Sl. No.
Decription
A
Fly Ash System Below ESP Hopper (Pass-A&B)
1
Pneumatic panel for PD pump
Location
4
5
6
7
Compressor House
2
1
2
3
4
5
Silo-02
Date-15/04/2015
Work Status
Remarks on 15-04-15
&B)
Erection balance
4/16/2015
Erection balance
4/16/2015
Balance
4/18/2015
Balance
Pipe Erection & civil work under progress 02-05-15 (After civil clearance)
Cable laying Started
Cable laying Started
4/22/2015
4/22/2015
4/20/2015
4/20/2015
Not completed
4/16/2015
Erection pending
Not completed
ESP-2
ESP Paas-B
1
ERM at ESP top
2
ERM heater at ESP top
3
Transformer at ESP top
Transformer Insulator heater at
4
ESP top
5
Insulator Heater at ESP top
6
Guide vane for GD screen
8
9
10
11
Scarp Removal
Not Started
ESP-2
Remarks on 15-04-15
Mechanical
Mechanical
C&I
4/16/2015
4/16/2015
4/22/2015
C&I
4/22/2015
Electrical
Electrical
Electrical
4/22/2015
4/22/2015
4/22/2015
Electrical
4/22/2015
Electrical
Mechanical
4/22/2015
4/16/2015
4/20/2015
Mechanical
4/20/2015
Mechanical
C&I
4/20/2015
4/22/2015
C&I
4/22/2015
Mechanical
4/20/2015
Dated: 15-04-2015
Remarks
Steel structure not erected
from platform area to the BA
Slurry sump.
Remarks on 15-04-15
After civil clearance, mech
work completion period - 7
days
Erection of Hydraulic Pipe line along with Hose to the Bottom Doors
Hydraulic Cylinder
Front door & camera with vision glass
Erection of Vent air ducting from MAC Extractor to the Bottom Hopper.
Fit-up & Welding of Hopper Seal With MAC Extractor with Bottom
Flange.
Closing of all Openings With Proper Flanged Doors and Dummies for the
precrusher Inline Equipment / Contact Cooler.
8
9
10
11
Gear box & motor for MAC belt & spill chain
Gear box & motor for Primary crusher
O-chain
Post cooler conveyor
12
13
14
15
Erection of HP water line for the Mixing tank and Hydro ejector for Wet
ash Disposal of BA Silo.
B. Electrical Works
Cable Laying and Termination for the Bottom Door Hydraulic Control
1
Unit Motor
Erection of LPBS, Cable laying & Termination for the MAC Belt abd Spill
Chain, Pre-Crusher, Primary Crusher, O-chain, Postcooler Conveyor.
Charging of MCC Panel for the Bottom Door Hydraulic system, MAC Belt
abd Spill Chain,
Pre-Crusher, Primary Crusher, O-chain,
Postcooler Conveyor and also Cable laying & Termination for VFD
Panels.
C. Instrumentation Works
PLC Cable laying & Termination for the Bottom Door JB's & Cylinder
1
Limit Switches.
2
opper Unit # 2.
Dated: 15/04/2015
Work Status
Remarks on 15-04-15
Under progress
4/15/2015
Erection pending
4/16/2015
4/16/2015
Erection pending
4/16/2015
4/16/2015
4/16/2015
Not Completed.
4/16/2015
4/16/2015
4/16/2015
4/20/2015
4/20/2015
Not Completed.
4/25/2015
Not Completed.
4/25/2015
4/16/2015
4/20/2015
4/25/2015
4/16/2015
Not Completed.
4/25/2015
4/25/2015