Petrofac

Petrofac International Limited


PROJECT:

Kashagan Development Experimental Program

TITLE :

Design Calculation for Two-Way Slab

DOCUMENT No.

DATE
28-05-2006

DESIGNED

JJX

CHECKED

SHEET

MNR

DESIGN OF TWO-WAY SLAB: (as per BS 8110:Part 1 - 1997)


1.0 GENERAL DATA:
Grade of concrete

25

N/mm2

Grade of reinforcement

390

N/mm2

Density of concrete

25

kN/m3

Clear cover to reinforcement

25

mm

Length of slab in shorter direction, l x

3500

mm

Length of slab in longer direction, l y

5500

mm

ly/lx =

1.571

< 2. Hence, the slab is two-way.

2.0 SIZE OF SLAB:

Thickness of slab

150

mm

Type of panel (Edge Condition)

= One short edge


discontinuous

3.0 LOADING:
3.1 Dead Load:
Self-weight of slab

3.75

kN/m2

Load due to floor finish

1.25

kN/m2

Load due to insulation, if any

0.5

kN/m2

Other loads, if any

kN/m2

Total dead load

5.5

kN/m2

7.5

kN/m2

1.5

kN/m2

Load factor for dead load

1.4

Load factor for live load

1.6

Load factor for snow load

1.6

Total design load, n

= 1.4 x 5.5 + 1.6 x 7.5 + 1.6 x 1.5

3.2 Live Load:


Live load on slab
3.3 Snow Load:
Snow load on slab, if any
3.4 Design Load:

22.1

kN/m2

Petrofac
Petrofac International Limited
PROJECT:

Kashagan Development Experimental Program

TITLE :

Design Calculation for Two-Way Slab

DOCUMENT No.
DESIGNED

JJX

Refer Clause 3.5.3.4 of BS 8110-1:1997.


Maximum design ultimate moments (for unit width),
for span lx,

msx = sx n lx2

for span ly,

msy = sy n lx2

Refer Table 3.14 of BS 8110-1:1997 for bending moment coefficients.

Bending Moment (kN-m/metre width)

X direction

Y direction

Location

Coefficient

Moment, kN-m

Support

0.059

msxS =

15.973

Mid span

0.044

msxM =

11.912

Support

0.037

msyS =

10.017

Mid span

0.028

msyM =

7.58

5.0 CALCULATION OF SHEAR FORCE AT EDGES:


Refer Clause 3.5.3.7 of BS 8110-1:1997.
Maximum design ultimate shear force (for unit width),
for span lx,

vsx = vx n lx

for span ly,

vsy = vy n lx

Refer Table 3.15 of BS 8110-1:1997 for bending moment coefficients.

Shear Force (kN/metre width)


Direction

X direction

Y direction

CHECKED

MNR

4.0 CALCULATION OF BENDING MOMENTS:

Direction

DATE
28-05-2006

Edge

Coefficient

Shear Force, kN

Continuous

0.479

vsxC =

37.051

Discontinuous

0.000

vsxD =

Continuous

0.360

vsyC =

27.846

Discontinuous

0.240

vsyD =

18.564

SHEET

Petrofac
Petrofac International Limited
PROJECT:

Kashagan Development Experimental Program

TITLE :

Design Calculation for Two-Way Slab

DOCUMENT No.

DATE
28-05-2006

DESIGNED

JJX

CHECKED

SHEET

MNR

6.0 DESIGN OF SLAB:


6.1 Design for Bending Moment:
Refer 3.4.4.4 of BS 8110:Part 1 - 1997

K' =

0.156

Moment redistribution ratio,

b =

Considering unit width of slab,

b=

1000

Minimum reinforcement required,

(no redistribution of moments)

mm

Astmin = 0.0013 x 1000 x 150


=

195

mm2

(0.13%, Refer Table 3.25


of BS 8110:Part 1 - 1997)

a) Calculation of Bottom Reinforcement in X direction:


Design Bending Moment

11.912

d=

120

K=

Mu/bd fcu

kN-m
mm

0.033

(Compression reinf. is not required)

z = d {0.5 + sqrt(0.25 - K/0.9)}


=

114

(zmax = 0.95d)

mm

Ast = Mu/(0.95 fy z)
=

283

mm2

Astreq =

283

mm2

Diameter of reinforcement

10

mm

Required spacing of reinforcement

277

mm

Maximum spacing of reinforcement allowed

= 70000 b/fy + dia. of bar

Refer 3.12.11.2.3 of

BS 8110:Part 1 - 1997

Comparing with Astmin,


Area of reinforcement required

190

Provide 10 T @ 175 mm c/c (at the bottom of slab along X direction).


Area of reinforcement provided,

Astprovided =

Hence, percentage of reinforcement provided

449
0.299

mm2
%

b) Calculation of Bottom Reinforcement in Y direction:


Design Bending Moment

7.58

kN-m

d=

111

mm

K=

Mu/bd2 fcu

0.025

(Compression reinf. is not required)

Petrofac
Petrofac International Limited
PROJECT:

Kashagan Development Experimental Program

TITLE :

Design Calculation for Two-Way Slab

DOCUMENT No.

DATE
28-05-2006

DESIGNED

JJX

z = d {0.5 + sqrt(0.25 - K/0.9)}


=

105.45

CHECKED

SHEET

MNR
(zmax = 0.95d)

mm

Ast = Mu/(0.95 fy z)
=

195

mm2

Astreq =

195

mm2

Comparing with Astmin,


Area of reinforcement required
Diameter of reinforcement

mm

Required spacing of reinforcement

257

mm

Maximum spacing of reinforcement allowed

= 70000 b/fy + dia. of bar

Refer 3.12.11.2.3 of

BS 8110:Part 1 - 1997

188

Provide 8 T @ 175 mm c/c (at the bottom of slab along Y direction).


Area of reinforcement provided,

Astprovided =

287

Hence, percentage of reinforcement provided

mm2

0.191

15.973

kN-m

c) Calculation of Top Reinforcement in X direction:


Design Bending Moment

=
d=

120

K=

Mu/bd2 fcu

0.044

mm

(Compression reinf. is not required)

z = d {0.5 + sqrt(0.25 - K/0.9)}


=

113.81

(zmax = 0.95d)

mm

Ast = Mu/(0.95 fy z)
=

379

mm2

Astreq =

379

mm2

Diameter of reinforcement

10

mm

Required spacing of reinforcement

207

mm

Maximum spacing of reinforcement allowed

= 70000 b/fy + dia. of bar

Refer 3.12.11.2.3 of

BS 8110:Part 1 - 1997

Comparing with Astmin,


Area of reinforcement required

190

Provide 10 T @ 175 mm c/c (at the top of slab along X direction).


Area of reinforcement provided,

Astprovided =

Hence, percentage of reinforcement provided

449
0.299

mm2
%

Petrofac
Petrofac International Limited
PROJECT:

Kashagan Development Experimental Program

TITLE :

Design Calculation for Two-Way Slab

DOCUMENT No.

DATE
28-05-2006

DESIGNED

JJX

CHECKED

SHEET

MNR

d) Calculation of Top Reinforcement in Y direction:


Design Bending Moment

10.017

d=

111

K=

Mu/bd2 fcu

0.033

kN-m
mm

(Compression reinf. is not required)


(zmax = 0.95d)

z = d {0.5 + sqrt(0.25 - K/0.9)}


=

105.45

mm

Ast = Mu/(0.95 fy z)
=

257

mm2

Astreq =

257

mm2

Comparing with Astmin,


Area of reinforcement required
Diameter of reinforcement

mm

Required spacing of reinforcement

195

mm

Maximum spacing of reinforcement allowed

= 70000 b/fy + dia. of bar

Refer 3.12.11.2.3 of

BS 8110:Part 1 - 1997

188

Provide 8 T @ 175 mm c/c (at the top of slab along Y direction).


Area of reinforcement provided,

Astprovided =

Hence, percentage of reinforcement provided

287

mm2

0.191

6.2 Check for Shear Stress:


Refer 3.5.5 of BS 8110:Part 1 - 1997.
Maximum shear force, V

37.051

kN

Average effective depth, d

115.5

mm

Design shear stress, v

V/bd

0.321

N/mm2

Refer 3.5.5.2 of BS 8110:Part 1 - 1997.


Maximum allowable shear stress

0.5
2
= 0.8 (fcu) or 5 N/mm , whichever is less

=
Refer Table 3.8 of BS 8110: Part 1 - 1997.

N/mm2

Hence Ok.

Petrofac
Petrofac International Limited
PROJECT:

Kashagan Development Experimental Program

TITLE :

Design Calculation for Two-Way Slab

DOCUMENT No.

DATE
28-05-2006

DESIGNED

CHECKED

JJX

Design concrete shear stress, c

1/3
1/4
= 0.79 {100 As/(bv d)} {400/d} /m

Factor for characteristic strength of concrete

(fcu/25)1/3

100 As/bv d =

0.191

{400/d}1/4 =

1.364

m =

1.25

c =

0.496

Partial safety factor for material

2
where, fcumax = 40 N/mm

(without shear reinforcement)


(Refer 2.4.4.1 of BS 8110:Part 1 - 1997)

N/mm2

Shear stress is less than the design concrete shear stress, hence Ok.

6.3 Check for Deflection:


Refer 3.5.7 of BS 8110:Part 1 - 1997.
lx/dx =

Span/effective depth,

3500/120
29.167

Refer Table 3.9 & Cl. 3.4.6.4 of BS 8110: Part 1 - 1997.


Basic span/effective depth ratio

26

(Continuous Support)

Refer equations 7 & 8 of BS 8110: Part 1 - 1997.


= 0.55 +

Modification factor for tension reinforcement

(477 - f s)

<2

120 [0.9 + M/bd ]


2

fs =

Design service stress,

2 fy As req

3 As prov

Refer 3.4.6.2 of BS 8110: Part 1 - 1997.


As no redistribution of moment is done, b

fs =

163.88

Mu/bd2 =

0.827

Modification factor for tension reinforcement

N/mm2

Refer equation 9 of BS 8110: Part 1 - 1997.


Modification factor for compression reinf.

= 1 + 100A's prov/bd

< 1.5

3 + 100A's prov/bd
=
Hence, modified span/effective depth ratio

1.091

= 2 x 1.091 x 26
=

56.732

SHEET

MNR

> 29.167, hence Ok.

Petrofac
Petrofac International Limited
PROJECT:

Kashagan Development Experimental Program

TITLE :

Design Calculation for Two-Way Slab

DOCUMENT No.
DESIGNED

JJX

Description

CHECKED

MNR

CONTENTS

S. No.

DATE
28-05-2006

Page No.

1.0

General Data

2.0

Size of Slab

3.0

Loading

3.1 Dead Load

3.2 Live Load

3.3 Snow Load

3.4 Design Load

4.0

Calculation of Bending Moments

5.0

Calculation of Shear Force at Edges

6.0

Design of Slab

6.1 Design for Bending Moment

6.2 Check for Shear Stress

6.3 Check for Deflection

SHEET

Petrofac
Petrofac International Limited
PROJECT:

Kashagan Development Experimental Program

TITLE :

Design Calculation for Two-Way Slab

DOCUMENT No.

DATE
28-05-2006

DESIGNED

JJX

CHECKED

MNR

SHEET

Petrofac
Petrofac International Limited
PROJECT:

Kashagan Development Experimental Program

TITLE :

Design Calculation for Two-Way Slab

DOCUMENT No.

DATE
28-05-2006

DESIGNED

JJX

CHECKED

MNR

SHEET

Вам также может понравиться