FRONT GENERATOR
Doc. No : MEP-R-ES-007
Rev 0
page 1 of 10
STANDARD SPECIFICATION
FOR
FLARE STACK, FLARE TIP AND FLAME FRONT GENERATOR
MEP-R-ES-007, Flare Stack, Flare Tip And Flame Front Generator, rev 0, 25 July 2005
Custodian: Surface Engineering
Doc. No : MEP-R-ES-007
Rev 0
page 2 of 10
TABLE OF CONTENTS
PAGE
1
SCOPE
2.1
2.2
3
4
DESIGN
3.1
3.2
4
5
Process Design
Vertical Flare Stack
DOCUMENTATION
GUARANTEE
DATA SHEET
10
MEP-R-ES-007, Flare Stack, Flare Tip And Flame Front Generator, rev 0, 25 July 2005
Custodian: Surface Engineering
Doc. No : MEP-R-ES-007
Rev 0
page 3 of 10
SCOPE
1.1
This specification, together with the project data sheets, drawings, and project
specific requirements, covers the minimum requirements for the engineering,
design, fabrication, inspection and delivery of flare stack, flare tip assemblies
complete with pilots, and remote flame front generators for vertical flare stacks
1.2
VENDOR shall have total unit responsibility for the packages, including:
-
1.3
VENDOR shall provide a base quotation in compliance with this specification and
referenced COMPANY specifications and drawings. However, the VENDOR may
also submit alternate quotations. Alternate quotations shall be clearly identified as
such, shall be fully described technically and shall be separately priced (as
add/deduct) to the base quotation. VENDORs are encouraged to separately quote
alternatives to the base quotation, provided the alternatives are technically
equivalent to COMPANY specifications.
MEP-R-ES-007, Flare Stack, Flare Tip And Flame Front Generator, rev 0, 25 July 2005
Custodian: Surface Engineering
Doc. No : MEP-R-ES-007
Rev 0
page 4 of 10
AISE and AWS D1.1 Standard for Design and Welding of Structural Steel
API Std - 2510A,
API RP-521,
2.2
ISA RP-12.2,
Intrinsically
Safe
Instrumentation
and
Non-Incentive
Electrical
NFPA 70
MEP-P-ES-001
MEP-P-ES-003
MEP-P-ES-005
MEP-M-ES-017
MEP-G-ES-008
MEP-I-ES-004
DESIGN
3.1
Process Design
VENDOR shall supply a stack of sufficient height to limit the radiation to levels
specified in project data sheets and project specifications. Flare tip, stack, and
MEP-R-ES-007, Flare Stack, Flare Tip And Flame Front Generator, rev 0, 25 July 2005
Custodian: Surface Engineering
Doc. No : MEP-R-ES-007
Rev 0
page 5 of 10
The Flare Stack System shall consist of self supporting or guyed stack,
as specified in the project data sheets and project specific
specifications, complete with pilots, ignitors, flame failure
thermocouples, and molecular seal, all provided by VENDOR. Seal
drums and/or knock-out drums shall be furnished by VENDOR when
specified in project data sheets and project specifications.
3.2.2
The Flare Stack and Accessories shall conform to API RP521 and the
API Manual on Disposal of Refinery Wastes, Volume on Atmospheric
Emissions, Chapter 15 - Flares, unless specifically modified herein. The
Flare Assembly shall be complete with all auxiliary equipment and
accessories required to operate satisfactorily. VENDOR shall specify
minimum purge gas rate in the quotation.
3.2.3
The Flare Tip Assembly furnished by VENDOR shall consist of the main
flare tip, pilots, and ignitors. The flare tip shall be designed to flange to
the stack. As a minimum, the top 10 ft. of flare tip, pilot, and ignitor
piping shall be 310 S.S. This top 10 ft. section shall be flanged (ANSI
150 RFWN) to permit removal for maintenance. The top 10 ft sections
of 310 S.S. pilot and ignitor piping shall terminate with 3000# socket
weld unions or ANSI 150 RFSW flanges.
3.2.4
The VENDOR shall furnish all pilot gas, ignitor, and gas seal piping from
flare tip assembly down to 15 ft. from stack base. Molecular seal drain
piping to base of stack shall also be furnished by VENDOR. Drain
piping shall terminate with valve at stack base. Piping shall be carbon
steel A106B in accordance with MEP-P-ES-001, Piping Spec (Spec. 1B)
and MEP-P-ES-003, Fabricated piping. All piping shall be attached by
clips to the individual stack sections. Valves shall comply with
MEP-P-ES-005, Valve specification
3.2.5
Main flare stack piping shall be carbon steel, A-106B or API 5L GRB
(ERW or Seamless) in compliance with MEP-P-ES-001, Piping Material
Specification (Spec. 1B) and MEP-P-ES-003, Standard Specification for
Fabricated Piping, except that corrosion allowance shall be increased
from 1/16" to 1/8". Flare stack minimum design pressure shall be 150
PSIG at 150oF. Individual sections of the flare stack shall be flanged
(ANSI 150 RFWN) and individual flanged sections shall not exceed 30
ft. length, in order to facilitate shipment and field erection. VENDOR
MEP-R-ES-007, Flare Stack, Flare Tip And Flame Front Generator, rev 0, 25 July 2005
Custodian: Surface Engineering
Doc. No : MEP-R-ES-007
Rev 0
page 6 of 10
3.2.7
3.2.8
3.2.9
When guyed stacks are specified in the project data sheets and project
specifications, the VENDOR shall supply:
-
Guy wires and guy wire installation hardware shall be galvanized per
MEP-G-ES-008, Surface Preparation, Painting, Galvanizing.
3.2.10
The pilot flame shall remain lit, even under adverse conditions of high
wind and heavy rain. Wind velocities of up to 80 mph and rainfall rates
of up to 2 inches per hour are possible. Three (3) flare pilots and flame
front ignitors spaced 120 degrees apart shall be furnished to ensure the
flare will stay lit regardless of wind direction.
MEP-R-ES-007, Flare Stack, Flare Tip And Flame Front Generator, rev 0, 25 July 2005
Custodian: Surface Engineering
Doc. No : MEP-R-ES-007
Rev 0
page 7 of 10
3.2.11
3.2.12
3.2.13
Doc. No : MEP-R-ES-007
Rev 0
page 8 of 10
4.1
4.2
DOCUMENTATION
COMPANY requires VENDOR to supply project data books (5) sets, which shall,
as a minimum, include the following, in accordance with specification
MEP-G-ES-001, General Technical Conditions For Tender And Purchase
Equipment And Materials:
5.1
As built drawings.
5.2
5.3
5.4
5.5
5.6
Nameplate rubbing.
5.7
5.8
Doc. No : MEP-R-ES-007
Rev 0
page 9 of 10
GUARANTEE
The VENDOR shall guarantee that the composite unit and all of the components
are in accordance with specification MEP-G-ES-001, General Technical Conditions
for Tender and Purchase of Equipment and Materials. The VENDOR shall also
provide process performance guarantees as stated in the project specifications.
Doc. No : MEP-R-ES-007
Rev 0
page 10 of 10
AFE No. :
MR No. :
Tag No. :
Prepared by
Revision/Date
Service
:
:
:
SITE CONDITIONS
Location
Grade Elevation (M) :
o
:
Temperature ( F)
Rel Humidity
:
Min :
Seismic Zone
Wind Speed
Precipitation
Elec. Area Class
Max.:
:
:
:
:
PROCESS CONDITIONS
Waste Gas Composition
:
Capacity (MMSCFD)
:
Moleculat Weight
:
Lower Heating Valve (BTU/LB)
Temperature (oF)
:
Inlet Pressure (PSIA)
:
Min :
Max :
:
Min :
Max :
UTILITIES AT SITE
Instrument Air Press. (PSIG) :
(PSIG) :
Utility Water Pressure (PSIG) :
Electric Power
:
Min :
Max
Min :
Volts,
Max
Phase,
:
:
Hertz
:
:
MECHANICAL CONDITIONS
Flare type
:
( )
Base Diameter (MM)
:
Base Height (M)
:
Base W.T. (MM)
:
Stack Diameter (MM)
:
Stack Height (M)
:
Stack W.T. (MM)
:
Stack
:
()
Lifting Davit on Stack
:
()
Heaviest Lift (Kg)
:
Highest Lift (M)
:
Flame Front Generator Ignitor
Vertical Stack;
()
Transformer;
( ) Piezoelectric
NOTES:
MEP-R-ES-007, Corrugated Plate Intercept Separator, rev 0, 25 July 2005
Custodian: Surface Engineering