Вы находитесь на странице: 1из 5

NPARKS-0-CSC03

[This form may take you 10 minutes to fill in.]

CHECKLIST FOR CSC SUBMISSION CONVENTIONAL HOUSING


DEVELOPMENT WITH OPEN SPACE PROVISION
Applicable
Standard Requirements

Complied
With

Retention of existing trees / palms


Existing trees / single stem palms approved for
retention are retained at site.

Area and location of open space


The open space has been constructed in
accordance with the approved plan.

General requirements on open space

Not Complied
With

Not
Applicable

3.1 The terrains of the open space have been


constructed in accordance with the
approved plan.
3.2 The open space is free from water
ponding. Drainage system has been
provided in accordance to the approved
plan.
3.3 The open space is planted with 50mm
thick Axonopus compressus (cow
grass), in close turfing in accordance with
specification in approved plan.
4

Proposed landscaping scheme


4.1 Tree / palm location
4.1.1

Species

4.1.2

Proposed trees / palms have


been planted in accordance with
the approved plan as follows :
No.(s)

OG Box has been installed in


accordance with the approved
plan

4.2 Size and planting hole of a sapling tree /


single palm / cluster palm have been
provided in accordance with the approved
plan.

CSC CH-LIST OS

01/09/2014 at 7:58 AM

Page 1 of 5

CHECKLIST FOR CSC SUBMISSION CONVENTIONAL HOUSING


DEVELOPMENT WITH OPEN SPACE PROVISION
Applicable
Standard Requirements

Complied
With

Not Complied
With

Not
Applicable

4.3 Size and planting hole of an instant tree


have been provided in accordance with
approved plan.
4.4 Stakings are provided for all the proposed
sapling trees / single stem palms have in
accordance with specifications stipulated
in the approved plan.
4.5 Tree collar protectors are provided for all
proposed sapling trees/ single stem palms
in accordance with specifications
in the approved plan.
4.6 Shrubs Planting Requirements
4.6.1 Single shrub planting have been
provided in accordance with
approved plan.
4.6.2 Size and soil depth for shrub
planting bed have been provided
in accordance with approved
plan.
4.6.3 Proposed shrubs have been
planted in accordance with the
approved plan as follows:
Species

Nos

Play Equipment or Fitness Equipment


5.1

CSC CH-LIST OS

The total area for installing and usage of


play equipment or fitness equipment has
been constructed in accordance with the
approved plan.

01/09/2014 at 7:58 AM

Page 2 of 5

CHECKLIST FOR CSC SUBMISSION CONVENTIONAL HOUSING


DEVELOPMENT WITH OPEN SPACE PROVISION
Applicable
Standard Requirements
5.2

The play or fitness equipment has been


installed in accordance with the
approved plan.

5.3

All play and/or fitness equipment are


situated within acceptable protective
surfacing materials in accordance with
approved plan.

5.4

Subsoil drainage has been provided


within sand pit or play area. These
subsoil pipes are linked to the nearest
drain

5.5

Clearly defined edging between the


playground area and adjacent surfaces is
provided. The playground area, adjacent
ground and edging are flush with each
other.

5.6

Relevant instructional signboards have


been provided for all fitness equipment.
They are of weather resistant and vandal
proof, and comply with Singapore
Standards SS 457:2007 and SS
534:2007.

5.7

Relevant labelling signs are provided for


all playground and fitness equipment.
They are weather resistant and vandal
proof, and comply with Singapore
Standards - SS 457 : 2007 and SS
534:2007.

5.8

The playground/fitness equipment is


designed and constructed or assembled
in accordance with Singapore Standards
- SS 457 : 2007 and SS 534:2007,
respectively.
A 5-year warranty, transferable to
NParks from the supplier for the
imported play and fitness equipment is
attached. The validity of the warranty
should not be less than 4 years at the
time when the warrant is transferred.

5.9

Complied
With

Not Complied
With

Not
Applicable

5.10 The footings for playground and fitness


equipment are designed in accordance
to the approved plan.

CSC CH-LIST OS

01/09/2014 at 7:58 AM

Page 3 of 5

CHECKLIST FOR CSC SUBMISSION CONVENTIONAL HOUSING


DEVELOPMENT WITH OPEN SPACE PROVISION
Applicable
Standard Requirements
6

Complied
With

Not Complied
With

Not
Applicable

Footpath
6.1

Footpath has been constructed in


accordance with the approved plan.

6.2

Any footpaths leading to or away from


the open space are flushed upon
intersecting

6.3

The gradient of ramp complies with


BCAs requirements.

Park lighting
Park lightings have been installed in
accordance with approved plan.
The Electrical Engineer has completed the
Mechanical & Electrical services checklist & a
set of as built plan is attached.
(Checklist is available in
http://www.nparks.gov.sg/cms/images/develop
mentsubmissionsection/M&E_checklist.pdf)

Park furniture
8.1

Benches
8.1.1 Benches have been constructed in
accordance with the approved
plan.
8.1.2 All benches are connected to the
footpath by means of concrete
platform with a minimum 0.5m
apron all round. The finish level
should match with the footpath.
8.1.3 A quality warranty transferable to
NParks for imported benches is
attached.

8.2 Litter bins


8.2.1 Litter bins have been installed in
accordance with the approved
plans.
8.2.2 Each litter bin has been secured
firmly to the ground with stainless
steel bolts and nuts.
8.2.3 A quality warranty transferable to
NParks for imported litter bins is
attached.
8.3 Signboards
8.3.1 Signboards have been installed in
accordance with the approved
plan.

CSC CH-LIST OS

01/09/2014 at 7:58 AM

Page 4 of 5

CHECKLIST FOR CSC SUBMISSION CONVENTIONAL HOUSING


DEVELOPMENT WITH OPEN SPACE PROVISION
Applicable
Standard Requirements

10

Complied
With

Not Complied
With

Not
Applicable

8.3.2 A quality warranty transferable to


NParks for imported signboards is
attached.
8.4 Shelter
8.4.1 Shelter has been constructed in
accordance with the approved
plan. Certificate of supervision of
piling work and structural work are
attached.
8.4.2 Certificate of supervision and as
built structural plan / calculation is
attached.
Railings
Railings have been constructed in accordance
with the approved plan.

11

Architectural Checklist
The Architect has completed the Architectural
checklist and a set of as built plan is attached.
Checklist is available in
http://www.nparks.gov.sg/cms/docs/aboutus/checklist/BP_Architectural.pdf

12

Civil and Structural Checklist


The Professional Engineer has completed the
Civil & Structural checklist and a set of as built
plan is attached. Checklist is available in
http://www.nparks.gov.sg/cms/docs/aboutus/checklist/BP_Architectural.pdf

13

Inventory
An inventory of park facilities is fully
completed and attached.

CSC CH-LIST OS

01/09/2014 at 7:58 AM

Page 5 of 5