Fly Ash Pending Work List for Unit#2

Sl. No.
Decription
A
Fly Ash System Below ESP Hopper (Pass-A&B)
1
Pneumatic panel for PD pump

Location

All PD Pump & Ash vessel blow valve orifice

All pneumatic instruments tubing


MS adopter fludising pads fabric cloths (Field-4th
Below ESP Hopper
to 9th)

4
5

Ash Conveying Pipe (from esp to fly ash silo)

6
7

level probe & RTD for ESP Hopper


All C&I work

ESP Root Blower

BTG & Fly Ash Compressor House

BTG Compressor ZR-160

Between ESP & ID


Fan

Compressor House
2

Fly Ash Compressor ZR-630

Fly Ash Silo


Fluidizing Air Line

1
2
3
4
5

Timer Card Panel for Bag Filter Purging at top of


silo

Solenoid for bag filter


RVF for Ash conditioner
RVF for Unloading spout
Ash conditioner Motor
Local panel for RVF, Unloading spout & ash
conditioner
Level probe & 3D scanner for Silo level

PLC operation for fly ash slurry system

Silo-02

Date-15/04/2015
Work Status

Remarks on 15-04-15

&B)
Erection balance

4/16/2015

Erection balance

4/16/2015

Balance

4/18/2015

Balance

Availability of matl to be checked

Pipe Erection & civil work under progress 02-05-15 (After civil clearance)
Cable laying Started
Cable laying Started

4/22/2015
4/22/2015

01No. Root Blower erection completed


out of 02 Nos. Blower Heater & Heater
panel erection also pending.

4/20/2015

01 No. Compressor balance for


commissioning
2 No. Compressor balance for
commissioning

Matl despatched. Expected on 2004-15.

Work under progress

4/20/2015

24-04-15 - Service engr required.

Fixing not started


No load trial completed
No load trial completed
Erection pending

Matl will arrive at site by 20-04-15


and will be commissioned with in
one or two days
4/20/2015
4/16/2015
4/16/2015
4/16/2015

Not completed

4/16/2015

Erection pending

Followup for the matl of sleeve


Service engr will arrive on 20-0415

Awaited for new timer card panel

Not completed

ESP Pending Work List for Unit#2


Date-15/04/2015
Sl. No. Decription
ESP Paas-A
1
ERM Shaft hammer
2
Guide vane for GD screen
3
level probe for ESP hopper
4

Location Work Status

ESP-2

level probe for ESP hopper

ESP Paas-B
1
ERM at ESP top
2
ERM heater at ESP top
3
Transformer at ESP top
Transformer Insulator heater at
4
ESP top
5
Insulator Heater at ESP top
6
Guide vane for GD screen

Tack welding not completed


Welding not completed
Cable laying started
04 Nos. erection balance
(Field1st&3rd)
Motor Termination balance
Cable laying not completed
Motor Termination balance
Cable laying started

ERM Shaft hammer

8
9

CRM Shaft hammer


level prober for ESP Hopper

Cable laying not completed


Welding not completed
Hammer erection work under
progress
Tack welding After completion of
erection
Tack welding not completed
Cable laying started

10

RTD for ESP hopper

04 Nos. erection balance (Field-9th)

11

Scarp Removal

Not Started

ESP-2

g Work List for Unit#2


Dept

Remarks on 15-04-15

Mechanical
Mechanical
C&I

4/16/2015
4/16/2015
4/22/2015

C&I

4/22/2015

Electrical
Electrical
Electrical

4/22/2015
4/22/2015
4/22/2015

Electrical

4/22/2015

Electrical
Mechanical

4/22/2015
4/16/2015
4/20/2015

Mechanical
4/20/2015
Mechanical
C&I

4/20/2015
4/22/2015

C&I

4/22/2015

Mechanical

4/20/2015

Punch points for ECO & APH Unit # 2


Dated: 15-04-2015
A. Mechanical Punch Points
Sl.No
Description
Status of Work
Erection of Structre for the ASH
Pipe line erected only at the
1
slurry transportation from ECO & APH
Platform area.
HOPPER to ASH Sump.

B. Instrumentation Punch Points


1

All C & I Work regarding the


instruments and Air line.

Not yet Started.

Dated: 15-04-2015
Remarks
Steel structure not erected
from platform area to the BA
Slurry sump.

Remarks on 15-04-15
After civil clearance, mech
work completion period - 7
days

After civil clearance, C&I


work completion period - 7
days

Pending Work of Bottom Ash Hopper Unit # 2.


Dated: 15/04/2015
Sl. No.
Description
A. Mechanical Works
1
Erection of Mechanical Seal between Boiler and BAH
Fitment of Vision Glass & flange at (+)6.0 m Elevation at East & West
2
Side of BAH

Erection of Hydraulic Pipe line along with Hose to the Bottom Doors
Hydraulic Cylinder
Front door & camera with vision glass

Erection of Vent air ducting from MAC Extractor to the Bottom Hopper.

Fit-up & Welding of Hopper Seal With MAC Extractor with Bottom
Flange.

Closing of all Openings With Proper Flanged Doors and Dummies for the
precrusher Inline Equipment / Contact Cooler.

8
9
10
11

Gear box & motor for MAC belt & spill chain
Gear box & motor for Primary crusher
O-chain
Post cooler conveyor

12

Structure erection for Post cooler conveyor

13

Wet Disposal & Dry Unloading equipment at Bottom of Silo


Platforms Structure @ (+)6.0m Elevation, (+)8.2m Elevation, and (+)
23.69m Elevation.

14
15

Erection of HP water line for the Mixing tank and Hydro ejector for Wet
ash Disposal of BA Silo.

B. Electrical Works
Cable Laying and Termination for the Bottom Door Hydraulic Control
1
Unit Motor

Erection of LPBS, Cable laying & Termination for the MAC Belt abd Spill
Chain, Pre-Crusher, Primary Crusher, O-chain, Postcooler Conveyor.

Charging of MCC Panel for the Bottom Door Hydraulic system, MAC Belt
abd Spill Chain,
Pre-Crusher, Primary Crusher, O-chain,
Postcooler Conveyor and also Cable laying & Termination for VFD
Panels.

C. Instrumentation Works
PLC Cable laying & Termination for the Bottom Door JB's & Cylinder
1
Limit Switches.
2

Installation of Zero Speed Switches, Micro Level Indicators, Level


Switches.

opper Unit # 2.

Dated: 15/04/2015
Work Status

Remarks on 15-04-15

Under progress

4/15/2015

Erection pending

4/16/2015

Pipe line Erection balance on front side.

4/16/2015

Erection pending

4/16/2015

Duct Connection at the MAC Extractor pending.

4/16/2015

Fit-up completed, Welding balance.

4/16/2015

Not Completed.

4/16/2015

Motor Erection Pending


Motor Erection Pending
Erection pending
Erection Under progress
Stairways & Handrailings at the Curved section not
completed.
Erection Balance.

4/16/2015
4/16/2015
4/20/2015
4/20/2015

Not Completed.

4/25/2015

Not Completed.

4/25/2015

Cable termination completed at Motor Side and


Pending at Panel Side.

4/16/2015

4/20/2015
4/25/2015

Not Completed. Platforms at the respective elevation


to be completed.

4/16/2015

Not Completed.

4/25/2015

Cable laying & Termination work completed at Far side,


4/16/2015
Balance at Front Side.
Not completed.