Evolution Business Park Construction Project

Safety Audit Report


Construction Project Safety Audit Checklist
Sr. No.
1

Item

Observation

Recommendations

Health and Safety Policy Rule38


1. Does the Project have health and safety Policy?

Yes

To be maintained

2. Do you have any Corporate health and safety

Yes it is same

To be maintained

It is signed by Chief

To be maintained

Policy?
3. Is it signed by head of project?

Operating Officer
4. When was the safety policy declared and

03/08/10

Nil

5. Whether it has been updated?

No

It may be updated

6. Whether the safety policy is made known to all?

No

adopted?

It should be distributed
among all concerned and it
should be communicated to
labours through TBT.

7. Does it find a place in annual report?

No

8. Whether it displayed at conspicuous locations in

Yes

the Project in local/English language/Hindi?

It may be included
It has been displayed In
English , Hindi and
Marathi in prominent
locations at project site

Safety & Health Organization


A. Safety Department
1. Does the Project has a safety department ?Rule

Yes

To be maintained

Only one safety officer, one

Qualified safety officer

208
2. Are the safety professionals qualified and

Rule

(209) experienced as per statutory requirement?

asst safety officer and

should be employed for

4 safety assistant are

this site.

employed
3. Whether the strength of the safety professionals is

Yes

To be maintained

Yes

To be maintained

No training plan is

First aid training programme is organized


by MICL and it was attended by Asst.
Safety Officer. Other construction safety
training plan to be organized regularly.

as per statutory requirement? Rule 209


4. Does the head of the safety department reports to
head of the project? Rule 209

5. How often is the safety officers are retrained?

available

6. What additional duties the safety officer is

No additional work

To be maintained

He is authorized to stop

To be maintained

required to do?
7. What is the authority of safety officer?

work in case unsafe act or


unsafe conditions prevail
B. Safety Committee
1. Does the project have a safety committee? Rule

Yes. It is formed by Man


Infracon Ltd and updated on

208

17/04/2012.
Page 1 of 12

Evolution Business Park Construction Project


Safety Audit Report
2. Is the tenure of the safety committee is as per

It has started functioning

statutory requirement?

from Sept 2011 by Man

Reconstituted ON 17/04/2012

Infracon Ltd
3. How often is the safety committee meetings are

Last meeting conducted in

held? Once in month Rule209

December 11

4. How are the safety committee members are

They are selected

To be maintained
To be maintained

selected/nominated or elected?

5. Whether the recommendations of the committee

MOM is prepared but it is not

MOM to be circulated among all staff

circulated

members for the effective implementation

are implemented?
6. Are the minutes of the meeting circulated among

Yes

To be maintained

members?
3

Accident Reporting Investigation &Analysis

1.

Whether the accident data for reportable and non-

Only report of first aid cases are

reportable accident available? Rule 210

available

Near miss and other


reportable accident are
recorded but not
communicated to all staff
members

2. Is there any system of classifying and analyzing

No

It should be done

No

It should be investigated

the near miss incidents or accidents?


3. Are all near miss incidents reported and investigated

and reported( Last Near Miss


record available was of
28/04/2012.
4. By whom the accident statistics and data are

Safety Officer

It should be maintained

maintained?
It is circulated only to PM/HSE
5. How is the top management apprised of these

No system of internal

data?

communication is available

6. Is the accident statistics effectively utilized? If yes,

No analysis of accident

how?

statistics is available

7. What nature of injuries occurred so for in the

Few cases of first aid cases

Project?

of finger injury are reported

8. How do you ensure implementation of the

No system is available

recommendations to avoid the recurrence of the

Manager

It should be introduced
First Aid cases to be analysed
All cases to be circulated to
Site Engineers and it should
also be discussed in safety
meeting and TBT

incidents?
4

Safety Inspection

1. What type of safety inspections are carried out

Safety Inspection Checklist like


Electrical, Tower crane, Bar
cutting and bending machine,
Vehicle Inspection, Welding
Machine, Access ways, Ladder,
Scaffolding are available but it is
not used at site effectively.

Effective implementation of
checklist to be ensured at
site.

and what is their frequency?


2. Is there any system of internal inspection?

Yes

To be maintained

3. Who does the inspections?

Safety Officers

It should be maintained

Page 2 of 12

Evolution Business Park Construction Project


Safety Audit Report
4. Are the check-list prepared for these

Checklists are

Checklist to be available

inspections?(for example housekeeping, fire

available.

for Crane hoist ,

protection

Working Floor ,access


ways , platform etc and
to be implemented

5. To whom the recommendations are submitted?

No record was available

6. Are the recommendations implemented?

No record is available

It should be submitted to
project head
Record of
implementation should
be available
Necessary report to be made
for non complied items and it
should be discussed in the

7. Is there any tracking system to monitor the

No

meeting

implemented and pending items of


recommendations?
5

Safety Training
1. Is there any training department or section or

Yes, it is done by Safety Officer

To be maintained

Yes

To be maintained

30 minutes

To be maintained

person responsible for training?


2. Is there any programme of induction training
programme to all Project employees including
contractors and sub-contractors?
3. What is the duration of induction training
programme for each category of employees and
what are the contents of the induction-training
programme?
Questions are asked after the
training to assess. (No Safety
Induction training room

4. Whether the assessment of the trainee workers is

available so they are doing it at

A safety induction training room to be made

site and completing it within 30

and system of assessment of trainee to be

minutes.)

implemented.

done or not?
5. Whether the induction-training programme is

Yes

It should be maintained

It is ongoing basis

All the new employees to

conducted in the local language?


6. Are all the employees trained and what is the
frequency of such training?

be trained before
inducted at site

7. Do the training programmes cover safety and

No well defined training

A well defined training

health aspects and if so how much (in terms of

contents are available

contents to be developed

number of sessions/hours)?
08. How many employees have been trained in

for conducting training


No record is available after the job started
from 10/04/2012.

It should be implemented.

2hrs /week

Record should be kept

No system is available

Identity card can be

safety and health from the start of the Project? Brake


up for Company, Contractors and Sub-contractors.
9. How many man-days / hours are used in training
the employees?
10. How do you ensure that the training is put to
use by the employees trained in safety and health?

11. What is the training plan till the end of the

marked to ensure person


ID Card is stamped after the
training. But not all labours are
having the ID Card

has been trained


It should be implemented and
ID Card to be issued to all
labours.

Project?
12. What documentation system has been

Only Training Register is

Record may be updated

established

available

in computer

Page 3 of 12
Evolution Business Park Construction Project
Safety Audit Report

Safety communication &promotional activity


How is safety and health information publicized in
your Project?

a)

Bulletin boards?

b)

Post-serious accidents?

c)

Newsletter?

d)

Others, specify?

Accident statistics, display

It should be maintained

boards , posters ,signs etc


have been put around site

First Aid
1. Are the adequate number of first aid boxes

Yes

To be maintained

provided? Rule231
2. Is there any first aid/ambulance room?

Only first aid room is

Rule225/229

available

3. Are qualified / trained first aid is available?

One trained male nurse is

To be maintained
It is to be maintained

available
4. How many qualified / trained first-aiders are

6 workers are trained in

available in each shift / department?

first aid

To be maintained

5. How many persons are trained / given refresher

Six

To be maintained

No

It should be introduced

No

The facility to be

3. Are the Medical Attendants / Doctor available in

No , Only one shift

It is to be maintained

each shift?

operation .Nurse is

training in first aid so for?


8

Occupational Health Center Rule 225,232


1. Whether occupational safety and health center is
provided or not?
2. Does it conform to the provisions of the existing
legislation?

provided

available
4. Is the ambulance van available?

No. One vehicle is kept for

It should be maintained

24 hrs at site to attend


medical emergency
5. Any liaison with the nearest hospital (s)?

Yes

It should be maintained

6. Whether emergency medical care facility is

Yes

Tie up with nearest

available?
9

hospital has been made

Housekeeping
1. Are all the passages, floors and the stairways in

Partially

Regular inspection to be

Two bins are provided

It should be maintained

Yes

It should be maintained

No

It should be implemented

No.

It is to be maintained

good condition? Rule 127


2. Do you have sufficient trash cans/bins with cover

done

lids clearly marked and whether these are suitably


located?
3. Whether walkways are clearly
marked/barricaded and free from obstruction?
4. Has your Project elaborated good housekeeping
programme/practices and standards and made
them known to company employees,
Contractors/Sub-contractors?
5. Are there any working conditions which make

Page 4 of 12

Evolution Business Park Construction Project


Safety Audit Report
the walkway, working area floors slippery? If so,
what measures are taken to make them safe?
6. Whether waste and trash regularly disposed?

Yes ,By BMC

System to be maintained

No. (also scrap materials near

All loose reinforcement bar to

bar cutting and bending

be tied properly. (scrap

machines are not disposed

materials to be disposed off

7.. Area is free from loose reinforcement bars?

regularly)

regularly)

08. Steel/rebar properly stacked?

Yes

To be maintained

09. Shuttering plates/boards and wooden batons

yes

To be maintained

10 Area clear of concrete debris?

Yes

To be maintained

11. Area clears of earthen heaps?

Yes

To be maintained

Whether personal protective equipment like ear

Not being used by all

All workers in potential

muff / plugs are provided and used?

concerned workers

noisy area to use ear plug

properly stacked?

10

Noise Management

compulsorily
11

12

Ventilation
Whether natural ventilation is adequate or not?

Natural ventilation is

Rule 164

adequate

To be maintained

Illumination Rule 50
Was any study carried out for the assessment of

No .During day sufficient

It should be done at site

illumination level during day, night and inside

light is available

in evening

building working conditions?


13

Hazard Identification &control Rule 39


Hazard Identification

for scaffolding

erection work, Electrical Panel board,


welding work, Vehicle movement at
site,

Manual

Reinforcement,
bending

Material
Bar

work,

Air

handling,

cutting

and

compressor,

Excavation (sump pit), Transportation


of Material, Gas cutting and welding
work, Tower crane erection work etc

1. Are all the hazardous jobs and hazards of the

are available.

It should be implemented at site.

2. What are the types of hazards (physical noise,

Only physical ,mechanical

Suitable protective

heat, etc. and chemical fire, explosion, toxic

and electrical hazards are

measures to be taken

release, etc)

prevalent

project are identified?

3. What steps have been taken to prevent these

Through site inspections

Corrective actions are taken based on the

hazards are identified.

hazards.

hazards?
4. Are Safety Audit or any other study carried out

Yes . Internal and external

and the recommendations implemented?

safety audit started

It should be maintained

5. Are the written safe working procedures/method

Yes but not for all the activities

It should be prepared for all


the activities

Yes, In Hindi

It should be maintained.

7. Whether the safe working procedures are


prepared jointly by the Project Site line and safety
departments?

No

It should be made

8. What system is used to ensure that the existing

No

It should be introduced

statements available for all work activities/jobs?


6. Whether the written safe working procedures
displayed or made available and explained in the
local language to the workers?

safe working procedures are updated?


9. Are Contractor/Sub-contractor workers are

Yes ,Through induction

educated and trained to observe safety at

Training, safety

workplace?

Meeting and tool box talks

It should be maintained

Page 5 of 12

Evolution Business Park Construction Project


Safety Audit Report
10. Is there any work permit system in the Project?

Yes,

It should be implemented at site

Permits like Welding work


permit, Gas cutting work permit,
Electrical work permit etc. are
11. What types of work permits exists in the Project?

available

It should be implemented at site

12. Whether the work permit issuers and receivers

System has been

It should be properly

are complying and implementing the work permit

introduced

defined

system properly?
It should be implemented at
13. Whether Lock Out and Tag Out system is

Permit format is available.

site.

No

System should be

followed for all electrical related and electrical


maintenance works?
14

Hazardous Waste Management EP Act 1986 with Rules


Is identification done for various types of wastes
generated?

15

introduced

Personal Protective Equipments Rule 45,46 ,54


1. Has a list of required PPE for each work activity /

Yes

It is be maintained

Yes

It is to be maintained

Yes

It is to be maintained

Indian Standard

It is to be maintained

Yes ,Indian Standard

To be maintained

job been developed and the required PPE is made


available to the workers?
2. Are the workers and safety department consulted
before selecting a particular PPE?
3. Have the workers been trained in proper use of
PPE?
4. Are the PPE conform to any standard?
16

Fire prevention & protection Rule 35


1. Whether the fire extinguishers are of any
Standard?
Last Inspection done on
03/12/2012, next due on
2. What is the inspection and maintenance schedule

Six monthly .It is done by

of the above extinguishers? Who performs these

third party

03.06.2012.

functions?

17

3. Are all personnel conversant with the fire

Yes. Basic fire fighting

prevention?

program gas been started

To be maintained

4. Is there any fire alarm?

Yes

It is to be maintained

Yes

To be maintained

Monthly

But last mock drill was


conducted on 03/12/2012. It
should conducted again
immediately.

Yes

It should be maintained

Yes

It should be maintained

Emergency Preparedness Rule 36


1. Is there an on-site emergency plan for your
Project site?

2. What is the frequency of conducting mock drills


of on-site emergency plan?
3. Whether emergency team or the key personnel
identified?
4. Are suitable and adequate protective and rescue
equipment available? How is the emergency rescue
team trained to use these equipment?
5. Is any alternate power source identified?
6. What is the medical emergency response system?

D.G.Set
No notification is available

It should be maintained.
It may be prepared

Page 6 of 12

Evolution Business Park Construction Project


Safety Audit Report
7.. Emergency telephone numbers posted at number

Yes

It is to be maintained

of places/areas (medical services, fire department,


safety department)?
18

Pressure Plant / Machineries Rule 207


Air compressors at Batching
1. Give details of the plants, piping and vessels

plant and at site.

which are operated at a pressure greater than the


atmospheric pressure?
2. How is it ensured that the working pressure

Through pressure relief

inside the pressure vessels / pressure plants will

valve

It is to be maintained

not exceed their maximum working pressure for


which it is designed?
3. Whether the pressure Plants are Tested?

Yes

To be maintained

4. Is there any competent person for testing these

Yes

To be maintained

Pressure relief valve

To be maintained

Yes, done for tower crane.

To be maintained.

pressure vessels?
5. Give details of safety devices available for these
pressure vessels?
19

Hoists and Cranes Rule 56


1. Whether all the lifting machines / cranes are
marked with their SWL?
Tower cranes are tested but
wire rope slings are not having
2. Are all the examinations and tests documented in

test certificates.

It should be done for all wire ropes.

No

To be done

Yes

To be maintained

Yes

To be maintained

the prescribed form as per Statutory requirement?


3. Are all the examinations and tests carried out and
certified by competent person as per Statutory
requirement.
4. Are adequate lifting tackles provided at all the
places where it is required?
5. Are the trained operators engaged for operating
the equipment?
Wire ropes to be certified by
6. Are all the lifting machines and tackles

Lifting Tackles are not

maintained in good conditions and records

maintained

third party immediately.

maintained?
7. Whether the crane is provided with Automatic

Not applicable, Only tower


cranes are used at site.

It is to be maintained.

Yes

It is to be maintained

No, also third party certificates


not available.

It should be introduced

Yes

To be maintained

Safe Working Load Indicator?


8. Whether a Fire Extinguisher is available inside
operators cabin?
10. Slings, chains, hook and eyes inspected before
each use?
11. Signal persona / riggers are experienced /
trained?
12. Rigging hand signals posted and understood by

Posted at Part-B Tower crane.

It should be posted for Part-A


Tower crane.

rigger and crane operator?

20

13. Inspection and maintenance log maintained?

No

It should be maintained

14. Hazard signs posted and visible to operator?

No

It may be posted

A. Mobile equipment and vehicular traffic Rule


48,88,89,90

Page 7 of 12

Evolution Business Park Construction Project


Safety Audit Report
1. Are trained drivers engaged?

Yes

2. What system do you adopt to assess their

Driving license

To be maintained
To be maintained

standard of driving as proof / fair / satisfactory /


good?
3. Are there adequate number of warning signs /

Yes

To be maintained

Not all

Reverse horns shall be

signals?
4. Does the equipments have reverse/back-up
alarm?

installed on all vehicles


Speed limit boards are

5. Are the hazards associated with transportation

Not all

displayed

within the Project Site and safety measures taken?


No. Inspection record not

21

6. Inspection and maintenance records up to date?

available

To be implemented.

7. All roads well maintained and properly laid out?

No

It should be done.

Yes

To be maintained

2. Are all such access in good condition?

Partially

All access to be in good

3. Ladders inspected and in good condition?

Yes

To be maintained

4. Ladders properly secured to prevent slipping,

Yes

It should be maintained

Ladders Rule 172,173, 174


1. Is adequate safe access provided to all places
where workers need to work?
condition

sliding or falling?
5. Ladder extended 36 inches above the top of

Yes

It should be maintained

landing?
22

Storage/Manual Handling Rule 186-187


1. Are there adequate storage facilities available?

Yes

It should be maintained

2. Are these areas clearly defined?

No

It should be done

3. Are there adequate equipment for handling

Yes

To be maintained

No

Awareness programe to

materials?
4. Do the workers know the hazards associated with
manual material handling?

23

be conducted

5. Where manual handling is necessary, are the

Yes , No training is

workers been trained?

imparted

They should be trained

Gas cylinders The Gas Cylinder Rules 2004


1. What are the various gas cylinders used in the

Oxygen /LPG are used

To be maintained

Project?
2. What are the storage facilities?

No, storage shed for gas


cylinders.

3. Whether cylinder caps are available?

Caps are not available

Caps To be provided

4. Whether cylinders are stored and used in upright

No many lying on ground

All cylinders to be kept

position?
5. Whether gas cylinders are painted with

It should be done.

vertical
Yes

To be maintained

Yes

To be maintained

Yes

To be maintained

appropriate color as per Indian standard?


6. Whether pressure gauges are fitted to gas
cylinders while being used?
7. Whether gas torches are fixed with flash back
arresters?

Page 8 of 12

Evolution Business Park Construction Project


Safety Audit Report
8. Whether gas cylinders are stored in shelter and

No

Shelter to be made

No

It should be done

No storage shed is made

It should be done

By raising the alarm

It should be audible at

up-right position?
9. Whether cylinders are secured while in use and
storage?
10. Whether oxygen and flammable gas cylinders
are stored separately?
24

Communication System
What is the means of communicating emergency in
the Project Site?

25

farthest distance

Electrical Safety Rule 47


1.Ground Fault circuit interrupters used ( RCCB)

All location 30ma RCCB

To be maintained

has been provided


2. Whether proper warning signs are posted?

Yes

It should be maintained

3. Terminal boxes provided with required covers for

Yes

To be maintained

4. Whether licensed electricians are used?

Yes

To be maintained

5. Whether receiving station /substation are

Yes

It should be maintained

Checklist is available

It should be implemented

protection from rain?

approved by electrical inspector?


6. Whether written down electrical maintenance
procedures are followed?
No Electrical Safety Hand gloves
7. Whether Electrical safety gloves are available?

are seen used by Electrician.

It should be available to
electrician

26

Scaffold Rule 188-194


1. Whether scaffold materials are in good condition?

Yes

It should be maintained

2. Whether materials are stored and maintained

Yes

It should be maintained

Yes

It should be maintained

adequately?
3. Are base plates and sole boards are in use?

Checklists are filled by safety


officer, no competent scaffolding
person nominated for checking
4. Is there any inspection procedure for scaffolding

of scaffolding.

It should be done.

5. Are sufficient bracings are in use?

Yes

To be maintained

6. Are scaffoldings base is plumbed (leveled)?

To be maintained

7.. Whether scaffolders are trained and experienced?

No
Not Trained, No such training
available

8.. Are ladders are fixed to access the work

Not in all locations

It should be provided in

before use?

platform?
09. Scaffolding erection properly supervised?
10. All connections secure?
27

They should be trained


all locations

No

It is to be supervised

Yes

To be maintained

Yes

To be maintained.

No medical examination done


after 10/04/2012.

All workers to be

Welfare Facilities Rule223, 243,244


1. Whether workers accommodation is in hygienic
condition?

2. Whether all workers are medically examined


before employment?

medically checked before


employment

3. Is the drinking water available?

Yes

Page 9 of 12

To be maintained

4. Whether fire tender can access the accommodation easily? (Enough Yes
space and road?)

28

29

5. Are there enough fire extinguishers fixed at


appropriate locations?

Yes

To be maintained

6. Whether the security personnel are trained in the


use of fire extinguishers?

Yes

To be maintained

7. Are appropriate measures are taken to dispose the waste


generated appropriately?

No schedule is available

It should be maintained

8. Whether all electrical installations are provided with circuit


breakers, RCCB, earthing etc?

It is provided with 30ma


RCCB

All RCCB to be maintained

9. All the wires/cables are in good condition,


protected from damages?

Yes

To be maintained

10. Does workers instructed safe use of electricity


inside the accommodation?

Yes

To be maintained

11. Is there any smoking restriction inside the accommodation?

Yes

To be maintained

12. Are there any smoke alarms fixed inside the


workers accommodation?

NA

NA

13. Whether first aid box is available?

Yes

It should be maintained

14. How many workers are trained in first aid?

5 workers are trained

To be maintained

15. Is there any ambulance or dedicated vehicle for


use in emergency 24 hours?

One Sumo jeep is available

It should be maintained

1. Safe carrying practices used?

Yes

To be maintained

2. Tools regularly inspected and maintained


records?

Yes

To be maintained

Hard barrication to be provided

2. Roadways or walkway hazards effectively barricaded?

Warning tapes are


provided
No

3. Barricades illuminated or reflector red at night?

NA

NA

1. Welders are trained ?

Yes, Training record


available

To be maintained

2. Screens and shields used when needed?

Yes, Shields are used

To be maintained

3. Goggles, welding helmets, gloves, clothing used


as required?

No. Welders found doing


welding of staircase
without proper PPEs.
Welding machine is not
grounded

All PPEs to be used by all


workmen.

It should be grounded

7. Fire extinguisher of proper type nearby?

Not all, cutting and


bending machine found
without grounding
Some places power cables
are lying above the
ground.
Yes

8. Surrounding area inspected for fire hazards?

Yes

To be maintained

9. Flammables materials protected or removed?

Yes

To be maintained

Electrical Power Tools/Hand tools Rule 47

Housekeeping
1. Excavated pits barricaded?

30

Evolution Business Park Construction Project


Safety Audit Report
To be maintained

It is to be maintained

Gas Cutting /welding Rule 163

4. Equipment is in safe operating condition?


5. Electrical equipment grounded?
6. Power cables protected and in good repair?

Page 10 of 12

It should be grounded

It should be kept overhead.


To be maintained

10. Gas torches are provided with flash back arresters?


31

32

33

34

35

Excavation Rule 119-130


1. Roads and side walks supported and protected?

Yes

To be maintained

2. Material or spoil stored 1 m away from


excavation?

Loose concrete blocks

To be removed from edge

3. Equipment working at a safe distance from edge


of excavation?

Yes

To be maintained

4. Ladders, stairs or other safe access provided?

Yes

To be maintained

1. BIS marked safety helmets available on Site and worn?

Yes

To be maintained

2. Eye Protection?

Yes

To be maintained

3. Face shields?

Yes

To be maintained

4. Electricians rubber gloves?

Not available

To be provided

5. Full body safety harness?

Yes , Test certificate not available

Test certificate should be


available

1. Employees protected from cement / concrete


dust?

Partially

To be protected for all

2. Area clear of concrete debris?

Partially

To be totally cleared

3. Pipelines of concrete pumps adequately secured?

Yes

To be maintained

4. Reinforced protruding rebar removed from area


or capped?

Partially

All rebar protruded to be


capped

1. Chemical inventory list developed and maintained?

Yes

To be maintained

2. Containers properly labeled?

Not all

Label to be provided

3. Material safety data sheets collected and


available?

Available

It should be maintained

4. Adequate employee information and training


provided?

Yes, store persons are aware of


the system

To be maintained

1. Hot work permit obtained, if needed prior to entry and


work?

Yes, Permit system is available

Its implementation at site to


be ensured.

2.Work at height permit is available

No

To be developed

3.Electrical Isolation Permit is available

Yes, but implementation is not


ensured
Excavation is not done by MICL

It should be done

1. Whether Safety Guidelines are issued for contractor?

Yes

To be maintained

2. Whether Safety officers are employed are


qualified and adequate?

Yes

Safety manager to be
recruited

Personal Protective Equipments Rule 54, 178

Form Work Rule 96-107

Hazard Communication Program

Work Permit System

4. Excavation Permit is available


36

Yes

Evolution Business Park Construction Project


Safety Audit Report
To be maintained

Contractor Safety Rule 5,6,7

Page 11 of 12

37

3. Whether safety publicity materials are used by


contractor?

Yes

4. Whether contractors report accidents?

Yes

To be maintained

5. Whether PPES are issued by contractors?

Yes

To be maintained

6. Whether contractor has its safety policy?

Yes

To be maintained

7. Whether policy is distributed and


Communicated, displayed?

Yes

It should be maintained

8. Whether Safety manual is available?

Yes Contents are not


adequate

Contents to be reviewed
and modified

1. Whether means of access is Proper?

Partially, Not available to all


places.

It should be done

2. Whether Life line is used?

Yes

To be used in future

3. Whether Fall Arrestor Is used?

No, Only one Tower crane is


provided with fall arrestor
Partially

It should to all the tower crane.

Work At Height ( More Than 2 meter)

4. Whether Double lanyard Safety harness is used?

38

39

40

41

Evolution Business Park Construction Project


Safety Audit Report
To be maintained

To should be given to all


workmen.

Tower Crane Rule 80


1. Whether tower crane is installed on ground with adequate Yes
strength?

To be maintained

2. Whether only trained operator operates crane?

Yes

To be maintained

3. Whether base of tower crane is level and firm?

Yes

To be maintained

4. Whether safe operating instructions are


displayed?

Displayed at only one tower


crane in Part-B

It should be displayed in Part-A


also.

1. Whether all the dangerous moving parts of


machines are guarded?

No.

Guard should be
provided

2. Whether any guard is removed when machine is in


motion?

Yes

To be fixed

1. Whether reinforcement steel is stored as per


shape, size and length?

Yes

To be maintained

2. Whether pipes are stored in a way to prevent


rolling?

Yes

To be maintained

3. Whether stack height is low?

No, scaffolding material in front


of the store is stacked above 5 ft.

It should be less than 5 ft.

1. Whether safety rule for Visitor is available?

Not available

To be Prepared

2. Whether gate pass is issued to all vehicles?

No

It should be made

3. Whether site safety rules are displayed at gate?

Yes

To be maintained

4. Whether emergency telephone no are displayed at gate?

Yes

To be maintained

Fencing Of Machines etc Rule 37

Stacking of Cement and other materials Rule 187

Miscellaneous

Page 12 of 12