Project co-ordination:
Govindgarh Town
DISTRICT REWA
POPULATION- 10535
ffi-rutd-s ildr-{
6qr68g.6,,';{0q./d}oFjtoYr},
Cqogg)
,r'rFd-.Era rarrra
g.l.l".f 13
cft,
uFtrinr
cqfiq evflTtc gri
qoqo ri.ma
5w
fiors
l+*nq
ftqq:
oTftq
q"6t(q,
fuq?il<r{kr
c{ {rEflld .r: ri
qn,r+
qtft-'ilrd q.n
o1
em dqn
*fto il
L-*-(i'
Yo;5
f.6F
.....
/nlqo
/ ...1g
rtFr;{rrc
A*
Wbf M
qfttufr
f
gt*I
no
>&
crfrdT orffi
sftqq qiff"Eq-d
ilrt
:p1s
fuar
Q-m (qoso)
28.06.2013
qrarq o-qio
r ot
s.qqfrfuR
Irtflrq Fqto-1
trq
fuqt
o1
s-trrE
rilfu'qrrd
3r-Jdrc-q
o{i
emd
vqo
ffiq
+ft:?TT
oi-e 6fir gdrn
qa fi-ors
qrorqfa qR-{fi
gq
YrdA
Ffr
qffie
wnea gRur
RreTr gfrtrr
q-Seq fuo-rs
3rq qe.F
vet gun
qd
422 'ifl{E
241 Alqg
190 arcl
830 dtEI
340 drr
4000 ar{l
275 drEI
740 FllI
1 100 drsl
170 dlcl
40 drI
q09q@
sm
--
5q
6KIqT{/3[qt4
Trn
fu-ar-o
(*
qRg-E
(aouo)
;rrR qRsE
ftrar-t-fl
(qoqo)
City Profile
CompanyName
ULB Name
Yes
24 22'
81 17'
1000-1100 mm
330 M
13.23
13.23
13.23
NA
Town Brief
Population
Historic importance
Population Year 1981 (under Municipal
boundary only)
Population Year 1991 (under Municipal
boundary only)
Population Year 2001 (under Municipal
boundary only)
Population Year 2011 (under Municipal
boundary only)
In one or two
sentences
NA
8,437
9,697
10,535
Town level
11,041
12,380
13,883
Land Use
Land Use
Latitude
Longitude
MM
Mts
Sq kms
Sq kms
Sq kms
Date
Residential
Commercial
Public - semi public
Industrial
Roads
Recreational
Sensitive
Water bodies
Total Developed area
Agriculture / Undeveloped area
Total Municipal Area
1.091
0.031
0.007
0.004
0.367
0.094
4.132
5.726
7.506
13.232
19.05
0.54
0.12
0.07
6.42
1.63
72.16
100.00
56.72
Ward 1
Ward 2
Ward 3
Ward 4
Ward 5
Ward 6
Ward 7
Ward 8
Ward 9
Ward 10
Ward 11
Ward 12
Ward 13
Ward 14
Ward 15
Total
588
0.28
2085.1
303
285
NA
NA
NA
941
47.79
NA
625
0.74
842.9
338
287
NA
NA
NA
849
63.2
NA
731
0.94
774.3
367
364
NA
NA
NA
992
54.58
NA
653
0.12
5543.3
337
316
NA
NA
NA
938
70.9
NA
550
0.75
730.4
305
245
NA
NA
NA
803
73.82
NA
735
0.54
1353.1
381
354
NA
NA
NA
929
57.96
NA
642
0.10
6673.6
318
324
NA
NA
NA
1019
42.06
NA
709
0.31
2309.4
388
321
NA
NA
NA
827
64.6
NA
649
0.07
9140.8
328
321
NA
NA
NA
979
50.39
NA
679
0.68
993.6
363
316
NA
NA
NA
871
64.21
NA
526
0.13
4109.4
273
253
NA
NA
NA
927
60.08
NA
659
0.19
3525.9
345
314
NA
NA
NA
910
73.44
NA
568
0.16
3579.1
287
281
NA
NA
NA
979
56.34
NA
687
0.91
751.4
361
326
NA
NA
NA
903
27.07
NA
696
7.31
95.3
415
281
NA
NA
NA
677
58.05
1
9697
13.23
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
92
118
123
1665
Trade and
Commerce
Trade and
Commerce
Trade and
Commerce
Small HH
level units
NA
111
112
130
111
99
115
107
small acale HH small acale HH small acale HH small acale HH small acale HH small acale HH
or
or
or
or
or
or
manufacturing manufacturing manufacturing manufacturing manufacturing manufacturing
indistries
indistries
indistries
indistries
indistries
indistries
96
126
120
98
107
small acale HH small acale HH small acale HH small acale HH
or
or
or
or
manufacturing manufacturing manufacturing manufacturing
indistries
indistries
indistries
indistries
Primary occupation
(Majority)
Farming
Seconday occupation
Trade and
Commerce
Trade and
Commerce
Trade and
Commerce
Trade and
Commerce
Trade and
Commerce
Farming
Farming
small acale HH
or
manufacturing
indistries
Trade and
Commerce
Farming
Trade and
Commerce
Trade and
Commerce
Tertiary occupation
small acale HH
or
manufacturing
indistries
Farming
Farming
Farming
Farming
Trade and
Commerce
Trade and
Commerce
NA
Farming
Trade and
Commerce
Farming
Farming
Farming
Farming
5109
4588
1751
752
NA
903
57.63
3
Trade and
commerce
Farming
Farming
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Small scale
industries
such as bidi,
soap, pickles,
etc. at HH
scale. No
Major
industries.
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
*
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
*
NA
NA
*
NA
NA
*
NA
NA
NA
NA
NA
NA
NA
NA
*
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
*
NA
NA
*
NA
NA
NA
2264
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
384
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Nil
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
5
78
2
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
0.65
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
% of population NA Open
defecation
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
75 % HH
(7272 person)
No. of Commercial
establishments
No. of Slum pockets
Slum population
No. of Slum Households
No. of Individual water
connections in the ward
No. of Community water
connections
No. of Commercial water
connections
No. of Tubewells
No. of Handpumps
No. of OHTs
% Coverage of piped water
supply
Ward 1
Ward 2
Ward 3
Ward 4
Ward 5
Ward 6
Ward 7
Ward 8
Ward 9
Ward 10
Ward 11
Ward 12
Ward 13
Ward 14
Ward 15
Total
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
700
650
650
500
500
700
600
600
300
400
500
100
930
550
300
7980
970
500
300
300
400
300
300
300
800
500
950
5620
506
958
305
217
282
219
996
462
904
285
346
5480
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of Streetlights
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
407
No. of Electricity
connections
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
1502
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Length of National
Highway
Length of Road side drains
Pucca (Mts)
Length of Natural drains
(Nallah)
Pucca/Channelized (Mts)
41.16
43.75
51.17
45.71
38.5
51.45
44.94
49.63
45.43
47.53
36.82
46.13
39.76
48.09
48.72
678.79
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Govindgarh
fort, Hindu
temples etc.
NA
NA
NA
NA
No. of Residential
properties
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Available Government
land (Sq kms)
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Remarks
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of Commercial
properties
Total Property tax
collection (in Rs.)
Property tax coverage(in
%)
Note: Population data has been given as per the Census-2001. As per the discussion with RGI Census Data for 2011 has not published, which will publish by July 2013.
Sectoral Analysis
Source
Sewerage
Drainage
SWM
Physical Infrastructure
Water Supply
Existing Source
Tubewell/Ha
Well
ndpump
5 Tubewell /
78
Handpumps
2.85 Lakh
MLD
River/Lake/Talab
Raja talab and Raghuraj talab
Roads
Sectoral Analysis
Name of National Highway passing from or nearby from
the town (NHNAXYZ)
NA
NA
13.46 Km
(kms)
5.62 Km
(kms)
Surplus of 1 Km by 2035
Street lighting
NA
4000 (Estimated)
Yes
No
1
2
3
NA
559 poles
407
162
97
NA
NA
148
NA
Location of Substation
http://www.mptransco.nic.in
Power
Physical Infrastructure
NA
33/11KV
NA
NA
NA
1502
NA
NA
NA
5
Sectoral Analysis
Name of Heritage site/s
Ownership/agency
Prevailing Heritage Act/s
Govindgarh fort
NA
NA
Govindgarh fort, shiva tample, Hanuman
temple, Govinf temple' Lal bagh etc.
NA
NA
NA
NA
2
Government
Beds
Private
Beds
NA
NA
NA
Health
No. of Hospitals
Education
No
Name of
town
Distance
(Kms)
Rewa
~20 Km
No. of Colleges
No. of ITI
0
0
Social Infrastructure
0
0
NA
NA
No
NA
NA
The social security pension scheme for old
age, physically challenged and widows etc.
Sectoral Analysis
Slums & Urban Poor
Name of Slum
Ward
pocket/
Notified/ UnNo
reference
notified
name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
Ward no. 1
Ward no. 2
Ward no. 3
Ward no. 4
Ward no. 5
Ward no. 6
Ward no. 7
Ward no. 8
Ward no. 9
Ward no. 10
Ward no. 11
Ward no. 12
Ward no. 13
Ward no. 14
Ward no. 15
Note:
Un-Notified
Un-Notified
Un-Notified
Notified
Un-Notified
Notified
Notified
Slum
Individual
No. of
No. of
No. of
No. of
Ward
population
Slum
water
Community Handpump Individual Community
population of Notified population
connections
taps
s
toilets
toilets
slums
588
NA
NA
NA
625
NA
NA
NA
731
NA
NA
NA
653
NA
NA
NA
550
NA
NA
NA
735
NA
NA
NA
642
NA
NA
NA
709
NA
NA
NA
649
NA
NA
NA
679
NA
NA
NA
526
NA
NA
NA
659
NA
NA
NA
568
NA
NA
NA
687
NA
NA
NA
696
NA
NA
NA
9697
*2025
2264
* Mark shows the Total slum population of notified slums.
Box shows ward having slum population
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of
Pucca
houses
No. of Semi
pucca
houses
No. of
Kuccha
houses
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of
No. of
Permanent Temporary
pattas
pattas
distributed distributed
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of
Primary
school in
the slum
pocket
No. of
Primary
Health
centres in
the slum
pocket
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Beneficiari
Any
es under interventio
social
ns under
security
IHSDP
schemes
(Y/N)
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
SECTORIAL GOALS
YEAR
PHYSICAL INFRASTRUCTURE
DRAINAGE
WATER SUPPLY
Components
2015
2025
2035
Preliminary
estimate
Implementing agency
40%
100%
100%
135
135
135
40%
Quality of water
As
per
Standards
25%
15%
Consumer metering
80%
100%
Cost recovery
100%
100%
40%
80%
100%
10%
70%
100%
80%
100%
100%
100%
WHO As per
Standards
100%
100%
100%
100%
100%
100%
Contract basis
PPP
PPP
PPP
100%
100%
100%
100%
PPP
80%
100%
PPP
60%
PPP
As
per
Standards
GNP
PPP
PPP
100%
80%
WHO As per
Standards
100%
100%
80%
100%
100%
100%
100%
100%
GNP
GNP
100%
100%
100%
Partial
Partial
Partial
80%
70%
Full
Full
Full
100%
100%
Full
Full
Full
100%
100%
Implementation of
Integrated waste
management system.
GNP
241 Lakhs
Including slum area
GNP
GNP
GNP
GNP
GNP, PWD
PPP
ENVIRONMENT
FIRE
FIGHTIN
G
POWER
STREET
LIGHTNING
PHYSIC
HEREITAGE & TOURISM
100%
100%
Road upgradations
50%
100%
100%
Widening/ strengthening
50%
100%
100%
ROBs/flyovers
60%
100%
100%
70%
100%
100%
100%
100%
100%
30%
60%
100%
GNP, PWD
BOOT
Parking facilities
New Installation
Upgradation
Underground cabling
100%
30%
100%
-
100%
70%
100%
70%
100%
100%
100%
100%
GNP, PWD
GNP
GNP
GNP
Contract
Contract
Contract
Contract
Energy savings
70%
100%
100%
GNP
Contract
100% *
100% *
Development of
underground cabling.
100%
100%
100%
100%
100%
100%
340 Lakhs
Including slum area
GNP, PWD
BOOT
GNP, PWD
PPP
GNP, PWD
PPP
GNP, PWD
GNP, PWD
BOOT
GNP, PWD
BOOT
GNP, PWD
PPP
GNP
GNP
GNP
GNP
100% *
100% *
100% *
100% *
GNP
100% *
100% *
100% *
Desilting of nallahs
100% *
100% *
GNP
1100 Lakhs
PPP
PPP
100% *
PPP
GNP
Development of
Govindgarh as transit point
for surrounding tourist
points, development of
water fronts, improvement
of connectivity of tourist
places.
State dovt.
PPP
PPP
Development of water
bodies, plantation,
checking of pollution level,
use of eco-friendly
vehicles, treatment
facilities for wastes etc.
GNP, GoMP
PPP
GNP
GNP
PPP
GNP
PPP
GNP
GNP
HEALTH
EDUCATION
RECREATIONAL
SOCIAL INFRASTRUCTURE
100% *
100% *
100% *
100% *
Literacy rates
100% *
100% *
100% *
Strenthening
infrastructures in health
275 Lakhs
centers and to run health Including slum area
initiative programs.
Provision of co-education,
strengthning of education
740 Lakhs
infrastructures and
Including slum area
opening of vocational
training centres.
Contract
Contract
100% *
PPP
100% *
GNP
Contract / PPP
100% *
100% *
100% *
Development of water
bodies, mini-stadium,
exibition ground,
community halls, public
library etc.
GNP
Included in tourism
100% *
GNP
GNP
GNP
contract
MPHB, GNP
100% *
Recruitment
Contract
4000 Lakhs
PPP
100% *
GNP
100% *
GNP
Contract / PPP
GNP
Contract / PPP
GNP
PPP
GNP
PPP
100% *
GNP
PPP
GNP
GNP
GNP
MPHB, GNP
PPP
PPP
PPP
Education facilities
Community halls etc.
Adequate health facilities
Security of tenure for urban poor
Note:
100% *
100% *
100% *
Provision of Land
ownership, improvement
schemes, relocation of
hazardous slums, pucca
drain network, financial
support for the
construction of houses
Investment
included in other
sectors
100% *
100% *
100% *
100% *
* Marks - project has to be done till year 2035 by GNP, depending upon city need and available resources.
10
Capital Expenditures
Revenue Expenditure
Capital
Receipts
Revenue Income
Municipal Finance (Should be filled carefully and it should be checked whether the capital income is factual or based on assumption
Year
Rates and Tax Revenue
Assigned Revenues & Compensation
Rental Income from Municipal Properties
Fees & User Charges
Sale & Hire Charges
Revenue Grants, Contribution and Subsidies
Income from Investments
Interest Earned
Tax
Non-Tax
Other Income
Total - Revenue Income
Grants, Contribution for specific purposes
Secured Loans
Unsecured Loans
Deposits
Deposit works
Total Capital Receipts
Establishment Expenses
Administrative Expenses
Operations & Maintenance
Interest & Finance Charges
Programme Expenses
Revenue Grants, Contribution and Subsidies
Miscellaneous Expenses
Transfer to Fund
Other
Total - Revenue Expenditure
Fixed Assets
Capital Work-in-Progress
Investments -General Fund
Investments-Other Funds
Stocks/Inventory
Loans, Advances and Deposits
Other Assets
Miscellaneous Expenditure
Total Capital Expenditure
Total Income
Total Expenditure
2005-06
-
2006-07
-
2007-08
-
2008-09
32000
172137
10531216
10735353
7334292
42240
2975037
10351569
-
2009-10
35190
264232
13875928
14175350
9112660
34000
9146660
-
2010-11
34000
340000
17107926
17481926
12697908
33000
894741
13625649
-
Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.
11
Achieved
(Y/N)
2012-13
Full migration of double accounting System
2013-14
2014-15
Preliminary
estimate (if any)
for
implementation
Implementing
agency
2015-16
25%
50%
75%
100%
No
Not Available
UADD
25%
50%
75%
100%
No
Not Available
Nagar Parishad
25%
50%
75%
100%
No
Not Available
Nagar Parishad
25%
50%
75%
100%
No
Not Available
67%
33%
100%
No
30 lakh
50%
75%
100%
No
Not Available
N
N
25%
12
PROJECT CO-ORDINATION
City Managers' Association Madhya Pradesh
Sub Engineer
Govindgarh
Page i
TABLE OF CONTENTS
LIST OF TABLES ------------------------------------------------------------------------------------------------------------------------- VII
LIST OF FIGURES ------------------------------------------------------------------------------------------------------------------------ XI
LIST OF GRAPHS ---------------------------------------------------------------------------------------------------------------------- XIII
EXECUTIVE SUMMARY -------------------------------------------------------------------------------------------------------------- XIV
1.
INTRODUCTION --------------------------------------------------------------------------------------------------------- 2
1.1
1.2
1.3
1.4
1.5
1.6
BACKGROUND -------------------------------------------------------------------------------------------------------------- 2
CONCEPT AND PRINCIPLE OF CITY DEVELOPMENT PLAN ---------------------------------------------------------------- 2
OBJECTIVE OF THE ASSIGNMENT ------------------------------------------------------------------------------------------ 3
UNDERSTANDING OF TERMS OF REFERENCE VIS A VIS METHODOLOGY OF THE STUDY ------------------------------- 3
APPROACH AND METHODOLOGY FOR PREPARATION OF CDP ---------------------------------------------------------- 3
SCOPE OF WORK ----------------------------------------------------------------------------------------------------------- 5
2.
2.1
2.2
2.3
2.4
2.5
2.4.1
2.4.2
2.6
2.7
3.
3.1
3.2
3.3
3.4
3.5
3.5.1
3.5.2
3.5.3
BACKGROUND ------------------------------------------------------------------------------------------------------------ 20
POPULATION TREND AND URBANIZATION ------------------------------------------------------------------------------ 20
POPULATION DENSITY --------------------------------------------------------------------------------------------------- 21
POPULATION PROJECTIONS ---------------------------------------------------------------------------------------------- 23
METHODOLOGY ADOPTED TO ESTIMATE POPULATION ---------------------------------------------------------------- 23
ARITHMETIC PROGRESSION METHOD ----------------------------------------------------------------------------------- 23
GEOMETRICAL PROGRESSION METHOD -------------------------------------------------------------------------------- 24
INCREMENTAL INCREASE METHOD -------------------------------------------------------------------------------------- 25
DMG Consulting Pvt. Ltd., Noida
Page i
4.
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.8.1
4.9
4.10
4.11
BACKGROUND ------------------------------------------------------------------------------------------------------------ 31
SEX RATIO ---------------------------------------------------------------------------------------------------------------- 31
LITERACY RATE ----------------------------------------------------------------------------------------------------------- 31
AVERAGE HOUSEHOLD SIZE --------------------------------------------------------------------------------------------- 31
WORKFORCE PARTICIPATION -------------------------------------------------------------------------------------------- 31
WORKFORCE DISTRIBUTION --------------------------------------------------------------------------------------------- 31
DEPENDENCY RATIO------------------------------------------------------------------------------------------------------ 32
INDUSTRIAL ACTIVITIES -------------------------------------------------------------------------------------------------- 34
INFORMAL BUSINESS AND LOCAL ECONOMY (TRADE & COMMERCE) ------------------------------------------------ 35
HERITAGE AND TOURISM ------------------------------------------------------------------------------------------------ 35
SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 39
ISSUES --------------------------------------------------------------------------------------------------------------------- 39
5.
5.1
5.2
5.3
5.4
5.5
5.5.1
5.5.2
5.5.3
5.5.4
5.5.5
5.5.6
5.5.7
5.5.8
5.6
5.7
5.8
BACKGROUND ------------------------------------------------------------------------------------------------------------ 41
SPATIAL GROWTH TRENDS ---------------------------------------------------------------------------------------------- 41
SPATIAL DISTRIBUTION OF POPULATION -------------------------------------------------------------------------------- 41
LAND-USE ANALYSIS ----------------------------------------------------------------------------------------------------- 42
HOUSING SCENARIO ----------------------------------------------------------------------------------------------------- 44
INTRODUCTION ----------------------------------------------------------------------------------------------------------- 44
HOUSING STOCK---------------------------------------------------------------------------------------------------------- 44
DISTRIBUTION OF HOUSES BY TYPES ------------------------------------------------------------------------------------ 44
CATEGORIES OF HOUSING STRUCTURE --------------------------------------------------------------------------------- 45
DISTRIBUTION OF HOUSES BY USE--------------------------------------------------------------------------------------- 46
OWNERSHIP STATUS ----------------------------------------------------------------------------------------------------- 46
PRESENT AND FUTURE HOUSING DEMAND----------------------------------------------------------------------------- 46
HOUSING GAP ASSESSMENT--------------------------------------------------------------------------------------------- 48
FUTURE GROWTH POSSIBILITIES ---------------------------------------------------------------------------------------- 48
SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 49
CITY SPECIFIC STRATEGIES AND ACTION PLAN-------------------------------------------------------------------------- 50
6.
Page ii
Page iii
7.1
BACKGROUND ---------------------------------------------------------------------------------------------------------- 123
7.2
MADHYA PRADESH TOURISM AND HERITAGE POLICY --------------------------------------------------------------- 123
7.3
PLACES OF TOURIST INTEREST IN AND AROUND THE CITY ----------------------------------------------------------- 124
7.4
TOURIST PLACES NEARBY GOVINDGARH ------------------------------------------------------------------------------ 125
7.5
ARTS & CRAFTS--------------------------------------------------------------------------------------------------------- 126
7.6
EXISTING STATUS OF MAJOR TOURIST DESTINATIONS --------------------------------------------------------------- 127
7.7
EFFORTS FOR CONSERVATION OF HERITAGE SITES ------------------------------------------------------------------- 128
7.8
ASSESSMENT OF TOURISM SUPPORTED INFRASTRUCTURE ---------------------------------------------------------- 129
7.9
KEY CONCERN AREAS FOR TOURISM DEVELOPMENT ---------------------------------------------------------------- 129
7.10
TOURISM DEVELOPMENT OPTION & STRATEGIES-------------------------------------------------------------------- 130
7.11
RECOMMENDED TOURISM DEVELOPMENT PROPOSALS ------------------------------------------------------------- 132
7.12
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 134
7.13
BEST PRACTICE --------------------------------------------------------------------------------------------------------- 134
7.14
SUMMARY OF PROJECTS ----------------------------------------------------------------------------------------------- 135
PROJECT IDENTIFICATION & COSTING------------------------------------------------------------------------------------------------- 136
8.
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9
9.
9.1
9.1.1
9.1.2
9.2
9.3
Page iv
10.
10.1
10.1.1
10.1.2
10.1.3
10.2
10.3
10.4
10.5
10.5.1
10.5.2
10.5.3
10.5.4
10.5.5
10.6
10.6.1
10.6.2
10.6.3
10.6.4
10.6.5
10.7
11.
11.1
11.2
11.3
11.4
Page v
12.
12.1
12.2
12.3
13.
Page vi
LIST OF TABLES
Table 2.3.1: Study Area -------------------------------------------------------------------------------------------------------------- 15
Table 2.4.1: Average Annual Rainfall in Govindgarh -------------------------------------------------------------------------- 17
Table 3.2.1: Comparative Assessment of Urban Population ---------------------------------------------------------------- 20
Table 3.2.2: Population Growth Trends ------------------------------------------------------------------------------------------ 21
Table 3.3.1: Population Density Trends ------------------------------------------------------------------------------------------ 22
Table 3.3.2: Demographics of the Town Govindgarh----------------------------------------------------------------------- 22
Table 3.5.1: Trend of Population Growth in Govindgarh Town ------------------------------------------------------------ 24
Table 3.5.2: Projected Population Arithmetic Progression Method ---------------------------------------------------- 24
Table 3.5.3: Projected Population Geometrical Progression Method -------------------------------------------------- 25
Table 3.5.4: Calculation of Population Projection Incremental Increase Method----------------------------------- 25
Table 3.5.5: Projected Population Incremental Increase Method ------------------------------------------------------ 25
Table 3.7.1: Comparative Assessment of Urban SC & ST Population ----------------------------------------------------- 26
Table 3.8.1: Comparative Assessment of Literacy Rate Govindgarh, M.P. -------------------------------------------- 26
Table 3.8.2: Ward Wise Comparative Assessment of Literacy Rate Govindgarh, M.P. ---------------------------- 27
Table 3.9.1: Comparative Assessment of Sex Ratio --------------------------------------------------------------------------- 28
Table 3.9.2: Ward Wise Comparative Assessment of Sex Ratio Govindgarh, M.P. --------------------------------- 29
Table 4.4.1: Comparative Assessment of Household Size ------------------------------------------------------------------- 31
Table 4.5.1: Comparative Assessment of WFPR ------------------------------------------------------------------------------- 31
Table 4.6.1: Ward Wise Comparative Assessment of WFPR & Work Force Distribution ---------------------------- 32
Table 4.7.1: Comparative Assessment of Non-working Population ------------------------------------------------------- 33
Table 4.7.2: Ward Wise Comparative Assessment of Dependent Population & Dependency Ratio -------------- 33
Table 4.8.1: List of Important Industries in Rewa District and in its surrounding Districts ------------------------- 34
Table 4.9.1: List of Important Centres/Spots for Tourists in Town and in its Proximity ------------------------------ 37
Table 5.3.1: Ward Wise Distribution of Population Density ---------------------------------------------------------------- 41
Table 5.4.1: Existing Landuse Distribution; 2011 Govindgarh------------------------------------------------------------- 42
Table 5.5.1: Comparative Assessment of Household Size ------------------------------------------------------------------- 44
Table 5.5.2: Ward Wise Present Housing Demand and Gap ---------------------------------------------------------------- 47
Table 5.5.3: Present and Future Housing Demand and Gap ---------------------------------------------------------------- 47
Table 6.2.1: Main Sources of Water Supply ------------------------------------------------------------------------------------- 52
Table 6.2.2: Silent Feature of Water Supply System in Govindgarh------------------------------------------------------- 53
DMG Consulting Pvt. Ltd., Noida
Page vii
Page viii
Page ix
Page x
LIST OF FIGURES
Figure 1-1: Specific Objectives of CDP .................................................................................................................. 4
Figure 1-2: Stage 1: Inception ............................................................................................................................... 6
1-3 Kick-off workshops at nagar parishad ............................................................................................................ 7
Figure 1-4: Stage 2: Sector Assessment and City Profile ...................................................................................... 7
Figure 1-5: Stage 3: City Vision and Development Objectives ............................................................................. 9
Figure 1-6: Stage 4: Draft CDP .............................................................................................................................. 9
Figure 1-7: Schematic Diagram for Methodology of City Development Plan Preparation ................................ 10
Map 2-1: Location of Govindgarh ....................................................................................................................... 14
Map 2-2: Regional Connectivity Govindgarh, M.P. ......................................................................................... 15
Map 2-3: Ward Map Govindgarh Nagar Parishad ........................................................................................... 16
Map 3-1: Ward Wise Population Density Govindgarh, M.P. .......................................................................... 23
Map 3-2: Ward Wise Literacy Rate Govindgarh, M.P. ..................................................................................... 27
Map 3-3: Ward Wise Sex Ratio Govindgarh, M.P. .......................................................................................... 28
Figure 4.4-1: Workforce Distribution Govindgarh, M.P. ................................................................................. 31
Figure 4.4-2: Gender Wise Dependency Ratio Govindgarh, M.P. ................................................................... 33
Figure 4.4-3: Rani Talab and Raja Talab in the town near Govindgarh Fort ...................................................... 36
Map 4-4: Tourism in and around Govindgarh Town ......................................................................................... 38
Map 4-5: Tourism in and around Govindgarh Town ......................................................................................... 38
Figure 5-1: Landuse Distribution-I Municipal Area .......................................................................................... 42
Figure 6-1: Water Supply Distribution Arrangements ........................................................................................ 53
Figure 6-2: Concept of Rain Water Harvesting ................................................................................................... 59
Figure 6-3 A view of the bus in Govindgarh passengers boarding on the road ................................................. 88
Figure 6-4 A view of the encroachment along road ........................................................................................... 90
Figure 6-52: Street Light at Old Chowk - Govindgarh ......................................................................................... 97
Figure 6-6: Schools in Govindgarh .................................................................................................................... 109
Map 6-7: Social Infrastructure of Govindgarh ................................................................................................. 111
Figure 4.6-85: Rani Talab and Raja Talab in the town near Govindgarh Fort .................................................. 117
Figure 7-1: Gurh Forest..................................................................................................................................... 125
Figure 8-1: Institutional Setup Govindgarh Nagar Parishad .......................................................................... 138
Figure 9.9-1: Year Wise Total Income, Govindgarh Nagar Parishad................................................................. 145
DMG Consulting Pvt. Ltd., Noida
Page xi
Page xii
LIST OF GRAPHS
Graph 3.1: Population Govindgarh, M.P. -------------------------------------------------------------------------------------- 20
Graph 3.2: Decadal Growth of Population Govindgarh, M.P. ------------------------------------------------------------ 21
Graph 4.1: Gender Wise Work Force Distribution in Different Sectors of Economy ---------------------------------- 32
Graph 2: Financing Option- Water Supply ------------------------------------------------------------------------------------- 174
Graph 3: Financing Option- Sewerage & Sanitation ------------------------------------------------------------------------ 174
Graph 4 Financing Option- Solid Waste Management --------------------------------------------------------------------- 174
Graph 5: Financing Option- Strom water Drainage ------------------------------------------------------------------------- 175
Graph 6: Financing Option-Traffic & Transportation ----------------------------------------------------------------------- 175
Graph 7: Financing Option: Street Lighting & Fire Fighting --------------------------------------------------------------- 175
Graph 8: Financing Option- Urban Poor --------------------------------------------------------------------------------------- 176
Graph 9: Financing Option- Health facility ------------------------------------------------------------------------------------ 176
Graph 10: Financing Option- Education Sector------------------------------------------------------------------------------- 176
Graph 11: Financing Option- Tourism ------------------------------------------------------------------------------------------ 177
Graph 12: Financing Option- Other Components---------------------------------------------------------------------------- 177
Graph 13: Financing Option- Urban Reforms & Capacity Building ------------------------------------------------------ 177
Graph 14: Structure of Reforms-------------------------------------------------------------------------------------------------- 182
Page xiii
EXECUTIVE SUMMARY
Introduction
To meet the requirements of the increasing population of towns, Government of India and government of
Madhya Pradesh have initiated number of programs to deliver the basic services and infrastructure facilities.
Two prominent schemes for the development of small and medium towns are Urban Infrastructure
Development scheme for small and medium towns (UIDSSMT) and Integrated Housing and Slum
development Programme (IHSDP). Other than these there are several programs have been initiated for the
development of urban areas by the Central and State governments.
Under the JnNURM Scheme preparation of City Development Plan is necessary for the sustainable
development of a town. Preparation of a CDP is a planning process and a vision for the future development
of a city which builds and improves the coordination between various stakeholders for efficient and proper
delivery and management of basic services, facilities and resources. DMG Consulting (P) Ltd. has adopted the
process of Targeted Focus Group discussion which will strengthen inclusive planning process for the
development of cities.
This is the Phase-II assignment of GoMP where they are preparing City Development plans (CDP) for 258
towns. In the phase-I stage they already done CDPs for 258 towns. In this Phase DMG Consulting Pvt. Ltd did
CDPs for 7 towns out of the 258 towns.
Based on this programme, GoMP launched Mukhyamantri Sahari Adhusanrachna Bikas Yojana, which is going
to be, funded all the projects proposed in the CDPs to the respective ULB.
Objectives and scope of the Assignment
Behind this exercise major objectives are to involve the local residents in the city development, to find out
the existing problems and issues and their views about improvements and proposals; and efficient
mobilisation of existing resources.
For the preparation of the CDP, scope has been divided in to 4 stages: A) inception: it is the initial stage in
which introduction of CDP and its concept, purpose & outcomes were discussed. This stage also includes
current financial and administrative context and unique features of the city. To find out the issues and
problems different steps had been taken like stakeholder meetings, field reconnaissance, kick-off workshop,
secondary data analysis etc. B) Sectoral assessment and preparation of city profile: In this stage, based upon
survey and interaction with stakeholders, detail sector analysis has been done for different sectors like
transportation, infrastructure, housing, environment, heritage, tourism, socio-economic analysis,
demographic study etc. this stage also includes studies for finding the emerging issues, SWOT analysis,
present gap and future demands of housing, infrastructure, basic services etc. C) Preparation of city vision
and identification of development objectives: in this stage a city vision for 25 years was developed, for the
participation of government and people in the CDP process. To achieve the desired goals and objectives for
the development of city, different strategies and required programmes have been identified for each sector
and for implementation of the project; financial aspect has been seen at sector level. For financial strategy,
resource mobilisation plan has been prepared for remunerative and non-remunerative projects. Sources of
financial support have been identified as government, private-partnership, financial institutions etc. and their
financial sharing in the projects for each sectors has been done. D) Preparation of the final CDP Report:
After incorporating the feedbacks and inputs from stakeholders, the third workshop has been organised for
DMG Consulting Pvt. Ltd., Noida
Page xiv
Page xv
Page xvi
Page xvii
Page xviii
Page xix
Page xx
CHAPTER 1
INTRODUCTION
Page 1
1.
INTRODUCTION
1.1 Background
Madhya Pradesh is urbanizing at a fast pace and the Urban Local Bodies of the state are facing the challenge
of meeting the requirements of the growing population with limited technical and financial resources.
Government of India (GoI) as well as the Government of Madhya Pradesh (GoMP) have initiated a number of
programmes to meet the growing demands of infrastructure and service delivery. Two prominent schemes of
the GoI are: Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT) and
Integrated Housing and Slum Development Programme (IHSDP), while the GoMP has initiated DFID funded
MPUSP which links reform with investment in infrastructure for the poor. Other than these there are several
programmes that have been launched by the GoI and GOMP.
Page 2
1.3
The following objectives have been framed to achieve the goal of City Development Plan:
1.4
To prepare a perspective and Vision for the future development of the city.
To improve and strengthen the municipal services including their delivery and management system and
making them self-sustaining
To suggest policies and programmes that specifically address the issues of urban poor
It is expected that the CDP will serve the requirements of the UIDSSMT and IHSDP programmes as well
as JNNURM and other development schemes
To assist the State government to undertake such urban sector reforms, which facilitate flow of
investments into city based infrastructure
To strengthen the municipal governments, their financial management and accounting processes,
thereby promoting transparency in their functioning.
The understanding of terms of reference under city development plan refers to broad contours of the
assignment including status of the existing infrastructure, supply and demand gap assessment, key issues
and concerns of city development, major economic drivers & opportunities, city vision and positioning of the
city, identifying key projects to achieve the city vision and aspiration of citizens, preparing city investment
plans and phasing of implementation framework including capacity building and reforms to be undertaken
to achieve the envisaged city development goals and vision.
The methodology will document and bring a stepwise process and sequential arrangement of tasks and
activities. These activities will have a set of processes to follow and guidelines to adhere so that the broad
objectives and goals of the study are achieved. In other words, methodology is a set of methods and
techniques employed to achieve the targeted goals/objectives of the proposed study. The understanding of
Terms of Reference is crucial to derive and plan a proper methodology to achieve broad objectives and goals
of the study. Therefore the Terms of Reference (ToR) and methodology are complementary and mutually
inclusive in nature.
1.5
The CDP preparation is both a perspective and a vision for the future development of a city captured through
a consultative process. It presents the current stage of the citys development where we stand now? It sets
out the directions of change where do we want to go? It identifies the thrust areas -- what do we need to
address on a priority basis? It also suggests alternative routes, strategies, and interventions for bringing
about the change what interventions do we make in order to attain the vision? It provides a framework and
vision within which projects need to be identified and implemented. It establishes a logical and consistent
framework for the evaluation of investment decisions.
Page 3
Page 4
Scope of Work
The scope or work of preparation of CDP has been divided into four stages: Inception, Sectoral Assessment
and preparation of City profile, preparation of city vision and identification of development objectives, and,
drafting and submission of the City Development Plan. DMG Consulting Pvt. Ltd. has prepared the CDP in
conformity with the scope defined in the ToR, in close collaboration with the concerned ULB.
Stage 1: Inception
The review and analysis of the current status and unique features of the city with regard to the state of its
development, systems and procedures, as well as its institutional and financial context is taken-up at the
initial stage also known as the inception stage. The main activities include introduction of CDP concept,
purpose and outcome to public representatives like MLA, President, Ward Councillors, citizens forming the
city, along with Chief Municipal Officer - Heads of Nagar Parishad Govindgarh, Departmental Heads and other
personnel involved in the project. Associated tasks involve familiarity visit to city and review of its growth
pattern, identification of growth corridors, collection and collation of information and data from Nagar
Parishad and other line Departments/Agencies/Organizations, . This stage will identify the strengths,
weaknesses and opportunities in the city for its development and will provide an understanding of what
hampers the service delivery and management within the existing set-up and how can it better contribute to
efficient and self-sustaining service provision. This stage involves the following activities.
The assignment commenced with the preliminary meeting with the officials of the Nagar Parishad
Govindgarh to understand their requirements from this assignment.
Reconnaissance
The CDP consultant has conducted introductory meetings with the President, Chief Municipal Officer, Head
of Departments, Councillors, representatives of ongoing urban programmes, etc. to understand the dynamics
and divergent views about the city and to gather secondary information such as - expansion of the city in
respect to the city boundary including land-use or base map for the Nagar Parishad Govindgarh, demographic
profile of the city including data on slums/urban poor, Socio-economic profile, ULBs status in terms of its
functions, strength and composition of various departments, ULBs annual budget reports, ULBs budget
allocations/proposal for coming financial years, other ongoing projects under past and current urban
development programmes , reports giving status of service delivery, relevant documents on heritage listing
and government policy documents etc.
CDP Consultant has had interactions with various institutions, organizations and key stakeholders such as
PHED, Town and Country Planning Department, local residents of various social groups, local NGOs, CBOs
etc. and other line departments, that have any role and responsibility in city planning and administration
with reference to development, delivery and maintenance of urban basic service to the citys population.
Detailed secondary data on the urban infrastructures and services viz. Drinking Water Supply, Drainage,
Sewerage, Sanitation, Solid Waste Management, Roads and street lighting etc was collected through
available documents and reports.
A field reconnaissance has been done with regard to up gradation of base map and various characteristics of
the town such as growth corridors, growth patterns, major physical constraints which limit the citys spatial
growth, major land-use type of the city, exiting planning issues and challenges , housing typology,
development undertaken under public and private sectors including entrepreneur builders, selfconstruction, slum growth and locations, corridors of major development potential, regulations, overview of
urban basic services - drinking water supply system, drainage & sewerage network, sanitation, solid waste
DMG Consulting Pvt. Ltd., Noida
Page 5
Kick-off Workshop
The kickoff workshop is a formal entry level activity to start the city development plan. The consultant
proposed to have one to one meetings with the Mayor, head of Nagar Parishad and heads of the various
departments of the ULB to fix a date, time and venue for a one day kick-off workshop with the identified
various stakeholders to familiarize them with the purpose, process and expected outcomes of the CDP and
build enthusiasm, understanding and commitment to the CDP. A one day kick-off workshop with Nagar
Parishad Govindgarhs support was organized (Dated-21/11/2011).
The kick off workshop helped in deriving a consensus along with the stakeholders firming the process and
agreeing upon a structured programme to take the CDP forward. The formation of the Steering Group will
also be announced as well as the sectors for which detailed analysis will be carried out.
Page 6
Sector Analysis
The sector analysis was carried out in consultation with the local counterparts. Interaction with various
stakeholder groups (meetings, workshops, focus group discussions, etc.), reviewing relevant publications,
reports, GOs, resolutions, procedures, laws etc. to analyse the current situation in each of the identified
sectors. Detailed analysis at this stage included study of physical and demographic characteristics of the
town, socio-economic analysis, infrastructure services, housing and slums, traffic and transportation sector,
environment and forests, heritage conservation and tourism etc.
City/Town Profile
The findings from the sector analysis have been used in preparing the City Profile consisting of assessment of
the existing situation in all the identified sectors, emerging issues, SWOT analysis and analysis of the present
gaps and future requirements.
The framework of parameters includes issues relating to demography, economic base, finance, physical and
environmental issues, infrastructure, and institutions and universalize of services especially for the poor.
Page 7
Page 8
DMG consulting Pvt. Ltd. with support from ULB will organize third workshop involving all the stakeholders,
who have been part of the CDP preparation process. The workshop will seek an endorsement of the City
Development Plan from the stakeholder group present and agree on procedures for performance
monitoring.
The 2nd Stage presentation at the District Level would be organised
The 2nd Stage discussion at the State Level would be organised at the Directorate of Urban Administration
and Development, Bhopal to monitor the progress of the project.
Page 9
Figure 1-7: Schematic Diagram for Methodology of City Development Plan Preparation
Page 10
CHAPTER 2
Introduction to Govindgarh
Page 11
2.
INTRODUCTION TO GOVINDGARH
2.1
Introduction to Rewa
Rewa district is situated in the north-eastern part of the state of Madhya Pradesh in India. It was a princely
state of Vindhya Pradesh. The city lies about 420 kilometres northeast of the state capital Bhopal and 130
kilometres south of the city of Allahabad.
It lies between 240 18 and 250 12 north latitudes and 810 2 and 820 18. The district is bounded on the north
by Uttar Pradesh, on the east and southeast by Sidhi on the south by Shahdol and on the west by Satna.
The district has a varied terrain that includes alluvial plains, hills, ravines, scarp, rivers, and water-falls. The
rain-water of the district flows out along two tributary rivers of the Ganges the Tamas and the Son.
According to the 2011 census, Rewa District has a population of 2,363,744, roughly equal to the nation of
Latvia or the US state of New Mexico. This gives it a ranking of 191st in India (out of a total of 640). The
district has a population density of 374 inhabitants per square kilometre. Its population growth rate over the
decade 2001-2011 was 19.79%. Rewa has a sex ratio of 930 females for every 1000 males and a literacy rate
of 73.42%.
A limestone belt runs through the Rewa district and coal is found in the nearby districts of Shahdol, Umaria,
Sidhi and Singrauli. Cement factories are located in nearby Naubasta, Bela (Satna district) and Bhagwar (Sidhi
district). The Jaypee Group has built a township known as Jaypee Nagar in Rewa. Asia's biggest cement
factory, Prism cement (previously Rasi Cement), operates near Rewa in Satna district. Various Birla Group
Companies, such as Vindhya Tele Links and Birla Ericson Ltd., are also located there.
In 2006, the Ministry of Panchayati Raj named Rewa one of the country's 250 most backward districts (out of
a total of 640 districts in India). It is one of the 24 districts in Madhya Pradesh currently receiving funds from
the Backward Regions Grant Fund Programme (BRGFP).
2.2
Administrative Boundary
Govindgarh, the summer capital of Maharaja Rewa, is about 19 kilometres from Rewa in Madhya Pradesh.
Govind Garh is also known as `Mini Vrindavan` and a large number of famous temples are situated in the
region. Major temples are Ram Govind Temple, Panchmukhi Temple, Chowandi Temple, Shiva Temple and
Hanuman Temple. All these temples are within the vicinity of the famous Govind Garh Fort. It is also believed
that the name Govind Garh was based on the Govind Temple; build by Maharaja Venkat Raman Pratap Singh,
now situated within the Govind Garh Fort Premises.
The town also holds an important place in the history of India. It is famous for its royal history and structures
such as Govindgarh Fort. Besides being known for its various monuments and history the city has also been
known for its agricultural and some economic activities.
Geographically, the town lies at 2422 north latitude and 8117 east longitude at an altitude of about 330
meter above mean sea level in Baghelkhand Region. The town is divided into 15 wards.
Page 12
Located in the North-eastern part of Rewa District, Govindgarh town is well connected to the rest of the
towns of M.P. and U.P. by Road. Govindgarh is famous as the birth place of White tiger. The famous Sunderja
mango variety is a medal winner variety. The town forms the valley of the Chhuiya hill.
Roadways
Two state highways i.e. State Highway 9 and 52 pass through the town making it accessible to the other
nearby areas. The town is also well connected to rest of the towns of by other major district roads at regional
level.
Railway Linkage: Govindgarh town is not directly linked to other places directly by the Indian Railway
System; the nearest railway station being Rewa Junction, the district headquarters at a distance of 19
kilometres followed by Allahabad at a distance of 148 km.
Airways: The nearest airport is Satna Airport at a distance of 54 km. which has an airstrip but is however not
in use for regular fights followed by Bamrauli (Defence Air Base) near Allahabad in Uttar Pradesh which is
approximately 161 km. from Govindgarh.
Page 13
Page 14
2.4
Study Area
The study area Govindgarh Town covers an area of about 13.25 sq. Km. under the jurisdiction of
Govindgarh Nagar Parishad (GNP). For the administration and management of civic needs & services for a
total population of about 10535 (as per Census - 2011), the town is divided into 15 wards represented by
ward councillors elected by the citizens. Figure 2.3 describes the Study Area: Govindgarh Nagar Parishad.
Table 2.4.1: Study Area
Administrative Body
Govindgarh
Parishad.
Nagar 13.25
Area (HA)
1325.00
Remarks
Semi-Urban Area
Most of the area under GNP is agricultural
and recreational spaces.
The area has lot of potentials for the
development.
Page 15
2.5
Physical Characteristics
2.5.2. Climate
The climate of this zone can be divided into three distinct seasons, namely,
The climate of the area is characterised by hot and dry summers and mild winters. Annual precipitation in the
town ranges from 1000 to 1500 mm.
Page 16
Sl. No.
Year
1999
1484
2000
1478
2001
1478
2002
1015
2003
1492
2004
1774
2005
780
2006
1063
2007
1063
The rainfall distribution pattern is irregular. Approximately 90% of all rainfall in the region caused by the
monsoon falling from June to October accounts for average annual rainfall of about 950-1100 mm but most
of it gets lost due to runoff. July and August are the months of maximum rainfall. April is the driest month of
the year, the scant winter rainfall is useful for the cultivation of Rabi crops but is usually inadequate without
access to supplementary irrigation purposes.
2.6
The main crops of the region are rice, millets and wheat. More than one-third of the area is covered with
forests, yielding timber and there are some cement factories as well in the vicinity of Govindgarh.
The chief means of subsistence of the people in this region is agriculture. The area has a very high yield of
Soyabean, Grain and Masoor. Wheat is the other major crop produced in this region.
The town has small scale manufacturing industries such as Bidi making works etc. There are not many big or
large scale industries in Govindgarh town producing industrial products.
At regional level, the region is rich in valuable minerals, forests and wild animals. Bauxite, coal, lime, basalt,
iron ore, etc are some of the minerals available in abundance in this region. A rich store of fuel exists in the
coal-seams of the Barakar group in the Gondwana series. The colliery at Umaria has been successfully
worked for many years, and the Johilla coal field contains coal of even better quality.
The prevalent trees in the forests of Rewa District are sagon, sal, tendu, shishum, bambaoo etc. The
brushwood consists mainly of the species Grewiazizyphus, Casearia, Antidesma, Woodfordia, Flueggia,
Phyllanthus, Bosewellia and Buchanania with occasional trees of mahua (Bassialatifolia).
Govindgarh or can be said the district Rewa is famous for white tigers. The first white tiger Mohan was
captured in 1951 in the nearby jungles was kept in this palace till his death. The unusual coloration of white
tigers has made them popular in zoos and entertainment showcasing exotic animals. The magicians Siegfried
& Roy are famous for breeding and training two white tigers for their performances, referring to them as
"ROYAL WHITE TIGERS", referring to the white tiger's association with the Maharaja of Rewa.
Rewa Maharaja Martand Singh first observed male white tiger Mohan during his visit to Govindgarh jungle at
Rewa, Madhya Pradesh. After hunting for months, he was able to capture the first living white tiger seen in
nature. With the help of veterinary experts, he unsuccessfully tried to breed the white tiger with coloured
Page 17
2.7
SWOT Analysis
STRENGTH
WEAKNESS
The town is not directly linked with Indian
Railway System
No initiatives for River front development
Development is mainly confined along the
state highway 9 and 52 and important roads
passing through the city.
OPPORTUNITY
THREAT
Page 18
CHAPTER 3
Demographic Profile of the Town
Page 19
3.
3.1
A demographic profile has been prepared based on analysis of census data, data from GNP and other
secondary sources and discussion with GNP. The analysis covers, apart from the population growth and
trends in the town, an assessment of the other social characteristics of the population including literacy,
education, gender etc. These analyses, together with the economic base will form the basis for working out
the growth scenarios for the town.
3.2
As per the Census of India, 1991 the total population of Govindgarh town was about 8437 which increased to
9697 in year 2001 with decadal growth rate of 14.93 %. This population increased to 10535 in the year 2011
with a decadal growth rate of 8.64 %. This decreased decadal growth rate is very significant for an emerging
town like Govindgarh. It gives an inference that the population of the town is increasing but at a lower rate
which means the thinking and perception of the public is changing toward the population increment.
Alternatively, it can also be surmised that there is considerable outflow of the population to other areas; a
reflection of lesser economic opportunities in the Nagar Parishad area.
Table 3.2.1: Comparative Assessment of Urban Population
Area
Total Population
Urban
Population
Male
Female
Decadal Growth
Rate 2001-2011
Urban India
37,71,05,760
19,58,07,196
18,12,98,564
31.80%
2,00,59,666
1,04,70,511
95,89,155
25.63%
3,95,487
2,07,771
1,87,716
23.40%
10,535
5,418
5,117
8.64%
Population
12000
10000
9697
10535
8437
8000
6000
4000
2000
0
1981 to 1991
1991 to 2001
2001 to 2011
Page 20
Year
Population
GNP
Rewa District
GNP
Rewa District
1951 - 1961
7,72,925
1961 - 1971
9,77,782
26.50
1971 - 1981
12,07,598
23.50
1981 - 1991
8437
15,54,987
28.77
1991 - 2001
9697
19,72,333
14.93
26.84
2001 - 2011
10535
23,63,744
8.64
19.85
At district level the decadal population growth rate is also highly skewed during the period 1961-2011. The
average decadal growth rate during 1961-1971 was 26.5% which declines to 23.50% in 1971-1981 and
increased to 28.77% in 1981-1991 and subsequently declined to 26.84% during 1991-2001 and 19.85% in
2001-2011. This is because of out migration in search of livelihood as the Rewa District itself does not have
much potential in terms of education & health facilities, economic opportunities to cater the growing
population.
26.84
25
19.85
20
14.93
15
8.64
10
5
0
0
1
Decadal Growth Rate (%) GNP
3.3
Population Density
As per the Census of 2001, the gross density of Govindgarh town is 7 persons per hectare which is increasing
continuously.
Page 21
Year
Population
Area in Hectare
Density (pph)
1991
8,437
1323.00
13.23
638
2001
9,697
1323.00
13.23
733
2011
10,535
1323.00
13.23
796
As far as distribution of population within the town is concerned, ward number 3, 6 and 8 have the maximum
concentration of population as per Census 2001. Only ward no. 3, 4, 6, 8, 10 and 14 accounts for more than
43% of total population of GNP. As far as population density is concerned, the core and old areas of the town
including some outer areas are densely populated. The lowest is 1 person per hectare in ward no. 15 because
it has more agricultural area and water bodies while the highest is 91.41 persons per hectare in ward no. 9.
Ward No. 4 and 7 have high population density with more than 50 persons per hectare. According to the
UDPFI guidelines, a small town should have an average population density of 75-125 population per hectare.
But in this town population density is only 8 persons per hectare.
The average household size for the town is 5.8 persons in 2001. At ward level, the average household size is
less than the towns average in all the wards except ward no. 4, 6, 7, 8, 12 and 13. The average household
size is lowest in ward no. 9 i.e. 5.2 persons while ward no. 8 have the highest i.e. 7.4. The Ward Wise
Demographics of the town is given below.
Table 3.3.2: Demographics of the Town Govindgarh
Ward No.
Ward No.1
Ward No.2
Ward No.3
Ward No.4
Ward No.5
Ward No.6
Ward No.7
Ward No.8
Ward No.9
Ward No.10
Ward No.11
Ward No.12
Ward No.13
Ward No.14
Ward No.15
Total
No. of HH
111
112
130
111
99
115
107
96
126
120
98
107
92
118
123
1665
Population
Male
Female
Total
303
338
367
337
305
381
318
388
328
363
273
345
287
361
415
5109
285
287
364
316
245
354
324
321
321
316
253
314
281
326
281
4588
588
625
731
653
550
735
642
709
649
679
526
659
568
687
696
9697
Avg.
HH Size
5.3
5.6
5.6
5.9
5.6
6.4
6.0
7.4
5.2
5.7
5.4
6.2
6.2
5.8
5.7
5.8
Area
(in ha.)
28.2
74.15
94.41
11.78
75.3
54.31
9.62
30.7
7.1
68.34
12.8
18.69
15.87
91.43
730.5
1323.20
Population
Density (pph)
21
8
8
55
7
14
67
23
92
10
41
35
36
8
1
8
Page 22
3.4
Population Projections
The population growth rate of the town has started declining since 1991 as per Census of India. The average
decadal growth rate of Govindgarh town for past 3 decades is 117.6%. The design populations for the next 25
years have been forecast for Govindgarh. The exercise has been done taking into account the population of
past decades and as per the guidelines detailed out in CPHEEO Manual. Looking to the factors governing the
future growth and development of Govindgarh Town like location, educational, industrial, commercial
(including investment from outside), tourism, social and administrative aspects, it is felt that the most
suitable method for population projection will be Geometrical Progression Method. However, other
methods suggested have also been followed.
3.5
For populations projection Plan Period three methods i.e. Arithmetic Progression Method, Geometrical
Progression Method and Incremental Progression Method were adopted.
Page 23
Years
1991
2001
2011
Population
8437
9697
10535
10535 9697
= 838
9697 8437
= 1260
TOTAL: 6039
Average increase per decade
= 1049
= 699
Formula = (Recent year population + Average increase per five year) Taking this into consideration the future
population will be:
Table 3.5.2: Projected Population Arithmetic Progression Method
Years
2011 (Base Year)
2012
2013
2014
2015
2020
2025
2030
Population
-2012
4025
6039
8054
10074
12099
14129
2035
16164
= 8.6 %
(9697 8437)*100/8437
= 14.93 %
TOTAL:
= 97.53%
= 117.6 %
= 16.25%
= 11.76 %
Formula: (Recent year population + (Recent year population * Average increase per five year)
Page 24
Years
2011 (Base Year)
2012
2013
2014
2015
2020
2025
2030
2035
Population
10535
10659
10785
10912
11041
11691
12380
13110
13883
Year
Population
1981
0
1991
8437
2001
9697
2011
10535
TOTAL
Average per decade
Average per five years
Average per year
Total five year (1006.5 92)
Total per year (201 18.4)
Incremental Increase
0
0
0
-422
-422
-422
-211
-42.2
Years
2011 (Base Year)
2012
2013
2014
2015
2020
2025
2030
2035
Population
10535
10598
10660
10723
10786
11099
11413
11726
12040
Page 25
Incremental Increase method followed by Arithmetic Progression Method has given very less
population and is not the suitable method for a town like Govindgarh which has very good prospects
of growth in near future.
Geometric Progression Method gives higher population as compared with Incremental Increase
through arithmetical progression method and is suitable & closer to reality as the town with
abundant agricultural land is located very much closer to district headquarters Rewa and has
substantial investment opportunity in various sectors escorting the development of town.
Thus the population has been taken as calculated by Geometric Progression Method.
3.7
As per 2001 Census, out of the total population the Govindgarh Nagar Parishad had 18.05% (1751) of
Schedule Caste (SC) Population which is more than the National Average and District Average while 7.75 % of
total population accounts for Schedule Tribe (ST) Population in the town.
Table 3.7.1: Comparative Assessment of Urban SC & ST Population
Area
Urban India
Madhya Pradesh
Rewa District
Govindgarh Nagar Parishad
% of SC
Population
11.75%
23.72%
11.67%
18.05 %
% of ST
Population
2.44%
4.93%
6.19%
7.75 %
3.8
Literacy Rate
Literacy, being an important indicator of social development, affects the demographic characteristics and
work force participation.
As per 2001 Census, the average literacy rate of Govindgarh town was 57.45 % which has increased to
66.55% as per 2011 Census but it is lower as compared to the District Average of 73.42 %. The male literacy
rate as per census 2011 is high as 75.97 % while female literacy rate is a significant 56.58 %. The status of
women in terms of literacy has been significantly low at town level; this lower literacy rate may be due to the
absence of proper education facilities and the backwardness of the area. The lower female literacy rate may
be due to absence of social awareness. But due to pace of time the literacy rate has increased from the
previous decade, because of introduction of schemes to promote the education system in MP, like,
Improvement in Science Education Scheme, Modernisation Scheme of Madarsa Education, Integrated
Education for Disabled Children, Computer Literacy and Study Scheme in Schools, District Primary Education
Programme, Sarva Shiksha Abhiyan, Education Gaurantee Scheme etc.
Area
Urban India
Madhya Pradesh
2011
89.67
90.24
Female
2001
72.86
70.47
2011
79.92
77.39
Page 26
62.01
57.45
73.42
66.55
75.65
69.58
83.67
75.97
47.58
43.94
62.49
56.58
Source: Census of India, 2001 & Provisional Figure, Census of India 2011.
Ward No.
Ward No.1
Ward No.2
Ward No.3
Ward No.4
Ward No.5
Ward No.6
Ward No.7
Ward No.8
Ward No.9
Ward No.10
Ward No.11
Ward No.12
Male
Female
47.79
63.20
54.58
70.90
73.82
57.96
42.06
64.60
50.39
64.21
60.08
73.44
59.08
76.63
67.57
85.46
82.30
69.03
54.72
76.80
66.16
75.48
71.43
82.61
35.79
47.39
41.48
55.38
63.27
46.05
29.63
49.84
34.27
51.27
47.83
63.38
Page 27
56.34
27.07
58.05
57.45
72.47
34.07
70.60
69.58
39.86
19.33
39.50
43.94
3.9
Sex Ratio
The ratio between the number of males and the number of females is expressed in number of females per
1000 males. The sex ratio measures the extent of prevailing equity between males and females in the
project area.
Table 3.9.1: Comparative Assessment of Sex Ratio
Area
Sex Ratio
Sex Ratio
(0-6 Age Group)
2001
2011
2001
2011
2001
2011
2001
2011
Urban India
900
926
906
902
923
944
Madhya Pradesh
898
916
907
895
907
912
Rewa District
941
930
926
883
939
924
903
944
937
716
845
Source: Census of India, 2001 & Provisional Figure, Census of India 2011.
Map 3-3: Ward Wise Sex Ratio Govindgarh, M.P.
Page 28
Ward No.
Sex Ratio
Ward No.1
Ward No.2
Ward No.3
Ward No.4
Ward No.5
Ward No.6
Ward No.7
Ward No.8
Ward No.9
Ward No.10
Ward No.11
Ward No.12
Ward No.13
Ward No.14
Ward No.15
GNP
941
849
992
938
803
929
1019
827
979
871
927
910
979
903
677
898
1089
872
1119
1179
773
750
942
864
917
885
833
932
1294
947
655
922
WEAKNESS
Literacy rate among females is low as compared
to males.
Sex Ratio of Town is less than the average of
District, M.P and Urban India which means town
has out-migration trend due to lack of job
opportunities.
Sex-ratio among 0-6 age group is declining,
discouraging girl child birth.
OPPORTUNITY
THREAT
Page 29
CHAPTER 4
Socio - Economic Profile of the Town
Page 30
4.
4.1
Background
Socio-economic profile reflects the sociological and economical characteristics of the city, which may include
Sex-ratio
Literacy rate
Household characteristics
Workforce participation rate
Industrial activities
Trade and commerce
Tourism etc.
In this section, an analysis has been done to identify the socio-economic profile of Govindgarh and major
issues have been addressed. No data assessment of the economic base of the city is possible as, essential
town-wise economic information is not readily available. It can, however, be conjectured that the dominant
sector of the economy of Govindgarh is the primary sector followed by tertiary and secondary sectors.
4.2
Sex Ratio
The ratio between the number of males and the number of females is expressed in number of females per
1000 males. The sex ratio measures the extent of prevailing equity between males and females in the project
area.
As per the Census 2001, the sex ratio in the Govindgarh Town is 898 females per 1000 males which increased
to 944 females per 1000 males in 2011. The average national sex ratio for urban India, Madhya Pradesh and
Rewa District are 926, 916 and 930 female per 1000 males respectively as per the Census 2011.
4.3
Literacy Rate
Demographic characteristics
Participation in labour
As per the Census 2011, the average literacy rate of Govindgarh town has increased to 66.55 % from 57.45 %
in 2001 Census. The status of women in terms of literacy has been significantly low. The male literacy rate as
per 2011 Census is high as 75 % while female literacy rate is significant at 69%.
4.4
The total number of households in Govindgarh Town as per Census 2001 is 1665. The average household size
in Govindgarh Town is 5.6 persons. A comparative assessment of urban population indicates that the average
household size of the town is higher than the district average of 5.44 and national average of 5.12. The state
average is also higher at 7.27 persons per household.
Table 4.4.1: Comparative Assessment of Household Size
Area
Total Population
Household
Average HH Size
Urban India
28,61,19,689
5,58,32,570
5.12
1,59,67,145
21,95,725
7.27
3,62,657
5.44
1665
5.6
Rewa District
Govindgarh Nagar Parishad
9697
Page 31
Workforce Participation
As per the 2001 Census, Govindgarh Nagar Parishad has a normal Work Force Participation Rate (WFPR) and
it is recorded at 38.66 % indicating low dependency ratio, while the National Urban average accounts for
32.25%.
Table 4.5.1: Comparative Assessment of WFPR
Area
Total
population
Workers
Total
Male
Female
Urban India
28,61,19,689
9,22,78,654
7,61,75,323
16,103,331
32.25
1,59,67,145
48,93,293
39,88,452
9,04,841
30.65
Rewa District
19,73,306
8,62,959
5,02,107
3,60,852
43.73
3749
2428
1321
38.66
Govindgarh
Parishad
Nagar 9697
WFPR (%)
4.6
Workforce Distribution
Work force distribution indicates the economic base of any city or town. There are a total of 3749 workers in
the town as per the Census 2011 and majority of workers are engaged in tertiary activities such as trade &
commerce. The share of work force involved in trade & commerce (tertiary sector) is 55%. The primary sector
(including cultivators & agricultural labourers) and secondary sector (small scale house hold or manufacturing
industries) constitutes 16% and 29% of total work force respectively.
9%
Cultivators
Agricultural
Laborers
55%
House Hold
Industries
29%
Others
Page 31
In Percentage
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
Total WFPR
Primary
Secondary
Tertiary
Male
64.76
50.82
40.38
81.39
Female
35.24
49.18
59.62
18.61
Graph 4.1: Gender Wise Work Force Distribution in Different Sectors of Economy
Table 4.6.1: Ward Wise Comparative Assessment of WFPR & Work Force Distribution
Ward No.
Total
Population
108
Total
WFPR
(%)
41.16
Total
Male
Female
588
242
134
625
238
158
80
731
301
167
653
263
550
Primary
Secondary
Tertiary
67.77
23.97
8.26
38.08
7.56
34.87
57.56
134
41.18
1.99
43.85
54.15
176
87
40.28
11.03
29.66
59.32
168
124
44
30.55
0.60
30.36
69.05
735
251
178
73
34.15
15.94
5.98
78.09
642
264
155
109
41.12
38.26
2.65
59.09
709
240
160
80
33.85
64.17
0.00
35.83
649
274
146
128
42.22
10.22
34.31
55.47
10
679
166
146
20
24.45
9.64
6.02
84.34
11
526
207
134
73
39.35
2.90
33.82
63.29
12
659
205
150
55
31.11
3.41
26.34
70.24
13
568
269
155
114
47.36
5.58
63.20
31.23
14
687
373
217
156
54.29
2.95
58.71
38.34
15
696
288
228
60
41.38
4.86
8.33
86.81
Govindgarh
9697
3749
2428
1321
38.66
16.27
28.41
55.32
4.7
Dependency Ratio
The average dependency ratio for Govindgarh Town is 61.34 % which indicates that GNP has higher level of
dependent population in comparison to District Average. Like most of the cities or town, females constitute
higher proportion of dependent population of more than 60 % of total number of non-working population.
Page 32
Area
Total
population
Non-Workers
Total
Male
Female
Urban India
286119689
193841035
74378775
119462260
67.74
15967145
11073852
4424107
6649745
69.35
Rewa District
1973306
862959
502107
360852
56.27
5948
2681
3267
61.34
Govindgarh
Parishad
Nagar 9697
Dependency
Ratio (in %)
The dependency ratio within the town indicates that Ward Nos. 2, 5, 6, 8, 11 and 12 have 60% or more
dependent population.
This dependency may be due to the presence of children and old age people as they come under nonworking population.
45%
Male
55%
Female
Ward No.
Total
Population
Total
Male
Female
Total
Male
Female
588
346
169
177
58.84
48.84
51.16
625
387
180
207
61.92
46.51
53.49
731
430
200
230
58.82
46.51
53.49
653
390
161
229
59.72
41.28
58.72
550
382
181
201
69.45
47.38
52.62
735
484
203
281
65.85
41.94
58.06
642
378
163
215
58.88
43.12
56.88
709
469
228
241
66.15
48.61
51.39
649
375
182
193
57.78
48.53
51.47
Page 33
679
513
217
296
75.55
42.30
57.70
11
526
319
139
180
60.65
43.57
56.43
12
659
454
195
259
68.89
42.95
57.05
13
568
299
132
167
52.64
44.15
55.85
14
687
314
144
170
45.71
45.86
54.14
15
696
408
187
221
58.62
45.83
54.17
Govindgarh
9697
5948
2681
3267
61.34
45.07
54.93
4.8
Industrial Activities
The town has no major industries within its vicinity. There are some cement factories in the nearby area.
Apart from Small Scale Household Industries, there are some large industrial units within Rewa District and
also in the surrounding districts which providing direct and indirect employment to the residents of the town.
The important industries found in and around Rewa District have been listed in the table below includesTable 4.8.1: List of Important Industries in Rewa District and in its surrounding Districts
District/Town
Rewa
Satna
Sidhi
Singrauli
Allahabad
Important Industries
Page 34
Chitrakut
Mirzapur
Recron
Farming, Agricultural Produce and Agro-based industries.
Carpets and Cotton Durries Manufacturing Industries
Metal Pots (Brass) Manufacturing Industries
Cement Manufacturing Industry established by JAYPEE group at Chunar
Mineral Based Industries
Agricultural Produce and Agro-based industries
Figure 4.3: Major Markets/Commercial and Wholesale Trading Areas of the Town
4.9
At town level, Govindgarh has many tourist destination and heritage buildings along with some natural
elements such as nallah, pond and water bodies.
HERITAGE:
1) Govindgarh fort
RELIGIOUS:
1) Ram Govind Temple
DMG Consulting Pvt. Ltd., Noida
5) Shiva Temple
6) Hanuman Temple
1) Raja Talab
2) Nallah and pond
The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands. It is a small Island within the lake which is known for its scenic beauty and lush
green surroundings. The Sunderja Mangoes of the Govindgarh are famous in the country. The people of the
area are decent and have higher human values. The law and order situation of the area is also good. This is
being developed as a future tourist destination to attract International Tourists.
Govindgarh is also known as `Mini Vrindavan and a large number of famous temples are situated in the
region. Major temples are Ram Govind Temple, Panchmukhi Temple, Chowandi Temple, Shiva Temple and
Hanuman Temple. All these temples are within the vicinity of the famous Govindgarh Fort. It is also believed
that the name Govindgarh was based on the Govind Temple now situated within the Govind Garh Fort
Premises. Khando Devi temple is another destination for the tourists in Govindgarh, which was founded by
Maharan Pratap.
Figure 4.4-3: Rani Talab and Raja Talab in the town near Govindgarh Fort
Page 36
Tourist Spot
Location
Page 37
Page 38
WEAKNESS
OPPORTUNITY
THREAT
4.11 Issues
The overall population of Govindgarh is increasing but decadal population growth rate is decreasing from
last three decade because the town has lack of economic activities which causes migration of people to
other cities.
Town is rich in natural and architectural heritage but there is no management of these resources. In other
words, there is a lack of conservation in the town.
Town does not have a dumping site as a result of which, waste is disposed into open drains and along the
roads. It is a cause of pollution in water bodies.
o
o
o
o
o
Page 39
CHAPTER 5
Physical Planning and Growth
Management
Page 40
5.
5.1
Urban land-use planning, attempts to achieve an optimal spatial coordination of different human activities
for enhancement of quality of life. It plans for community growth and development based on optimal landuse planning, urban design, economic and environmental planning principles. This chapter highlights the
analysis of general spatial growth pattern, directions and land-use distribution of the town.
5.2
The total area of Govindgarh Nagar Parishad is about 13.25 sq. Km. with a population of about 10,535 as per
2011 Census. Out of the total area, the town has approximately 43 % developed area and 57 % undeveloped
area or agricultural land.
The spatial growth pattern suggests that the town is predominantly developing along the state Highway 52
and State Highway 9. The development has also occurred along Rewa road; Ameen Road. These areas have
high density across the road with residential and commercial landuse. Half of the area of Govindgarh is
undeveloped and is categorised under recreational spaces in the form of Govindgarh Fort, Sundar-van, Raja
Talab etc.
5.3
As per Census 2001, Govindgarh had a total population of 9697 which has increase to 10535 in 2011 and this
population distribution is uneven in the whole area. The development pattern is apparent in the density
pattern of the municipal area. Gross density of Govindgarh town is 7 persons per hectare and net density is
18 persons per hectare.
Density varies from one ward to the other and the core or inner areas of the town are densely populated. It is
evident that the pressure of development is more along the State Highway 52 and 9.
Table 5.3.1: Ward Wise Distribution of Population Density
Ward No.
Area in Hectare
% to Total Area
Total Population
Population
(pph)
Ward No.1
Ward No.2
Ward No.3
Ward No.4
Ward No.5
Ward No.6
Ward No.7
Ward No.8
Ward No.9
Ward No.10
Ward No.11
Ward No.12
Ward No.13
Ward No.14
Ward No.15
Total
28.2
74.15
94.41
11.78
75.3
54.31
9.62
30.7
7.1
68.34
12.8
18.69
15.87
91.43
730.5
1323.2
2.13
5.60
7.13
0.89
5.69
4.10
0.73
2.32
0.54
5.16
0.97
1.41
1.20
6.91
55.21
100.00
588
625
731
653
550
735
642
709
649
679
526
659
568
687
696
9697
21
8
7
55
7
14
67
23
91
10
41
35
36
8
1
7
Density
Page 41
Land-use Analysis
The study of land-use pattern would enable us to understand the city as envisaged in the past and the
direction of its future growth and development. A change in land-use is inevitable over time and reflects the
needs and demands of the residents of the city. This section deals with the existing land-use of the town.
At present the total municipal area of Govindgarh town is 1323 Ha out of which current developed area is
572.68 Ha. (43.28 %) and 750.59 Ha. (56.72 %) area is undeveloped or agricultural land. This undeveloped
area consists of recreational and agricultural spaces. In the case of Govindgarh this undeveloped area is not a
bad situation rather it is a potential for the area.
The table below highlights the existing land-use pattern of the municipal area which has been tentatively
carried out by DMG based on Google image, town map provided by the Nagar Parishad followed by survey in
due consultation with officials of Govindgarh Nagar Parishad.
Table 5.4.1: Existing Land use Distribution; 2011 Govindgarh
Land use
Area in Hectare
Percentage
Remarks
Residential
109.12
19.06
Commercial
3.1
0.54
Industrial
0.4
0.07
0.7
0.12
Recreational
9.35
1.63
Circulation
36.74
6.42
Water Body
413.21
72.16
572.6
43.28
750.59
56.72
1323.21
100.00
With existing developed area, 19.06 % of the total land-use is residential. A large area (72.16 % of the total
land-use) is under water body followed by 6.42 % under agriculture, 0.54 % as commercial, and 0.12 % as
public and semi-public area while 0.07 %area is under industrial use.
43%
developed area
57%
undeveloped area
Page 42
Landuse Distribution
19%
1%
0%
0%
2%
6%
Residential
Commercial
Industrial
Public/Semi public and Public
Utilities
Recreational
72%
Circulation
Map 5.1: Existing Land use Map; 2011 Govindgarh Nagar Parishad
Page 43
Housing Scenario
5.5.1 Introduction
Housing is a basic social need of each and every individual. It is an important determinant of the quality of life
of the people thus it needs to be addressed properly and judiciously. Adequacy of housing stock,
construction quality, the number of occupants in proportion to the number of rooms and the provision of
basic amenities are all important determinants of development. Hence, tackling housing needs to fulfil the
demand for the same is an important component of any city Development Plan. In Govindgarh housing
development is done by Madhya Pradesh Housing Board (MPHB) and private builders.
Area
Total Population
Household
Average HH Size
Urban India
28,61,19,689
5,58,32,570
5.12
1,59,67,145
21,95,725
7.27
9697
1655
6.5
39%
permanent
61%
semi-permanent
Page 44
0.05%
0.00%
0.18%
0.00%
Grass, Thatch, Bamboo etc.
Plastic, Polythene
Mud, Unburnt Brick
40.86%
Wood
55.31%
0.14%
0.09%
0.14%
11.36%
Slate
0.09%
2.59%
0.05%
68.28%
Brick
Page 45
0.00%
25.58%
67.59%
6.09%
0.28%
0.00%
Mud
Wood, Bamboo
Brick
Stone
Cement
Mosaic, Floor tiles
Any other material
2.77%
Owned
Rented
Others
93.87%
Figure 5.7: Housing Ownership Status Govindgarh Nagar Parishad
Page 46
Ward No.
Total No. of HH
Total
Population
Avg. HH Size
Housing
Demand
Housing
Gap
Ward No.1
111
588
5.3
118
Ward No.2
112
625
5.6
125
13
Ward No.3
130
731
5.6
146
16
Ward No.4
111
653
5.9
131
20
Ward No.5
99
550
5.6
110
11
Ward No.6
115
735
6.4
147
32
Ward No.7
107
642
6.0
128
21
Ward No.8
96
709
7.4
142
46
Ward No.9
126
649
5.2
130
Ward No.10
120
679
5.7
136
16
Ward No.11
98
526
5.4
105
Ward No.12
107
659
6.2
132
25
Ward No.13
92
568
6.2
114
22
Ward No.14
118
687
5.8
137
20
Ward No.15
123
696
5.7
139
16
Total
1665
9697
5.6
1940
276
Based on the above assumptions, at present there is a demand supply gap in housing, there is a shortfall of
276 houses. This indicates that there is a demand for housing. The demand gap is highest in ward no. 8, 6 and
14 located in periphery and core areas of the town.
Table 5.5.3: Present and Future Housing Demand and Gap
Year
Total Population
Existing Supply
Housing Demand
Housing Gap
2011
2012
2013
2014
2015
2020
2025
2030
Non-Slum
8271
8369
8467
8567
8668
9179
9720
10293
Slum
2264
2291
2318
2345
2373
2512
2661
2817
Non-Slum
760
760
760
760
760
760
760
760
Slum
208
208
208
208
208
208
208
208
Non-Slum
1654
1674
1693
1713
1734
1836
1944
2059
Slum
453
458
464
469
475
502
532
563
Non-Slum
894
914
933
953
974
1076
1184
1299
Slum
245
250
256
261
267
294
324
355
2035
10899
2983
760
208
2180
597
1420
389
Total
Total
Demand Gap
2107
2132
2157
2182
2208
2338
2476
2622
1139
1164
1189
1214
1240
1370
1508
1654
2777
1809
Page 47
=
=
=
=
968
1654
453
274
=
=
=
894
245
2777
=
=
=
2180
597
1809
=
=
1420
389
5.6
The future growth possibilities have been envisaged based on the existing growth pattern and the population
projection.
The present growth is mainly along the State Highway 52 and 9 and this will continue as this network is the
backbone of the town. Future growth can also be assumed along these major roads. The future development
of Govindgarh also depends upon the existing water bodies of the town such as Raja Talab, nallah, and two
other small ponds.
The future development will be in ward number 14, 13, 3, 5 and 6 for residential land-use. Commercial
development may occur in the form of tourism industry in ward number 15 due to the presence of the
heritage and religious structures as well as natural scenic beauty. This growth will be directed in the southeast and north-east direction due to the presence of connectivity and natural resources.
The future growth possibilities and directions have been discussed with respect to five aspects that include
existing urban growth, the transportation lines, availability of abundant agricultural land in GNP, natural and
the proposed economic activities. Municipal body should ensure the future development of town in a
planned manner as per these identified zones along with detailed layout master/development plans
prepared by TCP Department, Rewa.
Page 48
Map 5.2: Govindgarh: Future Growth Possibilities/Direction with Proposed Sectoral Zones - 2035
5.7
SWOT Analysis
STRENGTH
WEAKNESS
Average household size is more than the national
urban average
More than 50% of the houses do not have pucca
floor
Low and slow growth pattern
Development is concentrated mainly along the
transportation line i.e. SH 52 & 9
Half of the area in the town is undeveloped
No existing norms and guidelines for water bodys
conservation
No existing norms and guidelines for heritage
conservation and exploitation.
Page 49
THREAT
5.8
S. No.
Aspects
Issues
1.
Spatial
Growth
2.
Density
Pattern
3.
4.
Housing
Page 50
CHAPTER 6
Urban Infrastructure Services
Page 51
6.
6.1
The infrastructure profile of a town makes a direct reference on the quality of life within it. It is one of the
crucial considerations for the towns economic development and its investment climate. Infrastructure
services and its adequacy require an assessment be made of its coverage, quantity and quality, as also the
demand supply gap. This chapter presents the existing status and estimates the present and future gaps by
the year 2035. It includes all the major sectors/aspects including Water Supply; Sewerage and Sanitation;
Solid Waste Management; Drainage; Urban Transport; Community Facilities covered under both Physical
and Social Infrastructure.
6.2
Physical Infrastructure
6.2.1
Water Supply
Water Sources
Capacity (MLD)
Tube wells
Page 52
Other Sources
In addition to the main sources, a significant volume of ground water is also extracted through hand pumps
and wells installed at various locations, which help in meeting the demand of the weaker sections of the
society.
Description
Sources of Water Supply
No. of Tube Wells
Water Treatment Plant
-Description regarding Storage
2 OHT
Description regarding Connections
Residential
Commercial
Total Connections
No. of Hand pumps
Details
Tube Wells and Hand Pumps
5 Nos.
Capacity in Lakh Litres
-Capacity in Lakh Litres
4.06 LL, 1.78 LL (Ward 10)
Nos. of Connections
384
Nil
384
78
Page 53
4% 1%
Tap
0%
Handpump
Tubewell
40%
Well
Tank, Pond, Lake
52%
River, Canal
Spring
Any other
2%
31%
36%
Within Premises
Near Premises
Away
33%
This shows that half of the total households in town are dependent on other means/sources of water supply
such hand pumps, own tube wells and wells etc.
Page 54
S. No.
Years
Population
Present
(MLD)
1
2
3
4
5
6
7
8
9
10535
10659
10785
10912
11041
11691
12380
13110
13883
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
Water
(MLD)
Required
1.42
1.44
1.46
1.47
1.49
1.58
1.67
1.77
1.87
Page 55
Sr.
No.
Years
Population
Fire
Demand
(1%) (MLD)
Industrial
Demand
(3%)
Considering
Losses (5%)
Total
Demand
(MLD)
Supply
Gaps (MLD)
1
2
3
4
5
6
7
8
9
2011
2012
2013
2014
2015
2020
2025
2030
2035
10535
10659
10785
10912
11041
11691
12380
13110
13883
0.014
0.014
0.015
0.015
0.015
0.016
0.017
0.018
0.019
0.043
0.043
0.044
0.044
0.045
0.047
0.050
0.053
0.056
0.071
0.072
0.073
0.074
0.075
0.079
0.084
0.088
0.094
1.55
1.57
1.59
1.61
1.62
1.72
1.82
1.93
2.04
-1.14
-1.16
-1.18
-1.20
-1.21
-1.31
-1.41
-1.52
-1.63
S.
No.
Indicators
Unit
Current
Status
Normative
Standard
Litres
27.9
135
Percent
40.00
100
0.00
100
Percent
0.00
100
Percent
36.24
85
Percent
>5
Source: Computed based on the data collected from Govindgarh Nagar Parishad
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
Page 56
WEAKNESS
Good quality of water is available from all the The water distribution system is very old and has
leakage problem due to which pressure remains
sources
low
Surface water (Raja Talab and Rani Talab) is
THREAT
Water revenue demand can be enhanced There are several drains/ storm water drains out
falling in the Raja Talab and Rani Talab.
through drive of new house connection, and
discourage limited stand post installation.
Surface water is available throughout the year
Two over head tanks are present which can be
repaired, thereby increasing the storage capacity
Supply of water 24 hours a day and better
services with revised tariff will be acceptable to
the people
Rain water harvesting can be introduced.
Issues
The water distribution system is very old and has leakage problem due to which pressure remains
low
Both the existing OHTs are not functional due to leakage problem
About 15,000 litres of water remains unaccounted leading to distribution loss of 25% of the total
supply
There is lack of technical/ skilled man power to handle the system
The distribution system has limited coverage. As the pipelines are mainly laid along the major roads,
is a major constraint in distributing water to the end user in internal areas
There is a large scale demand and supply gap, which is likely to increase drastically in future with
respect to increase in population if no measures are taken to augment the water supply system
DMG Consulting Pvt. Ltd., Noida
Page 57
Per capita supply is low (27.9 lpcd) against the standard norm of 135 lpcd
Though the tapped water facility has coverage of about 48% in the town, t out of total households,
only 33.2% houses have tapped water facility within premises. This indicates that majority of
households draw water from community stand post, hand pumps, wells and other means
The tariff collection efficiency of water charges is low.
S. No.
Components
1
2
3
4
5
6
7
8
9
Horizon Period
2015
40%
135
40%
As per WHO
Standards
25%
80%
100%
40%
10%
2025
100%
135
100%
As per WHO
Standards
15%
100%
100%
80%
70%
2035
100%
135
100%
As per WHO
Standards
5%
100%
100%
100%
100%
Raja Talab could be the source of water in Govindgarh town after its water treatment
It is proposed to prepare a fresh Detailed Project Report (DPR) for the development of Water Supply
System in Govindgarh Nagar Parishad
Water treatment plant as per the future demand based on projected population
Leakage detection studies; repair, replacement or rehabilitation of old/defunct system including 2
OHTs should be undertaken to enhance the present water distribution system
Extension of water pipelines to un-serviced/ internal areas, thereby ensuring 100% water supply
network coverage
Implementation of 100% consumer metering system via monitoring and disconnection of illegal
water connections
Awareness programme for judicious use of water; recycling and recharging to prevalent water loss,
thereby encouraging Rain water harvesting at household level
Tariff planning to make water supply a self sustaining project
DMG Consulting Pvt. Ltd., Noida
Page 58
Best Practices
1
Page 59
Page 60
Page 61
Figure 6.4: Typical rapid sand filter water treatment with components
Figure 6.4: Typical rapid sand filter water treatment with components
Page 62
Code No.
Projects proposed
6.2.2
Page 63
15.33%
30.79%
Toilet within
house
84.67%
Other latrine
39.07%
Pit latrine
30.15%
No Toilet
Water closet
Public Toilets
The Govindgarh Nagar Parishad is responsible for the provision of public toilets in town. But in Govindgarh
there is very little effort from the civic body in providing public toilets and public urinals. As on today there
are only 2 public toilets in ward number 10 and 12 which are functioning but not in good condition. Public
toilets are very much required in the town.
As per the city sanitation survey conducted in 2008, mostly people (about 81% of households) demand for
individual toilets but only about 20% of households are willing to pay for development and operation and
41% for maintenance of toilet and urinal services.
COMPONENTS
YEARS
2011
2012
2013
2014
2015
2020
2025
2030
2035
1.55
1.57
1.59
1.61
1.62
1.72
1.82
1.93
2.04
1.24
1.25
1.27
1.28
1.30
1.38
1.46
1.54
1.63
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Gaps
1.24
1.25
1.27
1.28
1.30
1.38
1.46
1.54
1.63
2011
2012
2013
2014
2015
2020
2025
2030
2035
1.24
1.25
1.27
1.28
1.30
1.38
1.46
1.54
1.63
Page 64
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Capacity
Demand
Plant 1.24
1.25
1.27
1.28
1.30
1.38
1.46
1.54
1.63
Gaps
1.24
1.25
1.27
1.28
1.30
1.38
1.46
1.54
1.63
2011
2012
2013
2014
2015
2020
2025
2030
2035
Existing Connections
2107
2132
2157
2182
2208
2338
2476
2622
2777
Gap
2107
2132
2157
2182
2208
2338
2476
2622
2777
2011
2012
2013
2014
2015
2020
2025
2030
2035
0.0
Gap
of
Treatment
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
As there is complete absence of underground Sewerage Network, the sewage flows through open drains
which ultimately flow into the existing water bodies i.e. Raja Talab & Rani Talab. There is no form of
treatment before or after disposal. Only 25 % percent of households commonly use septic tanks or pits for
sewage disposal while the rest do not have in-house toilet facilities. They either use public toilet or go for
open defecation in town. Thus, the town requires immediate action regarding provision of sewerage and
sanitation facility (Low Cost Sanitation Projects) with 100% network coverage.
S. No.
1
2
3
4
5
6
7
8
9
Performance Indicator
Coverage of Toilets
Coverage of Sewerage Network
Collection Efficiency of Sewerage Network
Adequacy of Sewerage Treatment Capacity
Quality of Sewage Treatment
Extent of Reuse and Recycling of Sewage
Extent of Cost Recovery in Wastewater Management
Efficiency in redressal of Customer Complaints
Efficiency in Collection of Sewage Water Charges
Benchmark
100%
100%
100%
100%
100%
20%
100%
80%
90%
Status
15.33%
0%
0%
0%
0%
0%
0%
0%
0%
Page 65
WEAKNESS
There is no underground sewerage system for the
town
There is no treatment plant for treating the
sewage generated
Limited number of public toilets. There is need of
around 15 public toilet
The income prohibits urban poor to make capital
expenditure on development of toilet units and
their maintenance.
OPPORTUNITY
There are substantial number of urban poor who
have land and houses without toilets
There is scope for development of low cost
sanitation projects
New sewerage schemes to increase the
sewerage coverage to 100 %.
New sewerage system is to be developed,
Opportunity to select latest modern
technology for treatment.
THREAT
Sewage flows through open drains, channels &
nalas in town and disposes into the talabs/nalahs
causing underground and surface water
contamination, the major sources of water supply
Environment and health of sanitary workers is at
risk.
Danger of ground water pollution.
Risk of spreading epidemic.
Issues
All the grey matter of the sewerage is disposed off in the Nalah which flows into Raja Talab and
contaminates the water of the lake.
There is absence of hygienic and safe method of sewerage disposal system i.e. underground
Sewerage Disposal System in the town
The pour flush latrines and toilet blocks are usually connected to a septic tank and then connected to
drains, channels or nallas ultimately falling into the Talab causing contamination of the main sources
of water supply
There is no form of treatment before or after disposal
Town lacks public conveniences/ sanitation facilities such as - community or public toilet which are
limited in number
The service level cost recovery is going to be the major challenge for GNP as most of the households
are not willing to pay for development and maintenance of facilities
Widespread practice of open defecation as about 84% of households does not have in-house toilet
facility.
Page 66
S. No.
Components
Horizon Period
2015
2025
2035
to 60%
100%
100%
Disposal 80%
100%
100%
80%
100%
Sewer
Network
Households
Coverage
Sewage Treatment
Arrangement
and
60%
100%
100%
Page 67
Code
No.
Projects proposed
Project Cost
(in Lakh)
Department
SS 1
5.00
UADD, Govt. of
M.P. and GNP
SS 2
150.00
Govt. of M.P
SS 3
150.00
Govt. of M.P
SS 4
171.00
Nagar Parishad
SS 5
3.00
Nagar Parishad
SS 6
Construction of individual
subsidies for 1300 units)
52.00
ULB's, Govt. of
M.P.
531.00
Page 68
Background:
Pune city, the educational and cultural capital of the State of
Maharashtra has a population of 28 lakhs, of whom about 40% live
in slums. There are 503 slum pockets, out of which only 348 are
notified slums in the city. Pune Municipal Corporation has
Conservancy Department the duty of which is to clean and
maintain toilet blocks in the city. But, as in other cities, the
municipal staffs are not performing their duties including
construction and maintenance of toilets and city sanitation. Since
the local community does not have any control over the sanitation
staff, the latter do not respond to their concerns.
Since 1992, only 22 pay and use toilet blocks had been built in the
city. In 1992, Municipal Commissioner himself took initiatives and a massive programme of building toilets
in slums through community participation by giving contracts to non-governmental organizations (NGOs)
was started. There were 8 NGOs which were selected to carry out the first phase of the programme. First
priority was given to those settlements with a minimum population of 500 but had no toilet facilities.
Key Components of the Project:
Construction: The Slum Sanitation Program was implemented in phased manner which are as follows;
Phase-1 (1999-2000): In the first phase, it was decided to construct 220 toilet blocks with about 3500 toilet
seats through NGOs. The expenditure incurred on the first phase was Rs.22.5 crores.
Phase-11 (2000 -2001): On completion of the second phase (planned for another 220 blocks between),
more than 400 blocks or more than 10,000 toilet seats was supposed to be constructed at a cost of more
than Rs.40 crores and benefiting more than 5 lakh slum dwellers.
Maintenance: In the bid itself, a guarantee was also to be given that the NGOs and the community would
maintain the toilet block for 30 years by collecting contributions from the community. The programme
envisaged the collection of Rs.20 per family per month to fund the appointment of a caretaker and for
cleaning materials. The caretaker is to be accountable to the community and is supervised by them.
Implementation: During construction, the Municipal Commissioner was himself holding a weekly meeting
to monitor the progress of the work with the highest priority and, as a result, people worked day and night
to complete the programme in a few months.
Lesson Learned: Slum dwellers are not expected to pay anything at all when they use the toilets, they are
expected to pay a general tax for the facilities they are given. However, even if public sanitation is free, it is
not of much use because it is hardly functional.
The relationship between the Corporation, NGOs and communities has been reconfigured. NGOs and
communities are not cast in the roles of clients or supplicants but rather are treated as partners by the
Corporation.
When grassroots democracy is in place, the accountability of institutions is ensured.
Page 69
Page 70
Advantages:
With no use of machinery and associated maintenance, the root zone system provides for low
maintenance cost and negligible attendance for operation and monitoring
It enhances the landscape and gives the site a green appeal
It provides natural habitat for birds and after a few years gives an appearance of a Bird sanctuary.
It is a green zone, it does not have mosquito problem
Salinity may not be a problem for a survival or operations of reed beds
It is recommended to combine vertical flow and then horizontal flow of sewage with a soil having
impervious bottom
In the horizontal flow system, the sewage percolates through bed and that has all roots of the
wetland plants spread very thickly nearly with 2500 types of bacteria and 10,000 types of fungi and
aerobically oxidized organic matter of the effluent
Root zone system gives a very good performance of removing 90% BOD and 63% Nitrogen.
The Root Zone Treatment system (RZTS) also known as the reed bed system or constructed wetland system is
a sealed filter bed consisting of a sand / gravel/ soil system, occasionally with a cohesive element, planted
with vegetation that can grow in wetlands. After removal of coarse and floating material, the wastewater
passes through the filter bed where biodegradation of the wastewater takes place. The functional
mechanisms in the soil matrix that are responsible for the mineralization of biodegradable matter are
characterized by complex physical, chemical and biological processes, which result from the combined effects
of the filter bed material, wetland plants, micro-organisms and wastewater.
The treatment processes are based essentially on the activity of microorganisms present in the soil. The
oxygen for microbial mineralization of organic substances is supplied through the roots of the plants,
atmospheric diffusion and in case of intermittent wastewater feeding, through suction into soil by the outflowing wastewater. RZTS contain aerobic, anoxic and anaerobic zones. This causes the presence of a large
number of different strains of microorganisms and consequently a large variety of biochemical pathways are
formed. This explains the high efficiency of biodegradation of substances that are difficult to treat.
Conversion of nitrogen compounds (nitrification / De-nitrification) occurs due to planned flow of wastewater
through anaerobic and aerobic zones. Reduction of phosphorous depends on the availability of acceptors
like iron compounds and the redox potential in the soil. The filtration by percolation through the bed
DMG Consulting Pvt. Ltd., Noida
Page 71
Thus root zone systems are not only eco-friendly but have low operational costs, producing high water
quality (up to bathing water standards) suitable for re-use. These features make RZT systems low-cost,
environment-friendly, and reliable in both the short and long term.
Page 72
Figure: 6-6 Main DEWATS modules for physical and biological wastewater treatment
DEWATS stands for Decentralized Wastewater Treatment Systems and represents a technical approach
rather than merely a technology package.
DEWATS applications are designed to be low-maintenance: most important parts of the system work without
technical energy inputs and cannot be switched off intentionally.
DEWATS applications provide state-of-the-art technology at affordable prices because all of the materials
used for construction are locally available.
DEWATS applications provide treatment for both domestic and industrial sources
Systems can be designed to handle organic wastewater flows from 1-1000 m3 per day
Systems are built to be reliable, long lasting and tolerant towards fluctuations in loads
DEWATS applications do not require sophisticated maintenance
Without considering facilities for necessary chemical pre-treatment of wastewater from industries, DEWATS
applications are designed with four basic technical treatment modules which are combined and configured to
provide a custom solution for a given sanitation/wastewater challenge:
DEWATS applications are designed and dimensioned in such a way that treated water meets requirements
stipulated in environmental laws and regulations.
Advantages of DEWATS technology:
Page 73
DEWATS technology is an effective, efficient and affordable wastewater treatment solution for small and
medium sized towns. At locality level, this system is very efficient.
Benefits of DEWATS
Page 74
Page 75
S. No.
1
2
3
Raja Talab
Rani Talab
Nallah along Rani Talab
Page 76
Ward No.
In all the wards as they do not have sufficient drainage network and
mainly in ward no. 10 where no drains is there of any form.
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
Strong citizens desire to develop a fresh drainage
system for the town
Favourable natural slope for development of
drainage system which will also help in cost
reduction
Town has a natural slope towards north east to
south west.
OPPORTUNITY
WEAKNESS
Absence of proper drainage system in town
Most of the pucca drains are damaged and open
Reduction in flow capacity of existing drains due
to dumping of solid waste and presence of gray
matter
Detailed layout drawings of drainage network are
not available, making future planning difficult.
THREAT
Page 77
Issues
S. No.
Components
Horizon Period
2015
2025
80%
100%
2
3
4
100%
100%
100%
100%
100%
100%
2035
100%
100%
100%
100%
Page 78
This will also ensure Institutional strengthening and human resources development leading
to overall capacity building including assets required for the operation and maintenance of
drains.
2. Drains Rehabilitation and Improvement Programme: The programme would aim at the following to
channelize the flow and minimize the localized flooding and over-spilling:
Regular Cleaning of Drains removal of garbage and gray matter to ensure natural flow of
drains
De-silting, lining and repair of drains
Removal of encroachment along drains
Educating people for minimization of sewage and domestic waste discharge into drains
Construction of side walls to confirm to uniform cross-section in built up areas.
3. Rehabilitation of Primary Nallah/ Drains and Water Bodies:
Trapping of nallahs
Converting the Kutcha Nallahs to pucca one by lining and constructing side walls
Regular Cleaning of Drains desilting and removal of garbage and gray matter to ensure
natural flow of nallahs
Protection of environmental resources such as - open spaces, water bodies i.e. Raja Talab
should be carried out in co-ordinated way.
Code No.
Projects proposed
D1
D2
Govt. of M.P
D3
Nagar Parishad
191.90
6.2.3
Page 79
Ward No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
Total Population
588
625
731
653
550
735
642
709
649
679
526
659
568
687
696
9697
(in Grams/Person)
41160
43750
51170
45710
38500
51450
44940
49630
45430
47530
36820
46130
39760
48090
48720
678790
(in MT/Day)
0.04
0.04
0.05
0.05
0.04
0.05
0.04
0.05
0.05
0.05
0.04
0.05
0.04
0.05
0.05
0.68
Page 80
Page 81
S. No.
1
2
3
4
5
Numbers
1
1
7
10
2
Years
Total
Population
Waste Generation
(MT/Day)
Waste Collection
(MT/Day)
Gaps
(MT/Day)
2011
2012
2013
2014
2015
2020
2025
2030
2035
10535
10659
10785
10912
11041
11691
12380
13110
13883
*70
250
250
250
250
250
250
250
250
*0.74 2.63
2.66
2.70
2.73
2.76
2.92
3.10
3.28
3.47
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
2.45
2.48
2.52
2.55
2.58
2.74
2.92
3.1
3.29
250
S. No.
Indicators
DMG Consulting Pvt. Ltd., Noida
Units
Current Status
Normative Standard
Page 82
Grams
Percent
Percent
Persons
70
25
Nil
0.26
Percent
Nil
250
100
100
2
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
Strong citizens desire for Govindgarh to be a
clean town
Enough biodegradable part is solid waste for
vermin composting
Availability of land for development of sanitary
land fill site of MSW.
OPPORTUNITY
WEAKNESS
GNP does not in compliance with MSW handling
rules, 2000.
Low collection efficiency
Door-to-Door waste collection system is not in
practice in town
Segregation of waste is not in practice, neither at
primary collection level nor at final disposal level
Lack of dhallaos and bins for waste storage
No incineration unit is available for biomedical
waste
Lack of man power and sufficient modest
equipments for collection, transportation of MSW.
Lack of capital to develop facilities.
THREAT
Scope of PPP in terms of waste collection, Lack of public awareness for use of polythene
transportation and disposal of waste by Health hazards fur to negligence for cleanliness
involving NGOs in town
Waste is been disposed of in low lying areas
To generate revenue by imposing levy on waste
throughout the town.
generators
Training and capacity building.
Issues
1. Govindgarh Nagar Parishad is not in compliance with MSW handling rules, 2000
Town has not adopted Door-to-Door Collection system and segregation of wastes at source level.
Lack of dhallaos and bins for storage of waste at primary level. Limited numbers of bins have been
provided at some places.
Inadequacy of man-power and modest equipments (including vehicle for transportation) with GNP
for Solid Waste Management from collection to its final disposal.
At present town does not have any designated sanitary land fill site as per the normative standard.
DMG Consulting Pvt. Ltd., Noida
Page 83
S. No.
Components
Horizon Period
2015
2025
2035
80%
100%
100%
Source Segregation
100%
100%
100%
100%
100%
100%
Partial
Full
Full
Partial
Full
Full
Partial
Full
Full
80%
100%
100%
70%
100%
100%
Page 84
Manual waste handling operation should be minimized. Primary collection system should be
initiated by introducing Multi-bin-carts (Push carts/ tricycles), semi mechanized systems like refuse
collectors etc. Separate collection vehicles should collect the non-bio-degradable waste stored in
separate bins. Thus, Primary collection should cover all areas of the town with even innovative but
safe transporting arrangements as per the MSW handling rules 2000.
3. Secondary Waste Collection and Transportation: At present, the GNP has inadequate number of
sanitary workers and equipments for loading, unloading and transportation vehicles (including bins)
for secondary collection and transportation of wastes. Therefore, it is recommended that GNP should involve private sector participation in secondary collection, transportation and
treatment of MSW facilities
GNP should purchase sufficient number of modest equipments including vehicles - such as
loader, un-loader, hydraulic closed truck/waste carrier for transportation and disposal of waste
Construction or demolition wastes / debris to be separately collected and disposed off in
separate landfill site for future use
GNP should prepare a Detailed Project Report (DPR) for Municipal Solid Waste Management for
the town, ensuring the quantity and quality of required modest equipments, techniques and
vehicles for collecting, processing and transporting MSW. This will also ensure Institutional
strengthening and human resources development leading to overall capacity building.
4. Processing and Disposal: The characteristics and quality of solid waste generated in the city primarily
influence the disposal options. Considering these aspects, it is recommended to develop a landfill site
for safe disposal of solid waste. The disposal strategy for Govindgarh town for short term at town
level will be Compost the organic fraction of the waste
Encourage aerobic vermin-composting at local level
Sanitary land filling of inorganic fraction of waste and the compost rejects
Educating the community on 4R strategy (Reuse, Recover, Recycle and Reduce) that can help
ease pressure on compost sites and affords resource recovery.
For the long term, it is further proposed that Govindgarh Nagar Parishad should co-ordinate with the
State Government for clustering in regional engineered landfill site for waste disposal involving
other neighbouring ULBs. This also ensures the scale and viability to the private partnership mode.
Best Practices
DMG Consulting Pvt. Ltd., Noida
Page 85
Page 86
Code No.
Projects proposed
SWM 1
SWM 2
Nagar Parishad
SWM 3
Nagar Parishad
SWM 4
Nagar Parishad
246.00
Page 87
Background
Urban economy is seen to improve with urban transport infrastructure. Roads and circulation is an important
city land-use allowing efficient function of any city or towns activities. Conversely, it can drag down and
prove detrimental to its GDP. The objective of studying town level transportation is to understand and
analyze the present level travel scenario of the town and to focus on existing potential and scope of
development.
Existing
Scenario
Traffic
and
Transportation
Destination
Mode of Transport
No. of vehicles
Rewa
Jeep
40
Bela
Auto-rickshaw
20
Bela
Commander
13
Satna
Bus
15
Singrauli
Bus
15
Ramnagar/ Jigina
Jeep
10
Page 88
The inter city public transport system for the town can be categorized into two parts i.e. State
Carriage and Private Carriage. State carriage includes buses by the State Government with fixed
routes and fare. The Private Carriage in under purely private domain and includes buses, jeeps,
matadors etc. operated by private operators.
At present there is no intra city public transport system in Govindgarh. As the town is very small and
all the important places such as major commercial and market areas, bus stands, hospitals etc. are in
the vicinity, most of the local people generally use cycle, scooter, motorcycle and walking etc. as
mode of travel for short trips.
Travel Characteristics
The travel characteristic of a town generally depends on the social status of citizens, types and location of
economic activities which give rise to diverse traffic modes. The predominant mode of travel in town is
motorized vehicles such as two- wheeler (Scooter & Motorcycle) and private transport which includes three
Wheelers (20 nos.) and four wheelers (Jeeps, cars etc.)Which are about 20 in number as the town is semiurban in nature all the important place are in vicinity. Thus, only major working population uses their own
means of transport such as cycles, scooters, motorcycle, and cars etc. for their workplace and other places
for day to day needs. Rest of the population prefers to walk for various purposes.
Page 89
S. No.
Type of Roads
1.
5.48
3.
7.98
4.
5.62
Total
19.08
Ward wise breakup of the above discussed road length and its indicators are shown below in table 6.21.
Table 6.2.24: Ward Wise Detail of Road Length in Govindgarh Town
Ward
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
Total
Total
Length of Population
Roads (in 2011
kms.)
Area
Road
in Sq. Density
Km.
(per sq.
km.)
Per Capita
Road
Length (in
meter.)
2.21
2.11
0.95
0.81
0.72
1.28
1.22
1.90
1.06
1.30
1.09
0.10
1.80
1.05
1.75
19.33
0.28
0.74
0.95
0.11
0.77
0.56
0.09
0.3
0.07
0.66
0.12
0.18
0.16
0.94
7.3
13.23
3.75
3.37
1.30
1.23
1.30
1.74
1.90
2.67
1.64
1.92
2.06
0.15
3.17
1.53
2.51
1.99
588
625
731
653
550
735
642
709
649
679
526
659
568
687
696
9697
7.88
2.85
1.00
7.32
0.93
2.29
13.54
6.32
15.17
1.98
9.04
0.56
11.25
1.12
0.24
1.46
Source: Area and Road Length Computed from Govindgarh Digitized Map by DMG
Consultant and Population as per Census 2011.
Page 90
S. No.
1.
State Highway 52
10.5
2.
State Highway 9
9.73
Source: Govindgarh Nagar Parishad and Draft Master Plan Govindgarh 2021
Figure 6 51 View of the road without proper shoulder, narrow internal road and kacha road in the town
Page 91
Parking Requirement
There is no provision for organized on-street parking and off-street parking at major commercial centres of
the town. The core market area of the town is characterized by narrow roads with slow moving traffic.
Unorganized on-street parking and informal shops leads to encroachment on the ROW and absence of
footpath force the pedestrians to walk on the carriageway.
Thus, the capacity of the road is further reduced resulting in conflict between pedestrians and vehicular
traffic. Therefore, there is urgent need/requirement of authorized parking as per the standards for major
commercial areas and in other important areas such as along SH 52 and SH9 of the town.
Page 92
COMPONENTS
YEARS
Projected
Population
Govindgarh
2011
2012
2013
2014
2015
2020
2025
2030
2035
19.33
19.33
19.33
19.33
19.33
19.33
19.33
19.33
19.33
15.8
16.0
16.2
16.4
16.6
17.5
18.6
19.7
20.8
Gaps
-3.5
-3.3
-3.2
-3.0
-2.8
-1.8
-0.8
0.3
1.5
2011
2012
2013
2014
2015
2020
2025
2030
2035
1.62
Improvement of Junctions
2012
2013
2014
2015
2020
2025
2030
2035
Footpath (Sidewalk) in km
Source: Population Projection & DMG Assessment as per IRC and UDPFI Guidelines
Type of Roads
Norms
Current Status
ROW
Carriage Way
ROW
Carriage Way
Arterial Road
50 60 m
21 m
10.5
7.5
Sub-Arterial Road
30 40 m
14 m
9.73
7.5
Collector Road
20 30 m
10.5 m
Local Street
10 20 m
7.5 m
Page 93
Footpath (Sidewalk)
The minimum width of footpath should be 1.5 m. The width should be increased by 1m in major commercial
or market areas to allow for dead width. Footpath adjoining shopping frontage should be at least 3.5 m.
Table 6.2.28: Desirable of Footpaths
Capacity (Persons)
In both Directions
800
1600
2400
3200
4000
1220
2400
3600
4800
6000
1.5
2.0
2.5
3.0
4.0
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
all directions
There are inter-city and intra-city movements
which provide opportunity for improvement of
transportation system.
WEAKNESS
Roads are narrow if concerned with future
demand
Pressure on major roads in core areas, due to
encroachment by informal establishment etc.
reduce the effective width of carriageway
No organized parking provisions at major
commercial centres, on-street parking is common
in town
Lack of pedestrian facilities
Lack of appropriate terminals further adds to the
congestion of the arterial roads
Lack of proper traffic management system &
infrastructure facilities such as automated signals
etc. in the town.
OPPORTUNITY
THREAT
Land availability for major projects like In the absence of adequate public transportation
systems in town, individual and personalized
development of Bus Terminal, Transport Nagar for
modes of transport would increase
goods carriers and parking facilities
Issues
Page 94
There is absence of public transportation system, which leads to increase in the number of
personalized modes of transportation and results in traffic congestion in many part of the city in busy
hours
There is great pressure on major roads, since all the major commercial activities, important
institutions etc. are concentrated long these roads
Rampant encroachment, on-street parking on all major roads leads to congestion thereby reducing
the ROW and carriageway resulting in slow movement of traffic in core area
The town lacks proper transport, utility/infrastructure systems such as Bus Terminal, Transport
Nagar (Truck Terminal), organized and adequate parking spaces in important areas to properly
facilitate movement of vehicles in the town and improve the traffic situation
Currently the existing bus terminal is very small; it is not being used by bus operators because of
paucity of space in making entry and exit due to informal development, inefficient road width.
Hence, it is being used as taxi stand
Narrow streets in the core areas of the town need to be widened through proper planning and
addressing the encroachment problems
Gomati Chouraha is a congested area and needs junction improvement.
Sr.
No.
Components
2
3
4
5
6
7
Horizon Period
2015
2025
2035
100%
100%
50%
60%
70%
100%
30%
100%
100%
100%
100%
100%
60%
100%
100%
100%
100%
100%
100%
100%
Page 95
Code No.
Projects proposed
TT 1
Nagar Parishad
TT 3
Nagar Parishad
TT 4
Nagar Parishad
TT 2
TT 5
Nagar Parishad
PWD
Page 96
Nagar Parishad
830.00
6.2.5
S. No.
1.
2.
3.
Total
Equipment
Poles with Tube Lights
Poles with CFL Bulb
Poles with Sodium Light
Total Number
162
97
148
407
Percentage to Total
40%
24%
36%
100.00%
Fire Service
There is no separate office for the fire fighting operations in the town and no fire tender in the town. In case
of incidents of fire, fire tenders come from Rewa.
DMG Consulting Pvt. Ltd., Noida
Page 97
COMPONENTS
Street Light (in nos.)
Existing Street Light
Road Length Demand (in km)
Street Light Demand @ 1 light per
40 m spacing on one side of road
(within wards)
Gaps
YEARS
2011
407
15.8
395
2012
407
16.0
400
2013
407
16.2
404
2014
407
16.4
409
2015
407
16.6
414
2020
407
17.5
438
2025
407
18.6
464
2030
407
19.7
492
2035
407
20.8
521
-12
-7
-3
31
57
85
114
As per the UDPFI Guidelines, Govindgarh Nagar Parishad at present has surplus of street light and expected
to maintain the future requirement by 2035 which will be around 45. In some areas, spacing of street light
poles is irregular.
S. No.
1.
2.
3.
4.
5.
Total
1 fire tenders
1 electric pole vehicle
1 Fire Men
4 Helper
2 Driver
Hence for operating one fire fighting vehicle and one electric pole vehicle there will be a requirement of 7
men with a total annual salary of Rs. 9, 84,000/- to deliver the service effectively as and when required in the
town.
Page 98
S.
No.
1.
2.
3.
4.
Indicator
Unit
Meters
Current
Status
irregular
Norms/
Standards
30 - 40
Meters
Percentage
Percentage
40
39.8
23.8
40 - 50
60 - 70
100
Source: Field Survey, UDPFI Guidelines and * certain experience and thumb rules.
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
Street light coverage 100%.
Awareness about emerging technologies of power
saving light
Political and social willingness to switch to power
saving light
WEAKNESS
Irregular spacing of street light poles within the
wards or residential areas of town
High capital cost for installation of system
Irregular availability of power
Non-availability of vehicles for street lighting and
fire fighting.
OPPORTUNITY
THREAT
Total households
1,697
Sources of Lighting
Electricity
Kerosene
Solar Energy
Other Oil
1,502
188
No. of Households
Firewood
Crop Residue
1556
8
Page 99
1
0
1
124
2
0
5
1697
Out of 1697 households, majority of households (1556) use firewood as a fuel for cooking purpose followed
by the LPG (124) for domestic cooking. This shows a strain on forest/wood resources which is a concern and a
threat to environment and causes depletion of natural resources.
Issues
At present the town has nearly 559 street light poles and there is some sort of street light on 407
poles.
Out of the 407 almost 148 poles have sodium vapour lamp, 162 poles have energy tube light and 97
have bulb.
As per the primary survey, there is street light on all the major roads (Rewa Road, Sidhi Road, Tamra
road etc.) and streets of the town in working condition.
The Parishad is switching over to the energy saving CFL bulb.
Inappropriate maintenance and functioning of lights. Around one-fourth of the street lights are nonfunctional.
Irregular spacing of street light poles in the residential areas of the town.
Inadequacy in number of street lights in the town.
Lack of fire fighting service facilities and staff.
S. No.
Components
Horizon Period
2015
2025
2035
30%
70%
100%
Up-gradation of existing
100%
100%
100%
Underground Cabling
70%
100%
Energy Saving
70%
100%
100%
100%
100%
100%
100%
100%
100%
Page 100
Code No.
Projects proposed
SL 1
Installation of 218
street lights within the 75.00
wards/residential area (33230/- Solar street light pole)
Page 101
60.00
Govindgarh
Nagar Parishad
SL 3
25.00
SL 4
Govindgarh
Nagar Parishad
Govindgarh
Nagar Parishad
SL 5
50.00
Govindgarh
Nagar Parishad
SL 6
5.00
Govindgarh
Nagar Parishad
340.00
6.2.6
Page 102
Slums and squatter settlements are essentially products of poverty. In the context of basic service delivery,
almost by definition, the population living in slums lacks access to basic infrastructure services like safe
water, sanitation, solid waste collection and disposal, drainage, access roads, street lights, neighbourhood
amenities like safe play areas for children and community facilities and electricity connections.
The social composition of a majority of slums comprises SC, ST and OBC population. Most of the slums have
predominantly one caste staying in it or people from one place of origin.
A majority of the working population in slums is engaged in small scale industries or work as agricultural
labourers.
Health related obligatory functions of the Nagar Parishad are restricted and health related activities are
insufficient. Primary health is in poor conditions in the slums and lack of awareness among people.
6.2.8
Urban Basic Services in Slums (in line with JnNURM 7 point charter)
Slums within the town do not have adequate infrastructure facilities. The following analysis has been done
taking into account the seven point charter.
Water Supply
Page 103
Drainage
The existing condition of surface drainage is a mess in the whole slum pocket. Most of the roads in the
selected slum areas do not have proper drainage system. During the monsoon most of these roads get
crammed with muddy water, which remain stagnant for weeks and as a result give rise to many diseases.
Sanitation
At present the main type of sanitation in these slum areas is the pit latrine. A few houses have water closets
with septic tanks which has been a major factor in ground water contamination. The sanitation alternatives
in selected sum areas also comprises of public latrine blocks, the pour flush latrines and toilet blocks which
are usually connected to septic tanks and then to nallah flowing to Raja Talab. The present condition suggests
that the public toilets are not successful in the town since a communal facility often seems to belong to no
one. Individual users have very little feelings of responsibility or commitment to keep it clean under these
circumstances. The latrines become unhygienic and in-sanitary and as a result people stop using it. Thus, the
residents who do not have access to one of these sanitation facilities have the common practice of open
defecation in open spaces.
Sewerage
In the existing scenario, the underground and protected sewerage system is absent in the entire town area.
In the slum areas sewage, sludge and storm water flows in open kuccha drains which causes serious health
and safety risks.
Educational Facilities
DMG Consulting Pvt. Ltd., Noida
Page 104
Health Facilities
As per the survey conducted under the programme, very less percentage of slum pockets have access to
health care facilities within the distance of 100 meters to 500 meters. Most of the urban poor have to travel
more than 1.5 km distance to Community Health Centre for health care facility.
6.2.9
As per Census of India 2011, the average household size in the town is 6.5 which is higher than the national
urban average of 5.12. Since the town is in transition phase of development (rural to urban), it is semi-urban
in nature. The present and future housing demand for the town has been estimated by taking into account
the ideal size of a household / dwelling unit (DU) that is 5.0. The average household size in most of the wards
is higher than the ideal household size.
Table 6.2.39: Present and Future Housing Demand and Gap for Slum Population
Year
2011
2012
2013
2014
2015
2020
2025
2030
2035
Total Population
Non-Slum
Slum
8271
2264
8369
2291
8467
2318
8567
2345
8668
2373
9179
2512
9720
2661
10293
2817
10899
2983
Existing Supply
Non-Slum
Slum
760
208
760
208
760
208
760
208
760
208
760
208
760
208
760
208
760
208
Housing Demand
Non-Slum
Slum
1654
453
1674
458
1693
464
1713
469
1734
475
1836
502
1944
532
2059
563
2180
597
Housing Gap
Non-Slum
Slum
894
245
914
250
933
256
953
261
974
267
1076
294
1184
324
1299
355
1420
389
Based on the above assumptions, at present there is a gap for slum housing of 245 houses. This indicates that
there is a demand for housing.
453
245
Page 105
597
389
6.2.10
Page 106
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
Housing is mainly developed by individuals on plotted
development
The housing sector uses locally available cheap
materials like stone and bricks including bamboo and
woods
The land is cheap and developed land is available in
Govindgarh town
The town has scope for redevelopment for housing
transformation Kutchha to Pucca and tiles to RCC
roofs.
OPPORTUNITY
WEAKNESS
Urban poor have no tiled roof houses and
currently occupying in low lying areas
The provision of services will have difficulty
to reach at poor settlements in Govindgarh
The Kutcha houses and thatched roofs limit
scope of housing transformation for urban
poor in Govindgarh
The sites and services scheme has limited
success in town
Most of the population does not have margin
money to avail housing units under IHSDP.
THREAT
There are urban poor who have land titles, can access The urban poor have no regular jobs and
sites and services funds
faced migration to major cities
There is Government land available for relocation of The tribal prefer to stay in villages and
urban poor under IHSDP/BSUP
practice agriculture in old age
The tribal target groups have affordability to pay for The sale of property becomes difficult in case
EWS public housing especially those working in
of shifting of jobs.
Government and having regular jobs
Encouragement in land Patta distribution will increase
housing construction activities among the urban poor.
6.2.12
Issues
Most of the houses in the slums are kutcha type. There is lack of basic services and amenities in terms of
quantity and quality. Due to bad economic conditions, the urban poor are not able to contribute much into
housing. Most of the slums have land tenure ship, which can act as a potential for improvement of slums in
the city.
The shelter conditions are very scruffy in the selected pockets. The majorities of the houses in these
slums areas are made of mud and wattle with burnt mud tiles (Khapra) and iron sheet roofs.
Many of these houses lack basic amenities such as toilet, power, water, open spaces etc. and have
katcha houses.
Most of the residents of the slum obtain their water from Municipal Hand pumps.
The existing condition of surface drainage is a mess in the whole slum pocket.
At present the main type of sanitation in these slum areas is the pit latrine.
All the roads in the selected slums are narrow tracks eroded by runoff water.
There are 4 dustbins in the selected slum areas (In ward 1, 5 and 15).
Page 107
6.2.13
Code No.
Projects proposed
UP 1
4000.00
6.3
6.3.1
Social Infrastructure
Health
Page 108
6.3.2
Education
Page 109
Area
Male
Female
2001
2011
2001
2011
2001
2011
Urban India
79.92
84.98
86.27
89.67
72.86
79.92
Madhya Pradesh
79.39
84.90
87.39
90.24
70.47
77.39
Rewa District
62.01
73.42
75.65
83.67
47.58
62.49
57.45
66.55
69.58
75.97
43.94
56.58
Source: Census of India, 2001 & Provisional Figure, Census of India 2011.
Table 6.3.2: Ward Wise Comparative Assessment of Literacy Rate Govindgarh, M.P.
Ward No.
Male
Female
Ward No.1
47.79
59.08
35.79
Ward No.2
63.20
76.63
47.39
Ward No.3
54.58
67.57
41.48
Ward No.4
70.90
85.46
55.38
Ward No.5
73.82
82.30
63.27
Ward No.6
57.96
69.03
46.05
Ward No.7
42.06
54.72
29.63
Ward No.8
64.60
76.80
49.84
Ward No.9
50.39
66.16
34.27
Ward No.10
64.21
75.48
51.27
Ward No.11
60.08
71.43
47.83
Ward No.12
73.44
82.61
63.38
Ward No.13
56.34
72.47
39.86
Ward No.14
27.07
34.07
19.33
Ward No.15
58.05
70.60
39.50
Page 110
57.45
69.58
43.94
The above figure shows ward-wise distribution of literate population in Govindgarh. Most of wards have
higher literate population; ward no. 5 ranking the highest followed by ward no. 12 & 4. The wards having
literacy rate below 50% are ward nos. 1, 7 and 14.
6.3.3
Sports Facilities
Town has a polo ground with a pavilion for sports. Besides this, there is no other planned sports facility.
Page 111
There is no separate office for fire fighting operations in the town. The responsibility of fire services has been
delegated to the municipality, among other tasks but there is no formal fire fighting services available in the
town. In such anthropogenic hazards situation few water tankers are being used and GNP asks for help from
District Headquarter Rewa. Moreover there is no additional options/manpower available for rescue
operations.
Thus, the ULB urgently needs a fully fledged fire fighting department equipped with latest fire-fighting
vehicles (including operation and maintenance of assets) and well trained manpower to control the
anthropogenic hazard and fire mishap for Govindgarh Nagar Parishad.
6.3.5
The following tables provide information on the comparative analysis with UDPFI guidelines and the demand
and supply gaps for social infrastructure in Govindgarh Nagar Parishad.
Table 6.3.3: Comparative Analysis with UDPFI Guidelines Social Infrastructure
Particulars
Standards/Norms
Current Status
1 for 90,000-1
population
College
Educational Facilities
lakh -
Nursing home, Child welfare and maternity 1 for 0.45 to 1 lakh Included in CHC
centre with 25 30 beds
population
Dispensary
Community room
Recreational Club
Socio-cultural Facilities
Police
Page 112
Police post
Fire
1 fire station or sub fire station within 1 - 3km
Table 6.3.4: Present and Future Demand and Supply Gaps Social Infrastructure
COMPONENTS
Particulars
Govindgarh
Population
YEARS
2011 2012 2013 2014 2015 2020 2025 2030 2035
Projected 10535 10659 10785 10912 11041 11691 12380 13110 13883
2011
Intermediate
Demand
Hospital 1
2012
2013
2014
2015
2020
2025
2030
2035
Poly- clinic
with some 1
observation beds Demand
Poly- clinic
with some 0
observation beds Existing
Poly-clinic Gaps
Dispensaries Gap
30
30
30
30
30
30
30
30
21
22
22
22
23
25
26
28
10
10
10
10
10
10
10
10
10
Page 113
30
30
30
30
30
30
30
30
32
33
34
34
38
43
48
54
31
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
Gap
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
Page 114
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
WEAKNESS
Health
Health
There is a Community Health Centre in There is a lack of specialty/Intermediate hospital
Govindgarh which serves as a referral health
and poly-clinic in the town
centre.
No private clinics
Poor people have limited affordability to pay for
health services
Communicable and Vector borne diseases are
common in Govindgarh.
Education
Education
Govindgarh has a high literacy rate of 69.88%
The girls have to undertake household work or
support in economic activities of the family thus
Sufficient number of higher secondary school
the literacy rate among the females is low at
Govindgarh has sufficient no. of college for higher
63.17%.
education.
There is a lack of integrated school with hostel
facility and technical institute ITI in town.
Recreation and Entertainment
Recreation and Entertainment
Plenty of land is available for the development of Town does not have any designated place as park
recreational area such as park and playground in
or playground as recreational area for the citizens
the town.
except the polo ground
Absence of community room, community halls and
public library in the town for the citizens
Absence of tourist facility or picnic spots.
OPPORTUNITY
THREAT
Health
Health
There is scope for private and low cost health
infrastructure in Govindgarh
There is population without proper medical
facilities
State government commitment for health and
education services.
Education
Private sector participation in development of
education sector
State government commitment for education
service
Right of children for free and compulsory
education act will provide free education for poor
children
Recreation and Entertainment
PPP possibilities are there to develop the river
DMG Consulting Pvt. Ltd., Noida
Education
Lack of monitoring and regularization
Lack of maintenance for educational institutions
such as government schools.
6.3.7
fund
for
social
Issues
1. Health Sector
Town has insufficient facilities for hospital, poly-clinic, dispensary and doctors
Town has no intermediate/specialty hospital and specialized health care facilities for which it
depends on nearest town Rewa.
2. Education Sector
Town has insufficient number of primary schools
The physical conditions of the schools are not good
Schools do not have proper basic requirement of drinking water and sanitation facilities for
students, except private school
Inadequate teaching staff in Government Schools
Town does not have any technical/vocational training institute such as ITI.
3. Recreational and Entertainment Sector
There is no notified or designated place as open space, parks or play ground for the residents.
There are no community gathering halls or rooms, public library etc. for the citizens
Picnic spot or recreational areas like Raja Talab, Sunder Ban, Govindgarh Fort etc. are there but
its proper development has not been done.
6.3.8
1. Health Sector
Extension of hospital situated in the premise of community health centre by constructing a multi
storied block
As there is poor infrastructure in health sector in the town, care should be taken by providing
land for development of new intermediate/ multi-specialty hospitals, poly-clinics, increase beds
and number of doctors in the existing hospital and health care centres
Lack of specialized medical care in the existing health care centres, so specialized medical
services should be facilitated in the town by constructing dispensaries
Municipal body can initiate the different health campaigns throughout the year and create
public awareness for prevention of diseases especially during monsoon season
By providing proper health facilities in the city, health tourism can be promoted in the area
which will serve the region and generate revenue for the city.
2. Education Sector
Facilitating provision of more number of schools at the primary and secondary education level
along with required infrastructure facilities for the sector
Reconstruction or renovation of school buildings and other infrastructure which is in dilapidated
conditions
Enhancement and maintenance of infrastructure facilities like drinking water, toilet, solid waste
management etc. in schools and other educational institutions
Establishment of vocational training institutes and ITIs
For adult skill up-gradation as well as self-employment opportunities, establishment of
vocational school should be encouraged
Public awareness programmes should be encouraged in urban poor areas as they are not willing
to educate their children
Page 116
Municipal body shall initiate the literacy campaigns and spread the awareness of education
especially in the slums.
Municipal body shall initiate awareness programmes related to Right to Education especially
for girls and its importance to all citizens to increase the literacy rate among the female.
3. Recreational and Entertainment Sector
Municipal body shall identify the place and initiate the development of community room, Rain
Basera, community halls and public library in town for the citizens as per the norms
Pond development can be done on PPP basis which can be use and conserved as major tourist
site, picnic spot or recreational area for the citizens as well as for domestic tourism
Municipal body shall identify places and designate the same as parks and play grounds for the
residents to cope with present and future development of town.
Municipal body shall identify the site for the development of Stadium/play ground for the town.
Code No.
Projects proposed
H1
Health
Department
H2
Health
Department
H3
Health
Department
for 50.00
275.00
Educational Facilities
Considering the emerging issues and potentials in the sector, the following projects have been identified in
the education sector:
Table 6.3.6: Proposed Project, Project Cost and Implementing Agencies for Education Facilities
Code No.
Projects proposed
Page 117
Education
Department, Govt.
of M.P.
E2
Education
Department, Govt.
of M.P.
E3
Education
Department, Govt.
of M.P.
E4
Education
Department, Govt.
of M.P.
E5
Nagar Parishad
E6
Nagar Parishad
70.00
1140.00
6.4
Environment
6.4.1
As such there is no records found regarding the flora and fauna in the study area i.e. Govindgarh Nagar
Parishad.
At regional level, the region is rich in valuable minerals, forests and wild animals. Variability in climatic
conditions brings about significant difference in the forest types of the state. There are four important forest
types viz. Tropical Moist, Tropical Dry, Tropical Thorn and Subtropical broadleaved Hill forests. The status of
the forests is reserved and protected forests and forests owned and maintained by villagers that have no
protected status.
The prevalent trees in the forests of Rewa District are Mango, Neem, Jamun, Sagon, Sal, Tendu, Shishum,
Eucalyptus, Teak, Palas, Saja, Mahua bamboo etc, The brushwood consists mainly of the species
Grewiazizyphus, Casearia, Antidesma, Woodfordia, Flueggia, Phyllanthus, Bosewellia and Buchanania with
occasional trees of mahua (Bassialatifolia). The Rewa District is famous for white tigers, bears, panthers,
sambar (Cervus unicolor), Chinkara (Gazellabenetii) and other species. Wild fowl of all classes are common
throughout the area.
6.4.2
Page 118
As per the existing land-use 2011 the town has plenty of agricultural land but does not have any designated
and organized green space or open spaces for the citizens. According to the UDPFI guidelines, the open
spaces for parks and playgrounds/ green space should be around 12-14% of the total developed area, which
shows there is a lack of planned developed open spaces in the city. The town needs developed recreational
areas of around 0.8 ha.
6.4.4
A large portion of the Parishads area lies under water. There is a perennial water body in the town. The
water body is separated into two portions known as Raja Talab and Rani Talab. The Parishad has prepared a
project for the beautification and conservation of the great water body of the town but due to delay in
sanction of the fund the project is lying unimplemented. Thus, there is a great scope for the development of
the pond.
Therefore to attract the potential domestic and national/international tourists to Govindgarh, different water
front development activities like green belt, boating, landscape along the riverside should be developed.
6.4.5
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
No industrial pollution as of now
Scenic beauty around the water body
Good ambient air quality
WEAKNESS
Inadequate planning efforts for provision of green
spaces
No environmental compliance system from urban
local body
Lack of monitoring system for pollution control
OPPORTUNITY
THREAT
Good potential for developing a recreational Lack of public awareness regarding environment
management.
space, tourist or picnic spot
States policy implementation for ecotourism in
Govindgarh.
6.4.6
6.4.7
Issues
There is no environmental compliance system at municipal level
Lack of air, water and soil pollution monitoring facilities for pollution level
Inadequate planning efforts regarding provision of green spaces for citizens
Public health is under threat due to absence of basic infrastructure facilities
Waste water drains directly discharge along with municipal solid waste into drains
No water body conservation and beautification has been undertaken
Informal sectors and slum settlements in open areas.
Page 119
6.5
Conservation and plantation of appropriate tree species on the existing roadsides and along both the
sides of the river to mitigate the level of air pollutants
Promotion of rainwater-harvesting and providing more open spaces for water recharge and
plantation at the planning stage for development schemes
In order to control environmental pollution, GNP shall initiate the awareness campaigns for
plantation and other pollution control strategies
There is need of municipal level policy for urban greening of the town with review and monitoring
provisions.
6.5.1
At town level, Govindgarh has many tourist destination and heritage buildings along with some natural
elements such as nallah, pond and water bodies.
HERITAGE:
1) Govindgarh fort
RELIGIOUS:
1) Ram Govind Temple
2) Panchmukhi Temple
3) Chowandi Temple
4) Shiva Temple
5) Khando Devi Temple
6) Hanuman Temple
Tourist Spot
Raja Talab and Rani Talab
Location
Located in southern part of the town near Govind Fort
Page 120
Figure 4.6-85: Rani Talab and Raja Talab in the town near Govindgarh Fort
The above listed tourist spots such as Buddha Stupas & Rock Painting at Deorkothar, Big statue of God Shiva
called "Bhairom Baba" at Gurh, Kyunti Water Fall etc. are in un-developed stage as they lack sufficient and
efficient modes of transportation, infrastructure services - street lights, public drinking water, public toilets,
eating places etc.
Page 117
At regional level Rewa District has a major tourist and pilgrim sites which attract tourists. Rewa district has
some major religious and adventurous tourism spots including Gurh, Govidgarh, Hanumana, and Kyunti
Water Fall. It is also proud to have an ancient archeological site - Buddhist Stupas and Rock Painting at
Deorkothar declared as monument of national importance in 1988 by the Govt. of India and is being
preserved and conserved by Archaeological Survey of India, Bhopal.
Moreover the strategic location of town at the state borders provides it a status of gateway to the famous
pilgrimage center Prayag or Allahabad. Tourists coming from the holy city Prayag or Allahabad moves
straight to Orchha or Khajuraho, Maihar, Panna National Park, Bandhavgarh National Park. Thus, Govindgarh
town falls under KhajurahoPannaBandhavgarh-Chitrakoot-Allahabad tourist circuit.
Tourist Spot
Location
Page 118
110 Km
45 km
Varanasi
165 Km
The overall economy of the town is highly localized and confined to only low economic activities of the
hinterland. Tourism is also not contributing too much to the economic development of the town, it is
Page 119
6.5.3
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed. Table
below presents the SWOT analysis at city level.
STRENGTH
WEAKNESS
THREAT
Page 120
6.5.4
Issues
Town is rich in natural and architectural heritage but there is no management of these resources. In
other words, there is a lack of conservation in the town.
Town does not have a dumping site, as a result waste is disposed into open drains and along the
roads. It is a cause of pollution of water bodies.
6.5.5
Code No.
Projects proposed
T1
6.00
T2
500.00
T3
50.00
Govindgarh
Parishad
T4
50.00
Nagar
606.00
* PWD (SOR) Ap
Page 121
CHAPTER 7
Tourism and Heritage Conservation
Page 122
7.
7.1
Madhya Pradesh offers outstanding opportunity to indulge in various tourism options such as cultural
tourism, heritage tourism, adventure tourism, wildlife tourism and many more. A variety of traditions in each
of Madhya Pradesh's four geographical and cultural regions-Malwa, Nimad, Baghelkhand and Bundelkhand
have added color to the State's rich cultural tapestry, making it a many splendored land. There are many
deserving tourist destinations in the State widely acclaimed for its rich cultural heritage sites and wonders.
Heritage tourism is one of the most popular options of tourism appealing tourists from all over the world.
Though, heritage Tourism has great potential in Govindgarh city. It has heritage structures like Govindgarh
fort, temples with unique architecture forms, royal history, fairs and festivals, history of white tigers,
bountiful nature with Raja Talab and Rani Talab, Sunder ban, easily accessible national wild life sanctuary and
dam, etc.
Govindgarh falls under Jabalpur KhujrahoRewaGovindgarhBandhavgarhJabalpur circuit. Despite it
ideal location within the tourism circuit with rich inventory of tourism resources, this region Lacks Tourism
infrastructure such as Tourist Information Centers, transportation facilities, public conveniences such as
toilets, refreshment centers, information Centre etc. Further, being located in isolation in terms of
development, the region is facing challenges, which directly and indirectly curb the growth of tourism. The
existing infrastructure, safety & Security, local awareness and others are the major hindrance for the
development of the tourism in this region.
The Govindgarh region receives very few numbers of tourists in comparison to other destination of tourism
circuits. Despite its strategic location within the circuit, city has not been developed as a nodal Centre as base
city to cater tourist for its facilities. The existing infrastructure is inadequate to support tourism in the region
and it needs urgent up gradation. The region has wide range of tourism products, which need to be
integrated and made an intra-circuit to increase the duration of stay of the Tourists in the region. Govindgarh
city has great potential in the region to cater tourist from the circuit i.e. KhujrahoRewaGonindgarh
BandhavgarhJabalpur.
Integrating with other destination, Govindgarh can be converted as a transit zone between Khajuraho and
Varanasi or Bandhavgarh.
Hence, immense potential for developing Govindgarh as one of the destination with heritage, scenic beauty
and religious node, need to be fully exploited. In terms of improving the tourism product, in the short term
quick gains can be made by developing the destination and providing basic infrastructure facilities at various
tourist locations and at city level with high potential, which are already well connected and have a
reasonable infrastructure in place.
7.2
The State Tourism Policy, Heritage Tourism Policy and Eco and Adventure Tourism Policies of the State
supported with initiatives towards strengthening of infrastructure and facilities at places of tourist interests is
an important indicator of commitment of the GoMP to create an environment conducive for attracting
increased private investment in the tourism sector. In accordance with the aims and objectives of the
Tourism Policy of the State and the provisions made towards development of tourism sector, the
Government of MP, Department of Tourism has issued a Policy for the Allotment of Government Land for the
Development of Tourism in the State.
Page 123
7.3
The Tourism Products in Govindgarh can broadly be classified into those based on the Heritage Tourism,
Religious Centers/ Pilgrim centres, handicraft and Wild-life Tourism in Panna National Park in the
surrounding. The city has many places for tourist attraction i.e. Govindgarh Fort, Sunder Van, Durga Temple,
Lal Bagh, Raja Talab, Rani Talab etc.
Govindgarh Fort
The Govindgarh palace used to have security like a well protected fort. The stately palace of Gobindpur on
the banks of the Lake houses, a police training school and Baghela museum is running now.
The island, nestled in the Lake also showcases a wonderful palace. The doorway of this beguiling palace
however is closed for the general public.
An underground tunnel is also there which was used as a secret path for kings between Govindgarh & Rewa.
The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands.
Lal Bagh
The Lal Bagh area is famous for its Sunderja Mango garden. The area is also known for its lush green beauty.
Lal Bagh is situated on the bank of Raja Talab near to Govindgarh Fort. The Sunderja Mangoes of the
Govindgarh are famous in the country. The people of the area are decent and have higher human values. The
law and order situation of the area is also good. This is being developed as a future tourist destination to
attract International Tourists.
Page 124
7.4
Bandhavgarh
The Bandhavgarh National Park is located in the Vindhya
Range in central India this park was formed on 1968. The
National park holds the highest density of tigers due to its rich
evergreen forest with trees like Sal & Bamboo with well spread
water bodies & grasslands all over the park.
Bandhavgarh National Park spread in an area of 448 sq. kms. is
Figure 7-1: Govindagarh Forest
densely populated with tiger and other wildlife species of gaur, nilgai,
sambhar and barking dear. In the backdrop of the park is the old fort which has references in Shiva Purana
and Panch Ratna. The park has in all about 32 mammals, 250 species of birds and about 72 types of
butterflies. The Park of also has the archaeological relies of Sheshai Vishnu and number of caves.
The park has some basic infrastructure such as accommodation includes resorts and lodges PWD Rest House,
MPSTDC lodge and many eatery and shops. However, the destination lacks in providing safe drinking water
facilities. The water source is Open well and borewells. Hotels and Lodges have independent Borewells.
DMG Consulting Pvt. Ltd., Noida
Page 125
Keonti Falls
The Keoti Falls is on the Mahana River, a tributary of Tamsa or Tons River as it comes down from the Rewa
Plateau. It has a total height of 98 meters (322 ft. The World Waterfall Database puts the height of the
waterfall at 130 meters (430 ft) is one of the major waterfall in India. It is situated at 42 km from Rewa.
Sirmaur
Sirmaur is situated at 57 km from Rewa. Kyoti Garhi is one of the
major destination in Sirmaur which made by Yuvraj Nagmal, 2nd
son of Baghel (17th ) Maharaj, Shaliwahan Singh Ju Deo between
1605-10 A.D. Presently this Garhi is with M.P. Archeological Dept.
The Garhi overlooks a 270 feet deep gauge making a water fall on
the river Mahana, but is in a very bad shape & needs to be
developed as a tourist spot as the place holds great potential.
Figure 7-3: Keonti Fall
Besides, Garhi, Laua Kothi, Dev Talab, Shiv Temple Dev Talab,
Naigarhi Kothi Naigarhi, Semaria Garhi, Laxmanbagh Temple, and Deur Kothar Buddist Stupa are other
destination.
Other Destination
There are many rocks painting Rock painting scattered around the region such as Khando samuh, Gaddi
samuh, Shivpurva samuh, Itar samuh, Badwar samuh, Jaldar samuh, Ledroghat samuh, Ginjwa samuh, Quoti
samuh, Hanuman samuh etc.
7.5
Handicrafts / Articrafts & Other Human Resources in the Region:Madhya Pradesh is also known for its carpets where Rewa is one of the centres in the state. The toys made
out of Beatle nut are very rare and famous in this area, which cant be got anywhere else. Except these there
are many women who are involved in bangle making and other artistic works. Ahir (Yadav) & Kali are the
main folk dances of this area. Most of the dishes made in this area are based on dals (Lenten) and hence very
nutritious and less spicy in character.
Page 126
Cleanliness in the surrounding areas is not been taken care of which effects the number of tourists visiting
the place. Landscaping, where ever open spaces are available has not been done and the spaces been left
unseen. Haphazard vegetative growth provides negative impression on the tourists. No safety measure like
provision of guards on most of the temples has been taken.
Direct discharge of sewage from domestic sources, not connected to treatment plants; eventually make its
way into existing water bodies i.e. Raja Talab and Rani Talab.
Lack of public utilities, proper information, water facility, refreshment counters and above all parking spaces
in or around most of the temple complexes affects the number of visitors at such places.
Table 7.6.1: Assessment of tourist destination in & around the city
S.No. Assessment
Major Tourist Destination/sites in and around the City
Parameters
Govindgarh
Rewa Fort Complex Bandhavgarh National
Fort
Agency
responsible
for M.P. Tourism
protection
Accessibility/ Connectivity
Fair
Excellent
Good
Good
Good
Good
Good
Fair
Fair
Fair
Cleanliness of Surroundings
Fair
Fair
Fair
Landscaping
Fair
Fair
Fair
Fair
Poor
Fair
Overall Maintenance
Fair
Good
Good
10
Parking Facilities
Bus, other
Public Toilets
11
HHMCT
Park
Forest Dept
Good
Good
Available,
designated
but
not
Available
12
Refreshment stalls
Not Available
Available (Pvt)
13
Information Kiosks
Not Available
Not Available
Available
Open well and bore wells
14
Available
Not Available
30 guides approved
15
Fair
Poor
Fair
Page 127
Heritage
Present Status
1.
Govindgarh Fort
7.7
The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands.
Tourist Arrival
Tourism has been identified as one of the key drivers of growth by the MP government. Eight million
domestic tourists and 160,000 foreigners visited the state in 2005-06. The government has approved $12.2
million for development of 17 tourist locations across the state and is also making concrete efforts to
improve air connectivity to other states. It has taken initiatives to promote eco and adventure tourism and is
keen on promoting medical/ herbal tourism in association with private parties.
There is no record for tourist visiting various temples and forts in Govindgarh. There is no entrance ticket
system prevailing either at the main entrance of forts or at any of the temples. This is the major handicap in
estimating the accurate tourists influx at Govindgarh.
Despite, presence of historical building and temple, the city does not fall within any tourism circuit in the
state. Tourism prospect of Govindgarh can be viewed with the development of city infrastructure and
existing tourism destination to make a complete circuit with the Bandhavgarh-Govindgarh-Rewa as sub
circuit of Bandhavgarh - Chitrakoot-Khujario. Chitrakoot receives maximum number of visitors i.e. 9.1 million
(2008) followed by Khajuraho (0.27 million) and Bandhagarh (0.09 million).
Table 7.7.1: Number of visitors to these three major destinations in the region during 2005-08.
Centers
Tourist
Types
2005
2006
Bandhavgarh
Year
2007
Indian
23244
38614
Foreign
4068
6812
Total
27312
45426
Chitrakoot
Indian
2673847 6096835
Foreign
460
499
Total
2674307 6097334
Khajuraho
Indian
145987
164406
Foreign
70726
73843
Total
216713
238249
Source: Perspective Tourism Pan, Govt. of India
55835
13706
69541
7952629
725
7953354
193764
84887
278651
2008
69641
24781
94422
9142009
654
9142663
201443
89169
290612
20052006
66.12
67.45
66.32
128.02
8.48
128.00
12.62
4.41
9.94
CAGR (%)
20062007
44.60
101.20
53.09
30.44
45.29
30.44
17.86
14.96
16.96
20072008
24.73
80.80
35.78
14.96
-9.79
14.95
3.96
5.04
4.29
It is assumed that a significant number of tourists will be attracted and diverted to Rewa from Khajuraho,
Chitrakoot and Bandhavgarh, if proper tourism supported infrastructure and strong marketing is done.
DMG Consulting Pvt. Ltd., Noida
Page 128
Tourism Development of any destination cannot be accomplished without proper development of support
infrastructure facilities including accessibility, accommodation, water supply, sanitation, power and drainage.
In Govindgarh city, very limited infrastructure is developed. Except approach road, small shops and drinking
water non on the infrastructure are available like Toilet facility, Solid waste Management, Street Lightning
etc. at the tourist spots.
Transportation
There is good network of roads connecting all the major parts of the state with Govindgarh. The State
Highway 9 and State Highway 52 connect Govindgarh with major cities of Madhya Pradesh. Govindgarh is not
directly connected to railway line. The nearest railway station is Rewa junction at a distance of 20 Km. The
nearest airport is Satna Airport at a distance of 54 km. which has an airstrip, however not in use for regular
fights followed by Bamrauli (Defense Air Base) in Uttar Pradesh which is approximately 161 km. from
Govindgarh.
Accommodations (Regional Level)
At town level, Govindgarh doesnt have any hotel facility to accommodate the peoples or tourists. But at
district headquarter Rewa; there are nearly 497 beds in 24 various categories of Accommodation. Besides
this, the Rewa city has nearly 5-6 Dharmshalas, which accommodates nearly 4-500 people in total. A three
Star level hotel namely Hotel Rewa Raj Vilas (owned by Maharaja Rewa) is situated in the heart of city.
7.9
Key concern areas for enhancement of tourism development in Govindgarh have been identified from the
analysis of existing tourist scenarios and overview of SWOT analysis. The following table shows the Key
concern areas.
Table 7.9.1: Key Concern Areas and related issues
Issues
Limited Tourist inflow
Remarks
Continued
tourism
infrastructure constraints
Information Constraints
Unexplored
Assets
Heritage
related
Suggestions
Specifically define potential area
of tourist attractions where there
are wide ranges of tourism
products.
Enhance the attractiveness by
augmenting core activities by
providing additional activities.
Focus is to be given to identify
new tourism products
Transverse tourism circuit linking
destinations of Govindgarh with
other major tourist spots in Rewa
and other districts.
Page 129
On site/offsite deficiency
of infrastructure
Lack of Publicity
Inadequate information
dissemination
Page 130
The overall tourism development of Govindgarh Region can be segmented into two levels
a) Major Tourism Circuits -Though there are many tourism attractions scattered around the Govindgarh City
linking Rewa, Bandhavgarh National Park etc.
Page 131
Page 132
Page 133
Strength
Govindgarh having many heritage and
tourist centers.
Number of tourist increasing with time.
Opportunity
Govindgarh
falls
under
JabalpurBandhavgarhKahjurahoChitrakut
tourist circuit.
Govindgarh got good road connectivity
and it is also near to Rewa Junction.
Govindgarh having many water bodies
and religious centers also attracts tourist.
Weakness
Non- maintained heritage buildings.
No proper connectivity to some of the tourist
centers.
Poor existing infrastructure.
Threat
Un-maintained heritage site might result into
ruined structures.
Inadequate infrastructure & connectivity may
leads to decline in tourist flow.
Page 134
Projects
1
a
b
c
d
e
f
2
a
B
3
a
b
c
Page 135
Tourism Supported Infrastructure in the Govindgarh City and Khando devi Temple
Construction of Designated Parking facilities for taxi stand and tourist Vehicle
Establishment of Public Convenience
Design and location for every component of street furniture, signage
Tourist Facility & Information Centre- Establish tourist facility centre including tourist information
centre, toilet and drinking water facilities and conventional shops near Govindgarh Fort.
9
10
Code No.
Projects proposed
T1
6.00 (1% of
Project Cost)
T2
500.00
T3
50.00
T4
50.00
606.00
Page 136
CHAPTER 8
Existing Institutional Framework
for Development
Page 137
8.
8.1
The main organization in the town is the Govindgarh Nagar Parishad which provides all the civic services,
levies local taxes and maintains registers of births and deaths. The municipality is primarily funded by local
grants and levy of property tax.
Chairman of Nagar
Parishad
Chief Municipal
Officer
Deputy Chairman
15 Ward
Councilors
Administrative Authority
Page 138
Functions
Administrative Powers
Revenue Powers
Limitations on powers
Constraints Identified
8.2
The main function and activities of Town & Country planning department are governed by MP Nagar Tatha
Gram Nivesh Adhiniyam 1973 and rules prepared there-under e.g. MP Nagar Tatha Gram Nivesh Niyam 1975
and MP Bhumi Vikas Niyam 1984.
The main functions are: preparation of Town Development Plan, Review Evaluation and Modification of
existing Development Plan, Preparation of Regional Development Plan, Monitoring and Enforcement of
various schemes such as Integrated Development Plan of Small and Medium Towns (IDSMT) and Urban
Infrastructure Development scheme for Small & Medium Towns (UIDSSMT), Control on unauthorized
development in towns and functions of State Nodal Agency for National Urban Information System Scheme.
Page 139
8.3
Development Authority
8.4
Public Health Engineering Department (PHED) is one of the major departments of the state of Madhya
Pradesh as it is not only responsible for the provision of public health but also carries the water supply and
sewerage and sanitation projects in the entire state. Major infrastructure projects under urban infrastructure
are implemented by public health engineering department both in the urban and rural areas.
8.5
The Madhya Pradesh Housing Board had been set up by the government of Madhya Pradesh as a corporate
body under the 1972 Madhya Pradesh Griha Nirman Mandal Adhiniyam Act. The Madhya Pradesh Housing
Board is the only housing board in India that does not receive any subsidy from the government. The main
objective of the housing board in Madhya Pradesh is to provide housing and basic accommodation to the
needy people in the state. In the state of Madhya Pradesh, the Madhya Pradesh Housing Board is the single
largest builder and developer of real estate. The housing board contributes around 10,000 plots and 6,000
houses per year to the housing stock in the state. It has invested around Rs. 2,000 crores in construction and
housing sector.
The various objectives of the Madhya Pradesh Housing Board are:
To construct houses for the various sections of the society that is, the low, middle, and the high
income groups
To make various schemes that provide financial help to the high and middle income groups in the
purchase of houses
To select the sites where houses are to be constructed and to decide the various facilities that are to
be provided in the houses
The Madhya Pradesh Housing Board has been successful to a large extent in catering to the accommodation
needs of the people of Madhya Pradesh. However, there still exists significant scope for improvement and
the state government is making all possible efforts to ensure that the infrastructure provided by the Madhya
Pradesh Housing Board is efficient and utilitarian.
Page 140
Madhya Pradesh Pollution Control Board (MPPCB) - The Board has been vested with considerable authority
and responsibility under various environment legislations to prevent pollution. Madhya Pradesh Pollution
Control Board presently looks after the implementation of following Acts:
The main objective of Board is to maintain water, air and soil in healthy and usable condition for various
purposes. There are 10 Regional Offices, 4 Sub Regional, 3 Single Window System and 2 Monitoring Centres
equipped with trained personnel and sophisticated instruments which are constantly keeping watch on
environmental activities in the state to attain the objectives.
Major function of the board is to reduce, control and monitor the state environmental pollution in terms of
air, water and soil. It also provides consent for industries to establish and operate in order to maintain the
environmental compliance within the state.
8.7
There is no role of private sector in service delivery mechanism or infrastructure creation at Govindgarh. The
role of private sector is restricted to social sector - education and health-care in a limited manner. Even
outsourcing of activities such as maintenance and upkeep of street light, solid waste collection and
transportation which are common among small municipalities is not practiced at Govindgarh.
8.8
Issues
8.9
Page 141
principles such as improved accounting techniques, monitoring and evaluation of projects (including
social audit), and improved budgeting methods
Focus on skill-up-gradation of municipal staff on a regular basis. Human resources are the key to
efficient service delivery in any organization. Municipal Council will need to emphasize on developing
core skills of municipal staff in order to ensure that these skills are relevant to the ever-changing
operational environment
Decentralization of functions: Decentralization of municipal functions, particularly in service delivery,
citizen interface and planning will greatly enhance the operational capabilities of Municipal Council
Special budget should be incorporate for the target groups like urban poor, women etc. which gives
basically focus on infrastructure development, affordable housing for poor, local economic
generation etc.
Demand Collection Balance should be started at ward level.
Page 142
CHAPTER 9
Investment Plan and Financing
Strategies
Page 143
9.
9.1
Revenue Accounts
The revenue account comprises two components - revenue income and revenue expenditure. Revenue
income comprises internal resources and external sources of income of Govindgarh. Internal sources of
income, also referred to as own sources of income, comprise tax and non-tax items. The external resources
come in the form of shared taxes/ transfers and revenue grants from the State and Central Governments and
loans from Financial Institutions. Revenue expenditure comprises expenditures incurred on salaries,
operation & maintenance cost, contribution & donations and debt servicing.
9.1.1
Key Assumptions
9.1.2
9.2
Water supply
Rents
Sale of properties
Penalties
Interest rate
Revenue Income
Based on the Accounts procured from Govindgarh, the information in respect of Revenue Income is as under:
From the figure, it can be clearly observed that the income is increasing every year with a very high growth
rate. Total income of Govindgarh in the financial year 2009-10 was 141.75 Lakhs and it was 174.81 Lakhs in
the financial year 2010-11. Total income of Govindgarh is increasing every year because of increasing
Property as well as resources of taxes and grants.
Page 144
200
150
100
50
0
2008-09
2009-10
2010-11
Financial Years
Figure 9.9-1: Year Wise Total Income, Govindgarh Nagar Parishad
9.3
Growth in Income
As per the Budget, the contribution of Municipal Taxes and grants was 2.95 Lakhs and Rs 3.74 Lakhs for
the year 2009-10 and 2010-11, respectively. For the same year, the third contributor is income from non
tax sources which has a contributing of Rs 139.11 Lakhs and 171.07 Lakhs in the FY 2009-10 and 2010-11,
respectively. This source has a very high growth rate in comparison of other sources.
9.4
Observations
9.5
As compared to the income of Rs 107.33 Lakhs in the FY 2008-09, the income for the FY 2009-10 was
Rs 141.75 Lakhs.
Revenue Expenditure
In the FY 2009-10, total expenditure was less as compared to the previous year but in FY 2010-11 total
expenditure of Govindgarh increased due to Establishment Expenditure (Salary, Wages, Benefit and
allowance).
Page 145
Expenditure(in lakhs)
140
120
100
80
60
40
20
0
2008-09
2009-10
2010-11
Financial Year
Figure 9.9-2: Total Expenditure Govindgarh Nagar Parishad
9.6
Capital Account
The capital account comprises capital income and capital expenditure. Capital income consists of income
earned by the Govindgarh Nagar Parishad from loans raised, transfers from revenue surplus and utilization
of funds from sinking funds and grants received for undertaking capital works. Capital expenditure largely
comprises expenses incurred for creation of civic infrastructure and towards debt servicing (principal
repayments).
9.6.1
Capital Income
Table 9.9.6.1: Year Wise Income of Govindgarh Nagar Parishad from Various Sources
Financial Year
Tax
Non-Tax
Transfer
grants
inc. Total
2008-09
172137
10531216
32000
10735353
2009-10
264232
13875928
35190
14175350
2010-11
340000
17107926
34000
17481926
Source: Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad
From the above table it can be clearly observed that the income is increasing every year at a very high
rate. The income of Govindgarh is driven by three main sources i.e. income from taxes (Property tax,
Water tax, Pilgrimage tax, Sewerage tax, conservancy tax) non tax sources such as (Rental from
DMG Consulting Pvt. Ltd., Noida
Page 146
Sources of Income
180
160
Income(in lakhs)
140
120
100
2008-09
80
2009-10
60
2010-11
40
20
0
Tax
Non-Tax
9.6.2
Capital Expenditure
Capital expenditure largely comprises expenses incurred for creation of civic infrastructure and towards debt
servicing (principal repayments).
Table 9.6.2: Year Wise Expenditure of Govindgarh Nagar Parishad
Financial
Year
(Wage
& Operation and Payment
Maintenance
Interest
salary)
Establishment
Others
Total
2008-09
7334292
42240
2975037
10351569
2009-10
9112660
34000
9146660
2010-11
12697908
33000
894741
13625649
Source: Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad
9.7
9.7.1
Revenue Indicators
Own sources revenue to Total revenue: Higher the percentage of own sources better is the financial
health of the municipality and less dependent on the Government
Taxes and non-taxes to own revenue: It is good to have own tax revenue sources increasing in trend
which shows elasticity and increase of tax revenue in municipal budget. Increase in non-tax sources
indicate municipal services are charged and increased with increase in services consumption.
Therefore, both indicators are independently monitored in municipal finance.
DMG Consulting Pvt. Ltd., Noida
Page 147
Capital revenue to Total revenue: This source of revenue indicates fund availability of capital work as
well as resources available from the higher level of government and better credit worthiness of
municipalities to access loan from market and financial institutions.
9.7.2
9.8
Expenditure Indicators
Capital expenditure to total expenditure: More capital expenditure more development, more asset
creation, better infrastructure. This is a good indicator and shows good municipality. More per capita
capital expenditure better is the municipality and vice-versa.
Revenue expenditure to total expenditure: Less the revenue per capita expenditure, better is the
financial health of the municipality. It shows that the municipality does not have surplus money for
capital and infrastructure work and this is bad for the municipal finance.
For the financial assessment, three year financial data pertaining to the years 2008-09 to 2010-11 have been
used. At present, Govindgarh follows a cash-based single entry accounting system, where income and
expenditure heads are maintained on a cash inflow and outflow basis. In order to gauge the correct financial
picture of Govindgarh, it is critical to recast accounts in a standard accounting format with appropriate heads.
Govindgarh accounts have, therefore, been recast appropriately. The financial assessment has then been
done by looking at the annual growths of various components of income and expenditure, the sectoral
makeup of the finances, the extent of Govindgarhs dependence on the State and Central government grants
and reimbursements, the status of debt servicing, performance indicators and so on.
In this exercise, all the revenue earned by Govindgarh from taxes, fees, shared income etc. have been treated
as revenue income and the income from loans and revenue grants has been treated as a capital income.
Similarly, all expenses towards regular maintenance are treated as revenue expenses, while expenses on any
asset creation have been treated as capital expenses. The financial assessment thus undertaken is discussed
in the following sections.
9.8.1
The assessment of the income and expenditure statement of Govindgarh, at aggregate level, reveals that
from all the years reviewed, in 2008-10 it shows buffer margin but in the year 2010-11 it turns into deficit
margin due to more Capital expenditure.
Table 9.9.8.1: Total Revenue Income and Expenditure of GNP
Financial
Year
Revenue Income
Revenue Expenditure
2008-09
10735353
10351569
383784
2009-10
14175350
9146660
5028690
2010-11
17481926
13625649
3856277
Source: Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad
Page 148
Lakhs
Revenue Income
Revenue Expenditure
Buffer Margin
2008-09
2009-10
2010-11
Financial Year
Figure 9.9-4: Year Wise Revenue Income, Expenditure and Surplus - GNP
From the table of income and expenditure it can be analysed that there is a balance between income and
expenditure of Govindgarh. Only in the financial year 2010-11, there was more expenditure in comparison to
income. The analysis has been conducted, keeping in mind the limitation arising out of limited total income in
general, and internal revenue generation in particular. The spending pattern of Govindgarh suggests high
spending, as compared to the total income, leaving a very small buffer margin. However, a buffer margin is
maintained as Closing Balance (CB) with a major help of grants & aids. Generating internal resources is a
must to sustain development activities for a longer time.
Since the job of Govindgarh Nagar Parishad happens to be a non-commercial one, it is not expected and
right to have a much lower total expenditure as compared to the total income. Income is generated to fulfil
the requirements of society and community by spending as much as possible on the development front.
However, a buffer margin should always be kept for any contingency and emergency situation. This buffer
margin takes care of any unplanned project, which at times crops-up as urgent due to uncertainties in life.
Hence, if the income is good then a relatively narrow buffer margin can also be kept. Therefore it is desirable
to increase the spending by increasing the income first as higher income is important for high spending.
9.9
The key issues and conclusions drawn on the basis of above financial analysis are as follows:
The income and expenditure of Govindgarh runs neck to neck, which creates limitations
The potential sources of internal revenue generation should be spruced-up and larger accruals
should be made
There is a need to properly account all the properties and tax them with adequate rates
Income from Water Tax & Charges also needs to be augmented with increasing number of built-in
area and increase in population and households
Expenditure should be made proportionate to the internal revenue generation capacity of
Govindgarh
Page 149
Revenue collection needs to be computerized so that data is clearly monitored and defaults can be
identified on a periodic basis. Computerization of the system mainly includes three things:
o Financial and account
o Workshop: Solid Waste management & Street lightening
o Technical Development: In Water supply, roads networking etc.
Revision of user charges, property tax collection
Introduction of Asset Evaluation and Inventory Management System
Preparation of Demand Collection Balance at ward level
Funds for identified Towns/Cities would be released to the designated State Nodal Agency, which in
turn would leverage additional resources from the State Government
A revolving fund would be created to take care of operation and maintenance of various assets
created under the Mission
Arrangement of well-equipped necessary systems for implementing reforms and improving efficiency
of Govindgarh, which may include new methods of register maintenance, data storage and retrieval,
etc.
e- Governance should be incorporated in grievance redressal system.
Page 150
CHAPTER 10
Investment Prioritization Plan
Page 151
10.1.1
Physical Infrastructure
Water Supply
Sector
Water Supply
Proposed Projects
- Raja Talab could be used as
source of potable water in the
town after its treatment
- Water Supply / Renewal Works
- Water Supply Distribution
Network
- Replacement of older OHT and
construction of newer ones
- Up-gradation and extension of
WTP with an enhanced capacity
as per the future demand
- Metered Water Connection in
all Dwelling Units 2135 by 2035
- Employing skilled man-power
for
water
supply
and
maintenance works
- Preparation of fresh DPR for
Water Supply System for the
town.
Drainage
Sector
Drainage
Proposed Projects
-
Channelization of nallahs
and major drains by desilting, lining and repair
works
Converting
the
Kutcha
Nallahs to pucca one by Desilting,
lining
and
constructing side walls
Construction of new drains
in all wards and converting
the open ones to covered
type.
Page 152
Sewerage
Sanitation
and
There
is
no
underground
sewerage system in the town
Contamination of river water due
to outfall of drains/nallahs
carrying sewage from households
through septic tank
Considering
the
sanitation
coverage of the city, presently
more than 70% of households do
not have in-house facilities
Unmaintained limited number of
public urinals
No community toilets for
exclusive women complex.
Proposed Projects
-
Solid
management
waste
Proposed Projects
-
Formation
of
ward
samiti/committee
to
ensure
the
primary
collection and disposal of
waste on PPP basis
Provision of vehicles and
sweepers
in
the
municipality
Identification of proper
dumping yard and working
out management plan.
Provision of dustbins and
construction of waste
depots in all wards
Preparation of a Detailed
Project Report (DPR) for
Municipal Solid Waste
Management for the town,
ensuring the design, size
and type of Land fill site
and quantity & quality of
required
modest
equipments,
techniques
Page 153
Roads
Transportation
and
Proposed Projects
-
Establishment of Traffic
Police Station and Traffic
Management Centre
Construction of new bus
stands to a newer location
with proper ISBT on BOOT
basis
Construction
of
Truck
Terminal/Transport Nagar
on BOOT basis
Removal of encroachment,
Road Widening & Junction
improvement in core and
accident prone areas
Development
of
footpath/pedestrian
pathways along the major
roads
Construction of parking lots
in main roads including
O&M on PPP basis
Up-gradation of existing
kutcha roads into pucca
ones
Construction of new roads
by 2035 to cover all areas of
the town
Introduction of eco-friendly
Intra-city Public Transport
System
Improved Street Lighting
covering the whole of the
street length
High mast lights at entry
points of the City.
Page 154
Urban Poor
Proposed Projects
-
10.1.2
Slum
Improvement
Programmes
Provision of security of
tenure
Skill
up-gradation
and
economic
up-liftment
schemes
Improvement of shelters
Development of EWS and
LIG colonies by MPHB with a
focus or poverty eradication
in identified sectoral zones
especially for urban poor
under IHSDP
Relocation of slums from
hazardous areas.
Social Infrastructure
Health Facilities
Sector
Health facilities
Lack of specialty/intermediate
hospitals in the town
No
specific
government
programmes for health sector
other than Family planning, RCH
and Immunization etc.
Infrastructures in government
hospitals are inadequate in terms
of facilities and number of
doctors.
Proposed Projects
-
Educational Facilities
Sector
Education facilities
Proposed Projects
-
Recreation
Entertainment
and
10.1.3
Proposed Projects
-
Development of Community
Halls and Rooms
Development of Rain Basera
Development of Parks and
Playgrounds
Development of Stadium
Raja Talab Development
with tourist infrastructure.
Sector
Proposed Projects
-
NGOs
Govt. and
Municipal
Bodies
Religious
bodies
Industry
Womens
Group
Assoc.
Stakeholder
Group
Prominent
Local
citizen
RWAs
Students
Slum
People
Based on stakeholder consultations, the prioritization of projects was done so that the views, aspirations and
felt needs of the local officials, residents, experts, NGOs, elected representatives and others are given due
cognizance. The sectoral priority to the projects is assigned on the basis of various consultations and
discussions held with the government departments involved in the implementation of CDP. It also takes into
account the aspirations of the residents of Govindgarh expressed in a workshop, informal discussions and
meetings held for the purpose.
DMG Consulting Pvt. Ltd., Noida
Page 157
Preparation of fresh DPR for Water Supply System for the town.
Construction of Water Supply Distribution Network for extension of present distribution system.
Construction of Water Treatment Plant of capacity of 4 MLD.
Construction of intake well, pump house with electrical pumping machinery.
Construction of 2 OHT each of capacity of 2 MLD (one in southern part of the town and other one in
northern part of the town).
Preparation of DPR/Comprehensive Master Plan for Sewerage and Drainage System for the entire
town.
Construction of one STP of 3 MLD capacities.
Construction of underground sewerage network for 35 km to cover the entire town.
Construction of 5 Community/Public Toilets of 20 Seats like Sulabh Complex & 10 Urinals of 5 seats in
urban poor areas & commercial/ market areas.
Construction of some Community/Public Toilets especially for women.
Construction of new storm water drainage network to cover the whole town (for 65 Kms - including
both the sides of roads).
Converting the Kutcha Nallahs to pucca one by De-silting, lining and constructing side walls.
Preparation of a Detailed Project Report for Municipal Solid Waste Management with required
infrastructure and modest equipment.
Provision of dustbins and construction of waste depots in all wards.
Development/construction of Scientific Waste Disposal Site.
Construction of a new bus stand to a newer location with proper ISBT on BOOT basis.
Construction of a Truck Terminal/Transport Nagar on BOOT basis.
Construction of new roads of total length of 14 km by 2035 in different areas of town.
Development of footpath/pedestrian walkways along the major roads (for 20 kms).
Construction of 5 parking lots in main roads/commercial or market areas including O&M on PPP
basis.
Development of EWS and LIG colonies by MPHB with a focus on poverty eradication in identified
zones especially for urban poor under IHSDP.
Establishment of 3 more primary school by 2035.
Establishment of 1 Integrated School with Hostel Facility in ward no 8.
Establishment of vocational training institutes and ITIs.
Development of 1 Public Library.
Construction of Multi-specialty/Intermediate hospital.
Construction of one 10 bedded Poly-clinic for 2035.
Development of one Community Hall.
Development of a Rain Basera in ward numbers 7, 14 and 15.
Development of Parks and Playgrounds.
Development of Stadium.
Preparation of Detailed Project Report for Raja Talab development including landscaping, designing
and details of infrastructure required.
Page 158
10.5.1
Physical Infrastructure
Water Supply
With a vision to provide adequate amount of treated water to the projected population of 2035, the
following projects are identified to achieve the goal in the sector:
Table 10.5.1: Proposed work, Project cost and Implementing Agencies for Water Supply
Code No.
WS 1
WS 2
WS 3
WS 4
WS 5
WS 6
WS 7
WS 8
Projects proposed
Page 159
Govt. of M.P.
Govindgarh
Parishad
Govindgarh
Parishad
Nagar
Nagar
1001.50
Code No.
Projects proposed
SS 1
Preparation of DPR/Comprehensive
Master Plan for underground Sewerage
System for entire town
5.00
SS 2
150.00
Govt. of M.P
SS 3
150.00
Govt. of M.P
SS 4
171.00
Nagar Parishad
SS 5
3.00
Nagar Parishad
SS 6
Construction of individual
toilet
(Support in terms f subsidies for 1300
units)
52.00
531.00
Page 160
Projects proposed
SWM 1
SWM 2
Nagar Parishad
SWM 3
Nagar Parishad
SWM 4
Nagar Parishad
246.00
Code No.
Projects proposed
D1
D2
Govt. of M.P
D3
Nagar Parishad
191.90
Page 161
Code No.
Projects proposed
TT 1
Nagar Parishad
TT 2
Nagar Parishad
TT 3
Nagar Parishad
TT 4
Nagar Parishad
TT 5
PWD
TT 6
Nagar Parishad
100.00
830.00
Table 10.5.6: Proposed Project, Project Cost and Implementing Agencies for Street Lighting and Fire Fighting
Code No.
Projects proposed
SL 1
Govindgarh
Parishad
Nagar
SL 2
Govindgarh
Parishad
Nagar
Page 162
SL 4
Govindgarh
Parishad
Nagar
Govindgarh
Parishad
Nagar
SL 5
Govindgarh
Parishad
Nagar
SL 6
Govindgarh
Parishad
Nagar
25.00
5.00
340.00
Urban Poor
Presently slum coverage is 9.25% of the city and there is lack of physical and social infrastructure in most of
the slums as well. So to make the city slum free the following projects have been identified in this sector:
Table 10.5.7: Proposed Project, Project Cost and Implementing Agencies for Urban Poor
Code No.
Projects proposed
UP 1
4000.00
10.5.2
Social Infrastructure
Health Facilities
Most of the population is not served by this because of poor medical infrastructure facilities in terms of
hospital beds and doctors. So the following projects have been identified for the overall development of the
sector:
Table 10.5.8: Proposed Project, Project Cost and Implementing Agencies for Health Facilities
Project
Department
Cost
(in
Lakh)
Code No.
Projects proposed
H1
Health Department
Page 163
Health Department
H3
Health Department
275.00
Educational Facilities
Considering the emerging issues and potentials in the sector, the following projects have been identified in
the education sector:
Table 10.5.9: Proposed Project, Project Cost and Implementing Agencies for Education Facilities
Code No.
Projects proposed
E1
Establishment of 1
with Hostel Facility
E2
Education Department,
Govt. of M.P.
E3
Education Department,
Govt. of M.P.
E4
Education Department,
Govt. of M.P.
E5
Nagar Parishad
E6
Nagar Parishad
70.00
Education Department,
Govt. of M.P.
1140.00
Tourism
Presently the tourism industry is lacking infrastructure facilities and there is shortage of active recreational
space in the city. With a goal to enhance the tourism activities in the city the following projects have been
identified for improvement of the sector:
DMG Consulting Pvt. Ltd., Noida
Page 164
Code No.
Projects proposed
T1
6.00 (1% of
Project Cost)
T2
500.00
T3
50.00
T4
50.00
606.00
10.5.3
Other Components
Other than the above stated sectors, some other projects have also been identified for the development of
the city.
Table 10.5.11: Proposed Project, Project Cost and Implementing Agencies for Other Development works
Code No.
Projects proposed
O1
O2
10.00
O3
50.00
O4
170.00
10.5.4
Table 10.5.12: Proposed Project, Project Cost and Implementing Agencies for Urban Reforms and Capacity Buildings
Code No.
Projects proposed
Page 165
Govindgarh
Parishad
Nagar
UR 2
systems; 5
Govindgarh
Parishad
Nagar
UR 3
Training/Manpower Assistance
Nagar
UR 4
Strengthening
Engineering
AUTOCAD, all h/w & s/w)
(MIS, 5
Govindgarh
Parishad
Govindgarh
Parishad
UR 5
Govindgarh
Parishad
Nagar
Nagar
40
10.5.5
Physical Infrastructure
Sub Total Cost (A)
Water Supply
1001.50
531.00
191.90
246.00
830.00
340.00
Urban Poor
4000.00
Health Facilities
275.00
Educational Facilities
1140.00
Tourism
606.00
Other Components
170.00
40.00
Social Infrastructure
9371.40
Phase I (2012-2015)
Phase II (2016-2020)
Phase III (2021-2025)
Phase IV (2026-2030)
DMG Consulting Pvt. Ltd., Noida
Page 166
10.6.1
Phase V (2031-2035)
These projects are to be implemented over the plan period for first phase ( 2012- 2015) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.
Table 10.6.1: Sector wise Project cost and Yearly Schedule of Expenditure (Phase I)
2013-14
2014-15
2012-13
Project Code
WS 2
30
50
50
WS 4
300
50
50
WS 5
235
100
WS 6
100
WS 7
50
50
WS 8
30
100
WS 9
15
100
WS 10
30
30
10
WS 11
50
50
Water Supply
50
150
13.3
SS 3
100
50
SS 4
171
50
50
SS 5
100
136
Page 167
30
50
SWM 4
75
30
TT 1
500
70
TT 2
100
50
TT 3
25
TT 4
25
TT 5
90
25
TT 6
90
16.6
SL 1
75
SL 2
60
16.6
16.6
SL 3
25
100
SL 4
125
SL 5
50
SL 6
100
4000
20
20
20
20
25
30
10
20
20
Urban Poor
UP 1
20
Health Facilities
H1
150
33.3
E2
500
50
E3
10
E4
50
E5
10
Educational Facilities
100
20
20
20
50
50
Tourism
T3
500
DMG Consulting Pvt. Ltd., Noida
20
Page 168
50
T5
50
50
50
Other Components
O1
60
100
O2
10
100
UR 1
20
50
UR 2
100
UR 3
50
UR 4
100
UR 5
50
10.6.2
50
50
50
These projects are to be implemented over the plan period for first phase ( 2016- 2020) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.
Table 10.6.2: Sector wise Project cost and Yearly Schedule of Expenditure (Phase II)
50
50
WS 4
300
50
WS 9
15
10
10
SS 2
150
13.3
13.3
SS 3
100
50
2019-20
51
2018-19
WS 3
2017-18
2016-17
Project Code
13.3
13.3
13.3
Water Supply
Page 169
136
SWM 3
30
SWM 4
75
50
20
30
120
D3
70
25
30
30
30
10
500
15
15
TT 2
100
50
TT 3
25
20
TT 4
25
TT 5
90
25
25
TT 6
90
16.6
16.6
16.6
SL 1
75
SL 2
60
16.6
16.6
16.6
16.6
SL 4
125
SL 5
50
20
20
20
4000
20
20
20
H1
150
33.3
33.3
H3
50
20
20
20
16.6
70
Urban Poor
UP 1
Health Facilities
100
Educational Facilities
E2
10
50
Page 170
50
20
E6
70
100
T3
500
20
T4
50
50
20
Tourism
20
20
20
Other Components
O3
50
O4
50
10.6.3
100
100
These projects are to be implemented over the plan period for first phase ( 2021- 2025) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.
Table 10.6.3: Sector wise Project cost and Yearly Schedule of Expenditure (Phase III)
2024-25
2023-24
2022-23
2021-22
Project Code
Water Supply
WS 10
30
10
150
13.3
50
50
6.6
Tourism
T5
10.6.4
These projects are to be implemented over the plan period for first phase ( 2026- 2030) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.
Page 171
2027-28
2028-29
2029-30
2026-27
Cost
of Schedule of Expenditure (% of project cost)
Project (in
Lakhs)
2025-26
Project Code
Water Supply
WS 10
30
10
136
120
25
25
40
75
Educational Facilities
10.6.5
These projects are to be implemented over the plan period for first phase ( 2031- 2035) as per following
implementation schedule worked out on the basis of time involved in completing the projects and the
priority decided for the same.
Table 10.6.5: Sector wise Project cost and Yearly Schedule of Expenditure (Phase V)
2034-35
2033-34
2032-33
2031-32
Cost
of Schedule of Expenditure (% of project cost)
Project (in
Lakhs)
2030-31
Project Code
Water Supply
WS 10
30
10
10
Page 172
136
176
25
25
20
148
Health
H2
75
100
Educational Facilities
E1
100
100
Central Governments Grants: Under Central Government funding there are many scheme are
sponsored by the Government of India like JNNURM, NUIS, UIDSSMT, and Urban Statistics for HR &
Assessment, Rajiv Awas Yojana etc.
State Governments Grants & Loans: State Government also transfers funds to municipal body based
on stamp revenue share, Transport and other funds.
International Funding Agency: International funding agency include multilateral bodies like World
Bank, Asian development Bank etc.
Municipal body: Under domestic funding agency mainly Urban Local Bodies comes.
Private Operator: Under this category mainly private sectors are included.
Based on the availability of funds with each of the above and their willingness to provide grants/loans, the
projects could be funded.
The suggested pattern of funding is as under:
Page 173
Private Operator
Private
Operator
Private Operator
Page 174
Private Operator
20%
35%
State
Governments
Grants
Central
Governments
Grants
45%
Private Operator
Page 175
Private Operator
Private Operator
Page 176
Municipal Council
Private Operator
Private Operator
Page 177
Funding agencies
Central Government
2728.8
30%
State Government
3638.4
40%
Municipal Body
1819.2
20%
Private sector
909.6
10%
TOTAL
9096
100%
Page 178
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
2021-22
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
2032-33
2033-34
107.03
141.40
174.48
195.42
218.87
245.13
274.55
307.49
344.39
385.72
432.00
483.84
541.91
606.93
679.77
761.34
852.70
955.02
1069.63
1197.98
1341.74
1502.75
1683.08
1885.05
2111.25
2364.60
2034-35
2648.36
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
2021-22
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
2032-33
2033-34
Income
(in
lakhs)
107.03
141.40
174.48
198.91
226.75
258.50
294.69
335.94
382.98
436.59
497.72
567.40
646.83
737.39
840.62
958.31
1092.48
1245.42
1419.78
1618.55
1845.15
2103.47
2397.95
2733.67
3116.38
3552.67
2034-35
4050.05
From the above projection of income of the Municipal Council from major sources of income except income of aids and grants, it is clear that under normal condition of growth the income of the Parishad will rise to 2648.36 lakhs, under
the performing growth rate, the income of the Parishad would be 4050.05 lakhs.
Page 122
CHAPTER 11
Urban Reforms
Page 180
Mandatory reforms
Optional reforms
All the mandatory and optional reforms shall be implemented by the State/ULB/Para-Statals within the
Scheme period.
Reform-Linked Investments
o Reform linked assistance to State Governments and ULBs.
o Integrate reform initiatives to catalyze investments in urban infrastructure.
Page 181
Reforms
Mandatory
State
Government
Optional
State
Government
Page 182
Mandatory Reforms
1.
i.
Page 183
ii.
Introduction of system of e-governance using IT applications like GIS Not yet implemented.
and MIS for various services provided by ULBs
iii.
Reform of property tax with GIS, so that it becomes major source of Computerized
revenue for Urban Local Bodies (ULBs) and arrangements for its property tax system is
effective implementation so that collection efficiency reaches at least yet to be introduced.
85% within the mission period.
iv.
O&M charges
have
been
implemented.
User charges
like in water
billing
etc.
have
been
started.
v.
Internal earmarking within local body budgets for basic services to the It is implemented.
urban poor.
vi.
2.
i.
ii.
Rationalization of Stamp Duty to bring it down to no more than 5% Not implemented yet.
within the mission period
iii.
under
Page 184
iv.
under
v.
B.
Optional Reforms
i.
ii.
iii.
It is implemented.
It
is
implemented.
NIC is working
under
the
Town
&
Country
Planning.
iv.
v.
vi.
vii.
viii.
ix.
x.
under
Page 185
Structural reforms
It is under process.
xii.
It is implemented.
11.8 Issues
There have been no mandatory reforms laid down for the town.
The municipal staff lacks in adequate awareness of the reform agenda and technical advancement.
The Nagar Parishad is not well equipped with the necessary systems for implementing reforms and
improving efficiency. Systems include new methods of register maintenance, data storage and
retrieval, etc. Most of the work happens in an ad-hoc manner without laid out procedures.
The Nagar Parishad needs to coordinate with Para-statals such as, Public Health Engineering
Department, Housing Board etc.
It has been found that while the local people have lots of problems and they want to participate and
bring to the notice to the authorities for their problems, the absence of a proper grievance redressal
system has made it very difficult for the local.
Low Efficiency of service delivery in various aspects such as extent of collection of property tax and
other taxes, poor maintenance of roads, poor sanitary conditions, inappropriate solid waste
management practices, inadequate street light provision, etc.
Lack of data/Information Base which could help in the development of area.
Page 186
CHAPTER 12
City Vision
Page 187
100 percent
population
coverage of
treated water
Quantity of
supply to be
135
lpcd, Quality
as per
standards
Provision of
community stand
posts in all slum
areas, public
places, parks, temples
100 percent water supply coverage which includes the present as well as the future demand by 2035.
Quality and quantity should be ensured as per the standards for the future population. The coverage
of the water supply system can be enhanced by providing community taps or stand posts in all slum
areas, public places and in recreation areas.
Page 188
100 percent
population
coverage by
sewerage
system
Provision of
community
toilet blocks
near public
places to ensure
sanitation
Decentralised
waste water
treatment
Presently there is no sewage disposal system in the town or most of the households have their own
arrangements for the disposal. Therefore for future efforts should be made to have 100 percent coverage for
waste water to minimize the sanitation problem of the town. In this regards, the following steps can
considered:
Community toilet blocks should be provided near riverside, market places, in slum areas and core
town areas where there is limited scope of expansion of the dwelling units to have toilet in it.
There should be government interventions in providing toilets in urban poor settlements, in which
the government can act as a facilitator or provider.
Page 189
Storm Drainage:
Covering of all
open drains or
nalas
Considering the present drainage system, the following goals would be set to minimize the adverse effect of
poor drainage system:
100 percent coverage of the town through proper drainage system by 2035.
Converting the kutcha nallas to pucca ones, covering of all open drains and lining of all natural drains
and nallas.
Encroachment on the low lying natural drainage channel should be minimized so that flow of water
will not be blocked.
Page 190
Provision of
sweepers, vehicles and
equipment as per
standards
100 percent
coverage of the
city
Treatment of solid
waste before disposal
Present solid waste system is not covering all parts of the town. So the future direction for solid waste
management would be as follows:
Covering the whole part of the town including the present as well as the future developments.
Special care should be given to manage wastes that are generated on any auspicious days on river
beds.
Segregation of hazardous wastes like bio medical waste, bio degradable waste etc. and treatment of
solid waste before disposal.
Page 191
Special lighting
at
Lake, rivers, m
onuments and
other public
100 percent
coverage of the city places
to ensure safety for
the residents as
well as the tourists
Use of modern
technology, energy
saving equipments
like solar light.
Considering the present street lighting situation in the town, the future goals for 2035 would be:
Ensure 100 percent coverage in town to ensure safety and security for all the residents and the
tourists coming to the town.
Care should be given to provide street lights in public gathering spaces and recreation spaces like
lake, rivers, monuments and parks.
Page 192
Though there is opportunity for improved transportation system, there is lacking in the present road
networks and transport facilities. To improve the current situation and to address the future demand the
goals would be as follows:
Improvement of the existing road networks in terms of road geometry, road surfacing and traffic
signals etc.
For intra as well as inter-town movement public transport facilities should be improved.
Page 193
As slum is a major problem in the town. So the follows steps can be taken to make the town slum free.
Encouraging slum improvement schemes like improvement of physical i.e. water supply, drainage,
sanitation facilities as well as social infrastructure like education, health facilities in the slums.
Community participation should be emphasized in any of the schemes launched by the govt. or
NGOs.
Page 194
Promoting
Health tourism
Facilitating
specialised medical
care
Increasing the number
of hospitals by making
available more land for
new hospitals, thereby
increasing beds and
doctors
Providing land for new hospitals, increase beds and no, of doctors in the existing hospital and health
care centres.
By providing proper health facilities in the town, health tourism can be promoted in the area which
will serve the region and generate economy for the town.
Page 195
Facilitating vocational
training centres for
adult skill impartation
for gainful
employment / self
Facilitating provision employment
of more
schools, thereby
increasing no. of
seats and improving
literacy
Facilitating
Specialised
education
opportunities
Considering the emerging issues and potentials the following goals would be derived for addressing the
future requirements:
Facilitating provision of more number of schools at the primary and secondary education level and
providing required infrastructure facilities for the sector.
Public awareness programmes should be encouraged in urban poor areas as they are not willing to
educate their children.
Page 196
Water
sports, theme
parks, boating, e
tc.
Facilitating
infrastructure for
specialised tourist
attractions such as
National Parks, etc.
Improvement of sites
of monuments and
other heritage
structures for
attracting tourists
Having the great potential for tourism development in the town, the following goals can be derived for future
development in the sector:
River front development and lake/river based activities like water sports, theme park and boating
etc. to encourage tourism.
Facilitating infrastructure in terms of good connectivity, hotels and resorts to attract tourists.
Page 197
Forest based
activities
Tourism and
Support
economic
activities
Agri Based
commercial
activities, Other
economic
activities
For the economic up-liftment of the Town, the following goals can be set:
As the town is surrounded by large chunk of agricultural land, therefore agricultural based
commercial activities should be encouraged for the economic development of the town.
Forest based activities like selling of forest products can be another way of development economy of
the people.
As Town has high potential for tourism development, so tourism related activities like hotel industry,
tourist transportation should be encourage to form a major source of income generation activity for
many people.
Page 198
Economically
Vibrant
A
Commercial
Hub
Ecologically
Sustainable
Environmentally
Pleasing
In order to achieve the above vision, strategies have been suggested in the next chapter. Ultimately, these
strategies would be translated into tangible projects which would be viable and implementable.
Page 199
River and
Lake
Economy
Rail
Infrstructure
Parks
Forests
Governance
Temples
Monuments
Commercial
Hub
Economic Rejuvenation:
Commercial Activities There are many agro based activities which are related to agricultural
produce. There is a need to boost this area by creating suitable structures so that more people find
gainful self-employment in these activities. For this, it is necessary that land be allotted for creating
facilities for manufacture, storage, display and sale of these products.
Tourism Related Activities The water bodies and other tourist attractions have not been
adequately developed. It is proposed that once these are developed in the form of tourist circuits,
with transportation linkages, boarding and lodging facilities and other related tourism infrastructure,
with adequate marketing and publicity, tourism could be promoted in this region. The water bodies
can also be an area for development of parks, boating and water sport activities. This can also have a
spin off in terms of forward and backward linkages and employment generation for the local
population.
Religious Activities The local temples and parks are held in great reverence by the local
population and regularly, festivals and functions are held. Therefore, proper developments of these
sites along with facilities for the pilgrims are needed so as to cater to the local sentiments of the
people.
Infrastructure Development
There cannot be two opinions on the fact that the civic infrastructure of Town needs to be improved. The
strategy for this is to urgently undertake projects, as identified later in this chapter, so that the required
facilities and amenities area provided to the residents in a timely manner so that the basic quality of life can
be achieved.
Slum Improvement
DMG Consulting Pvt. Ltd., Noida
Page 200
Page 201
13. ANNEXURE
Page 202
E
AT
ST
TO R E
WA
H
IG
H
AY
W
52
WARD
NO - 5
TO TA
MRA
WARD
NO - 6
STATE HIGHWAY 9
WARD
NO - 2
WARD
NO - 3
WARD
NO - 1
WARD
NO - 8
WARD NO - 14
WARD
NO - 4
WARD
NO - 7
BOYS HIGH.
SEC.SCHOOL
WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL
SLUM
WARD NO - 13
WARD
NO -11
MANDI
NAGAR PARISHAD
CHC
FISHERY
BOARD
LEGENDS
POLICE
STATION
NALAH
H
LA
NA
RAJA TALAB
BUS STAND
GOVINDGARH
FORT
STATE HIGHWAY 9
WARD NO - 10
SUNDAR - VAN
TO REW
A
WARD
NO - 9
N.P. BOUNDARY
WARD BOUNDARY
WATER BODY
RESORT
WARD NO - 15
TO
NALAH
SID
HI
BUILT-UP AREA
TO AN
ROAD NETWORK
OOPP
U
CLIENT:
DEVI TEMPLE
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
TO RE
W
A
TN
SA
H
IG
W
H
AY
52
WARD
NO - 5
TO TA
MRA
WARD
NO - 6
WARD
NO - 3
WARD
NO - 1
WARD
NO - 8
PL
WARD NO - 14
STATE HIGHWAY 9
R
WARD
NO - 2
LEGENDS
WARD
NO - 4
N.P. BOUNDARY
WARD
NO - 7
TO REW
WARD
NO - 9
WARD BOUNDARY
BOYS HIGH.
SEC.SCHOOL
WARD
NO -12
R
WARD NO - 13
GIRLS HIGH.
SEC. SCHOOL
SLUM
CHC
FISHERY
BOARD
WARD
NO -11
MANDI
NAGAR PARISHAD
WATER BODY
NP
POLICE
STATION
PS
NALAH
NALAH
NA
H
LA
RAJA TALAB
SUNDAR - VAN
BUS STAND
GOVINDGARH
FORT
R
STATE HIGHWAY 9
WARD NO - 10
RESORT
WARD NO - 15
TO
SID
RDEVI TEMPLE
CLIENT:
Project coordination:
Submitted By:
E:\anand singh\LOGO\ff.jpg
EDUCATIONAL INSTITUTIONS
RELIGIOUS BUILDINGS
RESORT
HI
TO AN
OOPP
UR
CHC
PS
POLICE STATION
NP
NAGAR PARISHAD
PL
POLO FIELD
WARD
NO - 2
WARD
NO - 1
LEGENDS
WARD
NO - 3
WARD NO - 14
N.P. BOUNDARY
WARD
NO - 4
WARD
NO - 7
WARD
NO - 9
WARD BOUNDARY
WARD
NO -12
WARD
NO -11
WARD NO - 13
POPULATION DENSITY
WARD NO - 10
BELOW 50
50 - 100
WARD NO - 15
ABOVE 100
CLIENT:
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
WARD
NO - 2
WARD
NO - 1
LEGENDS
WARD
NO - 3
WARD NO - 14
N.P. BOUNDARY
WARD
NO - 4
WARD
NO - 7
WARD
NO - 9
WARD BOUNDARY
WARD
NO -12
WARD
NO -11
WARD NO - 13
SEX RATIO
WARD NO - 10
BELOW 900
900 - 950
WARD NO - 15
ABOVE 950
CLIENT:
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
WARD
NO - 2
WARD
NO - 1
LEGENDS
WARD
NO - 3
WARD NO - 14
N.P. BOUNDARY
WARD
NO - 4
WARD
NO - 7
WARD
NO - 9
WARD BOUNDARY
WARD
NO -12
WARD
NO -11
WARD NO - 13
LITERACY RATE
WARD NO - 10
BELOW 65
65 - 75
WARD NO - 15
ABOVE 75
CLIENT:
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
TO RE
W
A
TN
SA
H
IG
W
H
AY
52
WARD
NO - 5
TO TA
MRA
WARD
NO - 6
WARD
NO - 1
WARD
NO - 8
WARD NO - 14
STATE HIGHWAY 9
WARD
NO - 2
WARD
NO - 3
WARD
NO - 4
WARD
NO - 7
BOYS HIGH.
SEC.SCHOOL
WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL
SLUM
WARD NO - 13
WARD
NO -11
MANDI
NAGAR PARISHAD
CHC
FISHERY
BOARD
LEGENDS
POLICE
STATION
NALAH
NA
H
LA
RAJA TALAB
BUS STAND
GOVINDGARH
FORT
STATE HIGHWAY 9
WARD NO - 10
SUNDAR - VAN
TO REW
WARD
NO - 9
N.P. BOUNDARY
WATER SUPPLY
NETWORK
WATER BODY
RESORT
WARD NO - 15
TO
SID
NALAH
HI
BUILT-UP AREA
ROAD NETWORK
TO AN
OOPP
UR
DEVI TEMPLE
OHT
CLIENT:
Project coordination:
Submitted By:
E:\anand singh\LOGO\ff.jpg
E
AT
ST
TO R E
WA
H
IG
H
AY
W
52
WARD
NO - 5
TO TA
MRA
WARD
NO - 6
STATE HIGHWAY 9
WARD
NO - 2
WARD
NO - 3
WARD
NO - 1
WARD
NO - 8
WARD NO - 14
WARD
NO - 4
WARD
NO - 7
BOYS HIGH.
SEC.SCHOOL
WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL
SLUM
WARD NO - 13
WARD
NO -11
LEGENDS
N.P. BOUNDARY
MANDI
NAGAR PARISHAD
CHC
FISHERY
BOARD
WARD BOUNDARY
POLICE
STATION
NALAH
H
LA
NA
RAJA TALAB
BUS STAND
GOVINDGARH
FORT
STATE HIGHWAY 9
WARD NO - 10
SUNDAR - VAN
TO REW
A
WARD
NO - 9
WATER BODY
NALAH
BUILT-UP AREA
STATE HIGHWAY 9
RESORT
WARD NO - 15
TO
SID
HI
STATE HIGHWAY 52
PUCCA ROAD
TO AN
OOPP
U
DEVI TEMPLE
KUTCHA ROAD
CLIENT:
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
TO RE
W
A
TN
SA
H
IG
W
H
AY
52
TO TA
MRA
STATE HIGHWAY 9
BOYS HIGH.
SEC.SCHOOL
GIRLS HIGH.
SEC. SCHOOL
SLUM
FISHERY
BOARD
MANDI
NAGAR PARISHAD
CHC
H
LA
BUS STAND
GOVINDGARH
FORT
STATE HIGHWAY 9
NA
RAJA TALAB
SUNDAR - VAN
LEGENDS
POLICE
STATION
NALAH
N.P. BOUNDARY
OPEN DRAINS
WATER BODY
RESORT
TO
SID
NALAH
HI
BUILT-UP AREA
ROAD NETWORK
TO AN
OOPP
UR
DEVI TEMPLE
CLIENT:
Project coordination:
Submitted By:
E:\anand singh\LOGO\ff.jpg
E
AT
ST
TO R E
WA
H
IG
H
AY
W
52
TO TA
MRA
LEGENDS
STATE HIGHWAY 9
N.P. BOUNDARY
WATER BODY
NALAH
BOYS HIGH.
SEC.SCHOOL
GIRLS HIGH.
SEC. SCHOOL
ROAD NETWORK
CHC
FISHERY
BOARD
POLICE
STATION
NALAH
BUS STAND
GOVINDGARH
FORT
RESIDENTIAL
STATE HIGHWAY 9
H
LA
NA
RAJA TALAB
SUNDAR - VAN
BUILT-UP AREA
MANDI
NAGAR PARISHAD
SLUM
COMMERCIAL
PUBLIC / SEMI PUBLIC
INDUSTRIAL
RESORT
TO AN
OOPP
U
CLIENT:
TO
SID
HI
OPEN SPACE /
AGRICULTURAL AREA
DEVI TEMPLE
Project coordination:
City Manager's Association
Madhya Pradesh
INSTITUTIONAL
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
TO RE
W
A
TN
SA
H
IG
W
H
AY
52
WARD
NO - 5
TO TA
MRA
WARD
NO - 6
WARD
NO - 1
WARD
NO - 8
WARD NO - 14
STATE HIGHWAY 9
WARD
NO - 2
WARD
NO - 3
WARD
NO - 4
WARD
NO - 7
BOYS HIGH.
SEC.SCHOOL
WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL
SLUM
WARD NO - 13
WARD
NO -11
TO REW
WARD
NO - 9
MANDI
NAGAR PARISHAD
CHC
FISHERY
BOARD
LEGENDS
POLICE
STATION
BUS STAND
RAJA TALAB
SUNDAR - VAN
GOVINDGARH
FORT
STATE HIGHWAY 9
WARD NO - 10
N.P. BOUNDARY
WATER BODY
NALAH
RESORT
WARD NO - 15
TO
BUILT-UP AREA
SID
HI
ROAD NETWORK
OPEN DRAINS
TO AN
OOPP
UR
DEVI TEMPLE
PROPOSED DRAINS
FLOOD PRONE/ LOW
LYING AREAS
CLIENT:
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
TO RE
W
A
TN
SA
H
IG
W
LEGENDS
AY
52
WARD
NO - 5
TO TA
MRA
N.P. BOUNDARY
WARD
NO - 6
WARD
NO - 1
WARD
NO - 8
WARD NO - 14
TJ
WARD
NO - 4
TJ
SLUM
WARD NO - 13
FISHERY
BOARD
BS
NALAH
TO REW
WARD
NO - 9
BUILT-UP AREA
WARD
NO -11
MANDI
TJ
NAGAR PARISHAD
STATE HIGHWAY 9
CHC
TJ
POLICE
STATION
NALAH
NA
H
LA
RAJA TALAB
BUS STAND
GOVINDGARH
FORT
STATE HIGHWAY 52
STATE HIGHWAY 9
WARD NO - 10
SUNDAR - VAN
WATER BODY
TJ
BOYS HIGH.
SEC.SCHOOL
GIRLS HIGH.
SEC. SCHOOL
WARD BOUNDARY
TJ
WARD
NO - 7
WARD
NO -12
STATE HIGHWAY 9
WARD
NO - 2
WARD
NO - 3
PUCCA ROAD
KUTCHA ROAD
PROPOSED ROAD
WARD NO - 15
RESORT
TO
SID
HI
TO AN
OOPP
UR
CLIENT:
DEVI TEMPLE
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
BS
TJ
PROPOSED TRAFFIC
JUNCTION
IMPROVEMENT
TO RE
W
A
TN
SA
LEGENDS
H
IG
N.P. BOUNDARY
H
AY
52
WARD
NO - 5
TO TA
MRA
E1
WARD
NO - 1
WARD
NO - 8
PL
WARD NO - 14
WATER BODY
STATE HIGHWAY 9
R
WARD
NO - 2
WARD
NO - 3
WARD BOUNDARY
WARD
NO - 6
NALAH
WARD
NO - 4
WARD
NO - 7
CH
PC
GIRLS HIGH.
SEC. SCHOOL
R
WARD NO - 13
BOYS HIGH.
SEC.SCHOOL
WARD
NO -12
SLUM
CHC
FISHERY
BOARD
WARD
NO -11
MANDI
MS
H
LA
EDUCATIONAL INSTITUTIONS
RELIGIOUS BUILDINGS
RESORT
POLICE
STATION
PS
BUS STAND
GOVINDGARH
FORT
R
STATE HIGHWAY 9
NA
NP
WARD NO - 10
SUNDAR - VAN
NAGAR PARISHAD
NALAH
RAJA TALAB
TO REW
WARD
NO - 9
CHC
PS
POLICE STATION
NP
NAGAR PARISHAD
PL
POLO FIELD
ITI
TO
SID
HI
TO AN
OOPP
UR
CLIENT:
RDEVI TEMPLE
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
MS
MULTI-SPECIALITY HOSPITAL
PC
POLY CLINIC
IS
INTEGRATED SCHOOL
ITI
POLY-TECHNIQUE OR ITI
CH
COMMUNITY HALL
TO RE
W
A
TN
SA
H
IG
W
H
AY
52
WARD
NO - 5
TO TA
MRA
WARD
NO - 6
WARD
NO - 1
WARD
NO - 8
WARD NO - 14
LEGENDS
STATE HIGHWAY 9
WARD
NO - 2
WARD
NO - 3
N.P. BOUNDARY
WATER SUPPLY
NETWORK
WARD
NO - 4
WARD
NO - 7
BOYS HIGH.
SEC.SCHOOL
WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL
SLUM
WARD NO - 13
WARD
NO -11
WATER BODY
MANDI
NAGAR PARISHAD
NALAH
CHC
FISHERY
BOARD
POLICE
STATION
NALAH
WARD NO - 10
NA
H
LA
RAJA TALAB
BUS STAND
GOVINDGARH
FORT
BUILT-UP AREA
STATE HIGHWAY 9
WFP
SUNDAR - VAN
TO REW
WARD
NO - 9
ROAD NETWORK
OHT
PROPOSED WATER
SUPPLY NETWORK
RESORT
WARD NO - 15
TO
SID
PROPOSED OHT
HI
WFP
TO AN
OOPP
UR
CLIENT:
PROPOSED FILTRATION
PLANT
DEVI TEMPLE
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
TO RE
W
A
TN
SA
H
IG
W
H
AY
52
WARD
NO - 5
TO TA
MRA
WARD
NO - 6
WARD
NO - 1
WARD
NO - 8
WARD NO - 14
STATE HIGHWAY 9
WARD
NO - 2
WARD
NO - 3
WARD
NO - 4
WARD
NO - 7
BOYS HIGH.
SEC.SCHOOL
WARD
NO -12
GIRLS HIGH.
SEC. SCHOOL
SLUM
WARD NO - 13
WARD
NO -11
MANDI
NAGAR PARISHAD
CHC
FISHERY
BOARD
LEGENDS
POLICE
STATION
NALAH
NA
H
LA
RAJA TALAB
BUS STAND
GOVINDGARH
FORT
STATE HIGHWAY 9
WARD NO - 10
SUNDAR - VAN
TO REW
WARD
NO - 9
N.P. BOUNDARY
WARD BOUNDARY
WATER BODY
RESORT
WARD NO - 15
TO
SID
NALAH
HI
BUILT-UP AREA
ROAD NETWORK
TO AN
OOPP
UR
DEVI TEMPLE
LOCATION OF
CLUSTERS OF URBAN
POOR
CLIENT:
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
WARD
NO - 2
WARD
NO - 1
LEGENDS
WARD
NO - 3
WARD NO - 14
N.P. BOUNDARY
WARD
NO - 4
WARD
NO - 7
WARD
NO - 9
WARD BOUNDARY
WARD
NO -12
WARD
NO -11
WARD NO - 13
LITERACY RATE
WARD NO - 10
BELOW 65
65 - 75
WARD NO - 15
ABOVE 75
CLIENT:
Project coordination:
City Manager's Association
Madhya Pradesh
Submitted By:
DMG CONSULTING Pvt.Ltd.
Noida ,Uttar Pradesh
an important indicator of commitment of the GoMP to create an environment conducive for attracting
increased private investment in the tourism sector. In accordance with the aims and objectives of the Tourism
Policy of the State and the provisions made towards development of tourism sector, the Government of MP,
Department of Tourism has issued a Policy for the Allotment of Government Land for the Development of
Tourism in the State.
The Madhya Pradesh Department of Tourism has, to date, sought to develop the tourism potential of the State
by involving itself in three major activities: Providing decent accommodation in areas of tourism interest,
operating a transport fleet of coaches, cars and Gypsies, and organizing package tours. Publicity and
marketing of tourist destinations and facilities has also been a major thrust activity. Apart from these efforts
undertaken by the Government, the private sector has also contributed by way of investment in hotels,
transport, and marketing of some important tourist destinations in the State. However, the efforts of the
Government and the private sector have not been dovetailed into a common developmental programme, with
the result that there has been overemphasis at certain venues, while some other important places and activities
have been neglected.
The Tourism Policy envisages creation of an environment conducive to attracting increased private
investment in the tourism sector, and a more meaningful role for the Government. The focus will be on i)
Improvement and creation of adequate basic infrastructure- land, road, water, electricity etc. ii) Up gradation
and augmentation of accommodation, catering and recreational facilities, iii) Augmentation of transport
facilities, iv) Marketing of destinations to ensure optimal use of infrastructure, v) Establishing and
strengthening institutions for the development of human resources, vi) Evolving suitable policies for
increasing foreign exchange earnings, vii) Promotion of the arts and crafts of the State.
One of the objectives of the Tourism Policy of Madhya Pradesh announced in 1995 was to convert the
heritage wealth of the State i.e. forts, palaces, havelis and kothis into heritage hotels. Later, Madhya Pradesh
Heritage Tourism Policy-2002 also envisages and set urgent needs for restoration of these beautiful buildings
are unable to attract tourists in large numbers.
1.3. Places of Tourist Interest in and Around the City
The Tourism Products in Govindgarh can broadly be classified into those based on the Heritage Tourism,
Religious Centers/ Pilgrim centres, handicraft and Wild-life Tourism in Panna National Park in the
surrounding. The city has many places for tourist attraction i.e. Govindgarh Fort, Sunder Van, Durga Temple,
Lal Bagh, Raja talab, Rani Talab etc.
1.3.1. Govindgarh Fort
The Govindgarh palace used to have security like a well protected fort. The stately palace of Gobindpur on
the banks of the Lake houses, a police training school and Baghela museum is running now.
The island, nestled in the Lake also showcases a wonderful palace. The doorway of this beguiling palace
however is closed for the general public.
An underground tunnel is also there which was used as a secret path for kings between Govindgarh & Rewa.
The Department of Tourism, Government of Madhya Pradesh State has recently leased out Govindgarh Fort
to a Delhi based Company for converting into a Heritage Hotel & Resort and developing other tourism related
activities on the related lands.
National park holds the highest density of tigers due to its rich evergreen forest with trees like Sal & Bamboo
with well spread water bodies & grasslands all over the park.
Bandhavgarh National Park spread in an area of 448 sq. kms. is densely populated with tiger and other
wildlife species of gaur, nilgai, sambhar and barking dear. In the backdrop of the park is the old fort which
has references in Shiva Purana and Panch Ratna. The park has in all about 32 mammals, 250 species of birds
and about 72 types of butterflies. The Park of also has the archaeological relies of Sheshai Vishnu and
number of caves.
The park has some basic infrastructure such as accommodation includes resorts and lodges PWD Rest House,
MPSTDC lodge and many eatery and shops. However, the destination lacks in providing safe drinking water
facilities. The water source is Open well and borewells. Hotels and Lodges have independent Borewells.
Gurh
Gurh is situated at 40 km from Govindgarh. The major places of tourist
attraction are Gurgi (Kalchuri) Heritage Site, Khadda Shiv Temple, Khajuha
Shiv and Ram Temple, Bhairavnath Temple, garhi and many other small
desination. Gurgi Kalchuri is an important Heritage Site, has lots of
reminiscence of the Fort & temples of Kalchuri rulers (6th to 12th century).
Lots of the idols from this place have been taken to Rewa, Satna, Tikamgarh
and Bhopal museums also. Presently this place is under archeology
department.
Figure 1: Gurh Temple
Keonti Falls
The Keoti Falls is on the Mahana River, a tributary of Tamsa or Tons
River as it comes down from the Rewa Plateau. It has a total height of
98 metres (322 ft. The World Waterfall Database puts the height of the
waterfall at 130 metres (430 ft). is one of the major waterfall in India. It
is situated at 42 km from Rewa.
Sirmaur
Sirmaur is situated at 57 km from Rewa. Kyoti Garhi is one of the major destination in Sirmaur which made
by Yuvraj Nagmal, 2nd son of Baghel (17th ) Maharaj, Shaliwahan Singh Ju Deo between 1605-10 A.D.
Presently this Garhi is with M.P. Archeological Dept. The Garhi overlooks a 270 feet deep gauge making a
water fall on the river Mahana, but is in a very bad shape & needs to be developed as a tourist spot as the
place holds great potential. Besides, Garhi, Laua Kothi, Dev Talab, Shiv Temple Dev Talab, Naigarhi Kothi
Naigarhi, Semaria Garhi, Laxmanbagh Temple, and Deur Kothar Buddist Stupa are other destination.
Other Destination
There are many rock painting Rock painting scattered around the region such as Khando samuh, Gaddi
samuh, Shivpurva samuh, Itar samuh, Badwar samuh, Jaldar samuh, Ledroghat samuh, Ginjwa samuh, Quoti
samuh, Hanuman samuh etc.
S.No.
Assessment
Parameters
a.
Agency
responsible
protection
b.
Accessibility/ Connectivity
Fair
Good
Good
c.
Excellent
Good
Good
d.
Good
Good
Good
e.
Fair
Fair
Fair
f.
Cleanliness of Surroundings
Fair
Fair
Fair
g.
Landscaping
Fair
h.
Fair
Fair
Poor
Fair
Fair
i.
Overall Maintenance
Fair
Good
Good
j.
Parking Facilities
Bus, other
k.
Public Toilets
Nil
l.
Refreshment stalls
Not Available
Available,
designated
but
not
Not Available
Available
Available (Pvt)
Available
S.No.
Assessment
Parameters
m.
Information Kiosks
n.
Available
Not Available
30 guides approved
Fair
Poor
Fair
Sr. No.
1.
Heritage
Govindgarh Fort
Present Status
Building condition of fort is good and at present, it is under
renovation. It is closed for peoples because of its renovation.
Centers
Bandhavgarh
Tourist
Types
2005
2006
2007
2008
Indian
Foreign
23244
4068
38614
6812
55835
13706
69641
24781
Year
CAGR (%)
2005200620072006
2007
2008
66.12
44.60
24.73
67.45
101.20 80.80
Centers
Tourist
Types
Year
2005
2006
Total
27312
45426
Indian
2673847 6096835
Chitrakoot
Foreign
460
499
Total
2674307 6097334
Indian
145987
164406
Khajuraho
Foreign
70726
73843
Total
216713
238249
Source: Perspective Tourism Pan, Govt. of India
2007
2008
69541
7952629
725
7953354
193764
84887
278651
94422
9142009
654
9142663
201443
89169
290612
20052006
66.32
128.02
8.48
128.00
12.62
4.41
9.94
CAGR (%)
20062007
53.09
30.44
45.29
30.44
17.86
14.96
16.96
20072008
35.78
14.96
-9.79
14.95
3.96
5.04
4.29
It is assumed that a significant number of tourists will be attracted and diverted to Rewa from Khajuraho,
Chitrakoot and Bandhavgarh, if proper tourism supported infrastructure and strong marketing is done.
1.8. Assessment of Tourism Supported Infrastructure
Tourism Development of any destination cannot be accomplished without proper development of support
infrastructure facilities including accessibility, accommodation, water supply, sanitation, power and drainage.
In Govindgarh city, very limited infrastructure is developed. Except approach road, small shops and drinking
water non on the infrastructure are available like Toilet facility, Solid waste Management, Street Lightning
etc. at the tourist spots.
1.8.1. Transportation
There is good network of roads connecting all the major parts of the state with Govindgarh. The State
Highway 9 and State Highway 52 connect Govindgarh with major cities of Madhya Pradesh. Govindgarh is
not directly connected to railway line. The nearest railway station is Rewa junction at a distance of 20 Km.
The nearest airport is Satna Airport at a distance of 54 km. which has an airstrip, however not in use for
regular fights followed by Bamrauli (Defense Air Base) in Uttar Pradesh which is approximately 161 km.
from Govindgarh.
1.8.2. Accommodations (Regional Level)
At town level, Govindgarh doesnt have any hotel facility to accommodate the peoples or tourists. But at
district headquarter Rewa; there are nearly 497 beds in 24 various categories of Accommodation. Besides this,
the Rewa city has nearly 5-6 Dharmshalas, which accommodates nearly 4-500 people in total. A three Star
level hotel namely Hotel Rewa Raj Vilas (owned by Maharaja Rewa) is situated in the heart of city.
1.9. Suggested Action Programmes
1.9.1. Key Concern Areas for Tourism Development
Key concern areas for enhancement of tourism development in Govindgarh have been identified from the
analysis of existing tourist scenarios and overview of SWOT analysis. The following table shows the Key
concern areas.
Table 4: Key Concern Areas and related issues
Issues
Remarks
Suggestions
Issues
Remarks
Continued
tourism
infrastructure constraints
Information Constraints
Suggestions
related
Inadequate information
dissemination
1.10.
Despite its strategic location within the tourism circuit, Govindgarh city has not been developed as a nodal
centre or as a base city to cater tourist for its facilities. In the tourism circuit of Jabalpur Bhedaghat
Mandla Kanha Bandhavgarh and Khajurahu-Panna/Bandhavgarh-Chitrakoot, Bandhavgarh and Panna is a
major Tourist node in the region after Chitrakoot and Khajurahu. Govindgarh can play a major tourist node or
base town to support tourist with its supported infrastructure. Presently, infrastructure is inadequate to support
tourism in the region, and it needs urgent upgradation. Further, an integrated circuit can be formed
considering Panna, Bandhavgarh and Sanjay National Park as part of Natural and Wildlife tourist and
Govindgarh and Rewa to support as base facilitation centre. The region has wide range of tourism products,
which need to be integrated and made an intra-circuit to increase the duration of stay of the Tourists in the
region. Govindgarh city has great potential in the region to cater tourist from the circuit. This elevated status
of Bandhavgarh as base can be retained, till a few of the tourist destinations in and around Govindgarh
region to develop their own tourist facilities. Some of the destinations like Govindgarh Fort, Khando Devi etc.
can be raised to the status of sub - nodes, with adequate improvement of infrastructure and development of
new tourism product based on Fort and the Lake. Govindgarh plays an important role in the form of Natural
& Wildlife tourism.
The City of Govindgarh has many locations for attracting tourist of various segments including religious,
heritage tourism. In the nearest towns of Govindgarh, Rewa is one of the art and craft centre in the region and
also a major city for providing lodging and boarding facilities.
At present city is devoid of basic tourism supported infrastructure such as tourism information centre, basic
amenities at destinations within the city as well as accommodation of attracting high end tourism. Some
associated cultural activity areas like Govindgarh Fort, Raja Talab (lake) and Khando Devi Temple area can
be developed which will form an integrated cultural circuit. The immense potential for developing
Govindgarh as one of the destination with heritage and religious destination, it needs to be fully exploited. In
terms of improving the tourism product, in the short term quick gains can be made by developing the
destination and providing basic infrastructure facilities at locations with high potential, which are already well
connected and have a reasonable infrastructure in place.
The overall tourism development of Govindgarh Region can be segmented into two levels
a) Major Tourism Circuits -Though there are many tourism attractions scattered around the Govindgarh City
linking Rewa, Bandhavgarh National Park etc.
b) Minor Tourism Circuits- the Cultural (Heritage) and religious tourism destinations located within the city
includes Govindgarh Fort, Ram Govind Temple, Panchmukhi temple and other temple and heritage can be
integrated within this Mega Tourism Project.
Govindgarh as a tourist needs to be a co-ordinated effort to improve the quality and range of public realm
spaces, heritage sites and temples and other facilities. The emphasis of this is on Govindgarh Nagar Parishad
for overall development of the city.
Overall Development of Govindgarh Town- Govindgarh has great potential for tourism development. Planned
tourism development in Govindgarh would significantly increase domestic and foreign tourist arrivals and
attract their long duration visits. This would result in their higher spending for various facilities and services
within the region. This would directly boost up trade and commerce, transport sectors and other service
sectors. Studies show that tourism is one sector having the highest multiplier effect. Tourism can trigger off
development in many supporting sectors and create a large number of employment opportunities.
1.11.
Considering all these aspects, the activities can be well planned and organised to enhance tourist attraction by
providing;
a) Site attractiveness /enhancement Projects
Conservation of Govindgarh Fort, Raja Talab and development of basic amenities to the tourist.
Development of tourist infrastructure at Khando Devi temple.
Provide large open areas and street furniture in the city.
b) Additional attractiveness
Waterfront Development
Shopping arcade with Cafeteria selling art materials, dance materials, other essential articles for
students, schools & visitors.
c) Site specific critical infrastructure project
A comprehensive Master Plan of the area needs to be prepared.
Provision of designated paid parking areas for tourist buses, cars and other vehicles.
General landscape plan for the area
Design and location for every component of street furniture
d) Development Guidelines and control
Programmes based on development guidelines and also enforcement controls.
e) Marketing
Defining Tourism Circuit in the State, adding Govindgarh as one of the cultural centre
1.12.
Action Programme
The action program aims to specify and define potential areas of tourist attractions where wide ranges of
tourism products can be provided, enhancing the attractiveness by augmenting existing core activities by
providing additional activities and improve connectivity and access to already tourist attraction at a subdued
10
level. The objective is to support regenerate and upgrade the existing attraction through augmenting core
activities by providing additional activities.
1.13.
This project should include Conservation measures, planned development and upkeep of the environment,
designed lighting facilities and provision of tourists/ visitor facilities. Govindgarh town has mainly
Govindgarh Fort which is important from heritage point of view and need to be conserved.
Conservation Master Plan for the Govindgarh fort and environments is to be prepared. Archaeological
Survey of India (ASI) and State Archaeological Department has been mainly concentrating on the
conservation it could not make the monument attractive with proper landscaping and providing basic
amenities. M.P. Tourism in this respect can play meaningful role to refurbish it and make it very attractive.
The conservation master plan shall cover following components:
o Delineation of the Central core (Govindgarh Fort), historical temples and Raja Talab area to be
considered under Conservation Plan. Conservation of identified heritage buildings/areas and
preparation of conservation guidelines.
o Preparation of land use plan for conservation area
o General landscape plan for the area
o Design and location for every component of street furniture
o Waste management plan, which could be considered as part of town level waste management plan.
o Architectural and Development Control Regulations (DCR)
o Development of Urban Design concept and streetscape.
Development of Govindgarh Fort and Raja/Rani Talab area- Govindgarh Fort area is to be developed as an
integrated cultural zone and this will attract tourists.
Construction of public convenience and safe drinking water facilities within the fort complex
Construction of Parking for tourist vehicles
Establishing `Light and Sound shows
Construction of Entrance Gate: The entrance Gate of monument, which helps to form the first
impression of what, is inside. An artistically designed gateway by incorporating architectural elements
should be provided at the site.
1.14. City Level Green spaces and Parks
The City lacks in proper green spaces and the presently gardens are not attractive it requires redevelopment.
There is need of park development.
i) Establishment of Regional Park- Regional Park may be developed at Khando Devi temple. The landscape
may incorporate meandering pathways, seating places, concealed low-intensity lighting, etc. The facilities
will also include Refreshment centre, Toilets, drinking water facilites and Landscaped Garden
ii) Development of garden including landscaping- Establish Landscaped park near to Govindgarh fort because
there is availability of water from Raja talab.
1.15.
i.
11
ii.
iii.
iv.
v.
1.16.
Clock rooms and pay - use toilets for men and women at a minimum of 3 locations by the side
Construct pay & use toilets in places of public assembly and also in tourist locations. It should be
made mandatory for all shopping areas and restaurants having more than a specified built up area to
provide public toilet facilities, which may also be maintained on, pay & use basis. The major roads
may also be provided with wayside coin operated toilets, at least in major urban centers. The models
adopted by Sulabh Sauchalaya in many towns and cities are worth mentioning in this context. The
local self-governments, both urban and rural, should be made to think and act on these lines.
General landscape plan for the area
Charming garden with lush green landscape will add elegance to the whole town. The tourist
complexes should be properly landscaped in a manner compatible with the environmental character of
the surroundings. No construction should commence without having secured the consent of the
appropriate authority for the provision of infrastructural services, i.e electricity, telephone, road
access, water, etc.
Design and location for every component of street furniture
Designed Electrical & telephone poles in the area should be replaced with artistically designed
beautiful ancient looking poles. Stone Benches with shade. The benches in the heritage area should be
artistically designed.
Tourist Facility & Information Centre
Establish tourist facility centre including tourist information centre, toilet and drinking water facilities
and conventional shops near Govindgarh Fort.
Development of Raja/Rani talab (lake)
The landscape in this part is exceedingly scenic and offers the potential for excellent development of Water
based tourism. Lake offers pleasure boating facilities. However, any resort that may be developed here should
follow the characteristics of the site. The architecture should respect the characteristics of vernacular
architecture, and in any way, should not cause visual conflict with the surrounding nature.
Water sports based tourism, especially related to boating. This would help in development of water sports like
water scooter, water skiing, etc. Restaurants, toilets, shops, sports gear renting outlets etc. catering to tourists
have to be developed in this area as part of the Project.
1.17.
SWOT Analysis
Strength
Govindgarh having many heritage and tourist
centers.
Number of tourist increasing with time.
Opportunity
Govindgarh falls under Jabalpur- BandhavgarhKahjuraho- Chitrakut tourist circuit.
Govindgarh got good road connectivity and it is
also near to Rewa Junction.
Govindgarh having many water bodies and
religious centers also attracts tourist.
Weakness
Non- maintained heritage buildings.
No proper connectivity to some of the tourist centers.
Poor existing infrastructure.
Threat
Un-maintained heritage site might result into ruined
structures.
Inadequate infrastructure & connectivity may leads to
decline in tourist flow.
12
1.18.
Best Practice
Box: 0.1: Heritage Conservation Gohar mahal Restoration & Reuse as Craft centre
Background:
Bhopal is the capital of the Indian state of Madhya Pradesh and the administrative headquarters of Bhopal District and Bhopal
Division. The city was the capital of the former Bhopal state. Bhopal is also known as the Lake City for its various natural as well as
artificial lakes and is one of the greenest cities in India.
Gohar Mahal is situated in the banks of the magnificent Upper Lake. It is one of
the beautiful palaces in Bhopal. Gohar Mahal is an architectural marvel, which
presents a perfect blend of Hindu and Mughal Architecture.
It is constructed by
Kudasia Begum in
1819 AD and due to
unmaintained
conditions; it has
become
degraded
and dilapidated.
Key Components of the Projects:
To recover that condition detailed documentation and condition
assessment of the building has been done and prepared a restoration and
reuse proposal by INTACH. It also involved community in the redevelopment process to know their views and perception.
The palace has been restored and maintained the original fabric and construction details of the buildings. New functions will be
introduced to convert the complex into an Urban Haat to showcase the local craft and a cuisine. This project has been supported by
DC H&H, Government of India and MPHHVN, Govt. of Madhya Pradesh.
Lesson Learned:
Close partnerships with national and local government bodies as well as with international funding agencies.
1.19.
Sr.
No.
1
a
b
c
d
e
f
2
Summary of Projects
Projects
Development of heritage building i.e. Govindgarh fort
Preparation of Conservation Plan for Govindgarh Fort.
Preparation of land use plan for conservation area (a) Landscape Plan of the area, b)
Development Control Regulation
Heritage Walk - Development of Signages
Construction of shopping arcade
Construction of public convenience and safe drinking water facilities
Construction of Parking for tourist vehicles
Establishing `Light and Sound
City Level Green spaces and Parks
13
Institutional
tMeeting
with
nt
and
Institutional
,various
municipal
and
Stakeholder
finance
sF municipal
finance
Y
2
0
0
4
0
5
SE
CT
t
o
OR
F
Y
2
0
0
7
0
8
AN
B
3
a
b
c
4
5
6
7
8
9
10
Establishment of Regional Park at Khando Devi Temple area including landscaped open area
for stage and assembly area for gatherings, dinners, performances etc. including fitting and
fixture of sitting and lighting.
Development of local park at Govindgarh Fort.
Development of Raja/Rani Talab
Dredging/ silt controlling and cleaning of Raj/Rani Talab
Equipments for boating and Skiing
Construction of restaurants, toilets, shops, sports gear renting outlets
Tourism Supported Infrastructure in the Govindgarh City and Khando devi Temple
Construction of Designated Parking facilities for taxi stand and tourist Vehicle
Establishment of Public Convenience
Design and location for every component of street furniture, signage
Tourist Facility & Information Centre- Establish tourist facility centre including tourist
information centre, toilet and drinking water facilities and conventional shops near Govindgarh
Fort.
Construction of Cafeteria, Restaurants, toilets, shops,etc
Security /Police Cabins
AL
YS
IS
14
An ISO 9001:2000
Certified Company
Overview
Govindgarh:
Known as Mini Vrindavan and a large number of famous temples are situated in the region.
Famous for its Royal history and structures such as Govindgarh Fort.
13.23
Number of Wards:
15
Total Population:
10535
State Highways: SH-9 and SH-52 passes through the town which makes
nearby areas.
Govindga
rh
Physical characteristics
Latitude:
2422 N
Longitude:
8117 E
Altitude:
Region:
Bagelkhand
Soil Type:
Maximum Avg.Temp.:
420 C (May-June)
Minimum Avg.Temp.:
5.50 C
Rainy Season:
1100 mm
Demographic profile
Total Population :
8.64% (2011)
SC Population:
18.05%
ST Population:
7.75%
The population of the town is increasing but with slower growth rate. This shows that the people are out
migrating to nearby big towns from Govindgarh which is more semi-urban in nature.
9697
10535
8437
6000
4000
2000
0
1981 to 1991
1991 to 2001
2001 to 2011
14.93 %
2001-2011
8.64%
Prevalent out-migration as Rewa does not have much potential in terms of educational &
health facilities or economic opportunities to cater to the demand.
Decadal Population Growth
35
30
28.77
26.84
25
19.85
20
14.93
15
8.64
10
5
0
1991
2001
2011
Population projection
Average Decadal Growth Rate
1981-2011: 39.2%
Population Projection
2025 2026
12380
2035 2036
13883
Considering the future growth and development potential in educational, industrial, commercial
(including investment from outside), tourism, social and administrative aspects, Geometric
Progression Method was found suitable.
Population Projection
16000
14000
Population
12000
10000
8000
6000
4000
2000
0
Population
2011
2012
2013
2014
2015
2020
2025
2030
2035
10535
10659
10785
10912
11041
11691
12380
13110
13883
The average household size of the town is higher than the national average of 5.12 while the state average is
higher at 7.27.
There are a total of 3749 (38.66%) workers in the town (2001 Census) and majority of workers are
engaged in tertiary activities such as trade & commerce.
7%
9%
55%
29%
Cultivators
Agricultural Laborers
Others
In Percentage
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
Total WFPR
Primary
Secondary
Tertiary
Male
64.76
50.82
40.38
81.39
Female
35.24
49.18
59.62
18.61
The market have come up along SH52, SH-9 and near Nagar Parishad and
is very unorganized.
Panchmukhi Temple
Chowandi Temple
Shiv Temple
Hanuman Temple
Khando Devi
Raja Talab
Rani Talab
Sunder Van
Religious
Water Bodies
Govindgarh Fort
Rani Talab
(Lake)
Unfortunately, the town has not been able to capitalize its potential in this sector.
Lack of sufficient and efficient modes of transportation, infrastructure services in town that can hold the
tourist.
Issues
Lack of conservation of the heritage structure of the town i.e. Govindgarh Fort.
Town doesnt have a dumping site, as a result waste is disposed into open drains
and along the roads (along SH-52). It is a cause of pollution in water bodies.
SWOT Analysis
STRENGTH
Literacy rate of town has increased continuously over
the years.
WEAKNESS
Female literacy rate is low as compared to male.
Lack of conservation & management of tourist
resources.
Lack of awareness and management techniques of
heritage and natural elements.
THREAT
Shifting of workers from primary to tertiary might
result into reduction in agricultural production.
Improper infrastructure services, local awareness and
un-developed lake front etc. are major hindrance for
the development of the tourism.
Landuse distribution
Landuse
Residential
Commercial
Industrial
Public/Semi public and Public Utilities
Recreational
Circulation
Water Body
Total Developed Area
Undeveloped Area/ Agricultural Land
Total Municipal Area
Area in Hectare
109.12
3.1
0.4
0.7
9.35
36.74
413.21
572.6
750.59
1323.21
Percentage
19.06
0.54
0.07
0.12
1.63
6.42
72.16
43.28
56.72
100.00
Remarks
Source: Open Source Google Satellite Imagery and DMG Primary Survey
Residential
43%
57%
19%
developed
area
undevelope
d area
1%
6%
72%
2%
Commercial
Industrial
Public/Semi public and
Public Utilities
Recreational
Circulation
Water Body
Housing scenario
As per 2001 Census of India, there are 1655 households in Govindgarh Nagar Parishad (GNP) with an
average household size of 6.5 persons and total pakka housing stock is only 968 houses. (Detailed census
2011 data not available)
3.36%
2.77%
39%
permanent
Owned
semipermanent
61%
Rented
Others
temporary
93.87%
Distribution of Houses by Type
Area
Urban India
Madhya Pradesh (Urban)
Govindgarh Nagar Parishad
Total Population
28,61,19,689
Household
5,58,32,570
Average HH Size
5.12
1,59,67,145
9697
*10,535
21,95,725
1655
1881
7.27
6.5
5.6
Total Population
Existing Supply
Housing Demand
Non-Slum Slum Non-Slum Slum Non-Slum Slum
8271 2264
760
208
1654
453
8369 2291
760
208
1674
458
8467 2318
760
208
1693
464
8567 2345
760
208
1713
469
8668 2373
760
208
1734
475
9179 2512
760
208
1836
502
9720 2661
760
208
1944
532
10293 2817
760
208
2059
563
10899 2983
760
208
2180
597
=
=
=
=
=
245
=
=
=
=
1420
389
Housing Gap
Total
Non-Slum Slum Demand
894 245
2107
914 250
2132
933 256
2157
953 261
2182
974 267
2208
1076 294
2338
1184 324
2476
1299 355
2622
1420 389
2777
968
1654
453
274
894
2777
2180
597
1809
Total
Gap
1139
1164
1189
1214
1240
1370
1508
1654
1809
SWOT Analysis
STRENGTH
Most of the people have their own houses, which are pucca in
nature.
WEAKNESS
More than 50% of the houses do not have pucca floor.
OPPORTUNITY
Water front development and recreational spaces development
(Raja/Rani Talab).
Good possibilities of residential development due to presence of
suitable agricultural land, social infrastructure and commercial
centres ((in ward 1, 2, 3, 5, 6 and 14).
Better quality housing demand and cheap land values can attract
real estate developers for development of new townships in
Water supply
Water Supply system - predominantly depending on ground water.
Current ground water level is at the depth of 40 to 120 feet.
Water Sources
5 Tube wells and 78 hand pumps
Surface water (Ponds)
Capacity (MLD)
2.85 lakh litre (90 %)
75 thousand litres (10 %)
Town don't facility of water treatment plant, direct water supply is also done.
Chlorination is done weekly to improve the quality of water.
Description
Details
5 Nos.
2 OHT
Description regarding
Connections
Residential
Nos. of Connections
Commercial
Nil
Total Connections
384
384
78
The monthly charge for residential connection is Rs. 45/Distribution of Houses by Sources of Water
36%
0%
Within Premises
33%
Tap
4% 1%
0%
Handpump
Tubewell
40%
Near Premises
Away
1%
Well
Tank, Pond, Lake
52%
River, Canal
Spring
2%
Any other
Population
2011
2012
2013
2014
2015
2020
2025
2030
2035
10535
10659
10785
10912
11041
11691
12380
13110
13883
Domestic
Fire Demand
Water Demand (1%) (MLD)
0.014
1.42
0.014
1.44
0.015
1.46
0.015
1.47
0.015
1.49
0.016
1.58
0.017
1.67
0.018
1.77
0.019
1.87
Industrial
Demand (3%)
0.043
0.043
0.044
0.044
0.045
0.047
0.050
0.053
0.056
Considering
Losses (5%)
0.071
0.072
0.073
0.074
0.075
0.079
0.084
0.088
0.094
Total Demand
(MLD)
1.55
1.57
1.59
1.60
1.63
1.72
1.82
1.93
2.04
Issues
Water distribution system is very old and has leakage problem due to which pressure remains low.
About 15,000 litres of water remain unaccounted indicating distribution loss of 25% of the total supply.
Per capita supply is low (27.9 lpcd) against the standard norm of 135 lpcd.
Supply Gaps
(MLD)
1.14
1.16
1.18
1.19
1.22
1.31
1.41
1.52
1.63
SWOT Analysis
STRENGTH
Good quality of water is available from all the sources
(ground water and Raja Talab).
WEAKNESS
Both the 2 OHTs (in ward 10) are not functional due to leakage
problem.
OPPORTUNITY
Surface water is available throughout the year.
Two over head tanks are present (in ward 10) which
can be repaired, thereby increase the storage capacity.
Components
1
2
3
4
5
6
7
8
9
Horizon Period
2015
40%
135
2025
100%
135
2035
100%
135
40%
As per WHO
Standards
100%
As per WHO
Standards
100%
As per WHO
Standards
25%
80%
100%
40%
10%
15%
100%
100%
80%
70%
5%
100%
100%
100%
100%
system.
Extension of water pipeline to un-served areas (outer areas of ward 1, 3, 5, 6 and 14) thereby
ensuring 100% water supply network coverage.
Projects proposed
Preparation of DPR for Water Supply System
Rehabilitation/ replacement of present pipe line system (2 km)
150 dia (cost @ Rs1471)
Extension of present distribution line to cover the whole of the
city (3.5 km) 150 dia (cost @ Rs1471)
Construction of 2 OHT each of capacity 4 MLD by 2013 and
2015 years
Construction of Filtration Plant/ Water Treatment Plant of
capacity 4 MLD in ward no. 15
Department
Nagar Parishad
51.00
Nagar Parishad
300.00
Nagar Parishad
235.00
Nagar Parishad
Nagar Parishad
2.00
Nagar Parishad
50.00
Nagar Parishad
WS 8
30.00
Nagar Parishad
WS 9
15.00
Nagar Parishad
30.00
Nagar Parishad
5.00
755.48
Nagar Parishad
WS 6
WS 7
2011
1.55
1.24
0.0
1.24
2011
1.24
0.0
1.24
1.24
2011
0
2107
2107
2011
15.80
0.0
15.80
15.80
2012 2013
1.57 1.59
1.25 1.27
0.0
0.0
1.25 1.27
2012 2013
1.25 1.27
0.0
0.0
1.25 1.27
1.25 1.27
2012 2013
0
0
2132 2157
2132 2157
2012 2013
15.99 16.18
0.0
0.0
15.99 16.18
15.99 16.18
YEARS
2014 2015
1.61 1.62
1.28 1.30
0.0
0.0
1.28 1.30
2014 2015
1.28 1.30
0.0
0.0
1.28 1.30
1.28 1.30
2014 2015
0
0
2182 2208
2182 2208
2014 2015
16.37 16.56
0.0
0.0
16.37 16.56
16.37 16.56
2020
1.72
1.38
0.0
1.38
2020
1.38
0.0
1.38
1.38
2020
0
2338
2338
2020
17.54
0.0
17.54
17.54
2025
1.82
1.46
0.0
1.46
2025
1.46
0.0
1.46
1.46
2025
0
2476
2476
2025
18.57
0.0
18.57
18.57
2030
1.93
1.54
0.0
1.54
2030
1.54
0.0
1.54
1.54
2030
0
2622
2622
2030
19.67
0.0
19.67
19.67
2035
2.04
1.63
0.0
1.63
2035
1.63
0.0
1.63
1.63
2035
0
2777
2777
2035
20.82
0.0
20.82
20.82
Issues
All the grey matter of the sewerage is disposed off in the Nallah and this nallahs water get mixed in the pond
located in ward no 5.
Unmaintained limited no. of public urinals and public toilets (only 2 which are located in ward 10 and 12)
Wide spread practice of open defecation as about 84% of household does not have in-house toilet facilities.
Swot analysis
STRENGTH
Town has good natural slope i.e. South west to north east.
WEAKNESS
No underground sewerage system for the town.
Land availability for sewerage treatment plant (in ward 5 and 6).
Code No.
SS 1
Projects proposed
Preparation of DPR/Comprehensive
Master Plan for underground Sewerage
System for entire town
SS 2
150.00
Nagar Parishad
SS 3
100.00
Nagar Parishad
SS 4
171.00
Nagar Parishad
SS 5
1.00
426.22
Department
Nagar Parishad
Nagar Parishad
Drainage system
At present the town does not have a comprehensive and effective drainage system and facility of treatment
plant.
Along the SH 9, 52 and other major roads of town, drains have been constructed.
The drainage condition survey in the town indicates that the drainage network in Govindgarh is open and
unorganized.
Most of the drains do not have capacity to flow the waste water as they are damaged and remain chocked due
to presence of gray matter and disposal of solid waste in it (mainly in ward 4, 11 and 12).
Low lying areas in ward nos. 10, 11, 12, 13, 14 and 15 in the southern side of the Govindgarh town are
major flood prone areas of town.
Condition of Drains in Govindgarh
Ward 1
Ward 4
Ward 10
Ward 11
Drainage Map
As the Raja Talab and Rani
Talab are located in the
southern part of the town
and the storm water from the
city and hilly area also flows
in these Talabs.
All the low lying areas in
ward nos. 10, 11, 12,13, 14
and 15 in the southern side of
the town Govindgarh are
major flood prone areas of
town.
Swot analysis
STRENGTH
Strong desire of citizens to develop a fresh
drainage system for town.
Town has a natural slope towards south west
to north east which is favourable for
development of drainage system which will
also help in cost reduction.
OPPORTUNITY
Making rainwater harvesting in commercial
and residential plots mandatory.
WEAKNESS
Detailed layout drawings of drainage network
are not available. Hence, making future
planning difficult.
THREAT
Health hazards due to negligence for
cleanliness.
Code No.
D1
Projects proposed
Preparation of DPR for Storm
Water Drainage System for entire
town
D2
Construction of new storm water
drainage network to cover the
whole town (3 kms.) (@Rs 44
lakh/km)
D3
Converting the to pucca one by
De-silting, lining and constructing
side walls. 3.5km (@Rs 20
lakh/km)
Sub Total Cost (D)
Project Cost
(in Lakh)
Department
1.9 (1%) of Nagar Parishad
total project
cost)
120
Nagar Parishad
70
191.9
Nagar Parishad
At present in the absence of incineration unit, waste from medical/healthcare establishments are
either mixed with municipal waste or indiscriminately dumped.
Presently there is no Door-to-Door solid waste collection system from the individual
households and other establishments as primary collection.
Total
Standard as per UDPFI
Population Guidelines (Grams/Person)
10535
250
10659
250
10785
250
10912
250
11041
250
11691
250
12380
250
13110
250
13883
250
Waste Generation
(MT/Day)
2.63
2.66
2.70
2.73
2.76
2.92
3.10
3.28
3.47
Waste Collection
(MT/Day)
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
0.18
Gaps
(MT/Day)
2.45
2.48
2.52
2.55
2.58
2.74
2.92
3.1
3.29
Major Issues
Lack of dhalows and bins for storage of waste at primary level.
Inadequacy of man power and modest equipments (including vehicle for transportation) with GNP for
Solid Waste Management from collection to its final disposal.
Collection efficiency is very low (approximate 65%).
Lack of capital/funds with GNP for the development of SWM facilities.
Absence of dumping site.
Projects proposed
Issues
Great pressure on major roads (SH 52 and SH 9) since all the major commercial activities, important
institutions etc. are concentrated along these roads.
Rampant encroachment, on-street parking on SH 52 leading to reduced ROW and carriageway
resulting in slow movement of traffic and congestion in core area.
Existing bus terminal is very small (in ward 10); not being used by bus operators because of paucity of
space in making entry and exit due to informal development, inefficient road width.
Narrow streets in the core areas (in ward 4, 10, 11 and 12) need to be widened through proper planning
and addressing the encroachment problems.
Gomati Chouraha (in ward 12) is a congested area and there is a need for junction improvement.
TT 2
TT 3
TT 4
TT 5
TT 6
Projects proposed
Development of new Bus Stand with
proper ISBT on BOOT basis in ward
no. 12
Development of road in ward 14
(2km)
Development of
footpath/pedestrian along the
major roads. (for 5 km)
Construction of 5 parking lots along
main roads and in commercial or
market areas
Road Widening from 3 m to 4.5 m
(major district roads for 6km.)
Improvement of traffic junctions,
rotary development including
installation of traffic light/signals.
Project Cost
(in Lakh)
500
Department
Nagar Parishad
100
Nagar Parishad
25
Nagar Parishad
25
Nagar Parishad
90
PWD
90
Nagar Parishad
830
Swot Analysis
STRENGTH
Huge scope for development in terms of street light
services.
WEAKNESS
Irregular spacing of street light poles within the residential
areas of town.
OPPORTUNITY
Energy saving initiatives
Installation of high Mast Light at important junctions, rotary and entry point (mainly on Gomati Chauraha)of the
town.
Alternate Street Light options (Solar, energy saver like CFL, LED etc.) and installation of automated control lights on
Raja Talab, Govindgarh Fort, Khando Devi etc.
Installation of solar based electric poles in Public Buildings i.e. Nagar Parishad, Schools, Hospital etc.
Urban poor
Around 21.49% (2264) of total population (10535) are slums, squatter and other poor population which
mainly resides in ward no. 1, 5, 6, 7, 10, 14 and 15 of the town.
Out of the total slum population (2264); nearly 70% population (i.e. 1585) accounts for Below
Poverty Line (BPL) population.
The shelter conditions are very scruffy in the selected pockets. The majorities of the houses in these
slums areas are made of mud and wattle with burnt mud tiles (Khapra) and iron sheet roofs.
Many of these houses lack basic amenities such as toilet, power, water, open spaces etc. and have
katcha houses.
Most of the residents of the slum obtain their water from Municipal Hand pumps.
The existing condition of surface drainage is a mess in the whole slum pocket.
At present the main type of sanitation in these slum areas is the pit latrine.
All the roads in the selected slums are narrow tracks eroded by runoff water.
There are 4 dustbins in the selected slum areas (In ward 1, 5 and 15).
Only one school in slum areas is located (in ward no. 15) which is not sufficient to educate the
people including slum population at town level.
Projects proposed
Installation of 218 nos. of street lights
within the wards/residential area
(33230/- Solar street light pole)
SL 2
SL 3
SL 4
SL 5
SL 6
Sub Total Cost (F)
Project Cost
(in Lakh)
75
Nagar Parishad
60
Nagar Parishad
25
Nagar Parishad
125
Nagar Parishad
50
Nagar Parishad
Nagar Parishad
340
Department
Social infrastructure
Altogether there are 5 government schools (3 are primary, 1 high school for boys and 1 higher
secondary school for girls ) and 4 private schools in Govindgarh (mainly in ward 11 and 12).
The town has a Anganwari kendras in each ward.
The schools have basic facility like toilets, urinals, drinking water and playground.
At present, there is one Community Health Centre (CHC) with 30 beds and two Primary Health
Centres (PHCs) in surrounding Gram Panchyats in Rehat and Tikar.
There are five doctors, five nurses, two assistant nurses and to supporting staff.
However, the demand for health services are bound to increase considering the increasing population, a
need for a speciality hospital is envisaged.
Town also has a facility of veterinary hospital near CHC (in ward 12).
Schools
Issues
Town has no intermediate/speciality hospital and specialized health care facilities.
Town has insufficient no. of primary schools.
The physical conditions of the schools are not good.
Government schools dont have proper basic requirement of drinking water and sanitation facilities
for students.
Inadequate teaching staff in Government Schools.
Town does not have any technical/vocational training institute such as ITI.
There is no notified or designated place as open space, parks and play grounds for the resident of town.
Town does not have community gathering halls or rooms, public library etc. for the citizens.
Picnic spot or recreational area like Raja Talab, Sunder Ban, Govindgarh Fort etc. is there but its
development has not been done.
Project Cost
(in Lakh)
Department
150
Health Department
H2
Construction of 1 Multi-specialty /
intermediate hospital with 44 no. of
beds @1 bed per 500 person for 2035
in ward no. 10 or 13
75
Health Department
H3
50
Health Department
275
Projects proposed
Establishment of 1 no. of Integrated
School with Hostel Facility
E2
10
Education Department,
Govt. of M.P.
E3
100
Education Department,
Govt. of M.P.
E4
50
Education Department,
Govt. of M.P.
E5
10
Nagar Parishad
E6
70
Education Department,
Govt. of M.P.
740
Raja Talab
Govindgarh Fort
Swot analysis
STRENGTH
WEAKNESS
OPPORTUNITY
THREAT
Water front development on PPP basis along with Raja lake and related activities like water sports, theme
park and boating etc. to encourage tourism.
Facilitating infrastructure in terms of good means of transport, hotels and resorts to attract tourists.
Promoting Govindgarh as a transit point for the surrounding tourist destination like Gurh, Orchha or
Khajuraho, Maihar, Panna National Park, Bandhavgarh National Park.
Projects proposed
Project Cost
(in Lakh)
T1
6 (1% of
Project
Cost)
T2
--
T3
500.00
T4
50.00
T5
50.00
606.00
Department
UADD, Govt. of and GNP
Code No.
Projects proposed
Project Cost
(in Lakh)
Department
O1
60.00
Nagar Parishad
O2
10.00
Nagar Parishad
O3
50.00
Nagar Parishad
O4
50.00
Nagar Parishad
170.00
Municipal finance
Year Wise Income of Govindgarh Nagar Parishad from Various Sources
Financial Year
Tax
Non-Tax
Transfer inc. grants
2008-09
172137
10531216
32000
2009-10
264232
13875928
35190
2010-11
340000
17107926
34000
Source:Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad
Year Wise Expenditure of Govindgarh Nagar Parishad
Financial
(Wage & salary)
Operation and
Payment Interest
Year
Establishment
Maintenance
2008-09
7334292
42240
2975037
2009-10
9112660
34000
2010-11
12697908
33000
Source:Income and Expenditure Statement (2008 - 2011) - Govindgarh Nagar Parishad
Total
10735353
14175350
17481926
Others
Total
894741
10351569
9146660
13625649
Code No.
UR 1
Projects proposed
Computerization of property tax &
other assets
Project Cost
(in Lakh)
Department
Nagar Parishad
20
UR 2
Nagar Parishad
UR 3
Training/Manpower Assistance
Nagar Parishad
UR 4
Nagar Parishad
UR 5
Nagar Parishad
40
755.48
426.22
191.9
141.4
830
340
4000
Educational Facilities
740
Tourism
606
Other Components
170
40
275
8516