Вы находитесь на странице: 1из 1

CONTRACT # GTC/144B/2006

QATAR POWER TRANSMISSION SYSTEM EXPANSION


PHASE VIII SUBSTATIONS (PACKAGES S-2-2 & S-4-1)
WEEKLY PROGRESS REPORT
1.1

THREE WEEK LOOK AHEAD SCHEDULE

66/11kV AL-KHISSA CENTRAL SUBSTATION


STATUS UP TO LAST WEEK
CIVIL WORKS

Battery Room & LVAC/ DC Room Final


Painting
HVAC/ Transformer Fire Wall Final
Painting Surface Preparation
Around the Substation Gravel Filling
Store Room Final Painting Work
Stair Case 13 Final Painting Surface
Preparation Work
First Floor HVAC Duct Area Fire Sealant
Work
Boundary Wall Internal Painting work
Basement Terrazzo Tiles Fixing

WEEK 1:June 10 ~ June17 , 2010

GIS Room Final Painting


HVAC/ Transformer Fire Wall Final
Painting
Transformer Area Gravel Filling
Telecom Final Painting Work
Stair Case ,2&3 Final Painting Work
First Floor HVAC Duct Area Fire Sealant
Fixing
Boundary Wall External Surface
Preparation for painting work
Lobby Final Painting Work

WEEK 2: June 18 ~ June 25, 2010

WEEK 3: June 26 ~ July 2, 2010


Basement Surface Preparation & Final
Painting Work
Basement Skirting Work

Switch Gear Room Surface


Preparation & Final Painting
Control & Relay Room Final Painting
Work
Steel Door Final Painting
Stair Case -1 Final Painting Work

Cable Rise r Duct &HVAC Duct Final


Painting Work

Boundary wall External Final Painting


Work
Main Gate Fixing Work
Kerb Stone Painting Work

Embankment Work outside boundary


wall

HVAC Duct & Damper Works


Wiring in Distribution Panels
Laying of 11KV Outgoing Feeder
Cables
FW Pump House Cables& Wiring
Erect HVAC Equipment
Guard House Cables & Wiring
Testing of Electrical Equipment
Fire sealant and bentonight filling
TESTING AND COMMISIONING OF
GURAD ROOM AND PUMP ROOM
Testing and commissioning of HVAC
SYETEM

MEP & ELECTRICAL WORKS

HVAC Duct & Damper Works


Wiring in Distribution Panels
Continuity testing of LV & Control Cables
Deluge system cabin installation
Plumbing Piping & Fixtures
Potable Water Piping & Fixtures
FW Pump House Cable & Wiring
Install Exhaust & Extract Fans
FM 200 System Panels & Wiring
Testing of Electrical Equipment
11 kV cable laying and clamping

Our Ref : PH8-IISA-4B-LTR-09-0705

HVAC Duct & Damper Works


Wiring in Distribution Panels
Continuity testing of LV & Control
Cables
Plumbing Piping & Fixtures
FW Pump House Cable & Wiring
Potable Water Piping
Guard House LV Wiring
FM200 System Panels & Wiring
Testing Electrical Equipment
11 kV cable laying and clamping

HVAC Duct & Damper Works


Wiring in Distribution Panels
Laying of 11KV Outgoing Feeder
Cables
FW Pump House Cable & Wiring
Guard House Cable & Wiring
Testing of Electrical Equipment
Erect HVAC Equipment
Outdoor earthing
Fire sealant and bentonight filling
Testing and commissioning of
LIGHTING and SMALL POWER
Testing and commissioning of DELUGE
system

Date : 11th November 2009

Page