city places
to ensure safety for
the residents as
well as the tourists

Use of modern
technology, energy
saving equipments
like solar light.

Considering the present street lighting situation in the town, the future goals for 2035 would be:

Ensure 100 percent coverage in town to ensure safety and security for all the residents and the
tourists coming to the town.

Care should be given to provide street lights in public gathering spaces and recreation spaces like
lake, rivers, monuments and parks.

Use of modern power saving technology should be encouraged.

DMG Consulting Pvt. Ltd., Noida

Page 192

City Development Plan, Govindgarh, M.P.


Roads and Transportation:

Improve road and rail


connectivity
Improve public
bus stand facility

Improve existing road


network in terms of
road
surfacing, geometrics
and signals

Though there is opportunity for improved transportation system, there is lacking in the present road
networks and transport facilities. To improve the current situation and to address the future demand the
goals would be as follows:

Improvement of the existing road networks in terms of road geometry, road surfacing and traffic
signals etc.

For intra as well as inter-town movement public transport facilities should be improved.

DMG Consulting Pvt. Ltd., Noida

Page 193

City Development Plan, Govindgarh, M.P.


Slums:

Skill development and


economic upliftment
Ownership
rights
Slum Environment
Improvement

As slum is a major problem in the town. So the follows steps can be taken to make the town slum free.

Encouraging slum improvement schemes like improvement of physical i.e. water supply, drainage,
sanitation facilities as well as social infrastructure like education, health facilities in the slums.

Providing land ownership to the slum dwellers.

Involvement of NGOs should be encouraged for improvement of slums.

Community participation should be emphasized in any of the schemes launched by the govt. or
NGOs.

DMG Consulting Pvt. Ltd., Noida

Page 194

City Development Plan, Govindgarh, M.P.


Health Facilities:

Promoting
Health tourism
Facilitating
specialised medical
care
Increasing the number
of hospitals by making
available more land for
new hospitals, thereby
increasing beds and
doctors

The future goals for the health facilities would be as follows:

Providing land for new hospitals, increase beds and no, of doctors in the existing hospital and health
care centres.

Specialized medical services should be facilitated in the town.

By providing proper health facilities in the town, health tourism can be promoted in the area which
will serve the region and generate economy for the town.

DMG Consulting Pvt. Ltd., Noida

Page 195

City Development Plan, Govindgarh, M.P.


Education:

Facilitating vocational
training centres for
adult skill impartation
for gainful
employment / self
Facilitating provision employment
of more
schools, thereby
increasing no. of
seats and improving
literacy

Facilitating
Specialised
education
opportunities

Considering the emerging issues and potentials the following goals would be derived for addressing the
future requirements:

Facilitating provision of more number of schools at the primary and secondary education level and
providing required infrastructure facilities for the sector.

For adult skill up gradation as well as self-employment opportunities, establishment of vocational


school should be encouraged.

Public awareness programmes should be encouraged in urban poor areas as they are not willing to
educate their children.

DMG Consulting Pvt. Ltd., Noida

Page 196

City Development Plan, Govindgarh, M.P.


Tourism:

Water
sports, theme
parks, boating, e
tc.

Facilitating
infrastructure for
specialised tourist
attractions such as
National Parks, etc.

Improvement of sites
of monuments and
other heritage
structures for
attracting tourists

Having the great potential for tourism development in the town, the following goals can be derived for future
development in the sector:

River front development and lake/river based activities like water sports, theme park and boating
etc. to encourage tourism.

Promoting Town as a transit point for the surrounding tourism destination.

Facilitating infrastructure in terms of good connectivity, hotels and resorts to attract tourists.

DMG Consulting Pvt. Ltd., Noida

Page 197

City Development Plan, Govindgarh, M.P.


Economy

Forest based
activities

Tourism and
Support
economic
activities

Agri Based
commercial
activities, Other
economic
activities

For the economic up-liftment of the Town, the following goals can be set:

As the town is surrounded by large chunk of agricultural land, therefore agricultural based
commercial activities should be encouraged for the economic development of the town.

Forest based activities like selling of forest products can be another way of development economy of
the people.

As Town has high potential for tourism development, so tourism related activities like hotel industry,
tourist transportation should be encourage to form a major source of income generation activity for
many people.

DMG Consulting Pvt. Ltd., Noida

Page 198

City Development Plan, Govindgarh, M.P.


12.2 Town Vision
The vision for Town has been evolved as under:
To develop a commercial town which is economically vibrant, ecologically sustainable and environmentally
pleasing; a town which will meet the aspirations of the local residents as well as the tourists alike and is
manageable.

Economically
Vibrant

A
Commercial
Hub

Ecologically
Sustainable

Environmentally
Pleasing

In order to achieve the above vision, strategies have been suggested in the next chapter. Ultimately, these
strategies would be translated into tangible projects which would be viable and implementable.

12.3 Town Positioning


Town has been positioned as a commercial hub by boosting local economy and at the same time also
showcasing various cultural as well as natural assets. This strategy has been adopted on account of the fact
that there is a great potential for Town to emerge as a commercial destination, given the fact that it has
excellent rail connectivity and rail infrastructure. At the same time, there are various natural assets such as
the forests, river and lake water and national parks nearby. This positioning of the town can give the town a
much needed boost for the local economy and lead to prosperity and economic vibrancy.

DMG Consulting Pvt. Ltd., Noida

Page 199

City Development Plan, Govindgarh, M.P.


The concept is illustrated in the diagram given below:

River and
Lake

Economy

Rail
Infrstructure

Parks

Forests

Governance

Temples

Monuments

Commercial
Hub

Economic Rejuvenation:
Commercial Activities There are many agro based activities which are related to agricultural
produce. There is a need to boost this area by creating suitable structures so that more people find
gainful self-employment in these activities. For this, it is necessary that land be allotted for creating
facilities for manufacture, storage, display and sale of these products.

Tourism Related Activities The water bodies and other tourist attractions have not been
adequately developed. It is proposed that once these are developed in the form of tourist circuits,
with transportation linkages, boarding and lodging facilities and other related tourism infrastructure,
with adequate marketing and publicity, tourism could be promoted in this region. The water bodies
can also be an area for development of parks, boating and water sport activities. This can also have a
spin off in terms of forward and backward linkages and employment generation for the local
population.

Religious Activities The local temples and parks are held in great reverence by the local
population and regularly, festivals and functions are held. Therefore, proper developments of these
sites along with facilities for the pilgrims are needed so as to cater to the local sentiments of the
people.

Infrastructure Development
There cannot be two opinions on the fact that the civic infrastructure of Town needs to be improved. The
strategy for this is to urgently undertake projects, as identified later in this chapter, so that the required
facilities and amenities area provided to the residents in a timely manner so that the basic quality of life can
be achieved.

Slum Improvement
DMG Consulting Pvt. Ltd., Noida

Page 200

City Development Plan, Govindgarh, M.P.


Slum improvement has to form a central part of town improvement. The strategy for improving the slums is
to upgrade them in-situ. There is a need to prepare a detailed plan for improving the slums and it is
suggested that tenure rights may be granted to the dwellers that do not have the title so that they are able
to upgrade their shelter on their own as there is no fear of eviction.

Governance and Reforms


For the local administration to implement all the projects under the town development plan in the first
instance and later, to maintain the new assets created thereby, it is necessary that the Nagar Parishad be
strengthened. Operations, particularly revenue collection needs to be computerized so that data is clearly
monitored and defaults can be identified on a periodic basis. This would help in proper resource
mobilization. Further, migration from a fund based or cash based system of accounting to a double entry
accounting mechanism is also a must. To do this at a later stage would be more time consuming and difficult.
Therefore, when the municipality is small, it is better to put the modern systems and computerization of
service delivery in place.

DMG Consulting Pvt. Ltd., Noida

Page 201

City Development Plan, Govindgarh, M.P.

13. ANNEXURE

DMG Consulting Pvt. Ltd., Noida

Page 202

BASE MAP OF GOVINDGARH


TO
SA
TN

E
AT
ST

TO R E
WA

H
IG
H
AY

W
52

WARD
NO - 5

TO TA

MRA

WARD
NO - 6

STATE HIGHWAY 9

WARD
NO - 2

WARD
NO - 3

WARD
NO - 1
WARD
NO - 8

WARD NO - 14
WARD
NO - 4

WARD
NO - 7

BOYS HIGH.
SEC.SCHOOL

WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL

SLUM

WARD NO - 13

WARD
NO -11

MANDI
NAGAR PARISHAD

CHC

FISHERY
BOARD

LEGENDS

POLICE
STATION

NALAH

H
LA

NA

RAJA TALAB

BUS STAND

GOVINDGARH
FORT

STATE HIGHWAY 9

WARD NO - 10

SUNDAR - VAN

TO REW
A

WARD
NO - 9

N.P. BOUNDARY
WARD BOUNDARY
WATER BODY

RESORT
WARD NO - 15

TO

NALAH

SID

HI

BUILT-UP AREA
TO AN

ROAD NETWORK

OOPP
U

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

DEVI TEMPLE

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

SOCIAL INFRASTRUCTURE MAP, GOVINDGARH, M.P.


TO
E
AT
ST

TO RE
W

A
TN
SA
H
IG
W

H
AY
52

WARD
NO - 5

TO TA
MRA

WARD
NO - 6

WARD
NO - 3

WARD
NO - 1
WARD
NO - 8

PL

WARD NO - 14

STATE HIGHWAY 9

R
WARD
NO - 2

LEGENDS

WARD
NO - 4

N.P. BOUNDARY
WARD
NO - 7

TO REW

WARD
NO - 9

WARD BOUNDARY
BOYS HIGH.
SEC.SCHOOL

WARD
NO -12

R
WARD NO - 13

GIRLS HIGH.
SEC. SCHOOL

SLUM

CHC

FISHERY
BOARD

WARD
NO -11

MANDI
NAGAR PARISHAD

WATER BODY

NP
POLICE
STATION

PS

NALAH

NALAH
NA
H
LA

RAJA TALAB
SUNDAR - VAN

BUS STAND

GOVINDGARH
FORT
R

STATE HIGHWAY 9

WARD NO - 10

RESORT
WARD NO - 15

TO

SID

RDEVI TEMPLE

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:

Submitted By:

E:\anand singh\LOGO\ff.jpg

City Manager's Association


Madhya Pradesh

COMMUNITY HEALTH CENTRE

EDUCATIONAL INSTITUTIONS

RELIGIOUS BUILDINGS
RESORT

HI

TO AN

OOPP
UR

CHC

DMG CONSULTING Pvt.Ltd.


Noida ,Uttar Pradesh

PS

POLICE STATION

NP

NAGAR PARISHAD

PL

POLO FIELD

CITY DEVELOPMENT PLAN


GOVINDGARH

WARD WISE DENSITY MAP OF


GOVINDGARH
N
WARD
NO - 5
WARD
NO - 6
WARD
NO - 8

WARD
NO - 2

WARD
NO - 1

LEGENDS

WARD
NO - 3
WARD NO - 14

N.P. BOUNDARY

WARD
NO - 4

WARD
NO - 7

WARD
NO - 9

WARD BOUNDARY
WARD
NO -12

WARD
NO -11

WARD NO - 13

POPULATION DENSITY
WARD NO - 10

BELOW 50
50 - 100

WARD NO - 15

ABOVE 100

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

WARD WISE SEX RATIO MAP


OF GOVINDGARH
N
WARD
NO - 5
WARD
NO - 6
WARD
NO - 8

WARD
NO - 2

WARD
NO - 1

LEGENDS

WARD
NO - 3
WARD NO - 14

N.P. BOUNDARY

WARD
NO - 4

WARD
NO - 7

WARD
NO - 9

WARD BOUNDARY
WARD
NO -12

WARD
NO -11

WARD NO - 13

SEX RATIO
WARD NO - 10

BELOW 900
900 - 950

WARD NO - 15

ABOVE 950

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

WARD WISE LITERACY RATE


MAP OF GOVINDGARH
N
WARD
NO - 5
WARD
NO - 6
WARD
NO - 8

WARD
NO - 2

WARD
NO - 1

LEGENDS

WARD
NO - 3
WARD NO - 14

N.P. BOUNDARY

WARD
NO - 4

WARD
NO - 7

WARD
NO - 9

WARD BOUNDARY
WARD
NO -12

WARD
NO -11

WARD NO - 13

LITERACY RATE
WARD NO - 10

BELOW 65
65 - 75

WARD NO - 15

ABOVE 75

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

WATER SUPPLY MAP, GOVINDGARH, M.P.


TO
E
AT
ST

TO RE
W

A
TN
SA
H
IG
W

H
AY
52

WARD
NO - 5

TO TA
MRA

WARD
NO - 6
WARD
NO - 1
WARD
NO - 8

WARD NO - 14

STATE HIGHWAY 9

WARD
NO - 2

WARD
NO - 3

WARD
NO - 4

WARD
NO - 7

BOYS HIGH.
SEC.SCHOOL

WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL

SLUM

WARD NO - 13

WARD
NO -11

MANDI
NAGAR PARISHAD

CHC

FISHERY
BOARD

LEGENDS

POLICE
STATION

NALAH
NA
H
LA

RAJA TALAB

BUS STAND

GOVINDGARH
FORT

STATE HIGHWAY 9

WARD NO - 10

SUNDAR - VAN

TO REW

WARD
NO - 9

N.P. BOUNDARY
WATER SUPPLY
NETWORK
WATER BODY

RESORT
WARD NO - 15

TO

SID

NALAH
HI

BUILT-UP AREA
ROAD NETWORK

TO AN

OOPP
UR

DEVI TEMPLE

OHT

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:

Submitted By:

E:\anand singh\LOGO\ff.jpg

City Manager's Association


Madhya Pradesh

DMG CONSULTING Pvt.Ltd.


Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

ROAD NETWORK MAP OF GOVINDGARH


TO
SA
TN

E
AT
ST

TO R E
WA

H
IG
H
AY

W
52

WARD
NO - 5

TO TA

MRA

WARD
NO - 6

STATE HIGHWAY 9

WARD
NO - 2

WARD
NO - 3

WARD
NO - 1
WARD
NO - 8

WARD NO - 14
WARD
NO - 4

WARD
NO - 7

BOYS HIGH.
SEC.SCHOOL

WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL

SLUM

WARD NO - 13

WARD
NO -11

LEGENDS
N.P. BOUNDARY

MANDI
NAGAR PARISHAD

CHC

FISHERY
BOARD

WARD BOUNDARY

POLICE
STATION

NALAH

H
LA

NA

RAJA TALAB

BUS STAND

GOVINDGARH
FORT

STATE HIGHWAY 9

WARD NO - 10

SUNDAR - VAN

TO REW
A

WARD
NO - 9

WATER BODY
NALAH
BUILT-UP AREA
STATE HIGHWAY 9

RESORT
WARD NO - 15

TO

SID

HI

STATE HIGHWAY 52
PUCCA ROAD

TO AN

OOPP
U

DEVI TEMPLE

KUTCHA ROAD

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

DRAINAGE MAP, GOVINDGARH, M.P.


TO
E
AT
ST

TO RE
W

A
TN
SA
H
IG
W

H
AY
52

TO TA
MRA

STATE HIGHWAY 9

BOYS HIGH.
SEC.SCHOOL
GIRLS HIGH.
SEC. SCHOOL

SLUM

FISHERY
BOARD

MANDI
NAGAR PARISHAD

CHC

H
LA

BUS STAND

GOVINDGARH
FORT

STATE HIGHWAY 9

NA

RAJA TALAB
SUNDAR - VAN

LEGENDS

POLICE
STATION

NALAH

N.P. BOUNDARY
OPEN DRAINS
WATER BODY

RESORT

TO

SID

NALAH
HI

BUILT-UP AREA
ROAD NETWORK

TO AN

OOPP
UR

DEVI TEMPLE

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:

Submitted By:

E:\anand singh\LOGO\ff.jpg

City Manager's Association


Madhya Pradesh

DMG CONSULTING Pvt.Ltd.


Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

LAND USE MAP OF GOVINDGARH


TO
SA
TN

E
AT
ST

TO R E
WA

H
IG
H
AY

W
52

TO TA

MRA

LEGENDS
STATE HIGHWAY 9

N.P. BOUNDARY
WATER BODY
NALAH

BOYS HIGH.
SEC.SCHOOL

GIRLS HIGH.
SEC. SCHOOL

ROAD NETWORK

CHC

FISHERY
BOARD

POLICE
STATION

NALAH

BUS STAND

GOVINDGARH
FORT

RESIDENTIAL

STATE HIGHWAY 9

H
LA

NA

RAJA TALAB
SUNDAR - VAN

BUILT-UP AREA

MANDI
NAGAR PARISHAD

SLUM

COMMERCIAL
PUBLIC / SEMI PUBLIC
INDUSTRIAL

RESORT

TO AN

OOPP
U

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

TO

SID

HI

OPEN SPACE /
AGRICULTURAL AREA

DEVI TEMPLE

Project coordination:
City Manager's Association
Madhya Pradesh

INSTITUTIONAL

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

DRAINAGE MAP, GOVINDGARH, M.P.


TO
E
AT
ST

TO RE
W

A
TN
SA
H
IG
W

H
AY
52

WARD
NO - 5

TO TA
MRA

WARD
NO - 6
WARD
NO - 1
WARD
NO - 8

WARD NO - 14

STATE HIGHWAY 9

WARD
NO - 2

WARD
NO - 3

WARD
NO - 4

WARD
NO - 7

BOYS HIGH.
SEC.SCHOOL

WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL

SLUM

WARD NO - 13

WARD
NO -11

TO REW

WARD
NO - 9

MANDI
NAGAR PARISHAD

CHC

FISHERY
BOARD

LEGENDS

POLICE
STATION

BUS STAND

RAJA TALAB
SUNDAR - VAN

GOVINDGARH
FORT

STATE HIGHWAY 9

WARD NO - 10

N.P. BOUNDARY
WATER BODY
NALAH

RESORT
WARD NO - 15

TO

BUILT-UP AREA
SID

HI

ROAD NETWORK
OPEN DRAINS

TO AN

OOPP
UR

DEVI TEMPLE

PROPOSED DRAINS
FLOOD PRONE/ LOW
LYING AREAS

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

ROAD NETWORK MAP OF GOVINDGARH


TO
E
AT
ST

TO RE
W

A
TN
SA
H
IG
W

LEGENDS

AY
52

WARD
NO - 5

TO TA
MRA

N.P. BOUNDARY

WARD
NO - 6
WARD
NO - 1
WARD
NO - 8

WARD NO - 14

TJ
WARD
NO - 4

TJ
SLUM

WARD NO - 13

FISHERY
BOARD

BS

NALAH
TO REW

WARD
NO - 9

BUILT-UP AREA

WARD
NO -11

MANDI

TJ

NAGAR PARISHAD

STATE HIGHWAY 9

CHC
TJ
POLICE
STATION

NALAH
NA
H
LA

RAJA TALAB

BUS STAND

GOVINDGARH
FORT

STATE HIGHWAY 52

STATE HIGHWAY 9

WARD NO - 10

SUNDAR - VAN

WATER BODY

TJ

BOYS HIGH.
SEC.SCHOOL
GIRLS HIGH.
SEC. SCHOOL

WARD BOUNDARY

TJ
WARD
NO - 7

WARD
NO -12

STATE HIGHWAY 9

WARD
NO - 2

WARD
NO - 3

PUCCA ROAD
KUTCHA ROAD
PROPOSED ROAD

WARD NO - 15
RESORT

TO

SID

HI

TO AN

OOPP
UR

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

DEVI TEMPLE

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

BS

PROPOSED BUS STAND

TJ

PROPOSED TRAFFIC
JUNCTION
IMPROVEMENT

CITY DEVELOPMENT PLAN


GOVINDGARH

SOCIAL INFRASTRUCTURE MAP, GOVINDGARH, M.P.


TO
E
AT
ST

TO RE
W

A
TN
SA

LEGENDS

H
IG

N.P. BOUNDARY

H
AY
52

WARD
NO - 5

TO TA
MRA

E1

WARD
NO - 1

WARD
NO - 8

PL

WARD NO - 14

WATER BODY

STATE HIGHWAY 9

R
WARD
NO - 2

WARD
NO - 3

WARD BOUNDARY
WARD
NO - 6

NALAH

WARD
NO - 4

WARD
NO - 7

CH

PC

GIRLS HIGH.
SEC. SCHOOL

R
WARD NO - 13

BOYS HIGH.
SEC.SCHOOL

WARD
NO -12

SLUM

CHC

FISHERY
BOARD

WARD
NO -11

MANDI

MS

H
LA

EDUCATIONAL INSTITUTIONS

RELIGIOUS BUILDINGS
RESORT

POLICE
STATION

PS

BUS STAND

GOVINDGARH
FORT
R

STATE HIGHWAY 9

NA

COMMUNITY HEALTH CENTRE

NP

WARD NO - 10

SUNDAR - VAN

NAGAR PARISHAD

NALAH

RAJA TALAB

TO REW

WARD
NO - 9

CHC

PS

POLICE STATION

NP

NAGAR PARISHAD

PL

POLO FIELD

ITI

PROPOSED SOCIAL INFRASTRUCTURE


RESORT
WARD NO - 15

TO

SID

HI

TO AN

OOPP
UR

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

RDEVI TEMPLE

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

MS

MULTI-SPECIALITY HOSPITAL

PC

POLY CLINIC

IS

INTEGRATED SCHOOL

ITI

POLY-TECHNIQUE OR ITI

CH

COMMUNITY HALL

CITY DEVELOPMENT PLAN


GOVINDGARH

WATER SUPPLY MAP, GOVINDGARH, M.P.


TO
E
AT
ST

TO RE
W

A
TN
SA
H
IG
W

H
AY
52

WARD
NO - 5

TO TA
MRA

WARD
NO - 6
WARD
NO - 1
WARD
NO - 8

WARD NO - 14

LEGENDS

STATE HIGHWAY 9

WARD
NO - 2

WARD
NO - 3

N.P. BOUNDARY
WATER SUPPLY
NETWORK

WARD
NO - 4

WARD
NO - 7

BOYS HIGH.
SEC.SCHOOL

WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL

SLUM

WARD NO - 13

WARD
NO -11

WATER BODY

MANDI
NAGAR PARISHAD

NALAH

CHC

FISHERY
BOARD

POLICE
STATION

NALAH
WARD NO - 10
NA
H
LA

RAJA TALAB

BUS STAND

GOVINDGARH
FORT

BUILT-UP AREA

STATE HIGHWAY 9

WFP

SUNDAR - VAN

TO REW

WARD
NO - 9

ROAD NETWORK
OHT
PROPOSED WATER
SUPPLY NETWORK

RESORT
WARD NO - 15

TO

SID

PROPOSED OHT

HI

WFP
TO AN

OOPP
UR

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

PROPOSED FILTRATION
PLANT

DEVI TEMPLE

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

LOCATION OF URBAN POOR


TO
E
AT
ST

TO RE
W

A
TN
SA
H
IG
W

H
AY
52

WARD
NO - 5

TO TA
MRA

WARD
NO - 6
WARD
NO - 1
WARD
NO - 8

WARD NO - 14

STATE HIGHWAY 9

WARD
NO - 2

WARD
NO - 3

WARD
NO - 4

WARD
NO - 7

BOYS HIGH.
SEC.SCHOOL

WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL

SLUM

WARD NO - 13

WARD
NO -11

MANDI
NAGAR PARISHAD

CHC

FISHERY
BOARD

LEGENDS

POLICE
STATION

NALAH
NA
H
LA

RAJA TALAB

BUS STAND

GOVINDGARH
FORT

STATE HIGHWAY 9

WARD NO - 10

SUNDAR - VAN

TO REW

WARD
NO - 9

N.P. BOUNDARY
WARD BOUNDARY
WATER BODY

RESORT
WARD NO - 15

TO

SID

NALAH
HI

BUILT-UP AREA
ROAD NETWORK

TO AN

OOPP
UR

DEVI TEMPLE

LOCATION OF
CLUSTERS OF URBAN
POOR

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

WARD WISE LITERACY RATE


MAP OF GOVINDGARH
N
WARD
NO - 5
WARD
NO - 6
WARD
NO - 8

WARD
NO - 2

WARD
NO - 1

LEGENDS

WARD
NO - 3
WARD NO - 14

N.P. BOUNDARY

WARD
NO - 4

WARD
NO - 7

WARD
NO - 9

WARD BOUNDARY
WARD
NO -12

WARD
NO -11

WARD NO - 13

LITERACY RATE
WARD NO - 10

BELOW 65
65 - 75

WARD NO - 15

ABOVE 75

CLIENT:

Urban Administration & Development


Department, Madhya Pradesh.

Project coordination:
City Manager's Association
Madhya Pradesh

Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh

CITY DEVELOPMENT PLAN


GOVINDGARH

Tourism and Heritage Conservation


1.1. Background
Madhya Pradesh offers outstanding opportunity to indulge in various tourism options such as cultural tourism,
heritage tourism, adventure tourism, wildlife tourism and many more. A variety of traditions in each of
Madhya Pradesh's four geographical and cultural regions-Malwa, Nimad, Baghelkhand and Bundelkhand
have added color to the State's rich cultural tapestry, making it a many splendoured land. There are many
deserving tourist destinations in the State widely acclaimed for its rich cultural heritage sites and wonders.
Heritage tourism is one of the most popular options of tourism appealing tourists from all over the world.
Though, heritage Tourism has great potential in Govindgarh city. It has heritage structures like Govindgarh
fort, temples with unique architecture forms, royal history, fairs and festivals, history of white tigers,
bountiful nature with Raja Talab and Rani Talab, Sunder ban, easily accessible national wild life sanctuary
and dam, etc.
Govindgarh falls under Jabalpur KhujrahoRewaGovindgarhBandhavgarhJabalpur circuit. Despite
it ideal location within the tourism circuit with rich inventory of tourism resources, this region Lacks
Tourism infrastructure such as Tourist Information Centers, transportation facilities, public conveniences such
as toilets, refreshment centers, information Centre etc. Further, being located in isolation in terms of
development, the region is facing challenges, which directly and indirectly curb the growth of tourism. The
existing infrastructure, safety & Security, local awareness and others are the major hindrance for the
development of the tourism in this region.
The Govindgarh region receives very few numbers of tourists in comparison to other destination of tourism
circuits. Despite its strategic location within the circuit, city has not been developed as a nodal Centre as base
city to cater tourist for its facilities. The existing infrastructure is inadequate to support tourism in the region
and it needs urgent up gradation. The region has wide range of tourism products, which need to be integrated
and made an intra-circuit to increase the duration of stay of the Tourists in the region. Govindgarh city has
great potential in the region to cater tourist from the circuit i.e. KhujrahoRewaGonindgarh
BandhavgarhJabalpur.
Integrating with other destination, Govindgarh can be converted as a transit zone between Khajuraho and
Varanasi or Bandhavgarh.
Hence, immense potential for developing Govindgarh as one of the destination with heritage, scenic beauty
and religious node, need to be fully exploited. In terms of improving the tourism product, in the short term
quick gains can be made by developing the destination and providing basic infrastructure facilities at various
tourist locations and at city level with high potential, which are already well connected and have a reasonable
infrastructure in place.
1.2. Madhya Pradesh Tourism and Heritage Policy
The State Tourism Policy, Heritage Tourism Policy and Eco and Adventure Tourism Policies of the State
supported with initiatives towards strengthening of infrastructure and facilities at places of tourist interests is

DMG Consulting Pvt. Ltd.

an important indicator of commitment of the GoMP to create an environment conducive for attracting
increased private investment in the tourism sector. In accordance with the aims and objectives of the Tourism
Policy of the State and the provisions made towards development of tourism sector, the Government of MP,
Department of Tourism has issued a Policy for the Allotment of Government Land for the Development of
Tourism in the State.
The Madhya Pradesh Department of Tourism has, to date, sought to develop the tourism potential of the State
by involving itself in three major activities: Providing decent accommodation in areas of tourism interest,
operating a transport fleet of coaches, cars and Gypsies, and organizing package tours. Publicity and
marketing of tourist destinations and facilities has also been a major thrust activity. Apart from these efforts
undertaken by the Government, the private sector has also contributed by way of investment in hotels,
transport, and marketing of some important tourist destinations in the State. However, the efforts of the
Government and the private sector have not been dovetailed into a common developmental programme, with
the result that there has been overemphasis at certain venues, while some other important places and activities
have been neglected.
The Tourism Policy envisages creation of an environment conducive to attracting increased private
investment in the tourism sector, and a more meaningful role for the Government. The focus will be on i)
Improvement and creation of adequate basic infrastructure- land, road, water, electricity etc. ii) Up gradation
and augmentation of accommodation, catering and recreational facilities, iii) Augmentation of transport
facilities, iv) Marketing of destinations to ensure optimal use of infrastructure, v) Establishing and
strengthening institutions for the development of human resources, vi) Evolving suitable policies for
increasing foreign exchange earnings, vii) Promotion of the arts and crafts of the State.
One of the objectives of the Tourism Policy of Madhya Pradesh announced in 1995 was to convert the
heritage wealth of the State i.e. forts, palaces, havelis and kothis into heritage hotels. Later, Madhya Pradesh
Heritage Tourism Policy-2002 also envisages and set urgent needs for restoration of these beautiful buildings
are unable to attract tourists in large numbers.
1.3. Places of Tourist Interest in and Around the City
The Tourism Products in Govindgarh can broadly be classified into those based on the Heritage Tourism,
Religious Centers/ Pilgrim centres, handicraft and Wild-life Tourism in Panna National Park in the
surrounding. The city has many places for tourist attraction i.e. Govindgarh Fort, Sunder Van, Durga Temple,
Lal Bagh, Raja talab, Rani Talab etc.
1.3.1. Govindgarh Fort
The Govindgarh palace used to have security like a well protected fort. The stately palace of Gobindpur on
the banks of the Lake houses, a police training school and Baghela museum is running now.
The island, nestled in the Lake also showcases a wonderful palace. The doorway of this beguiling palace
however is closed for the general public.
An underground tunnel is also there which was used as a secret path for kings between Govindgarh & Rewa.
The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands.

DMG Consulting Pvt. Ltd.

1.3.2. Lal Bagh


The Lal Bagh area is famous for its Sunderja Mango garden. The area is also known for its lush green beauty.
Lal Bagh is situated on the bank of raja Talab near to Govindgarh Fort. The Sunderja Mangoes of the
Govindgarh are famous in the country. The people of the area are decent and have higher human values. The
law and order situation of the area is also good. This is being developed as a future tourist destination to
attract International Tourists.
1.3.3. Temples in Govindgarh
Ram Govind Temple, Panchmukhi Temple, Chowandi Temple, Shiv Temple and Hanuman Temple are the
major temple in Govindgarh city. All the mentioned temples are located nearby Govindgarh Fort. It is also
believed that the name Govindgarh was based on the Govind Temple now situated within the Govind Garh
Fort Premises.
Khando Devi temple is another major temple at a distance of 2 Km. from the Govindgarh City. Khando is
famous for its beautiful topography because in rainy season the area is known for its natural beauty and it
attracts maximum tourists in this season.
1.3.4. Raja Talab (Lake) and Rani Talab
Raja Talab is located just behind the Govindgarh Fort. This beautiful lake was prepared by Baghela Kings. It
is a lake which is known for its scenic beauty and lush green surroundings. This lake plays an important role
in helping irrigation as well as in gound water recharge. Fish farming (pisciculture) is also done in these
talabs. Raja lake has a facility of boating at the time of Khando Devi Temple fair because it is also near to
Khando Devi Temple (2 Km.).
1.3.5. Famous for White Tigers
The first white tiger, Mohan, was captured in 1951 in the nearby jungles of Govindgarh, was kept in this
palace till his death. The unusual coloration of white tigers has made them popular in zoos and entertainment
showcasing exotic animals. The white tigers are known as Royal White Tigers, and this is associated with
the Maharaja of Rewa.
Rewa Maharaja Martand Singh first observed male white tiger Mohan during his visit to Govindgarh jungle at
Rewa. After hunting for months, he was able to capture the first living white tiger seen in nature. With help
from official veterinary experts, he unsuccessfully tried to breed the white tiger with colored female tigers.
Eventually, however, he succeeded in creating a second generation of white tigers. In time, it expanded
around the world.

1.3.6. Tourist Places nearby Govindgarh


Bandhavgarh
The Bandhavgarh National Park is located in the Vindhya
range in central India this park was formed on 1968. The

DMG Consulting Pvt. Ltd.

National park holds the highest density of tigers due to its rich evergreen forest with trees like Sal & Bamboo
with well spread water bodies & grasslands all over the park.
Bandhavgarh National Park spread in an area of 448 sq. kms. is densely populated with tiger and other
wildlife species of gaur, nilgai, sambhar and barking dear. In the backdrop of the park is the old fort which
has references in Shiva Purana and Panch Ratna. The park has in all about 32 mammals, 250 species of birds
and about 72 types of butterflies. The Park of also has the archaeological relies of Sheshai Vishnu and
number of caves.
The park has some basic infrastructure such as accommodation includes resorts and lodges PWD Rest House,
MPSTDC lodge and many eatery and shops. However, the destination lacks in providing safe drinking water
facilities. The water source is Open well and borewells. Hotels and Lodges have independent Borewells.
Gurh
Gurh is situated at 40 km from Govindgarh. The major places of tourist
attraction are Gurgi (Kalchuri) Heritage Site, Khadda Shiv Temple, Khajuha
Shiv and Ram Temple, Bhairavnath Temple, garhi and many other small
desination. Gurgi Kalchuri is an important Heritage Site, has lots of
reminiscence of the Fort & temples of Kalchuri rulers (6th to 12th century).
Lots of the idols from this place have been taken to Rewa, Satna, Tikamgarh
and Bhopal museums also. Presently this place is under archeology
department.
Figure 1: Gurh Temple

Keonti Falls
The Keoti Falls is on the Mahana River, a tributary of Tamsa or Tons
River as it comes down from the Rewa Plateau. It has a total height of
98 metres (322 ft. The World Waterfall Database puts the height of the
waterfall at 130 metres (430 ft). is one of the major waterfall in India. It
is situated at 42 km from Rewa.
Sirmaur

Figure 2: Keonti Fall

Sirmaur is situated at 57 km from Rewa. Kyoti Garhi is one of the major destination in Sirmaur which made
by Yuvraj Nagmal, 2nd son of Baghel (17th ) Maharaj, Shaliwahan Singh Ju Deo between 1605-10 A.D.
Presently this Garhi is with M.P. Archeological Dept. The Garhi overlooks a 270 feet deep gauge making a
water fall on the river Mahana, but is in a very bad shape & needs to be developed as a tourist spot as the
place holds great potential. Besides, Garhi, Laua Kothi, Dev Talab, Shiv Temple Dev Talab, Naigarhi Kothi
Naigarhi, Semaria Garhi, Laxmanbagh Temple, and Deur Kothar Buddist Stupa are other destination.
Other Destination
There are many rock painting Rock painting scattered around the region such as Khando samuh, Gaddi
samuh, Shivpurva samuh, Itar samuh, Badwar samuh, Jaldar samuh, Ledroghat samuh, Ginjwa samuh, Quoti
samuh, Hanuman samuh etc.

DMG Consulting Pvt. Ltd.

1.4. Arts & Crafts


1.4.1. Handicrafts / Articrafts & Other Human Resources in the Region:Madhya Pradesh is also known for its carpets where Rewa is one of the centres in the state. The toys made out
of Beatle nut are very rare and famous in this area, which cant be got anywhere else. Except these there are
many women who are involved in bangle making and other artistic works. Ahir (Yadav) & Kali are the main
folk dances of this area. Most of the dishes made in this area are based on dals (Lenten) and hence very
nutritious and less spicy in character.
1.5. Existing Status of Major Tourist Destinations
Cleanliness in the surrounding areas is not been taken care of which effects the number of tourists visiting the
place. Landscaping, where ever open spaces are available has not been done and the spaces been left unseen.
Haphazard vegetative growth provides negative impression on the tourists. No safety measure like provision
of guards on most of the temples has been taken.
Direct discharge of sewage from domestic sources, not connected to treatment plants; eventually make its way
into existing water bodies i.e. Raja Talab and Rani Talab.
Lack of public utilities, proper information, water facility, refreshment counters and above all parking spaces
in or around most of the temple complexes affects the number of visitors at such places.
Table 1: Assessment of tourist destination in & around the city

S.No.

Assessment
Parameters

Major Tourist Destination/sites in and around the City


Govindgarh
Rewa
Fort Bandhavgarh
National
Fort
Complex
Park
for
HHMCT
M.P. Tourism
Forest Dept

a.

Agency
responsible
protection

b.

Accessibility/ Connectivity

Fair

Good

Good

c.

Visibility of the Building/Sites

Excellent

Good

Good

d.

Condition of access road

Good

Good

Good

e.

Site displayed Signage

Fair

Fair

Fair

f.

Cleanliness of Surroundings

Fair

Fair

Fair

g.

Landscaping

Fair

h.

Safety & Security

Fair
Fair

Poor

Fair
Fair

i.

Overall Maintenance

Fair

Good

Good

j.

Parking Facilities
Bus, other

k.

Public Toilets

Nil

l.

Refreshment stalls

Not Available

DMG Consulting Pvt. Ltd.

2 Whlr, Available, but Not Available


not designated

Available,
designated

but

not

Not Available
Available
Available (Pvt)
Available

S.No.

Assessment
Parameters

m.

Information Kiosks

Major Tourist Destination/sites in and around the City


Govindgarh
Rewa
Fort Bandhavgarh
National
Fort
Complex
Park
Not Available
Not Available
Open well and borewells

n.

Drinking Water Facility

Available

Not Available

30 guides approved

Trained Tourist Guides

Fair

Poor

Fair

Source: DMG Consulting, Pvt. Ltd.


Presently, no major efforts have been initiated by the government in restoration of buildings which has
heritage importance. Most of the buildings are either in dilapidate status or required immediate attention for
restoration and conservation.
Table 2: Present status of heritage sites in Govindgarh

Sr. No.
1.

Heritage
Govindgarh Fort

Present Status
Building condition of fort is good and at present, it is under
renovation. It is closed for peoples because of its renovation.

1.6. Efforts for conservation of Heritage Sites


The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands.
1.7. Tourist Arrival
Tourism has been identified as one of the key drivers of growth by the MP government. Eight million
domestic tourists and 160,000 foreigners visited the state in 2005-06. The government has approved $12.2
million for development of 17 tourist locations across the state and is also making concrete efforts to improve
air connectivity to other states. It has taken initiatives to promote eco and adventure tourism and is keen on
promoting medical/ herbal tourism in association with private parties.
There is no record for tourist visiting various temples and forts in Govindgarh. There is no entrance ticket
system prevailing either at the main entrance of forts or at any of the temples. This is the major handicap in
estimating the accurate tourists influx at Govindgarh.
Despite, presence of historical building and temple, the city does not fall within any tourism circuit in the
state. Tourism prospect of Govindgarh can be viewed with the development of city infrastructure and existing
tourism destination to make a complete circuit with the Bandhavgarh-Govindgarh-Rewa as sub circuit of
Bandhavgarh - Chitrakoot-Khujario. Chitrakoot receives maximum number of visitors i.e. 9.1 million (2008)
followed by Khajuraho ( 0.27 million) and Bandhagarh (0.09 million).
Table 3: Number of visitors to these three major destinations in the region during 2005-08.

Centers

Bandhavgarh

Tourist
Types

2005

2006

2007

2008

Indian
Foreign

23244
4068

38614
6812

55835
13706

69641
24781

DMG Consulting Pvt. Ltd.

Year

CAGR (%)
2005200620072006
2007
2008
66.12
44.60
24.73
67.45
101.20 80.80

Centers

Tourist
Types

Year
2005

2006

Total
27312
45426
Indian
2673847 6096835
Chitrakoot
Foreign
460
499
Total
2674307 6097334
Indian
145987
164406
Khajuraho
Foreign
70726
73843
Total
216713
238249
Source: Perspective Tourism Pan, Govt. of India

2007

2008

69541
7952629
725
7953354
193764
84887
278651

94422
9142009
654
9142663
201443
89169
290612

20052006
66.32
128.02
8.48
128.00
12.62
4.41
9.94

CAGR (%)
20062007
53.09
30.44
45.29
30.44
17.86
14.96
16.96

20072008
35.78
14.96
-9.79
14.95
3.96
5.04
4.29

It is assumed that a significant number of tourists will be attracted and diverted to Rewa from Khajuraho,
Chitrakoot and Bandhavgarh, if proper tourism supported infrastructure and strong marketing is done.
1.8. Assessment of Tourism Supported Infrastructure
Tourism Development of any destination cannot be accomplished without proper development of support
infrastructure facilities including accessibility, accommodation, water supply, sanitation, power and drainage.
In Govindgarh city, very limited infrastructure is developed. Except approach road, small shops and drinking
water non on the infrastructure are available like Toilet facility, Solid waste Management, Street Lightning
etc. at the tourist spots.
1.8.1. Transportation
There is good network of roads connecting all the major parts of the state with Govindgarh. The State
Highway 9 and State Highway 52 connect Govindgarh with major cities of Madhya Pradesh. Govindgarh is
not directly connected to railway line. The nearest railway station is Rewa junction at a distance of 20 Km.
The nearest airport is Satna Airport at a distance of 54 km. which has an airstrip, however not in use for
regular fights followed by Bamrauli (Defense Air Base) in Uttar Pradesh which is approximately 161 km.
from Govindgarh.
1.8.2. Accommodations (Regional Level)
At town level, Govindgarh doesnt have any hotel facility to accommodate the peoples or tourists. But at
district headquarter Rewa; there are nearly 497 beds in 24 various categories of Accommodation. Besides this,
the Rewa city has nearly 5-6 Dharmshalas, which accommodates nearly 4-500 people in total. A three Star
level hotel namely Hotel Rewa Raj Vilas (owned by Maharaja Rewa) is situated in the heart of city.
1.9. Suggested Action Programmes
1.9.1. Key Concern Areas for Tourism Development
Key concern areas for enhancement of tourism development in Govindgarh have been identified from the
analysis of existing tourist scenarios and overview of SWOT analysis. The following table shows the Key
concern areas.
Table 4: Key Concern Areas and related issues

Issues

Remarks

DMG Consulting Pvt. Ltd.

Suggestions

Issues

Remarks

Limited Tourist inflow

Continued
tourism
infrastructure constraints
Information Constraints

Suggestions
related

Specifically define potential area


of tourist attractions where there
are wide ranges of tourism
products.

Enhance the attractiveness by


augmenting core activities by
providing additional activities.
Focus is to be given to identify
new tourism products
Transverse tourism circuit linking
destinations of Govindgarh with
other major tourist spots in Rewa
and other districts.
Improve Connectivity and access by projects covering roads, rail,
and air.

Once Govindgarh was very famous


for its cultural heritage and religious
Unexplored
Heritage
importance in the state. Now they
Assets
have almost lost their charm due to
poor maintenance and Lack of
tourism supported infrastructure.
Unexplored marketing
Lack of diversified tourism activities
On site infrastructure is inadequate
Most of the sites are not equipped
On site/offsite deficiency
with basic tourism infrastructure
of infrastructure
facilities such as parking, en-route
facility etc.
Inadequate road widths and poor
condition of roads connecting
various tourist destinations.
Lack of Publicity

Govindgarh can boast as the place of


the heritage and scenic beauty in
India.

Publicity by Brochure, audiovisual, literature for various market


segments within the country and
also abroad. Development of
tourist facilities at these localities.

Inadequate information
dissemination

Limitation in tourist traffic /


monitoring tourist database and
database Management

Data Collection / information


collection by ticketing at entry
points of all the potential sites.
Information brochures bulletins
and package tours to be published.

Lack of Raja Talab/Rani


Talab
(lake)
Conservation

Contamination in lake water because


town doesnt have drainage system
and treatment plan. There is also
absence of solid waste management.

Private partner can bring in


activities such as boating facilities,
jogging track, childrens park,
theme park, water parks, and
nature walks etc. around the lake
which would help in accruing
revenue all the year round.

There should be a planned drainage


system
and
solid
waste
management.

DMG Consulting Pvt. Ltd.

1.10.

Tourism Development Option & Strategies

Despite its strategic location within the tourism circuit, Govindgarh city has not been developed as a nodal
centre or as a base city to cater tourist for its facilities. In the tourism circuit of Jabalpur Bhedaghat
Mandla Kanha Bandhavgarh and Khajurahu-Panna/Bandhavgarh-Chitrakoot, Bandhavgarh and Panna is a
major Tourist node in the region after Chitrakoot and Khajurahu. Govindgarh can play a major tourist node or
base town to support tourist with its supported infrastructure. Presently, infrastructure is inadequate to support
tourism in the region, and it needs urgent upgradation. Further, an integrated circuit can be formed
considering Panna, Bandhavgarh and Sanjay National Park as part of Natural and Wildlife tourist and
Govindgarh and Rewa to support as base facilitation centre. The region has wide range of tourism products,
which need to be integrated and made an intra-circuit to increase the duration of stay of the Tourists in the
region. Govindgarh city has great potential in the region to cater tourist from the circuit. This elevated status
of Bandhavgarh as base can be retained, till a few of the tourist destinations in and around Govindgarh
region to develop their own tourist facilities. Some of the destinations like Govindgarh Fort, Khando Devi etc.
can be raised to the status of sub - nodes, with adequate improvement of infrastructure and development of
new tourism product based on Fort and the Lake. Govindgarh plays an important role in the form of Natural
& Wildlife tourism.
The City of Govindgarh has many locations for attracting tourist of various segments including religious,
heritage tourism. In the nearest towns of Govindgarh, Rewa is one of the art and craft centre in the region and
also a major city for providing lodging and boarding facilities.
At present city is devoid of basic tourism supported infrastructure such as tourism information centre, basic
amenities at destinations within the city as well as accommodation of attracting high end tourism. Some
associated cultural activity areas like Govindgarh Fort, Raja Talab (lake) and Khando Devi Temple area can
be developed which will form an integrated cultural circuit. The immense potential for developing
Govindgarh as one of the destination with heritage and religious destination, it needs to be fully exploited. In
terms of improving the tourism product, in the short term quick gains can be made by developing the
destination and providing basic infrastructure facilities at locations with high potential, which are already well
connected and have a reasonable infrastructure in place.

Figure 3: Major Tourist circuits around the Govindgarh city


DMG Consulting Pvt. Ltd.

The overall tourism development of Govindgarh Region can be segmented into two levels
a) Major Tourism Circuits -Though there are many tourism attractions scattered around the Govindgarh City
linking Rewa, Bandhavgarh National Park etc.
b) Minor Tourism Circuits- the Cultural (Heritage) and religious tourism destinations located within the city
includes Govindgarh Fort, Ram Govind Temple, Panchmukhi temple and other temple and heritage can be
integrated within this Mega Tourism Project.
Govindgarh as a tourist needs to be a co-ordinated effort to improve the quality and range of public realm
spaces, heritage sites and temples and other facilities. The emphasis of this is on Govindgarh Nagar Parishad
for overall development of the city.
Overall Development of Govindgarh Town- Govindgarh has great potential for tourism development. Planned
tourism development in Govindgarh would significantly increase domestic and foreign tourist arrivals and
attract their long duration visits. This would result in their higher spending for various facilities and services
within the region. This would directly boost up trade and commerce, transport sectors and other service
sectors. Studies show that tourism is one sector having the highest multiplier effect. Tourism can trigger off
development in many supporting sectors and create a large number of employment opportunities.
1.11.

Recommended Tourism Development Proposals

Considering all these aspects, the activities can be well planned and organised to enhance tourist attraction by
providing;
a) Site attractiveness /enhancement Projects
Conservation of Govindgarh Fort, Raja Talab and development of basic amenities to the tourist.
Development of tourist infrastructure at Khando Devi temple.
Provide large open areas and street furniture in the city.
b) Additional attractiveness
Waterfront Development
Shopping arcade with Cafeteria selling art materials, dance materials, other essential articles for
students, schools & visitors.
c) Site specific critical infrastructure project
A comprehensive Master Plan of the area needs to be prepared.
Provision of designated paid parking areas for tourist buses, cars and other vehicles.
General landscape plan for the area
Design and location for every component of street furniture
d) Development Guidelines and control
Programmes based on development guidelines and also enforcement controls.
e) Marketing
Defining Tourism Circuit in the State, adding Govindgarh as one of the cultural centre
1.12.

Action Programme

The action program aims to specify and define potential areas of tourist attractions where wide ranges of
tourism products can be provided, enhancing the attractiveness by augmenting existing core activities by
providing additional activities and improve connectivity and access to already tourist attraction at a subdued

DMG Consulting Pvt. Ltd.

10

level. The objective is to support regenerate and upgrade the existing attraction through augmenting core
activities by providing additional activities.
1.13.

Selective Development of Heritage site

This project should include Conservation measures, planned development and upkeep of the environment,
designed lighting facilities and provision of tourists/ visitor facilities. Govindgarh town has mainly
Govindgarh Fort which is important from heritage point of view and need to be conserved.
Conservation Master Plan for the Govindgarh fort and environments is to be prepared. Archaeological
Survey of India (ASI) and State Archaeological Department has been mainly concentrating on the
conservation it could not make the monument attractive with proper landscaping and providing basic
amenities. M.P. Tourism in this respect can play meaningful role to refurbish it and make it very attractive.
The conservation master plan shall cover following components:
o Delineation of the Central core (Govindgarh Fort), historical temples and Raja Talab area to be
considered under Conservation Plan. Conservation of identified heritage buildings/areas and
preparation of conservation guidelines.
o Preparation of land use plan for conservation area
o General landscape plan for the area
o Design and location for every component of street furniture
o Waste management plan, which could be considered as part of town level waste management plan.
o Architectural and Development Control Regulations (DCR)
o Development of Urban Design concept and streetscape.
Development of Govindgarh Fort and Raja/Rani Talab area- Govindgarh Fort area is to be developed as an
integrated cultural zone and this will attract tourists.
Construction of public convenience and safe drinking water facilities within the fort complex
Construction of Parking for tourist vehicles
Establishing `Light and Sound shows
Construction of Entrance Gate: The entrance Gate of monument, which helps to form the first
impression of what, is inside. An artistically designed gateway by incorporating architectural elements
should be provided at the site.
1.14. City Level Green spaces and Parks
The City lacks in proper green spaces and the presently gardens are not attractive it requires redevelopment.
There is need of park development.
i) Establishment of Regional Park- Regional Park may be developed at Khando Devi temple. The landscape
may incorporate meandering pathways, seating places, concealed low-intensity lighting, etc. The facilities
will also include Refreshment centre, Toilets, drinking water facilites and Landscaped Garden
ii) Development of garden including landscaping- Establish Landscaped park near to Govindgarh fort because
there is availability of water from Raja talab.
1.15.
i.

Enhancement and Up-gradation of City Level Infrastructure


Designated Parking facilities
a. Provision of designated paid parking areas for tourist buses, cars and other vehicles.
b. Provision of designated taxi and auto stands in at least 2 or 3 locations in the central area.

DMG Consulting Pvt. Ltd.

11

ii.

iii.

iv.

v.

1.16.

Clock rooms and pay - use toilets for men and women at a minimum of 3 locations by the side
Construct pay & use toilets in places of public assembly and also in tourist locations. It should be
made mandatory for all shopping areas and restaurants having more than a specified built up area to
provide public toilet facilities, which may also be maintained on, pay & use basis. The major roads
may also be provided with wayside coin operated toilets, at least in major urban centers. The models
adopted by Sulabh Sauchalaya in many towns and cities are worth mentioning in this context. The
local self-governments, both urban and rural, should be made to think and act on these lines.
General landscape plan for the area
Charming garden with lush green landscape will add elegance to the whole town. The tourist
complexes should be properly landscaped in a manner compatible with the environmental character of
the surroundings. No construction should commence without having secured the consent of the
appropriate authority for the provision of infrastructural services, i.e electricity, telephone, road
access, water, etc.
Design and location for every component of street furniture
Designed Electrical & telephone poles in the area should be replaced with artistically designed
beautiful ancient looking poles. Stone Benches with shade. The benches in the heritage area should be
artistically designed.
Tourist Facility & Information Centre
Establish tourist facility centre including tourist information centre, toilet and drinking water facilities
and conventional shops near Govindgarh Fort.
Development of Raja/Rani talab (lake)

The landscape in this part is exceedingly scenic and offers the potential for excellent development of Water
based tourism. Lake offers pleasure boating facilities. However, any resort that may be developed here should
follow the characteristics of the site. The architecture should respect the characteristics of vernacular
architecture, and in any way, should not cause visual conflict with the surrounding nature.
Water sports based tourism, especially related to boating. This would help in development of water sports like
water scooter, water skiing, etc. Restaurants, toilets, shops, sports gear renting outlets etc. catering to tourists
have to be developed in this area as part of the Project.
1.17.

SWOT Analysis

Strength
Govindgarh having many heritage and tourist
centers.
Number of tourist increasing with time.
Opportunity
Govindgarh falls under Jabalpur- BandhavgarhKahjuraho- Chitrakut tourist circuit.
Govindgarh got good road connectivity and it is
also near to Rewa Junction.
Govindgarh having many water bodies and
religious centers also attracts tourist.

DMG Consulting Pvt. Ltd.

Weakness
Non- maintained heritage buildings.
No proper connectivity to some of the tourist centers.
Poor existing infrastructure.
Threat
Un-maintained heritage site might result into ruined
structures.
Inadequate infrastructure & connectivity may leads to
decline in tourist flow.

12

1.18.

Best Practice

Box: 0.1: Heritage Conservation Gohar mahal Restoration & Reuse as Craft centre
Background:
Bhopal is the capital of the Indian state of Madhya Pradesh and the administrative headquarters of Bhopal District and Bhopal
Division. The city was the capital of the former Bhopal state. Bhopal is also known as the Lake City for its various natural as well as
artificial lakes and is one of the greenest cities in India.
Gohar Mahal is situated in the banks of the magnificent Upper Lake. It is one of
the beautiful palaces in Bhopal. Gohar Mahal is an architectural marvel, which
presents a perfect blend of Hindu and Mughal Architecture.
It is constructed by
Kudasia Begum in
1819 AD and due to
unmaintained
conditions; it has
become
degraded
and dilapidated.
Key Components of the Projects:
To recover that condition detailed documentation and condition
assessment of the building has been done and prepared a restoration and
reuse proposal by INTACH. It also involved community in the redevelopment process to know their views and perception.
The palace has been restored and maintained the original fabric and construction details of the buildings. New functions will be
introduced to convert the complex into an Urban Haat to showcase the local craft and a cuisine. This project has been supported by
DC H&H, Government of India and MPHHVN, Govt. of Madhya Pradesh.
Lesson Learned:

Complete participation of the community at all stages.

Conservation as a tool to promote development and improve living standards.

Close partnerships with national and local government bodies as well as with international funding agencies.

1.19.
Sr.
No.
1
a

b
c
d
e
f
2

Summary of Projects
Projects
Development of heritage building i.e. Govindgarh fort
Preparation of Conservation Plan for Govindgarh Fort.
Preparation of land use plan for conservation area (a) Landscape Plan of the area, b)
Development Control Regulation
Heritage Walk - Development of Signages
Construction of shopping arcade
Construction of public convenience and safe drinking water facilities
Construction of Parking for tourist vehicles
Establishing `Light and Sound
City Level Green spaces and Parks

DMG Consulting Pvt. Ltd.

13

Institutional
tMeeting
with
nt
and
Institutional
,various
municipal
and
Stakeholder
finance
sF municipal
finance
Y
2
0
0
4
0
5

SE

CT

t
o

OR

F
Y
2
0
0
7
0
8

AN

B
3
a
b
c
4
5
6
7
8

9
10

Establishment of Regional Park at Khando Devi Temple area including landscaped open area
for stage and assembly area for gatherings, dinners, performances etc. including fitting and
fixture of sitting and lighting.
Development of local park at Govindgarh Fort.
Development of Raja/Rani Talab
Dredging/ silt controlling and cleaning of Raj/Rani Talab
Equipments for boating and Skiing
Construction of restaurants, toilets, shops, sports gear renting outlets
Tourism Supported Infrastructure in the Govindgarh City and Khando devi Temple
Construction of Designated Parking facilities for taxi stand and tourist Vehicle
Establishment of Public Convenience
Design and location for every component of street furniture, signage
Tourist Facility & Information Centre- Establish tourist facility centre including tourist
information centre, toilet and drinking water facilities and conventional shops near Govindgarh
Fort.
Construction of Cafeteria, Restaurants, toilets, shops,etc
Security /Police Cabins

AL
YS
IS

DMG Consulting Pvt. Ltd.

14

City Development Plan


for
Govindgarh

DMG Consulting Pvt. Ltd.


A-81, Sector 65, Noida, Uttar Pradesh - 201301

An ISO 9001:2000
Certified Company

Overview
Govindgarh:

Summer capital of Mahraja of Rewa

Known as Mini Vrindavan and a large number of famous temples are situated in the region.

Famous for its Royal history and structures such as Govindgarh Fort.

Total area (sq. km.):

13.23

Number of Wards:

15

Total Population:

10535

State Highways: SH-9 and SH-52 passes through the town which makes
nearby areas.

Nearest Railway Station: Rewa Junction

Nearest Town: Rewa (19 km from Govindgarh)

it accessible to the other

Regional Location of Govindgarh

Govindga
rh

Physical characteristics
Latitude:

2422 N

Longitude:

8117 E

Altitude:

330 (above MSL)

Region:

Bagelkhand

Soil Type:

Fertile medium deep black soil

Maximum Avg.Temp.:

420 C (May-June)

Minimum Avg.Temp.:

5.50 C

Rainy Season:

Mid June till end September

Avg. Annual Rainfall:

1100 mm

Swot ANALYSIS: Physical characteristics

Demographic profile
Total Population :

10535 (census 2011)

Decadal Growth Rate:

8.64% (2011)

SC Population:

18.05%

ST Population:

7.75%

The population of the town is increasing but with slower growth rate. This shows that the people are out
migrating to nearby big towns from Govindgarh which is more semi-urban in nature.

Population Growth Trend


12000
10000
8000

9697

10535

8437

6000
4000
2000

0
1981 to 1991

1991 to 2001

2001 to 2011

Population growth rate


Declining Average Decadal Growth Rate
1991-2001

14.93 %

2001-2011

8.64%

Prevalent out-migration as Rewa does not have much potential in terms of educational &
health facilities or economic opportunities to cater to the demand.
Decadal Population Growth
35
30

28.77

26.84

25

19.85

20

14.93

15

8.64

10
5
0
1991

2001

2011

Decadal Growth Rate (%) GNP


Decadal Growth Rate (%) Rewa
District

Population projection
Average Decadal Growth Rate
1981-2011: 39.2%
Population Projection
2025 2026
12380
2035 2036
13883
Considering the future growth and development potential in educational, industrial, commercial
(including investment from outside), tourism, social and administrative aspects, Geometric
Progression Method was found suitable.
Population Projection
16000
14000

Population

12000
10000
8000
6000

4000
2000
0
Population

2011

2012

2013

2014

2015

2020

2025

2030

2035

10535

10659

10785

10912

11041

11691

12380

13110

13883

Socio economic profile


Total number of households
Average household size

1665 (Census 2011)


5.6 persons. (Census 2011)

The average household size of the town is higher than the national average of 5.12 while the state average is
higher at 7.27.
There are a total of 3749 (38.66%) workers in the town (2001 Census) and majority of workers are
engaged in tertiary activities such as trade & commerce.

Gender Wise Work Force Distribution

7%

9%

55%

29%

Cultivators

Agricultural Laborers

House Hold Industries

Others

In Percentage

Work Force Distribution

90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00

Total WFPR

Primary

Secondary

Tertiary

Male

64.76

50.82

40.38

81.39

Female

35.24

49.18

59.62

18.61

Trade and commerce

The Govindgarh market is centrally


located (in ward 3, 4, 10, 11 and 12).

The market have come up along SH52, SH-9 and near Nagar Parishad and
is very unorganized.

The informal markets/shops along


SH-52
predominantly
include
vegetables, fruits, cloths
&
garments, hardware, groceries items
etc.

HERITAGE AND Tourism


At town level, Govindgarh has many tourist destination and heritage buildings:

Govindgarh fort (Heritage)

Ram Govind Temple

Panchmukhi Temple

Chowandi Temple

Shiv Temple

Hanuman Temple

Khando Devi

Raja Talab

Rani Talab

Sunder Van

Religious

Water Bodies

Govindgarh Fort

Rani Talab
(Lake)

Unfortunately, the town has not been able to capitalize its potential in this sector.
Lack of sufficient and efficient modes of transportation, infrastructure services in town that can hold the

tourist.

Issues

Lack of economic activities which causes migration of people to other cities.

Rich natural and architectural heritage (Govindgarh Fort) without proper


management.

Lack of conservation of the heritage structure of the town i.e. Govindgarh Fort.

Town doesnt have a dumping site, as a result waste is disposed into open drains
and along the roads (along SH-52). It is a cause of pollution in water bodies.

Lack of Tourist Infrastructure i.e. hotels, market, information centres, parking


etc.

SWOT Analysis

STRENGTH
Literacy rate of town has increased continuously over
the years.

Rich heritage and natural beauty (Govindgarh fort


and Raja Talab).

Matsya Palan is emerging as new activity in the


town (in ward 15).
OPPORTUNITY
Existing water bodies (Raja/Rani Talab) and
Govindgarh Fort can be developed and conserved as
major tourist site for the locals as well as for
domestic tourism.
Town has potential of developing as a tourist centre
for its hinterland.

Town has a great royal history which can be used.

WEAKNESS
Female literacy rate is low as compared to male.
Lack of conservation & management of tourist
resources.
Lack of awareness and management techniques of
heritage and natural elements.
THREAT
Shifting of workers from primary to tertiary might
result into reduction in agricultural production.
Improper infrastructure services, local awareness and
un-developed lake front etc. are major hindrance for
the development of the tourism.

Disposal of solid waste along roads (mainly along SH52).

Landuse distribution
Landuse
Residential
Commercial
Industrial
Public/Semi public and Public Utilities
Recreational
Circulation
Water Body
Total Developed Area
Undeveloped Area/ Agricultural Land
Total Municipal Area

Area in Hectare
109.12
3.1
0.4
0.7
9.35
36.74
413.21
572.6
750.59
1323.21

Percentage
19.06
0.54
0.07
0.12
1.63
6.42
72.16
43.28
56.72
100.00

Remarks

%age out of the Total


Developed Area

%age out of the Total


Municipal Area

Source: Open Source Google Satellite Imagery and DMG Primary Survey
Residential

43%
57%

19%

developed
area
undevelope
d area

1%
6%

72%

2%

Commercial
Industrial
Public/Semi public and
Public Utilities
Recreational
Circulation
Water Body

Housing scenario
As per 2001 Census of India, there are 1655 households in Govindgarh Nagar Parishad (GNP) with an
average household size of 6.5 persons and total pakka housing stock is only 968 houses. (Detailed census
2011 data not available)
3.36%
2.77%
39%

permanent
Owned

semipermanent

61%

Rented
Others

temporary
93.87%
Distribution of Houses by Type
Area
Urban India
Madhya Pradesh (Urban)
Govindgarh Nagar Parishad

Housing Ownership Status

Total Population
28,61,19,689

Household
5,58,32,570

Average HH Size
5.12

1,59,67,145
9697
*10,535

21,95,725
1655
1881

7.27
6.5
5.6

Source: Census of India, 2001; *provisional figures Census of India 2011

Present and Future Housing Demand & Gap


Year
2011
2012
2013
2014
2015
2020
2025
2030
2035

Total Population
Existing Supply
Housing Demand
Non-Slum Slum Non-Slum Slum Non-Slum Slum
8271 2264
760
208
1654
453
8369 2291
760
208
1674
458
8467 2318
760
208
1693
464
8567 2345
760
208
1713
469
8668 2373
760
208
1734
475
9179 2512
760
208
1836
502
9720 2661
760
208
1944
532
10293 2817
760
208
2059
563
10899 2983
760
208
2180
597

Present Housing Stock (Pakka House)


Present Housing Demand for Non-Slum
Present Housing Demand for EWS/Slum
Present Housing Gap
Present Housing Gap for Non-Slum
Present Housing Gap for EWS/Slum
=
Total Future Requirement of Housing in year 2035
Future Requirement of Housing for Non-Slum in Year 2035
Future Requirement of Housing for EWS/Slum in Year 2035
Total Future Gap of Housing in year 2035
Future Gap of Housing for Non-Slum in Year 2035 =
Future Gap of Housing for EWS/Slum in year 2035 =

=
=
=
=
=
245
=
=
=
=
1420
389

Housing Gap
Total
Non-Slum Slum Demand
894 245
2107
914 250
2132
933 256
2157
953 261
2182
974 267
2208
1076 294
2338
1184 324
2476
1299 355
2622
1420 389
2777
968
1654
453
274
894

2777
2180
597
1809

Total
Gap
1139
1164
1189
1214
1240
1370
1508
1654
1809

GOVINDGARH: Future GROWTH POSSIBILITIES

SWOT Analysis

STRENGTH
Most of the people have their own houses, which are pucca in
nature.

Cheaply available abundant agricultural land for new developments


(in ward 1, 2, 3, 5, 6 and 14).

WEAKNESS
More than 50% of the houses do not have pucca floor.

The town has good connectivity (SH 52 and SH 9), making it an


emerging town.

Half of the area in the town is undeveloped.

OPPORTUNITY
Water front development and recreational spaces development
(Raja/Rani Talab).
Good possibilities of residential development due to presence of
suitable agricultural land, social infrastructure and commercial
centres ((in ward 1, 2, 3, 5, 6 and 14).

Better quality housing demand and cheap land values can attract
real estate developers for development of new townships in

peripheral areas (mainly along SH-52 and SH-9).

Opportunity of tourism sector is very high and it can generate


economy for local people.

Low and slow growth pattern.


Development is concentrated mainly along the transportation line
i.e. SH 52 & SH 9.
No existing norms and guidelines for conservation of heritage
structures and water bodys conservation (Govindgarh Fort,
Raja/Rani Talab).
THREAT
Land encroachments are common along SH 52 and SH 9 especially
in commercial areas (mainly in ward 5, 6, 7, 9, 10, 11 and 12).
Unplanned water front development (Raja Talab) may result into
water spreading and other issues in the nearby areas.
Absence of Urban Land Management Policy.
Threat to the forest and wildlife existing in the town.
Threat to the sculptures and heritage due to slackness.
Threat to the water body (Raja Talab/Rani Talab); if not conserved
will spoil the beauty of the Southern Part of the town.

City Specific Strategies and Action Plan


Aspects
Issues
Strategies and Action Plan
Spatial Growth Linear growth All residential and Development of more commercial centres in the
commercial development is concentrated town, especially in north-west part of the town
along the SH 52 & 9.
to promote equitable growth throughout the
The concentration of all the major town (Mainly in Ward 1,2,3 and 14).
commercial establishments is in core area Encourage new planned developments/
of the town (Near Nagar Parishad Office townships away from the core areas (in Ward
and Hospital).
1,2,3 and 14).
Density Pattern High density is concentrated in core areas Decongest high density wards and promote
of town (in ward 4, 11 and 12).
planned development in sparsely developed
wards (ward 1, 2, 3, 5, 6 and 14).
Low and slow growth pattern.
Real estate developers can play important role in
Landuse
Ward 3, 5, 6, 10, 14 and 15 are partially development of basic amenities.
Distribution
developed (Periphery area).
The urban poor/ slums are mainly As per the demand, construction of 1809 houses
Housing
concentrated in ward 7, 14 and 15 under LIG, MIG and HIG schemes should be
(periphery of the city).
planned by MPHB (in ward 7, 14 and 15).
The demand for housing is high.

Water supply
Water Supply system - predominantly depending on ground water.
Current ground water level is at the depth of 40 to 120 feet.
Water Sources
5 Tube wells and 78 hand pumps
Surface water (Ponds)

Capacity (MLD)
2.85 lakh litre (90 %)
75 thousand litres (10 %)

2 water tankers of capacity having 90000 lt.


Ward number 7 has no access to public water supply and in other wards demand is partially fulfilled by

public water supply.


There are 2 OHT in the town (In ward nos. 10) and approximately 65 % area is covered by these 2 OHTs.
Water supply - 358 household connection, 78 hand pumps and 10 public taps.
Ward no 7 is completely deprived of municipal water supply.

Town don't facility of water treatment plant, direct water supply is also done.
Chlorination is done weekly to improve the quality of water.

Description

Details

Sources of Water Supply

Tube Wells and Hand Pumps

No. of Tube Wells

5 Nos.

Description regarding Storage

Capacity in Lakh Litres

4.06 LL, 1.78 LL (Ward 10)

2 OHT

Description regarding
Connections
Residential

Nos. of Connections

Commercial

Nil

Total Connections

384

384

No. of Hand pumps

78

The monthly charge for residential connection is Rs. 45/Distribution of Houses by Sources of Water

Distribution of Houses by Location of Tapped Water


31%

36%

0%

Within Premises

33%

Tap
4% 1%

0%

Handpump
Tubewell
40%

Near Premises
Away

1%

Well
Tank, Pond, Lake

52%

River, Canal
Spring
2%

Any other

Present & Future Demand & Supply Gaps


Present Water Supply in the Govindgarh town is 0.41 MLD (28 LPCD).
Years

Population

2011
2012
2013
2014
2015
2020
2025
2030
2035

10535
10659
10785
10912
11041
11691
12380
13110
13883

Domestic
Fire Demand
Water Demand (1%) (MLD)
0.014
1.42
0.014
1.44
0.015
1.46
0.015
1.47
0.015
1.49
0.016
1.58
0.017
1.67
0.018
1.77
0.019
1.87

Industrial
Demand (3%)
0.043
0.043
0.044
0.044
0.045
0.047
0.050
0.053
0.056

Considering
Losses (5%)
0.071
0.072
0.073
0.074
0.075
0.079
0.084
0.088
0.094

Total Demand
(MLD)
1.55
1.57
1.59
1.60
1.63
1.72
1.82
1.93
2.04

Issues

Water distribution system is very old and has leakage problem due to which pressure remains low.

About 15,000 litres of water remain unaccounted indicating distribution loss of 25% of the total supply.

There is lack of technical/ skilled man power to handle the system.

Per capita supply is low (27.9 lpcd) against the standard norm of 135 lpcd.

Supply Gaps
(MLD)
1.14
1.16
1.18
1.19
1.22
1.31
1.41
1.52
1.63

SWOT Analysis

STRENGTH
Good quality of water is available from all the sources
(ground water and Raja Talab).

WEAKNESS
Both the 2 OHTs (in ward 10) are not functional due to leakage
problem.

The surface water (Raja Talab and Rani Talab) is


available throughout the year to fulfil the water
requirement of town.

Lack of technical/ skilled man power to handle the system.

Ground water level is at lesser depths and is


replenished by the rains during monsoon.

Present per capita supply is 27.9 LPCD, which is very less as


compared to the standard of 135 LPCD as per UDPFI Guidelines.

Inadequate water supply connections at household level, there are


only 384 water connections.
THREAT
There are several drains/ storm water drains out falling in the water
bodies (mainly in ward 15).

OPPORTUNITY
Surface water is available throughout the year.

Two over head tanks are present (in ward 10) which
can be repaired, thereby increase the storage capacity.

Opportunity to supply 24 hours water supply by


providing better services revised tariff well be
acceptable by the people.

Rain water harvesting can be introduced.

Detailed layout plans and drawings of water supply distribution lines


are not available, making future planning difficult.

Goals & Services Outcomes


Sr.
No.

Components

1
2

Network Coverage to Households


Per Capita Supply as per norms
(lpcd)

3
4

24/7 Water Supply


Quality of Water

5
6
7
8
9

Non Revenue Water


Consumer Metering
Cost Recovery
Roof Water Harvesting
Private Sector Participation

Horizon Period
2015
40%
135

2025
100%
135

2035
100%
135

40%
As per WHO
Standards

100%
As per WHO
Standards

100%
As per WHO
Standards

25%
80%
100%
40%
10%

15%
100%
100%
80%
70%

5%
100%
100%
100%
100%

Strategies and action plans


Raja Talab could be the source of water in Govindgarh town after its water treatment (water
treatment plant in ward 15).
It is therefore proposed to prepare a fresh Detailed Project Report (DPR) for the development of
Water Supply System in Govindgarh Nagar Parishad.
Leakage detection studies; repair, replacement or rehabilitation of old/defunct system
including 2 OHTs (in ward 10) should be under taken to enhance the present water distribution

system.
Extension of water pipeline to un-served areas (outer areas of ward 1, 3, 5, 6 and 14) thereby
ensuring 100% water supply network coverage.

Sector wise project identification


Code
No.
WS 1
WS 2
WS 3
WS 4
WS 5

Projects proposed
Preparation of DPR for Water Supply System
Rehabilitation/ replacement of present pipe line system (2 km)
150 dia (cost @ Rs1471)
Extension of present distribution line to cover the whole of the
city (3.5 km) 150 dia (cost @ Rs1471)
Construction of 2 OHT each of capacity 4 MLD by 2013 and
2015 years
Construction of Filtration Plant/ Water Treatment Plant of
capacity 4 MLD in ward no. 15

Project Cost (in Lakh)

Department

7.48 (1% of the total


project cost)
30.00

Nagar Parishad

51.00

Nagar Parishad

300.00

Nagar Parishad

235.00

Nagar Parishad

Nagar Parishad

2.00

Nagar Parishad

50.00

Nagar Parishad

WS 8

Construction of intake well, pump house with pumping


machinery electrical
Construction of treatment plant i.e. electrical, mechanical
equipments
Laying of 450 mm dia Pumping mains intake to treatment plant

30.00

Nagar Parishad

WS 9

Laying of 250 mm Pumping main from rest house to OHT

15.00

Nagar Parishad

30.00

Nagar Parishad

5.00
755.48

Nagar Parishad

WS 6
WS 7

WS 10 Water Meter Connection in all Dwelling Units 2135 by 2035 (@


Rs. 150/connection)
WS 11 Training and Capacity Building of Staff
Sub Total Cost (A)

Sewerage and sanitation


No underground sewerage system for a population of 10535 in 15 wards.
Current sewage generation is approximately 0.32 mld.
According to City Sanitation Survey (2008), 81 % of the HH do not have toilet facility.
Sewage Disposal System consists of individual disposal system that includes water closet, soak
pits or pit type latrines, open drains.
Resident in old areas uses dry-latrines. New developments have individual septic tanks for
sewage disposal.
Town don't have the facility of mud pump.
There are only 2 public toilets in ward number 10 and 12 which are functioning but not in
good condition.

Present & Future Demand & Supply Gaps


COMPONENTS
Sewage Generation (in MLD)
Total Water Demand
Govindgarh Sewage Generation
Existing Sewage Collection
Gaps
STP capacity (in MLD)
Govindgarh Sewage Generation
Existing Capacity of Treatment Plant
Capacity of Treatment Plant Demand
Gaps
Sewer Connection (in Nos.)
Existing Connections
Demand for Sewer Connections
Gap
Sewer Network (in Kms.)
Road Length Demand
Existing Sewerage Network
Sewerage Network Demand
Gap

2011
1.55
1.24
0.0
1.24
2011
1.24
0.0
1.24
1.24
2011
0
2107
2107
2011
15.80
0.0
15.80
15.80

2012 2013
1.57 1.59
1.25 1.27
0.0
0.0
1.25 1.27
2012 2013
1.25 1.27
0.0
0.0
1.25 1.27
1.25 1.27
2012 2013
0
0
2132 2157
2132 2157
2012 2013
15.99 16.18
0.0
0.0
15.99 16.18
15.99 16.18

YEARS
2014 2015
1.61 1.62
1.28 1.30
0.0
0.0
1.28 1.30
2014 2015
1.28 1.30
0.0
0.0
1.28 1.30
1.28 1.30
2014 2015
0
0
2182 2208
2182 2208
2014 2015
16.37 16.56
0.0
0.0
16.37 16.56
16.37 16.56

2020
1.72
1.38
0.0
1.38
2020
1.38
0.0
1.38
1.38
2020
0
2338
2338
2020
17.54
0.0
17.54
17.54

2025
1.82
1.46
0.0
1.46
2025
1.46
0.0
1.46
1.46
2025
0
2476
2476
2025
18.57
0.0
18.57
18.57

2030
1.93
1.54
0.0
1.54
2030
1.54
0.0
1.54
1.54
2030
0
2622
2622
2030
19.67
0.0
19.67
19.67

2035
2.04
1.63
0.0
1.63
2035
1.63
0.0
1.63
1.63
2035
0
2777
2777
2035
20.82
0.0
20.82
20.82

Issues

All the grey matter of the sewerage is disposed off in the Nallah and this nallahs water get mixed in the pond
located in ward no 5.

Grey water from ward 10 and 15 get mixed in Rani Talab.

Town doesn't have the facility of mud-pump.

Unmaintained limited no. of public urinals and public toilets (only 2 which are located in ward 10 and 12)

Wide spread practice of open defecation as about 84% of household does not have in-house toilet facilities.

Swot analysis
STRENGTH
Town has good natural slope i.e. South west to north east.

WEAKNESS
No underground sewerage system for the town.

Land availability for sewerage treatment plant (in ward 5 and 6).

No treatment plant for treating sewage generated.


Limited number of public toilets. There is need of around 15
public toilet (one in each ward).

Low levels of income of urban poor prohibits them to make


capital expenditure on development of toilet units and their
maintenance.
OPPORTUNITY
THREAT
Scope for development of low cost sanitation projects.
Danger of ground water pollution, risk of spreading
epidemic.
New sewerage system is to be developed, Opportunity to select
latest modern technology for treatment.

Sector wise project identification


Project Cost
(in Lakh)
4.22 (1% of
project cost)

Code No.
SS 1

Projects proposed
Preparation of DPR/Comprehensive
Master Plan for underground Sewerage
System for entire town

SS 2

Construction of DEWATS in each wards


Rs 2000 per sq m of land underwet
land. Each plant need around 500 sp. m

150.00

Nagar Parishad

SS 3

Construction of treatment plant


support electrical, mechanical
equipments

100.00

Nagar Parishad

SS 4

Construction of eco-toilets in slum


areas and public place. (Rs 15000 per
toilet)

171.00

Nagar Parishad

SS 5

Construction of 20 public urinals (@


Rs5000)

Sub Total Cost (B)

1.00
426.22

Department
Nagar Parishad

Nagar Parishad

Drainage system
At present the town does not have a comprehensive and effective drainage system and facility of treatment
plant.
Along the SH 9, 52 and other major roads of town, drains have been constructed.
The drainage condition survey in the town indicates that the drainage network in Govindgarh is open and
unorganized.
Most of the drains do not have capacity to flow the waste water as they are damaged and remain chocked due
to presence of gray matter and disposal of solid waste in it (mainly in ward 4, 11 and 12).
Low lying areas in ward nos. 10, 11, 12, 13, 14 and 15 in the southern side of the Govindgarh town are
major flood prone areas of town.
Condition of Drains in Govindgarh

Ward 1

Ward 4

Ward 10

Ward 11

Drainage Map
As the Raja Talab and Rani
Talab are located in the
southern part of the town
and the storm water from the
city and hilly area also flows
in these Talabs.
All the low lying areas in
ward nos. 10, 11, 12,13, 14
and 15 in the southern side of
the town Govindgarh are
major flood prone areas of
town.

Swot analysis

STRENGTH
Strong desire of citizens to develop a fresh
drainage system for town.
Town has a natural slope towards south west
to north east which is favourable for
development of drainage system which will
also help in cost reduction.
OPPORTUNITY
Making rainwater harvesting in commercial
and residential plots mandatory.

Availability of land for the development of


waste water treatment plant (in ward 9
and15).

WEAKNESS
Detailed layout drawings of drainage network
are not available. Hence, making future
planning difficult.

THREAT
Health hazards due to negligence for
cleanliness.

Contamination of lake water due to discharge


of untreated waste water (in ward 15).

PROPOSED DRAINAGE PLAN

Sector wise project identification

Code No.
D1

Projects proposed
Preparation of DPR for Storm
Water Drainage System for entire
town
D2
Construction of new storm water
drainage network to cover the
whole town (3 kms.) (@Rs 44
lakh/km)
D3
Converting the to pucca one by
De-silting, lining and constructing
side walls. 3.5km (@Rs 20
lakh/km)
Sub Total Cost (D)

Project Cost
(in Lakh)
Department
1.9 (1%) of Nagar Parishad
total project
cost)
120
Nagar Parishad

70

191.9

Nagar Parishad

Solid waste management


The total quantity of solid waste generated in Govindgarh town is approximately 2.63 MT per
day.

At present in the absence of incineration unit, waste from medical/healthcare establishments are
either mixed with municipal waste or indiscriminately dumped.
Presently there is no Door-to-Door solid waste collection system from the individual
households and other establishments as primary collection.

There is no area or site designated for disposal of municipal wastes (presently at SH 52 3 km


away) .
Dumping along the roads near
to Raja Talab

Dustbins in the town in ward 11

Collection and conveyance of


Solid waste

Solid waste management


For the collection and conveyance of the solid waste, there are 7 dust bins, 1 tractor and trolley, 10
hand-pull cart and 2 thela/tricycles are available with municipality.
Present and Future Demand and Supply Gaps of Waste Collection Govindgarh Town
Years
2011
2012
2013
2014
2015
2020
2025
2030
2035

Total
Standard as per UDPFI
Population Guidelines (Grams/Person)
10535
250
10659
250
10785
250
10912
250
11041
250
11691
250
12380
250
13110
250
13883
250

Waste Generation
(MT/Day)
2.63
2.66
2.70
2.73
2.76
2.92
3.10
3.28
3.47

Waste Collection
(MT/Day)
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18

Gaps
(MT/Day)
2.45
2.48
2.52
2.55
2.58
2.74
2.92
3.1
3.29

Major Issues
Lack of dhalows and bins for storage of waste at primary level.
Inadequacy of man power and modest equipments (including vehicle for transportation) with GNP for
Solid Waste Management from collection to its final disposal.
Collection efficiency is very low (approximate 65%).
Lack of capital/funds with GNP for the development of SWM facilities.
Absence of dumping site.

Sector wise project identification


Project Cost
Department
(in Lakh)
Preparation of Detailed Project Report for
1.4 (1% of Govindgarh Nagar Parishad
SWM 1
Municipal Solid Waste Management for entire project cost)
town.
Construction of Sanitary Landfill Site with
Govindgarh Nagar
SWM 2
35.00
other infrastructure facility
Parishad
Providing equipments and machines to
Govindgarh Nagar
SWM 3
30.00
support the SWM system
Parishad
Enhancing the capacity of municipality by
Govindgarh Nagar
SWM 3
75.00
providing Transportation vehicles (4) ,
Parishad
Container (60) and Rickshaw (30) & Handcart
(60)
Sub Total Cost (C)
141.4
Code No.

Projects proposed

Traffic and transportation


The town Govindgarh is located on SH 52 and 9 (accounting for 5.36 km of road length of town)
connecting Sidhi to Rewa and Satna.
There is no direct railways connectivity to the town and the nearest railway station is in the district
headquarter which is Rewa around 20 km through SH 9.
At present there is no intra city public transport system exists in Govindgarh.
The town also has one bus stand which has a capacity of around 5 buses (in ward 10).

Issues
Great pressure on major roads (SH 52 and SH 9) since all the major commercial activities, important
institutions etc. are concentrated along these roads.
Rampant encroachment, on-street parking on SH 52 leading to reduced ROW and carriageway
resulting in slow movement of traffic and congestion in core area.
Existing bus terminal is very small (in ward 10); not being used by bus operators because of paucity of
space in making entry and exit due to informal development, inefficient road width.
Narrow streets in the core areas (in ward 4, 10, 11 and 12) need to be widened through proper planning
and addressing the encroachment problems.

Gomati Chouraha (in ward 12) is a congested area and there is a need for junction improvement.

Sector wise project identification


Code No.
TT 1

TT 2
TT 3

TT 4

TT 5

TT 6

Sub Total Cost (E)

Projects proposed
Development of new Bus Stand with
proper ISBT on BOOT basis in ward
no. 12
Development of road in ward 14
(2km)
Development of
footpath/pedestrian along the
major roads. (for 5 km)
Construction of 5 parking lots along
main roads and in commercial or
market areas
Road Widening from 3 m to 4.5 m
(major district roads for 6km.)
Improvement of traffic junctions,
rotary development including
installation of traffic light/signals.

Project Cost
(in Lakh)
500

Department
Nagar Parishad

100

Nagar Parishad

25

Nagar Parishad

25

Nagar Parishad

90

PWD

90

Nagar Parishad

830

Swot Analysis

STRENGTH
Huge scope for development in terms of street light
services.

WEAKNESS
Irregular spacing of street light poles within the residential
areas of town.

Awareness about emerging technologies of power saving


light.

OPPORTUNITY
Energy saving initiatives

Inadequate number of street lights (mainly in ward 5 and 7).

Movement of vehicles throughout day and night on major


roads of town i.e. SH 52 and 9.

Lack of monitoring and regularization

High capital cost for installation of system.


THREAT
Power thefts through street lights
High O & M cost

Strategies and Action Plan

Installation of high Mast Light at important junctions, rotary and entry point (mainly on Gomati Chauraha)of the
town.

Alternate Street Light options (Solar, energy saver like CFL, LED etc.) and installation of automated control lights on
Raja Talab, Govindgarh Fort, Khando Devi etc.

Installation of solar based electric poles in Public Buildings i.e. Nagar Parishad, Schools, Hospital etc.

Institutional strengthening, human resources development

Urban poor
Around 21.49% (2264) of total population (10535) are slums, squatter and other poor population which
mainly resides in ward no. 1, 5, 6, 7, 10, 14 and 15 of the town.
Out of the total slum population (2264); nearly 70% population (i.e. 1585) accounts for Below
Poverty Line (BPL) population.

The shelter conditions are very scruffy in the selected pockets. The majorities of the houses in these
slums areas are made of mud and wattle with burnt mud tiles (Khapra) and iron sheet roofs.
Many of these houses lack basic amenities such as toilet, power, water, open spaces etc. and have
katcha houses.
Most of the residents of the slum obtain their water from Municipal Hand pumps.
The existing condition of surface drainage is a mess in the whole slum pocket.
At present the main type of sanitation in these slum areas is the pit latrine.
All the roads in the selected slums are narrow tracks eroded by runoff water.
There are 4 dustbins in the selected slum areas (In ward 1, 5 and 15).
Only one school in slum areas is located (in ward no. 15) which is not sufficient to educate the
people including slum population at town level.

SLUM SITUATION IN TOWN

SWOT ANALYSIS: URBAN POOR

Sector wise project identification


Code No.
SL 1

Projects proposed
Installation of 218 nos. of street lights
within the wards/residential area
(33230/- Solar street light pole)

SL 2

High mast lights at entry points of the


City (2 Nos.) and in core area (2 No.)
(15 lakhs/- unit)
Procurement of 1 electric pole
vehicle
Procurement of 2 no. of fire tenders
and other equipment's (one big and
one small)
Establishment of fire station and staff
cost
Training & capacity building of staff

SL 3
SL 4

SL 5
SL 6
Sub Total Cost (F)

Project Cost
(in Lakh)
75

Nagar Parishad

60

Nagar Parishad

25

Nagar Parishad

125

Nagar Parishad

50

Nagar Parishad

Nagar Parishad

340

Department

Social infrastructure
Altogether there are 5 government schools (3 are primary, 1 high school for boys and 1 higher
secondary school for girls ) and 4 private schools in Govindgarh (mainly in ward 11 and 12).
The town has a Anganwari kendras in each ward.
The schools have basic facility like toilets, urinals, drinking water and playground.
At present, there is one Community Health Centre (CHC) with 30 beds and two Primary Health
Centres (PHCs) in surrounding Gram Panchyats in Rehat and Tikar.
There are five doctors, five nurses, two assistant nurses and to supporting staff.
However, the demand for health services are bound to increase considering the increasing population, a
need for a speciality hospital is envisaged.

Town also has a facility of veterinary hospital near CHC (in ward 12).

Community Health Centre inWard


No. 11

Veterinary Hospital in ward 12

Schools

Issues
Town has no intermediate/speciality hospital and specialized health care facilities.
Town has insufficient no. of primary schools.
The physical conditions of the schools are not good.
Government schools dont have proper basic requirement of drinking water and sanitation facilities
for students.
Inadequate teaching staff in Government Schools.
Town does not have any technical/vocational training institute such as ITI.
There is no notified or designated place as open space, parks and play grounds for the resident of town.
Town does not have community gathering halls or rooms, public library etc. for the citizens.
Picnic spot or recreational area like Raja Talab, Sunder Ban, Govindgarh Fort etc. is there but its
development has not been done.

SWOT ANALYSIS: SOCIAL INFRASTRUCTURE

Sector wise project identification


Code No.
Projects proposed
H1
Extension of hospital situated in the
premise of health centre by
constructing multi storied building
thereby extending the health facilities

Project Cost
(in Lakh)
Department
150
Health Department

H2

Construction of 1 Multi-specialty /
intermediate hospital with 44 no. of
beds @1 bed per 500 person for 2035
in ward no. 10 or 13

75

Health Department

H3

Construction of 1 Poly-clinic @10 no. of


beds for 2035 in ward no. 13

50

Health Department

Sub Total Cost (H)

275

Sector wise project identification


Code No.
E1

Projects proposed
Establishment of 1 no. of Integrated
School with Hostel Facility

Project Cost (in


Lakh)
Department
500
Education Department,
Govt. of M.P.

E2

Establishment of 2 nos. of Informal and


adult literacy centers, Anganwadi centers
in ward no 15 & 13(@5 lakh each)

10

Education Department,
Govt. of M.P.

E3

Construction of Polytechnic college/


Vocational Training Institutes and ITIs

100

Education Department,
Govt. of M.P.

E4

Renovation of school buildings which are


in bad condition

50

Education Department,
Govt. of M.P.

E5

Provision of equipments and necessary


infrastructure like provision of toilets, safe
drinking water, kitchen shed and
electricity etc. in education institutions.

10

Nagar Parishad

E6

Establishment of Public Library (1 in no.)

70

Education Department,
Govt. of M.P.

Sub Total Cost (I)

740

TOURISM AND HERITAGE


At town level, Govindgarh has many tourist destination and heritage buildings along with some natural elements
such as ponds and water bodies.
HERITAGE:
Govindgarh fort
RELIGIOUS:
Ram Govind Temple,
Panchmukhi Temple,
Chowandi Temple,
Shiv Temple,
Hanuman Temple.
Khando Devi

Raja Talab

Govindgarh Fort

NATURAL SCENIC AREA:


Raja talab
Sunder Ban
Nallah and Pond

Temple in Govindgarh Fort

Swot analysis
STRENGTH

Town is rich in heritage and natural beauty.

Accepting Matasya Paln as new emerging


activity in the town (in ward 15).

WEAKNESS

Lack of conservation & management of tourist


resources (Govindgarh Fort, Raja Lake/Talab, Khando
Devi etc.).

Lack of awareness and management techniques of


heritage and natural elements.

OPPORTUNITY

THREAT

Existing water body (Raja Talab) can be


developed and conserved as major tourist site
for the locals as well as for domestic tourism.

Improper infrastructure services, local awareness and


un-developed Raja lake front etc. are major
hindrance for the development of the tourism.

Town has a great royal history which can be


used.

Disposal of solid waste into the Raja and Rani


Talab/lake.

City Specific strategies

Water front development on PPP basis along with Raja lake and related activities like water sports, theme
park and boating etc. to encourage tourism.

Facilitating infrastructure in terms of good means of transport, hotels and resorts to attract tourists.

Govindgarh can be developed as a rural tourist centre.

Promoting Govindgarh as a transit point for the surrounding tourist destination like Gurh, Orchha or
Khajuraho, Maihar, Panna National Park, Bandhavgarh National Park.

Summary of tourism projects


Sr. No. Projects
1
Development of heritage building i.e. Govindgarh fort
a
Preparation of Conservation Plan for Govindgarh Fort.
Preparation of land use plan for conservation area (a) Landscape Plan of the area, b) Development
Control Regulation
b
Heritage Walk - Development of Signages
c
Construction of shopping arcade
d
Construction of public convenience and safe drinking water facilities
e
Construction of Parking for tourist vehicles
f
Establishing `Light and Sound
2
City Level Green spaces and Parks
a
Establishment of Regional Park at Khando Devi Temple area including landscaped open area for stage
and assembly area for gatherings, dinners, performances etc. including fitting and fixture of sitting and
lighting.
B
Development of local park at Govindgarh Fort.
3
Development of Raja/Rani Talab
a
Dredging/ silt controlling and cleaning of Raj/Rani Talab
b
Equipments for boating and Skiing
c
Construction of restaurants, toilets, shops, sports gear renting outlets
4
Tourism Supported Infrastructure in the Govindgarh City and Khando devi Temple
5
Construction of Designated Parking facilities for taxi stand and tourist Vehicle
6
Establishment of Public Convenience
7
Design and location for every component of street furniture, signage
8
Tourist Facility & Information Centre- Establish tourist facility centre including tourist information centre,
toilet and drinking water facilities and conventional shops near Govindgarh Fort.
9
Construction of Cafeteria, Restaurants, toilets, shops,etc
10 Security /Police Cabins

Sector wise project identification


Code No.

Projects proposed

Project Cost
(in Lakh)

T1

Preparation of Detailed Project Report for


Raja Talab development including
landscaping, designing and details of
infrastructure required

6 (1% of
Project
Cost)

T2

Conservation and tourism infrastructure


Development of Govindgarh fort

--

T3

Development, beautification, plantations


along the raja talab and rani talab

500.00

T4

Development of active recreation facilities


like water sports, theme park and boating
etc.
Promoting Govindgarh as a transit point by
making provision for a tourist circuit and
associated tourism infrastructure for the
surrounding tourist destination.

50.00

T5

Sub Total Cost (J)

50.00

606.00

Department
UADD, Govt. of and GNP

Tourism Dept. Govt. of


M.P.

Tourism Dept. Govt. of


M.P.

Sector wise project identification

Code No.

Projects proposed

Project Cost
(in Lakh)

Department

O1

Development of Entrance Gates to town (2


in Nos.) one towards north side and other
towards south. (@30 lakh/unit)

60.00

Nagar Parishad

O2

Development of hawker zone

10.00

Nagar Parishad

O3

Development of organized playground

50.00

Nagar Parishad

O4

Construction of one Community Hall and


two Rooms

50.00

Nagar Parishad

Sub Total Cost (K)

170.00

Municipal finance
Year Wise Income of Govindgarh Nagar Parishad from Various Sources
Financial Year
Tax
Non-Tax
Transfer inc. grants
2008-09
172137
10531216
32000
2009-10
264232
13875928
35190
2010-11
340000
17107926
34000
Source:Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad
Year Wise Expenditure of Govindgarh Nagar Parishad
Financial
(Wage & salary)
Operation and
Payment Interest
Year
Establishment
Maintenance
2008-09
7334292
42240
2975037
2009-10
9112660
34000
2010-11
12697908
33000
Source:Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad

Total
10735353
14175350
17481926

Others

Total

894741

10351569
9146660
13625649

Sector wise project identification

Code No.
UR 1

Projects proposed
Computerization of property tax &
other assets

Project Cost
(in Lakh)
Department
Nagar Parishad
20

UR 2

Billing s/w & collection systems;


hardware & software

Nagar Parishad

UR 3

Training/Manpower Assistance

Nagar Parishad

UR 4

Strengthening Engineering (MIS,


AUTOCAD, all h/w & s/w)

Nagar Parishad

UR 5

Other Management Supports


training for supervisory & staff

Nagar Parishad

Sub Total Cost (L)

40

Sector wise total cost


Physical Infrastructure
Sub Total Cost (A) Water Supply

755.48

Sub Total Cost (B)

Sewerage and Sanitation

426.22

Sub Total Cost (C)

Storm Water Drainage

191.9

Sub Total Cost (D)

Solid Waste Management

141.4

Sub Total Cost (E)

Traffic and Transportation

830

Sub Total Cost (F)

Street Lighting and Fire Fighting

340

Sub Total Cost (G) Urban Poor


Social Infrastructure
Sub Total Cost (H) Health Facilities

4000

Sub Total Cost (I)

Educational Facilities

740

Sub Total Cost (J)

Tourism

606

Sub Total Cost (K)

Other Components

Sub Total Cost (L)

Urban Reforms & Capacity Building

170
40

Total Cost (L)

275

8516