Tebodin Malaysia Sdn Bhd (958337-U)

SCOPE OF WORK
Tender Package 10: Earthworks,
improvement & deep foundation Works

ground

Error: Reference source not foundPage 1 / 4

eep

Project documents specifying mandatory requirements:

General References Documents

ACTION

General Project Information

TMY

Localization Map

TMY

Master Plan - Layout

TMY

Site Data and Conditions

TMY

Health, Safety and Environmental Requirements for Design

TMY

Soil Investigation Report Phase 1 (. May 2014); and


appendix

TMY

Soil Investigation Report Phase 2 (. July 2014); and


appendix

GEOLAB/TMY

Limestone A & B (breccia), Sand and Water Tests Report

LMA

Project Procedure - Master Security Plan

TMY

Project Procedure
Contractors

Utilities

Data

for

Vendors

and

Specification for Design (Design Criteria)

Discuss

ACTION

Design Criteria - Earthworks

TMY

Design Criteria Ground Improvement

By Piling contractor

Design Criteria - Drainage

TMY

Design Criteria Roads & Yards Paving

TMY

Specification for Supply (Construction Specification)

ACTION

Specification for Supply - Earthworks

TMY

Specification for Supply - Grouting

TMY

Specification for Supply - Excavation & Backfill for Foundation

By Piling
contractor

Specification for Supply - Concrete Works

By Piling

Tebodin Malaysia Sdn Bhd (958337-U)


SCOPE OF WORK
Tender Package 10: Earthworks,
improvement & deep foundation Works

ground

Error: Reference source not foundPage 2 / 4

eep

contractor
Specification for Supply - Protection of Concrete
Mitigation of
spreading:

earthquake

induced

settlements

By Piling
contractor
and

lateral

By piling
contractor

Moment magnitude Mw of the earthquake and the peak ground


acceleration (PGA).

TMY

The water table elevation and for lateral spreading evaluation


the relevant cross sections for lateral spreading

TMY

Construction Standard

ACTION

Construction Standard Site Arrangement

TMY

Construction Standard - Concrete Works

By Piling
contractor

Construction Standard - Roads & Yards Paving

TMY

Construction Standard - Drainage

TMY

Construction Standard Milestone for construction

TMY/LHOIST

Construction Standard Construction Standard Calculation Notes of Basic Engineering Design

ACTION

Calculation Notes Earthworks

TMY

Calculation Notes - Ground Improvement

By piling
contractor

Calculation Notes - Drainage

TMY

Drawings of Basic Engineering Design

ACTION

Drawing - Earthworks Layout

TMY

Drawing - Earthworks Cross Sections

TMY

Drawing - Ground Improvement Area

By piling
contractor

Drawing - Ground Improvement Cross Sections

By piling
contractor

Tebodin Malaysia Sdn Bhd (958337-U)


SCOPE OF WORK
Tender Package 10: Earthworks,
improvement & deep foundation Works

ground

Error: Reference source not foundPage 3 / 4

eep

Drawing - Roads & Yards Paving Layout

TMY

Drawing - Roads & Yards Paving Cross Sections

TMY

Drawing - Drainage Layout

TMY

Drawing - Drainage Cross Sections

TMY

Drawing - Warehouse Big Bag Layout & Cross Sections

TMY

Drawing - Coal Storage Layout & Cross Sections

TMY

Drawing - Kiln Feed Silo and Limestone Fine Silo Layout & Cross
Sections

TMY

Drawing Kiln Layout & Cross Sections

TMY

Drawing - Hydration Building Layout & Cross Sections

Discuss

Drawing - Bulk Load and Bagging Area Layout & Cross Sections

TTH

Drawing - Coal Milling & Drying Layout & Cross Sections

TMY

Drawing - Coal Heating Layout & Cross Sections

TMY

Drawing - Coal Silo (Heating) Layout & Cross Sections

Discuss

Drawing - Lime Stock Yard (Feed Hooper) Layout & Cross Sections

TMY

Drawing - Consumer Room Layout & Cross Sections

To be
Advised

Drawing Crushing Layout & Cross Sections

TMY

Drawing - Diesel Station Layout & Utility & Cross Sections

TMY

Drawing - Guard House Layout & Cross Sections

TMY

Drawing Heater Layout & Cross Sections

TMY

Drawing MCC Layout & Cross Sections

TMY

Drawing Chimney Layout & Cross Sections

Discuss

Drawing - Cable Rack Layout & Cross Sections

Discuss

Drawing - Office Building Layout & Cross Sections

TMY

Drawing - Sub-Station Layout & Cross Sections

KLC

Drawing - Refuse Chamber Layout & Cross Sections

TMY

Drawing Loading arrangement

TMY

Drawing Raft footing drawings

TMY

Drawing Retaining wall arrangement

TMY

Design Report of Basic Engineering Design


Design Report - Earthworks Layout

ACTION
TMY

Tebodin Malaysia Sdn Bhd (958337-U)


SCOPE OF WORK
Tender Package 10: Earthworks,
improvement & deep foundation Works

ground

Error: Reference source not foundPage 4 / 4

eep

Design Report - Ground Improvement

By piling
contractor

Design Report - Roads & Yards Paving

TMY

Design Report - Drainage

TMY