Project
Ref. : 2120/4145/HOTEL
Design, Supply and Installation of Linen Chute at Venetian (Macau)
JEC Ref.
MS/05
Date
Submission No.
Revision: 0
MS/05
statement
Ref. : 2120/4145/HOTEL
Design, Supply and Installation of Linen Chute at Venetian (Macau)
JEC Ref.
MS/05
Date
Revision: 0
CONTENT
A.
statement
Ref. : 2120/4145/HOTEL
Design, Supply and Installation of Linen Chute at Venetian (Macau)
JEC Ref.
MS/05
Date
Revision: 0
A.
A.1.
A.2.
A.3.
A.4.
B.
B.1.
Preparation
B.1.1
B.1.2
B.1.3
statement
Ref. : 2120/4145/HOTEL
Design, Supply and Installation of Linen Chute at Venetian (Macau)
JEC Ref.
MS/05
Date
Revision: 0
B.2.
B.2.1
B.2.2.
B.2.2.
B.3.
Installation
B.3.1.
B.3.2.
B.3.3
B.3.4.
Infill the floor slab and erect enclosure wall around the chute
by others.
B.3.5.
B.3.6.
File : MS05-Method
statement
Ref. : 2120/4145/HOTEL
Design, Supply and Installation of Linen Chute at Venetian (Macau)
JEC Ref.
MS/05
Date
Revision: 0
B.3.8.
B.3.9.
B.3.10. Install the master control panel on the Linen discharge floor
level just next to the discharge door.
B.3.11.Testing and Commissioning for the electric interlock
communication and door lock control chute cleansing device
and disinfectant & sanitizing unit under the JEC submitted
T&C procedure after completion of chute installation.
C.
C.1.
C.2.
C.3.
C.4.
statement
Ref. : 2120/4145/HOTEL
Design, Supply and Installation of Linen Chute at Venetian (Macau)
JEC Ref.
MS/05
Date
Revision: 0
C.5.
C.6.
C.7.
C.8.
statement