Академический Документы
Профессиональный Документы
Культура Документы
Objective:
To become a part of result oriented and successful team involved in innovative and implementing new ideas and
technologies in tune with the quality standard.
Strength:
Professional Experience:Experience & Field:8years 6 Months in Fabrication and Erection of steel structural.
Since 2014 Julyto till date working as a Manager Estimation at M/s Capacite Structures Ltd.
Nature of work:
Study the tender documents and decision making for further proceeding
Taking key points for estimation like Raw material type & grade, type of consumables,
equipments requirement.
Since 2012Novto July 2014worked as a Senior Lead Engineer forM/s FLSmidthPvt Ltd. In Chennai
FLSmidth House (HO).
Nature of work:
Prepared contract document for contractors based on client contract agreement, Involves Scope
of work, Schedule of Rates, Technical, commercial terms and conditions.
Cost analysis (Estimation) for project, (Shop fabrication, Erection of steel structures and
equipments, conveyor belt vulcanizing, thermal insulation, equipment hiring, painting and site
fabrication).
Scrutinize the rates receives from contractors whether reasonable cum acceptable or not.
After finalizing the contractor, preparing and Issuing LOI and Work order to contractors.
Since 2011 Decto 2012 Novworked as an Execution (site) Engineer for M/s Afcons Infrastructure Ltd.
For Chennai Metro Rail Project in Chennai.
Client: - Chennai Metro Rail Ltd
Design: - TranstonnelStory (Russia)
Cost: - 2800 Crores
Nature of work:
Fabrication & Erection of Struts, Wallers,Plunged -in-columns & its supporting items for
stations (3500 MT)
2009Nov to 2011 DECworked asan Execution Engineer for M/s Afcons Infrastructure Ltd. in Worlds
Highest Bridge Project for Konkan railway Corporation limited in Jammu
Assisting with foreigner for Erection of 58mm and 54mm steel cables between distances of
1000 MTR
Pylon bolts (10.9 Gr) inspection carried out with SEIK-Austrian inspector
2007 Nov to 2009 Novworked as an Execution (site) Engineer for M/s Afcons Infrastructure Ltd. in
Asias largest shipyard at Gujarat forPipavav shipyard Limited.
Client: - Pipavav Shipyard Ltd.
Nature of work:
Fabrication of Asias 2nd largest Goliath Crane (Girders, Pier leg & hinged legs) 148 MTR
length (1270 MT)
2006 June to 2007 Novworked as Execution Engineer for M/s Flakt Wood (India) Ltd. in Chennai
workshop.
Nature of work:
Fabrication of panels
Preparation of BOM
Estimation of various works (Shop fabrication, Erection of steel structures and equipments,
conveyor belt vulcanizing, thermal insulation, equipment hiring, painting and site fabrication).
Preparation of Micro Plan includes the utilization of Man, Materials and Machines
Subcontractors Billing
NEBOSH Level - II
Skills: