CONTENTS
Page
Summary
Preamble to the Internet edition February 2011
An explanation of the efficiency of network arches
1
3
3a
4
5b
7
8
9
13
16
16
19
19a
20
21
25
25a
26
29j
29k
30b
Railway bridges
Network arch railway bridges designed in Grimstad and Dresden 2002 to 2007
Some work on railway bridges mainly before 1974
31
31a
38
47
50
50a
Erection of the steel skeleton of a network arch on the side span of the Skodje Bridge
Removing the temporary lower chord of the Skodje Bridge
Erection of network arches in coastal areas and wide rivers
50a
52
54
Nielsens bridges
Trouble with hangers coming out of concrete ties
Influence lines etc. of previously calculated network arches
54
55a
56
Steinkjer
Bolstadstraumen
Vienna 1980
kvik Sound, Norwegian edition
57
58
59
73
92a
93
93b
93c
94b
94b
Literature
Organisers of the lectures on network arches February and March 2000
Modified 17.08.2013
95
102
2
Per Tveit
per.tveit@uia.no
On references: A reference is given by author and year. For instance: (Nielsen 1930) indicates that
Nielsen published something on the subject in 1930. The author finds that this method gives valuable
information without forcing the reader to look at the list of literature at the end of the publication.
When referring to information on the internet one should often give page numbers or numbers of figures.
That makes it easier to check statements. It is much more difficult to get hold of books and publications.
On tonnes: In this publication t, tons or tonnes mean metric tonnes, which are 1000 kilos.
Modified 25.10.2014
AN EXPLANATION OF THE
EFFICIENCY OF NETWORK ARCHES
The purpose of a bridge is to take traffic over an
obstacle. The traffic can be on a road as in fig.
1a. Often there is no room for members under
the bridge. For an evenly distributed load a
parabolic arch with vertical hangers like in fig.
1b is a very good solution. The forces in all
members are predominantly axial forces.
For uneven loads it is often better to use
crossing hangers like in the network arch in fig.
1c. Then all loads are led to the arches in such a
way that there is very little bending in the
chords. See figs 85 to 87. In trusses secondary
stresses and load between the nodes create
bigger stresses than in a well designed network
arch.
The simplest tie would be a concrete slab
spanning between the arches. See fig. 1d. The
slab and the edge beams distribute any load
between many hangers.
Fig. 1e shows the necessary thickness of a slab.
The transverse bending in the middle of the slab
is normally bigger than the longitudinal bending
in the tie. See p. 14. Thus there is no need for
steel beams in the tie.
The hangers give the arch good support in the plane of the arch. Universal columns or American wide
flange beams like in fig. 1f can be used. They give very slender and good-looking bridges with low
upkeep. The universal columns in the arches should be turned like in fig. 1f. Then the buckling strength in
the plane of the arch and out of the plane of the arch can be about the same. High strength steel is well
utilised. Fig. 98 on p. 93 shows that much steel can be saved by using optimal network arches instead of
arch bridges with vertical hangers. The network arch is equally well suited for rail and road bridges.
At suitable sites the arch bridge indicated on this page gives a very light and economical bridge if
economical methods of erection can be found. The network arch can be built on a scaffold. See fig. 6d, p.
6b and fig. 7a, p. 7a. Sometimes a temporary lower chord can be used. Combined with arches and hangers
it can make a steel skeleton that can be moved if lifted near the ends. See pp. 29k-30a and 50-55. The
steel skeleton can support the casting of the concrete tie. In coastal areas big floating cranes can be used
to lift steel skeletons or finished spans over 300 m from the shore to the pillars.
Modified 21.07.2014
3a
Fig. 2a. One-sided live load on the span might make the dotted hangers relax
With todays loads and materials many hangers may relax due to load on one side of the span as indicated
in fig. 2a. The hangers tendency to relax might be counteracted by increasing the distance between the
nodal points. See fig. 3. This, however, would lead to increased bending in the chords and less buckling
strength of the arch.
Fig. 3. Increased distance between the nodal points gives decreased tendency for the hangers to relax
Between the nodes the arch has a tendency to move upward and the lower chord has a tendency to move
downward. Thus it would be an advantage to put in an extra set of hangers between the chords as shown
in fig. 4a.
Two sets of hangers give smaller buckling lengths in the arch and less bending in the chords. This effect
is even greater if we put in three sets of hangers. See fig. 4b. This structure has three trusses on top of one
another. The authors definition of a network arch bridge is an arch bridge where some hangers cross
other hangers at least twice.
Fig. 4. Tied arches with two and three sets of hangers respectively
Modified 21.07.2014
The network arch can be seen as a simply supported beam with a tensile and a compressive flange. The
hangers are the web. Most of the shear force is carried to the supports by the vertical component of the
force in the arch. Much of the variation in the shear force is taken by variation in the hanger forces. The
hangers distribute the load between the chords in such a way that the chords have little bending.
The axial forces in the tensile and the compressive flanges are inversely proportional to the distance
between them. In tied arches, aesthetic reasons limit the distance between the arch and the tie. When the
rise of the arch has been decided, saving of materials depends mainly on whether or not a design gives
light chords and a light web. The arch could be part of a circle. This gives evenly distributed bending
moments in the chords. A reduced radius of curvature near the ends of the arch can give less bending in
the wind portal and a constant axial force in a longer portion of the arch.
When the tie is a concrete slab the upper nodes of the hangers should normally be placed equidistantly
along the arch. The members between the last node and the end of the arch can be a little longer than the
other members. If universal columns are used in the arches, the lower half of the members in the wind
portal can have a steel plate on top of the arch. The cavity under the steel plate can be filled with concrete
to make it more collision resistant.
All hangers should have the same cross-section. With careful choice of the slope of the hangers, the force
in the hangers can become surprisingly even. See the chapter on the optimal arrangement of hangers p.
26. The tie has a concrete slab spanning between the planes of the arches. The footpaths are outside the
arches. The biggest bending moment in the tie is usually found in the middle of the slab between the
arches. The longitudinal bending is usually smaller. If high-strength concrete is used, the distance
between the arches can be more than 16 m.
The small edge beams in the planes of the arches must be able to carry the hanger forces. They must also
have room for the prestressing cables that take the axial forces between the ends of the arches. These
prestressing cables give the tie a moderate longitudinal prestress. Such longitudinal prestress probably
contributes to preventing problems at the lower end of hangers that go directly into the concrete.
From the hangers the arch gets good support in the plane of the arch. Thus it has little tendency for
buckling in the plane of the arch. All the members in an optimal network arch efficiently carry forces that
can not be avoided in any simply supported beam. Therefore it is a most efficient structure. The network
arch uses any kind of steel efficiently, but it will be even more competitive in combination with future
steels with high yield strengths. There is valuable information on high strength steels in IABSE (2005).
An arch bridge with a parabolic
arch and vertical hangers like in
fig. 5 works well for evenly
distributed loads. There are only
axial forces in every part of the
Fig. 5. Arch bridge with vertical hangers and even load
structure.
For live loads only on half of the
span the axial force in the arch is
reduced, but the arch moves to the
right, and the deflections and the
bending moments increase.
Fig. 5a. Load on half the bridge in fig. 5
The type of bridge in fig. 5 is
less efficient for increased modern
live loads and modern materials.
That is because the stronger
materials lead to reduced crosssections of the chords and thus to
reduced bending capacity in the
Fig 5b. Network arch
chords.
Fig. 5b shows a network arch. Sloping hangers reduce the bending moments in the chords. It can be seen
as a simply supported beam consisting of many trusses on top of each other. A concentrated load gives
some bending, but the load does not have far to go to distribute itself to all the trusses. The distribution is
indicated by double arrows with opposite directions. Thus the bending moments are very small.
Modified 21.07.2014
5
One can normally get a good estimate of the axial force in the chords with the help of the influence lines
in figs 41, 63, 64, 65, 77, 81 and 82. (Tveit 66 p. 251) has formulas for calculating the axial forces in the
chords. Normally it is enough to calculate the axial forces in the middle of the span before more precise
values are calculated by means of a computer program. The force in the arch varies little till we get down
to the wind portal. The bending moment is biggest and the prestressing force is smallest in the middle of
the span. The formulas are simple.
The formula for the compressive force in the arch in the middle of the span is: N= ql2/8f+fq/2 tan2vh
The formula for the tensile force in the tie in the middle of the span is:
N=ql2/8f-fq/2 tan2vh
Fig. 5c. Axial forces in the middle and at the end of the chords
Fig. 5c gives the axial forces due to evenly distributed loads in the middle and at the ends of the chords.
The influence lines for axial forces in the chords are ~triangular. See figs 41, 6365, 77, 81 and 82.
For calculation of the axial force at mid span due to a concentrated load, the load can be replaced by a
uniformly distributed load equal to the concentrated load divided by half the span. This is because the
maximum ordinate of the influence line is roughly twice as big as the average ordinate. This makes it easy
to find the axial force due to concentrated loads. Preliminary hanger forces can be found by looking at
influence lines on pp. 57, 58, 60 and 72.
The nodes in the lower chord should be placed in such a way as to obtain nearly the same maximum force
in all hangers and to give all hangers a suitable resistance against possible relaxation. This has been
achieved in the bridges in fig. 8, p. 8. There will be more on this for instance on pp. 26-29j.
When some hangers relax, the bending moment in the chords increases and the buckling strength of the
arch is reduced because the support of the arch is less stiff. This is normally compensated for by the
inevitable reduction of the normal force in the arch. There is more on this on pages 67 and 68.
More relaxation of hangers is allowed if the arch is a box section like in the bridges for Vienna, pp. 59 to
72. Fewer hangers should be allowed to relax when the arches are universal columns like in Teich and
Wendelin 2001. See fig. 97, p. 93. This is because the arch in the bridges for Vienna has considerable
capacity for taking the increased bending due to the relaxation of hangers. In long bridges with universal
columns in the arch and slender ties it might not be advisable to let any hangers relax in the ultimate limit
state. Here an increased skew load might quickly give too much bending in the arches. More on this on
pages 27, 29i, 67 and 68.
In the serviceability limit state it might be best if all hangers are in tension. This is a must if the arches are
universal columns or American wide flange beams. In any case that would simplify the calculation of the
hangers. The arch should have a continuous curvature. This simplifies production. If the radius of the
curvature is smaller in the wind portal, the wind portal becomes shorter and the axial force in the arch has
less variation. Furthermore the rotation of the ends of the bridge is reduced. Brunn and Schanack 2003
chapter 6.
Modified 21.07.2014
5a
5b
Fig. 6a. The network arch at Steinkjer was opened in the spring of 1963.
6a
In the longitudinal
direction the piles are
3.5 m apart. If there
is a flood in the
winter, the slanting
piles will break up
ice that flows against
the scaffold.
Fig. 6d shows the scaffold for the tie of the network arch at Steinkjer
Experience from the first 50 years of the Steinkjer network arch.
The network arch at Steinkjer is in good shape after over 50 years. Given good maintenance it is likely to
last at least another 50 years. More on this can be found in (Tveit 2007).
The tie was cast on a scaffold on piles in the river bed. See fig. 6d. The cube strength of the concrete was
well over the prescribed 35 MPa. The content of the cement was 450 kg/m3. The steel arch and the
hangers should have been carrying the tie before the winter set in, but the steel mill did not deliver the
steel as promised. A flood came after the ice was around 0.15 m thick and swept away over 17 m of the
support under the tie. Due to this the tie was sagging 0.2 m and cracks over 2 mm wide developed.
Damage due to the flood with winter ice was overcome. The scaffolding was repaired and strengthened in
a makeshift way. Twelve piles in the river could not be replaced. When the steel had been erected, the tie
was straightened by the tensioning of the hangers. Prestress closed the cracks. Now they are hard to find.
Modified 21.07.2014
6b
Modified 21.07.2014
6c
Fig. 7a. Scaffolding for erecting the concrete and steel of the network arch of the Bolstadstraumen Bridge
In the first two Norwegian network arch bridges the ties were cast on timber structures resting on piles in
the river bed. See fig. 7a. That gave a convenient platform for erecting the arches and putting in the
hangers. The hangers were tightened till they carried the concrete deck. Then the timber structure was
removed. The form of the elements of the bridge was measured carefully prior to the erection of the steel.
In order to control built-in stresses, great care was needed in the adjustment of the hangers.
The force in a hanger was found by measuring the deflection of the hanger due to a transverse force on
the hanger. By comparing the actual forces in the hangers with the calculated ones, and the form of the
loaded bridge with the intended forms of the arch and the deck, it was possible to determine which
hangers needed adjusting.
After the bridge had been built many houses were built south of the bridge. For this reason some of the
lane has been made a footpath. The traffic is so little that this seems a change for the better. The
Bolstadstraumen Bridge is included in a national plan for the protection of roads bridges and associated
cultural relics.
Modified 21.07.2014
7a
Fig. 10. Two bridges designed for the kvik Sound in Northern Norway. Tveit 1999 a, b, and c.
In 1997 to 1998 a group of steel users in Norway were looking for competitive bridge types for spans
between 120 and 300 metres. The group initiated the design of the two bridges shown in fig. 10. The author
suggested the slim bridge. Its steel weight is indicated by the dot in fig. 9. See previous page. Teich and
Wendelin 2001 continued the work on this bridge. Pp. 93-93a and http://home.uia.no/pert under the button
Masters Theses.
A highly reputed Norwegian firm designed the heavier bridge. It is a Nielsen bridge because each hanger
cross other hangers only once. The lower chord of the heavier bridge is 1.5 metres deeper than the lower
chord of the slimmer bridge. Therefore the ramps of the slimmer bridge can be made shorter.
In the bridge with many side spans a beam is carried across the fjord by an arch. In the slim bridge the
lower chord of the arch is much slimmer than the side-spans. Thus aesthetic reasons argue for only two side
spans. The ramps usually cost less per metre than the side spans.
The real thickness in the slimmer bridge is meant to be shown in the drawing, but the arches are never seen
behind each other and the railings are not shown. Thus the real bridge would seem less slim. The hangers
of the slimmer bridge are not shown because they would be less than 0.03 mm thick in the drawing. As can
be seen from fig. 7 on page 7, they would hardly be seen even on a clear day. The skeleton lines of the
slimmer bridge in fig. 10 are shown in fig. 12. See next page.
The lane loads used in the design of Norwegian highway bridges in fig. 10 are shown in fig. 11. On the
footpath outside the hangers the maximum loads are 4 kN/m2 and a single wheel load of 18 kN. When there
is traffic load between the hangers, the load on the pavement outside the hangers is 2 kN/m2.
The kvik Sound network arch could have been erected by the methods indicated in figs 21 and 22 on p.
12, fig. 39 on p. 29k. The main span of the kvik Sound network arch was redesigned by Teich and
Wendelin in 2001. They used German loads and codes. In this publication that bridge is called the
kviksound network arch. See page 93.
Fig. 11. Lane loads used for the design of the kviksound network arch in fig. 10
Modified 21.07.2014
Fig. 12. Skeleton lines for arch and windbracing of the slimmer bridge in fig. 10 on the previous page
The cross-section of the tie of the slimmer bridge is shown in fig. 13. It is made of concrete with cube
strength of 45 MPa. For the heavier bridge ~40% more concrete with cube strength of 55 MPa has been
used. If higher cube strength had been used in the lighter span, the tie would have been lighter and the
hangers may have been less steep. The number of hangers in the lighter span could have been reduced by
15% without any great increase in the steel weight.
193 tons
STEEL WEIGHTS OF
THE HEAVIER SPAN
Arches:
234 tons
Windbracing:
25 tons
Hangers:
42 tons
Transverse beams: 149 tons
Lower chord:
114 tons
Miscellaneous:
41 tons
Structural steel: 596 tons
Rebars:
83 tons
Total: 679 tons
Fig. 14. Steel needed for the two spans in fig. 10.
Erection costs will be smaller if there is little material to erect.
For the lighter span, steel with a yield stress fy=460 MPa is
advantageous and has been selected. For the heavier span
fy=355 MPa and fy=420 MPa have been chosen. The exposed
steel surface that needs corrosion protection is 7 times bigger
for the heavier bridge.
10
For the heavier span the welds are 23 times as long as for the lighter span. The longer welds indicate that
more parts need to be cut out and handled. Thus the price per ton might well be less for the lighter span. See
also the table on page 93a. The main span in the lighter bridge uses only 28 % of the steel needed in the main
span of the heavier bridge. Railings and expansion joints are not included in these weights.
The transverse beams in the heavier span weigh just as much as the structural steel in the lighter span. The
transverse beams are heavy partly because the arches are outside the pavement and sloping towards each
other. This increases the span of the transverse beams. Furthermore, there are no shear connections between
the concrete lane and the steel of the transverse beams. This makes it easier to put the concrete elements in
the lane in place.
To support the claim that the steel in the lighter bridge is not costly to fabricate, some structural details are
shown in figs 16 to 20. Fig. 16 shows two ways of fastening the windbracing to the lighter arch. It can be
done by welding or by flanges that are fastened to the tubes by means of high strength bolts.
In fig. 17 a hanger is fastened to the stronger arch by means of high strength bolts. The arches are universal
columns. This profile is often used in high-rise buildings. The profile is ideally suited to the network arch
where the buckling length is much smaller in the plane of the arch than out of the plane of the arch. The
profile can be bent to the shape of the arch in the steel mill. This saves a lot of welding and other work.
Fig. 19 shows flange plates in a joint in the arch. The high strength bolts in the flanges are needed only for
erection, because there is compression over the whole cross-section of the arch for all load cases. The joints
in the arch can also be site welded. A possible design of the end of a network arch is shown in fig. 18. For
the steel weight of the lighter bridge in page 9 rubber bearings have been assumed.
The steel and concrete for the network arch for the kviksound would not be costly. The economics also
depend on the method of erection. The finished network arch, including the concrete slab, weighs ~1000
tons. The whole span can be finished on shore and lifted to its final position by two big floating cranes of
the type used in offshore work. See fig. 39 on page 29k. Using these cranes costs a lot.
The most versatile methods of erection utilise the fact that the structural steel, supplemented by a
temporary lower chord, can form a steel skeleton with so much strength and stiffness that it can be moved.
The steel for the temporary lower chord for the kviksound network arch weighs around 24 tons. An
example of a temporary tie is shown in figs 21 and 22.
This temporary lower chord needs no corrosion protection. It can be produced on site using high strength
bolts. When the steel skeleton and the reinforcement are in place, the lower chord can be cast. First the
transverse beams at the ends of the arches are cast. Then the smallest edge beam is cast. See fig. 13.
To prevent bending moments due to hangers relaxing, the casting must start at both ends of the span and
proceed to the middle. Then the biggest edge beam is cast in the same way. When the edge beams have
been cast, they will take most of the bending in the tie. The prestressing cables will take most of the axial
force in the tie. Finally the deck is cast. See also pages 30 and 30a.
Fig. 25 on page 15 shows how the structural steel in a network arch bridge can be erected on the side-spans
and be moved into place by means of pontoons and/or cranes. See also pages 19a, 20, 29k, 34 and erection
and removal of the temporary lower chord on pages 50a to 53a. See also (Tveit 2013a Pp. H-6, H-9, H-25
and H-28).
With slight alterations this temporary lower
chord can be used in many different network
arches. If the whole span is to be removed, a
temporary lower chord can be used if the
concrete is removed before the steel skeleton
is removed.
12
Fig. 23. Geometry, loads and quantities of the two tied arches
Modified 17.08.2013
13
Fig. 24. Areas, stiffnesss and influence lines for the lower and upper chord of two tied arches
The upper part of fig. 24 shows influence lines for bending moments in the arches. The network arch
usually saves more than half the steel compared with other bridges, but the steel weight for the bridge
with vertical hangers is in this case only twice the steel weight of the network arch. This impresses the
author because the Straubing Bridge uses no concrete in the deck.
When the arches are made of concrete and the hangers are vertical, it is important that creep does not
change the shape of the arch over the years. Therefore the shape of the arch should be near to a second
degree parabola. When the arch is made of steel and the hangers cross each other, the arch should have a
constant curvature except, maybe, near the end. That would lead to more even maximum bending in the
chords.
If the shape of the arch of the Straubing Bridge had been more like a circle, the ordinates of the influence
line for the bending moments in the chords could have been more equal. Now, when the arch is nearly
parabolic, the bending in the middle of the span is smaller than in the quarter points.
14
Fig. 25. Erection procedure for a network arch spanning 200 metres
Fig. 25 shows how a network arch bridge can be erected on site at Straubing. The costly and complicated
adjusting of hangers can be avoided if the arch, hangers and the temporary lower chord have the correct
shape and no unnecessary stresses when erected on the side-span. A wagon for moving the steel skeleton
can roll along over the side spans. The side spans do not need strengthening to carry this wagon. After the
span is in place, the steel crew has finished their job and the concrete workers can take over.
15
16
Fig. 27. The main span of the Fehmarn Sound Bridge. Opened in May 1963.
Fig. 28. Proposed network arch design from the authors PhD thesis. Tveit 1959.
17
In fig 28 the arches slope toward each other. This reduces the bracing between the arches and the bending
moments in the wind portal. It makes the slab or transverse beams in the tie longer. This leads to
increased steel weight. At the time the author still suggested the constant slope of hangers and some
nodes where two hangers meet. Now he would not even consider such arrangements.
Professor Masao Naruoka saw model tests on the Fehmarn Sound Bridge in TH-Hannover in 1960.
Naruoka took the idea to Japan where it has been flourishing. (Naruoka 1977), (Fujiono 1965), (Hiroshi
1965) and (Tagai 1970). More than 100 bridges of this type have been built. (Kikuno 1973), (Yoshikava
1993) and (Nakai 1995). Many references to Japanese articles on network arches can be found at the end
of (Tveit 1999a).
The Japanese have a small country and it is very important for them to make it more beautiful by building
beautiful bridges. Many of their bridges resemble the heaviest bridge for the kvik Sound. See fig. 10,
page 9. About half of their network arches have parallel arches. Nakai 1995. Most Japanese articles on
network arches tell about spans with arches sloping towards each other. The Shinhamadera Bridge, fig.
29, was the longest network arch when it was opened. The Japanese call these bridges Nielsen-Lohse
bridges. They might not know that O. F. Nielsen never crossed the hangers in the bridges that he built.
Nielsen 1930, 1932 and 1936.
In most Japanese network arches all hangers have the same slope. That was also the case in many of the
bridges that Nielsen built in Sweden between the two world wars. In his bridges the hangers were
supposed to relax due to live loads. The constant slopes of the hangers made the design of these bridges
less complicated when Nielsens method of calculation was used. Nielsen 30. See also p. 55. With
modern methods of calculation it might be easy and more economical to vary the slope of the hangers. It
is the authors impression that the Japanese might think that the constant slope of hangers looks best. If
the arches slope towards each other, the hangers might look unsystematic, as if they had had varying
slopes.
Modified 21.07.2014
18
Fig. 31a shows the steel skeleton of the network arch at Providence before it is floated to the site
pillars.
19
Fig. 31b. Bridge over the Ohio River in the USA. Opened 2007. Span 268 m.
In 1996 W. H. Hess presented An Alternate Hanger System for Tied Arch Bridges at the 13th Annual
International Bridge Conference in June 1996 in Pittsburgh, Pennsylvania. Hess 1996. It was an
independent idea of his, but he recognised the authors work on network arches. Michael Baker Jr., where
he worked suggested network arches for many bridges. Finally the idea was adopted for the Blennerhasset
Bridge. (Wollmann and Zoli 2008) contain much interesting information on the design. There is a three
page description of the Blennerhassett bridge on the authors homepage http://home.uia.no/pert under the
button Systematic Theses pp. H-23 to H-25.
The main span in the Blennerhassett Bridge was erected from pillars in the river. See fig. 31c. The
distance between the pillars allowed ships to pass. Wollmann and Zoli 2008 say that compared to a
bridge with vertical hangers the crossing hangers reduce the live load deflections by a factor of 11. Arch
rib and tie beam bending moments are reduced by a factor of 4 and 5 respectively.
There is 32.6 m between the planes of the arches. With the great width of the bridge and the
correspondingly heavy concrete deck slab, live load stresses in the inclined hangers remain low and
hanger unloading is not an issue. The design was accepted because it saved a lot of money. The
Blennerhassett Bridge won the 2009 National Award for Long Span Bridges from The National Steel
Bridge Alliance.
Modified 31.03.2014
19a
Fig. 33. A suggestion for a network arch bridge across Storestraumen in Skodje in Western Norway
The tubular parts of the arches under the lane could have been floated in or erected from the side-spans.
The structural steel above the lane, supplemented by a temporary lower chord, could have been erected on
side-spans on one side of the fjord. See figs 21 and 22, p.12. Then it could have been floated across to the
other side of the fjord by means of a floating crane or a pontoon. It could also be lifted across the fjord by
a mobile crane.
Modified 15.11.2013
20
Fig. 33a shows the reinforcement in the edge beam nearest the footpath. The capital letters indicate the
sequence in which the reinforcement is to be put in place. The longitudinal prestress reduces the need for
longitudinal reinforcement. In fact there will be no transverse cracks in the slab in the serviceability limit
state.
The longitudinal prestress will increase the bond in the transverse reinforcement. This leads to smaller
distances between the cracks in the longitudinal direction of the bridge, especially half way between the
arches. However this beneficial effect has not influenced the authors choice of transverse reinforcement
in the slab.
Fig. 33a. Reinforcement in the edge beam nearest to the footpath in the proposed Skodje Bridge
There is more on the erection on the side-span and the removal of the temporary lower chord in: Erection
of the steel skeleton of the network arch on the side span of the Skodje Bridge and in Removing the
temporary lower cord of the Skodje Bridge. See pages 50a to 53a.
In general the bridge authorities have a considerable influence on the type of bridge chosen. The author
was very pleased when Professor Gnter Ramberger, after the lecture in Vienna in March 2000, said: If
design alternatives from firms have been invited and the network arch has the lowest price, it would be
hard to avoid accepting it if it is technically in order. This applies to the whole of the EU. Norway,
however, is not a member of the EU.
A committee decided to build a bridge with the whole arch under the lane. See fig. 33b. It will never be
known how much less the authors network arch would have cost.
Fig. 33b. This arch bridge was built over Storestraumen in Skodje in 2000
20a
21
22
23
Modified 15.11.2013
24
Fig. 34a. A universal column compared to two box sections with the same area
The high wind force on the universal column speaks for using tubes in narrow network arches. The wind
force on the biggest cylinder in fig. 34b is only about 1.3 times as big as the force on the universal
column. The two tubes in fig. 34b have the same area as the universal column that could be used in the
arch of a bridge like in fig. 97. Also the tube in the middle has a cross-section of class 1. The whole crosssection can have quite a lot of yield before local buckling occurs. The tube to the right in fig. 34b has the
same diameter as the diagonal of the universal column to the left. The author prefers the slim looks of
network arches with universal columns or similar American wide flange beams in the arches. Tubal
arches that are filled with concrete soon after erection, is an alternative that deserves examining.
Fig. 34b. A universal column compared to tubes with nearly the same area.
Modified 17.08.2013
25
Aesthetic appearance.
Small bending in the chords.
No steel beams in the lower chord.
A distance between hangers that suits a light temporary lower chord for erection.
Equal cross-section and near maximum utilisation of tensile capacity in all hangers.
Hangers with slopes not causing too big bending moments in the chords due to relaxation of hangers.
Small and even distances between the nodes in the middle of the tie. This gives small and even
bending moments in the tie.
Since the network arch is the slimmest tied arch bridge possible, it is likely to look nice. The network arch
normally looks best if the rise of the arch is not over 0.16 times the length of the span. Steel beams in the
tie would make the tie less slim and thus detract from the good looks. Steel beams in the tie are likely to
cost more than the simple concrete slab tie.
When there is less than 15 to18 metres distance between the arches, the tie should be a concrete slab with
longitudinal partial prestress. The author does not think much of steel beams in the tie when the distance
between the arches is less than 15 m. The transverse bending in the slab is usually much bigger than the
longitudinal bending. Thus the main purpose of the edge beam is to accommodate the hanger forces and
the longitudinal prestressing cables.
For load cases that relax none or only very few hangers, network arches act very much like many trusses
on top of one another. They have little bending in the chords. How many hangers that could be allowed to
relax depend on the stiffness and bending capacity of the chords. Much bending capacity in the arch can
better carry the extra bending moments that come when an increasing number of hangers relax. To avoid
extensive relaxation of hangers, the hangers should not be inclined too steeply. If hangers do not relax,
less steep hangers will normally increase the bending moments due to concentrated loads.
The network arches described on pp. 5b to 12 and pp. 56 to 94 are very competitive. The details are
simple and the exposed surface is small. The steel weight is low, but not minimal. The arch and hangers
supplemented by a light temporary lower chord can be moved. This steel skeleton can be erected on
shore, on side-spans or on the ice between the abutments. When it is in place, this steel skeleton has
enough strength and stiffness to support the casting of the concrete tie. In coastal regions network arches
can be completely finished on shore and be lifted to the pillars by means of big floating cranes. If tubual
arches are filled with concrete as soon as the steel skeleton is in place, lighter cranes can be used.
On pp. 93a to 93c there is a comparison between network arches and arch bridges with vertical hangers.
Network arches spanning 150 m are compared to an arch bridge with spans of 100 m. In the network arch
the cost per m of bridge is between 35 % and 45 % less than in the arch bridge with vertical hangers.
For wide bridges, three or four parallel arches could be used to keep down the span of the concrete slab
between the arches. See fig. 32, p. 20. For long bridges, where many spans are needed, the network arches
could be made exclusively from prestressed high strength concrete. The spans could be made on shore
and could be floated to the site on pontoons. See figs 49 and 50, p. 48.
If only one hanger in a network arch relaxes, it has little influence on the bending in the chords. The span
still works primarily like a truss, and the increase in bending moments is small. When a few hangers relax
the support of the arch is reduced. This leads to reduced buckling strength, but the one-sided load gives
reduced axial force in the arch.
After part of the span starts to act like part of an arch with only one set of hangers as in fig. 37a, p. 29,
increasing partial live load can make stresses increase faster than the same increase in live load on the
whole span. This load case is especially dangerous when the chords are very slender. It will normally take
a substantial increase in partial live load after a hanger has relaxed before the partial live load becomes as
severe as the same live load on the whole span. See pp. 67 to 68.
Modified 17.08.2013
26
The hanger arrangements in the two network arches on fig. 8, p. 8 and on pp. 59 to 72 might be a help in
finding optimal hanger arrangements. The ratio of live load to dead load decides which network arch is
the best paradigm. Look also at the network arch on pp. 73 to 93. Some very interesting work has been
done in Brunn and Schanack 2003. Their work can be found at the authors home page:
http://home.uia.no/pert under the button Master Theses. See also Brunn and Schanack 2009
In the wind portal Brunn and Schanack use a reduced curvature of the arch. Here the radius of curvature
is 80% of the curvature in the rest of the arch. This leads to shorter wind portals with smaller bending
moments and more even, normal force in the arch. Brunn and Schanacks Optimisation of the hanger
arrangement pp. 30 to 73 leads to recommendations in fig. 6.61, p. 69 in their masters thesis. See the
authors home: page http://home.uia.no/pert under the button Master Theses.
Hangers placed equidistantly along the arch give the smallest bending due to local curvature when the
span is fully loaded. Two hangers at each nodal point would give more bending in the arch due to local
curvature and less efficient support of the arch in buckling.
When hangers relax due to partial loading, it makes little difference whether hangers meet at the nodal
points in the arch or not. When the nodal points are evenly distributed along the arch, the distance
between some of the points of support doubles where some hangers relax. Then bending due to local
curvature increases and the support of the arch becomes weaker.
However these load cases do not necessarily give maximum stresses, because load cases that make
hangers relax give smaller maximum axial force in the arch. Because it saves design work and for many
other reasons, it might seem best that the load on the whole span decides the dimensions of every point in
the arch.
The optimal number of hangers is a central question in the design of network arches. Many hangers will
increase the amount of man-hours in design, workshop and erection. This increase will, however, be
moderate since all hangers can have the same cross-section and the hanger details are all alike. Many
repetitions tend to keep the labour costs down. Many hangers also give lighter hangers and require lighter
equipment for their erection.
More hangers could also lead to a lighter temporary lower chord for erecting the span. The edge beam is
usually cast after the ends of the tie are cast and before the concrete slab is cast. This makes it easier to
keep a constant distance between the transverse beams in the lower chord in spite of the uneven distance
between the nodes in the tie.
Many hangers make it easier to replace defective hangers without interruption of traffic. This is because
each hanger is lighter and the temporary removal of a hanger causes less extra stress. If there are many
hangers, there is less chance that the breaking of one or more hangers caused by a vehicle will have
catastrophic effects. See Zoli and Woodward 2005. The static effect of breaking of hangers is mentioned
in Tveit 66. Fig. 96, p. 92 deals with the breaking of a hanger in the Norwegian version of the kvik
Sound network arch.
Adjacent hangers at the deck are well spaced at the arch. Thus the network arch is probably less sensitive
to the breaking of hangers than the usual bowstring arch. The author is not aware that breaking of hangers
is an important cause of accidents in bowstring arches.
The hangers nearest to the ends of the arch tend to have smaller maximum forces than other hangers. This
can be counteracted by increasing the distance between the hangers at the end of the span. When a
temporary tie is used, the first hanger in the arch should normally be sloping away from the end of the
span as shown in fig. 8, p. 8, fig. 12, p. 10, fig. 41, p. 39 and fig. 96 p. 92.
In the middle half of the span the nodes could be placed equidistantly along the lower chord. See fig. 8,
p.8 and pp. 59 to 93. In the rest of the lower chord hanger distances should be varied in order to obtain
nearly the same maximum force in all hangers. It is an advantage to avoid long distances between nodal
points because these tend to lead to the biggest bending moments in the tie. See influence lines in fig. 65,
p. 60. Since the longitudinal bending moments in the tie are small, this might not be a primary concern.
It deserves to be emphasised again that the bending moments due to concentrated loads can normally be
reduced by making the hangers steeper. Too steep hangers lead to too much relaxation of hangers. See
also page 16. For this reason a fair amount of this section will be devoted to the relaxation of hangers and
a reasonable choice of slope of hangers.
Modified 21.07.2014
27
The network arch where hangers relax is a discontinuous system, where each combination of relaxed
hangers leads to new equations for calculating forces and deflections. This complicates calculations
because influence lines can not be used. However, modern computer programs can easily calculate the
static effects of hangers relaxing.
Back in 1962 the influence lines for the two Norwegian network arches were calculated by means of the
Sara digital computer of the Swedish Aircraft Corporation (SAAB). Using a primitive frame program for
calculating network arches, relaxation of hangers could be accounted for by removing hangers in
compression and recalculating, until all hangers that were not in tension had been removed. When the
first two Norwegian network arches were calculated, computer facilities were not available for
recalculation.
For this reason it was necessary to avoid relaxation of any hangers. This was not so difficult because the
collapse limit state had not been introduced at that time. A need was felt for an easy method for predicting
the relaxation of hangers. The method might still be of interest, but casual readers should skip the rest of
the chapter except for the last two pages. Others might come back to this chapter after having read most
of this publication.
It can be seen that the influence lines for hangers on pp. 57 and 58 have nearly the same shape as
influence lines for diagonals in trusses. If the network arch consists of three trusses on top of one another
as in fig. 4b, p. 4 then the ordinates of the influence lines can be expected to be approximately one third
of what they are in a simple truss. This, however, has little influence on the relative size of the positive
and negative areas of the influence lines. Thus simple truss models could be used in order to decide
approximately what loads will relax a hanger in a network arch.
The reasoning leading to the diagram in fig. 35 was slightly different. See fig. 36 next page.
Fig. 35. Connection between slope of hangers and relaxation of the first hanger for a span with a
rise/length ratio of 0.15
28
Fig. 36. Network arch with hypothetical releases for the calculation of hangers resistance to relaxing
The line A-A in fig. 36 is parallel to adjacent hangers. The relaxation of hangers leads to considerable
increase in bending moments only after all hangers across the line A-A have become relaxed. Thus it is of
interest to calculate what loads will relax all hangers across a line A-A in fig. 36. Tveit 66.
For the dotted hangers in fig. 36, this can be done by finding the sign of the shearing force across in A-A.
These joints can take bending, but no shearing force. Assuming no bending in the chords, the hangers will
not be relaxed if the shearing force at A-A is positive. The dotted hangers resistance against becoming
relaxed will depend on the slope of A-A, i.e. the slope of the hangers adjacent to A-A.
The hangers actual resistance against becoming relaxed is slightly larger than found by this method. This
is mainly due to the presence of shear and bending in the chords. The above method has been used to
prepare fig. 35 and figs 38 to 38f. These graphs indicate the slopes that will enable hangers to resist
certain ratios of live to dead load.
The spans are assumed to be loaded from the left end, as this is the type of loading that is most likely to
make some hangers relax. It has been found that for various reasons, including shear and bending
moments in the chords, fig. 35 and figs 38 to 38f give a reasonable prediction of the relaxation of the first
hanger. The prediction is best for long bridges with slender chords.
The design and use of the diagrams in fig. 35 and figs 38 to 38f are explained at length later in this
chapter. The diagrams look alike, but the rise of the arch differs. In fig. 37 relaxed hangers are dotted. The
bridge has begun to act as a part of an arch with one set of hangers along the line A-A. As mentioned
before in this chapter, the bending moments will now start to increase faster because the nodes in the arch
and tie are less firmly kept in place by the hangers. More on this in figs 67 and 68.
Fig. 37. Network arch with live load from one end of the span
Modified 28.08.2013
29
Let us look at the stresses in the chords of the railway bridge in fig. 44, p. 42 and fig. 44a, p. 43. In fig.
44a there is no live load on the 28.05 m on the left of the 65 m span. Four hangers relax. Compared to the
full live load on the bridge in fig. 44 the biggest increase in bending in the arch is in node 21 where the
bending moment increases from ~35 tm to ~75 tm. At the same time the maximal axial force decreases
from 1467 t to 1040 t. Maximum stress due to these forces will be:
For full load. ( Fig. 44):
=N/F+M/Wxu=1440/690.6 + 3500/9059 = 2.47 t/cm2
With no live load on the leftmost 28.05 m of the span. ( Fig. 44a):
= N/F+M/Wxu=1040/690.6 + 7500/9059 = 2.33 t/cm2
Excuse the old-fashioned terms. t means metric tons everywhere in this publication. The results come
from linear calculations. Hangers that had no tension were removed by hand before recalculation. The
cross-sectional data were taken from fig. 42, p. 41. It can be seen that the reduction in the axial force
more than made up for the increase in bending. This is a usual result. Since the arches are relatively stiff,
the effect of the tendency to buckle is not likely to change the picture.
How to predict when hangers will become relaxed?
When dead load and live load are fixed, the tendency for relaxation is primarily decided by the slope of
the hangers and the form of the arch. The stiffness of the chords and the cross-sections of the hangers also
influence the result, but to a lesser extent. Stiff chords and the small cross-sectional area of the hangers
reduce the tendency for relaxation.
After hangers have started to relax, the bending moments increase more quickly with increasing partial
live load. See fig. 73, p. 68. When one set of hangers relaxes, the bending moments will carry more load.
Thus the maximum tension in hangers usually becomes slightly smaller. See fig 45, p. 44.
Let us now turn our attention to computing the loads that will make a hanger relax. To calculate the ratios
of live load to dead load which will make a hanger relax, it is necessary to compute the influence lines for
the hanger by a computer program. First the relaxed hangers must be removed. Once the influence line of
a hanger is obtained, it is easy to compute the ratio of live load to dead load that will give zero tension in
the hanger. A frictionless joint is assumed in the chords at each side of the line A-A.
Fig. 37a. Bridge with live load on the left hand side of the span. Relaxed hangers are not shown.
29a
Once the influence line is obtained, the ratio of live load to dead load which will give zero tension in a
hanger can be computed as follows.
-A1(LL+DL) + A2DL = 0
LL/DL = A2/A1 1
(e2)
Here
The ratio LL/DL may be approximated without having to compute the influence lines. If the bending
moments and shear forces in the chords are disregarded, it is easy to find the ratio of live load to dead
load that makes the hangers across the line A-A in fig. 37a relax.
This can be seen from drawing the influence line for the imaginary member a-a in fig. 37a. This is done in
fig. 37b. See next page. Movements of the non-deformable parts I and IV that shorten and relax a-a will
also shorten and relax the other hangers across A-A. The relative deformations of the parts I to IV can be
found by a virtual displacement. This is done by a method taught to undergraduates at the technical
university in Trondheim in the middle of the last century. The method seems to have vanished.
The influence lines are drawn without stating the size of the ordinates. The factor K in the next equation
can be determined by calculating one ordinate. However, calculation of this ordinate is not necessary in
order to find the load that relaxes a-a.
Relaxation of the imaginary hanger a-a in fig. 37a occurs when the ratio of live load (LL) to dead load
(DL) is given by the equation:
LL/DL = (KA2 KA1)/KA1 = A2/A1 1
(e3)
The assumption that bending moments and shear in the chords are equal to zero corresponds to assuming
joints as shown in fig. 37a and 37b.
The result is more generally applicable if we assume that the distance between the hinges, , is very small
compared to the length of the bridge. It is easily seen that the exactness in the prediction of increase in
bending moments is not much influenced by this distance. Calculations become much simpler when the
distance between the hinges is considered small.
Fig. 37b. shows the parts of the bridge that will move as undeformable bodies when the influence line for
a-a in fig. 38a is found by the kinematic method
29b
b + c = dx
(e.4)
tan3 = dy/dx
(e.5)
b x tan 1 + c x tan 2 = dy
(e.6)
(L X 0 ) 2
A2 c L X 0 a
2
A1 b
x0
(e.7)
x0 a
The symbols used in (e.4) to (e.7) are defined in figures 37b and 37c.
Combining (e.4) and (e.7) and inserting them in (e.3) we get:
(e.8)
Figure 37d, on the next page, shows the results of measurements on the model in Tveit 59. Disregarding
shear forces and bending moments leads to about 20% under-estimation of the live load that would cause
all hangers crossing line A-A in figs. 37 to 37a to be relaxed.
29c
Fig. 37d illustrates the discrepancy between calculated and measured resistance against relaxation of all
hangers crossing one line
As can be seen from fig. 37d the deviation of approximately 20% between calculated and observed live
load that relaxes all hangers crossing a line was observed in the middle 80% of the span. This deviation
occurs because we have some bending moments and shear forces in the vicinity of A-A in figs 37 and
37a. Thus, the calculated theoretical value is a good enough indication as to what live load makes
moments in chords start to increase due to relaxation of hangers.
Formula (e.8) has been used for calculating LL/DL values for hanger relaxation in 37d. It has also been
used for calculating the diagrams in figs 38a to 38f. See the next four pages. Some of these diagrams were
first published in Tveit 66.
To sum up: The diagrams in figs 38a to 38f have been calculated to show what ratio of partial live load to
dead load, (LL/DL) makes hangers relax in a section right in front of the live load, under the assumption
that there is no bending moment or shear force in the chords.
Because of bending and shear that occur in the chords of the network arch, the diagrams in figs 38 to 38f.
underestimate the magnitude of the partial live load that is necessary to make all the hangers in a section
(like A-A in fig. 37a), in front of the partial live load, relax.
Experience so far shows that the diagrams in figs 38a to 38f underestimate even the partial live load that
will make the first hanger in front of the partial live load relax. Therefore, these diagrams can be used for
finding ratios of partial live load to dead load that can be used without any danger of having hangers
relax. Figs 37e and 38f illustrate how this is done.
29d
Figure 37e. Chords and some hangers in the Bolstadstraumen Bridge. Tveit 66.
In fig. 37e most of the hangers of the Bolstadstraumen Bridge are omitted. By means of fig. 38f the
resistance against relaxation of the hanger sloping down to the right can be found. See dotted line in fig.
38f. The dotted line indicates that a partial live load of 0.7 times the dead load covering 0.55 x L from the
left of the span will not relax the hanger sloping down to the right on the drawing. In fact no hanger
crossing the dotted line on the drawing will relax as long as the partial live load is not greater than 0.7
times the dead load.
Figs 38 to 38f can be used to find hangers resistance in hangers that are not too near to the ends of the
arches. Usually the resistance against relaxation in the hangers that are near to the ends of network arches
is no problem. See fig. 38g.
Figure 37e corresponds to the dotted line in figure 38f. For the network arches built in Norway the
diagrams in fig. 35 and fig. 38f consistently give values of live load smaller than those necessary to make
the first hangers relax. For the bridge at Steinkjer the diagram in fig. 35 gives loads that were 15% or
more too small. For the bridge at Bolstadstraumen the loads found by means of diagram 38f were 5% or
more too small to make hangers relax. The bridge at Steinkjer had a stiffer lane, and that is probably the
reason for the estimated loads here being more on the safe side.
How much concentrated loads influence hangers' tendency to become relaxed can best be judged by
looking at influence lines of bridges that have already been calculated. See figs 41, 63, 64, 65, 77 and 84.
Fig. 38. Slope of hangers necessary for preventing the relaxation of hangers when bridges with f/L=0.1
carry uniform load from the left
29e
Fig. 38a. Slope of hangers necessary for preventing the relaxation of hangers when bridges with f/L= 0.15
carry uniform load from the left.
Fig. 38b. Slope of hangers necessary for preventing the relaxation of hangers when bridges with f/L=0.14
carry uniform load from the left
29f
Fig. 38c. Slope of hangers necessary for preventing the relaxation of hangers when bridges with f/L=0.12
carry uniform load from the left
Fig. 38d. Slope of hangers necessary for preventing the relaxation of hangers when bridges with f/L=0.16
carry uniform load from the left
29g
Fig. 38f. Slope of hangers necessary for preventing the relaxation of hangers when bridges with f/L=0.18
carry uniform load from the left
Bridge load usually consists of a combination of concentrated and evenly distributed loads. When using
figs. 35 and 38a to 38f it seems a rough, but reasonable assumption that the loaded influence line is a
triangle. Then the bridge load can be transformed into an equivalent evenly distributed load, which is
equal to the evenly distributed bridge load, plus the concentrated load divided by half the loaded length.
Fig. 38g gives the result of applying the diagram in fig. 35 to the skeleton lines of the bridge 200A on
page 59 to 68 and the tendencies for relaxation found from the influence lines of the hangers. Tveit 80a.
The correlation is surprisingly good in the middle two thirds of the span.
Fig. 38g. Relaxation of first hanger according to fig. 35 and according to a calculation of the span on pp.
59 to 68. The span 200A is also mentioned on pp. 8, 13 and 15.
29h
The prediction of a hangers relaxation found by figs 35 and 38a to 38f is best for long bridges with
slender chords. For stiffer and shorter spans the diagrams 35, 38a to 38f are likely to overestimate the
hangers tendencies to relax. This is because shorter spans and/or spans with stockier chords tend to
accumulate more shear and bending in the chords prior to relaxation of hangers.
For Bolstadstraumen Bridge in fig 7, p. 7 and fig. 64, p. 58 the overestimation of the hangers tendency to
relax was 5% or more for all hangers. That means that the hangers had a smaller tendency to relax than
calculated by means of fig. 38f. For the Bridge at Steinkjer fig. 6, p. 5b, and fig. 6a and fig.6c p. 6 and fig.
63, p. 57 the overestimation of the hangers tendency to relax by means of fig. 35 on p. 28 was nowhere
under 15 %.
The thin curves in fig. 38g represent equivalent load intensity according to the Danish regulations for road
bridge loads. See fig. 23 and Vejdirektoratet (74) for the span on page 60. It is interesting to note that full
load on the whole span decides the dimensions of the span on page 60. This is so, even though the
equivalent load per unit length for 0.61 times the length of the span was more than 75% greater than the
load that made the first hanger relax. This is caused by the considerable stiffness of the arch. See fig. 24,
p.14, and figs 70 and 76 on p. 65, and p. 71.
For full load on the left 50 % to 70% of the span some hangers may relax occasionally in the
serviceability limit state. For these loads the chords in the ultimate limit state carry considerable bending
moments. In network arches with very slender chords, it would be very much on the safe side to avoid the
relaxation of hangers also in the collapse limit state.
An increase in the live load over the years might be dangerous. Another reason for avoiding the relaxation
of hangers might be a desire to save design work. See also pp. 67, 68 and 90.
For the loads on the right quarter of fig. 38g, p. 29h, the hangers resistance against relaxation might seem
unnecessarily high. Here the slope of the hangers was decided by the desire to have a relatively even force
in all hangers.
The slope of hangers might not be chosen freely since it depends on the distance between nodal points in
the middle of the lower chord and on the number of times a hanger in the middle of the span intersects
with other hangers. The distance between nodes in the central part of the span and the number of
intersections of a hanger in the middle of the bridge strongly influence the slope of all hangers.
Examples of choice of hanger arrangements can be found in two articles on preliminary design of
network arch road bridges on the authors home page http://home.uia.no/pert/
Little is known about the optimal arrangement of three or more sets of hangers. Tveit 1984. See fig. 26,
p. 16. It shows the hanger arrangement for a single-track railway bridge spanning 67 metres. The live load
is a train according to Union International des Chemins de Fer 74.
The author has been told that these days there is a tendency to increase the live load on railway bridges by
around 30 %.
To prevent relaxation in the serviceability limit state, the two most sloping hangers in the steepest sets of
hangers have been given up to 0.4% extra length. In other words various degrees of lack of fit have been
introduced. Furthermore, the steepest set of hangers, and some hangers at the end of the span have 44%
smaller cross-section than the other hangers. These measurements give a very even utilisation of hangers
and contribute to evenly distributed bending.
Modified 21.07.2013
29i
Modified 28.08.2013
29j
Fig. 39. Lifting the temporary steel skeleton of the kvik Sound Bridge in fig. 97, p. 93. Span 135 m.
DESIGN OF TEMPORARY LOWER CHORDS
Some very promising methods of erection use a temporary lower chord. See figs 21 and 22 p. 12, and
figs 56 and 57 pp. 50 and 51. Combined with arch and hangers, the temporary lower chord makes a stiff
steel skeleton. This steel skeleton can be moved when lifted near the ends. It has enough strength and
stiffness to carry the concrete tie while it is cast.
The temporary lower chord has longitudinal beams between the ends of the arches. Transverse beams are
placed equidistantly except near the ends of the arches. Longitudinal wooden beams on top of the
transverse beams carry the wooden form. This gives a convenient platform for placing the reinforcement
and the prestressing cables.
Local conditions will decide how much formwork and reinforcement should be put in before the steel
skeleton is moved to the final position. Fig. 39 shows how the steel skeleton of the kvik Sound Bridge
in fig. 97 on p. 93 is lifted in place by Norways biggest floating crane. The lifting capacity is 600 tons.
The steel skeleton weighs around 230 tons, but it might be practical to put in so much wood and
reinforcement that 410 tons is lifted. Floating cranes that can lift over 3000 tons are available. The limited
room under the hooks decides how high over the sea level the steel skeleton can be lifted. Normally it is
better to use one crane at each end of the steel skeleton.
When the reinforcement and the form are finished, the concrete tie can be cast. First, the ends of the tie
with the curved parts of the prestressing cables must be cast. Then the edge beams are cast. The casting
must be done from both ends of the span in order to avoid relaxation of hangers during the casting.
Fig. 90 on p. 87 shows forces and deflections when the smaller edge beam in the kvik Sound network
arch is cast. For the longitudinal steel beams the decisive load occurs during the casting of the concrete
edge beam. After the concrete edge beams have been cast they take most of the bending in the tie. The
prestressing cables take most of the axial force in the tie. Thus the transverse beams can be placed
equidistantly even if this does not give minimum bending in the chords. Any transverse beam with
enough length and strength can used. Finally the slab between the edge beams is cast. Afterwards the
temporary lower chord can be removed and used again for erecting other network arches.
In fig. 39a, see next page, the temporary lower chord is joined to the ends of the arches just above the
bearings. Reinforcement, dowels and diagonals in the lower chord are not shown. The temporary lower
chord can be joined to the steel plate above the bearings. Some of the dimensions are taken from the
bridge in fig. 97 on p. 93. Generally the dimensions are not the result of precise calculations. At the fixed
end of the arches the main bearings can be of the types shown in figs 6b and 18.
29k
30
The author has often been asked: Since you have got the temporary lower chord anyway, why do you not
make it part of a permanent combination of steel and concrete? Then you do not have to remove it. Below
is a list of reasons why the temporary lower chord should not become part of the permanent tie. The
author would like to state that the maximum potential of a network arch can be achieved only if the tie is
a concrete slab.
1.
A permanent longitudinal temporary steel chord leads to a deeper lower chord. This is unfavourable
from the aesthetic point of view and leads to longer ramps at some bridge sites.
2.
If the tie is a concrete slab instead of a steel structure, there is a smaller distance between the traffic
over and under the tie.
3.
If the traffic under the bridge bumps into the tie, there is a bigger chance of damage if the tie is a
steel structure.
4.
A network arch with a permanent steel tie might be simpler to erect, but it would have a much
higher steel weight. The comparison is lopsided, but in fig. 14 on p.10 the weight of the lower
chord and the transverse beams is 264 tons. The temporary lower chord for the same bridge weighs
24 tons. See page 12.
5.
The longitudinal bending in the lower chord in the finished span is so small that there is no need for
a longitudinal beam of structural steel to take the longitudinal bending.
6.
The concentrated wheel loads always cause a lot of bending in the slab. In narrow bridges only
moderate amounts of extra reinforcement are needed for the slab to span between the arches.
7.
If you use transversal beams, the loads on the slab are concentrated before they reach the edge
beam. This gives more bending in the edge beams and in the arches. On page 66 it is shown how
the wheel loads for the network arch in fig. 23 on p.13 are distributed when they reach the edge
beam.
8.
A permanent tie of structural steel in tension causes cracks in a concrete slab above it. This reduces
the durability of the concrete slab.
9.
Transverse beams in the permanent lower chord would make the reinforcement in the slab more
complicated.
10. The temporary lower chord is joined together by high strength bolts. It needs no corrosion
protection and can be produced on site. Thus the cost of fabrication per tonne is not high.
11. The edge beam is cast before the slab. When the slab is cast the longitudinal bending in the tie is
taken mainly by the edge beam. Thus the distances between the temporary transverse beams can be
constant.
12. A temporary lower chord can be used again and again in bridges of varying widths and lengths.
One just has to make some new holes and maybe cut or weld some beams and windbracing. The
wood on the temporary lower chord can be Doka beams that can be reused.
13. The transverse beams in the temporary lower chord can be chosen freely as long as they have
be maintained forever.
15. The great longitudinal tensile forces in the tie are best taken by prestressing cables because of the
network arch on the side span of the Skodje Bridge, page 50a, and Removing the temporary
lower chord of the Skodje Bridge, page 52.
19. If a permanent lower chord is used, the formwork might still have to be removed. If the formwork
30a
Modified 22.04.2014
30b
RAILWAY BRIDGES
In 1964 when the author had finished his Ph.D. thesis, he happened to come across the drawings of a
bridge to be built over the Tinnelv river at Stormo in Norway. It was a single-track railway bridge
spanning 67.8 m. 275 tons of steel were to be used for the welded truss. Through preliminary
calculations the author found that only some 80 tons of steel would have been needed for a similar bridge
using network arches.
It deserves to be mentioned that the author did not pay enough attention to fatigue in his preliminary
design. Since the bridge was soon to be built, there was no time for a redesign. In the over fifty years
after the opening of the Tinnelv Bridge, Norwegian railway bridges with a span over 60 m, have been
few and far between.
Since 1964 the author has been convinced that the network arch is suitable for railway bridges. It has a
pleasing appearance, and the lower chord can very well be a concrete trough that carries the railway
between the arches and at the same time provides the necessary horizontal tie needed. All lower chords
made of concrete and especially the concrete trough with ballast give less noise than an all-steel solution.
The thin lower chord gives shorter ramps. This is especially valuable in railway bridges on flat terrain
because railways have smaller maximum gradients than roads.
Fig. 40 gives a comparison of the steel weights for different types of railway bridges. The lines for singletrack railway bridges are found in (Herzog 1975). The shaded areas were first presented in Tveit 1973.
Note that the double-track network arch bridge tends to use less steel than a usual single-track railway
bridge! The low steel weight of the network arch bridges is not only due to the optimal behaviour of the
arches having inclined hangers. It is also due to the use of a concrete trough or slab in the lower chord
instead of the more common solution, i.e. using floor-beams and stringers of steel.
Steel prestressed against the concrete in the tie is less susceptible to fatigue and can carry high stresses.
This contributes to low steel weights. The prestress makes the lower chord less susceptible to fatigue and
more resistant to corrosion. The stress in the hangers is much influenced by fatigue. However, this is not
very important, because the hangers are a small proportion of the steel weight. Furthermore all diagonals
in truss railway bridges are also influenced by fatigue.
Fatigue increases the cross-section of the hangers. This increases the buckling strength in the arches. If
fatigue decides the dimensions of the hangers and the arch, the weight of the concrete will hardly increase
the steel weight because it gives constant stress in arch and hangers. There is little bending in a network
arch. This is good because bending very often gives fatigue due to stress variation.
The cross in the diagram below indicates the steel weight found by Brunn and Schanack 2003. Their
work will be a great help to anyone who wants to design a network arch railway bridge. There is much
more on railway bridges in (Brunn and Schanack 2003), (Schanack 2008) and (Steimann 2002). These
masters theses can be found in the authors home page http://home.uia.no/pert under the button Masters
theses.
Modified 22.04.2013
31
Steimann found that H-profiles could hardly be used in the windportal and recommended a box section in
the arches. He also recommended flat hangers -80x50 mm. This is as recommended by the German
railways. The hangers can be cut and welded in a way that gives high fatigue strength.
Steimann went on to design network arches in the firm GMG-Ingenieurgesellschaft, GmbH, Dresden
before he joined his fathers firm.
31a
Fig. 40d. Front view with windbracing of steel alternative of Steimanns railway bridge
31b
Fig. 40e shows a two track railway bridge spanning 100 m designed by Brunn and Shanack
Benjamin Brunn and Frank Schanack did their masters thesis in Grimstad in the summer of 2003.
They too designed a two track network arch railway bridge spanning 100 m. A colour picture is shown in
fig. 40e. They used a rise of 17 m and a windbracing that is shown in fig. 40e. This windbracing has little
room for electric cables above the train. The tie is made of concrete. One concrete cross-section is shown
in fig. 40f. Their thesis is written in English. It can be found on http://home.uia.no/pert under the button
Master theses.
The distance between the arch planes measures 10.15 m. The 43 cm deep concrete slab that spans
between the arch planes is transversely prestressed by threadbars with a diameter of 36 mm. They are
placed 27 cm apart. A 47 cm deep reinforced concrete slab was a reasonable alternative without
prestressing. The bridge deck has extensions on either side providing an area for 75 cm wide service
footpaths.
Each arch plane has 48 steel bar hangers with a diameter of 60 mm. The arrangement of the hangers,
which essentially decides the forces and force variations in a network arch, was the subject of an
extensive optimisation process. As a result Brunn & Schanack proposed the radial hanger arrangement as
shown in Fig. 40g. See next page. In its simplest form it features constant distances of the upper hanger
connections along the arch and a constant cross angle between arch and hangers.
The radial hanger arrangement has been applied successfully in many students works, e.g. Skalda &
Rohm (Awarded a prize by the Saxonian Building Industry in 2005), Drange Hole (Norway), Valenzuela
(Chile) and Beyer (Awarded the Gottfried-Brendel-Prize 2006 by TU-Dresden). Furthermore it has been
the object of scientific studies by Prof. Grae, Dipl.-Ing. Teich and J. Berthellemy. The Flora Bridge over
Mittelland Canal at Haldersleben, Germany is the first network arch bridge that will be built with the
radial hanger arrangement. See page 35.
The existence of a wind bracing and the radial hanger arrangement leads to very small bending moments
so that rolled American wide flange profiles can be applied for the whole arch length. That is
W360x420x634 for the middle section and W 360x420x900 for the ends that also form the portal frame
columns.
Fig. 40f. Reinforcement for a tie in the railway bridge in fig. 40e
32
The wind bracing is a K-truss of CHS 219.1x8 profiles. The length of the portal frame columns is
reduced by diagonal struts as shown in the front view in figure 40e. A temporary steel chord can be used
for the construction.
The bridge with this temporary lower chord weighs less than 400 tons and can be moved. Resting on its
final position the steel skeleton can support the formwork and the fresh concrete for the deck. The casting
sequence might be different from project to project to avoid hanger relaxation during the construction
stages.
The double track railway network arch bridge has been designed according to the specifications of the
Eurocode for a maximum train speed of 160 km/h. The total amount of steel is 448 tons, which
corresponds to 2.24 tons per track and meter of span. According to Herzog 1975 the reference value for
other steel railway bridges with a span of 100 m is about 5.5 tons per track, which is almost 150 %
higher.
Brunn and Schanak, 2005, use a very advanced shape of arch and hanger arrangement that leads to very
constant axial force in a long middle part of the span. The maximum hanger forces are very equal and
near to optimal when it comes to fatigue.
Fig. 40g. This network arch railway bridge was designed by Brunn and Schanack 2003. Their masters
thesis was written in English.
33
Fig. 40i. Cross-section of a combined road and railway bridge designed by (Rck 2003).
Fig. 40j. Two drawings of the bridge in fig. 31c. See also Rck home.uia.no/pert under the button
Master theses
Fig. 40k. How the bridge in fig. 40i and 40j can be transported from the shore to the pillars.
34
This hanger arrangement shows no relaxation of hangers under service loads. The drastic reduction of
bending moments in arches and stiffening beams is the main reason for the saving of steel. Since
aesthetic aspects were not particularly significant for this railway bridge, hangers with a cross-section of
100x 40 mm were used. Therefore - compared with round hangers - higher fatigue strength of the
relatively simple butt welds was achieved.
The hangers are fastened to the inner and outer vertical plates of the arches alternately. So they have a
distance at the crossing points, and devices for damping can be built in. The upper flanges of the
stiffening beams are connected laterally to their web so that the hangers can be fastened directly to the
web. The steel in the network arch has fewer joints than the arch bridge with vertical hangers.
The assembly of the bridge took place beside the railway track. Then the steel skeleton was moved
transversely onto the track. Then came a longitudinal launching across the canal by means of a pontoon
that could carry 1250 tons.
Vertical planes for the arches and the footpaths outside the hangers would be more economical, but
maybe this would not look so attractive. The sloping planes of the arches were adopted from a competing
alternative with vertical hangers and can not be blamed on Ingenieurgeselshaft GMG in Dresden,
Germany.
Professor Dr. Steffen Marx of TU-Dresden has written this German text on network arch railway
bridges. Per Tveit has translated this text into English, making some insignificant alterations in the
process.
Many network arches are being planned for the German railways. This is being done by a subsidiary
company, DB Projekbau. It has been found that the network arch has the following advantages compared
to conventional arch bridges with vertical hangers.
The slender cords can only take small concentrated loads. Sometimes this makes the erection
more complicated.
The frequent change in the tension in the hangers results in a tendency to fatigue. This must be
counteracted by the geometry of the net of hangers and by relatively high fatigue strength in the
ends of the hangers.
Professor Marx describes two railway bridges that have been designed:
The Rosenbachtal Bridge
The new bridge will replace 5 arch spans under the railway track because these spans are in poor shape.
Compared to the rebuilding of the existing spans, the network arch means lower costs, better appearance
and little damage to the valuable natural surroundings.
A single track bridge spanning 98 m is planned. It has an orthotropic steel tie. The superstructure needs
591 tons of steel. Compared to a conventional arch bridge with vertical hangers it saves 123 t of steel.
The network arch is erected in a field parallel to the railway track. Then it is moved sideways onto the
track and rolled to the site. The railway traffic is stopped for three months while the existing bridge is
dismantled and new abutments are built. The bridge was finished in October 2008.
36
38
E=2100t/cm2
E=2100t/cm2
E=2100t/cm2
E=2100t/cm2
E= 350t/cm2
E=1500t/cm2
These data were used for the computer calculations
Fig. 41. Influence lines for half of a double track railway bridge. Tveit 1973.
39
Fig. 42. Cross-section of arch and lane for suggested double track railway bridge. (Tveit 73).
Increased knowledge of buckling speaks for single American wide flange beams in the arches.
41
Fig. 43. Tveit 73. Upper and lower ends of hangers with some details of slab and formwork.
41a
Fig. 44. Forces due to maximum symmetric load. On the right hand side of the diagram bending and
hanger forces are also due to 5 mm shortening of hangers 1 and 13. Such a shortening of the last hanger is
normally a good idea. It gives less bending in the chords at the ends of the span and a better utilization of
the capacity in the hanger nearest to the end of the span.
42
Fig 44a. Forces due to a skew load producing maximum bending in the middle of the bridge
43
Fig 45. Forces due to the loading that gives maximum bending in member 37. The left side of the
diagram gives the forces if the hangers are able to take compression. The right side gives the forces when
hangers relax.
44
Fig. 46. Forces due to the short skew load that produces maximum bending in member 33
45
Fig. 47. Forces due to the long skew load producing maximum bending in member 33
46
Fig. 48. Production site and transport of network arch made of concrete. Drawings from (Tveit 1980b)
In 1980 the author, (Tveit 1980b), wrote: For a long bridge the above arrangement would have these
advantages: Low weight and a high degree of prefabrication, which would give low labour and material
costs and good control of workmanship. Two developments favour this way of doing things. Over the
last 28 years available concrete strength has nearly doubled and skills and equipment for moving heavy
loads have increased.
The author has made some simple calculations for the bridge from Rdby to Puttgarden. See fig. 49 next
page. A similar arrangement of lanes has been indicated by (Rck 2003). See page 34. Calculations for
(Tveit 1996) have been updated. His ideas will not be used for this bridge, but maybe some day
somebody will have the good sense to use them in other projects.
There is more on the all concrete bridge over the Fehmarn Belt in (Tveit 2009a) and in (Tveit 2010a).
Modified 02.04.2014
47
Fig. 49. Cross-section through half a network arch with a span of 215 metres. Tveit 1999.
The bridge will be around 19 km long. For the calculation the distance between the centres of the piers
has been assumed to be 220 metres. For the deck, a cube strength of 65 or 75 MPa has been assumed.
With such concrete strengths the slabs can be made thinner than shown in fig. 49. For the arch cylinder
strengths of over 100 MPa should be considered. A concrete strength of 140 MPa was used in the Millau
Bridge in France.
Two concrete arches with 12 metres of lanes between them are cast on shore. Pairs of arches 18 metres
long with the windbracing between them can be cast on ground level. These pairs of arches are joined
together by steel plates perpendicular to the axis of the arches. See fig. 19 page 12. The arches can also be
cast in a permanent form. Then the spans can be lifted out after the casting and the prestressing are
finished.
The prefabricated spans can be lifted onto the pillars by cranes or transported to the piers on the pontoons
shown on fig. 51 on the next page. Temporarily they can be put down on a ledge a few metres above the
sea level. See fig 50. Then they can be lifted to the top of the piers up to 65 m above sea level and pulled
1.5 metres sideways onto the corbels for the bearings.
Fig. 50. Two network arches seen from the side. Tveit 1996.
48
To make it possible to lift the span past the outer corbel, there has to be a cut-out in the plate and the
transverse beams at the ends of the spans. When the span is in place, the windbracing above the railway
lines is installed. Simultaneously the cut-out in the transversal beams and at the end of the plate is cast
and prestressed transversally to the axis of the span.
Then the plate under the railway is cast and prestressed. Finally a plate between the two spans is cast on
the top of the pier. The structure under the railway and the windbracing above it can be made of steel.
This will give a simpler and faster erection.
Fig. 51 shows various stages in the erection of the spans around a pillar. The first, fourth and a bit of the
second quadrant show a pontoon for transporting the spans from the shore to the piers. Each of the
pontoons can lift 2000 tons. The pontoons can be joined together for putting the substructure of the span
in place. The substructure will probably have to be cast in a dry dock.
The third quadrant shows the contour of a span that rests on a ledge on the pier 5 to 10 metres above sea
level. Note the cut-out for lifting the span past the corbel for the outer bearing of the span. The second
and the third quadrant show the cross-section of the pillar above the ledge for the transport of the span.
The fourth quadrant indicates the contour of the crane for lifting the span in place. The first quadrant
shows a completed span in place. Only the plate spanning the pier is missing.
The best solution might be to lift each span into place by two big floating cranes.
The Eurocode ENV 1991-3: 1995 gives no limits for deflection of railway bridges spanning more than
120 metres. Preliminary calculations of deflection for the 200 metre span made of prestressed concrete
suggest a deflection compatible with high train speeds. This is hardly surprising because the network arch
is very stiff. See influence lines of deflection on pages 41, 57, 58, 60, and 72. Furthermore, the concrete
arches are stiffer in the longitudinal direction than steel arches. The concrete tie gives less bending than
steel ties because it has greater longitudinal stiffness. Most of the concrete in the tie is in compression all
the time. The pages 49 to 49 have been the same since 2000. Lately the author has initiated work on the
side spans of a Fehmarn Belt Bridge. Tveit 2009a, Tveit 2010a.
If terrorists want to damage the network arch, they will have to destroy many hangers before a span
collapses. See p. 22. The arch is so solid that it will be very hard to blow it up, but skilled terrorists with
enough explosives can blow up most bridges. Railings to protect the hangers can be made of steel and be
part of the load-carrying structure that is not needed to carry accidental loads. These railings should be
easy to repair. About the breaking of hangers see also p. 22.
Normally bridges without structural members above the deck are preferable because traffic on those
bridges can derail without damaging the structure. Because of possible savings, the network arch should
also be considered for bridges where there is room for the structure under the deck. Possible savings are
indicated by the table below where beam and network arch alternatives for the West Bridge in the Great
Belt Link, Fries 1990, are compared. Many alterations to page 47 to 50 will probably be made later.
5800t
<4000t
100%
45-55%
50-75%
1/110
1/220
45-55%
Price of substructure:
100%
Price of substructure:
50-75%
Price of superstructure:
100%
Price of superstructure:
60-80%
Fig. 51a
STRENGTHENING OF NETWORK ARCHES ALREADY BUILT
It is never easy to strengthen an existing bridge. The network arch is no exception, but in some cases it
can be done. If the lower chord is a concrete slab it can be strengthened by transverse tension members
under the slab. This speaks for using the concrete slab between the arches. If the deflections of the
slender slabs become too big, it can be counteracted by tensioning the transverse tension members under
the tie.
The tension members can be fastened to anchors glued to the lower outside corner of the slab. They can
be stressed through ordinary tensioning or by putting a kind of wedge between the slab and the tension
member. The wedges should make the tension in the transverse member counteract some of the bending
in the slab due to dead load. The tension members could be steel rods, wires or fibre reinforced polymers.
The transverse tension members will strengthen the slab so that bigger vehicles can pass over the bridge.
See http://home.uia.no/pert under the button Systematic Theses fig. G1.
If the arch is a universal column like in figs 40e on p. 33 and fig. 97 on p. 93 it can be strengthened by
welding a steel plate on top of the arch. Then the arch can take a bigger axial force. The plate will
increase the bending capacity in the arch. The longitudinal bending capacity in the lower chord will also
increase, a little.
An outside tensile member can strengthen the lower chord, but if such a member has not been taken into
account in the design of the bridge it will be difficult to fasten the tensile member at the ends.
Modified 21.07.2014
50
Modified 21.07.2014
50a
Fig. 56. Half tie and temporary lower chord for the Skodje Bridge on pp. 20 and 50
50b
Fig. 57. Scaffolding for the erection of a steel skeleton on a side-span of the Skodje Bridge, p. 20 and 50a to 50b.
A simpler and better way of erecting a network arch was used for the Mangamahu Bridge in New
Zealand. See the authors home page http://home.uia.no/pert under the button Systematic thesis on
page H-9. See also how the arch of the Brandanger Bridge was erected. p. 94a
51
Modified 15.11.2013
5. Four columns over 3 metres long are fastened to the extra long transversal beams. At the top of the
columns there are wheels that roll at the edge of the concrete slab. See fig. 59 on the previous page.
These columns support the platform for removing the temporary lower chord.
6. Before the platform can be lowered, someone in a basket at the end of a movable arm must go down
under the concrete slab and remove the screws at the ends of the longitudinal steel beams just above
the two long transversal beams. Screws between the hangers and the longitudinal steel beams in the
platform must also be removed. See fig. 22 on p. 12. The removal of screws can also be done from a
wagon travelling on the lower flanges of the long transversal steel beams.
7. When the screws mentioned in step 6 have been removed, the two extra long transverse wooden
beams can be lowered. To make sure that the longitudinal beams with the wooden plates of the
formwork above follow the transversal beams down, the wooden plates in the formwork must be well
greased or there must be a plastic film on top of the wooden plates in the formwork.
8. In the platform for removing the temporary lower chord there must be many nails between the
plywood plates and the longitudinal wooden beams. There must also be many nails in a piece of
wood on top of the transverse steel beams that gives the concrete slab the right camber. This piece of
wood must be securely fastened because it has to take up some of the bending moment in the
transverse beams.
9. Fig. 60 shows joints in the longitudinal wooden beams. These joints allow the plywood and the
wooden beams, to which it is fastened, to move down with the rest of the platform.
Fig. 60. Joint in wooden beam that lets the platform for removing the temporary chord be lowered
10. The platform for removing the lower chord is lowered so that the wheels at the top of the columns
roll on the edge of the concrete slab. See fig. 59 on the previous page.
11. Next to the columns are ladders to facilitate access to the platform after it has been lowered.
12. Before the removal of the rest of the temporary lower cord, a solid railing must be put up around the
platform that has been lowered. At both ends of the platform this railing reaches almost up to the
temporary lower chord to give the workers protection from beams and formwork torn loose from the
temporary lower chord. See fig. 61 on the next page.
13. Jacks fastened to the lower ends of the hangers above the lane can move the platform. No personnel
are allowed on the platform when it is moved.
14. Now to the actual removal of the temporary lower chord:
15. Members of the windbracing weigh 30 kg. Their screws in the transverse beams are removed. Then
the members are removed by hand.
16. The temporary transverse steel beams with the wood that gives camber weigh around 300 kg. When
the transverse beams are loosened from the longitudinal steel beams and the windbracing, they can be
removed.
17. The temporary transverse steel beams have holes in the ends for fastening a rope so they can swing
out to the edge of the bridge. Later they are lifted onto the bridge deck and taken away by trucks.
18. The longitudinal steel beams in the temporary lower chords can be made up of beams that weigh up
to 400 kg. When their longitudinal joints are undone and the longitudinal beams are loosened from
the lower end of the hangers, ropes are fastened to their ends.
Modified 21.07.2014
53
Fig. 61. Longitudinal cross-section of the platform for removal of the temporary lower chord
19. The longitudinal steel beams roll across the platform on wheels on columns on the platform. See fig.
61. After they glide off the platform, they hang suspended at the edge of the bridge till they are lifted
and loaded onto trucks.
20. The wood above the transverse beams is loosened by hand and brought to the outer edge of the
platform and lifted onto the roadway. The longitudinal wooden beams weigh around 25 kilograms
each.
21. Before the platform for removing the lower chord is taken away, the holes for the screws at the lower
end of the hangers will be filled with putty and scratches in the corrosion protection must be repaired.
Modified 02.04.2014
53a
NIELSENS BRIDGES
54
Modified 02.04.2014
55
TROUBLE WITH LOWER END OF HANGERS COMING OUT OF THE CONCRETE TIES.
Bridge authorities in Sweden are reluctant to accept lower ends of hangers that come directly out of the
concrete like in figs 6, 6a, 6c, on pp. 6 and 6a, and on fig. 43 on p. 41a. These lower ends of hangers are
difficult to maintain and can not be changed. The main trouble is corrosion just above the concrete. The
cement prevents corrosion in the concrete. The prestress in the ties of optimal network arches makes the
lower end of the hanger less likely to corrode. Often salt is used in the winter to remove snow. When the
snow melts a layer of salt is left on the steel just above the concrete tie. This encourages corrosion.
Careful maintenance can counteract the problem. There has not been a problem with the Steinkjer Bridge.
Maybe the level on the concrete was 5 to 10 mm higher around the lower end of the hangers. The
situation on the Bolstadstraumen Bridge can be seen in figs 61g and 61h. When the picture was taken the
bridge was 45 years old. The decisive cross-section in the rods is under the nuts. Just above the concrete
there might be corrosion, but here the stress is small. The author would have liked to have the corrosion
protection just above the concrete renewed right away.
Olav Grindland of the Bridge Department of the public roads in Norway suggests that corrosion
protection of the rods at the lower end of hangers should be applied down to 10 cm into the concrete
before the rods are built in.
What can be done to avoid irreparable damage at the end of hangers? There are two groups of remedies.
1. Extra careful corrosion protection of the steel just above the concrete. 2. Avoiding fastening the lower
end of hangers directly to the concrete.
1. A. More frequent maintenance of the corrosion coating that is used on all the steel.
1. B. Extra durable corrosion coating just above the concrete. For instance: A plastic coating that also
covers the concrete nearest to the steel rod.
2. A. Fastening the lower end of the hangers to rods through the tie as
suggested for the Brandanger Bridge on p. 94 by Einar Noremark of
the Norwegian Public Road Administration. See fig. 61f.
2. B. Fastening the lower end of the hangers to steel plates under the
tie. This would increase the area of steel that can not be replaced and
will have to be given good corrosion protection.
The Nielsen Bridges on the previous page have lower ends of hangers
that come directly out of the concrete. Wondering how the lower end
of these hangers had been doing, the author asked the Swedish bridge
office in Borlnge. They answered that they had had trouble with
nearly half the hangers that came directly out of the concrete and were
keen to avoid such designs. The author still prefers hangers that come Fig. 61f. Lower ends of hangers
directly out of the concrete.
Fig. 61g and fig. 61h. Lower ends of hangers coming out of concrete in the Bolstadstraumen Bridge
Modified 21.07.2014
55a
(L) = L/n
Cross-section
(A) = A.E/n2.m.(E)
Stiffness
(I) = IE/n4.m.(E)
Nodal load
(P) = P/n2 m
Deflection
(f) = f/n
Fig. 62. Structural details around the second tube in the windbracing of the network arch in Steinkjer
Modified 21.07.2014
56
Fig. 63. Typical influence lines for the bridge at Steinkjer. The difference in slope between two adjoining
hangers is 1.8. The slope of the steepest hanger is 74.4.
Modified 28.08.2013
57
Fig. 64. Typical influence lines for the bridge over Bolstadstraumen. The difference in slope between two
adjoining hangers is 1.7. The slope of the steepest hanger is 73.8.
58
VIENNA 1980
Two network arches both spanning 200 metres were calculated for the IABSE congress in Vienna in
1980. See fig. 8 p. 8. Tveit 1980a and 1980b. For the calculation of these network arches an optimisation
program called FEMOPT was used. Mr. Georg Andersen designed it in partial fulfilment of his Dr.-Ing.
degree, Andersen 1979.
The design called 200A, see pp. 60 to 68, has steeper hangers than the design called 200B. Pp. 69 to 72
give information on the dimensions and geometry of 200B. 200A and 200B have nearly the same crosssections. From the influence lines on p. 60 and p. 72 it can be seen that the steeper hangers in 200A give
smaller bending moments, but less resistance to relaxation of the hangers.
The skeleton lines for 200B have the same shape as the skeleton lines for the network arch for the kvik
Sound. The difference is a factor 135/200, which is the ratio of the spans. The good thing about the
skeleton lines presented in this publication is that they give very even maximum stress in the hangers.
This is to some extent load dependent, but for spans between 150 and 200 metres little can probably be
gained by examining other skeleton lines.
Most of the symbols in the diagrams will be immediately understandable to an experienced structural
engineer. The stress index in fig. 71 on p. 66 might be an exception. It is the stress in the member found
by Naviers formula divided by the nominal yield stress. In fig. 71 the result is multiplied by 1000. The
stress index is calculated in five places in the member. The highest stress index has been given as output.
The bending moment diagram in fig. 71 on p. 66 has thick and thin lines. The thin lines are the result of
the first calculation which is a standard linear-elastic calculation, carried out assuming that hangers take
compression etc. The thick line is calculated by non-linear methods assuming sagging hangers etc. When
the difference between two lines is small, only the thick line has been drawn.
Modified 21.07.2014
59
Vienna 200A
Fig. 65. Influence lines for the network arch 200A spanning 200 m. Designed for the IABSE Congress in
Vienna 1980. Tveit 1980a.
60
61
62
Fig. 69. Some reinforcement of edge beam and lane for 200A. Tveit 1980a. The thickness of concrete
cover outside the reinforcement was smaller 25 years ago.
64
65
Fig 71. Forces and stress indexes for loads that decide the dimension of the arch of network arch 200A
The diagram shows how non-linear calculations influence the forces in the arch. The definition of the
stress index is found on p. 59. The load groups are found in fig. 23 p. 13. The co-ordinates are found in
fig. 67. The dimensions of the network arch are found in figs 68 to 70.
Stress in the arch middle of the span due to a bending moment of 1 MNm is 26 N/mm2.
66
Network arches with all hangers in tension act as trusses and have little bending in the chords. Hangers
can, however, be made to relax by live load on one side of the span. Fig. 72 shows how the network arch
called 200A reacts to a very big load on one side of the span. The left 54% of the span carries a live load
equal to the dead load on the lane.
The dotted hangers are relaxed due to live load. They are numbered according to the sequence in which
they relax. The segments of the chords marked a belong to parts of the arch which act like a truss, i.e.
where all hangers are in tension.
The segments of the arch
marked b are attached by
hangers in tension to a section
of the span acting like a truss.
The chords marked c are
connected to each other by
one set of hangers in tension.
This part of the bridge
functions a bit like a tied arch
with one set of hangers.
The equilibrium of zone c is
dependent on shear and
bending in the chords. Zone
c can have large bending
moments. Zones a and b
are more firmly held in place
than zone c.
Relaxation of hangers causes
significant
increase
in
bending moments in the
chords only after a zone c
exists, and even then bending
moments do not increase as
fast as the moments in a tied
arch with vertical hangers.
This is because the sloping
hangers restrain the horizontal
displacement of the arch and
because parts of the network
arch work like a truss.
Even if some hangers relax,
moderate live load on part of
the span gives smaller
maximum stresses in the arch
than the same live load on the
whole span. This is because
the partial live load gives
smaller axial force in the arch.
Fig. 73 on the next page
shows that only after the
relaxation of six hangers does
the two load cases lead to the
same maximum stress.
Fig. 72. Forces and deflections due to an extremely skew load on 200A
When only two hangers have
relaxed, the whole structure
works almost like a truss.
67
Fig. 73. Development of maximum stress in the arch member numbered 114 in fig.72.
Fig. 73 applies to bridge 200A which has the arch shown in fig. 70. In bridges with more slender chords,
i.e. universal columns, the bending moments will increase more abruptly after some hangers have
relaxed. This is because slender chords have less ability to take the increased bending moments that occur
after some hangers have relaxed.
Fig. 73 shows how maximum stresses in member 114 increase with an increasing, evenly distributed
load. The loaded length of 54% of the span and member 114 has been chosen because it is the member
that gives equal maximum stress due to partial load and full load for the lowest live load intensity. The
curved line shows how stresses increase with increasing load intensity on the left of the span. The straight
line shows how stresses increase due to live load on the whole span.
For fig. 73 the span in fig. 72 has been calculated by non-linear calculation in the deflected state
assuming constant modulus of elasticity. Still stresses due to partial load are almost linear until the first
hanger relaxes. When hangers 1 and 2 have relaxed, the maximum stress in member 114 increases
equally fast due to partial load as due to load of equal intensity on the whole span. For a live load of 61%
of dead load, partial load and full load give equally high maximum stress in member 114. Hangers 1 to 6
are now relaxed.
Broadly speaking, hangers relax because of horizontal displacement of the arch due to partial live load on
the lane. If we give the hangers a smaller angle with the lower chord, their tendency to relax is reduced,
and bending due to relaxation is reduced. The smaller angle with the chords will, however, lead to an
increase in the bending moments due to concentrated loads. Clearly a compromise must be found.
Pp. 42 to 46 illustrate the effect of relaxation of hangers. Since it is more complicated to calculate spans
where hangers relax, it saves considerable time if the hangers have slopes that make it relatively easy to
prove that it is the load on the whole span that decides the dimensions of the chords. Look also at the
lower 40% of p. 5a. The author is not sure, but he thinks that there should be no relaxation of hangers in
serviceability limit state. SLS.
Modified 21.07.2014
68
Fig. 74. Skeleton lines for 200B, which is a network arch spanning 200 metres. Tveit 1980a.
69
Vienna 200B
Fig. 77. Influence lines for a bridge spanning 200 m calculated for the IABSE congress in Vienna 1980
72
Modified 21.07.2014
73
Fig. 90, p. 87, gives forces when the smaller edge beam is cast. A HE 200B in the temporary lower chord
has been assumed for these calculations. The stiffness of the part of the edge beam that has already been
cast has been disregarded. Just below the middle of p. 27 there is some good reasoning on the forces in
the temporary lower chord.
The right hand side of the diagram on p. 87 shows the forces when 12.23 metres at both ends of the span
carry the concrete of the lighter edge beam before it is hardened. The left side of the same diagram shows
the forces when 32.5 metres at both ends of the span carry the concrete of the lighter edge beam before it
is hardened.
In order to prevent the relaxing of hangers, the casting starts from the ends of the span and proceeds
towards the middle. The loads on one side of the span are as follows:
Reinforcement
Wooden formwork
Prestressing cables
Sum:
Weight of edge beam
2.4 kN/m
1.3 kN/m
0.7 kN/m
4.4 kN/m
10.4 kN/m
Modified 02.04.2014
74
75
Fig. 80. Cross-sections used in the final calculations for the kvik Sound network arch
77
Fig. 81. Influence lines for compression in the arch of the kvik Sound network arch
78
Fig. 82. Influence lines for tension in the tie of the kvik Sound network arch
79
Fig. 83. Influence lines for the force in the hangers in the kvik Sound network arch
80
Fig. 84. More influence lines for the force in the hangers of the kvik Sound network arch
81
Fig. 85. Influence lines for the bending moments in the lower chord of the kvik Sound network arch
82
Fig. 86. Influence lines for the bending moments in the arch of the kvik Sound network arch
83
Fig. 87. More influence lines for the bending moments in the arch of the kvik Sound network arch
84
Fig. 88. Influence lines for the deflection of the lower chord of the kvik Sound network arch
85
Fig. 89. Influence lines for the rotation in the lower chord of the kvik Sound network arch
86
Fig. 90. Forces in the kvik Sound network arch when the smaller edge beam is cast. Loads and
stiffnesses are explained on p. 74. The two halves of the drawing show the effects of two load cases. On
the left side of the drawing the casting has come to 32.5 m from the end of the bridge. On the right side of
the drawing the casting has come to 18.2 m from the end the bridge. The stiffness of the concrete cast has
been disregarded.
87
Fig. 91. Maximum load on the kvik Sound network arch in the ultimate limit state. The wheel loads are
in the middle of the span
88
Fig. 92. Forces and deflections just before elastic buckling due to the evenly distributed load on the
kvik Sound network arch
89
Fig. 93. Forces and deflections due to live loads on the left 54% of the kvik Sound network arch in the
ultimate limit state. Half the weight of asphalt on the whole span is assumed. The shortening of three
relaxed hangers is given in mm.
Modified 28.08.2013
90
Fig. 94. Forces and deflections just before elastic buckling due to load on the left 54% of the kvik
Sound network arch. The shortening of three relaxed hangers is given in mm.
91
Fig. 96. Forces and deflections just before buckling when one hanger in the middle of the kvik Sound
network arch is broken
92
NETWORK ARCH BRIDGE OVER THE RIVER LUZNICE (Czech Republic) Built 2005
Designer: Ladislav aek, PhD, Mott MacDonald, Prague
92a
Fig 96e. Proposed method of erection for the Bechyne network arch
The method of erection suggested in fig. 96e is very like a method that the author suggested in June 2004,
Tveit 2004, but that is a coincidence.
Fig. 96f. Contractors method of erection for the network arch at Bechyne
The amount of materials used per m2 is:
Concrete
0.316 m3
Reinforcement 66 kg
Prestressing steel 9.3kg
Construction steel 101 kg
Dr. Ladislav aek heard about the network arch from a colleague. Then he looked at the authors
homepage and went ahead with the design. The author never heard about the Bechyne Bridge until it was
finished. He was most impressed.
A thorough analysis of Dr. Saseks bridge over the Luznice river was the topic for the Masters thesis by
Aljandro Niklison from Argentina. It can be found at
http://www.ibb.uni-stuttgart.de/publikationen/fulltext/2010/niklison-2010.pdf
92c
Fig. 97. The kviksound network arch designed according to EU codes. Teich and Wendelin 2001.
OPTIMAL NETWORK ARCHES COMPARED TO OTHER STEEL BRIDGES
Two very able students of Professor W. Grae in TU-Dresden wrote their graduation thesis in Norway in
the summer of 2001. They calculated the optimal network arch in fig. 97. The resulting steel weights per
m2 of useful bridge area are shown on the left in fig. 98. The loads and codes of the EU were used. Where
there was doubt, solutions that gave the bigger steel weight were adopted. A revised version of the
students graduation thesis can be found at http://home.uia.no/pert under the button Masters Theses.
Fig. 98 compares the steel weight of the network arch in fig. 97 to steel weights in recent German arch
bridges with vertical hangers. The year that the bridges were built is indicated. Bridges marked N have no
wind bracing. In bridges marked S the arches slope towards each other.
It is surprising that the network arch tends to use less reinforcement in the tie than the bridges that have
steel beams under the concrete slab. Part of the reason for this is the high amount of minimum
reinforcement that is needed in the slab that lies on top of the elongating longitudinal steel beams in the
tie. In the optimal network arch the moderate longitudinal prestress in the serviceable limit state reduces
the need for minimum reinforcement. Furthermore it seems to the author that when the concrete slab can
carry the concentrated load, not much extra reinforcement is needed to take the load to the edge beams.
Fig. 98. Steel weight per square metre for various arch bridges
93
The Jerusalem Bridge in Magdeburg uses more than 4 times as much structural steel per m2 as the kvik
Sound Bridge. The spans are nearly the same. The kvik Sound Bridge comes out better because the area
under the arches is included in the surface that is used for calculating the steel weight in kg/m2. Different
methods of erection contribute to the great variation in steel weight in fig. 98. A temporary tie for the
kvik Sound Network arch would need a steel weight of ~45 kg/m2.
In the kvik Sound Network arch pre-bent H-profiles made of S 460 are assumed. In 2003 the steel mill
said that these profiles would cost between 22% and 30% more than straight profiles in grade S 355.
Steel weight is not the only thing that matters. The table in fig. 99 indicates other things that might be
important. Among other things it gives reasons why the steel in network arches might cost less per ton
than the steel in arch bridges with vertical hangers.
The references with the steel weights in fig. 98 can be found in Tveit 2002. Herzog 1975 says that arches
use about the same amount of steel as other steel bridges. See fig. 9 p. 8. It indicates that network arches
use much less steel than other road and rail bridges.
POINTS OF IMPORTANCE
Aesthetics
Bulkier bridges
Adaptability
Materials
Fabrication
Corrosion protection
Maintenance
Erection
Floating into place
Erection on side-spans
Erection on ice
Table 1 compares arch bridges with vertical hangers to optimal network arches
SAVING OF COST BY USING NETWORK ARCHES INSTEAD OF OTHER STEEL BRIDGES
In his work with network arches the author has presented influence lines and quantities to make it easy
for fellow engineers to check his claims concerning savings of materials. An incomplete list of
publications can be found on pp. 95 to 101.
Network arches have little welding and simple details that repeat themselves many times. The cost per
tonne will be fairly low if efficient methods of erection can be found. The author has been reluctant to
specify savings in US dollars or sterling because such savings are much more difficult to defend.
The reduction in cost resulting from the use of network arch bridges is of great interest. Therefore a
network arch with a span of 150 m is compared to an arch bridge with vertical hangers spanning 100 m
built over the river Saale near Calbe in Germany, Fiedler and Ziemann 1997. See fig. 98a, next page.
At similar sites network arches should normally have longer spans than other bridge types. This is
because the steel weight of the network arch is smaller and it increases more slowly with increasing
spans. This is an extra advantage if the size of the pillar depends mainly on the forces due to collision
with ships or forces from breaking of ice in the spring.
The data for the network arch are based on the network arch designed by Teich and Wendelin 2001. See
fig. 97 p. 93. A revised version of their work can be found on the authors home page,
http://home.uia.no/pert under the button Masters Theses.
The cost per m2 of bridge between the railings is compared. The average width between the railings is
13.9 m for the Calbe Bridge and 14.8 m for the network arch. Both bridges are assumed to have many
equal spans.
It is shown that the network arch with a span of 150 m will need about the same size of supports as the
100 m arch bridge with vertical hangers. The loads and codes of the EU are used for both spans. Factors
that influence the cost of the two spans are presented.
Modified 21.07.2014
93a
The pillars are the same for both bridges. Less weight needs to be moved during erection
The saving on cost is probably 35 to 45% per m2 of useful bridge area.
Fig. 98a. Comparison between the Calbe Bridge and a network arch.
Permanent load per span:
Structural steel
Railings 200kg/m
Reinforcement
Concrete
Asphalt,etc. 80mm
Calbe
Network arch
255.1 (150/135)2=
530 t
20 t
151 t
1463 t
136 t
2300 t
126.2 (150/135) =
1358 (150/135) =
315 t
30 t
140 t
1509 t
197 t
2191 t
Hangers
0.12207[m]
Railings
1100
0.061528[m]
1150
Traffic
2100
701 m
2150
759 m
The vertical load on the support is about 7 % smaller for the Calbe Bridge.
The area exposed to wind is approximately 8% smaller for the Calbe Bridge.
The useful area of the bridge is approximately 6 % smaller for the Calbe Bridge.
Since the span of the Calbe Bridge is 33 % smaller, the saving in the pillars when using the network arch
is likely to be between 25 % and 32%.
Modified 03.08.2014
93b
Comparison of the superstructure of the Calbe Bridge with a span of 100 m and a useful area of 1390 m
to a network arch with a span of 150 m and a useful area of 2205 m.
Reduction per m of
Calbe
Network arch
useful bridge area
Structural steel
Reinforcement bars
Concrete
Weight of steel skeleton during erection
530 t
151 t
1463 t
530 t
315 t
140 t
1509 t
~400 t
63 %
42 %
35 %
24 %
All comparisons will be lopsided. These additional facts should be taken into consideration:
The network arch makes better use of high strength steels. The yield strength of the steel in the Calbe
Bridge is 345 MPa compared with 430 MPa in the network arch. The network arch has simpler details
and much shorter welds. See fig. 99 page 93a, for comparisons between network arches and arch bridges
with vertical hangers.
The rise of the arch is 17 % of the span in the Calbe Bridge and only 15 % of the span in the network
arch. In the network arch the arch and the hangers protrude from the bridge area making the bridge area
less useful. This is partly compensated for by widening the network arches up to 1.2 m at the end of the
span. This widening is not included in the useful bridge area mentioned above.
The author thinks that using the network arch can save between 40 % and 50 % of the cost of the
superstructure. The author also thinks that using the network arch instead of the arch with vertical
hangers can save between 35 % and 45 % of the cost per m. Many good civil engineers will not believe
that these savings are possible. Nevertheless the author hopes that most of them will consider trying
network arches at suitable sites. If anybody makes a careful comparison of the cost of an optimal network
arch bridge spanning more than 100 m with other types of bridges, the author would like to know the
results.
THE BRANDANGER BRIDGE IS THE WORLDS MOST SLENDER ARCH BRIDGE
Modified 03.08.2014
93c
In 2003 Aril Hanekamhaug asked the author if he thought that a network arch would be suitable for the
Brandanger Sound in western Norway. The span had to be around 220m and the traffic asked for only
one lane. The author was sceptical at first. He was afraid that there would be dangerous vibrations, but he
soon found that this would not be the case. Fig. 99 shows one of his first drawings of the bridge.
In the spring of 2004 two students from TU-Dresden did their Masters thesis on the Brandanger Bridge.
They decided against the one lane alternative. Then they went back to Dresden and designed a two lane
alternative which won a prize from the local building industry. Dr. Jan Teigen of the bridge department of
the Norwegian public roads administration presented preliminary calculations of the Brandanger Bridge
in November of 2004
Another student from Germany, Monica Stacka, was in Grimstad, Norway in the autumn of 2006 to do
her Masters thesis on the Brandanger Bridge. Her work was continued by Susanne Matthes in 2008.
Monica Stacka has now got a job in the Bridge Department of the Norwegian Public Road
Administration. She has checked the calculations of the final design of the Brandanger Bridge done by
the firm Aas-Jacobsen. (Larsen and Jakobsen 2011). See fig. 100.
Fig. 101. The Brandanger Sound Bridge was lifted onto the pillars on the 7th of September 2010
Modified 21.07.2014
94
The firm Skaanska did a good job building the Brandanger Bridge. The main span was built on a flat area
where rock had been taken out for covering pipelines in the North Sea. Fig. 102 shows a stage in the
erection of the arch. Fig. 103 shows how the main span was transported 5 km to the bridge site by two big
Dutch floating cranes that could lift ~1200 each. The span weighed 1860t.
The Brandanger Bridge is the worlds most slender arch bridge and likely to remain so for a long time.
This is because it is unlikely that anybody will build a bridge with a span of over 200m when the traffic
does not need more than one lane. If they do, the steel in the arch will probably be more spread out than
on the Brandanger Bridge.
CONCRETE NETWORK ARCHES WHERE MANY EQUAL SPANS ARE NEEDED
Now towards the end the author would like to present some ideas on the design of all concrete side spans
for the Fehmarn Belt between Germany and Denmark.
Figure 104. Cross-section of concrete side spans for a bridge over the Fehmarn Belt
Where many equal spans are needed over navigable water, the spans can be made on land to be lifted
onto the pillars by big floating cranes. The cross-section in fig. 104 is for a side span of 235 m for the
Fehmarn Belt Bridge between Germany and Denmark. 16 km of side spans are needed. A concrete
quality with a cylinder strength of fcc= 85 MPa is suggested.
Two arches with the road in one direction would be produced on shore. Those spans weigh ~5500 t.
Seagoing cranes that could lift such spans exist. The concrete slab under the railway will be cast over the
water.
The concrete bridge will not be used for the Fehmarn Belt Bridge, but it will be interesting to compare it
to a steel alternative that has been designed. Preliminary investigations indicate the concrete alternative is
slightly less costly than the steel alternative, but it would be more complicated to change the traffic
between lanes and tracks in the concrete alternative.
Since there is little bending in the arches, they can be made of prefabricated elements. The wind portals
would be cast in situ. The concrete spans would be slightly heavier than the steel alternative, but they
would be subject to much less wind. Concrete in compression and concrete slabs with a slight prestress
would have small maintenance costs. Professor Marx of TU-Dresden and two of his students, Marcus
Krug and Steffen Mller have done interesting work and extensive calculations on the project.
Modified 17.11.2013
94a
Professor Dr. Kolbein Bell, NTNU Trondheim Tekn. Dr. Lennart Fransson, Lule Technical University
Tekn. Dr. Frank Axhag, Swedish Railways, Borlnge,
Professor Dr. Frank Schanack, UACh, Valdiva, Chile Civil Engineer Eduardo Hennings Marianyi, Lima
Professor Dr. Steffen Marx, TU-Dresden
RECOMMENDED STUDENTS:
Nine students of Professor Dr. Habil Wolfgang Grae of TU-Dresden have written their Masters
theses with me in Grimstad. Their grade average has been extremely good. Most of their
Masters theses can be found on my homepage http://home.uia.no/pert/ These students work
has been an inspiration to me. Their names are: Stephan Teich, Stefan Wendelin, Uwe
Steimann, Benjamin Brunn, Mathias Rack, Frank Schanack, Tobias Rohm, Torsten Skalda,
Monika Stacha, Susanne Matthes, Marcus Krug and Steffen Mller. The three last students did
not do their master thesis, but their work extended the knowledge on network arches.
After the author had retired, he had help with computer tasks from some very clever students.
They are: Joakim Hjerts, Dag yvind Godfredsen, Karl Syvert Lland, Thomas Hansen Gytil,
Per Steinar Karlsen, Are Loftesnes and yvind Storhaug. He strongly recommends them to any
future employers. More information can be obtained by ringing the author at +47 3723 3236 or
any phone number that he may have in the future.
Modified 28.08.2013
94b
LITERATURE
This list also contains references relevant to network arches not mentioned in this publication.
Andersen, G. (1979) Brugerveiledning for FEMOPT. Program for optimering af brende konstruksjoner.
(Users manual for FEMOPT. Program for the optimising of load carrying-structures, in Danish.) Note
no. 7902, Inst. Bldg. Tech. Struct. Engrg., Aalborg Univ. Centre, Aalborg, Denmark. 101 pages.
Arild, A. (1980?) Norwegian Road Bridges Through 50 years.
Backer, H., Pauw, B., Corte, W. and Bogaert, P. (2004) Force Variation and Slackness in Tied Arch Bridges with
Crossing Hangers. Arch Bridges IV, Barcelona, Nov. 2004. Advances in Assessment, Structural Design
and Construction. P. Roca and C. Molins (Eds.). pp. 651-660. ISBN: 84-95999-63-3
Bast (2008)Leitfaden zum Anhang II-H, Hnger von Stabbogenbrcken, des DIN-Fachberichtes 1003 (Ausgabe
2008) Schwihgungsanfllige Zugglieder im Brckenbau. Empfelungen fr ermdunggerechtes
Konstruiren. (Guidance to attachment II-H. Instructions on hangers for tied arch bridges for DINFachberechtes. Vibration inclined hangers in bridgebuilding. Recommendations for design against fatigue.
) 74 pages.
Berger, O. (1955) Beurteilung des Tragvermgens einer Groen Eisenbahnbrcke auf Grund von
Spannungsmessungen und Berechnung als hochgradig (38 fach) statisch unbestimmtes System.
(Evaluating the Load Carrying Capacity of a Big Railway Bridge and Calculating it as a Highly (38 times)
Indeterminate System. In German.). pp: 526 - 535Bauplanung Bautechnik H. 12 Des.1955. ISBN: 624.21
: 625. 183.3
Beyer, K. (1933) Die Statik im Eisenbetonbau. ( The Static in Concrete Structures. In German.) First volume,
third printing.
Brekke, G. (2005) Nettverksboge i Ytre Sogn (Network arch in outer Sogn. In Norwegian) Vegen og Vi. Oslo,
No.18, November 17th 2005. p. 21
Bittner, E. (1965) Platten und Behalter. Springer-Verlag, Vienna New York , 1965.
Bretting, A. E. (1935). Inclined Hangers Impart Slenderness to Ribs of 470-Ft. Concrete Arch. Engineering
News-Record. April 25, 1935. pp. 577-580.
Bretting, A. E. (1936). ber Bogentrger mit schrg gestellten Hangestngen. (On arches with inclined hangers,
in German.) Internat. Vereiniung fr Brckenbau und Hochbau. Zweiter Kongress, Schlussbericht 1936.
pp. 514-515.
Brunn, B. and Schanack, F. (2003) Calculation of a double track railway network arch bridge applying the
European standards Graduation thesis at TU-Dresden. August 2003. 320 pages. A revised version of this
thesis can be found at http://home.uia.no/pert under the button Masters Theses.
Brunn, B., Schanack, F. and Steimann, U. (2004) Network arches for railway bridges Arch Bridges IV,
Barcelona, Nov. 2004. Advances in Assessment, Structural Design and Construction. P. Roca and C.
Molins (Eds.). pp. 671-680. ISBN: 84-95999-63-3
Cederwall, K. & Fransson, L. (1979) Frstrkning av ett istckes brfrmga med armering. (Strengthening of
Sheets of Ice by Reinforcement. In Swedish.) Publ. 79:1 frn avd fr Konstrutionsteknik, Hgskolan i
Lule. (Publ 79 from Department of Structural Design, Hgskolan i Lule).
Chan M. and Romanes M. (2008) New Zealands First Network Arch Bridge Conference paper for the 4 th New
Zealand Metal Industry Conference, hosted by HERA in October 2008. All conference papers were
published into a CD.
Cronholm (1963) Die Versteiften Stabbogebrcken in Schweden Acier, Januar 1963. P. 6/8.
Eurocode 3: Design of steel structures Part 2: Steel bridges. ENV 1993-2. CEN, Central Secretariat: rue de
Stassart, 36, B-1050 Brussels. Ref. No.ENV 11993-2: 1997E.
Fiedler, E. and Ziemann, J. (1997), Die Bogenbrcke ber die Saale bei Calbe eine Brcke mit besonderer
Bogenform, (The Arch Bridge over the Saale River at Calbe a Bridge with an Unusual Arch Shape. In
German), Stahlbau, Vol. 66, No. 5, 1997, pp. 263-270, Dokumentation 1997, pp. 329-337, ISBN 3-92753504-4.
95
Franciosi, V. (1958). Ponto ad Arco con Implacato Sospenso. (Arch bridges with inclined hangers, in Italian.),
Milan, Editore Ulrico Hoepli. 93 pages.
Fries, C. And Hommel, D. (1990) Great Belt Link Tender design and contract design for the West Bridge.
Procedings of the 2nd Symposium on Strait Crossings. Trondheim/Norway/10-13 June 1990. Pulished by
A:A: Balkema, Rotterdam. pp. 5-312. ISBN 90 6191 1184.
Fujiono, T. and Ohsaka, K. (1965) Stress Analysis of Plane Frame Structure by Digital Computer. In Japanese.
November 1965. Mitsubishi Technical Bulletin MTB 010029. Mitsubishi Heavy Industries, Ltd. Tokyo,
Japan. 10 pages.
Gauthier, P. and Krontal, L. (2010) Erfahrungen mit Netzwerkbogenbrcken im Eisenbahnbrckenbau.
(Experiences with Network Arches in Railway Bridges. In German). Stahlbau H. 3. 2010 pp. 199-207.
Galambos, T. V. Ed. Guide to Stability Design Criteria for Metal Structures Fifth edition, 1998, John Wiley &
Sons. ISBN 0-471-12742-6. Chapter 15 and 17.
Geiler, K., Steimann, U., Grae, W. (2008) Netzwerkbogenbrcken Entwurf, Bemessung, Ausfrung
(Network Arch Bridges Design and Execution.) Stahlbau H. 3, 2008 pp. 159-171
Gerard, G. (1962) Introduction to Structural Stability Theory McGraw-Hill Book Company, Inc. 1962
Grae, W. and Tveit, P. (2007) Netzwerkbogenbrcken Geschichte, Tragwerhalten und ausgefhrte Beispiele
(Network Arches History, Function and Built Examples. In German.) 17. Dresdner
Brckenbausymposium. 13. March 2007. ISSN 1613-1169, ISBN 3-86005-542-9. pp. 183-198.
Gimsing, N. (1999) Bridge aesthetics and structural honesty. Vg- och Vattenbyggaren, Stockholm, 2. 99. pp. 2842.
Guinness Book of World Records (1995). Editor: Peter Matthews, Bantam Books, New York. Page 306.
Gut, H. and Shuwerk, O. (1971) Die Brcken der SBB im Raume Ziegelbrcke-Weesen. The bridges of the SBB
in the Ziegelbrcke-Weesen aerea Schweizerishe Bauzeitung, 1971, pp. 1017-1030.
Gnter, G., Hortmanns, M., Schwartzkopf, D., Sedlacek, G. and Bohmann, D. Dauerhafte Ausfrung von
Hngeranschlssen an stahlerne Bogenbrcken. (Durable Attachment of Hangers in Steel Arch Bridges.)
Stahlbau 69 (2000) Heft 11, pp. 894 908.
Herzog, Max. (1975). Stahlgewichte moderner Eisenbahn- und Straenbrcken. (Steel Weights of Modern Rail
and Road Bridges.) Der Stahlbau 9/1975. pp. 280-282.
Hennings Marianyi, E. (2006). Puente en Arco Tipo Network sobre el Ro Carbn, Departamento Cusco, Peru,
<http://www.network-arch.com/download/hennings_calculo_carbon_2006.pdf> (March 12, 2007), Lima,
Peru
Hess, W. L. (1996). An Alternate Hanger System for Tied Arch Bridges 13th Annual International Bridge
Conference in June 1996 in Pittsburgh, Pennsylvania.
Hiroshi, Y., Satake, M. and Korematsu, M. (1965) Study of Nielsen System Bridges. In Japanese. March 1965,
Mitsubishi Technical Buletin MTB 010021 Mitsubishi Heavy Industries, Ltd., Tokyo, Japan. 8 pages.
IABSE (2005) Use and Application of High-Performance Steels for Steel Structures ETH Hnggerberg CH-8093
Zrich. ISBN 3-85748-113-7. 152 pages.
Jay, A. (1998) Network Arches In French. Hgskolen i Agder, 4890 Grimstad, Norway. July 1998. 66 pages.
Kahman, R. and Beisel T. (1979) Eine auergewhnliche Montagemethode fr die Bogenbrcke bei Straubing.
Der Stahlbau 1979. Heft 4. Berlin. pp. 110-115.
Kikuno, M. (1973) Ohnura Bay Bridge (Japan). Acier-Stahl Steel, 41(4) Brussels, Belgium, pp.168-171.
Kolm, R. (1950) Bro ver Lulefjrden. (Bridge over Lulefjrden, in Swedish.) Svenska Vgfreningens
Tidsskrift 1950. No. 7. 7 pages.
Krck, G. E. (1946) Eisenbeton-Strassenbrcke ber den Mnam Pasak bei Ayuthia, Siam. (Concrete road
bridge over the Mnam Pasak at Ayutia, Siam, in German.) Schweizerische Bauzeitung 1946. Vol. 127,
pp. 139-146, Vol. 128, pp. 6-9, 15-19, 27-28.
96
Kungliga Vg- och vattenbygnadsstyrelsen. (1954) Bro ver Lulefjrden vid Lule. (Bridge over Lulefjrden vid
Lule, in Swedish) 76 pages.
Larsen, R.M. and Jakobsen, S.E. Brandangersundet Bridge A slender and light network arch Taller, Longer,
Ligher. IABSE-IASS-2011 London Symposium Report. ISBN: 978-0-7079-7122-3.
Leonhardt, (1991) Developing guidelines for aesthetic design. Bridge aesthetics around the world, M. P. Burke
Jr. et al.,eds., Nat. Res. Counsil, Washington, D.C. pp. 32-57.
Majid, K.I., Spindel, J. E., Williams, M. S. (1971) The Design of Inclined Tied Arch Railway Bridges over the
M56. Paper 7392, Proceedings of the Institution of Civil Engineers. Vol. 50, Oct. 1971, pp. 139-160.
Maier-Leibnitz. (1941) Grundstzliches ber Modellmessungen der Formnderungen und Spannungen von
verankerten Hngebrcken. (Fundamentals concerning measurements of stresses, strains and deflections
on models of anchored suspension bridges.) Die Bautechnik, Heft 46/47, October 1941.
Moeen, S. et al. (2004) Parametric Studies on Cable Supported Arch Bridges 9th International Conference on
Current Trends in Aquaducts, Road, Rail and Marine Bridges. 22-24 December, 2004 Hyderabad , India.
Vol. 2. pp. 281-289.
Nakai, H. et al. (1995) Proposition of Methods for Checking the Ultimate Strength of Arch Ribs in Steel NielsenLohse Bridges. Stahlbau 64 (1995) Heft 5, pp.129-137.
Naruoka, M., Itoh, K., and Matsukawa, A. (1977) Nielsen System Bridges in Japan. Pfluger-Festschrift Hannover,
Germany, 1977. pp. 193-202.
National Steel Bridge Alliance. 2009 Prize Bridge Competition. Modern steel Bridge construction. November
2009. p. 25-43
Nielsen, O. F. (1929) Foranderlige Systemer med anvendelse p buer med skraatstillede Hngestenger.
(Discontinuous systems used on arches with inclined hangers, in Danish.) 121 pages. Gad Copenhagen.
Ph.D. thesis.
Nielsen, O.F. (1932) Bogentrger mit Schrg gestelten Hngestangen. (Arches with inclined hangers, in
German.) Internationale Vereiningung f. Brckenbau und Hochbau. Abhandlungen 1, 1932. pp. 355-363.
Nielsen, O. F. (1936) Same title and periodical as above. Abhandlungen 4, 1936, pp. 429-438.
Ostenfeld, C. (1976) Christiani & Nielsen, Jernbetonens danske pionerer (Christiani & Nielsen, The Danish
Pioneers of Reinforced Concrete, In Danish.) Polyteknisk Forlag, Lyngby, Denmark. 245 pages.
Pelegrino, C.,Cupiani, G. and Modena, C. (2010) The Effect of Fatigue on the Arrangement of Hangers in Tied
Arch Bridges Engineering Structures (2010) doi:10.1016/j.engstruct.2009.12.040
Petrescu, I. & Popa, N (1999) Comparative Study of a bowstring arch bridge stability with various types of wind
bracings. Stahlbau H2, 1999.
Pucher, A. (1977) Einflussfelder elastischer Platten. Influence Surfaces of Elastic Plates. Springer-Verlag Wien
New York. Fifth revised edition. (Any edition of this book will do.)
Rck, M. (2003) Entwurf einer kombinierten Straen-Eisenbahn-Netzwerkbogen-brcke (Draft of a Network
Arch for a Combined Road and Railway Bridge) Graduation thesis at TU-Dresden. August 2003. 237
pages. A revised version of this thesis can be found at http://home.uia.no/pert under the button Masters
Theses.
aek, L. (2005). Getting on the Network. Innovation in arch design BRIDGE Design Engineering. v. 11, no
40, pp. 39-40
aek, L. (2006). Less is More, Civil Engineering, The magazine of the American Society of Civil Engineers ASCE, April 2006, pp. 50-55.
Schanack, F. (2007) Diseo y Estructura de Arcos Tipo Network. Trabajo de Investigation Departemento de
Ingenieria Estrutural y Mecnica, Escuela Tcnica de Caminos, Canales y Puertos, Unoversitad de
Cantabria, Santander, Espnia, 85 pages.
Modified 03.08.2014
97
Schanack, F. (2008) Puentes en Arco Tipo Network (Network Arch Bridges.) Doctoral Thesis. Departemento de
Ingenieria Estrutural y Mecnica, Escuela Tcnica de Caminos, Canales y Puertos, Universitad de
Cantabria, Santander, Espnia, 2008. 370 pages.
Schanack, F. (2008) Puentes en Arco Tipo Network (Network Arch Bridges.) Thesis Doctoral. Departemento de
Ingenieria Estrutural y Mecnica, Escuela Tcnica de Caminos, Canales y Puertos, Universitad de
Cantabria, Santander, Espnia, 2008. 246 pages. ISBN 978-84-89670-66-2
Schanack, F. and Brunn, B. (2009) Analysis of the structural performance of network arch bridges. The Indian
Concrete Concrete Journal. January 2009. pp. 7-13.
Schanack. F. (2009a) Berechnung der Knicklast in Bogenebne von Netzwerkbgen (Calculation of the Buckling
Load in the Plane of the Arches in Network Arches.) Bautechnik, Heft 5, Ernst & Sohn, Berlin.
Schanack, F. and Brunn, B. (2009) Netzgenerierung von Netzwerkbogenbrcken (Creation of Nets of Hangers in
Network Arches.) Stahlbau, Heft 7 2009, Ernst & Sohn, Berlin.
Schlaich J., Fackler T., Weibach M., Schmitt V., Ommert C., Marx S., Krontal L. (2008) Leitfaden Gestalten von
Eisenbahnbrcken Fischer Druck GMBH, Peine
Shorning, W. (2000) Mainbrcke an der NATO-Rampe zwischen den Gemarkungen Sulzbach Und Niedernberg.
Stahlbau 2000, H5. pp. 387-390.
Snelling, J. (1980) Two unusual features of the Merivale Rail Bridge. Presented at the 11 th IABSE Congress, held
in Vienna, Austria, Final Rep., IABSE, ETH-Hnggerberg, CH-8039, Switzerland, pp. 347-349.
Steimann, U. (2002) Berechnung und Konstruktion einer sthlernen Eisenbahn-Stabbogenbrcke mit
Netzwerkhngern (Calculation and Design of Network Arch Railway Bridge of Steel. In German.)
Graduation thesis at TU-Dresden. September 2002. 270 pages. A revised version of this thesis can be found
at http://home.uia.no/pert under the button Masters Theses.
Stein, Philipp. (1951) 100 Jahre GHH-Brckenbau. (100 Years of GHH Bridge Building) Publisher:
Gutehoffnungshtte Aktiengesellschaft, Oberhausen.
Stein, Peter and Wild, H. (1965). Das Bogentragwerk der Fehmarnsundbrcke. (The arch of the Fehmarnsound
Bridge In German.). Der Stahlbau, 34(6) Berlin, B.R.D. pp. 71-186.
Steere, P. and Yihui, Wu. (2008). Design and Construction of the Providence River Bridge Official Proceedings
of the 25th Annual International Bridge Conference, June 2-4, 2008.
Takagi, S. et al. (1970) Report of Experimental Research on Aki-Ohashi. (Nielsen System Lohse Girder Bridge).
In Japanese. Transactions of JSCE, Vol. 2, Part 1, 1970. pp. 104-110.
Teich, S. and Wendelin, S. (2001) Vergleichsrechnung einer Netzwerkbogenbrcke unter Einsats des Europishen
Normenkonsepts. (In German). Graduation thesis at TU-Dresden. August 2001. 300 pages. A revised
version of this thesis can be found at http://home.uia.no/pert under the button Masters Theses.
Teich, S. (2004) Fatigue Optimization in Network Arches Arch Bridges IV, Barcelona, Nov. 2004. Advances in
Assessment, Structural Design and Construction. P. Roca and C. Molins (Eds.). pp. 691-700. ISBN: 8495999-63-3.
Teich. S. (2012) Beitrag zur Optimierung von Netzwerkbogenbrken (Contrbution to Optimizing Network Arch
Bridges). PhD. thesis. ISSN 1613-6934. The whole text can be found at
http://www.qucosa.de/fileadmin/data/qucosa/documents/8604/Dissertation_Teich.pdf
Teich, S. and Grae, W. (2004a) Beitrag zur Optimierung von Hngeranschlssen Sthlerner Stabbogenbrcken
(Contribution to the optimisation of ends of hangers in steel arch bridges in German) Stahlbau, 2004, H.
12. pp. 1021-1030.
Tveit, P. (1955) Graduation thesis on arch bridges with inclined hangers. Delivered in September 1955. 76 pages. At
the Technical University of Norway, Trondheim.
Tveit, P. (1959) Bogebruer med skr krysstilte hengestenger. (Arch bridges with inclined intersecting hangers,
in Norwegian.) Ph.D. thesis presented at the Tech. Univ. of Norway. 64 pages, 78 drawings.
Tveit, P. (1964) Nettverkbogar, ein ny brutype. (Network Arches, a New Type of Bridge.) Bygg, Vol. 12, May
1964, pp.105-113.
Modified 28.08.2013
98
Tveit, P. (1966) Design of Network Arches. Struct. Eng:, 44(7). London, England, pp. 247-259.
Tveit, P. (1972). Discussion to Majid (1971). Proceedings of the Institution of Civil Engineers. Vol.52. August
1972, pp.181-184.
Tveit, P. (1973) Network arch in double track railway bridge. Presented at Nordic Research. Days for Steel
Struct., held in Oslo, Norway, Pre-print V713. (The publication is much the same as: Report 7205. Ren
og Anvendt Mekanik, Danmarks Ingenirakademi, Bygningsafdelingen, Aalborg, Denmark. 35 pages.)
Tveit, P. et al. (1978) Network arches. 1st ed., Civil Engineering. Department., Univ. of Houston June 26 1978. 93
pages. Revised edition reprinted at inst. of Bldg. Techn. Struct. Engrg., Aalborg Univ. Centre Aalborg,
Denmark, 1980. ISSN 0105-8185 NOTE NO. 8007. Including handout for the Poster Session of IABSEs
11. Congress, Vienna, September 1980. 45 pages.
Tveit, P. (1980a) Network arches. Handout for poster session of IABSEs 11 th Congress, held at Vienna, Publ. by
inst. Tech. Struct. Engineering., Aalborg Univ. Centre, Aalborg, Denmark. 45 pages.
Tveit, P. (1980b) Network Arches. 11 th IABSE Congress, held in Vienna, Austria, Final Report, IABSE, ETHHnggerberg, CH-8039, Zrich, Switzerland, pp. 817-818.
Tveit, P. (1981) 25 r med nettverkbogar. Resultat og perspektiv. (25 years with network arches. Results and
perspectives, in Norwegian.) Guest lect. at Tech. Univ. of Norway, printed at Inst. of Bldg, Tech. Struct.
Engineering., Aalborg University. Aalborg, Denmark. 40 pages. IFB/A 8101.
Tveit, P. (1983) Economic design of network arches. Rep. No. 8304, Inst. of Bldg. Tech. Strict. Enter., Aalborg
Univ. Centre, Aalborg, Denmark, 22 pages. ISSN 0105-7421 Report no, 8304.
Tveit, P. (1984) Economic design of network arches Handout for the poster session of IABSEs 12 th congress,
Vancouver, September 1984. Published by Inst. Bldg. Tech. Struct. Engineering., Alborg Univ. Centre,
Aalborg. 32 pages. ISSN 0105-7321 R8405.
Tveit, P. (1984a) A network arch with four sets of hangers designed to be cast and erected on ice floating between
piers. Handout for the poster session of IABSEs 12 th Congress, held at Vancouver, Canada. Publ. by Inst.
of Bldg. Tech. Struct. Engineering., Alborg Univ. Centre, Aalborg, Denmark. 106 pages.
Tveit, P. (1984b) Building network arches on reinforced ice between piers. Final Rep., IABSEs 12th Congress,
held at Vancouver, Canada, publ. by IABSE, ETH-Hnggerberg, CH-8039, Zrich, Switzerland, p.1130.
Tveit, P. (1987) Considerations for the Design of Network Arches. Journal of Structural Engineering, Vol. 1113,
No.10, October, 1987. ASCE, ISSN 0733-9445/87/0010-21897 Paper No. 21892. pp. 2189-2207.
Tveit, P and Moe, G. (1988) Submerged Floating Tubes with Free Spans over 4000 m. IABSE Symposium Kobe
1998. P. 785 and 786. ISBN 3-85748-095-5.
Tveit, P. (1992) Network Arches in Perspective Guest Lecture held at the technical Universities in Prague and
Vienna, March 1986. Published by Agder College of Engineering, Norway. Report 2/92 ISSN 0801-6313,
36 pages.
Tveit, P. (1996) Wie konstruiert man die schlankste und leichteste Bogenbrcke der Welt - Ein Vortrag ber
Netzwerkbgen. (How to design the lightest and most slender arch bridge in the world. A lecture on
network arches. In German.) Hgskolen i Agder, 1995. Publication series no. 2. ISSN: 0806-5942.
ISBN: 82-7117-301-4. 24 pages.
Tveit, P. (1996) Design of a submerged floating tube with a free span of 1750 m. Proceedings of an International
Conference on Submerged Floating Tunnels. Sandnes, Norway 29 th to 30th of May, 1996. Norwegian
Public Roads Administration. 67 pages.
Tveit, P. (1999a) Comparison of Steel Weights in Narrow Arch Bridges with Medium Spans. A Note on the
Optimal Design of Network Arches. Published by Agder University College. Publication Series No. 47. 8
pages. ISSN: 0806-5942 ISBN: 82-7117-378-2.
Tveit, P. (1999b) Netvrksbuer en interessant brotype. Foredrag i Kbenhavn , Gteborg og NTNU. March 1999.
(Network arches an interesting type of bridge. Lectures in Copenhagen, Gothenburg and NTNU. March
1999). Published by Agder University College 1999. 30 pages. ISSN: 0806-5942, ISSN: 0806-5942, ISBN:
82-7117-394-4.
99
Tveit, P. (1999c) Comparison of Steel Weights in Narrow Arch Bridges with Medium Spans. Stahlbau 68 (1999),
Heft 9, Berlin, pp. 753-757
Tveit, P. (2000) A bridge suitable for India? ICI journal, Indian Concrete Institute. Vol. 1, April June 2000 no.1,
pp. 7-10.
Tveit, P. (2000) The Network Arch - A bridge for China. Steel Construction. 2000.4. Vol. 15 No.50 ISSN 10079963 CN 11-3899/TF. pp. 57-59
Tveit, P. (2001) How, Why and Where for the Network Arch, the Worlds Most Slender Arch Bridge.
Contribution to ARCH01. Third international arch bridge conference. pp. 161-167. ISBN 2-85978-347-4.
Tveit, P. (2002) Optimal design of network arches. Contribution to the IABSE Symposium in Melbourne 2002.
13 pages. ISBN 3-85748-107-2
Tveit, P. (2003) Erection of Optimal Network Arches Contribution to 8 th International Conference on Innovation
and Planning, Design and Construction Techniques in Bridge Engineering. Organised by: Indian
Institution of Bridge Engineers. 26-27 April, 2003. Hyderabad, India. Vol.1 pp. 1-27
Tveit, P. (2003b) Competitive Design of Network Arches. In: Structural Research. Anniversary volume
honouring Pter Lenkei. Brsony, J. Ed. Pollack Mihly Faculty of Engineering. Pcs University, Hungary.
pp. 225-233.
Tveit, P. (2004) Introducing the Optimal Network Arch. Bridges in the Danube Basin. Procedings of the 5th
International Conference on Bridges across the Danube 2004. Novi Sad/Serbia & Montenegro/ 24 26
June 2004. Bratislav Stipanic. Ed. Pub. by Euro Gardi Group, Rumenacka 17, Novi Sad. pp. 257-266
Tveit, P. (2004a) Reduce Costs by Building Optimal Network Arches Keynote lecture at Arch Bridges IV,
Barcelona, Nov. 2004. Advances in Assessment, Structural Design and Construction. P. Roca and C.
Molins (Eds.). pp. 26-37. ISBN: 84-95999-63-3
Tveit, P. (2004b) Network arches for road bridges. Co-authors: Wolfgang Grae, Stephan Teich, Stephan
Wendelin. Arch Bridges IV, Barcelona, Nov. 2004. Advances in Assessment, Structural Design and
Construction. P. Roca and C. Molins (Eds.). pp. 681-690. ISBN: 84-95999-63-3
Tveit, P. (2004c) Erection of network arches. Co-authors: Mathias Rck, Frank Schanack. Arch Bridges IV,
Barcelona, Nov. 2004. Advances in Assessment, Structural Design and Construction. P. Roca and C.
Molins (Eds.). pp. 661-670. ISBN: 84-95999-63-3
Tveit, P. (2004d) Optimal Network Arches for Rail and Road Bridges. 9 th International Conference on Current
Trends in. Aqueducts, Road, Rail and Marine Bridges, 20-22 December 2004. Hyderabad, India.
Organised by: Indian Institution of Bridge Engineers. pp.185-195.
Tveit, P. (2005) Optimal Network Arches Save 50 to 75 % of the Steel. IABSE Conference New Delhi, India
2005. Role of Structural Engineers towards Reduction of Poverty. ISBN 3-85748-111-0. pp. 401-408
Tveit, P. (2005a).Optimal Network Arches for Road and Rail Bridges. 4th International Conference on New
Dimensions in Bridges, Flyovers, Overpasses & Elevated Structures. 24 25 October, 2005, Fuzhou,
China. ISBN: 981-05-3551-1. pp. 281-288.
Tveit, P. (2006) Optimal Network Arches for Coastal Regions. International conference on bridges, Dubrovnik,
May 2006. pp. 721-728. ISBN953-95428-0-4
Tveit, P. (2006b) Nettverkbroer, en effektiv kombinasjon av stl og betong. (Network arches an efficient
combination of steel and concrete. In Norwegian). Stlbygnad , Stockholm, No. 2. pp 33-35. ISSN 14049414
Tveit, P. (2007) Visit to the Steinkjer network arch 44 years later. ARCH07, 5th International Conference on
Arch Bridges. Madeira, 12-14 September 2007. pp. 305-314, University of Minho. Portugal. ISBN: 978972-8692-31-5
Tveit, P. (2007). An Introduction to the Optimal Network Arch. Structural Engineering International 2/2007,
Journal of the International Association for Bridge and Structural Engineering (IABSE) pp.184-187. ISSN
1016-8664, E-ISSN 1683-0350
Tveit, P. (2008) The Network Arch and How to Erect it. Zabljak, Montenegro March 070308. ISBN 978-8682707-14-1. pp. 361-368
100
Tveit, P. (2008a) Concrete in the Optimal Network Arch. Proceedings of The International FIP Symposium 2008,
Amsterdam, The Netherlands, 19-21 May 2008. ISBN 978-0-415-47535-8. pp. 164
Tveit, P. (2008b) About The Network Arch. This is a lecture that IABSE has asked the author to give for a group
of lectures that can be found at http://elearning-iabse/l20 Can also be found at the authors home page
http://home.uia.no/pert under the button My Publications.
Tveit, P. (2008c) India Needs Network Arches National Seminar on RECENT ADVANCES AND FUTURE
TRENDS IN DESIGN AND CONSTRUCTION OF BRIDGES 11-13 July, 2008 Hyderabad, India.
pp.29-46. Published By The Indian Institution of Bridge Engineers, 9, Gr. Fl. Greenfield CHS, Off
Sitaladevi Tempel Road, Matim, Mumbai-400 016.
Tveit, P. (2008) Concrete in the optimal network arch. Tailor Made Concrete Structures Walraven & Steelhorst
(eds) p.163 ISBN 978-0-415-47535-8
Tveit, P. (2008d) The Network Arch In the home page http://home.uia.no/pert under the button The Network
Arch.
Tveit, P. (2009d) Om nettverkbogar fr annan publikasjon
Tveit, P. (2009c) A Systematic Thesis on Network Arches . Same home page as above.
Tveit, P. (2009a) Efficient Utilisation of Optimal Network Arches. Proceedings of the fifth Sumposium on Strait
Crossings, Trondheim, Norway June 21-24, 2009. ISBN 978-82-92506-69-1 pp. 509-514.
Tveit, P. (2009b) Genesis and Development of the Network Arch Concept NSBA World steel Bridge
Symposium. San Antonio, Texas. November 17-20, 2009.
Tveit, P. (2009) India Needs Network Arches. Civil Engineering & Construction Review. August 2009. pp. 50-60
Tveit, P. (2010) Optimal Network Arches For Road and Rail Bridges Proceedings of the 6 th International
Conference on Arch Bridges. Fuzhou, Fujian, China. October 11-13, 2010. pp. 271-278. ISBN 978-9537621-10-0.
Tveit, P. and Pipinato, A. University of Padoa (2011) Il progretto di Ponti di tipo network-arch. (The network-arch
bridge design in Italian) Costruzione Matalliche. Mar/Apr 2011, Pp 47-56. ISSN n 0010-9673.
Tveit, P. (2014) The Network Arch. Bits of Manuscript in March 2014 after Lectures in 50 Countries. Can be
found at http://home.uia.no/pert/ under the button The Network Arch. Will be updated as long as the
author is active.
Union International des Chemins de Fer. (1974) Loading diagram to be taken into consideration for the calculation
of rail-carrying structures on lines used by international services. UIC code 702V, 2. ed. 1974.
Vejdirektoratet (1974) (Directorate of Highways) Beregnings- og belastningsforskrifter for vejbroer. (Rules for
Calculations and Loads for Road Bridges.) May 1974, Copenhagen, Denmark.
Wollmann, G., Zoli, T. and Shook, J. (2005) Design of Tied Arch Bridge Across Ohio River and Blennerhassett
Island Proceedings, 22nd Annual International Bridge Conference, Pittsburgh, PA, June 13-15.
Wollmann G, et al. (2007) Construction of Tied Arch Bridge Across Ohio River and Blennerhassett Island
Proceedings, 24th Annual International Bridge Conference, Pitsburgh, Pennsylvania, June 4-6
Wollmann, G. and Zoli, T. (2008) Bridge Across Ohio River and Blennerhassett Island Structural Engineering
International 1/2008., Number 1, February 2008. pp. 28-30.
Yoshikava, O. et al. (1993) Construction of the Shinamadera Bridge Stahlbau 63 (1993), Heft 5, pp.125-136.
Zoli, T. and Woodward, R. (2005) Design of Long Span Bridges for Cable Loss. IABSE Symposium, Structures
and Extreme Events, September 14-17, Lisbon, Portugal.
Zoli, T. and Steinhouse, J. Some Considerations in the Design of Long Span Bridges against Progressive
Collapse. 23nd US- Japan Bridge Engineering Workshop (11/2007).
http://www.pwri.go.jp/eng/ujnr/tc/g/pdf/23/23-2zoli.pdf
towski, K. (2005) Bogenbrcke ber den Flu in Wolin Entwurf und Realisierung. Stahlbau 2005, Heft 9,
pp. 685-690.
Zwingmann. B., Schanack, F. and Marx. S. (2009) Asymetrische Netzwerkbogenbrcken. (Asymetric Network
Arches.) Stahlbau 2009 Heft 7. pp. 471-476.
101
Principal contact
Universiteit Gent
Bundesanstalt fr Straenwesen
Brderstrae 53, Bergisch Gladbach
Universitt Stuttgart
University of Pisa
Fachhochschule Potsdam
TU Hamburg-Harburg
50 countries where the author has given lectures on network arches by the end of 2010.
Norway, Finland, Sweden, Denmark, Russia, Poland, Germany, Holland, Luxemburg, Belgium, France,
England, Spain, Portugal, Switzerland, Austria, Czech Republic, Slovakia, Hungary, Romania, Bulgaria,
Serbia, Montenegro, Kosovo, Macedonia, Croatia, Turkey, Greece, Italy, Egypt, Pakistan, India,
Bangladesh, China, Taiwan, the Philippines, Vietnam, Thailand, Malaysia, Singapore, Indonesia,
Australia, New Zealand, Chile, Argentina, Brazil, Peru, Mexico, the USA, Trinidad and Canada.
102
Deflection
28,29k,42,44,49b,67,73,74,85,89,91,92
Design 1,2,3,5a,9,13, 16,17,18,
20,21,22,26,27,29i
29e,30a,30b,31,32,43,48,49b,55,56,06,73,9294a,94b
Economy 3,22,43,93a-93c
For Vienna 2,5a,8,13,21,29j,59-72
Japanese 5,18,55a
Made of concrete 1,2,40-43
Maintenance 7,22,30a,93a,
Norwegian 1,2,3,5a-10,21,22,25,28,29e,30b,44,
56-58,93a,94
Preliminary design 2,5,21,26,29i,94b
Slenderness 1,7,9,23,24,27,29,29i,68.92a.94
Strengthening 15,43,96
Vibrations 22,23,2494
Nielsen Bridges 2,18,22,55,55a,96
Placing of nodes 1,5,8,26,27,29i,29j
Pontoons 1,12,15,20,26,40,41,42
Prestress 1,5,7,26,30b,31,42,48,50,92a,93a,93
Cables 1,7,7a,10,12,
20,29k,30a,32,48,50,55,74,92a
Ramps 1,9,31,30a
Railings 6,11,25,43,54,93b
Railway bridges 1,2,23,29a,29i,31-34,42,96,97
Rise of arch 1,5,7,13,26,28,29,29i,92a,93b,94
Rdby-Puttgarden 40-43
Serviceability limit state 5a,29i,32,50
Simple details 1,11,26,93a,93b
Skodje Bridge 2,7,20-21,30a,50-55
Steel
Prestressing steel 7,32,93
Price 11,12,26,92a
Saving 1,2,8,14,17,26,31,32,46
Skeleton 1,2,12,15,16,20,21,26,
29k,30,30a,30b
50-53,74
Strength (quality) 1,5,10,26,32,74,93,94a
Surface 10,26,93a
Weight
1,7,8,9,10,11,12,14,16,19,22,26,31,32,64,68
73,93,93a,93b,95,96,97
Other steel items 4,7, 7a,
11,12,15,16,20,21,22,23,26
30,30a,30b,31,32,40,4142,43,44,46,55,73,92a,93
93a,93b,94,94a
Steinkjer Bridge 5a-7,21,25,29e,29i,29j,56-57,94a
Stiffness
Related to erection by temporary lower chord
12,29k
Related to relaxation of hangers 26,29a,29i
Other stiffness of network arches 13,14,
24,26,42,44
45,48,49a,56,73,74,87
103
104