Product
Revised
6/24/2013
Focus
Production
Authors
Simha R. Magal
Stefan Weidner
Tom Wilder
Version
2.21
MOTIVATION
PREREQUISITES
You should be familiar with
navigation in the SAP system.
It is also recommended that
you have gone through the
fulfillment exercise.
ACKNOWLEDGEMENT
This material was prepared
with the assistance of student
interns at the Seidman ERP
program at Grand Valley
State University and the SAP
Club at CSU Chico as well as
student and research
assistants at SAP UCC
Magdeburg.
SAP AG
CASE STUDY
Phase IV Production
Enterprise
Structure
Rules and
Parameters
Master Data
Process
Execution
Table of Contents
General Notes and Cautions........................................................................................................1
Part IV.1 Enterprise Structure...................................................................................................3
Part IV.2 Rules and Parameters................................................................................................5
Part IV.3 Master Data.............................................................................................................. 21
Part IV.4 Process Execution....................................................................................................41
SAP AG
Phase IV Production
CASE STUDY
icon.
Saving: When the instructions to tell you to save data, always press the Enter key to validate. If there
are error(s) that occur, they must be corrected before continuing to the next task. You will find errors from
a transaction when there are red icons that appear in the message area. Messages that are yellow contain
warnings and not errors. At times, these must be fixed in order to move on. However, most of the time,
SAP AG
Page
Phase IV Production
CASE STUDY
they do not need to be fixed and you can simply enter through them. Green messages are obviously
showing that nothing went wrong with the transaction and that you may proceed to the next task.
Set Controlling Area Pop-Up: At times throughout this phase, there will be times when the system asks
you enter your controlling area to clarify which controlling area you are configuring for.
If this should happen, in the Set Controlling Area pop-up, enter the following information:
Attribute
Controlling Area
Click on
Description
Uniquely identifies a controlling area.
Data Value
NA##
(CONTINUE (ENTER)).
This will get you into the next screen where the instructions will then tell you what to do for the task.
Enter Chart of Accounts Pop-Up: At times throughout this phase, there will be times when the system
asks you enter your chart of accounts to clarify which chart of accounts you are configuring for.
If this should happen, in the Enter Chart of Accounts pop-up, enter the following information:
Attribute
Chart of Accounts
Click on
Description
Key that uniquely identifies a chart of accounts.
Data Value
GL##
(CONTINUE (ENTER)).
This will get you into the next screen where the instructions will then tell you what to do for the task.
SAP AG
Page
CASE STUDY
Phase IV Production
Rules and
Parameters
Master Data
Process
Execution
Table of Contents
IV.1.1: Determine Work Center Location......................................................................................4
SAP AG
Page
Phase IV Production
CASE STUDY
SAP AG
Page
Phase IV Production
CASE STUDY
icon.
In the New Entries: Overview of Added Entries screen, enter the following information:
Plnt
Your Plant Dallas (DL##)
Click on
Location
DALLAS TX
Name
GBI N42##
(ENTER).
In the Edit address: DL## DALLAS TX pop-up, enter the following information:
Attribute
Country
SAP AG
Description
The country key contains information which the system uses to check
entries such as the length of the postal code or bank account number.
Data Value
USA (US)
Page
CASE STUDY
Phase IV Production
Region
Texas (TX)
icon.
SAP AG
Description
Specifies the tax jurisdiction.
Data Value
Texas Jurisdiction Code
(TX0000000)
Page
Phase IV Production
SAP AG
CASE STUDY
Page
Phase IV Production
Click on
SAP AG
CASE STUDY
(ENTER (CONTINUE)). You will receive a message that says One entry chosen.
Page
Phase IV Production
CASE STUDY
icon.
SAP AG
Page
CASE STUDY
Phase IV Production
Rules and
Parameters
Master Data
Process
Execution
Table of Contents
IV.2.1: Define Production Scheduling Profile................................................................................6
IV.2.2: Define Production Scheduler............................................................................................7
IV.2.3: Configure Automatic Postings...........................................................................................8
IV.2.4: Activate Material Requirements Planning..........................................................................9
IV.2.5: Define Checking Control.................................................................................................10
IV.2.6: Define Scheduling Parameters........................................................................................11
IV.2.7: Define Order Dependent Parameters.............................................................................12
IV.2.8: Define Confirmation Parameters.....................................................................................13
IV.2.9: Carry Out Maintenance of Materials...............................................................................14
IV.2.10: Carry Out Maintenance of Production...........................................................................18
IV.2.11: Define Valuation of Goods Received.............................................................................20
SAP AG
Page 10
Phase IV Production
CASE STUDY
SAP AG
Page 11
Phase IV Production
CASE STUDY
In the Change View Production Scheduling Profile: Overview screen, click on the
icon.
In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant
Description
Key uniquely identifying a plant.
Data Value
Your Plant Dallas
(DL##)
10
Description
Release
Selected
Schedule Order
Selected
SAP AG
Page 12
Phase IV Production
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Data was saved.
Page 13
Phase IV Production
CASE STUDY
r
Tasks and Data Entry:
SAP AG
Page 14
Phase IV Production
CASE STUDY
icon.
In the New Entries: Overview of Added Entries screen, enter the following information:
Attribute
Plant
ProdSched.
Descriptio
n
ProdProfile
Click on
SAP AG
Description
Uniquely identifies a plant
Scheduler responsible for a material in production.
Description of Production Scheduler
Data Value
Your Plant Dallas (DL##)
0##
## DL Production Scheduler
10
(SAVE). You will receive a message that says Data was saved.
Page 15
Phase IV Production
CASE STUDY
SAP AG
Page 16
CASE STUDY
Phase IV Production
icon.
Gen. modif.
VAX
Valuation class
3100
Account
Your Cost of Goods Sold (780000)
0001
VAX
7920
0001
3000
0001
3030
0001
3100
0001
7900
0001
AUF
7900
0001
AUF
7920
SAP AG
Page 17
CASE STUDY
Phase IV Production
(741700)
0001
VBR
3000
0001
VBR
3100
0001
VBR
7900
0001
BSA
3000
0001
BSA
3100
0001
BSA
7920
0001
BSA
7900
SAP AG
Page 18
Phase IV Production
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Changes have been made.
Page 19
Phase IV Production
CASE STUDY
SAP AG
Page 20
Phase IV Production
CASE STUDY
icon.
You are in the Change View Activate Requirements Planning: Overview screen.
Enter the following information:
Plnt
Your Plant Dallas(DL##)
Selected
Selected
SAP AG
Page 21
Phase IV Production
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Data was saved.
Page 22
Phase IV Production
CASE STUDY
SAP AG
Page 23
Phase IV Production
Click on
CASE STUDY
(COPY AS). You will receive a message that says Specify target entries.
In the Change View Order control: Details of Selected Set screen, enter the following information:
Attribute
Plant
SAP AG
Description
Key uniquely identifying a plant.
Data Value
Your Plant Dallas (DL##)
Page 24
CASE STUDY
Phase IV Production
Click on
(ENTER). You will receive a message that says Specify target entries.
SAP AG
Description
Key uniquely identifying a plant.
Data Value
Your Plant Dallas (DL##)
Page 25
Phase IV Production
Click on
CASE STUDY
(ENTER). You will receive a message that says Number of entries copied: 2.
In the Change View Order control: Overview of Selected Set screen, click on the
SAP AG
icon.
Page 26
Phase IV Production
CASE STUDY
SAP AG
Page 27
Phase IV Production
CASE STUDY
SAP AG
Page 28
Phase IV Production
CASE STUDY
In the Change View Specify scheduling parameters: Overview screen, click on the
icon.
In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant
Description
Key uniquely identifying a plant.
Data Value
Your Plant Dallas (DL##)
Order type
Prodn Superv.
Scheduling Type
Backwards
Automatic Scheduling
Selected
Click on
SAP AG
(SAVE). You will receive a message that says Data was saved.
Page 29
Phase IV Production
SAP AG
CASE STUDY
Page 30
Phase IV Production
CASE STUDY
Page 31
Phase IV Production
CASE STUDY
You are in the Change View Order Type-Dependent Parameters: Overview: Overview screen.
Click on
(NEW ENTRIES).
In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant
Description
Key that uniquely identifies a plant.
Data Value
Your Plant Dallas (DL##)
Order Type
Routing Selection
BOM Application
SAP AG
Page 32
CASE STUDY
Phase IV Production
Description
Key that specifies which costing variant
is used to determine the planned costs.
Data Value
Production Order: Planned (PPP1)
SAP AG
Page 33
Phase IV Production
CASE STUDY
is used to determine the actual costs.
Click on
SAP AG
(SAVE). You will receive a message that says Data was saved.
Page 34
Phase IV Production
CASE STUDY
SAP AG
Page 35
Phase IV Production
CASE STUDY
(NEW ENTRIES).
In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant
Description
Key that uniquely identifies a plant.
Data Value
Your Plant Dallas (DL##)
Order Type
SAP AG
Page 36
CASE STUDY
Phase IV Production
Description
Specifies what sort of confirmation is to
be automatically proposed.
Data Value
Final Confirmation
Selected
SAP AG
Page 37
Phase IV Production
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Data was saved.
Page 38
Phase IV Production
CASE STUDY
SAP AG
Page 39
Phase IV Production
Click on
CASE STUDY
(CREATE).
Click on
Description
Key that uniquely identifies a plant.
(CREATE).
SAP AG
Data Value
Your Plant Dallas (DL##)
icon.
Page 40
Phase IV Production
CASE STUDY
You will receive a message that says Plant Parameters for Plant DL## can now be maintained.
SAP AG
icon.
icon.
Page 41
Phase IV Production
CASE STUDY
SAP AG
icon.
icon.
Page 42
CASE STUDY
Phase IV Production
You are in the Change View Number Ranges for Planned Orders: Overview screen.
Enter the following information:
Plnt
Your Plant Dallas (DL##)
Click on
SAP AG
Name 1
## Plant Dallas
NRge pl.orders
01
(SAVE). You will receive a message that says Data was saved.
Page 43
CASE STUDY
Phase IV Production
Click on
(BACK).
icon.
SAP AG
Name 1
## Plant Dallas
Page 44
Phase IV Production
CASE STUDY
Click on
(SAVE). You will receive a message that says Data was saved.
Click on
(BACK).
SAP AG
icon.
Page 45
CASE STUDY
Phase IV Production
You are in the Change View Number Ranges for Purchase Requisitions: Overview screen,
Enter the following information:
Plnt
Your Plant Dallas (DL##)
SAP AG
Name1
## Plant Dallas
NR - PReq
01
Page 46
Phase IV Production
CASE STUDY
Click on
(SAVE). You will receive a message that says Data was saved.
Click on
(BACK).
icon.
SAP AG
Page 47
CASE STUDY
Phase IV Production
You are in the Change View Number Ranges for MRP Lists: Overview screen.
Enter the following information:
Plnt
Your Plant Dallas (DL##)
Name 1
## Plant Dallas
Click on
(SAVE). You will receive a message that says Data was saved.
Click on
(BACK).
icon.
SAP AG
Page 48
CASE STUDY
Phase IV Production
You are
Reservations: Overview screen
SAP AG
Name 1
## Plant Dallas
NR. SimDepRs
01
Page 49
Phase IV Production
CASE STUDY
Click on
(SAVE). You will receive a message that says Data was saved.
Click on
(BACK).
SAP AG
icon.
Page 50
Phase IV Production
CASE STUDY
icon.
You will receive a message that says No entries found that match selection criteria.
SAP AG
Page 51
Phase IV Production
CASE STUDY
icon.
In the New Entries: Details of Added Entries screen, enter the following information:
Attribute
Plant
Description
Key uniquely identifying a plant.
Data Value
Your Plant Dallas (DL##)
MRP Controller
0##
## DL Controller
SAP AG
Page 52
Phase IV Production
CASE STUDY
Click on
(SAVE). You will receive a message that says Data was saved.
Click on
(BACK). You will receive a message that says Only one entry chosen.
SAP AG
icon.
Page 53
Phase IV Production
CASE STUDY
SAP AG
icon.
Page 54
Phase IV Production
CASE STUDY
SAP AG
icon.
Page 55
Phase IV Production
CASE STUDY
In the Change View Floats for Scheduling: Overview screen, click on the
icon.
In the New Entries: Overview of Added Entries screen, enter the following information:
Plnt
Your Plant Dallas
(DL##)
Marg.
001
Opening Period
1
Fl Bef.
1
Fl After
1
Rel. Per.
1
Click on
(SAVE). You will receive a message that says Data was saved.
Click on
(BACK). You will receive a message that says Only one entry chosen.
In the Change View Floats for Scheduling: Overview screen, click on the
SAP AG
icon.
icon.
Page 56
CASE STUDY
Phase IV Production
In the Change View Availability Check: Overview screen, enter the following information:
Plnt
Your Plant Dallas
(DL##)
SAP AG
Name 1
## Plant Dallas
Page 57
Phase IV Production
CASE STUDY
Click on
(SAVE). You will receive a message that says Data was saved.
Click on
(BACK).
SAP AG
icon.
Page 58
Phase IV Production
CASE STUDY
SAP AG
Page 59
Phase IV Production
CASE STUDY
You are in the Change View Default Values Purchasing/MRP: Details screen.
Enter the following information:
Attribute
Scheduling: Info Rec/Agreemt
Description
Determines whether the planned delivery time in the
record is used for scheduling in the planning run.
Data Value
Selected
Schedule lines
Schedule lines
(3)
Unknown (U)
Click on
SAP AG
(SAVE). You will receive a message that says Data was saved.
Page 60
Phase IV Production
CASE STUDY
SAP AG
Page 61
Phase IV Production
Click on
CASE STUDY
(MAINTAIN).
Click on
SAP AG
Description
Key uniquely identifying a plant.
Data Value
Your Plant Dallas (DL##)
(MAINATIN).
Page 62
Phase IV Production
CASE STUDY
SAP AG
icon.
icon.
Page 63
CASE STUDY
Phase IV Production
You are in the Change View Conv. Planned Ord. -> Prod.Ord., MRP Customizing: Overview screen.
Enter the following information:
Attribute
Production order
Click on
SAP AG
Description
Key that differentiates orders
Data Value
Standard Production Order (PP01)
(SAVE). You will receive a message that says Data was saved.
Page 64
Phase IV Production
Click on
(BACK) twice.
SAP AG
CASE STUDY
icon.
Page 65
Phase IV Production
CASE STUDY
SAP AG
icon.
icon.
Page 66
Phase IV Production
CASE STUDY
In the Change View Run-Time Statistics: Overview screen, enter the following information:
Attribute
Display list
Frequency
Description
Instructs the system to create a list of the planned materials.
Determines if an entry is made in the runtime statistics.
Click on
(SAVE). You will receive a message that says Data was saved.
Click on
(BACK).
SAP AG
Data Value
Selected
1
Page 67
Phase IV Production
CASE STUDY
SAP AG
icon.
icon.
Page 68
Phase IV Production
CASE STUDY
In the Change View BOM/Routing Selection: Overview screen, enter the following information:
Attribute
BOM Sel ID
Routing Sel ID
SAP AG
Description
Determines which BOM is to be used and
with which priority for BOM selection.
Determines which routing is to be used and
with which priority for routing selection.
Data Value
01 Production (01)
01 Released (general) (01)
Page 69
Phase IV Production
Click on
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Maintain selection ID in the parameters.
(ENTER). You will receive a message that says Data was saved.
Page 70
Phase IV Production
CASE STUDY
SAP AG
Page 71
Phase IV Production
CASE STUDY
You are in the Change View Valuation variants for order costing: Overview screen.
Click on
(NEW ENTRIES).
In the New Entries: Overview of Added Entries screen, enter the following information:
Attribute
Val. Area
Val. Var.
Click on
SAP AG
Description
Organizational level at which the material is valuated.
Determines the price of goods receipts for materials.
Data Value
Your Plant Dallas (DL##)
Production Order: Actual
(007)
(SAVE). You will receive a message that says Data was saved.
Page 72
CASE STUDY
Phase IV Production
Rules and
Parameters
Master Data
Process
Execution
Table of Contents
IV.3.1: Create Activity Type........................................................................................................ 22
IV.3.2: Change Activity Output/Prices.........................................................................................23
IV.3.3: Determine Person Responsible......................................................................................25
IV.3.4: Create Capacity.............................................................................................................. 26
IV.3.5: Create Work Centers......................................................................................................28
IV.3.6: Create Raw Materials.....................................................................................................30
IV.3.7: Create Semi-Finished Good...........................................................................................32
IV.3.8: Create Finished Good.....................................................................................................34
IV.3.9: Create Bills of Materials..................................................................................................36
IV.3.10: Create Product Routings...............................................................................................38
SAP AG
Page 73
Phase IV Production
CASE STUDY
SAP AG
Page 74
CASE STUDY
Phase IV Production
Description
Key uniquely identifying an activity type.
Data Value
LABOR
Valid From
Click on
(ENTER).
In the Create Activity Type: Basic Screen screen, enter the following information:
Attribute
Name
Description
General description of the object.
Data Value
## Labor Hours
Activity Unit
Hour (H)
CCtr categories
ATyp category
SAP AG
Page 75
Phase IV Production
CASE STUDY
Price indicator
Click on
SAP AG
(SAVE). You will receive a message that says Activity type has been created.
Page 76
Phase IV Production
SAP AG
CASE STUDY
Page 77
Phase IV Production
CASE STUDY
Output/Prices Change
Tasks and Data Entry:
In the Change Activity Type/Price Planning: Initial Screen screen, enter the following information:
Attribute
Version
Description
A collection of year-dependent indicators for planning data.
Data Value
Plan/Act Version
(0)
From Period
To Period
12
SAP AG
Page 78
CASE STUDY
Phase IV Production
Fiscal year
Current Year
Your Operations
(N40##)
Click on
(OVERVIEW SCREEN).
In the Change Activity Type/Price Planning: Overview Screen screen, enter the following information:
Activity
LABOR
Plan Activity
100000
Distribution key
Distribution as
before (2)
Click on
(NEXT COMBINATION).
Distribution key
Distribution as before (2)
Variable price
10
Repeat this for the rest of the cost centers within the group.
SAP AG
Page 79
Phase IV Production
Click on
CASE STUDY
(SAVE). You will receive a message that says Changed data has been posted.
In the Change Activity Type/Price Planning: Initial Screen screen, enter the following information:
Attribute
Fiscal year
Click on
SAP AG
Description
Period for which a company creates its inventory and balance sheet.
Data Value
Year After Current
(OVERVIEW SCREEN).
Page 80
CASE STUDY
Phase IV Production
In the Change Activity Type/Price Planning: Overview Screen screen, enter the following information:
Activity
LABOR
Click on
Plan Activity
100000
Distribution key
Distribution as
before (2)
Distribution key
Distribution as before (2)
Variable price
10
(NEXT COMBINATION).
Repeat this for the rest of the cost centers within the group.
Click on
SAP AG
(SAVE). You will receive a message that says Changed data has been posted.
Page 81
Phase IV Production
CASE STUDY
SAP AG
Page 82
CASE STUDY
Phase IV Production
Click on
(NEW ENTRIES).
In the New Entries: Overview of Added Entries screen, enter the following information:
Plnt
Your Plant Dallas
(DL##)
SAP AG
Pers. Respons.
0##
Page 83
Phase IV Production
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Data was saved.
Page 84
Phase IV Production
CASE STUDY
Create
Tasks and Data Entry:
In the Create Capacity: Initial Screen screen, enter the following information:
Attribute
Plant
Description
Key uniquely identifying a plant.
Data Value
Your Plant Dallas (DL##)
Capacity
SHIFT
Capacity category
Person (002)
SAP AG
Page 85
Phase IV Production
Click on
CASE STUDY
(ENTER).
Description
Describes the capacity in more detail.
Data Value
## Standard Day Shift
Hour (H)
Start
08:00:00
Finish
17:00:00
Length of breaks
01:00:00
Capacity utilization
100
Selected
Click on
SAP AG
(SAVE).
Page 86
Phase IV Production
CASE STUDY
You will receive a message that says Capacity SHIFT plant DL## category 002 created.
In the Create Capacity: Initial Screen screen, enter the following information:
Attribute
Capacity category
Click on
SAP AG
Description
The capacity category enables you to determine
whether it is machine or labor capacity.
Data Value
Machine (001)
(ENTER).
Page 87
Phase IV Production
CASE STUDY
Description
Describes the capacity in more detail.
Data Value
## Standard Day Shift
Hour (H)
Start
08:00:00
Finish
17:00:00
Length of breaks
01:00:00
Capacity utilization
100
Selected
Click on
SAP AG
(SAVE).
Page 88
Phase IV Production
CASE STUDY
You will receive a message that says Capacity SHIFT plant DL## category 002 created.
SAP AG
Page 89
Phase IV Production
CASE STUDY
Create
Tasks and Data Entry:
In the Create Work Center: Initial Screen screen, enter the following information:
Attribute
Plant
Description
Key uniquely identifying a plant.
Data Value
Your Plant Dallas (DL##)
Work center
ASSY10##
Labor (0003)
SAP AG
Page 90
CASE STUDY
Phase IV Production
Click on
(ENTER).
In the Create Work Center: Basic Data screen, enter the following information:
Attribute
Description
Description
Description
Data Value
## DL Assembly
Person responsible
Location
DALLAS TX
Usage
Click on
(ENTER).
Labor
should be entered
SAP AG
Page 91
Phase IV Production
CASE STUDY
In the Create Work Center: Default Values screen, enter the following information:
Attribute
Control key
Description
Determines which business transactions should be
executed for the object that belongs to the order.
Data Value
Routing/Ref. op. set internal proc.
(ASSY)
Labor
Minute (MIN)
SAP AG
Page 92
CASE STUDY
Phase IV Production
In the Create Work Center: Scheduling screen, enter the following information:
Attribute
Capacity category
Description
Enables the determination of whether it is machine or labor.
Data Value
Person (002)
Capacity
Capacity name
SHIFT
Setup formula
Processing formula
Prod.: Labor
SAP AG
Page 93
CASE STUDY
Phase IV Production
time (SAP003)
In the Create Work Center: Cost Center Assignment screen, enter the following information:
Attribute
Cost Center
Description
Key uniquely identifying a cost center.
Data Value
Your Production Costs (NAPR10##)
SAP AG
Activity Type
LABOR
Formula key
Prod.: Setup time (SAP001)
Page 94
CASE STUDY
Phase IV Production
Labor
Click on
SAP AG
LABOR
(SAVE).
Page 95
Phase IV Production
CASE STUDY
You will receive a message that says Work center ASSY10## in plant DL## was created.
SAP AG
Page 96
Phase IV Production
CASE STUDY
SAP AG
Page 97
CASE STUDY
Phase IV Production
In the Create Raw Material (Initial Screen) screen, enter the following information:
Attribute
Material
Description
Key uniquely identifying the material.
Data Value
BOLT10##
Industry sector
Mechanical engineering
Copy fromMaterial
BOLT1000
Click on
(ENTER).
SAP AG
Page 98
CASE STUDY
Phase IV Production
SAP AG
Page 99
CASE STUDY
Phase IV Production
Click on
(CONTUNUE (ENTER)).
Description
Key uniquely identifying a plant.
Data Value
Your Plant Dallas
(DL##)
Stor. Location
DL00
RM00
Click on
SAP AG
(CONTINUE (ENTER)).
Page 100
Phase IV Production
CASE STUDY
You will receive a message that says The material already exists and will be extended.
In the Create Raw Material BOLT10## screen, enter the following information:
Attribute
Material Description (Short Text)
Description
Material Description
Data Value
## Socket Head Bolt 5x20mm
Purchasing Group
SAP AG
Page 101
Phase IV Production
Click on
CASE STUDY
(ENTER).
SAP AG
Description
Specifies the number of the MRP Controller or group
of MRP controllers responsible for material planning.
Data Value
Your DL Controller (0##)
Page 102
Phase IV Production
CASE STUDY
Click on
Click on
(ENTER).
icon.
Refer to Appendix G to create the rest of the raw materials needed to produce the assembly and bike.
SAP AG
Page 103
Phase IV Production
CASE STUDY
SAP AG
Page 104
CASE STUDY
Phase IV Production
In the Create Semifinished Product (Initial Screen) screen, enter the following information:
Attribute
Material
Description
Key identifying the material.
Data Value
TRWA10##
Copy fromMaterial
TRWA1000
Click on
(ENTER).
SAP AG
Page 105
CASE STUDY
Phase IV Production
Click on
(CONTUNUE (ENTER)).
Description
Location at which the material is stored.
Data Value
Your Semi-Finished Goods
(SF##)
SF00
Click on
SAP AG
(CONTINUE (ENTER)).
Page 106
Phase IV Production
CASE STUDY
You will receive a message that says The material already exists and will be extended.
In the Create Semifinished Product TRWA10## screen, enter the following information:
Attribute
Material Description (Short Text)
Description
Material Description
Data Value
## Touring Aluminum Wheel Assembly
MRP Controller
Controller responsible
for material planning.
Click on
SAP AG
(ENTER).
Page 107
Phase IV Production
SAP AG
CASE STUDY
Page 108
CASE STUDY
Phase IV Production
Click on
Description
The time in workdays needed to produce the material in-house.
Data Value
1
(ENTER).
Click on
SAP AG
Description
Responsible for materials in production.
Data Value
Your DL Production Scheduler (0##)
Page 109
Phase IV Production
Click on
CASE STUDY
(ENTER).
icon.
SAP AG
Page 110
Phase IV Production
CASE STUDY
SAP AG
Page 111
Phase IV Production
CASE STUDY
In the Create Finished Product (Initial Screen) screen, enter the following information:
Attribute
Material
Description
Key identifying the material.
Data Value
DXTR30##
Copy fromMaterial
DXTR3000
Click on
SAP AG
(ENTER).
Page 112
CASE STUDY
Phase IV Production
icon.
Description
Location at which the material is stored.
Data Value
Your Finished Goods
FG00
Click on
SAP AG
(CONTINUE (ENTER)).
Page 113
Phase IV Production
CASE STUDY
You will receive a message that says The material already exists and will be extended.
In the Create Finished Product DXTR30## screen, enter the following information:
Attribute
Material Description (Short Text)
Description
Material Description
Data Value
## Deluxe Touring Bike (red)
MRP Controller
SAP AG
Page 114
CASE STUDY
Phase IV Production
Click on
(ENTER).
Click on
Description
The time in workdays needed to produce the material in-house.
Data Value
1
(ENTER).
Click on
SAP AG
Description
Responsible for materials in production.
Data Value
Your DL Production Scheduler (0##)
Page 115
Phase IV Production
Click on
CASE STUDY
(ENTER).
icon.
SAP AG
Page 116
Phase IV Production
CASE STUDY
Description
Key uniquely identifying the material.
Data Value
Your Touring Aluminum Wheel Assembly
(TRWA10##)
Plant
BOM Usage
Production (1)
SAP AG
Page 117
Phase IV Production
Click on
CASE STUDY
(COPY FROM).
Description
Key uniquely identifying the material.
Data Value
Touring Aluminum Wheel Assembly
Plant
Click on
SAP AG
(CONTINUE (ENTER)).
Page 118
Phase IV Production
CASE STUDY
icon.
(COPY).
You will receive an error that says Material TRTR1000 not maintained in plant DL##.
In the Create material BOM: Item: General data screen, enter the following information:
Attribute
Component
Click on
Description
Material number of the components that you enter.
Data Value
Your Touring Tire (TRTR10##)
(ENTER).
You will receive an error that says Material TRTB1000 not maintained in plant DL##.
Repeat this to add the rest of your raw materials to your touring wheel assembly bill of materials.
You are now in the Create material BOM: General Item Overview screen.
Click on
SAP AG
(SAVE). You will receive a message that says Creating BOM for material TRWA10##.
Page 119
Phase IV Production
CASE STUDY
In the Create material BOM: Initial Screen screen, enter the following information:
Attribute
Material
Click on
SAP AG
Description
Alphanumeric key uniquely identifying the material.
Data Value
Your Deluxe Touring Bike (red)
(DXTR30##)
(COPY FROM).
Page 120
Phase IV Production
CASE STUDY
Description
Alphanumeric key uniquely identifying the material.
Data Value
Deluxe Touring Bike (red)
(DXTR1000)
Plant
Click on
(CONTINUE (ENTER)).
SAP AG
icon.
(COPY).
Page 121
Phase IV Production
CASE STUDY
You will receive an error that says Material TRWA1000 not maintained in plant DL##.
In the Create material BOM: Item: General data screen, enter the following information:
Attribute
Component
Click on
SAP AG
Description
Number of the components that you enter.
Data Value
Your Touring Aluminum Wheel Assembly
(TRWA10##)
(ENTER).
Page 122
Phase IV Production
CASE STUDY
You will receive an error that says Material TRFR3000 not maintained in plant DL##.
Repeat this to add all of your raw materials to your deluxe touring bike (red) bill of materials.
You are in the Create material BOM: General Item Overview screen.
Click on
SAP AG
(SAVE). You will receive a message that says Creating BOM for material DXTR30##.
Page 123
Phase IV Production
CASE STUDY
SAP AG
Page 124
Phase IV Production
CASE STUDY
Routings Create
Tasks and Data Entry:
In the Create Routing: Initial Screen screen, enter the following information:
Attribute
Material
Description
Key uniquely identifying the material.
Data Value
Your Touring Aluminum Wheel Assembly
(TRWA10##)
Plant
SAP AG
Page 125
Phase IV Production
Click on
CASE STUDY
(COPY FROM).
icon.
You are in the Create Using Copy Function: Select Object to be Copied pop-up.
Enter the following information:
Attribute
Material
Description
Key uniquely identifying the material.
Data Value
Touring Aluminum Wheel Assembly
Plant
SAP AG
Page 126
Phase IV Production
Click on
CASE STUDY
(CONTINUE (ENTER)).
In the Create Routing: Header Data Check screen, enter the following information:
Attribute
Status
Click on
SAP AG
Description
You use the status key to indicate the processing status of a task list.
Data Value
Released
(general) (4)
(ENTER).
Page 127
CASE STUDY
Phase IV Production
You will receive an error that says Work center ASSY1000 does not exist in plant DL##.
In the Create Routing: Operation Check screen, enter the following information:
Attribute
SAP AG
Description
Data Value
Page 128
CASE STUDY
Phase IV Production
Work center
Click on
(ENTER).
Click on
SAP AG
icon.
(CONTINUE (ENTER)).
Page 129
Phase IV Production
CASE STUDY
You will receive a message that says Enter standard value Setup.
In the Create Routing: Operation Check screen, click on the
icon.
You will receive a message that says Enter standard value Setup.
Click on
(ENTER).
Repeat this to add the rest of your work centers to your touring wheel assembly product routing.
In the Create Routing: Operation Overview screen, click on the
icon.
You will receive a message that says Routing was saved with group and material TRWA10##.
SAP AG
Page 130
Phase IV Production
CASE STUDY
In the Create Routing: Initial Screen screen, enter the following information:
Attribute
Material
Description
Alphanumeric key uniquely identifying the material.
Data Value
Your Deluxe Touring Bike (red)
(DXTR30##)
Plant
SAP AG
Page 131
Phase IV Production
Click on
CASE STUDY
(COPY FROM).
icon.
You are in the Create Using Copy Function1: Select Object to be Copied pop-up.
Enter the following information:
Attribute
Material
Description
Alphanumeric key uniquely identifying the material.
Data Value
Deluxe Touring Bike (red)
(DXTR3000)
Plant
SAP AG
Page 132
Phase IV Production
Click on
CASE STUDY
(CONTINUE (ENTER)).
In the Create Routing: Header Data Check screen, enter the following information:
Attribute
Status
Click on
SAP AG
Description
You use the status key to indicate the processing status of a task list.
Data Value
Released
(general) (4)
(ENTER).
Page 133
Phase IV Production
CASE STUDY
You will receive an error that says Work center ASSY10## does not exist in plant DL##.
In the Create Routing: Operation Check screen, enter the following information:
Attribute
Work center
SAP AG
Description
Key identifying the work center.
Data Value
Your DL Assembly (ASSY10##)
Page 134
Phase IV Production
Click on
(ENTER).
Click on
SAP AG
CASE STUDY
icon.
(CONTINUE (ENTER)).
Page 135
Phase IV Production
CASE STUDY
You will receive a message that says Enter standard value Setup.
In the Create Routing: Operation Check screen, click on the
icon.
You will receive a message that says Enter standard value Setup.
Click on
(ENTER).
Repeat this to add the rest of your work centers to your deluxe touring bike (red) product routing.
In the Create Routing: Operation Overview screen, click on the
icon.
You will receive a message that says Routing was saved with group and material DXTR30##.
SAP AG
Page 136
Phase IV Production
CASE STUDY
SAP AG
Page 137
CASE STUDY
Phase IV Production
Rules and
Parameters
Master Data
Process
Execution
Table of Contents
IV.4.1: Create Initial Inventory Balances....................................................................................42
IV.4.2: Create Planned Order for Semifinished..........................................................................43
IV.4.3: Convert Planned Order for Semifinished.........................................................................44
IV.4.4: Issue Materials to Production Order I..............................................................................45
IV.4.5: Confirm Production for Semifinished...............................................................................46
IV.4.6: Receive Semifinished Into Inventory...............................................................................47
IV.4.7: Create Planned Order for Finished Goods......................................................................48
IV.4.8: Convert Planned Order for Finished...............................................................................49
IV.4.9: Issue Materials to Production Order II.............................................................................50
IV.4.10: Confirm Production for Finished Goods........................................................................51
IV.4.11: Receive Finished Goods into Inventory.........................................................................52
SAP AG
Page 138
Phase IV Production
CASE STUDY
Description
Goods Movement Type
Data Value
Receipt per initial entry of stock balances into unr.-use
(561)
Storage Location
SAP AG
Page 139
Phase IV Production
Click on
CASE STUDY
(ENTER).
In the Enter Other Goods Receipts: New Items screen, enter the following information:
Material
Your Socket Head Bolt 5X20mm (BOLT10##)
Quantity
20
UnE
EA
Plant
Your Plant Dallas (DL##)
10
EA
10
EA
10
EA
20
EA
40
EA
10
EA
10
EA
10
EA
10
EA
10
EA
SAP AG
Page 140
Phase IV Production
CASE STUDY
20
EA
20
EA
20
EA
10
EA
Click on
SAP AG
Page 141
Phase IV Production
CASE STUDY
SAP AG
Description
Profile that determines the order type, the procurement
type, the special procurement type, and the account
Data Value
Stock Order (LA)
Page 142
Phase IV Production
CASE STUDY
assignment type for processing the planned order.
Click on
(ENTER).
In the Create Planned Order: Stock order screen, enter the following information:
Attribute
Material
Description
Number of the material for the order.
Data Value
Your Touring Aluminum Wheel Assembly
(TRWA10##)
Order quantity
20
Ord.finish
Producing
plant
Stor. Location
SAP AG
Page 143
Phase IV Production
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Planned order will be created.
Page 144
Phase IV Production
CASE STUDY
Page 145
Phase IV Production
CASE STUDY
icon.
icon.
SAP AG
icon.
Page 146
Phase IV Production
CASE STUDY
SAP AG
Page 147
Phase IV Production
CASE STUDY
Goods Issue
Tasks and Data Entry:
In the Enter Goods Issue: Initial Screen screen, enter the following information:
Attribute
Movement Type
SAP AG
Description
Number the system uses to determine the
rules for updating quantities and values
Data Value
Consumption for order from warehouse
(261)
Page 148
Phase IV Production
CASE STUDY
(TO ORDER).
SAP AG
Description
Data Value
Page 149
Phase IV Production
Click on
CASE STUDY
(CONTINUE (ENTER)).
SAP AG
icon.
Page 150
Phase IV Production
CASE STUDY
SAP AG
Page 151
Phase IV Production
CASE STUDY
For Order
Tasks and Data Entry:
In the Enter Production Order Confirmation: Initial Screen screen, enter the following information:
Attribute
Order
SAP AG
Description
Number which identifies an order number.
Data Value
Production Order Number
Page 152
Phase IV Production
Click on
CASE STUDY
(ENTER).
In the Confirmation of Production Order Enter: Actual Data screen, enter the following information:
Attribute
Yield to Be Confirmed
SAP AG
Description
Yield that you want to confirm for the operation.
Data Value
20
Page 153
Phase IV Production
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Confirmation of order saved.
Page 154
Phase IV Production
CASE STUDY
Goods Receipt
Tasks and Data Entry:
In the Goods Receipt for Order: Initial Screen screen, enter the following information:
Attribute
Movement Type
SAP AG
Description
Goods Movement Type
Data Value
Good receipt for order into warehouse
(101)
Page 155
Phase IV Production
CASE STUDY
Order
Storage Location
Click on
(ADOPT + DETAILS).
In the Goods Receipt for Order: New Items 0001 screen, enter the following information:
Attribute
Deliv. Compl.
SAP AG
Description
Indicates that the item is to be regarded as closed.
Data Value
Selected
Page 156
Phase IV Production
Click on
SAP AG
CASE STUDY
Page 157
Phase IV Production
CASE STUDY
icon.
In the Create Planned Order: Stock order screen, enter the following information:
Attribute
Material
SAP AG
Description
Number of the material.
Data Value
Your Deluxe Touring Bike (red)
(DXTR30##)
Page 158
Phase IV Production
CASE STUDY
Order quantity
10
Ord.finish
Producing plant
Stor. Location
SAP AG
Page 159
Phase IV Production
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Planned order will be created.
Page 160
Phase IV Production
CASE STUDY
SAP AG
Page 161
Phase IV Production
CASE STUDY
icon.
icon.
SAP AG
icon.
Page 162
Phase IV Production
CASE STUDY
SAP AG
Page 163
Phase IV Production
CASE STUDY
Goods Issue
Tasks and Data Entry:
In the Enter Goods Issue: Initial Screen screen, enter the following information:
Attribute
Movement Type
Description
Number the system uses to determine
the rules for updating quantities and
values in the relevant ledger accounts.
Data Value
Consumption for order from warehouse
(261)
Storage Location
SAP AG
Page 164
CASE STUDY
Phase IV Production
Click on
(TO ORDER).
SAP AG
Description
Order Number
Data Value
Production Order Number
Page 165
CASE STUDY
Phase IV Production
Click on
(ADOPT + DETAILS).
In the Enter Goods Issue: New Item 0001 screen, enter the following information:
Material
Your Touring Aluminum Wheel Assembly
(TRWA10##)
SAP AG
Quantity
20
SLoc
Your Semi-Finished Goods
(SF##)
Page 166
Phase IV Production
Click on
CASE STUDY
(ADOPT).
In the Enter Goods Issue: New Item 0002 screen, click on the
icon.
SAP AG
Page 167
Phase IV Production
CASE STUDY
* Keep in mind that the rest of the materials are all raw materials.
In the Enter Goods Issue: Overview screen, click on the
icon.
SAP AG
Page 168
Phase IV Production
CASE STUDY
For Order
Tasks and Data Entry:
In the Enter Production Order Confirmation: Initial Screen screen, enter the following information:
Attribute
Order
SAP AG
Description
Order of which you wish to confirm production.
Data Value
Production Order Number
Page 169
Phase IV Production
Click on
CASE STUDY
(ENTER).
In the Confirmation of Production Order Enter: Actual Data screen, enter the following information:
Attribute
Yield to Be Confirmed
SAP AG
Description
Yield that you want to confirm for the operation.
Data Value
10
Page 170
Phase IV Production
Click on
SAP AG
CASE STUDY
(SAVE). You will receive a message that says Confirmation of order saved.
Page 171
Phase IV Production
CASE STUDY
Goods Receipt
Tasks and Data Entry:
In the Enter Receipt for Order: Initial Screen screen, enter the following information:
Attribute
Movement Type
SAP AG
Description
Movement
Data Value
Good receipt for order into warehouse (101)
Page 172
Phase IV Production
CASE STUDY
Order
Storage Location
Click on
(ADOPT + DETAILS).
In the Goods Receipt for Order: Items 0001 screen, enter the following information:
Attribute
Deliv. Compl.
SAP AG
Description
Indicates that the item is to be regarded as closed.
Data Value
Selected
Page 173
Phase IV Production
Click on
SAP AG
CASE STUDY
Page 174