Академический Документы
Профессиональный Документы
Культура Документы
Complied
With
Not Complied
With
Not
Applicable
Species
4.1.2
CSC CH-LIST OS
01/09/2014 at 7:58 AM
Page 1 of 5
Complied
With
Not Complied
With
Not
Applicable
Nos
CSC CH-LIST OS
01/09/2014 at 7:58 AM
Page 2 of 5
5.3
5.4
5.5
5.6
5.7
5.8
5.9
Complied
With
Not Complied
With
Not
Applicable
CSC CH-LIST OS
01/09/2014 at 7:58 AM
Page 3 of 5
Complied
With
Not Complied
With
Not
Applicable
Footpath
6.1
6.2
6.3
Park lighting
Park lightings have been installed in
accordance with approved plan.
The Electrical Engineer has completed the
Mechanical & Electrical services checklist & a
set of as built plan is attached.
(Checklist is available in
http://www.nparks.gov.sg/cms/images/develop
mentsubmissionsection/M&E_checklist.pdf)
Park furniture
8.1
Benches
8.1.1 Benches have been constructed in
accordance with the approved
plan.
8.1.2 All benches are connected to the
footpath by means of concrete
platform with a minimum 0.5m
apron all round. The finish level
should match with the footpath.
8.1.3 A quality warranty transferable to
NParks for imported benches is
attached.
CSC CH-LIST OS
01/09/2014 at 7:58 AM
Page 4 of 5
10
Complied
With
Not Complied
With
Not
Applicable
11
Architectural Checklist
The Architect has completed the Architectural
checklist and a set of as built plan is attached.
Checklist is available in
http://www.nparks.gov.sg/cms/docs/aboutus/checklist/BP_Architectural.pdf
12
13
Inventory
An inventory of park facilities is fully
completed and attached.
CSC CH-LIST OS
01/09/2014 at 7:58 AM
Page 5 of 5