Вы находитесь на странице: 1из 177

CASE STUDY

SAP ERP Configuration Phase IV


Production
SAP ERP GBI
Release 6.04

Product

Revised
6/24/2013

Focus
Production

Authors
Simha R. Magal
Stefan Weidner
Tom Wilder

Version
2.21

MOTIVATION

PREREQUISITES
You should be familiar with
navigation in the SAP system.
It is also recommended that
you have gone through the
fulfillment exercise.

ACKNOWLEDGEMENT
This material was prepared
with the assistance of student
interns at the Seidman ERP
program at Grand Valley
State University and the SAP
Club at CSU Chico as well as
student and research
assistants at SAP UCC
Magdeburg.

You will configure the


enterprise structure and
business processes for
Production.
After setting up the
organization units and
process parameters, you
will create necessary
master data and test the
business process.

SAP AG

CASE STUDY

Phase IV Production

Overview and Table of Contents

Enterprise
Structure

Rules and
Parameters

Master Data

Process
Execution

Table of Contents
General Notes and Cautions........................................................................................................1
Part IV.1 Enterprise Structure...................................................................................................3
Part IV.2 Rules and Parameters................................................................................................5
Part IV.3 Master Data.............................................................................................................. 21
Part IV.4 Process Execution....................................................................................................41

SAP AG

Phase IV Production

CASE STUDY

General Notes and Cautions


Warning: When working with other classmates at the same time in the same transactions within SPRO,
tables will tend to lock up and you will only be able to display them. This is due to the fact that the system
does not allow multiple users in the same transaction at the same time. To get passed this message, simply
wait until the current user in the transaction is finished and then proceed.
Attributes: At times, certain attributes or fields may not appear to have the name of them in front of the
user. To display the full name of the attribute or field, simply click within the field and then press the F1
key. This will bring up not only the title of the field, but it will bring up the full description of it to read.
The ## Symbol: When working with other classmates at the same time, you will be assigned your own
unique identifier which is called the ## Symbol or the Pound Pound Symbol. This will be your
identifier and is ASSIGNED FOR YOUR OWN USE ONLY!!! Please be cautious about other classmates
attempting to use your identifier whether it is on purpose or not and if you suspect other classmates using
it, inform your professor immediately so that fixes can be made accordingly. For example, if Ashley has
an identifier of 09, Ashleys company code will be US09.
The Search Tool: At times in this document, the instructions will ask you to search for something to put
in a field. When it does this, simply click on the field itself and click on the icon to the right of it (it looks
like a white square). Clicking on it will bring up another window and you will search from there. You
may also search other field by clicking on the downward arrow that may be on the left or right of the
field. It will bring up a drop down menu that will have options to choose from and click.
Where do I start? : There are three ways to proceed within the SAP system: Using the SAP Easy
Access menu, using the SAP Menu Bar, and using the SAP Customizing Implementation Guide
menu. All three of these are explained below:
1. The SAP Easy Access menu appears when you start a new session.
2. The SAP Menu Bar also appears when you start a new session at the very top of the screen.
3. In the SAP Customizing Implementation Guide, there are two ways you may use to get here:
a. The first is to simply type SPRO in the transaction field at the top of the screen.
b. Proceed through the path to get there. The path consists of the following:
(In the main menu of SAP, click on the black arrows on the left of these names) SAP menu Tools
Customizing IMG Execute Project (double-click on Execute Project)
In the Customizing: Execute Project screen, click on the

icon.

Saving: When the instructions to tell you to save data, always press the Enter key to validate. If there
are error(s) that occur, they must be corrected before continuing to the next task. You will find errors from
a transaction when there are red icons that appear in the message area. Messages that are yellow contain
warnings and not errors. At times, these must be fixed in order to move on. However, most of the time,

SAP AG

Page

Phase IV Production

CASE STUDY

they do not need to be fixed and you can simply enter through them. Green messages are obviously
showing that nothing went wrong with the transaction and that you may proceed to the next task.
Set Controlling Area Pop-Up: At times throughout this phase, there will be times when the system asks
you enter your controlling area to clarify which controlling area you are configuring for.
If this should happen, in the Set Controlling Area pop-up, enter the following information:
Attribute
Controlling Area
Click on

Description
Uniquely identifies a controlling area.

Data Value
NA##

(CONTINUE (ENTER)).

This will get you into the next screen where the instructions will then tell you what to do for the task.
Enter Chart of Accounts Pop-Up: At times throughout this phase, there will be times when the system
asks you enter your chart of accounts to clarify which chart of accounts you are configuring for.
If this should happen, in the Enter Chart of Accounts pop-up, enter the following information:
Attribute
Chart of Accounts

Click on

Description
Key that uniquely identifies a chart of accounts.

Data Value
GL##

(CONTINUE (ENTER)).

This will get you into the next screen where the instructions will then tell you what to do for the task.

SAP AG

Page

CASE STUDY

Phase IV Production

Part IV.1 Enterprise Structure


Enterprise
Structure

Rules and
Parameters

Master Data

Process
Execution

Table of Contents
IV.1.1: Determine Work Center Location......................................................................................4

SAP AG

Page

Phase IV Production

CASE STUDY

IV.1.1: Determine Work Center Location


Description: In this task, you define a work center location for your Dallas plant. A work center is a
group of certain activities within plants. A work center identifies the physical location where work is
carried out. It can be defined by a general place description (Philadelphia, for example) or a very
specific place description (office 105, desk III, for example).
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Enterprise Structure Definition Logistics
General Define Location

Tasks and Data Entry:

SAP AG

Page

Phase IV Production

CASE STUDY

In the Change View Locations: Overview screen, click on the

icon.

In the New Entries: Overview of Added Entries screen, enter the following information:
Plnt
Your Plant Dallas (DL##)

Click on

Location
DALLAS TX

Name
GBI N42##

(ENTER).

In the Edit address: DL## DALLAS TX pop-up, enter the following information:
Attribute
Country

SAP AG

Description
The country key contains information which the system uses to check
entries such as the length of the postal code or bank account number.

Data Value
USA (US)

Page

CASE STUDY

Phase IV Production

Region

In some countries, the region forms part of the address.

In the Street Address part, click on the

Texas (TX)

icon.

Enter the following information:


Attribute
Jurisdict. code

SAP AG

Description
Specifies the tax jurisdiction.

Data Value
Texas Jurisdiction Code
(TX0000000)

Page

Phase IV Production

SAP AG

CASE STUDY

Page

Phase IV Production

Click on

SAP AG

CASE STUDY

(ENTER (CONTINUE)). You will receive a message that says One entry chosen.

Page

Phase IV Production

CASE STUDY

In the New Entries: Overview of Added Entries screen, click on the

icon.

You will receive a message that says Data was saved.

SAP AG

Page

CASE STUDY

Phase IV Production

Part IV.2 Rules and Parameters


Enterprise
Structure

Rules and
Parameters

Master Data

Process
Execution

Table of Contents
IV.2.1: Define Production Scheduling Profile................................................................................6
IV.2.2: Define Production Scheduler............................................................................................7
IV.2.3: Configure Automatic Postings...........................................................................................8
IV.2.4: Activate Material Requirements Planning..........................................................................9
IV.2.5: Define Checking Control.................................................................................................10
IV.2.6: Define Scheduling Parameters........................................................................................11
IV.2.7: Define Order Dependent Parameters.............................................................................12
IV.2.8: Define Confirmation Parameters.....................................................................................13
IV.2.9: Carry Out Maintenance of Materials...............................................................................14
IV.2.10: Carry Out Maintenance of Production...........................................................................18
IV.2.11: Define Valuation of Goods Received.............................................................................20

SAP AG

Page 10

Phase IV Production

CASE STUDY

IV.2.1: Define Production Scheduling Profile


Description: In this task, you define how production orders are scheduled. You are able to assign a
production scheduling profile to a material (work scheduling screen in material master) or to a
production scheduler (customizing). It allows you to enter an overall profile for capacity leveling and
specify that automatic goods receipt should take place here. Notice that this step is technically master
data. However the production scheduler profile must be set up for the production scheduler so that
scheduling parameters for the Dallas plant will be able to become set up in rules and parameters.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Production Shop Floor Control Master
Data Define production scheduling profile

Tasks and Data Entry:

SAP AG

Page 11

Phase IV Production

CASE STUDY

In the Change View Production Scheduling Profile: Overview screen, click on the

icon.

In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant

Description
Key uniquely identifying a plant.

Data Value
Your Plant Dallas
(DL##)

Prod. Sched. Profile

Specifies which transactions are carried out in


parallel, can trigger an automatic goods receipt, or
specify an overall profile for capacity leveling.

10

Description

Description of production scheduler profile.

## Release & Schedule

Release

Specifies an order is to be released when it is created.

Selected

Schedule Order

Specifies an order is to be scheduled as it is released.

Selected

SAP AG

Page 12

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Data was saved.

Page 13

Phase IV Production

CASE STUDY

IV.2.2: Define Production Scheduler


Description: In this task, you define the scheduler and tie him/her to the profile. The production
scheduler carries out the production scheduling functions described in the previous task. Notice that
this step is technically master data. However the production scheduler must be set up so that
scheduling parameters for the Dallas plant will be able to become set up in rules and parameters.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Production Shop Floor Control Master
Data Define production schedule

r
Tasks and Data Entry:

SAP AG

Page 14

Phase IV Production

CASE STUDY

In the Change View Production Scheduler: Overview screen, click on the

icon.

In the New Entries: Overview of Added Entries screen, enter the following information:
Attribute
Plant
ProdSched.
Descriptio
n
ProdProfile

Click on

SAP AG

Description
Uniquely identifies a plant
Scheduler responsible for a material in production.
Description of Production Scheduler

Data Value
Your Plant Dallas (DL##)
0##
## DL Production Scheduler

Specifies which transactions are carried out in


parallel, can trigger automatic goods receipt, or
specify an overall profile for capacity leveling.

10

(SAVE). You will receive a message that says Data was saved.

Page 15

Phase IV Production

CASE STUDY

IV.2.3: Configure Automatic Postings


Description: In this task, you enter the system settings for production. Configuring automatic
postings will determine the accounts to which transactions will be posted to financial accounting.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Materials Management Valuation and
Account Assignment Account Determination Account Determination Without Wizard Configure
Automatic Postings

Tasks and Data Entry:

SAP AG

Page 16

CASE STUDY

Phase IV Production

In the Automatic Posting screen, click on the

icon.

In the Maintain FI Configuration: Automatic Posting Procedures screen, double-click on GBB.

You are in the Maintain FI Configuration: Automatic Posting Accounts screen.


Enter the following information:
Val. modif.
0001

Gen. modif.
VAX

Valuation class
3100

Account
Your Cost of Goods Sold (780000)

0001

VAX

7920

Your Cost of Goods Sold (780000)

0001

3000

Your Raw Material Consumption Expense (720000)

0001

3030

Your Supplies Expense (740000)

0001

3100

Your Trading Good Consumption Expense (720200)

0001

7900

Your Semi-Finished Consumption Expense (720300)

0001

AUF

7900

Your Manufacturing Output settlement (741600)

0001

AUF

7920

Your Manufacturing Output Settlement Variance

SAP AG

Page 17

CASE STUDY

Phase IV Production

(741700)
0001

VBR

3000

Your Raw Material Consumption Expense (720000)

0001

VBR

3100

Your Trading Good Consumption Expense (720200)

0001

VBR

7900

Your Semi-Finished Consumption Expense (720300)

0001

BSA

3000

Your Inventory-Suspense (Heaven) (200500)

0001

BSA

3100

Your Inventory-Suspense (Heaven) (200500)

0001

BSA

7920

Your Inventory-Suspense (Heaven) (200500)

0001

BSA

7900

Your Inventory-Suspense (Heaven) (200500)

SAP AG

Page 18

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Changes have been made.

Page 19

Phase IV Production

CASE STUDY

IV.2.4: Activate Material Requirements Planning


Description: In this task, you activate your individual plants to use material resource planning. This
activation allows for the execution of single-item and multi-level planning. The basic function of MRP
systems includes inventory control, bill of material processing, and elementary scheduling. MRP helps
organizations maintain low inventory levels. It is used to plan manufacturing, purchasing, and
delivering activities. Notice we are activating for all plants and not just for Dallas.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Materials Management Consumption-Based
Planning Planning Activate Material Requirements Planning

Tasks and Data Entry:

SAP AG

Page 20

Phase IV Production

CASE STUDY

In the Activation screen, click on the

icon.

You are in the Change View Activate Requirements Planning: Overview screen.
Enter the following information:
Plnt
Your Plant Dallas(DL##)

Activate requirements planning


Selected

Your DC Miami (MI##)

Selected

Your DC San Diego (SD##)

Selected

SAP AG

Page 21

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Data was saved.

Page 22

Phase IV Production

CASE STUDY

IV.2.5: Define Checking Control


Description: In this task, you specify what stock should be considered available for use in the
manufacturing of products for an order. In checking control, you can define for each order type and
checking rule which type of check is to be used for the material availability check. These checks
consist of no automatic check when an order is created, released or partially released, ATP check,
check against planning, and check when an order is saved.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Production Shop Floor Control
Operations Availability Check Define Checking Control

Tasks and Data Entry:


In the Change View Order Control: Overview screen, highlight the DL00 PP01 1 row.
Highlight the DL00 Plant PP01 2 row.

SAP AG

Page 23

Phase IV Production

Click on

CASE STUDY

(COPY AS). You will receive a message that says Specify target entries.

In the Change View Order control: Details of Selected Set screen, enter the following information:
Attribute
Plant

SAP AG

Description
Key uniquely identifying a plant.

Data Value
Your Plant Dallas (DL##)

Page 24

CASE STUDY

Phase IV Production

Click on

(ENTER). You will receive a message that says Specify target entries.

Enter the following information:


Attribute
Plant

SAP AG

Description
Key uniquely identifying a plant.

Data Value
Your Plant Dallas (DL##)

Page 25

Phase IV Production

Click on

CASE STUDY

(ENTER). You will receive a message that says Number of entries copied: 2.

In the Change View Order control: Overview of Selected Set screen, click on the

SAP AG

icon.

Page 26

Phase IV Production

CASE STUDY

You will receive a message that says Data was saved.

SAP AG

Page 27

Phase IV Production

CASE STUDY

IV.2.6: Define Scheduling Parameters


Description: In this task, you define for each plant, order type, and production scheduler the
parameters for scheduling production orders. This comprises maintaining scheduling levels, date
adjustment when dates are exceeded, date control for detailed scheduling, and reduction.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Production Shop Floor Control
Operations Scheduling Define Scheduling Parameters for Production Orders

Tasks and Data Entry:

SAP AG

Page 28

Phase IV Production

CASE STUDY

In the Change View Specify scheduling parameters: Overview screen, click on the

icon.

In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant

Description
Key uniquely identifying a plant.

Data Value
Your Plant Dallas (DL##)

Order type

Identifies the usage of the orders.

Standard Production order


(PP01)

Prodn Superv.

Scheduler responsible for a material.

Your DL Production Scheduler


(0##)

Scheduling Type

Specifies the scheduling type.

Backwards

Automatic Scheduling

Specifies that orders or networks are


automatically scheduled when saved.

Selected

Click on

SAP AG

(SAVE). You will receive a message that says Data was saved.

Page 29

Phase IV Production

SAP AG

CASE STUDY

Page 30

Phase IV Production

CASE STUDY

IV.2.7: Define Order Dependent Parameters


Description: In this task, you define the parameters that are valid for each order type and plant. For
each production order type, you can define their unique IMG behavior. For example: whether this
order type allows automatic or manual selection of production versions.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Production Shop Floor Control Master
Data Order Define order type-dependent parameters

Tasks and Data Entry:


SAP AG

Page 31

Phase IV Production

CASE STUDY

You are in the Change View Order Type-Dependent Parameters: Overview: Overview screen.
Click on

(NEW ENTRIES).

In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant

Description
Key that uniquely identifies a plant.

Data Value
Your Plant Dallas (DL##)

Order Type

Key that differentiates orders


according to their purpose.

Standard Production order (PP01)

Routing Selection

Controls per plant and order type how


the selection of a routing/reference
operation set is to be carried out.

Routing Mandatory (automatic


selection) (6)

BOM Application

Represents a process for automatic


determination of alternatives in the
different areas within a company.

Production General (PP01)

SAP AG

Page 32

CASE STUDY

Phase IV Production

Click on the Cost Accounting tab.

Enter the following information:


Attribute
Cstg variant planned

Description
Key that specifies which costing variant
is used to determine the planned costs.

Data Value
Production Order: Planned (PPP1)

Cstg variant actual

Key that specifies the costing variant that

Production Order: Actual (PPP2)

SAP AG

Page 33

Phase IV Production

CASE STUDY
is used to determine the actual costs.

Click on

SAP AG

(SAVE). You will receive a message that says Data was saved.

Page 34

Phase IV Production

CASE STUDY

IV.2.8: Define Confirmation Parameters


Description: In this task, you define production parameters related. Using the confirmation
parameters, you define which entry screen the system displays as standard; which data the system
proposes when you make entries; and the level of inspection severity you require.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Production Shop Floor Control
Operations Confirmation Define Confirmation Parameters

SAP AG

Page 35

Phase IV Production

CASE STUDY

Tasks and Data Entry:


You are in the Change View Parameters for Order Confirmation: Overview screen.
Click on

(NEW ENTRIES).

In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant

Description
Key that uniquely identifies a plant.

Data Value
Your Plant Dallas (DL##)

Order Type

Key that differentiates orders according to their purpose.

Standard Production order


(PP01)

SAP AG

Page 36

CASE STUDY

Phase IV Production

Click on the Individual Entry General tab.

Enter the following information:


Attribute
Confirmation Type

Description
Specifies what sort of confirmation is to
be automatically proposed.

Data Value
Final Confirmation

Clear Open Reservations

Specifies that with a final confirmation


the indicator Final issue is also set for
components that are not backflushed.

Selected

SAP AG

Page 37

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Data was saved.

Page 38

Phase IV Production

CASE STUDY

IV.2.9: Carry Out Maintenance of Materials


Description: In this task, you set up various plant parameters. You can specify all plant parameters for
the material requirements planning. In addition, you receive an overview of the maintenance
statuses of the individual MRP parameters on plant level. When specifying the plant parameters,
create an MRP controller (0##) for your Dallas plant. This controls the planning of a material.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Materials Management Consumption-Based
Planning Plant Parameters Carry Out Overall Maintenance of Plant Parameters

Tasks and Data Entry:


You are in the Plant Parameters for Material Requirements Planning screen.

SAP AG

Page 39

Phase IV Production

Click on

CASE STUDY

(CREATE).

In the Create Plant Parameters pop-up, enter the following information:


Attribute
Plant

Click on

Description
Key that uniquely identifies a plant.

(CREATE).

In the Create Plant Parameters pop-up, click on the

SAP AG

Data Value
Your Plant Dallas (DL##)

icon.

Page 40

Phase IV Production

CASE STUDY

You will receive a message that says Plant Parameters for Plant DL## can now be maintained.

In the Plant Parameters for Material Requirements screen, click on the

In the Maintain Plant Parameters pop-up, click on the

SAP AG

icon.

icon.

Page 41

Phase IV Production

CASE STUDY

In the Maintain Plant Parameters screen, click on the

In the Assign Number Ranges screen, click on the

SAP AG

icon.

icon.

Page 42

CASE STUDY

Phase IV Production

You will receive a message that says One entry chosen.

You are in the Change View Number Ranges for Planned Orders: Overview screen.
Enter the following information:
Plnt
Your Plant Dallas (DL##)

Click on

SAP AG

Name 1
## Plant Dallas

NRge pl.orders
01

(SAVE). You will receive a message that says Data was saved.

Page 43

CASE STUDY

Phase IV Production

Click on

(BACK).

In the Assign Number Ranges screen, click on the

icon.

You will receive a message that says One entry chosen.


You are in the Change View Number Ranges for Reservations: Overview screen.
Enter the following information:
Plnt
Your Plant Dallas (DL##)

SAP AG

Name 1
## Plant Dallas

NR: StkTrns Res.


01

Page 44

Phase IV Production

CASE STUDY

Click on

(SAVE). You will receive a message that says Data was saved.

Click on

(BACK).

In the Assign Number Ranges screen, click on the

SAP AG

icon.

Page 45

CASE STUDY

Phase IV Production

You will receive a message that says One entry chosen.

You are in the Change View Number Ranges for Purchase Requisitions: Overview screen,
Enter the following information:
Plnt
Your Plant Dallas (DL##)

SAP AG

Name1
## Plant Dallas

NR - PReq
01

Page 46

Phase IV Production

CASE STUDY

Click on

(SAVE). You will receive a message that says Data was saved.

Click on

(BACK).

In the Assign Number Ranges screen, click on the

icon.

You will receive a message that says One entry chosen.

SAP AG

Page 47

CASE STUDY

Phase IV Production

You are in the Change View Number Ranges for MRP Lists: Overview screen.
Enter the following information:
Plnt
Your Plant Dallas (DL##)

Name 1
## Plant Dallas

No. Range MRP


01

Click on

(SAVE). You will receive a message that says Data was saved.

Click on

(BACK).

In the Assign Number Ranges screen, click on the

icon.

You will receive a message that says One entry chosen.

SAP AG

Page 48

CASE STUDY

Phase IV Production

You are
Reservations: Overview screen

in the Change View Number Ranges for

Enter the following information:


Plnt
Your Plant Dallas (DL##)

SAP AG

Name 1
## Plant Dallas

NR. SimDepRs
01

Page 49

Phase IV Production

CASE STUDY

Click on

(SAVE). You will receive a message that says Data was saved.

Click on

(BACK).

In the Assign Number Ranges screen, click on the

SAP AG

icon.

Page 50

Phase IV Production

CASE STUDY

In the Maintain Plant Parameters screen click on the

icon.

You will receive a message that says No entries found that match selection criteria.

SAP AG

Page 51

Phase IV Production

CASE STUDY

In the Change View MRP Controllers: Overview screen, click on the

icon.

In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant

Description
Key uniquely identifying a plant.

Data Value
Your Plant Dallas (DL##)

MRP Controller

Specifies the number of MRP controller


or group of MRP controllers responsible
for material planning for the material.

0##

Name of MRP Controller

Specifies the name of the MRP controller


or group of MRP controllers responsible
for material requirements planning.

## DL Controller

SAP AG

Page 52

Phase IV Production

CASE STUDY

Click on

(SAVE). You will receive a message that says Data was saved.

Click on

(BACK). You will receive a message that says Only one entry chosen.

In the Change View MRP Controllers: Details screen, click on the

SAP AG

icon.

Page 53

Phase IV Production

CASE STUDY

In the Change View MRP Controllers: Overview screen, click on the

SAP AG

icon.

Page 54

Phase IV Production

CASE STUDY

In the Maintain Plant Parameters screen click on the

SAP AG

icon.

Page 55

Phase IV Production

CASE STUDY

In the Change View Floats for Scheduling: Overview screen, click on the

icon.

In the New Entries: Overview of Added Entries screen, enter the following information:
Plnt
Your Plant Dallas
(DL##)

Marg.
001

Opening Period
1

Fl Bef.
1

Fl After
1

Rel. Per.
1

Click on

(SAVE). You will receive a message that says Data was saved.

Click on

(BACK). You will receive a message that says Only one entry chosen.

In the Change View Floats for Scheduling: Overview screen, click on the

In the Maintain Plant Parameters screen, click on the

SAP AG

icon.

icon.

Page 56

CASE STUDY

Phase IV Production

You will receive a message that says One entry chosen.

In the Change View Availability Check: Overview screen, enter the following information:
Plnt
Your Plant Dallas
(DL##)

SAP AG

Name 1
## Plant Dallas

Rule for Availability Check


PP

Page 57

Phase IV Production

CASE STUDY

Click on

(SAVE). You will receive a message that says Data was saved.

Click on

(BACK).

In the Maintain Plant Parameters screen, click on the

SAP AG

icon.

Page 58

Phase IV Production

CASE STUDY

You will receive a message that says One entry chosen.

SAP AG

Page 59

Phase IV Production

CASE STUDY

You are in the Change View Default Values Purchasing/MRP: Details screen.
Enter the following information:
Attribute
Scheduling: Info Rec/Agreemt

Description
Determines whether the planned delivery time in the
record is used for scheduling in the planning run.

Data Value
Selected

Schedule lines

Indicator controls whether, during the planning run,


the system never creates schedule lines, only creates
schedule lines in the opening period, or whether it
creates schedule lines in the planning horizon.

Schedule lines
(3)

Unknown Acct Assignment

Account assignment for materials not valuated.

Unknown (U)

Click on

SAP AG

(SAVE). You will receive a message that says Data was saved.

Page 60

Phase IV Production

CASE STUDY

IV.2.10: Carry Out Maintenance of Production


Description: In this task, you specify all parameters for MRP. In addition, you receive an overview of
the maintenance statuses of the individual MRP parameters on a plant level.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Production Material Requirements Planning
Plant Parameters Carry Out Overall Maintenance of Plant Parameters

Tasks and Data Entry:


You are in the Plant Parameters for Material Requirements Planning screen.

SAP AG

Page 61

Phase IV Production

Click on

CASE STUDY

(MAINTAIN).

In the Maintain Plant Parameters pop-up, enter the following information:


Attribute
Plant

Click on

SAP AG

Description
Key uniquely identifying a plant.

Data Value
Your Plant Dallas (DL##)

(MAINATIN).

Page 62

Phase IV Production

CASE STUDY

In the Maintain Plant Parameters screen, click on the

In the Conversion screen, click on the

SAP AG

icon.

icon.

Page 63

CASE STUDY

Phase IV Production

You will receive a message that says One entry chosen.

You are in the Change View Conv. Planned Ord. -> Prod.Ord., MRP Customizing: Overview screen.
Enter the following information:
Attribute
Production order

Click on

SAP AG

Description
Key that differentiates orders

Data Value
Standard Production Order (PP01)

(SAVE). You will receive a message that says Data was saved.

Page 64

Phase IV Production

Click on

(BACK) twice.

In the Conversion screen, click on the

SAP AG

CASE STUDY

icon.

Page 65

Phase IV Production

CASE STUDY

In the Maintain Plant Parameters screen click on the

In the Plant Parameters: Reporting screen, click on the

SAP AG

icon.

icon.

Page 66

Phase IV Production

CASE STUDY

You will receive a message that says One entry chosen.

In the Change View Run-Time Statistics: Overview screen, enter the following information:
Attribute
Display list
Frequency

Description
Instructs the system to create a list of the planned materials.
Determines if an entry is made in the runtime statistics.

Click on

(SAVE). You will receive a message that says Data was saved.

Click on

(BACK).

SAP AG

Data Value
Selected
1

Page 67

Phase IV Production

CASE STUDY

In the Plant Parameters: Reporting screen, click on the

In the Maintain Plant Parameters screen click on the

SAP AG

icon.

icon.

Page 68

Phase IV Production

CASE STUDY

You will receive a message that says One entry chosen.

In the Change View BOM/Routing Selection: Overview screen, enter the following information:
Attribute
BOM Sel ID
Routing Sel ID

SAP AG

Description
Determines which BOM is to be used and
with which priority for BOM selection.
Determines which routing is to be used and
with which priority for routing selection.

Data Value
01 Production (01)
01 Released (general) (01)

Page 69

Phase IV Production

Click on

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Maintain selection ID in the parameters.

(ENTER). You will receive a message that says Data was saved.

Page 70

Phase IV Production

CASE STUDY

IV.2.11: Define Valuation of Goods Received


Description: In this task, you define how receipts are evaluated for materials with moving average
price control. For materials valued at moving average price, the value for the credit posting is made
using a valuation variant. You have to define the valuation variant for each valuation area. The
valuation variant specifies what material price is used for the credit posting. For materials valued at
standard price, credit posting always takes place at a standard price.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Production Shop Floor Control
Integration Define Valuation of Goods Received

Tasks and Data Entry:

SAP AG

Page 71

Phase IV Production

CASE STUDY

You are in the Change View Valuation variants for order costing: Overview screen.
Click on

(NEW ENTRIES).

In the New Entries: Overview of Added Entries screen, enter the following information:
Attribute
Val. Area
Val. Var.

Click on

SAP AG

Description
Organizational level at which the material is valuated.
Determines the price of goods receipts for materials.

Data Value
Your Plant Dallas (DL##)
Production Order: Actual
(007)

(SAVE). You will receive a message that says Data was saved.

Page 72

CASE STUDY

Phase IV Production

Part IV.3 Master Data


Enterprise
Structure

Rules and
Parameters

Master Data

Process
Execution

Table of Contents
IV.3.1: Create Activity Type........................................................................................................ 22
IV.3.2: Change Activity Output/Prices.........................................................................................23
IV.3.3: Determine Person Responsible......................................................................................25
IV.3.4: Create Capacity.............................................................................................................. 26
IV.3.5: Create Work Centers......................................................................................................28
IV.3.6: Create Raw Materials.....................................................................................................30
IV.3.7: Create Semi-Finished Good...........................................................................................32
IV.3.8: Create Finished Good.....................................................................................................34
IV.3.9: Create Bills of Materials..................................................................................................36
IV.3.10: Create Product Routings...............................................................................................38

SAP AG

Page 73

Phase IV Production

CASE STUDY

IV.3.1: Create Activity Type


Description: In this task, you begin to define labor needed to manufacture our products. Activity
types are used to describe the various forms of activity that are performed at a cost center. Activity
types are evaluated for each cost center and period with a charge rate that consists of a fixed portion
and a variable (work-related) portion. Thus the costs incurred at a cost center can be distributed to
products according to which activities have been performed.
Navigation: SAP menu Accounting Controlling Cost Center Accounting Master Data
Activity Type Individual Processing Create

SAP AG

Page 74

CASE STUDY

Phase IV Production

Tasks and Data Entry:


In the Create Activity Type: Initial Screen screen, enter the following information:
Attribute
Activity Type

Description
Key uniquely identifying an activity type.

Data Value
LABOR

Valid From

Date indicating as of when an entry is valid.

First Day of Current Year

Click on

(ENTER).

In the Create Activity Type: Basic Screen screen, enter the following information:
Attribute
Name

Description
General description of the object.

Data Value
## Labor Hours

Activity Unit

Time or quantity unit used to post


the consumed activity quantities.

Hour (H)

CCtr categories

Indicator determining for which


cost center types an activity type
is allowed for planning and as a
sender in activity allocation.

All Cost Center Cate (*)

ATyp category

Determining the method of


activity planning and allocation.

Manual entry, manual allocation (1)

SAP AG

Page 75

Phase IV Production

CASE STUDY

Allocation cost elem

A secondary cost element under


which the activity type business
process is allocated.

Your Labor (800000)

Price indicator

Indicator showing how the


system calculates the price of a
business process or activity type.

Plan price, automatically based on activity


(1)

Click on

SAP AG

(SAVE). You will receive a message that says Activity type has been created.

Page 76

Phase IV Production

SAP AG

CASE STUDY

Page 77

Phase IV Production

CASE STUDY

IV.3.2: Change Activity Output/Prices


Description: In this task, you define the price of the labor activity type for costing. The manual
planning of the process output (process quantities and prices) assumes that the corresponding quantity
for the input or output side is known. Manual planning is useful for scenarios in which you can
determine these quantities without too much effort. Manual planning in actual is equivalent to directly
confirming the corresponding quantities from activities and processes. The price can either be
manually set or iteratively set; that is, determined by the system with regard to all activity.
Navigation: SAP menu Accounting Controlling Cost Center Accounting Planning Activity

Output/Prices Change
Tasks and Data Entry:
In the Change Activity Type/Price Planning: Initial Screen screen, enter the following information:
Attribute
Version

Description
A collection of year-dependent indicators for planning data.

Data Value
Plan/Act Version
(0)

From Period

A planning period is the smallest closed unit of a fiscal year


in which plan data can be entered and stored in the system.

To Period

A planning period is the smallest closed unit of a fiscal year


in which plan data can be entered and stored in the system.

12

SAP AG

Page 78

CASE STUDY

Phase IV Production

Fiscal year

Period when a company creates inventory.

Current Year

Cost Center group

Organizational unit for grouping together cost centers.

Your Operations
(N40##)

Click on

(OVERVIEW SCREEN).

In the Change Activity Type/Price Planning: Overview Screen screen, enter the following information:
Activity
LABOR

Plan Activity
100000

Distribution key
Distribution as
before (2)

Click on

(NEXT COMBINATION).

Distribution key
Distribution as before (2)

Variable price
10

Repeat this for the rest of the cost centers within the group.

SAP AG

Page 79

Phase IV Production

Click on

CASE STUDY

(SAVE). You will receive a message that says Changed data has been posted.

In the Change Activity Type/Price Planning: Initial Screen screen, enter the following information:
Attribute
Fiscal year

Click on

SAP AG

Description
Period for which a company creates its inventory and balance sheet.

Data Value
Year After Current

(OVERVIEW SCREEN).

Page 80

CASE STUDY

Phase IV Production

In the Change Activity Type/Price Planning: Overview Screen screen, enter the following information:
Activity
LABOR

Click on

Plan Activity
100000

Distribution key
Distribution as
before (2)

Distribution key
Distribution as before (2)

Variable price
10

(NEXT COMBINATION).

Repeat this for the rest of the cost centers within the group.
Click on

SAP AG

(SAVE). You will receive a message that says Changed data has been posted.

Page 81

Phase IV Production

CASE STUDY

IV.3.3: Determine Person Responsible


Description: In this task, you assign the person responsible for the work center. Each work center
must have someone designated as the responsible party. The performing work center usually
represents one person or a group of people who perform the maintenance work.
Warning: See General Notes and Cautions about table locks.
Navigation: SAP Customizing Implementation Guide Production Basic Data Work Center
General Data Determine person responsible

Tasks and Data Entry:


You are in the Change View Person Responsible for Work Center: Overview screen.

SAP AG

Page 82

CASE STUDY

Phase IV Production

Click on

(NEW ENTRIES).

In the New Entries: Overview of Added Entries screen, enter the following information:
Plnt
Your Plant Dallas
(DL##)

SAP AG

Pers. Respons.
0##

Person responsible for work center


## Steve Barton

Page 83

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Data was saved.

Page 84

Phase IV Production

CASE STUDY

IV.3.4: Create Capacity


Description: In this task, you will create capacities. A capacity is the ability to perform a specific
task. You distinguish between various capacities in a work center by using the capacity category. In
order to plan capacities in a more detailed manner, you can define individual capacities for each one.
Navigation: SAP menu Logistics Production Master Data Work Centers Capacity

Create
Tasks and Data Entry:
In the Create Capacity: Initial Screen screen, enter the following information:
Attribute
Plant

Description
Key uniquely identifying a plant.

Data Value
Your Plant Dallas (DL##)

Capacity

Description by which the capacity is created.

SHIFT

Capacity category

Key which describes capacity in more detail.

Person (002)

SAP AG

Page 85

Phase IV Production

Click on

CASE STUDY

(ENTER).

In the Create Capacity: Header screen, enter the following information:


Attribute
Capacity short text

Description
Describes the capacity in more detail.

Data Value
## Standard Day Shift

Capacity planner grp

Key referring to the capacity planner group.

Planner group A (A)

Base unit of meas.

Unit in which capacity is maintained.

Hour (H)

Start

Start of the shift.

08:00:00

Finish

End of the shift.

17:00:00

Length of breaks

Total break time per shift.

01:00:00

Capacity utilization

The relationship between a machines actual


capacity and its theoretical capacity.

100

No. of indiv. cap.

Number of elements which make up a group.

Relevant to finite scheduling

Specifies that the system should take the


available capacity and the load of this
capacity into account during finite scheduling.

Selected

Click on

SAP AG

(SAVE).

Page 86

Phase IV Production

CASE STUDY

You will receive a message that says Capacity SHIFT plant DL## category 002 created.

In the Create Capacity: Initial Screen screen, enter the following information:
Attribute
Capacity category

Click on

SAP AG

Description
The capacity category enables you to determine
whether it is machine or labor capacity.

Data Value
Machine (001)

(ENTER).

Page 87

Phase IV Production

CASE STUDY

In the Create Capacity: Header screen, enter the following information:


Attribute
Capacity short text

Description
Describes the capacity in more detail.

Data Value
## Standard Day Shift

Capacity planner grp

Key referring to the capacity planner group.

Planner group A (A)

Base unit of meas.

Unit in which capacity is maintained.

Hour (H)

Start

Start of the shift.

08:00:00

Finish

End of the shift.

17:00:00

Length of breaks

Total break time per shift.

01:00:00

Capacity utilization

The relationship between a machines actual


capacity and its theoretical capacity.

100

No. of indiv. cap.

Number of elements which make up a group.

Relevant to finite scheduling

Specifies that the system should take the


available capacity and the load of this
capacity into account during finite scheduling.

Selected

Click on

SAP AG

(SAVE).

Page 88

Phase IV Production

CASE STUDY

You will receive a message that says Capacity SHIFT plant DL## category 002 created.

SAP AG

Page 89

Phase IV Production

CASE STUDY

IV.3.5: Create Work Centers


Description: In this task, you create a work center (ASSY10##) in your plant. Work centers are
environments that provide access to role-specific functions. The structure of a work center depends on
your role. You have access to relevant messages and documents for which your role is authorized.
Navigation: SAP menu Logistics Production Master Data Work Centers Work Center

Create
Tasks and Data Entry:
In the Create Work Center: Initial Screen screen, enter the following information:
Attribute
Plant

Description
Key uniquely identifying a plant.

Data Value
Your Plant Dallas (DL##)

Work center

Key identifying the work center.

ASSY10##

Work center cat.

Key which distinguishes the work centers.

Labor (0003)

SAP AG

Page 90

CASE STUDY

Phase IV Production

Click on

(ENTER).

In the Create Work Center: Basic Data screen, enter the following information:
Attribute
Description

Description
Description

Data Value
## DL Assembly

Person responsible

The person or group who is


responsible for the work center.

Your Person Responsible (0##)

Location

Physical location of the work center.

DALLAS TX

Usage

Controls which type of task list used.

Only routings (001)

Standard value key

Dimension to one of up to six values.

Normal production (SAP1)

Click on

(ENTER).

Enter the following information at the bottom of the screen:


Key Word
Setup

Rule for Mant.


should be entered

Labor

should be entered

SAP AG

Page 91

Phase IV Production

CASE STUDY

Click on the Default Values tab.

In the Create Work Center: Default Values screen, enter the following information:
Attribute
Control key

Description
Determines which business transactions should be
executed for the object that belongs to the order.

Data Value
Routing/Ref. op. set internal proc.
(ASSY)

Enter the following information at the bottom of the screen:


Parameter
Setup

Standard Value Unit


Minute (MIN)

Labor

Minute (MIN)

SAP AG

Page 92

CASE STUDY

Phase IV Production

Click on the Scheduling tab.

In the Create Work Center: Scheduling screen, enter the following information:
Attribute
Capacity category

Description
Enables the determination of whether it is machine or labor.

Data Value
Person (002)

Capacity

Capacity name

SHIFT

Setup formula

Formula used in scheduling to calculate the setup time.

Prod.: Setup time


(SAP001)

Processing formula

Formula used in scheduling to determine the processing time.

Prod.: Labor

SAP AG

Page 93

CASE STUDY

Phase IV Production

time (SAP003)

Click on the Costing tab.

In the Create Work Center: Cost Center Assignment screen, enter the following information:
Attribute
Cost Center

Description
Key uniquely identifying a cost center.

Data Value
Your Production Costs (NAPR10##)

Enter the following information at the bottom of the screen:


Alt activity descr.
Setup

SAP AG

Activity Type
LABOR

Formula key
Prod.: Setup time (SAP001)

Page 94

CASE STUDY

Phase IV Production

Labor

Click on

SAP AG

LABOR

Prod.: Labor time (SAP003)

(SAVE).

Page 95

Phase IV Production

CASE STUDY

You will receive a message that says Work center ASSY10## in plant DL## was created.

Refer to Appendix F for further action.

SAP AG

Page 96

Phase IV Production

CASE STUDY

IV.3.6: Create Raw Materials


Description: A raw material is a material that is procured externally and used in production. In this
task, you copy raw materials from US00 to create your own raw materials to use in production. In this
specific task, you create one raw material and then use the appendix as a reference.
Navigation: SAP menu Logistics Materials Management Material Master Material
Create (Special) Raw Material

Tasks and Data Entry:

SAP AG

Page 97

CASE STUDY

Phase IV Production

In the Create Raw Material (Initial Screen) screen, enter the following information:
Attribute
Material

Description
Key uniquely identifying the material.

Data Value
BOLT10##

Industry sector

Industry to which the material is assigned.

Mechanical engineering

Copy fromMaterial

Material you want the system to copy.

BOLT1000

Click on

(ENTER).

In the Select View(s) pop-up, highlight the Basic Data 1 row.


Highlight the Purchasing row.
Highlight the MRP1 row.
Highlight the MRP2 row.

SAP AG

Page 98

CASE STUDY

Phase IV Production

Highlight the General Plant Data / Storage 1 row.


Highlight the Accounting 1 row.
Highlight the Costing 1 row.
Click on

SAP AG

(SAVE AS DEFAULT VALUES).

Page 99

CASE STUDY

Phase IV Production

Click on

(CONTUNUE (ENTER)).

In the Organizational Levels pop-up, enter the following information:


Attribute
Plant

Description
Key uniquely identifying a plant.

Data Value
Your Plant Dallas
(DL##)

Stor. Location

The storage location at which the material is


stored.

Your Raw Materials


(RM##)

Copy from Plant

Plant of the reference material.

DL00

Copy from Stor. Location

Storage location of the reference material.

RM00

Click on

SAP AG

(CONTINUE (ENTER)).

Page 100

Phase IV Production

CASE STUDY

You will receive a message that says The material already exists and will be extended.

In the Create Raw Material BOLT10## screen, enter the following information:
Attribute
Material Description (Short Text)

Description
Material Description

Data Value
## Socket Head Bolt 5x20mm

Purchasing Group

A buyer or a group of buyers.

Your Purchasing Group (N##)

SAP AG

Page 101

Phase IV Production

Click on

CASE STUDY

(ENTER).

Enter the following information:


Attribute
MRP Controller

SAP AG

Description
Specifies the number of the MRP Controller or group
of MRP controllers responsible for material planning.

Data Value
Your DL Controller (0##)

Page 102

Phase IV Production

CASE STUDY

Click on

(ENTER) until you reach the last tab.

Click on

(ENTER).

In the Last data screen reached pop-up, click on the

icon.

You will receive a message that says Material BOLT10## created.

Refer to Appendix G to create the rest of the raw materials needed to produce the assembly and bike.

SAP AG

Page 103

Phase IV Production

CASE STUDY

IV.3.7: Create Semi-Finished Good


Description: In this task, you copy a semifinished good. This material is used in production of the
bike. A semifinished product is a material that is delivered to stock between operations. This material
can be used in production of another semifinished product or a finished product.
Navigation: SAP menu Logistics Materials Management Material Master Material
Create (Special) Semifinished Product

Tasks and Data Entry:

SAP AG

Page 104

CASE STUDY

Phase IV Production

In the Create Semifinished Product (Initial Screen) screen, enter the following information:
Attribute
Material

Description
Key identifying the material.

Data Value
TRWA10##

Copy fromMaterial

Material you want to copy from.

TRWA1000

Click on

(ENTER).

In the Select View(s) pop-up, deselect the Purchasing row.


Highlight the Work Scheduling row.
Click on

SAP AG

(SAVE AS DEFAULT VALUES).

Page 105

CASE STUDY

Phase IV Production

Click on

(CONTUNUE (ENTER)).

In the Organizational Levels pop-up, enter the following information:


Attribute
Stor. Location

Description
Location at which the material is stored.

Data Value
Your Semi-Finished Goods
(SF##)

Copy from Stor. Location

Storage location of the reference material.

SF00

Click on

SAP AG

(CONTINUE (ENTER)).

Page 106

Phase IV Production

CASE STUDY

You will receive a message that says The material already exists and will be extended.

In the Create Semifinished Product TRWA10## screen, enter the following information:
Attribute
Material Description (Short Text)

Description
Material Description

Data Value
## Touring Aluminum Wheel Assembly

MRP Controller

Controller responsible
for material planning.

Your DL Controller (0##)

Click on

SAP AG

(ENTER).

Page 107

Phase IV Production

SAP AG

CASE STUDY

Page 108

CASE STUDY

Phase IV Production

Enter the following information:


Attribute
In-house production

Click on

Description
The time in workdays needed to produce the material in-house.

Data Value
1

(ENTER).

Enter the following information:


Attribute
Prodn Supervisor

Click on

SAP AG

Description
Responsible for materials in production.

Data Value
Your DL Production Scheduler (0##)

(ENTER) until you reach the last tab.

Page 109

Phase IV Production

Click on

CASE STUDY

(ENTER).

In the Last data screen reached pop-up, click on the

icon.

You will receive a message that says Material TRWA10## created.

Refer to Appendix H to check your work.

SAP AG

Page 110

Phase IV Production

CASE STUDY

IV.3.8: Create Finished Good


Description: In this task, you create a finished product (DXTR30##). A finished product is a material
sold at a distribution center like Miami or San Diego. However, it is produced within Dallas.
Navigation: SAP menu Logistics Materials Management Material Master Material
Create (Special) Finished Product

Tasks and Data Entry:

SAP AG

Page 111

Phase IV Production

CASE STUDY

In the Create Finished Product (Initial Screen) screen, enter the following information:
Attribute
Material

Description
Key identifying the material.

Data Value
DXTR30##

Copy fromMaterial

Material you want to copy from.

DXTR3000

Click on

SAP AG

(ENTER).

Page 112

CASE STUDY

Phase IV Production

In the Select View(s) pop-up, click on the

icon.

In the Organizational Levels pop-up, enter the following information:


Attribute
Stor. Location

Description
Location at which the material is stored.

Data Value
Your Finished Goods

Copy from Stor. Location

Storage location of the reference material.

FG00

Click on

SAP AG

(CONTINUE (ENTER)).

Page 113

Phase IV Production

CASE STUDY

You will receive a message that says The material already exists and will be extended.

In the Create Finished Product DXTR30## screen, enter the following information:
Attribute
Material Description (Short Text)

Description
Material Description

Data Value
## Deluxe Touring Bike (red)

MRP Controller

MRP Controller responsible for


material planning for the material.

Your DL Controller (0##)

SAP AG

Page 114

CASE STUDY

Phase IV Production

Click on

(ENTER).

Enter the following information:


Attribute
In-house production

Click on

Description
The time in workdays needed to produce the material in-house.

Data Value
1

(ENTER).

Enter the following information:


Attribute
Prodn Supervisor

Click on

SAP AG

Description
Responsible for materials in production.

Data Value
Your DL Production Scheduler (0##)

(ENTER) until you reach the last tab.

Page 115

Phase IV Production

Click on

CASE STUDY

(ENTER).

In the Last data screen reached pop-up, click on the

icon.

You will receive a message that says Material DXTR30## created.

Refer to Appendix I to check your work.

SAP AG

Page 116

Phase IV Production

CASE STUDY

IV.3.9: Create Bills of Materials


Description: In this task, you create a bill of material for your finished product and then semifinished
product. It is a structured list of all the components and their quantity that make up an assembly.
Navigation: SAP menu Logistics Production Master Data Bills of Material Bill of
Material Material BOM Create

Tasks and Data Entry:


In the Create material BOM: Initial Screen screen, enter the following information:
Attribute
Material

Description
Key uniquely identifying the material.

Data Value
Your Touring Aluminum Wheel Assembly
(TRWA10##)

Plant

Key uniquely identifying a plant.

Your Plant Dallas (DL##)

BOM Usage

Defines the area where a BOM can be used.

Production (1)

SAP AG

Page 117

Phase IV Production

Click on

CASE STUDY

(COPY FROM).

In the Copy From pop-up, enter the following information:


Attribute
Material

Description
Key uniquely identifying the material.

Data Value
Touring Aluminum Wheel Assembly

Plant

Key uniquely identifying a plant.

Plant Dallas (DL00)

Click on

SAP AG

(CONTINUE (ENTER)).

Page 118

Phase IV Production

CASE STUDY

In the Create material BOM: Copy From screen, click on the


Click on

icon.

(COPY).

You will receive an error that says Material TRTR1000 not maintained in plant DL##.

In the Create material BOM: Item: General data screen, enter the following information:
Attribute
Component

Click on

Description
Material number of the components that you enter.

Data Value
Your Touring Tire (TRTR10##)

(ENTER).

You will receive an error that says Material TRTB1000 not maintained in plant DL##.

Repeat this to add the rest of your raw materials to your touring wheel assembly bill of materials.
You are now in the Create material BOM: General Item Overview screen.
Click on

SAP AG

(SAVE). You will receive a message that says Creating BOM for material TRWA10##.

Page 119

Phase IV Production

CASE STUDY

Refer to Appendix J to check your work.

In the Create material BOM: Initial Screen screen, enter the following information:
Attribute
Material

Click on

SAP AG

Description
Alphanumeric key uniquely identifying the material.

Data Value
Your Deluxe Touring Bike (red)
(DXTR30##)

(COPY FROM).

Page 120

Phase IV Production

CASE STUDY

In the Copy From pop-up, enter the following information:


Attribute
Material

Description
Alphanumeric key uniquely identifying the material.

Data Value
Deluxe Touring Bike (red)
(DXTR1000)

Plant

Key uniquely identifying a plant.

Plant Dallas (DL00)

Click on

(CONTINUE (ENTER)).

In the Create material BOM: Copy From screen, click on the


Click on

SAP AG

icon.

(COPY).

Page 121

Phase IV Production

CASE STUDY

You will receive an error that says Material TRWA1000 not maintained in plant DL##.

In the Create material BOM: Item: General data screen, enter the following information:
Attribute
Component

Click on

SAP AG

Description
Number of the components that you enter.

Data Value
Your Touring Aluminum Wheel Assembly
(TRWA10##)

(ENTER).

Page 122

Phase IV Production

CASE STUDY

You will receive an error that says Material TRFR3000 not maintained in plant DL##.

Repeat this to add all of your raw materials to your deluxe touring bike (red) bill of materials.
You are in the Create material BOM: General Item Overview screen.
Click on

SAP AG

(SAVE). You will receive a message that says Creating BOM for material DXTR30##.

Page 123

Phase IV Production

CASE STUDY

Refer to Appendix K to check your work.

SAP AG

Page 124

Phase IV Production

CASE STUDY

IV.3.10: Create Product Routings


Description: In this task, you copy product routings for your semifinished product and finished
product. A routing defines one or more sequences of operations for the production of a material. The
routing also specifies the work center where operations are performed.
Navigation: SAP menu Logistics Production Master Data Routings Routings Standard

Routings Create
Tasks and Data Entry:
In the Create Routing: Initial Screen screen, enter the following information:
Attribute
Material

Description
Key uniquely identifying the material.

Data Value
Your Touring Aluminum Wheel Assembly
(TRWA10##)

Plant

Key uniquely identifying a plant.

Your Plant Dallas (DL##)

SAP AG

Page 125

Phase IV Production

Click on

CASE STUDY

(COPY FROM).

In the Select Type pop-up, click on the

icon.

You are in the Create Using Copy Function: Select Object to be Copied pop-up.
Enter the following information:
Attribute
Material

Description
Key uniquely identifying the material.

Data Value
Touring Aluminum Wheel Assembly

Plant

Key uniquely identifying a plant.

Plant Dallas (DL00)

SAP AG

Page 126

Phase IV Production

Click on

CASE STUDY

(CONTINUE (ENTER)).

In the Create Routing: Header Data Check screen, enter the following information:
Attribute
Status

Click on

SAP AG

Description
You use the status key to indicate the processing status of a task list.

Data Value
Released
(general) (4)

(ENTER).

Page 127

CASE STUDY

Phase IV Production

You will receive an error that says Work center ASSY1000 does not exist in plant DL##.

In the Create Routing: Operation Check screen, enter the following information:
Attribute

SAP AG

Description

Data Value

Page 128

CASE STUDY

Phase IV Production

Work center

Click on

Key identifying the work center.

(ENTER).

In the Information pop-up, click on the

Click on

SAP AG

Your DL Assembly (ASSY10##)

icon.

(CONTINUE (ENTER)).

Page 129

Phase IV Production

CASE STUDY

You will receive a message that says Enter standard value Setup.
In the Create Routing: Operation Check screen, click on the

icon.

You will receive a message that says Enter standard value Setup.

Click on

(ENTER).

Repeat this to add the rest of your work centers to your touring wheel assembly product routing.
In the Create Routing: Operation Overview screen, click on the

icon.

You will receive a message that says Routing was saved with group and material TRWA10##.

SAP AG

Page 130

Phase IV Production

CASE STUDY

Refer to Appendix L to check your work.

In the Create Routing: Initial Screen screen, enter the following information:
Attribute
Material

Description
Alphanumeric key uniquely identifying the material.

Data Value
Your Deluxe Touring Bike (red)
(DXTR30##)

Plant

Key uniquely identifying a plant.

Your Plant Dallas (DL##)

SAP AG

Page 131

Phase IV Production

Click on

CASE STUDY

(COPY FROM).

In the Select Type pop-up, click on the

icon.

You are in the Create Using Copy Function1: Select Object to be Copied pop-up.
Enter the following information:
Attribute
Material

Description
Alphanumeric key uniquely identifying the material.

Data Value
Deluxe Touring Bike (red)
(DXTR3000)

Plant

Key uniquely identifying a plant.

Plant Dallas (DL00)

SAP AG

Page 132

Phase IV Production

Click on

CASE STUDY

(CONTINUE (ENTER)).

In the Create Routing: Header Data Check screen, enter the following information:
Attribute
Status

Click on

SAP AG

Description
You use the status key to indicate the processing status of a task list.

Data Value
Released
(general) (4)

(ENTER).

Page 133

Phase IV Production

CASE STUDY

You will receive an error that says Work center ASSY10## does not exist in plant DL##.

In the Create Routing: Operation Check screen, enter the following information:
Attribute
Work center

SAP AG

Description
Key identifying the work center.

Data Value
Your DL Assembly (ASSY10##)

Page 134

Phase IV Production

Click on

(ENTER).

In the Information pop-up, click on the

Click on

SAP AG

CASE STUDY

icon.

(CONTINUE (ENTER)).

Page 135

Phase IV Production

CASE STUDY

You will receive a message that says Enter standard value Setup.
In the Create Routing: Operation Check screen, click on the

icon.

You will receive a message that says Enter standard value Setup.

Click on

(ENTER).

Repeat this to add the rest of your work centers to your deluxe touring bike (red) product routing.
In the Create Routing: Operation Overview screen, click on the

icon.

You will receive a message that says Routing was saved with group and material DXTR30##.

SAP AG

Page 136

Phase IV Production

CASE STUDY

Refer to Appendix L to check your work.

SAP AG

Page 137

CASE STUDY

Phase IV Production

Part IV.4 Process Execution


Enterprise
Structure

Rules and
Parameters

Master Data

Process
Execution

Table of Contents
IV.4.1: Create Initial Inventory Balances....................................................................................42
IV.4.2: Create Planned Order for Semifinished..........................................................................43
IV.4.3: Convert Planned Order for Semifinished.........................................................................44
IV.4.4: Issue Materials to Production Order I..............................................................................45
IV.4.5: Confirm Production for Semifinished...............................................................................46
IV.4.6: Receive Semifinished Into Inventory...............................................................................47
IV.4.7: Create Planned Order for Finished Goods......................................................................48
IV.4.8: Convert Planned Order for Finished...............................................................................49
IV.4.9: Issue Materials to Production Order II.............................................................................50
IV.4.10: Confirm Production for Finished Goods........................................................................51
IV.4.11: Receive Finished Goods into Inventory.........................................................................52

SAP AG

Page 138

Phase IV Production

CASE STUDY

IV.4.1: Create Initial Inventory Balances


Description: In this step, you acquire the needed materials to produce 10 bikes. Normally, the
material planning process would create purchase requisitions for the necessary raw materials. You
would then execute the procurement process and obtain these materials. For this exercise, we will take
a shortcut and create inventory from heaven using a special movement type (561).
Navigation: SAP menu Logistics Materials Management Inventory Management Goods
Movement Goods Receipt Other

Tasks and Data Entry:


In the Enter Other Goods Receipts: Initial Screen screen, enter the following information:
Attribute
Movement Type

Description
Goods Movement Type

Data Value
Receipt per initial entry of stock balances into unr.-use
(561)

Storage Location

Location at which the


material is stored.

Your Raw Materials (RM##)

SAP AG

Page 139

Phase IV Production

Click on

CASE STUDY

(ENTER).

In the Enter Other Goods Receipts: New Items screen, enter the following information:
Material
Your Socket Head Bolt 5X20mm (BOLT10##)

Quantity
20

UnE
EA

Plant
Your Plant Dallas (DL##)

Your Brake Kit (BRKT10##)

10

EA

Your Plant Dallas (DL##)

Your Chain (CHAN10##)

10

EA

Your Plant Dallas (DL##)

Your Derailleur Gear Assembly (DGAM10##)

10

EA

Your Plant Dallas (DL##)

Your Hex Nut 5 mm (HXNT10##)

20

EA

Your Plant Dallas (DL##)

Your Lock Washer 5 mm (LWSH10##)

40

EA

Your Plant Dallas (DL##)

Your Packaging (PCKG10##)

10

EA

Your Plant Dallas (DL##)

Your Pedal Assembly (PEDL10##)

10

EA

Your Plant Dallas (DL##)

Your Touring Frame-Red (TRFR30##)

10

EA

Your Plant Dallas (DL##)

Your Touring Handle Bar (TRHB10##)

10

EA

Your Plant Dallas (DL##)

Your Touring Seat Kit (TRSK10##)

10

EA

Your Plant Dallas (DL##)

SAP AG

Page 140

Phase IV Production

CASE STUDY

Your Touring Tube (TRTB10##)

20

EA

Your Plant Dallas (DL##)

Your Touring Tire (TRTR10##)

20

EA

Your Plant Dallas (DL##)

Your Touring Aluminum Wheel (TRWH10##)

20

EA

Your Plant Dallas (DL##)

Your Warranty Document (WDOC10##)

10

EA

Your Plant Dallas (DL##)

Click on

SAP AG

(SAVE). You will receive a message that says Document posted.

Page 141

Phase IV Production

CASE STUDY

IV.4.2: Create Planned Order for Semifinished


Description: In this task, you create a planned order for your wheel assembly. Normally, the material
planning process would determine the need to produce bicycles. However, for the purpose of this
exercise, you have manually determined that you need 10 bikes (DXTR30##). To manufacture the
bikes, you need 20 wheel assemblies (TRWA10##). Therefore, you must produce the wheel
assemblies before you produce the bikes. A planned order is sent to a plant and is an MRP request for
the procurement of a particular material at a determined time. It specifies when the inward material
movement should be made and the quantity of material that is expected.
Navigation: SAP menu Logistics Production MRP Planned Order Create

Tasks and Data Entry:


In the Create Planned Order: Initial Screen screen, enter the following information:
Attribute
Planned order profile

SAP AG

Description
Profile that determines the order type, the procurement
type, the special procurement type, and the account

Data Value
Stock Order (LA)

Page 142

Phase IV Production

CASE STUDY
assignment type for processing the planned order.

Click on

(ENTER).

In the Create Planned Order: Stock order screen, enter the following information:
Attribute
Material

Description
Number of the material for the order.

Data Value
Your Touring Aluminum Wheel Assembly
(TRWA10##)

Order quantity

Quantity to be produced or ordered


according to the planned order.

20

Ord.finish

Date that you should expect either the


completion or the delivery of the order.

One Week from Today

Producing
plant

Plant in which the order quantity of the


internally produced material is to be
produced according to the planned order.

Your Plant Dallas (DL##)

Stor. Location

Location at which the material is stored.

Your Semi-Finished Goods (SF##)

SAP AG

Page 143

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Planned order will be created.

Page 144

Phase IV Production

CASE STUDY

IV.4.3: Convert Planned Order for Semifinished


Description: In this task, you convert your planned order into a production order. That is, you
authorize the production of the wheel assembly. The production order is based on the bill of materials
and you use it to produce a regular production item. You manage material transactions of the regular
production process. In addition, you can change components at the production stage. When you open a
new production order, all of the components are filled in automatically.
Navigation: SAP menu Logistics Production MRP Evaluations Stock/Requirements List

Tasks and Data Entry:


* Be sure that the system defaults your wheel assembly into the material field.
SAP AG

Page 145

Phase IV Production

CASE STUDY

In the Stock/Requirements List: Initial Screen screen, click on the

icon.

In the Stock/Requirements List screen, double-click on PldOrd.

In the Additional Data for MRP Element pop-up, click on the

icon.

You will receive a message that says Release carried out.

In the Production order Create: Header screen, click on the

SAP AG

icon.

Page 146

Phase IV Production

CASE STUDY

You will receive a message that says Order number saved.

SAP AG

Page 147

Phase IV Production

CASE STUDY

IV.4.4: Issue Materials to Production Order I


Description: In this task, you release (issue) the materials needed to produce the wheel assemblies. In
the previous task, you authorized production of the wheel assemblies. A goods issue is a goods
movement that is used to post the internal use of material, the issuing of material and the shipment of
goods to a customer. It results in a decrease of stock in the warehouse.
Navigation: SAP menu Logistics Production Shop Floor Control Goods Movements

Goods Issue
Tasks and Data Entry:
In the Enter Goods Issue: Initial Screen screen, enter the following information:
Attribute
Movement Type

SAP AG

Description
Number the system uses to determine the
rules for updating quantities and values

Data Value
Consumption for order from warehouse
(261)

Page 148

Phase IV Production

CASE STUDY

in the relevant general ledger accounts.


Click on

(TO ORDER).

In the Reference: Order pop-up, enter the following information:


Attribut
e
Order

SAP AG

Description

Data Value

Number of production order to which you issue the materials.

Production Order Number

Page 149

Phase IV Production

Click on

CASE STUDY

(CONTINUE (ENTER)).

In the Enter Goods Issue: Selection Screen screen, click on the

SAP AG

icon.

Page 150

Phase IV Production

CASE STUDY

You will receive a message that says Document posted.

SAP AG

Page 151

Phase IV Production

CASE STUDY

IV.4.5: Confirm Production for Semifinished


Description: In this task, you confirm the production of wheel assemblies. After the materials have
been released to the production order (previous task), the actual production takes place. When the
production has been completed it is necessary to inform the system of this fact.
Navigation: SAP menu Logistics Production Shop Floor Control Confirmation Enter

For Order
Tasks and Data Entry:
In the Enter Production Order Confirmation: Initial Screen screen, enter the following information:
Attribute
Order

SAP AG

Description
Number which identifies an order number.

Data Value
Production Order Number

Page 152

Phase IV Production

Click on

CASE STUDY

(ENTER).

In the Confirmation of Production Order Enter: Actual Data screen, enter the following information:
Attribute
Yield to Be Confirmed

SAP AG

Description
Yield that you want to confirm for the operation.

Data Value
20

Page 153

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Confirmation of order saved.

Page 154

Phase IV Production

CASE STUDY

IV.4.6: Receive Semifinished Into Inventory


Description: In this task, you receive (record) the material produced into inventory. This will create a
goods receipt. A goods receipt is the physical inbound movement of goods or materials into the
warehouse. It is a goods movement that is used to post goods received from external vendors or inplant production. All goods receipts result in an increase of stock. Goods receipts with reference to a
purchase order, a production order, and a delivery are considered.
Navigation: SAP menu Logistics Production Shop Floor Control Goods Movements

Goods Receipt
Tasks and Data Entry:
In the Goods Receipt for Order: Initial Screen screen, enter the following information:
Attribute
Movement Type

SAP AG

Description
Goods Movement Type

Data Value
Good receipt for order into warehouse
(101)
Page 155

Phase IV Production

CASE STUDY

Order

Identifies an order within a client.

Production Order Number

Storage Location

Location at which the material is stored.

Your Semi-Finished Goods (SF##)

Click on

(ADOPT + DETAILS).

In the Goods Receipt for Order: New Items 0001 screen, enter the following information:
Attribute
Deliv. Compl.

SAP AG

Description
Indicates that the item is to be regarded as closed.

Data Value
Selected

Page 156

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Document posted.

Page 157

Phase IV Production

CASE STUDY

IV.4.7: Create Planned Order for Finished Goods


Description: In this task, you create a planned order for your bike. Normally, the material planning
process would determine the need to produce bicycles. However, for the purpose of this exercise, you
have manually determined that you need 10 bikes (DXTR30##). A planned order is sent to a plant and
is an MRP request for the procurement of a particular material at a determined time. It specifies when
the inward material movement should be made and the quantity of the material.
Navigation: SAP menu Logistics Production MRP Planned Order Create

Tasks and Data Entry:


In the Create Planned Order: Initial Screen screen, click on the

icon.

In the Create Planned Order: Stock order screen, enter the following information:
Attribute
Material

SAP AG

Description
Number of the material.

Data Value
Your Deluxe Touring Bike (red)
(DXTR30##)

Page 158

Phase IV Production

CASE STUDY

Order quantity

Quantity to be produced or ordered


according to the planned order.

10

Ord.finish

Date, according to the planned order, that


you should expect either the completion or
the delivery of the planned order quantity.

One Week from Today

Producing plant

Plant in which the order quantity of the


internally produced material is to be
produced according to the planned order.

Your Plant Dallas (DL##)

Stor. Location

Location at which the material is stored.

Your Finished Goods (FG##)

SAP AG

Page 159

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Planned order will be created.

Page 160

Phase IV Production

CASE STUDY

IV.4.8: Convert Planned Order for Finished


Description: In this task, you convert your planned order into a production order. That is, you
authorize the production of the bike. The production order is based on the bill of materials and you use
it to produce a regular production item. You manage material transactions of the regular production
process. In addition, you can change components at the production stage. When you open a new
production order, all of the components are filled in automatically.
Navigation: SAP menu Logistics Production MRP Evaluations Stock/Requirements List

Tasks and Data Entry:

SAP AG

Page 161

Phase IV Production

CASE STUDY

In the Stock/Requirements List: Initial Screen screen, click on the

icon.

In the Stock/Requirements List screen, double-click on PldOrd.

In the Additional Data for MRP Element pop-up, click on the

icon.

You will receive a message that says Release carried out.

In the Production order Create: Header screen, click on the

SAP AG

icon.

Page 162

Phase IV Production

CASE STUDY

You will receive a message that says Order number saved.

SAP AG

Page 163

Phase IV Production

CASE STUDY

IV.4.9: Issue Materials to Production Order II


Description: In this task, you release (issue) the materials needed to produce the bikes.
Navigation: SAP menu Logistics Production Shop Floor Control Goods Movements

Goods Issue
Tasks and Data Entry:
In the Enter Goods Issue: Initial Screen screen, enter the following information:
Attribute
Movement Type

Description
Number the system uses to determine
the rules for updating quantities and
values in the relevant ledger accounts.

Data Value
Consumption for order from warehouse
(261)

Storage Location

Number of the storage location at which

Your Raw Materials (RM##)

SAP AG

Page 164

CASE STUDY

Phase IV Production

the material is stored. A plant may


contain one or more storage locations.

Click on

(TO ORDER).

In the Reference: Order pop-up, enter the following information:


Attribute
Order

SAP AG

Description
Order Number

Data Value
Production Order Number

Page 165

CASE STUDY

Phase IV Production

Click on

(ADOPT + DETAILS).

In the Enter Goods Issue: New Item 0001 screen, enter the following information:
Material
Your Touring Aluminum Wheel Assembly
(TRWA10##)

SAP AG

Quantity
20

SLoc
Your Semi-Finished Goods
(SF##)

Page 166

Phase IV Production

Click on

CASE STUDY

(ADOPT).

In the Enter Goods Issue: New Item 0002 screen, click on the

icon.

Repeat this for the remaining materials.

SAP AG

Page 167

Phase IV Production

CASE STUDY

* Keep in mind that the rest of the materials are all raw materials.
In the Enter Goods Issue: Overview screen, click on the

icon.

You will receive a message that says Document posted.

SAP AG

Page 168

Phase IV Production

CASE STUDY

IV.4.10: Confirm Production for Finished Goods


Description: In this task, you confirm the production of bikes. After the materials have been released
to the production order, the actual production takes place.
Navigation: SAP menu Logistics Production Shop Floor Control Confirmation Enter

For Order
Tasks and Data Entry:
In the Enter Production Order Confirmation: Initial Screen screen, enter the following information:
Attribute
Order

SAP AG

Description
Order of which you wish to confirm production.

Data Value
Production Order Number

Page 169

Phase IV Production

Click on

CASE STUDY

(ENTER).

In the Confirmation of Production Order Enter: Actual Data screen, enter the following information:
Attribute
Yield to Be Confirmed

SAP AG

Description
Yield that you want to confirm for the operation.

Data Value
10

Page 170

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Confirmation of order saved.

Page 171

Phase IV Production

CASE STUDY

IV.4.11: Receive Finished Goods into Inventory


Description: In this task, you receive (record) the material produced into inventory. This will create a
goods receipt. A goods receipt is the physical inbound movement of goods or materials into the
warehouse. It is a goods movement that is used to post goods received from external vendors or inplant production. All goods receipts result in an increase of stock. Goods receipts with reference to a
purchase order, a production order, and a delivery are considered.
Navigation: SAP menu Logistics Production Shop Floor Control Goods Movements

Goods Receipt
Tasks and Data Entry:
In the Enter Receipt for Order: Initial Screen screen, enter the following information:
Attribute
Movement Type
SAP AG

Description
Movement

Data Value
Good receipt for order into warehouse (101)
Page 172

Phase IV Production

CASE STUDY

Order

Number which identifies an


order within a client.

Production Order Number

Storage Location

Number of the storage location


at which the material is stored.

Your Finished Goods (FG##)

Click on

(ADOPT + DETAILS).

In the Goods Receipt for Order: Items 0001 screen, enter the following information:
Attribute
Deliv. Compl.

SAP AG

Description
Indicates that the item is to be regarded as closed.

Data Value
Selected

Page 173

Phase IV Production

Click on

SAP AG

CASE STUDY

(SAVE). You will receive a message that says Document posted.