MINISTRY OF RURAL DEVELOPMENT

GOVERNMENT OF INDIA

PRADHAN MANTRY GRAM SADAK YOJANA 2013


( PMGSY )

Constructing Bridge on Indrasi Reservoir River at Bhiloda Maumunai P


App.Road(MDR)

BLOCK:

Bhiloda

ESTIMATED COST RS.

DISTRICT:#VALUE!

Himmatnagar
Lacs

GOVERNMENT OF GUJARAT
ROADS & BUILDINGS DEPARTMENT
SACHIVALAYA ,

GANDHINAGAR

GUIDELINES FOR THE PREPARATION OF PACKAGE


PROPOSAL FOR RURAL ROADS UNDER PMGSY
PACKAGE NO.

CONTENTS

Sr.
No
1
2
3
4
5
6
7
8
9
10
11

Details
Package Summary Sheet
District Map Showing Blocks
Block Map(s) For The Package
Roads Proposed For Rural Connectivity
Cross Drainage Structure
Proposed Cross Section Details
(Pavement Layers)
Details of the Existing Road
Existing Cross Section Details
(Pavement Layers)
Cost Estimate of Roads
Cost Estimate for culverts / Minor Bridges
Rate Analysis For Roads

Format
F-1
M-1
M-2
F-2A
F-2B
F-3
F-4
F-5
F-6
F-7
F-8

LOPMENT

YOJANA 2013-14

iloda Maumunai Poshina

immatnagar

Page No.

Name Of Work:

Sr.No.

Cd No.

f
g
Thick of Thick of
Side
iner wall
wall
420

Total Ht

Constructing Bridge on Indrasi Reservoir River at Bhiloda Maumunai Poshina App


Box Cell
Designation
No/Ab/Ec

No of box
cell

size

3/33/0

2.00

3X3

EW

PW

2 WD

12

12

Length of
square return

Ref

34,3,40

350

Wing wall
length

HT of ww
At end
from gl
4670
700

6.985

a
b
Width(cle Ht. of Box
ar)
(clear)

3000

3000

c
Bot.Slab
Offset

300

Required
Design
Drowdown
Baring
Base
at time
Capacity( presure(T/M
T/M2)
2)
10

7.16

2.16

Mesuremant
Item No 1

Clearing the site before commencement and after completion of the work
Br sor Item no 106
job

Marking out the centre line of the bridge and various other components structures and co
out and levelling with theodolite, levels including out and levelling with theodolite, levels in
construction necessary masonry pillars for lines and levels and establishing necessary ba
complete as directed.
Br sor Item No. 107

Item No 2

job

Excavation For Foundation in sand . Gravel , clay . Soft soil and murrum etc., incliding sho
and dewatering as necessary and disposing of the excavated stulf as directed.

item no 3

For box
width
8.09

Length
12

Ht
`

width
3.783

For wing wall


No
0

length
6.985

Ht
2

For to curtain wall wall


D/s side
length
18.823694

width
1.850

Ht
2.65

length
18.823694

width
1.500

Ht
2.15

length
5

width
3.783

Ht
2

18.82

5.52

0.75

U/s side

Square return
No
4

Fix
Area
2

X
Apron
Apron
X

7.79

Total
=
Fexible Apron
Area
U/s
18.82
X

0.45

+
2
X

3.00

146.82

D/s
18.82

6.00

0.75

=
Total

Providing and casting in situ ordinary cement concrete M-150 for R.C.C. raft and cut off w
necessary shuttering laying, vibrating, ramming and curing complete.

item no 4

Width
8.09
8.09

For box culvert


Length
X
12.00
X
ADD for slant length as per detail-C
X
0.31
X

Thick
0.15

0.15

For wing wall


As per wing wall calculation

Certain wall
Slant length of ww
7.80

Projected length of WW
5.52

Total Length of certain wall

7.79

11.03

18.82

For to curtain wall


D/s side
length
18.82

width
1.85

Ht
0.15

length
18.82

width
1.50

Ht
0.15

length
5

width
3.78

U/s side

Square return
No
4

Ht
0.15

=
Total

Providing and casting in situ controlled cement concerte M- 250 For Pire, abutment and re
drawing including , centering, shuttering scaffolding where necessary laying vibrating curin
complete.(including Apoxy Painting of Exterior Surface)

Item No 5

Bot slab
Width
7.79

Length
X
12.00
X
ADD for slant length as per detail-C
length
Width
7.79
X
0.68
X

0.45

Depth
0.75

Thick
0.47

Top Slab
Width
7.19

length
12.00

2.00
2.00
1
8.00

Side wall
X
3.00
ADD As per detail A
X
0.45
Iinner wall
X
3
For Hunch
X
0.01

0.42

12.00

0.30

12.00

0.35

12

12.00

For wing wall


as per wing wall calculation

For to curtain wall


D/s side
length
18.82
18.82
18.82
18.82

X
X
X
X

width
1.65
0.75
0.45
0.20

X
X
X
X

Ht
0.55
0.75
0.75
0.45

=
=
=
=

length
18.82
18.82
18.82

X
X
X

width
1.30
0.45
0.20

X
X
X

Ht
0.80
0.75
0.45

=
=
=

U/s side

Square return
No
4.00

length
5.00

Area of section as per Drawing


7.91
Total

0.075

0.45

+
2.00

0.55

0.30
For both Side

Providing and casting in-situ ordinary cement concrete m 150 for approach slab including
curing and finishing complete.

item No 8

12.00

Providing and casting in-situ controlled cement concrete m 250 for kerb/kerb blocks includ
curing and finishing complete.

Item no 7 :

14.19

Providing and casting in-situ controlled cement concrete M-300 for average 75mm thick w
laid as directed including tamping, vibrating finshing curing and filling in joints with bitumen

Item No 6 :

14.19

Below Aproch Slab


3.5
X

12

0.15

Providing and casting in-situ controlled cement concrete m 250 for approach slab includin
curing and finishing complete

Item No 9 :

3.5

12

Total Quantity

For Steel=
133.72

For App Slab


quantity
25.2

Temp Steel
For Wing wall
length

133.72 Cmt

85 Kg/Cmt

WL12

length
5.55

0.3

Providing and placing in for T.M.T. Fe-415 bar rienfocement (I.S.I. Mark) including cutting
hooking and tying complete as per detailed drawing.(for solid slab, Dirt wall)

Item no 10 :

length

For Square Return area


5.00
X

85

85.000
Kg/Cmt

+
13.62 +
4.11

Ht
2.49

3.17

11366.2 Kg

2142 Kg

(BS-1850)2
3.26

No
4.00

0.00

4.00

63.40

Total Area
Temp. steel for Abutment, Pier & Return
63.40
X
5.50
Kg./Smt

63.40 Smt
=

348.70

Kg.

Total Kg =
ADD 5 %
Say
=

Item no 11 :

Providing and fixing post and pipe railing as per detailed drawing including 3 coats of pain
works complete

length

Item No 12

14.19 X

Providing G.I. 100mm diameter water spout including necessary iron gratings as

12

0.3

Providing and fixing in position 12 mm thick premoulded joint filler in expansion joint for fix
simply supported spans, covered with sealant complete as per drawing and technical spec

Item No 14

2
2
2

Providing and fixing tar papper bearing ,shall be provided between abutment/peir cap and
slab(MR)

Item No 13

X
X
X

12
12
0.25

X
X
X

0.3
3.995
1.16

=
=
=
Total

Providing & Filling in foundation with Ordinary cement concrete M 15 mix and Providin
vertical pin headers including formwork vibrating ramming & Curing Complete
(Trans filling)

Item No 15
Fix Apron
U/s & D/s
Area
2

7.79

+
2

146.82

Total quantity
0.45

For WW
length

WL12
=

+
13.62 +
4.11

5.52

(BS-1850)2
3.26

Ht
X

No
2.185

Square return
5.00

Providing and laying filter media 600 mm thick as directed at the back of abutments, return
walls as per detailed specifications.

Item No 16

length
4.11

18.82

No
3.17

Total

Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment,


return wall with 100 mm dia AC pipe extending through the full width of the structures with
1(V):20(H) towards drawing face complete as per drawing and technical specification Clau
1204.3.7

Item No 17

ww
4.11

2.185

sq return
5.000

3.17

12

box
2

Total
Area
No of weep holes

Item No18

=
=

135.40 sq mts
135.40
X

1.00

Filling available excavated EARTH (Excluding Rock) in Trenches,Plinth,sides of foundat


layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and

Excavation Qty. as per Item No.3

Less Qty. As per Item no.4

qty. of Item No.5


Bot slab,curtain wall,wing wall, square return

=
Say

Item No.19

2.0

Providing and filling sand behing abutments and between returns in layers as dire cted.

12 X

1.50 X

3 =

Item No.20

Diversion of Water Course/providing coffer dam and bund or island as may be necessary
and maintaining the same for period as may be necessary

JOB Work

Ls

Item No.21

Providing and fixing 20 cm X15cmX2.50cm size year plate of marble stone set in cement m
including finishing engraving letters etc. complete.(SOR P.No. 131 It.85.0.0)

Item No.22

Providing & Filling in foundation with Ordinary cement concrete M 15 mix and Providing necessary ve
headers including formwork vibrating ramming & Curing Complete.
(Trans filling)
Total

Item No.23

for Box

Providing and fixing steel dowe bar of Ge 415 grade 32 mm dia for anchoring by drilling holes in found
including, necessary bending hooking of dowel bars and grouting the holes complete as per detailed
directed

Total length of box


width

=
=

7.79
12.00

For total length

39.58 mt

for curtain wall


Total length

=
=

37.65 mt
77.2
mt

Dowel bar
Total

77.2
No
77.23 rmt

Item No.24

Numbering the C.D.work with approved paint including all materials for paintings etc. com

a Maumunai Poshina App.Road(MDR)


d
e
f
Thickness of Thickness of Thick of
top slab
Bot.slab
Side wall

470

DK

1200

450

420

g
Thick of iner
wall

EW

PW

2 WD

350

12

12

of the work
1

Ls

mponents structures and complete lining


ng with theodolite, levels including
establishing necessary banchmark etsc.

Ls

d murrum etc., incliding shorting, strutting


tulf as directed.

#VALUE! Cmt

0.00 Cmt

92.28 Cmt

60.71 Cmt

151.31 Cmt

146.82
Smt
66.07 Cmt

42.35 Cmt

84.71 Cmt
#VALUE! Cmt

or R.C.C. raft and cut off walls including


mplete.

14.56 Cmt
0.38 Cmt

0.00 Cmt

mt

5.22 Cmt

4.24 Cmt

11.35 Cmt
48.35 Cmt

0 For Pire, abutment and return as per


essary laying vibrating curing and finishing

42.07 Cmt

3.94 Cmt

40.55 Cmt

30.24 Cmt
3.24 Cmt
12.6 Cmt
1.08 Cmt

0.0 Cmt

17.08 Cmt
10.59 Cmt
6.35 Cmt
1.69 Cmt

19.58 Cmt
6.35 Cmt
1.69 Cmt

158.17 Cmt
355.22 Cmt

0 for average 75mm thick wearing cost


filling in joints with bitumen complete.
12.77 Cmt

for kerb/kerb blocks including formwork,

2.13 Cmt
2.00

4.26 Cmt

or approach slab including formwork,

12.60 Cmt

for approach slab including formwork

25.20 Cmt

S.I. Mark) including cutting, bending,


ab, Dirt wall)

Smt

Smt

13856.90 Kg
14549.75
14.55 MT

ng including 3 coats of painting to steel

28.38 rmt

ecessary iron gratings as per drawing.

4 No

een abutment/peir cap and RCC

7.2 Smt

ler in expansion joint for fixed ends of


drawing and technical specifications

7.2 Smt
95.88 Smt
0.58 Smt
103.66 Smt

rete M 15 mix and Providing necessary


amming & Curing Complete.

146.82 Smt

66.07 Cmt

e back of abutments, returns and wing

35.91 Smt

63.40 Smt
99.31 Smt

nforced concrete abutment, wing wall,


width of the structures with slope of
technical specification Clauses 614, 709,

0.00 Smt

63.4 Smt

72
135.40 Smt

135.40 Nos.

hes,Plinth,sides of foundations etc. in


ited layer by ramming and watering.

#VALUE! cum
-48.35 cum
-188.43 cum
#VALUE! cum

ayers as dire cted.

108.00 Cmt

and as may be necessary for foundation

1.00 Ls

marble stone set in cement mortar 1:4


131 It.85.0.0)

2.00 Nos.

mix and Providing necessary vertical pin

0.00

cum

oring by drilling holes in foundation strata


oles complete as per detailed dawing and as

erials for paintings etc. complete.

2 Nos

Required
Design
Drowdown
Baring
Base
at time
Capacity(T/ presure(T/M
M2)
2)
10

7.16

2.16

DK

Wing wall
Total Ht

1200

4670

length
HT of ww At
end from gl
700

6.985

Length of
square
return

Ref

34,3,40

Constructing Bridge on Indrasi Reservoir River at Bhiloda Maumunai Poshina App.Road(MDR)


::: ABSTRACT :::

Qty

Item
3
Clearing the site before commencement and after completion
of the work
Br sor Item no 106

Rank of MORD Spe.

2
Clause
It. 1
1000 & 1202
1.00

Add 1 % Labour Cess


Clause
It. 2
1000 & 1202

Marking out the centre line of the bridge and various other
components structures and complete lining out and levelling
with theodolite, levels including out and levelling with
theodolite, levels including construction necessary masonry
pillars for lines and levels and establishing necessary
banchmark etsc. complete as directed.
Br sor Item No. 107

1.00

Add 1 % Labour Cess


Clause
300

#VALUE!

Clause
802-3
1202-3
48.35

It. 3

Excavation for Structures


Excavation For Foundation in sand . Gravel , clay . Soft soil
and murrum etc., incliding shorting, strutting and dewatering
as necessary and disposing of the excavated stulf as directed.

(1)

(A) Depth uo tp 3.0 m


Add 1 % Labour Cess
BR SOR P No 171 I No 7
Providing and casting in situ ordinary cement concrete M-150
for R.C.C. raft and cut off walls including necessary shuttering
laying, vibrating, ramming and curing complete.

It. 4

I.

Add 1 % Labour Cess


Sor Br P No 171 It 13

It. 5

Providing and casting in situ controlled cement concerte M250 For Pire, abutment and return as per drawing including ,
centering, shuttering scaffolding where necessary laying
vibrating curing and finishing complete.(including Apoxy
Painting of Exterior Surface)

355.22
(B) height From 5.0 m to 10.0 m
Add 1 % Labour Cess
RA 1
Providing and casting in-situ controlled cement concrete M300 for average 75mm thick wearing cost laid as directed
including tamping, vibrating finshing curing and filling in joints
with bitumen complete.

Clause
It. 6
1000 & 1202

12.77

IV
Add 1 % Labour Cess
RA 4
It. 7

Providing and casting in-situ controlled cement concrete m 250 for


kerb/kerb blocks including formwork, curing and finishing complete.

4.26

12.60

Clause
It. 8
1000 & 1202

Clause
It. 9
1000 & 1202
25.20
Clause
It. 10
1000 & 1202

14.55
It. 11

28.38

Add 1 % Labour Cess


Sor Br P 189 I No 102 (A)
Providing and casting in-situ controlled cement concrete m
250 for approach slab including formwork curing and finishing
complete
Add 1 % Labour Cess
RA 6
Providing and placing in for T.M.T. Fe-415 bar rienfocement
(I.S.I. Mark) including cutting, bending, hooking and tying
complete as per detailed drawing.(for solid slab, Dirt wall)
Add 1 % Labour Cess
Sor Br P 184 I No 79 (A)
Providing and fixing post and pipe railing as per detailed
drawing including 3 coats of painting to steel works complete

Clause
It. 12
1000 & 1202

Add 1 % Labour Cess


(S.O.R , P 188 Item No.-97)
Providing G.I. 100mm diameter water spout including
necessary iron gratings as per drawing.

Clause
It. 13
1000 & 1202

Add 1 % Labour Cess


( SOR Br. P No 188 I. NO. 98 )
Providing and fixing tar papper bearing ,shall be provided
between abutment/peir cap and RCC slab(MR)

4.00

7.20

Add 1 % Labour Cess


It. 14

103.66
Clause
It. 15
1000 & 1202

66.07
It. 16

99.31

Add 1 % Labour Cess


RA 5
Providing and casting in-situ ordinary cement concrete m 150
for approach slab including formwork, curing and finishing
complete.

Providing and fixing in position 12 mm thick premoulded joint


filler in expansion joint for fixed ends of simply supported
spans, covered with sealant complete as per drawing and
technical specifications
Add 1 % Labour Cess
Sor br P 186 I No 87
Providing & Filling in foundation with Ordinary cement
concrete M 15 mix and Providing necessary vertical pin
headers including formwork vibrating ramming & Curing
Complete.
(Trans filling)
Add 1 % Labour Cess
Sor Br p 171 I No 13
Providing and laying filter media 600 mm thick as directed at
the back of abutments, returns and wing walls as per detailed
specifications.
Add 1 % Labour Cess
Sor Br P 170 I No 4

It. 17

135.40

Add 1 % Labour Cess


Clause
It. 18
1000 & 1202

#VALUE!
Clause
It. 19
1000 & 1202
108.00
It. 20

1.00

Filling
available excavated EARTH (Excluding Rock) in
Trenches,Plinth,sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidating each deposited layer
by ramming and watering.
Add 1 % Labour Cess
(SOR P No 22 I.N 6/4.12 Bld)
Providing and filling sand behing abutments and between
returns in layers as dire cted.
Add 1 % Labour Cess
Sor Br P 170 I No 5
Diversion of Water Course/providing coffer dam and bund or
island as may be necessary for foundation and maintaining the
same for period as may be necessary
Add 1 % Labour Cess

It. 21

2.00

Providing and fixing 20 cm X15cmX2.50cm size year plate of


marble stone set in cement mortar 1:4 including finishing
engraving letters etc. complete.(SOR P.No. 131 It.85.0.0)
Add 1 % Labour Cess

Clause
It. 22
1000 & 1202

1.00
Clause
It. 23
1000 & 1202

77.23

Providing & Filling


in foundation with Ordinary cement
concrete M 15 mix and Providing necessary vertical pin
headers including formwork vibrating ramming & Curing
Complete.
(Trans filling)
Add 1 % Labour Cess
Sor Br p 171 I No 13
Providing and fixing steel dowe bar of Ge 415 grade 32 mm
dia for anchoring by drilling holes in foundation strata
including, necessary bending hooking of dowel bars and
grouting the holes complete as per detailed dawing and as
directed
Add 1 % Labour Cess

Clause
It. 24
1000 & 1202
2.00

Providing weepholes in brick masonry/stone masonry,


plain/reinforced concrete abutment, wing wall, return wall with
100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical specification Clauses
614, 709, 1204.3.7

Numbering the C.D.work with approved paint including all


materials for paintings etc. complete.
Add 1 % Labour Cess
Sor Ch 26 item no 86 P 131
Total : >>>>>>>>>>>>>>>>>>>>
Say : >>>>>>>>>>>>>>>>>>>>

Deputy Executive Engineer


Panchayat (R&B) Sub Division
Bhiloada

Err:512

Sub Estimate No-9

Err:512
Err:512
Err:512
Err:512
::: ABSTRACT :::

Qty
1

Rank of
MORD Spe.
2
Clause
300

Item
3
It. 1
Err:512

Err:512

Clause
802-3
1202-3

Err:512 Err:512
Add 1 % Labour Cess
S.O.R.P.No.39 item No.11.1(ii)
It. 2
Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

Err:512

Err:512

Err:512

Err:512

Err:512

Err:512

Clause
802-3
1202-3

Clause
802-3
1202-3

Err:512
Err:512
Add 1 % Labour Cess
(S.O.R.P.No.46 it.no.11.4 (i) )
Err:512
Err:512
Add 1 % Labour Cess
(S.O.R.P.No.46 it.no.11.4 (ii) )

It. 3

Err:512

It. 4

Add 1 % Labour Cess


(S.O.R.P.No.46 it.no.11.4 (i) )
Err:512

Add 1 % Labour Cess


(S.O.R.P.No.46 it.no.12.9 )

Err:512

Clause
802-3
1202-3

It. 5

Err:512

Add 1 % Labour Cess


(S.O.R.Page No 49, Item No.-12.11)
Total : >>>>>>>>>>>>>>>>>>>>
Say : >>>>>>>>>>>>>>>>>>>>

Deputy Executive Engineer


Panchayat (R&B) Sub Division
0

Item No 16
Name of Work:-

Err:512
Err:512
Err:512
Err:512

Err:512

::: ABSTRACT :::


Qty
1

Rank of
MORD Spe.
2
Clause
300

Err:512

Item
3
It. 1
Err:512

Err:512
Err:512

Clause
802-3
1202-3
Err:512
Item No 17

It. 2

Err:512

Err:512
Err:512

Err:512
Err:512
Err:512
Add 1 % Labour Cess
Err:512
Err:512
Err:512
Add 1 % Labour Cess
Err:512
Err:512

Err:512
Err:512
Add 1 % Labour Cess
Err:512
Err:512
Err:512
Add 1 % Labour Cess
Err:512

Err:512

Clause
It. 3
1000 & 1202

Clause
It. 4
1000 & 1202
Err:512

Err:512

Err:512

Clause
1000 & 1202

1
Err:512

Add 1 % Labour Cess


Err:512
Err:512

Err:512 Err:512
Err:512
Err:512
Err:512 Err:512
Add 1 % Labour Cess
Err:512
It. 5
Err:512

Add 1 % Labour Cess


Err:512

Item No18

Qty

Err:512

Rank of
MORD Spe.

Item

3
It. 6

Err:512
Add 1 % Labour Cess
Err:512
Err:512
Add 1 % Labour Cess
Err:512
Err:512
Add 1 % Labour Cess

Err:512

It. 7

Err:512
Item No.19

It. 8

Err:512

It. 9

Err:512
Item No.20

It. 10

Err:512

It. 11

Err:512
Item No.21

It. 12

Err:512
Add 1 % Labour Cess

Err:512

It. 13

Err:512
Add 1 % Labour Cess

Item No.22

Err:512
Err:512
Add 1 % Labour Cess
Err:512
Err:512
Add 1 % Labour Cess
Err:512
Err:512
Add 1 % Labour Cess

Qty
1
Err:512

Rank of
MORD Spe.

Item

3
It. 14

Err:512
Add 1 % Labour Cess

It. 15

Err:512
Add 1 % Labour Cess

Item No.23
Err:512

Total : >>>>>>>>>>>>>>>>>>>>
Say : >>>>>>>>>>>>>>>>>>>>
Total Amount of 1x 6.0 M Opening (1 No.)

Deputy Executive Engineer


Panchayat (R&B) Sub Division
0

munai Poshina App.Road(MDR)


Rate
4

Unit
5

Amount
6

10,000.00
100.00
10,100.00

Ls

10100.00

0.101

10,000.00
100.00
10,100.00

Ls

10100.00

0.101

243.00
2.43
245.43

Cmt

#VALUE!

#VALUE!

4,759.00
47.59
4,806.59

Cmt

232398.63

2.324

6,173.00
61.73
6,234.73

Cmt

2214700.79

22.147

5,386.00
53.86
5,439.86

Cmt

69467.01

0.695

5,226.00

add diff items

52.26
5,278.26

Cmt

22485.39

4,289.00
42.89
4,331.89

Cmt

54581.81

0.546

5,479.00
54.79
5,533.79

Cmt

139451.51

1.395

54,575.00
545.75
55,120.75

MT

802006.91

8.020

1,402.00
14.02
1,416.02

rmt

40186.65

0.402

479.00
4.79
483.79

No

1935.16

0.019

125.00
1.25
126.25

Smt

909.00

0.009

906.00
9.06
915.06

Smt

94855.12

0.949

4,759.00
47.59
4,806.59

cum

317571.40

3.176

717.00
7.17
724.17

Smt

71917.32

0.719

125.00
1.25
126.25

Nos.

17094.25

0.171

53.30
0.53
53.83

cum

#VALUE!

#VALUE!

358.80
3.59
362.39

Cmt

39138.12

0.391

15,000.00
150.00
15,150.00

Ls

15150.00

0.152

399.00
3.99
402.99

Nos.

805.98

0.008

4,759.00
47.59
4,806.59

Cum

4806.59

0.048

538.29
5.38
543.67

R.M.

41987.63

0.420

53.00
0.53
53.53

R.M.

107.06
#VALUE!
#VALUE!
#VALUE!

0.001

#VALUE!

Executive Engineer
Panchayat (R&B) Division
Himmatnagar

Rate

Unit

Amount

176.00
1.76
177.76

Err:512
Err:512

2,625.00
26.25
2,651.25

Err:512

Err:512

3,012.00
30.12
3,042.12

Err:512

Err:512

54,042.21
540.42
54,582.63

Err:512

Err:512

109.00
1.09
110.09

Err:512

Err:512

1,390.00
13.90
1,403.90

Err:512

Err:512
Err:512
Err:512
Err:512

Executive Engineer
Panchayat (R&B) Division
0

Err:512

Rate

Unit

Amount

206.27
2.06
208.33

Err:512

Err:512

397.40
3.97
401.37

Err:512

Err:512

Err:512

Err:512
2,928.79
29.29
2,958.08
3,015.93
30.16
3,046.09

Err:512

Err:512
Err:512

Err:512

Err:512

54,042.21
540.42
54,582.63

Err:512

Err:512

Err:512

Err:512

Err:512

Err:512

Err:512

Err:512

Rate

Unit

Amount

4
286.00
2.86
288.86
374.00
3.74
377.74
1,154.74

3,985.63
39.86
4,025.49
4,318.85
43.19
4,362.04

57,146.37
571.46
57,717.83

11.55
1,166.29
114.82
1.15
115.97
863.00
8.63
871.63
15,000.00
150.00
15,150.00
25,000.00
250.00
25,250.00
925.00
9.25
934.25

Err:512

Err:512

Err:512

Err:512

Err:512

Err:512

Err:512

Err:512

Err:512

Err:512

Lump

Err:512

Lump

Err:512

Err:512

Err:512

Rate

Unit

4
365.00
3.65

368.65
1,794.95
17.95
1,812.90

Amount

Err:512

Err:512

Err:512

Err:512
Err:512
Err:512
Err:512

Executive Engineer
Panchayat (R&B) Division
0

Sr.
No.

PRADHANMANTRI GRAM SADAK YOJANA (PMGSY)


( Ministry of Rural Development, Govt. of India )
COST OF ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
( CULVERT AND MINOR BRIDGES )
Constructing Bridge on Indrasi Reservoir River at Bhiloda Maumunai Poshina App.Road(MDR)
Type of cross drainage work:Location Chainage :
Description of Item
No.
Length
Width
Height/
Unit
(m)
(m)
Thickness
(m)

1
It. 1

Clearing the site before commencement and after completion


of the work
Br sor Item no 106

job

7
Ls
Total

It. 2

It. 3

Marking out the centre line of the bridge and various other
components structures and complete lining out and levelling
with theodolite, levels including out and levelling with theodolite,
levels including construction necessary masonry pillars for lines
and levels and establishing necessary banchmark etsc.

job

12.00

For box
8.090
For wing wall
3.78
For to curtain wall wall
1.85
1.50
Square return
3.78
Apron

Cmt

2.000

Cmt

2.650
2.150

Cmt
Cmt

2.000

Cmt

6.99

D/s side
U/s side

18.82
18.82

5.00

Fix
Area

146.82

0.450

Cmt

18.82
18.82

3.00
6.00

0.75
0.75

Cmt
Cmt

Fexible Apron
U/s
D/s
a

Ls

Total

Excavation For Foundation in sand . Gravel , clay . Soft soil and


murrum etc., incliding shorting, strutting and dewatering as
necessary and disposing of the excavated stulf as directed.

Ordinary Soil
S.O.R.P.No.36 item No.11.1(i)

Total

Say..
It. 4

Providing and casting in situ ordinary cement concrete M-150 for leveling course
for R.C.C. raft and cut off walls including necessary shuttering
laying, vibrating, ramming and curing complete.
P.C.C Grade M 15
Nominal Mix

For box culvert


12.00
8.09
0.15
ADD for slant length as per detail-C
0.31
8.09
0.15
For wing wall
As per wing wall calculation
Certain wall
Total Length of certain wall
18.82
mt
D/s side
18.82
1.85
0.15
U/s side
18.82
1.50
0.15
Square return
4
5.00
3.78
0.15

Cmt
Cmt
Cmt

Cmt
Cmt
Cmt
Total
Say..

It. 5

Providing and casting in situ controlled cement concerte M- 250


For Pire, abutment and return as per drawing including ,
centering, shuttering scaffolding where necessary laying
vibrating curing and finishing complete.(including Apoxy
Painting of Exterior Surface)
P.C.C Grade M 20
Nominal Mix
S.O.R.P.No.46 item No.12.5 ii (i)
2
2
1
8

D/s side

Bot slab
12.00
7.79
ADD for slant length as per detail-C
7.79
0.68
Top Slab
12.00
7.19
Side wall
3.00
12.00
ADD As per detail A
0.45
12.00
Iinner wall
3.00
12.00
For Hunch
0.01
12.00
For wing wall
as per wing wall calculation
For to curtain wall
18.82
1.65
18.82
0.75
18.82
0.45
18.82
0.20

0.45

Cmt

0.75

Cmt

0.47

Cmt

0.42

Cmt

0.30

Cmt

0.35

Cmt
Cmt
Cmt

0.55
0.75
0.75
0.45

Cmt
Cmt
Cmt
Cmt

U/s side

18.82
18.82
18.82

5.00

1.30
0.80
0.45
0.75
0.20
0.45
Square return
Area of section as per Drawing
7.91

Cmt
Cmt
Cmt

Cmt
Total
Say..

It. 6

It. 7

It. 8

It. 9

Providing and casting in-situ controlled cement concrete M-300


for average 75mm thick wearing cost laid as directed including
tamping, vibrating finshing curing and filling in joints with
bitumen complete.
P.C.C,Grade M-30
Nominal Mix
S.O.R.P.No.50 item No.13.5
Providing and casting in-situ controlled cement concrete m 250
for kerb/kerb blocks including formwork, curing and finishing
complete.
R.C.C.Grade M-25
S.O.R.P.No.50 item No.13.1 ll
Providing and casting in-situ ordinary cement concrete m 150
for approach slab including formwork, curing and finishing
complete.
Nominal Mix
S.O.R.P.No.50 item No.13.11 I
Providing and casting in-situ controlled cement concrete m 250
for approach slab including formwork curing and finishing
complete

14.19

Wearing coat
12.00

14.19

Kerb
0.50

3.5

Approach slab
12.00

3.5

Approach slab
12.00

0.075

Cmt

Total..
2.00

0.30

Cmt

Total..
2

0.15

Cmt

Total..
2

0.3

Cmt

S.O.R.P.No.50 item No.13.12


Total..
It. 10

Providing and placing in for T.M.T. Fe-415 bar rienfocement


(I.S.I. Mark) including cutting, bending, hooking and tying Total Quantity
complete as per detailed drawing.(for solid slab, Dirt wall)
134
For App Slab
25.2
S.O.R.P.No.50 item No.13.3

85.00

133.72
Kg/Cmt

85

Kg/Cmt

Cmt
Kg
Kg

Temp Steel
For Wing wall
For Square Return area
Total Area
63.40

It. 11

It. 13

It. 14

It. 15

Smt
Smt
Smt

5.50

Kg./Smt

Kg.
Total Kg
ADD 5 %
Say

2.00

14.19

rmt

Drainage spouts
1

No

0.00
Providing and fixing tar papper bearing ,shall be provided
between abutment/peir cap and RCC slab(MR)

12.00

0.30

Total
Smt

Providing and fixing in position 12 mm thick premoulded joint


filler in expansion joint for fixed ends of simply supported
spans, covered with sealant complete as per drawing and
technical specifications

2
2
2

12.00
12.00
0.25

0.30
4.00
1.16

Total..
Smt
Smt
Smt

146.82
146.82

Apron
Smt
0.45

Err:509

Apron
Err:509

Providing and fixing post and pipe railing as per detailed


drawing including 3 coats of painting to steel works complete
Length

It. 12

0.00
63.40
63.40

(S.O.R.Page No 40, Item No.-13.8)


Providing G.I. 100mm diameter water
necessary iron gratings as per drawing.

Total
spout including

Total..

(S.O.R.Page No 41, Item No.-13.16 III.)


Providing & Filling in foundation with Ordinary cement concrete
M 15 mix and Providing necessary vertical pin headers Area
including formwork vibrating ramming & Curing Complete.
(Trans
filling) item No.12.50 II
S.O.R.P.No.50

Cmt
Total..

It. 16

Err:509
Err:509

Err:509

Err:509

Err:509
Err:509

Err:509

Err:509

Err:509

Err:509
Total..

It. 17

It. 18

It. 19

Providing and laying filter media 600 mm thick as directed at


the back of abutments, returns and wing walls as per detailed
specifications.

(S.O.R.Page No 49, Item No.-12.11)


Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall with
100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical specification Clauses
614, 709, 1204.3.7

4.00

4.11

5.00

3.17

For WW
4.00
Square return
4.00

Smt
Smt

Total..

Area of filter
No of weep holes

135.40
135.40

sq mts
1.00

Nos.

Total..

(S.O.R.Page No 49, Item No.-12.9)


Filling
available excavated EARTH (Excluding Rock) in
Trenches,Plinth,sides of foundations etc. in layers not Excavation Qty. as per Item No.3
exceeding 20 cm. in depth consolidating each deposited layer Less Qty. As per Item no.4
by ramming and watering.
qty. of Item No.5

cum
cum
cum
cum

It. 20

Providing and filling sand behing abutments and between


returns in layers as dire cted.

12

1.50

Cmt

Cmt
It. 21

Diversion of Water Course/providing coffer dam and bund or


island as may be necessary for foundation and maintaining the
same for period as may be necessary

Ls

Ls

Lump
It. 22

Providing and fixing 20 cm X15cmX2.50cm size year plate of


marble stone set in cement mortar 1:4 including finishing
engraving letters etc. complete.(SOR P.No. 131 It.85.0.0)

2.00

Nos.
Nos.

It. 23

Providing & Filling in foundation with Ordinary cement concrete


M 15 mix and Providing necessary vertical pin headers
including formwork vibrating ramming & Curing Complete.
(Trans filling)

1.00

0.00

Providing & Filling in foundation with Ordinary cement concrete


M 15 mix and Providing necessary vertical pin headers
including formwork vibrating ramming & Curing Complete.
(Trans filling)
It. 24

Providing and fixing steel dowe bar of Ge 415 grade 32 mm dia


for anchoring by drilling holes in foundation strata including,
necessary bending hooking of dowel bars and grouting the
holes complete as per detailed dawing and as directed

It. 25

Err:509

It. 26

Desmentaling exe Structure

Nos.

77.23

Err:509

R.M.
Err:509

Total
1.00

1.00
1.00

It. 27

Err:509
Err:509

Err:509
Err:509

It. 28

Err:509
Err:509

Err:509

Total

Deputy Executive Engineer


Panchayat (R&B) Sub Division

Deputy Executive Engineer


Panchayat (R&B) Sub Division
Dharampur

PRADHANMANTRI GRAM SADAK YOJANA (PMGSY)-2008-09

Sr.
No.
1
1

( Ministry of Rural Development, Govt. of India )


COST OF ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
( CULVERT AND MINOR BRIDGES )
Constructing a Minor Bridge on Ghotan Rahor Piproti Mani Road K.M.0/6 to 0/8
Type of cross drainage work:Protection wall
Location Chainage :
Design Discharge:Type of Soil : Ordinery soft soil
Description of Item
No.
Length
Width
Height/
Unit
(m)
(m)
Thickness
(m)
2
3
4
5
6
7
Err:512
Err:512
Err:512
Earthwork in excavation for structures as per drawing and Err:512
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
excavated suitable material.
Err:512
Err:512
Err:512
Err:512
Cum
Err:512
Err:512
Err:512
Err:512
Cum

Ordinary Soil
Total
Say..

S.O.R.P.No.39 item No.11.1(ii)


2

Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
P.C.C Grade M 10

(S.O.R.P.No.39 it.no.11.4 (i) )

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

0.30
0.30

Cum
Cum

Total
Say..

II

P.C.C Grade M 15
Nominal Mix (1:2,5:5)

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Total
Say..

S.O.R.P.No.34 item No.11.9


3

Cum
Cum

Supplying, fitting and placing MS bar reinforcement in


foundation complete as per drawings and technical
specifications Clauses 1000 and 1202

Providing steel 3.50kg./Sqm

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Kg.
Kg.

i.e.

M.Ton

S.O.R.P.No.39 item No.11.9

Providing weepholes in brick masonry/stone masonry,


plain/reinforced concrete abutment, wing wall, return wall with
100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical specification Clauses
614, 709, 1204.3.7
Err:512
Err:512

(S.O.R.Page No 42, Item No.-12.9)

Err:512
Err:512

1
1

/1.50
/1.50

No.
No.

Total..

Providing and laying filter media with granular crushed


aggregates as per specification to a thickness of not less than
600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height, compacted to
firm condition complete as per drawing and technical
specification Clause 1204.3.8
Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Cum
Cum

Say

0.00

Err:512
Err:512
(S.O.R.Page No 42, Item No.-12.11)

Deputy Executive Engineer


Panchayat (R&B) Sub Division
Dharampur

FORMAT F-7

KS

Quantity

Package
District :Block :Rate
( RS )

Himmatnagar
Idar
Amount
( RS )

10

10,000.00
100.00
10,100.00

10100.00

10,000.00
100.00
10,100.00

10100.00

1
1

1
#VALUE!
0.00
92.28
60.71
151.31

66.07

42.35
84.71
#VALUE!

243.00
2.43

#VALUE!

245.43

#VALUE!

4759.00
47.59
4,806.59

232398.63

14.56
0.38
0.00

5.22
4.24
11.35
48.35
48.35
42.07
3.94
40.55
30.24
3.24
12.60
1.08
0.00
jacktinh
17.08
10.59
6.35
1.69

19.58
6.35
1.69

158.17
355.22
355.22

6173.00
61.73
6,234.73

2214700.79

5,386.00
53.86
5,439.86

69467.01

5,226.00
52.26
5,278.26

22485.39

4,289.00
42.89
4,331.89

54581.81

5,479.00
54.79
5,533.79

139451.51

12.77

12.77
4.26

4.26
12.60

12.60
25.20

25.20

11366.20
2142.00

348.70
13856.90
14549.75
14.55
M.T

54,575.00
545.75
55,120.75

802006.91

1,402.00
14.02
1,416.02

40186.65

479.00
4.79
483.79

1935.16

125.00
1.25
126.25

909.00

906.00
9.06
915.06

94855.12

4,759.00
47.59
4,806.59

317571.40

28.38

28.38
4.00

4
7.20

7.20
7.20
95.88
0.58

103.66

66.07
66.07
Err:509

Err:509
Err:509

Err:509
Err:509
Err:509

Err:509

35.91
63.40

717.00
7.17
724.17

71917.32

125.00
1.25
126.25

17094.25

53.30
0.53
53.83

#VALUE!

358.80
3.59
362.39

39138.12

15000.00
150.00
15,150.00

15150.00

399.00
3.99
402.99

805.98

0.00

47.59

99.31

135.40

135.40
#VALUE!
-48.35
-188
#VALUE!
108.00

108
1.00

1
2.00

77.23
77
Err:509

Err:509
Err:509
1
Err:509
Err:509

0.48
48.07

0.00

538.29
5.38
543.67

41987.63

Err:509
Err:509
Err:509

Err:509

100,000.00
1,000.00
101,000.00

101000.00

Err:509
Err:509
Err:509

Err:509

Err:509

Err:509
Total cost of Rs

Err:509
Err:509
Err:509
Say Rs

Err:509
#VALUE!
#VALUE!
#VALUE!

Executive Engineer
Panchayat (R&B) Division

#VALUE!
90.058

Executive Engineer
Panchayat (R&B) Division
Valsad

FORMAT F-7

KS
Package
District :Block :-

GJ-2522
Valsad
Dharampur

Quantity

Rate
( RS )

Amount
( RS )

10

176.00
1.76
177.76

Err:512

2625.00
26.25
2,651.25

Err:512

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

3,012.00
30.12
3,042.12

Err:512

54042.21
540.42
54,582.63

Err:512

109.00
1.09
110.09

Err:512

Err:512
Err:512

Err:512
Err:512

Err:512
Err:512

Err:512

Err:512
Err:512

Err:512
Err:512
Total cost of Rs

1,390.00
13.90
1,403.90
Say Rs

Executive Engineer
Panchayat (R&B) Division
Valsad

Err:512
Err:512
Err:512

Err:512

Name Of Work

sl

box
1 2/32/0

Constructing Bridge on Indrasi Reservoir River at


Bhiloda Maumunai Poshina App.Road(MDR)
Wing Wall Calculation
Depth of
Length of
Length bet
net safe max Ht.ho
foundation wL
sec 1-1 & 2-2
10
4670
1500
6985
3691

section 1-1
C1s
C2s
Cs3
Bs
1438
1151
567

C1M

C2M
2034

D1s

D2s

3656

section 3-3
BM
D1M
910
5282

C3M
1628

D4s

580

1736

D2M

120

D4M

833

2487

-133

Area of section 3-3


pcc M -150

5.482

0.15

N-200

5.282

0.5

4.572

+
2

1.628

0.833

1.628

+
2

0.3

2.487

0.5

0.3

0.3

+
2

0.4

0.3

0.4

0.05

Total

Area of section 1-1


pcc M -150

3.856

0.15

N-200

3.656

0.5

3.156

+
2

1.151

0.58

1.151

+
2

0.3

1.736

0.5

0.3

0.3

+
2

0.4

0.3

0.4

0.05

=
Total

Area of section 4-4


pcc M -150

2.01

0.15

N-200

1.81

0.5

1.31

+
2

0.85

0.24

0.85

+
2

0.3

0.85

0.5

0.3

0.3

+
2

0.4

0.3

0.4

=
x

0.05

=
Total

Wing wall Calculation


M-15
area at section 3-3

0.8223

area at section 1-1

0.5784

area at section 4-4

0.3015

Section 3-3 to 1-1


Length of section

4.111

Volume

1.4395694

Length of section

3.691

Volume

1.6238555

volume

0.4221

M- 15 total

3.485525 Cmt

13.9421 Cmt

Section 1-1 to 2-2

Section 2-2 to end

For 4 wing wall

M-20
area at section 3-3

7.908268

area at section 1-1

4.623998

area at section 4-4

1.94045

Section 3-3 to 1-1


Length of section

4.111

Volume

12.880036

Length of section

3.691

Volume

12.114689

2.71663

0.0515235

27.762879 Cmt

111.0515 Cmt

Section 1-1 to 2-2

Section 2-2 to end


volume
For small trigular portion
M- 20 total

For 4 wing wall

2700
1200

servoir River at
.Road(MDR)
HT at sec
section 1-1
1-1 Hs
C1s
C2s
Cs3
Bs
3666
1438
1151
567

Total
Volume Of
106.83

0.8223
2.641
2.5823

2.397468

0.15

0.0175

0.12

D1s
3656

D2s
580

D4s
1736

120

7.908268

0.5784
1.828
1.24903

1.259468

0.15

0.0175

0.12
4.623998

0.3015
0.905
0.2592

0.48875

0.15
0.0175

0.12
1.94045

C1M

C2M
2034

C3M
1628

section 3-3
BM
D1M
910
5282

Total
D2M
D4M
Volume Of
833
2487
-133
106.83

Format for Joint inspection by the Superintending Engineer and State


Technical Agency for Bridges
(Reference para 4.3.1 of Operations Manual sub para 5)

Constructing Bridge on Indrasi Reservoir River at Bhiloda Maumunai Poshina A

Name of

Date of Visit:- 19/5/2014


Name and designation of STA.:-

Name of Superintending Engineer:Sl.No.


1 Name of the proposed Bridge

Item

Length of proposed Bridge


(Excluding approaches)
Width of Bridge Proposed

Width of existing road carriage way

Sl.no. of CN1 of the road

OMMS reference of the road including year

Type of obstruction

Type of river bed material

Type of Terrain

10

Are the banks well defined ?

11

Length of approach on either side to be

12
13

constructed
Has this been already included in the road
DPR ?
Traffic category taken in pavement design
of the road

14

Bridge alignment

15

17

Height of embankment of approach road


from the lowest bed level
Are flood marks,if any,available on an
existing structure ?
Highest Flood Level (HFL)

18

Ordinery flood Level (OFL)

19

Lowest Bed Level (LBL)

16

Sl.No.
20 Average ground level

Item

21

Empirical Formula for discharge calculation

22

24

Is toposheet available for calculation of


catchment area ?
Name of the nearest place for which highest
rain
data in the mm / hour as per Meterological
Department data
Rugosity Co-efficient for calculating velocity

25

Type of proposed Bridge

26

Type of Super structure

27

No.of spans proposed

28

Is the water way proposed to be less than


calculated effective linear water way ?
Has any pit or bore hole dug to assess to
foundation streta ?
Type of proposed foundation

23

29
30
31

Are river protection works on up stream as well


as down stream with cut of wall proposed ?

32

Type of river protection,if any

33

If rocky streta anticipated has opinion of


geologycal expert sought for assesing
suitability of location of bridge ?
Present arrangement for movement of traffic
i.e.wheather a causeway/low level bridge is
already existing If yes,reasons for proposing
Long span bridge

34

35

36

Atleast 4 photographs of bridge site,


indicating the alignment,feasibility,tentative
levels of road and bridge and inspection of
bridge site
Specific remarks of STA/S.E.about the
proposal

Executive Engineer
Panchayat (R.&B.) Division
Sabarkantha

Superintandent Engineer
Panchayat (R. & B. ) Circle
Ahmedabad

Chief Engineer
Panchayat ( R. & B.)
Gandhinagar

eer and State

rvoir River at Bhiloda Maumunai Poshina App.Road(MDR)

Shri:-S.K.Patel
Design Circle
Gandhinagar
Shri:-V.G.Patel
Ahmedabad circle-1
To be filled in by STA
Constructing Bridge on Indrasi Reservoir River at Bhiloda
Maumunai Poshina App.Road(MDR)
Mts
87.15
Mts7.50

3.75
MRL-1

PMGSY-II 2013-14
Box
Sand with bolder particals
Rolling
Yes
120 mts
120 mts
No

ESAL : 3.0 lacs to 6.0 lacs

Straight reach of the cause way


Mts
2.10

No
101.24
Mts
Mts
100.74

98.70
Mts

To be filled in by STA
99.00
Mts
Manning
"Yes"
Idar

0.045
Box
3X2
Box culvert
26.00
"Yes"
"Yes"
Shallow Isolated foundation
"Yes"

Concrete
"No"

To make the road all weather as


traffic is hindered for morethan
6 hours during monsoon

Atteched herewith

Superintandent Engineer
Design (R. & B. ) Circle
Gandhinagar

Constructing Bridge on Indrasi Reservoir River at Bhiloda Maumunai Poshina App.Road(MDR)


Anchoring RA

R.A NO 2 ITEM NO 10

providing and fixing steel dowel bar of Fe 415 grade 32 mm dia for anchoring by drilling holes in
foundation strata including , necessary bending hooking of dowel bars and grouting the hiles
complete as per detailed drawing and as directed
Basic Rate of Mild steel (Item no 32 / p 154)
Difference of TMT & MILD BAR
48000
Total Rs

6000 =
42000

Deputy Executive Engineer


Panchayat (R&B) Sub Division
Bhiloada

42000

471 R.M

6000

1.143
say Rs

538.29
538.29 R/m

Executive Engineer
Panchayat (R&B) Division
Himmatnagar

na App.Road(MDR)

by drilling holes in
outing the hiles

Name Of Work:

Constructing Bridge on Indrasi Reservoir River at Bhiloda Maumuna


App.Road(MDR)
Hydraulic Calculation

Inglis Formula
Q=
Where ,

125 A
(A+10)1/2
A=

(As Per IRC Sp 13)

Catchment Area
15.700

=
Q=

1962.50
5.07
387.12

Km2

From Google

cumecs

Dickens Formula
Q=

CM3/4

Where ,

M=
C=

Q=

110.42

(As Per IRC Sp 13)

Catchment Area
15.700
Km2
14.00

C =

11-14 Where the annual rain fall is 6


14-19Where the annual rain fall is m
120cm
22 in Western Ghats

cumecs

Ryve's Formula
Q=

CM2/3

Where ,

M=
C=

Q=

67.04

(As Per IRC Sp 13)

C= 6.8 for areas within 25 Km of the co

Catchment Area
15.700
Km2
8.50

8.5 for areas between 25 km and


the coast
10.0 for limited areas near the hills

cumecs

Manning's Formula At Main L/s


Ch. In
(mts)

G.L. in
(mts)

0.00
5.00
10.00
15.00
20.00

102.88
102.83
102.79
102.77
102.75

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

0.00
0.00
0.00
0.00
0.00

Mean
Depth in
(mts)

0.000
0.000
0.000
0.000

Length Area in
in (mts) (mts)

5.00
5.00
5.00
5.00

0.00
0.00
0.00
0.00

Diff. in
G.L.(mts)

0.046
0.041
0.022
0.022

25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00
155.00
160.00
165.00
170.00
175.00
180.00
185.00
190.00
195.00
200.00
205.00
210.00
215.00
220.00
225.00
230.00
235.00
240.00
245.00
250.00
255.00
260.00

102.73
102.70
102.68
102.61
102.54
102.48
102.42
102.35
102.29
102.22
102.15
102.08
101.97
101.90
101.86
101.81
101.77
101.71
101.66
101.60
101.54
101.48
101.44
101.43
101.35
101.28
101.20
101.12
100.83
100.24
99.65
99.06
98.47
97.97
97.91
97.84
97.77
97.70
97.68
97.66
97.65
97.64
97.64
97.85
98.05
98.26
98.46
98.67

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
0.12
0.41
1.00
1.59
2.18
2.78
3.27
3.33
3.40
3.47
3.54
3.56
3.58
3.59
3.60
3.60
3.40
3.19
2.98
2.78
2.57

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.021
0.081
0.264
0.705
1.297
1.888
2.480
3.021
3.301
3.368
3.436
3.504
3.550
3.569
3.584
3.598
3.603
3.498
3.292
3.086
2.880
2.674

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.11
0.40
1.32
3.52
6.48
9.44
12.40
15.11
16.50
16.84
17.18
17.52
17.75
17.85
17.92
17.99
18.02
17.49
16.46
15.43
14.40
13.37

0.022
0.023
0.024
0.069
0.066
0.064
0.064
0.064
0.064
0.067
0.066
0.074
0.106
0.073
0.043
0.044
0.046
0.055
0.055
0.058
0.058
0.058
0.040
0.014
0.077
0.077
0.078
0.077
0.290
0.592
0.591
0.592
0.591
0.492
0.067
0.068
0.068
0.067
0.025
0.014
0.015
0.014
-0.004
-0.206
-0.206
-0.206
-0.206
-0.206

265.00
270.00
275.00
280.00
285.00
290.00
295.00
300.00
305.00
310.00
315.00
320.00
325.00
330.00
335.00
340.00
345.00
350.00
355.00
360.00
365.00
370.00
375.00
380.00
385.00
390.00
395.00
400.00
405.00
410.00
415.00
420.00
425.00
430.00
435.00
440.00
445.00
450.00
455.00
460.00
465.00
470.00
475.00
480.00
485.00
490.00

98.88
99.21
99.74
100.26
100.79
101.25
101.28
101.32
101.36
101.40
101.44
101.48
101.53
101.58
101.64
101.69
101.74
101.81
101.88
101.95
102.02
102.09
102.16
102.20
102.23
102.25
102.28
102.31
102.34
102.37
102.40
102.44
102.47
102.49
102.51
102.53
102.56
102.62
102.68
102.74
102.80
102.86
102.92
102.96
103.00
103.04

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

2.37
2.03
1.50
0.98
0.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.468
2.197
1.765
1.239
0.713
0.225
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Area =

12.34
10.98
8.82
6.19
3.56
1.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
326.52

-0.206
-0.337
-0.526
-0.526
-0.526
-0.455
-0.039
-0.040
-0.039
-0.039
-0.039
-0.039
-0.047
-0.054
-0.054
-0.054
-0.054
-0.070
-0.070
-0.069
-0.070
-0.070
-0.070
-0.041
-0.026
-0.025
-0.026
-0.026
-0.032
-0.032
-0.033
-0.033
-0.032
-0.023
-0.020
-0.020
-0.028
-0.060
-0.061
-0.060
-0.061
-0.060
-0.055
-0.041
-0.041
-0.040
Perimeter

Where,

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
Perfact
1) Clean, straight bank, full stage,
0.025
no rifts or deep pools
2) Same as 1), but some weeds & 0.030
3) Winding,stones
some pools and
0.035
shoals,
clean
4) Same as 3) lower stages, more 0.040
ineffective
slope
and
sections
5)
Same as 3)
some
weeds
and 0.033
6) Same as stones
4) stoney sections 0.045
7) Sluggish river reaches , rather 0.050
weedy
or with
veryreaches
deep pools 0.075
8) Very
weedy
Where ,

Good
0.0275
0.033
0.040
0.045
0.035
0.050
0.060
0.100

Fair
0.030
0.035
0.045
0.050
0.040
0.055
0.070
0.125

R = A/P
R=
2.33

mts

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km

Bed
0.033
0.040
0.050
0.055
0.045
0.060
0.080
0.150

Distance
100.00 mts
300.00 mts
500.00 mts

Where ,

S = Bed slope
R.L.
100.09
97.74

u/p side
d/n side

250.00
780.00

S=

Distance
Diff R.L.

S=

1 in

225

S=

0.00444

530.00
2.35

V = 1/n * R2/3 * S1/2


=
22.22
1.76
=
2.61
m/s

0.07
(As Per IRC Sp 13)

Q=
Q=

A*V
326.52
851.55 cumecs

2.61

Manning's Formula At Main 100 U/s

Ch. In
(mts)

G.L. in
(mts)

0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00
155.00

102.20
102.14
102.08
101.93
101.70
101.68
101.72
101.76
101.71
101.54
101.45
101.42
101.43
101.01
100.00
99.00
98.96
99.05
99.13
99.19
99.23
99.07
98.93
98.92
98.90
98.53
98.44
98.62
98.79
98.97
101.89
102.56

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.24
1.24
2.24
2.28
2.19
2.11
2.05
2.01
2.17
2.31
2.32
2.34
2.71
2.80
2.62
2.45
2.27
0.00
0.00

Mean
Depth in
(mts)

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.118
0.735
1.737
2.258
2.235
2.149
2.079
2.030
2.089
2.239
2.316
2.330
2.524
2.757
2.713
2.535
2.357
1.134
0.000

Length Area in
in (mts) (mts)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.59
3.68
8.68
11.29
11.18
10.75
10.39
10.15
10.44
11.20
11.58
11.65
12.62
13.79
13.57
12.68
11.79
5.67
0.00

Diff. in
G.L.(mts)

0.063
0.064
0.151
0.222
0.029
-0.044
-0.045
0.058
0.168
0.090
0.027
-0.009
0.425
1.001
1.001
0.041
-0.086
-0.086
-0.055
-0.042
0.159
0.142
0.013
0.014
0.375
0.090
-0.178
-0.178
-0.178
-2.921
-0.664

160.00
165.00
170.00
175.00
180.00
185.00

Where,

102.90
102.80
102.71
102.64
102.56
102.49

101.24
101.24
101.24
101.24
101.24
101.24

0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000

5.00
5.00
5.00
5.00
5.00
5.00
Area =

0.00
0.00
0.00
0.00
0.00
0.00
181.67

-0.347
0.100
0.094
0.075
0.075
0.075
Perimeter

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
1) Clean, straight bank, full stage,
no rifts or deep pools
2) Same as 1), but some weeds &
stones
3) Winding, some pools and
shoals,
4) Sameclean
as 3) lower stages, more
ineffective
andweeds
sections
5) Same asslope
3) some
and
stones
6) Same as 4) stoney sections
7) Sluggish river reaches , rather
weedy
with very
deep pools
8) Very or
weedy
reaches

Perfact
0.025
0.030
0.035
0.040
0.033
0.045
0.050
0.075

Where ,

Good
0.0275
0.033
0.040
0.045
0.035
0.050
0.060
0.100

Fair
0.030
0.035
0.045
0.050
0.040
0.055
0.070
0.125

R = A/P
R=
2.00

mts

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km
Where ,

Bed
0.033
0.040
0.050
0.055
0.045
0.060
0.080
0.150

Distance
100.00 mts
300.00 mts
500.00 mts

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224

V = 1/n * R2/3 * S1/2


=
22.22
1.59
=
2.36
m/s

0.07
(As Per IRC Sp 13)

Q=
Q=

A*V
181.67
428.99 cumecs

2.36

Manning's Formula At Main 200 U/s

Ch. In
(mts)

G.L. in
(mts)

0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00

102.53
102.63
102.73
102.83
102.76
102.69
102.62
102.50
101.44
100.42
100.22
99.89
99.53
100.49
100.15
100.21
100.43
100.73
100.96
101.02
101.07
101.75
102.30
102.60
102.59
102.50
102.54
102.58

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.82
1.03
1.35
1.71
0.75
1.09
1.03
0.81
0.51
0.28
0.22
0.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Mean
Depth in
(mts)

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.411
0.923
1.189
1.534
1.233
0.919
1.057
0.921
0.662
0.396
0.254
0.196
0.084
0.000
0.000
0.000
0.000
0.000
0.000

Length Area in
in (mts) (mts)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.05
4.62
5.94
7.67
6.16
4.59
5.28
4.61
3.31
1.98
1.27
0.98
0.42
0.00
0.00
0.00
0.00
0.00
0.00

Diff. in
G.L.(mts)

-0.100
-0.100
-0.100
0.067
0.067
0.067
0.124
1.061
1.021
0.203
0.328
0.361
-0.962
0.334
-0.059
-0.212
-0.306
-0.226
-0.058
-0.058
-0.677
-0.552
-0.296
0.009
0.093
-0.043
-0.043

Area =

Where,

12.56

Perimeter

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
Perfact
1) Clean, straight bank, full stage, 0.025
2) Same as 1), but some weeds & 0.030
3) Winding, some pools and shoals,0.035
4) Same as 3) lower stages, more i0.040
5) Same as 3) some weeds and sto0.033
6) Same as 4) stoney sections
0.045
7) Sluggish river reaches , rather 0.050
8) Very weedy reaches
0.075
Where ,

Good
0.0275
0.033
0.040
0.045
0.035
0.050
0.060
0.100

Fair
0.030
0.035
0.045
0.050
0.040
0.055
0.070
0.125

R = A/P
R=
0.42

mts

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km
Where ,

Bed
0.033
0.040
0.050
0.055
0.045
0.060
0.080
0.150

Distance
100.00 mts
300.00 mts
500.00 mts

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224
.

V = 1/n * R2/3 * S1/2


=
22.22
0.56
=
0.83
m/s

0.07
(As Per IRC Sp 13)

Q=
Q=

A*V
12.56
10.41 cumecs

Manning's Formula At Main 300 U/s

0.83

Ch. In
(mts)

G.L. in
(mts)

0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00

104.14
104.22
104.29
104.36
104.44
104.40
104.37
104.34
104.21
103.14
100.14
99.99
100.12
99.97
100.20
100.47
100.69
100.85
101.45
102.04
102.08
102.11
102.14
102.19
102.25
102.22
102.19
102.17

Where,

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

Mean
Depth in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.10
1.26
1.12
1.27
1.04
0.77
0.55
0.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.552
1.180
1.188
1.194
1.153
0.904
0.658
0.467
0.194
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Length Area in
in (mts) (mts)

Diff. in
G.L.(mts)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Area =

-0.074
-0.074
-0.074
-0.075
0.034
0.033
0.034
0.125
1.076
3.000
0.151
-0.135
0.148
-0.231
-0.266
-0.225
-0.157
-0.596
-0.597
-0.033
-0.033
-0.033
-0.051
-0.052
0.026
0.026
0.026
Perimeter

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.76
5.90
5.94
5.97
5.76
4.52
3.29
2.34
0.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.45

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
Perfact
1) Clean, straight bank, full stage, 0.025
2) Same as 1), but some weeds & 0.030
3) Winding, some pools and shoals,0.035
4) Same as 3) lower stages, more i0.040
5) Same as 3) some weeds and sto0.033
6) Same as 4) stoney sections
0.045

Good
0.0275
0.033
0.040
0.045
0.035
0.050

Fair
0.030
0.035
0.045
0.050
0.040
0.055

Bed
0.033
0.040
0.050
0.055
0.045
0.060

7) Sluggish river reaches , rather 0.050


8) Very weedy reaches
0.075
Where ,

0.060
0.100
R = A/P
R=
0.82

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km
Where ,

0.070
0.125

0.080
0.150

mts

Distance
100.00 mts
300.00 mts
500.00 mts

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224
.

V = 1/n * R2/3 * S1/2


=
22.22
0.87
=
1.30
m/s

0.07
(As Per IRC Sp 13)

Q=
A*V
37.45
Q=
48.58 cumecs
Manning's Formula At Main 400 U/s

Ch. In
(mts)

G.L. in
(mts)

0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00

103.91
103.89
103.86
103.83
103.81
103.79
103.76
103.74
103.71

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Mean
Depth in
(mts)

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

1.30

Length Area in
in (mts) (mts)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Diff. in
G.L.(mts)

0.025
0.025
0.026
0.025
0.024
0.024
0.024
0.023

45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00

Where,

103.66
103.61
103.49
100.08
100.47
100.50
100.64
100.76
100.86
100.68
100.70
103.85
102.32
102.78
102.66
102.46
102.26
102.06
101.99
101.94
101.89
101.84

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

0.00
0.00
0.00
1.16
0.77
0.74
0.60
0.49
0.38
0.56
0.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.581
0.965
0.755
0.672
0.544
0.435
0.474
0.551
0.268
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Area =

0.00
0.00
0.00
2.91
4.83
3.77
3.36
2.72
2.17
2.37
2.75
1.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.23

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
Perfact
1) Clean, straight bank, full stage, 0.025
2) Same as 1), but some weeds & 0.030
3) Winding, some pools and shoals,0.035
4) Same as 3) lower stages, more i0.040
5) Same as 3) some weeds and sto0.033
6) Same as 4) stoney sections
0.045
7) Sluggish river reaches , rather 0.050
8) Very weedy reaches
0.075
Where ,

Good
0.0275
0.033
0.040
0.045
0.035
0.050
0.060
0.100

Fair
0.030
0.035
0.045
0.050
0.040
0.055
0.070
0.125

R = A/P
R=
0.56

mts

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km

Bed
0.033
0.040
0.050
0.055
0.045
0.060
0.080
0.150

Distance
100.00 mts
300.00 mts
500.00 mts

0.053
0.052
0.120
3.412
-0.395
-0.026
-0.139
-0.118
-0.101
0.181
-0.028
-3.145
1.528
-0.463
0.128
0.200
0.200
0.200
0.066
0.050
0.050
0.050
Perimeter

Where ,

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224
.

V = 1/n * R2/3 * S1/2


=
22.22
0.68
=
1.01
m/s

0.07
(As Per IRC Sp 13)

Q=
Q=

A*V
26.23
26.39 cumecs

1.01

Manning's Formula At Main 500 U/s

Ch. In
(mts)

G.L. in
(mts)

0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00

102.74
102.84
102.94
103.04
103.14
103.09
103.04
102.99
102.94
102.99
103.04
100.27
100.56
100.14
100.24
100.28
100.34
100.24
100.15

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.97
0.68
1.10
1.00
0.96
0.91
1.00
1.10

Mean
Depth in
(mts)

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.485
0.826
0.889
1.049
0.979
0.931
0.951
1.046

Length Area in
in (mts) (mts)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.43
4.13
4.44
5.24
4.90
4.65
4.76
5.23

Diff. in
G.L.(mts)

-0.100
-0.100
-0.100
-0.100
0.048
0.048
0.049
0.048
-0.048
-0.047
2.770
-0.289
0.414
-0.094
-0.045
-0.052
0.092
0.098

95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00

Where,

100.99
101.42
101.82
102.22
102.26
102.29
102.31
102.34

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

0.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.671
0.124
0.000
0.000
0.000
0.000
0.000
0.000

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Area =

3.36
0.62
0.00
0.00
0.00
0.00
0.00
0.00
39.76

-0.847
-0.426
-0.399
-0.399
-0.045
-0.025
-0.025
-0.025
Perimeter

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
Perfact
1) Clean, straight bank, full stage, 0.025
2) Same as 1), but some weeds & 0.030
3) Winding, some pools and shoals,0.035
4) Same as 3) lower stages, more i0.040
5) Same as 3) some weeds and sto0.033
6) Same as 4) stoney sections
0.045
7) Sluggish river reaches , rather 0.050
8) Very weedy reaches
0.075
Where ,

Good
0.0275
0.033
0.040
0.045
0.035
0.050
0.060
0.100

Fair
0.030
0.035
0.045
0.050
0.040
0.055
0.070
0.125

R = A/P
R=
0.78

mts

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km
Where ,

Bed
0.033
0.040
0.050
0.055
0.045
0.060
0.080
0.150

Distance
100.00 mts
300.00 mts
500.00 mts

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224

V = 1/n * R2/3 * S1/2


=
22.22
0.85

0.07

1.26

m/s
(As Per IRC Sp 13)

Q=
A*V
39.76
Q=
50.14 cumecs
Manning's Formula At Main 100 D/s

Ch. In
(mts)

G.L. in
(mts)

0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00
155.00
160.00
165.00
170.00
175.00

101.10
101.08
101.06
101.02
100.97
100.98
101.03
101.01
100.93
100.85
100.84
100.83
100.83
100.37
99.42
98.51
97.91
98.14
98.36
98.45
98.44
98.43
98.46
98.49
98.53
98.56
98.60
98.75
98.95
97.80
100.90
101.34
101.78
101.83
101.78
101.73

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

0.14
0.16
0.18
0.22
0.27
0.26
0.21
0.23
0.31
0.39
0.40
0.41
0.41
0.87
1.82
2.73
3.33
3.10
2.88
2.79
2.80
2.82
2.78
2.75
2.71
2.68
2.64
2.49
2.29
3.44
0.34
0.00
0.00
0.00
0.00
0.00

Mean
Depth in
(mts)

0.149
0.170
0.201
0.246
0.265
0.235
0.221
0.270
0.349
0.392
0.401
0.410
0.642
1.343
2.275
3.033
3.215
2.990
2.838
2.798
2.809
2.799
2.767
2.732
2.696
2.659
2.564
2.389
2.863
1.889
0.171
0.000
0.000
0.000
0.000

1.26

Length Area in
in (mts) (mts)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

0.74
0.85
1.01
1.23
1.33
1.18
1.10
1.35
1.74
1.96
2.01
2.05
3.21
6.71
11.37
15.17
16.08
14.95
14.19
13.99
14.05
14.00
13.83
13.66
13.48
13.29
12.82
11.95
14.32
9.45
0.86
0.00
0.00
0.00
0.00

Diff. in
G.L.(mts)

0.022
0.021
0.041
0.049
-0.012
-0.047
0.018
0.080
0.078
0.009
0.009
0.008
0.455
0.948
0.915
0.602
-0.238
-0.212
-0.092
0.011
0.012
-0.032
-0.033
-0.036
-0.037
-0.037
-0.152
-0.198
1.146
-3.093
-0.439
-0.439
-0.051
0.048
0.045

180.00
185.00
190.00
195.00

Where,

101.69
101.67
101.71
101.75

101.24
101.24
101.24
101.24

0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000

5.00
5.00
5.00
5.00
Area =

0.00
0.00
0.00
0.00
243.91

0.044
0.022
-0.040
-0.041
Perimeter

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
1) Clean, straight bank, full stage,
no rifts or deep pools
2) Same as 1), but some weeds &
stones
3) Winding, some pools and
shoals,
4)
Sameclean
as 3) lower stages, more
ineffective
andweeds
sections
5) Same asslope
3) some
and
stones
6) Same as 4) stoney sections
7) Sluggish river reaches , rather
weedy
with very
deep pools
8) Very or
weedy
reaches

Perfact
0.025
0.030
0.035
0.040
0.033
0.045
0.050
0.075

Good
0.0275
0.033
0.040
0.045
0.035
0.050
0.060
0.100

R = A/P
R=
1.56
Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km

Fair
0.030
0.035
0.045
0.050
0.040
0.055
0.070
0.125

Bed
0.033
0.040
0.050
0.055
0.045
0.060
0.080
0.150

Where ,

Where ,

mts
Distance
100.00 mts
300.00 mts
500.00 mts

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224
.

V = 1/n * R2/3 * S1/2


=
22.22
1.35
=
2.00
m/s

0.07
(As Per IRC Sp 13)

Q=
A*V
243.91
Q = 488.52 cumecs
Manning's Formula At Main 200 D/s

2.00

Ch. In
(mts)

G.L. in
(mts)

0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00

100.67
100.62
100.57
100.55
100.53
100.58
100.63
100.58
100.53
99.98
99.43
99.58
99.41
98.65
98.49
98.38
98.27
98.16
97.99
97.87
97.82
97.69
98.98
101.86
100.51
100.48
100.37
100.31
100.30
100.32
100.37

Where,

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

Mean
Depth in
(mts)

0.57
0.62
0.67
0.69
0.71
0.66
0.61
0.66
0.71
1.26
1.81
1.66
1.83
2.59
2.75
2.86
2.97
3.08
3.25
3.38
3.42
3.55
2.26
0.00
0.73
0.76
0.87
0.93
0.94
0.92
0.87

0.593
0.645
0.682
0.700
0.683
0.638
0.639
0.688
0.987
1.537
1.735
1.745
2.210
2.670
2.807
2.916
3.025
3.163
3.311
3.398
3.487
2.908
1.131
0.365
0.746
0.816
0.901
0.935
0.930
0.895

Length Area in
in (mts) (mts)

Diff. in
G.L.(mts)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Area =

0.051
0.051
0.025
0.011
-0.045
-0.046
0.049
0.048
0.550
0.550
-0.154
0.174
0.755
0.166
0.108
0.109
0.109
0.168
0.128
0.046
0.133
-1.293
-2.882
1.352
0.030
0.111
0.058
0.011
-0.021
-0.050
Perimeter

2.97
3.22
3.41
3.50
3.42
3.19
3.20
3.44
4.93
7.69
8.68
8.72
11.05
13.35
14.04
14.58
15.12
15.82
16.56
16.99
17.44
14.54
5.65
1.83
3.73
4.08
4.50
4.68
4.65
4.47
239.44

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
Perfact
1) Clean, straight bank, full stage,
0.025
no rifts or deep pools
2) Same as 1), but some weeds & 0.030
stones

Good
0.0275
0.033

Fair
0.030
0.035

Bed
0.033
0.040

3) Winding, some pools and


shoals,
4) Sameclean
as 3) lower stages, more
ineffective
andweeds
sections
5)
Same asslope
3) some
and
stones
6) Same as 4) stoney sections
7) Sluggish river reaches , rather
weedy
with very
deep pools
8) Very or
weedy
reaches

0.035
0.040
0.033
0.045
0.050
0.075

Where ,

0.040
0.045
0.035
0.050
0.060
0.100
R = A/P
R=
1.58

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km
Where ,

0.045
0.050
0.040
0.055
0.070
0.125

0.050
0.055
0.045
0.060
0.080
0.150

mts

Distance
100.00 mts
300.00 mts
500.00 mts

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224
.

V = 1/n * R2/3 * S1/2


=
22.22
1.36
=
2.02
m/s

0.07
(As Per IRC Sp 13)

Q=
A*V
239.44
Q = 484.15 cumecs
Manning's Formula At Main 300 D/s

Ch. In
(mts)

G.L. in
(mts)

0.00
5.00
10.00
15.00
20.00

100.69
100.69
100.68
100.68
100.68

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

0.55
0.55
0.56
0.56
0.56

Mean
Depth in
(mts)

0.552
0.554
0.557
0.559

2.02

Length Area in
in (mts) (mts)

5.00
5.00
5.00
5.00

2.76
2.77
2.78
2.79

Diff. in
G.L.(mts)

0.002
0.003
0.002
0.002

25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00
155.00
160.00
165.00
170.00

Where,

100.68
100.68
100.41
100.15
99.88
99.61
99.12
98.62
98.03
97.92
97.82
97.72
97.75
97.80
97.85
97.89
97.92
97.95
97.93
97.90
97.87
99.37
99.81
99.88
99.94
99.98
100.00
100.03
100.05
100.02

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

0.56
0.56
0.83
1.10
1.36
1.63
2.12
2.62
3.21
3.32
3.42
3.53
3.49
3.44
3.39
3.35
3.32
3.29
3.31
3.34
3.37
1.87
1.43
1.36
1.30
1.26
1.24
1.21
1.19
1.22

0.560
0.562
0.696
0.962
1.228
1.494
1.876
2.373
2.918
3.266
3.370
3.473
3.507
3.463
3.414
3.373
3.338
3.304
3.297
3.323
3.356
2.621
1.649
1.396
1.330
1.280
1.251
1.226
1.200
1.206

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Area =

2.80
2.81
3.48
4.81
6.14
7.47
9.38
11.87
14.59
16.33
16.85
17.37
17.53
17.31
17.07
16.87
16.69
16.52
16.48
16.62
16.78
13.11
8.24
6.98
6.65
6.40
6.25
6.13
6.00
6.03
342.65

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
1) Clean, straight bank, full stage,
no rifts or deep pools
2) Same as 1), but some weeds &
stones
3) Winding, some pools and
shoals,
4)
Sameclean
as 3) lower stages, more
ineffective
andweeds
sections
5)
Same asslope
3) some
and
stones
6) Same as 4) stoney sections
7) Sluggish river reaches , rather
weedy
with very
deep pools
8) Very or
weedy
reaches

Perfact
0.025
0.030
0.035
0.040
0.033
0.045
0.050
0.075

Good
0.0275
0.033
0.040
0.045
0.035
0.050
0.060
0.100

Fair
0.030
0.035
0.045
0.050
0.040
0.055
0.070
0.125

Bed
0.033
0.040
0.050
0.055
0.045
0.060
0.080
0.150

0.001
0.002
0.266
0.266
0.266
0.266
0.497
0.498
0.591
0.105
0.103
0.104
-0.037
-0.051
-0.046
-0.036
-0.034
-0.034
0.019
0.034
0.033
-1.504
-0.440
-0.066
-0.066
-0.034
-0.025
-0.025
-0.025
0.035
Perimeter

Where ,

R = A/P
R=
2.01

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km
Where ,

mts

Distance
100.00 mts
300.00 mts
500.00 mts

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224
.

V = 1/n * R2/3 * S1/2


=
22.22
1.60
=
2.37
m/s

0.07
(As Per IRC Sp 13)

Q=
Q=

A*V
342.65
813.42 cumecs

2.37

Manning's Formula At Main 400 D/s

Ch. In
(mts)

G.L. in
(mts)

15.00
20.00
25.00
30.00
35.00

100.35
100.28
100.28
100.28
100.28

H.F.L.in
(mts)

101.24
101.24
101.24
101.24
101.24

Depth in
(mts)

0.89
0.96
0.96
0.96
0.96

Mean
Depth in
(mts)

0.929
0.965
0.964
0.964

Length Area in
in (mts) (mts)

5.00
5.00
5.00
5.00

4.65
4.82
4.82
4.82

Diff. in
G.L.(mts)

0.071
0.000
-0.001
0.000

40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00
155.00
160.00
165.00
170.00
175.00
180.00
185.00
190.00
195.00
200.00

Where,

100.28
100.16
98.69
98.65
98.62
98.59
98.56
98.53
98.50
98.46
98.42
98.38
98.39
98.44
98.43
98.42
98.42
98.30
98.29
98.33
98.38
98.43
98.45
98.48
99.73
100.27
100.32
100.36
100.39
100.42
100.40
100.35
100.29

101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24
101.24

0.96
1.09
2.55
2.59
2.62
2.65
2.68
2.71
2.74
2.78
2.82
2.86
2.85
2.80
2.81
2.82
2.82
2.94
2.95
2.91
2.86
2.82
2.79
2.76
1.51
0.97
0.92
0.88
0.85
0.82
0.84
0.89
0.95

0.963
1.024
1.819
2.572
2.606
2.638
2.669
2.699
2.730
2.763
2.800
2.838
2.855
2.827
2.806
2.813
2.820
2.882
2.947
2.933
2.888
2.840
2.801
2.775
2.135
1.240
0.948
0.904
0.868
0.834
0.831
0.870
0.920

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Area =

4.82
5.12
9.10
12.86
13.03
13.19
13.34
13.50
13.65
13.82
14.00
14.19
14.27
14.14
14.03
14.06
14.10
14.41
14.74
14.66
14.44
14.20
14.00
13.88
10.68
6.20
4.74
4.52
4.34
4.17
4.16
4.35
4.60
378.38

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
1) Clean, straight bank, full stage,
no rifts or deep pools
2) Same as 1), but some weeds &
stones
3) Winding, some pools and
shoals,
4) Sameclean
as 3) lower stages, more
ineffective
andweeds
sections
5) Same asslope
3) some
and
stones
6) Same as 4) stoney sections
7) Sluggish river reaches , rather
weedy or with very deep pools

Perfact
0.025
0.030
0.035
0.040
0.033
0.045
0.050

Good
0.0275
0.033
0.040
0.045
0.035
0.050
0.060

Fair
0.030
0.035
0.045
0.050
0.040
0.055
0.070

Bed
0.033
0.040
0.050
0.055
0.045
0.060
0.080

-0.001
0.122
1.469
0.035
0.034
0.030
0.031
0.030
0.031
0.036
0.038
0.038
-0.005
-0.050
0.007
0.007
0.007
0.117
0.014
-0.043
-0.047
-0.049
-0.029
-0.022
-1.258
-0.533
-0.050
-0.039
-0.033
-0.033
0.027
0.050
0.051
Perimeter

8) Very weedy reaches

0.075

Where ,

0.100

0.125

R = A/P
R=
2.04

mts

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km
Where ,

0.150

Distance
100.00 mts
300.00 mts
500.00 mts

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224
.

V = 1/n * R2/3 * S1/2


=
22.22
1.61
=
2.40
m/s

0.07
(As Per IRC Sp 13)

Q=
Q=

A*V
378.38
907.03 cumecs

2.40

Manning's Formula For RTL

Ch. In
(mts)

G.L. in
(mts)

70.00

102.22

H.F.L.in
(mts)

100.920

Depth in
(mts)

0.00

Mean
Depth in
(mts)

Length Area in
in (mts) (mts)

Diff. in
G.L.(mts)

75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00
155.00
160.00
165.00
170.00
175.00
180.00
185.00
190.00
195.00
200.00
205.00
210.00
215.00
220.00
225.00
230.00
235.00
240.00
245.00
250.00
255.00
260.00
265.00
270.00
275.00
280.00
285.00
290.00
295.00
300.00
305.00
310.00

102.15
102.08
101.97
101.90
101.86
101.81
101.77
101.71
101.66
101.60
101.54
101.48
101.44
101.43
101.35
101.28
101.20
101.12
100.83
100.24
99.65
99.06
98.47
97.97
97.91
97.84
97.77
97.70
97.68
97.66
97.65
97.64
97.64
97.85
98.05
98.26
98.46
98.67
98.88
99.21
99.74
100.26
100.79
101.25
101.28
101.32
101.36
101.40

100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.09
0.68
1.27
1.86
2.46
2.95
3.01
3.08
3.15
3.22
3.24
3.26
3.27
3.29
3.28
3.08
2.87
2.66
2.46
2.25
2.05
1.71
1.18
0.66
0.13
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.044
0.385
0.977
1.568
2.160
2.701
2.981
3.048
3.116
3.184
3.230
3.249
3.264
3.278
3.283
3.178
2.972
2.766
2.560
2.354
2.148
1.877
1.445
0.919
0.393
0.065
0.000
0.000
0.000
0.000

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.22
1.92
4.88
7.84
10.80
13.51
14.90
15.24
15.58
15.92
16.15
16.25
16.32
16.39
16.42
15.89
14.86
13.83
12.80
11.77
10.74
9.38
7.23
4.60
1.97
0.32
0.00
0.00
0.00
0.00

0.066
0.074
0.106
0.073
0.043
0.044
0.046
0.055
0.055
0.058
0.058
0.058
0.040
0.014
0.077
0.077
0.078
0.077
0.290
0.592
0.591
0.592
0.591
0.492
0.067
0.068
0.068
0.067
0.025
0.014
0.015
0.014
-0.004
-0.206
-0.206
-0.206
-0.206
-0.206
-0.206
-0.337
-0.526
-0.526
-0.526
-0.455
-0.039
-0.040
-0.039
-0.039

315.00
320.00
325.00
330.00
335.00
340.00
345.00
350.00
355.00
360.00
365.00
370.00
375.00
380.00
385.00
390.00
395.00
400.00
405.00
410.00
415.00
420.00
425.00
430.00
435.00
440.00
445.00

Where,

101.44
101.48
101.53
101.58
101.64
101.69
101.74
101.81
101.88
101.95
102.02
102.09
102.16
102.20
102.23
102.25
102.28
102.31
102.34
102.37
102.40
102.44
102.47
102.49
102.51
102.53
102.56

100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920
100.920

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
Area =

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
285.71

Q = A*V
V = 1/n * R2/3 * S1/2
(As Per IRC Sp 13)

Where ,

n = 0.045

Stream condition
Surface
1) Clean, straight bank, full stage,
no rifts or deep pools
2) Same as 1), but some weeds &
stones
3) Winding, some pools and
shoals,
4)
Sameclean
as 3) lower stages, more
ineffective
andweeds
sections
5)
Same asslope
3) some
and
stones
6) Same as 4) stoney sections
7) Sluggish river reaches , rather
weedy
with very
deep pools
8) Very or
weedy
reaches
Where ,

Perfact
0.025
0.030
0.035
0.040
0.033
0.045
0.050
0.075

Good
0.0275
0.033
0.040
0.045
0.035
0.050
0.060
0.100

Fair
0.030
0.035
0.045
0.050
0.040
0.055
0.070
0.125

R = A/P
R=
2.19

mts

Bed
0.033
0.040
0.050
0.055
0.045
0.060
0.080
0.150

-0.039
-0.039
-0.047
-0.054
-0.054
-0.054
-0.054
-0.070
-0.070
-0.069
-0.070
-0.070
-0.070
-0.041
-0.026
-0.025
-0.026
-0.026
-0.032
-0.032
-0.033
-0.033
-0.032
-0.023
-0.020
-0.020
-0.028
Perimeter

Catchment Area
1) upto 3 sq. km
2) 3 to 15 sq. km
3) over 15 sq. km
Where ,

Distance
100.00 mts
300.00 mts
500.00 mts

S = Bed slope

u/p side
d/n side

180.00
750.00

S=

Distance
Diff R.L.

S=

1 in

S=

0.00447

R.L.
100.39
97.84
=

570.00
2.55

224
.

V = 1/n * R2/3 * S1/2


=
22.22
1.69
=
2.52
m/s

0.07
(As Per IRC Sp 13)

Q=
Q=

A*V
285.71
718.57 cumecs

2.52

Therfore , Now cumecs finally calculated as per below


1)
Inglis Formula
Q=
387.12
cumecs
2)
Manning At Main L/s
Q=
851.55
cumecs
3)
Manning at 100 mt U/s
Q=
428.99
cumecs
4)
Manning at 200 mt U/s
Q=
10.41
cumecs
5)
Manning at 300 mt U/s
Q=
48.58
cumecs
6)
Manning at 400 mt U/s
Q=
26.39
cumecs
7)
Manning at 500 mt U/s
Q=
50.14
cumecs
8)
Manning at 100 mt D/s
Q=
488.52
cumecs
9)
Manning at 200 mt D/s
Q=
484.15
cumecs
10)
Manning at 300 mt D/s
Q=
813.42
cumecs
11)
Manning at 400 mt D/s
Q=
907.03
cumecs
13)
Discharge up to RTL
Q=
718.57
cumecs

Velocity
2.61
2.36
0.83
1.30
1.01
1.26
2.00
2.02
2.37
2.40
2.52

m/s
m/s
m/s
m/s
m/s
m/s
m/s
m/s
m/s
m/s
m/s

Therfore , Now cumecs finally calculated for DESIGN CALCULATION IS as per below
Q=
589.69
cumecs
Resime Width of Stream

W=
W=

4.8Q^1/2
116.56

Praposed Box culvert


Length
3.00

Height
2.00

Area
6.00

Perimeter
10.00

Operating Head

0.45

Length of culvert

7.50

limitting due to road level

Design calculations
Q=

Q=

A X 4.43

A X 4.43

14.37

No of Box Required=

=
Say

1+Kc+Kf

)1/2

L=
R=

7.50
0.60

Kc =

0.572R0.3

0.49

Kf =

0.0035L/R1.25

0.05

A=
H=

6.00
0.45
H

1+Kc+Kf

)1/2

M3/S

original discharge
discharge found above
40.72
41.00

Adopted Design Data


Avg lowest level
Top fo Bot Slab of Box
Bottom of Top Slab of box
HFL
Slab Thickness
Wearing Coat
FRL
FRL adopted
Average GL

Total Discharge

99.00
98.70
98.70
101.24
0.450
0.075
101.225
101.225
99.00

mts
mts
mts

589.69

mts
mts
mts
mts
mts

cumecs

Width of stream at HFL

130.00

mt

Width of stream at RTL

110.00

mt

Diff of HFL-RTL

0.01

mt

Velocity

2.61

m/s

Discharge Above Box

4.69

cumecs

Dischrge Through Box

584.99

cumecs

Discharge up to FRL

584.99

cumecs

Discharge through one Box

15.65

cumecs

=
say

37.38
38.00

NO
NO

Total width of Cause way

130.45

mt

No. of Box As per formula

41.00

No

=
say

26.00
26.00

NO
NO

89.41

mt

Total no of Box

Due to limitong width of stream


Total no of Box Praposed

Total width of Cause way

Bhiloda Maumunai Poshina

HFL

101.24

the annual rain fall is 60-120 cm


he annual rain fall is more than
Ghats

within 25 Km of the coast


s between 25 km and 160 km of
the coast
d areas near the hills

Wetted
Perimete
r in
(mts)

0.00
0.00
0.00
0.00

pier/Abt

#REF!

ABTL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
5.00
5.01
5.03
5.03
5.03
5.03
5.02
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

99.45
98.85

99.45
98.85

P1
P2

ABTL
P1
P2
P3

198.30
ABTR

99.15

99.45
98.85
#REF!

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2

ABTL
P1
P2
P3

198.30
ABTR

99.15

99.45
98.85
#REF!

ABTL
P1
P2

5.00
5.01
5.03
5.03
5.03
5.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
140.32

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2
P3

198.30
ABTR

99.15

99.45
98.85
#REF!

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2

ABTL
P1
P2
P3

198.30
ABTR

99.15

ABTL
P1

99.45

P2

Wetted
Perimete
r in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.02
5.10
5.10
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.01
5.00
5.00
5.00
5.00
5.79
0.00

pier/Abt

#REF!

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2
P3

198.30
ABTR

99.15

ABTL

99.45
98.85

ABTL
P1
P2

ABTL
P1

0.00
0.00
0.00
0.00
0.00
0.00
91.04

99.45
98.85

P2
P3

198.30
ABTR

99.15

Wetted
Perimete
r in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.10
5.00
5.01
5.01
5.09
5.01
5.00
5.00
5.01
5.01
5.00
5.00
5.05
0.00
0.00
0.00
0.00
0.00
0.00

pier/Abt

#REF!

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2
P3

198.30
#REF!

99.45
98.85

ABTL
P1
P2

ABTL
P1

30.07

Wetted
Perimete
r in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.83
5.00
5.00
5.00
5.01
5.01
5.01
5.00
5.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
45.89

pier/Abt

#REF!

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2
P3

198.30
#REF!

99.45
98.85

ABTL
P1
P2

ABTL
P1

Wetted
Perimete
r in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

pier/Abt

#REF!

99.45
98.85

ABTL
P1
P2

0.00
0.00
0.00
6.05
5.02
5.00
5.00
5.00
5.00
5.00
5.00
5.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.98

99.45
98.85

ABTL
P1
P2
P3

198.30
#REF!

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2
P3

Wetted
Perimete
r in
(mts)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.72
5.01
5.02
5.00
5.00
5.00
5.00
5.00

pier/Abt

#REF!

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2
P3

198.30
#REF!

5.07
5.02
0.00
0.00
0.00
0.00
0.00
0.00
50.83

99.45
98.85

ABTL
P1
P2

ABTL

Wetted
Perimete
r in
(mts)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.02
5.09
5.08
5.04
5.01
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.13
5.88
5.02
0.00
0.00
0.00
0.00

pier/Abt

#REF!

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2
P3

0.00
99.45
98.85

P1
P2
P3

98.85
98.85
P3

198.30
0.00
99.45
98.85

P1
P2
P3

198.30
98.85
P3

198.30
P1

98.85
P3

0.00
0.00
0.00
0.00
156.28

197.70
198.30
P1

99.45

P2

Wetted
Perimete
r in
(mts)

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.03
5.03
5.00
5.00
5.06
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.16
5.77
5.18
5.00
5.00
5.00
5.00
5.00
5.00
151.25

pier/Abt

#REF!

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2
P3

198.30
99.45
98.85

P1
P2
P3

98.85
98.85
P3

198.30

99.45
98.85

ABTL
P1
P2
P3

198.30

Wetted
Perimete
r in
(mts)

5.00
5.00
5.00
5.00

pier/Abt

#REF!

ABTL

5.00
5.00
5.01
5.01
5.01
5.01
5.02
5.02
5.03
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.22
5.02
5.00
5.00
5.00
5.00
5.00
5.00
5.00
170.36

99.45
98.85

99.45
98.85

P1
P2

ABTL
P1
P2
P3

198.30
99.45
98.85

P1
P2
P3

98.85
98.85
P3

198.30

99.45
98.85

ABTL
P1
P2
P3

198.30
99.45
98.85

P1
P2
P3

Wetted
Perimete
r in
(mts)

5.00
5.00
5.00
5.00

pier/Abt

#REF!

ABTL

5.00
5.00
5.21
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.16
5.03
5.00
5.00
5.00
5.00
5.00
5.00
5.00
185.40

99.45
98.85

99.45
98.85

P1
P2

ABTL
P1
P2
P3

198.30
99.45
98.85

P1
P2
P3

98.85
98.85
P3

198.30

99.45
98.85

ABTL
P1
P2
P3

198.30
99.45
98.85

P1
P2
P3

98.85
98.85
P3

Wetted
Perimete
r in
(mts)

pier/Abt

#REF!

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.01
5.03
5.03
5.03
5.03
5.02
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.01
5.03
5.03
5.03
5.02
0.00
0.00
0.00
0.00

99.45
98.85

99.45
98.85

ABTL
P1
P2

ABTL
P1
P2
P3

198.30
ABTR

99.15

99.45
98.85
99.45
98.85

99.45

99.45
98.85

99.45
98.85

ABTL
P1
P2
P2

ABTL
P1
P2
ABTL
P1
P2

ABTL
P1
P2
P3

198.30
ABTR

99.15

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
130.31

99.45
98.85
99.45
98.85

99.45
98.85

99.45
98.85
99.45
98.85

99.45
98.85

ABTL
P1
P2
P2

ABTL
P1
P2
ABTL
P1
P2
P2

ABTL
P1
P2

low

101.73

Obstruction calculation By water way provided


Total Discharge=

589.69

Dischargeprovided Above RTL =

4.69

water way provided Through Box =

406.85

Total Discharge

411.54

% obstruction=

0.30

Ch

16.40

23.20
30.00

16.40
23.20
30.00
36.80
43.60

16.40
23.20
30.00

16.40
23.20
30.00

16.40
23.20
30.00
36.80
43.60

16.40
23.20
30.00

16.40
23.20
30.00

16.40
23.20
30.00
36.80
43.60

16.40
23.20
30.00

16.40
23.20
30.00

16.40
23.20
30.00
36.80
43.60

16.40
23.20
30.00

Ch

16.40
23.20
30.00

16.40
23.20
30.00
36.80
43.60

-6.80

16.40
23.20
30.00

16.40
23.20

30.00
36.80
43.60

Ch

16.40
23.20
30.00

16.40
23.20
30.00
36.80

16.40
23.20
30.00

16.40
23.20

Ch

16.40
23.20
30.00

16.40
23.20
30.00
36.80

16.40
23.20
30.00

16.40
23.20

Ch

16.40
23.20
30.00

16.40
23.20
30.00
36.80

16.40
23.20
30.00

16.40
23.20
30.00
36.80

Ch

16.40
23.20
30.00

16.40
23.20
30.00
36.80

16.40
23.20
30.00

#REF!

Ch

16.40
23.20
30.00

16.40
23.20
30.00
36.80
23.20
30.00
36.80

36.80

23.20
30.00
36.80

36.80
23.20
36.80

23.20
30.00

Ch

16.40
23.20
30.00

16.40
23.20
30.00
36.80
23.20
30.00
36.80

36.80

16.40
23.20
30.00
36.80

Ch

16.40

23.20
30.00

16.40
23.20
30.00
36.80
23.20
30.00
36.80

36.80

16.40
23.20
30.00
36.80
23.20
30.00
36.80

Ch

16.40

23.20
30.00

16.40
23.20
30.00
36.80
23.20
30.00
36.80

36.80

16.40
23.20
30.00
36.80
23.20
30.00
36.80

36.80

Ch

16.40
23.20
30.00

16.40
23.20
30.00
36.80
43.60

16.40
23.20
30.00
30.00

16.40
23.20
30.00
16.40
23.20
30.00

16.40
23.20
30.00
36.80
43.60

16.40
23.20
30.00
30.00

16.40
23.20
30.00
16.40
23.20
30.00
30.00

16.40
23.20
30.00

cumecs
cumecs
cumecs
cumecs

Name of Work: Constructing Slab Drain on Khedbrahma Laxmipura Antarsumba road to Galo
Approach Road
Rate Analysis for various Grade of concerte
Cement Grade
M-150
M-200
M-250
M-300
M-350
M-400
M-450

Kg
320
400
450
475
500
525
540

Ra For diff grade


Item No 8

Providing and casting in situ controlled cement concerte M- 250 For Pire, abutment and return as per draw
including , centering, shuttering scaffolding where necessary laying vibrating curing and finishing complete
(including Apoxy Painting of Exterior Surface)
Sor Br P 179 It 64 (B) ( M-200)
Extra Cement
rate

5883
50 Kg
5.8 Rs/Kg

Rate

Item no 10

6173

Providing and casting in-situ controlled cement concrete M 250 for R.C.C. works in pier cap abutment cap
wall including controlled cement concrete m 300 bed block or pedastals of required size below bearing as
detailed drawing centering, shuttering ,scaffolding, wherver necessary laying , vibrating, curing and finishin
complete

Sor Br P 180 It No 66(B) M- 200


cement

5794

50 Kg
rate

5.8 Rs/Kg

Rate

Item no 11

290

290

6084

Providing and casting in-situ controlled cement concrete M 300 for R.C.C. solid slab including centering sc
curing and finishing complete.

Sor Br P 182 It No 75 M- 250


cement

6503

25 Kg
rate

5.8 Rs/Kg

Rate

145

6648

Item no 6

Providing and casting in-situ controlled cement concrete M-300 for average 75mm thick wearing cost laid a
directed including tamping, vibrating finshing curing and filling in joints with bitumen complete.

Sor Br P 187 It No 91 (B) M- 200


cement

4951

75 Kg
rate

5.8 Rs/Kg

Rate
Item no 7

5386

Providing and casting in-situ controlled cement concrete m 250 for kerb/kerb blocks including formwork, cu
finishing complete.

Sor Br P 187 It No 93 (B) M- 200


cement

4936

50 Kg
rate

Item no 9

435

5.8 Rs/Kg

290

Rate
5226
Providing and casting in-situ controlled cement concrete m 250 for approach slab including formwork curin
finishing complete

Sor Br P 189 It No 103 (B) M- 200


cement

5189

50 Kg
rate

5.8 Rs/Kg

Rate

Deputy Executive Engineer


Panchayat (R&B) Sub Division
Bhiloada

290

5479

Executive Engineer
Panchayat (R&B) Division
Himmatnagar

For Slab Warring Coat and Kerb


M- 350 Controlled
M-250 controlled
cement
rate

5888
50 Kg
5.8 Rs/Kg

Rate

290

6178

Karb
M- 350 Controlled
M-200 controlled
cement
rate

93 B
100 Kg

4733
5.8 Rs/Kg

Rate

580

5313

Waring coat
M- 350 Controlled
M-200 controlled
cement
rate

91B
100 Kg

4951
5.8 Rs/Kg

Rate

580

5531

App slab
M- 350 Controlled
M-200 controlled
cement
rate

91B
100 Kg

4606
5.8 Rs/Kg

Rate

580

5186

Antarsumba road to Galodiya

butment and return as per drawing


g curing and finishing complete.

works in pier cap abutment cap and dirt


required size below bearing as per
g , vibrating, curing and finishing

solid slab including centering scaffolding

4359
80

480
4839

e 75mm thick wearing cost laid as


bitumen complete.

rb blocks including formwork, curing and

ch slab including formwork curing and

utive Engineer
at (R&B) Division