Contents
Project Background
Wison Capability
FLNG Solution
Capital Cost
Operational Expenditure
Development Pathway
Construction Schedule
Financial Viability
www.wison.com | www.wison-offshore.com
Page:2
Pre-treatment
Mooring and offloading
Description of technically feasible concepts and indicative capital costs
High level operating estimates
www.wison.com | www.wison-offshore.com
Page:3
Business Segments
Focusing on the Energy Industry and Hi-tech Sectors
Wison Group
Engineering Services
Specializing in
petrochemicals, coal
chemicals and refining
industries
A word-class EPC
Contactor focused
providing solutions on
international oil and gas
EPC Projects.
Clean Energy
Emerging Business
Development of
emerging chemical and
LNG related businesses.
www.wison.com | www.wison-offshore.com
Page:4
www.wison.com
www.wison.com
| www.wison-offshore.com
Page:5
Page:6
750MMscf/d nominal
1,000MMscf/d maximum
www.wison.com | www.wison-offshore.com
Page:7
Major subcontractors:
Regasification - Black & Veatch
and Hammworthy
Nantong Yard
www.wison.com | www.wison-offshore.com
Page:8
Under Construction
Zhoushan Yard
www.wison.com | www.wison-offshore.com
Page:9
www.wison.com | www.wison-offshore.com
Page:10
Client/Owner
Potential Build Own Operators
EPCIC Contractor
Process Design
Infrastructure
subcontractor
www.wison.com | www.wison-offshore.com
Page:11
Gas Turbine
Heavy hydrocarbons used in Fuel Gas
Onboard gas treatment (amine tower, mercury bed) and reinjection of sour
gas stream into reservoir
External turret mooring vessel can weathervane
Side-by-side or turret offloading to be determined - subject to review of the
metocean conditions and suitability of offloading solutions
Accommodation and utilities
Vessel construction estimated to take 38 months
www.wison.com | www.wison-offshore.com
Page:12
www.wison.com | www.wison-offshore.com
Page:13
www.wison.com | www.wison-offshore.com
Page:14
Near-shore Solution
Offshore field production using a Wison Horton designed Buoyant
Tower
Cost effective solution for the water depth and soil conditions
- Dry-trees
- Quick installation
- Wison installed the BPZ BT offshore Peru in 2012
Buoyant Tower topsides include production trees, gas pre-treatment
for sour gas removal and cleanup, sour gas reinjection, and
compression for the subsea pipeline to a near-shore location
Sub sea pipeline will run approximately 160km to an inshore
location that provides protection from harsh weather and seastates
LNG barge will be located in shallow water (at least 14m) allowing
LNG carriers to berth alongside whilst eliminating or minimising the
amount of dredging required
Barge can be jetty moored or part of a Gravity Based Structure
www.wison.com | www.wison-offshore.com
Page:15
Current Status
www.wison.com | www.wison-offshore.com
Page:16
www.wison.com | www.wison-offshore.com
Page:17
www.wison.com | www.wison-offshore.com
Page:18
www.wison.com | www.wison-offshore.com
Page:19
www.wison.com | www.wison-offshore.com
Page:20
Development Pathway
Concept Selection
Pre-FEED +/- 20% Capital cost estimates development cost.
-
www.wison.com | www.wison-offshore.com
Page:21
Pre-FEED
The next steps are further engineering studies to develop a basis of
design used during the pre-FEED design of the LNG barge, buoyant
tower, sour gas reinjection and subsea pipeline
Pre-FEED stage will determine the facilities required and identify all
major technical challenges and issues
The end result of the pre-FEED study is an initial engineering design
with a cost estimate of increased accuracy to evaluate project
economics
Wison Offshore & Marine will provide a pre-FEED project CAPEX
and OPEX with a cost accuracy of (20%) for a lump sum turnkey
near-shore LNG barge and Buoyant Tower
Environmental and government regulations and approvals to be
identified by the owner and addressed will require ongoing
engineering input in the approval processes as the project proceeds
www.wison.com | www.wison-offshore.com
Page:22
Construction Schedule
Preliminary schedule based on WOMs experience with a nearshore FLNG
Total construction timeframe from award of EPCIC contract until first
gas is approximately 36 months
www.wison.com | www.wison-offshore.com
Page:23
THANK YOU
www.wison-offshore .com
www.wison-offshore.com
www.wison.com | www.wison-offshore.com
Page:24