Академический Документы
Профессиональный Документы
Культура Документы
ZTE Corporation
Legal Information
Preface
During the running procedure of OMCR server, power-down may occur due
to power supply system fault or other reasons. This document introduces the
basic method of handling possible file system faults after power-down occurs.
Contents
Chapter 1 Handling of Abnormal Power-Down of OMCR Server..............................................1
1.1 Possible Faults due to Abnormal Power-Down.......................................................................1
1.2 Handling of Faults due to Abnormal Power-Down.................................................................1
5 If the system prompts the user to enter single user mode to implement
system maintenance, input the root user and password.
6 Input fsck y under the # prompt to implement file system check and
correction:
#fsck -y
** /dev/rdsk/c0t0d0s0
** Last Mounted on /
** Phase 1 - Check Blocks and Sizes
** Phase 2 - Check Pathnames
** Phase 3 - Check Connectivity
** Phase 4 - Check Reference Counts
** Phase 5 - Check Cyl groups
7 files, 14 used, 279825 free (17 frags, 347891 blocks, 0.0%
fragmentation)
The system will check file system for each partition and correct errors
automatically if there is any.
Run fsck y twice to thrice after a check completes to make sure all
errors are corrected.
7 Run the command reboot to restart the system after file system check
is completed.
# reboot