Steilyturvakeskus (STUK)
RAD WASTE
MANAGEMENT FUNDING
Nuclear waste fund
managed by TEM
11/5/2013
11/5/2013
KBS-3V
28.06.2010
KBS-3H
5
Legal requirements
& other constraints
Safety assessment
System understanding
Site
Waste streams
FEPs
Disposal
method
Design &
technical development
Safety case
Site characterisation,
design & technical
development
11/5/2013
Next stage
6
TURVA-2012
Synthesis
Site Description
TURVA -2012
Biosphere Description
Design Basis
Production Lines
Description of the Disposal System
Features, Events and Processes
Performance Assessment
Formulation of Radionuclide Release Scenarios
Models and Data for
the Repository
System
Biosphere Assessment
Data Basis
Biosphere Assessment
Complementary Considerations
11/5/2013
10
11/5/2013
11
11/5/2013
13
11/5/2013
14
- 80 m: Decommissioning
Waste Repository (Large
Scale Components)
- 195 m: Low &
Intermediate Level Waste
(LILW) Repository
- 315 m: Underground
Research Laboratory
(URL) and Demonstration
Tunnels
Oversized
Access Tunnel
Shafts &
Connections
Technical Rooms
& Vehicle Parking
Saanio & Riekkola, 16.9.2013
11/5/2013
19
20
Thank you!
Contact:
Timo Saanio
Vice President
timo.saanio@sroy.fi
tel. +358 09 566 6500 (office)
+358 40 506 5671 (mobile)
11/5/2013
21
www.posiva.fi
13
www.posiva.fi
www.posiva.fi
12
Founded 1962
Main office in Helsinki, Finland
Branch office in Seoul, South Korea
ISO 9001:2008 quality management
system
11/5/2013
25
Olkiluoto LILW
CONTROL
BUILDING
TRANSPORT TUNNEL
SHAFT
RESEARCH
TUNNEL
HALL
MEDIUM LEVEL
WASTE
CONSTRUCTION TUNNEL
EXPERIMENTAL
DEPOSITION HOLES
LOW LEVEL
WASTE
11/5/2013
WASTE
SILOS
26
Forsmark HLW
11/5/2013
27
11/5/2013
28
Wolsong LILW
11/5/2013
29
Underground
Facilities
Nuclear
Waste
Management
Mining
11/5/2013
30