PROPIETARIO:
1
MES 1
2
3
MES 2
2
3
MES 3
2
3
MES 4
2
3
MES 5
2
3
MES 6
2
3
MES 7
2
3
de %
01.00
OBRAS PROVISIONALES
100.00%
100.00%
02.00
TRABAJOS PRELIMINARES
100.00%
100.00%
03.00
MOVIMIENTO DE TIERRAS
04.00
05.00
06.00
MUROS Y TABIQUERIA
07.00
08.00
PISOS Y PAVIMENTOS
09.00
ZOCALOS
10.00
CARPINTERIA DE MADERA
100.00%
100.00%
11.00
CARPINTERIA METALICA
100.00%
100.00%
12.00
CARPINTERIA ESPECIAL
13.00
CERRAJERIA
50.00% 50.00%
100.00%
14.00
PINTURA
80.00% 20.00%
100.00%
15.00
16.00
SISTEMA DE DESAGUE
100.00%
100.00%
17.00
100.00%
100.00%
18.00
66.67%
19.00
100.00%
100.00%
20.00
CONDUCTORES
100.00%
100.00%
21.00
TABLERO DE DISTRIBUCIN
100.00%
100.00%
22.00
FERRETERIA ELECTRICA
100.00%
100.00%
23.00
100.00%
100.00%
24.00
OTROS
100.00%
100.00%
50.00%
50.00%
100.00%
100.00%
100.00%
25.00%
50.00%
25.00%
100.00%
25.00%
25.00%
100.00%
90.00% 10.00%
100.00%
50.00%
100.00%
100.00%
100.00%
90.00% 10.00%
100.00%
100.00%
100.00%
COSTO DIRECTO
S/. 88,631.13
TOTAL DE PRESUPUESTO
S/. 88,631.13
100.00%
33.33%