Вы находитесь на странице: 1из 1

Claim settlement

Flood claim - an update


even on 3rd & 4th August, Allianz team worked at a furious pace to
2004 making it difficult to ensure that the claims payments were
gain an approach to any of released as early as possible. This was
the affected areas. This has absolutely necessary so that the clients could
led to loss of 128 humans get back to work in the earliest possible time.
and several animals.
The status of claims reported and
In a proactive approach, payments made by Bajaj Allianz as on
Bajaj Allianz immediately September 30, 2004 is as under:
rushed a team from the Particulars Nos.
Flood is a major risk that affect many parts of Mumbai Regional Office on August 4, 2004
Total claims reported 227
our countr y and is a worldwide and got in touch with the clients based in the
affected area. The team was given a clear Claims paid full 104
phenomenon. Countries all over the world,
experience the wrath of nature in the form of mandate to survey and assess the loss based Partial Payments made 18
cyclones, hurricanes and typhoons. Recently, on the situation on the ground, assist in Claims withdrawn 36
a hurricane christened Charley, the most documentation formalities so as to ensure
powerful storm to strike the US since 1992, speedy settlement of claims with the
killed at least 16 and left millions homeless minimum of inconvenience to the insured. Precautions
when winds of 140 miles per hour hit the However there are some loss control
The team returned to Mumbai on August6, measures which can be taken to minimise
southwest Florida coast. Losses due to the
2004 and the first on account payment flood losses. They are:
recent Hurricane Ivan, which stormed the
started rolling out from August 8, 2004 n As far as possible, the godown should be
Caribbean region late September, are yet to
within a week of the loss having taken place. selected in such a location where the
be ascertained. As the people across the
Claims reported from Silvassa alone surrounding road level is lower than the
region pick themselves up from the
estimated were to the tune of Rs.14 Cr. On ground level of the place where the
devastation, another storm Jeanne wreaked
August 8, 2004, we had disbursed approx Rs. building is located.
havoc in Dominican Republic of Haiti and
2 Cr as on-account payments to various n Building should have good plinth
South Eastern coast of Florida.
parties. height, a minimum of 2 ft.
The fury of floods causes losses to property
The devastation story repeated itself in n If the complex has a compound wall and
and lives besides infrastructure facilities like
Northern India when incessant rain hit gate, the road level at gate should be
roads, bridges and communication facilities.
Chandigarh, Bhilwara, Jaipur, Kota etc. Water higher than road level outside the
It is therefore naturally prudent to have
levels reached heights of 10 to 12 feet complex.
adequate insurance cover for such risks that
resulting in extensive damage to factory n Storage inside the building should be
man has no control over nor any known
buildings including machines and stocks done at a higher level, preferably at a
means to avert. Insurance is the only form of
lying therein. Electricity supply was disrupted height of 1-2 ft depending upon the
protection that is known to man and can at
for over a week, which further aggravated the nature of susceptibility of the items
least recover the losses monetarily.
situation preventing emergency measures against water.
Recently, the heavy and incessant rains on and loss prevention activity, most equipment n Any items which are susceptible to water
1st & 2ndAugust 2004, coupled with opening and stocks were under water for nearly 18 damage should not be stored in the
up of the floodgates of Madhubani Dam at hours. open during the monsoons .
Upper Silvassa, the entire area covering n Basement storage should be avoided. If
Closer inspections of the site after the event
approx. 20 Kms radius in Dadra & Nagar basement occupancy cannot be done
showed extensive damage to stocks and
Haveli and Silvassa were flooded and away with, it should be provided with
extensive rusting to machinery. In some
inundated. Continuous rain in the Gujarat dewatering pumps which could operate
cases, equipment and material were swept
region also inundated various areas of Surat in the event of a water logging, to pump
away from the original site by nearly 15 to 20
and nearby areas. All approach roads to out the all the excess water.
meters away from the original site.
Silvassa and Dadra & Nagar Haveli were n The complex should be provided with
closed due to damage to bridges and After the storm calmed and when everything good storm water drains which should
washing away of roads. Heavy rain continued was gradually returning to normal, the Bajaj be cleaned regularly.

NEWSTRACK JUL.-AUG. 2004 3

Вам также может понравиться