Академический Документы
Профессиональный Документы
Культура Документы
GENERATOR
STATOR
AVR CONTROL
CURRENT(A) VOLTAGE(Uc)
1000
2000
4000
6000
8000
10000
12000
14000
16000
19407
OCC
GENERATOR
STATOR
VOLTAGE
AVR CONTROL
(KV)
VOLTAGE(Uc)
0
1
2
4
6
8
10
12
14
16
18
20
21
DATE:
EXCITER FIELD
EXCITER FIELD CURRENT(mv)
VOLTAGE(V)
[60mv=200A)
GENERATOR FIELD
CURRENT(A) Q
Axis coil volt
(0-40V=0-8000A)
DATE:
EXCITER FIELD
EXCITER FIELD CURRENT(mv)
VOLTAGE(V)
[60mv=200A)
GENERATOR FIELD
CURRENT(A) Q
Axis coil volt
(040V=0-8000A)
Remarks
Remarks
OBJECTIVE:
TO CARRY OUT GENERATOR SHORT CIRCUIT TEST,CURRENT OPERATED RELAYS DYANAMIC
TESTING,OPEN CIRCUIT TEST,VOLTAGE OPERATED RELAYS DYNAMIC TESTING,SYNCHRONIZATION
CIRCUIT CHECK,PROTECTION TRIP OF GENRATOR CIRCUIT BREAKER AND SYNCHRONIZATION
PREPARATIONS:
1 The following measurement circuits are to made through for monitoring and taking readings
A)
Generator voltage- RY,YB,BR
B)
Generator current- R,Y,B
C)
Excitation Voltage
D)
Excitation Current
E)
Generator field current(Q-AXIS coil voltage)
F)
Active power
G)
Reactive Power
H)
Power factor
I)
Energy meter
2 Synchronising cirucits and protection circuits are also to be kept ready alongwith recommended
settings set in the protection relays
3 Testing/measuring equipments to measure PMG voltage(3 Ph AC),Main Exciter(DC) and PMG's Phase
sequence and frequency in AVR are to be kept ready
4 Winding resistance for PMG&ME are to be measured to check the healthiness of PMG&ME
PREPARED BY:RMS
SHEET 3 OF 12
Interlock between switchyard and Field circuit breaker are to be isolated if required
GT Trf,Overall differential&Gen diff protection to be kept in service
10 AT standstill condition,test rotor earthfault and 100% stator earthfault circuit with 20 Hz Gen
a) earth the main exciter star point slip ring terminal at main exciter
b) earth the NGT 1.1 terminal at NGT
Frequency
Phase Sequence
Protection
Gen diffl(87G-GR1)
Methodology
SHORT ANY PHASE TO NEUTRAL
GRP-1 : N.SIDE - TB1-1,2,3,4
PH.SIDE - TB1 - 6,7,8,9
Relays
operation
operated I Value
Remarks
186A2/286A2
Iset= 0.1 In
(In=5 A)
186A2/286A2
Iset= 0.1 In
(In=5 A)
1
Gen diffl(87G-GR2)
186A1/286A1
Iset= 0.09 In
(In=5 A)
sec
186A1/286A1
Iset= 0.09 In
(In=5 A)
t=1 sec
PREPARED BY:RMS
SHEET 4 OF 12
t=1
I2th.set= 0.07 In
186C/286C
Negative Phase sequence(46G1)
(In=5 A)
I2th.k=6.3
I2th.set= 0.07 In
186A1/286A1
(In=5 A)
I2th.k=6.3
t=1
sec
3
I2th.set= 0.07 In
186C/286C
(In=5 A)
I2th.k=6.3
I2th.set= 0.07 In
186A1/286A1
(In=5 A)
I2th.k=6.3
t=1
sec
Overcurrent (51G1)
ALARM
Iset= 1.1 In
(In=5 A)
sec
t=2
ALARM
Iset= 1.1 In
(In=5 A)
sec
t=2
4
Overcurrent (51G2)
50 LBB (GR1)
186A1/286A1
Iset= 0.05 In
(In=5 A)
t=0.3 sec
50 LBB (GR2)
186A1/286A1
Iset= 0.05 In
(In=5 A)
t=0.3 sec
g)
Raise the current in steps and Take readings as given in SCC table.
h)
Note the spill current in all differential protection and shaft voltage and Temperatures of GEN and GT
PREPARED BY:RMS
SHEET 5 OF 12
b)
c)
Create 1 phase earth fult at SPVT cubicle. Check the 95% Stator earth fualt protection and
Interturn fault protection.
d)
e)
f)
g)
Note down the Temperatures of Generator and GT for winding,core and air
Protections during OCC
Sl No
Protection
Methodology
Relays
operation
operated V. Value
Remarks
Vn set=11 V
t=0.2 sec
186A2/286A2
Vn set=11 V
t=0.2 sec
ALARM
V>1 = 115.5 V
2 sec
186A2/286A2
V>2 =154 V
t= 0 sec
2
Over Voltage - 59G2
186A2/286A2
V>1 = 121 V
6 sec
t=
186A2/286A2
V>2 = 154 V
0 sec
t=
ALARM
186C/286C
ALARM
186C/286C
7
Under frequency - 81G2UF
t=
ALARM
ALARM
ALARM
186A2/286A2
7
ALARM
Over fluxing - 99G2
186A2/286A2
186A2/286A2
P<1=5W
T= 10 SEC
(WITH GCB
CLOSE)
186A2/286A2
P<1=5W
T= 10 SEC
(WITH GCB
CLOSE)
8
low forward power(37G2)
AVR CHECKING
PREPARED BY:RMS
SHEET 6 OF 12
De excite the machine and normalise the Manual chanel internal mode.
Reduce the over voltage protection to 105 % and Excite mahine through manual channel.
Check the change circuit of auto channel after cheking the matching circuit.
Check the Auto channel flashing after PID tuning
check the manual channel and auto chennel from ECP.
Check the V/Hz limiter.
Normalise all protections and the settings.
Synchronization circuit check
Normalise the turbine interlocks.
CFA01
TBK-23,24(R&N)
TBK-27,28(R&N)
21 KV VT-2 PT SUPPLY:
21 KV VT-4 PT SUPPLY:
SKE 11 CHECK SYNC RELAY SETTINGS
10
4%
0.22
Time Setting
0.5
ECP
CHECK SYNC SWITCH SELECTION FOR GCB MAN SYNC
CFA01
ECP
TBK-5 (INC)
1TBC-40
TBK-6 (RUN)
1TBC-41
TBK-7 (COMM)
1TBC-42
AT 12'0 CLOCK POSITION,
VOLTAGE BETWEEN 1TBC-40&1TBC-41 OF ECP SHALL BE ZERO AND CHECK SYNC PERM AVAILABLE
PHASE SEQUENCE OF GENERATOR PT SIGNALS:FORWARD
SYNCHRONIZATION
1 Excite the machine and develop 21KV voltage at Generator terminals.
2 Adjust the voltage & speed from ECP and get synchronising 12'O clock position using Voltage Raise\Lower PBs & Speed Raise\ Lower PBs.
3 Close GCB at 12'O clock position.
MASTER TRIP RELAY OPERATIONS ( 186 - GROUP 1 AND 286 - GROUP 2)
1 A1 - All trips ( Turbine, 21KV GCB, Field Breaker Trips, Main & Middle Breaker trips)
2 A2 - Only Turbine, 21KV GCB, Field Breaker Trips
3 C - Only Switch Yard Breakers Trips( Main & Middle Breakers)
4 D - Only 21KV GCB & Field Breaker Trips
PREPARED BY:RMS
SHEET 7 OF 12
CT-2 (0.2S)
RATIO
CT-3(PS)
22000/5 A
GRP-3
3
CT-4(PS)
22000/5 A
CT-5(PS)
22000/5 A
CT-6(PS)
22000/5 A
GRP-1
GRP-3
CJJ10
CT-7(0.2S)
GRP-2
T&AVT
CT-8(0.2S)
TB1-1
2
3
4
GROUP-2
PROTECTION
TB1-6
7
8
9
TB1-6
7
8
9
X05-17
19
21
26
GROUP-1
PROTECTION
GROUP-2 PROTECTION
LOAD
MEASUREMENT
TY-50
54
58
60
DVR CH-1
TB1-40
41
42
43
ENERGY METER
TBE-07
10
13
5
METERING
X05-27
29
31
36
LOAD
MEASUREMENT
TY-62
66
70
72
DVR-CH2
22000/5 A
CJJ10
DVR
M/S.APGENCO
GROUP-1
PROTECTION
22000/5 A
DVR
TB1- 1
2
3
4
REMARKS
M/S. BHEL
SL NO CT NO
CT-2 (0.2S)
CT-3(PS)
CT-4(PS)
CT-5(PS)
X05 -1
3
5
16
GRP-1
TB1- 1
2
3
4
GRP-3
TB1-1
2
3
4
GRP-1
TB1-6
7
8
9
TB1-6
7
8
9
22000/5 A
22000/5 A
22000/5 A
22000/5 A
GRP-3
5
CT-6(PS)
CT-7(0.2S)
CT-8(0.2S)
M/S.APGENCO
22000/5 A
CJJ10
X05-17
19
21
26
DVR
TY-50
54
58
60
GRP-2
TB1-40
41
42
43
T&AVT
TBE-07
10
13
5
CJJ10
X05-27
29
31
36
DVR
TY-62
66
70
72
@ 5000 A
@ 10000 A
@15000 A
@19407 A
22000/5 A
22000/5 A
M/S. BHEL
PURPOSE
REMARKS
LOAD
MEASUREMENT
GROUP-1
PROTECTION
GROUP-2
PROTECTION
GROUP-1
PROTECTION
GROUP-2 PROTECTION
LOAD
MEASUREMENT
DVR CH-1
ENERGY METER
METERING
LOAD
MEASUREMENT
DVR-CH2
M/S.APGENCO
M/S. BHEL
SL NO VT NO
RATIO
PANEL
GRP -1
VT-1(0.2/3P)
21000/110V
CJJ - 10
AVR
GRP -1
VT-2(0.2/3P)
21000/110V
AVR
T & AVT
CJJ - 10
GRP - 1
VT-3(0.2)
21000/110V CJJ - 10
10
T & AVT
11
GRP - 1
VT-4(0.2/3P)
12
21000/110V
T & AVT
TERMINALS
TB1-24
25
26
27
X03 - 1
4
7
10
TY - 46
47
48
TB1 - 41
42
43
44
TY - 41
42
43
TBK - 23
24
X03 - 11
13
15
TB2 - 1
2
3
4
X03 - 18
20
22
TBE - 1
2
3
4
TB2 - 22
23
24
25
TBK - 27
28
SPILL
@ 2KV
@ 5KV
@ 10KV
@ 12KV
@ 15KV
@ 21KV
PURPOSE
GR-1 RELAY
AUTO CH - 1
GR - 2 RELAY
AUTO CH - 2
SYNCHRONISING
LOAD
TRANSDUCER
METERING
LOAD
TRANSDUCER
METERING
SYNCHRONISING,
59 NGT
SYNCHRONISING
REMARKS