Вы находитесь на странице: 1из 3

BALANCE WORK OF TG-3 BUILDING

Descriptions

Sl. No
A

Scope

Completed

Balance

SQM

10.50

0.00

10.50

3 nos of door

SQM
SQM

60.00
4.20

50.00
0.00

10.00
4.20

3 nos of door

i) Painting
ii) Air Cooler
Inside Painting
Fixing of opening frame
4. Cooling Water Trench
i) Making of Precast Slab
Erections
i) Precast Beam
ii) Precast Slab
8.75 M LVL Floor
1. MCC Room
i) Window
2. Toilet Block

SQM

440.00

380.00

60.00

SQM
NOS

100.00
2.00

0.00
1.00

100.00
1.00

NOS

144.00

110.00

34.00

NOS
NOS

144.00
8.00

0.00
0.00

144.00
8.00

SQM

20.25

5.40

14.85

i) Pressure test of concealed GI pipe

RM
NOS
SQM
SQM
SQM
SQM
SQM

30.00
4.00
6.25
20.00
2.10
0.90
20.00

30.00
0.00
2.50
0.00
0.00
0.00
0.00

0.00
4.00
3.75
20.00
2.10
0.90
20.00

SQM
SQM
SQM

516.00
4.20
39.60

506.00
2.10
24.00

10.00
2.10
15.60

2 nos of door

SQM
SQM

50.40
8.40

45.90
4.20

4.50
4.20

(16 nos window)


2 nos Door

RM

30.00

0.00

30.00

5.25 M LVL Floor


1. Cable Cellar Room
i) Door

4/25/2015

4/26/2015

4/27/2015

4/28/2015

4/29/2015

Target date
30/04/2015

update on 24/04/15
Remarks

Unit

2. Pressurization Unit
ii) Painting
iii) Door
3. Unloading area to Equipment
Foundation

ii) Sanitary fitting


iii) Floor Tile
iv) Wall Tile
v) Door
vi) Ventilator
vii) Painting
9.75 M LVL Floor
1. Equipment Area
i) Flooring
iii) Door
iv) Window
13.25 M LVL Floor
1. TG Deck Area
iv) Window
v) Door
6. Toilet Block
i) Pressure test of concealed GI pipe

6 nos window

Page 1 of 3

ii) Sanitary fitting

NOS

4.00

0.00

4.00

iii) Floor tile

SQM

6.25

0.00

6.25

iv) Wall tile

SQM

20.00

0.00

20.00

v) Door

SQM

2.10

0.00

2.10

vi) Ventilator

SQM

0.90

0.00

0.90

vii) Painting

SQM

20.00

0.00

20.00

i) Door

SQM

2.10

0.00

2.10

ii) Ventilator

SQM

0.90

0.00

0.90

8. Officer Room

18.35 M LVL Slab

ii) Laying of GI Pipe line for water Supply

RM

30.00

30.00

0.00

iii) Water proofing

SQM

320.00

0.00

320.00

iv) Rain water pipe

Nos

5.00

0.00

5.00

4 nos

RM

24.00

24.00

0.00

1st coat Painting completed

RM

36.00

0.00

36.00

ii) West side

SQM

452.75

445.00

7.75

iv) South side

SQM

701.40

420.00

281.40

ii) West side

SQM

452.75

252.00

200.75

iii) North side

SQM

701.40

690.00

11.40

iv) South side

SQM

701.40

250.00

451.40

i) Plinth Protection

SQM

130.00

0.00

130.00

ii) Drainage work

RM

310.00

0.00

310.00

iii) Manhole chamber for sewage line

Nos

iv) Laying of Sewage line Pipe

RM

86.00

0.00

86.00

Staircase-I
i) Handrail Painting

Staircase-II
ii) Erection of Handrail with Painting

1no

External Plastering

External Painting

Miscellaneous work

Cooling Water Pipes for TG3 Cooling Tower Area

Page 2 of 3

i) Footings
L

i) Footings
M

NOS

Foundation for Strainer DS-501A, DS-501B & Operating Platform


NOS

18

15

i) Erections of Precast Slab

NOS

40

40

ii) PNT Fire System

NOS

iii) Oil Tank

NOS

iv) Soak Oil Pit

NOS

v) Support Pedestals

NOS

i) Drain Pit for Side Stream Filter (TG3)

NOS

ii) Handrailing of Staircase of Sump Roof


Slab with painting
iii) Chemical dosing pedestal
iii) Paving

RM
Nos
SQM

8
26
705.00

0
0
225.00

8
26
480.00

Main Entrance Road of TG -3 Building


i) Main Road
ii) Main Road side drain

RM
RM

40
80

0
0

40
80

Road in TG -3 & Cooling Tower Area


i) Main Road
ii) Main Road side drain

RM
RM

180
360

0
0

180
360

Transformer Building in CPP

TG-3 Cooling Tower

Erection completed

Page 3 of 3