To provide calculations of checking the punching shear and one way shear for the foundation

Show the sizes of pedestal for the steel stair cases and tents and clarify the assumptions for
calculating the vertical and lateral loads which used for design the pedestals and footings
At the locations of the toilets, the depth of the tie beams shall be reviewed considering the sizes
and the levels of the sleeves of the drain pipes.
Check the reinforcement of RB2 & RB3 between grids 14 & 19 as commented on the drawing
Review the depths of RB2 between grids 11, 14 & 19,22 as commented on the drawing
Provide elevation showing the difference in the levels for beams located above grid C between grids 11&22
See Comments on the Drawing
To coordinate with the MEP and to reflect the openings/shafts on the structural slab and to study its impact
All Sections are referring to incorrect drawings numbers
Review the typical section of block works below tie beam level as commented
Provide detail for all columns types
Clarify the locations of sections B & C
Clarify the level of the lift machine room
Check the key plan with Architectural drawings
Follow the comments for blocks F&G whenever applicable
provide general notes drawings,clarify all structural materials properties
provide general details drawings
steel roof plan clarifying all used structural members sizes and supports connections details
for all buildings clarify the lateral supporting system,its impact at seismic forces to be analyzed as per
ADIBC2013
justify providing eccentrecity in some details such as columns pedestals and shallow footings
soil report did not include clear recommendations about ground slab type,kindly ask the LAB. to provide it.
coordinations is required between all structural drawings and architectural plans,f.eg. Block C sructural
columns dont match with architectural plans columns

soil report clarified risk of cavities existence,does it affects the used shallow footings sizes and type.
is there any proceadure for soil compaction below ground slab,please coordinate it with soil lab.and provide its
recommendations
send us all beams and all slabs long term deflection calculations
clarify the maximum reaction from envelope service loads combinations
provide general notes drawings, clarify but not limited to, all structural materials properties, soil properties and
the most important notes from SIR including fill properties and compaction below ground slab and footings,
ground slab type and recommendations, loads values and design standard, durability and sustainability
requirements, concrete cover for all structural elements (sub and superstructure)
provide general details drawings ,,clarify but not limited to ,beams typical details, slabs typical details, columns
typical details, water proofing and construction joints typical details,opennings typical details in slabs or beams
or walls, moment resisting frame details, block walls typical details and schedules clarifying reinforcement
developed lengths and anchors.
f"c in this block is 34n/mm2 ,while in other blocks as G 30n/mm2,,verify unifying these values in all buildings
Clarify all external steps and ramps footing
justify providing eccentricity in some details such as some shallow footings, see commented plan
soil report did not include clear recommendations about ground slab type, kindly ask the LAB. to provide it
and send us the updated recommendations.
justify providing extra top reinforcement in strip footing plans, coordinate it with architectural plans.
send us soil pressure envelope considering all loads combinations in Safe file.
send us punching calculations for footings as per American standard
provide additional structural details for the cantilever part below thick block walls, see commented plans.
clarify TB5* location and levels and clarify it in section C-C
coordination is required with architectural plans especially at internal stands and stage,clarify its levels
At the locations of the toilets, the depth of the tie beams shall be reviewed considering the sizes and the levels
of the sleeves of the drain pipes.
Clarify the reference of the Live Loads
Punching shear detail shall be amended to match the requirements of ACI-318
Beam (B4) on grid (6) between grids (C&D) and similar cases shall not be represented as continuous beam
on the models

Beam on grid (1) between grids (B&C) and similar cases where the beams are offsite front the columns, the
beam shall be extent t the end of the columns and detail shall be provided.
To coordinate with the MEP and to reflect the openings/shafts on the structural slab and to study its impact
Follow the comments for blocks F&G whenever
applicable

Spandrel beam torsion modifier shall be 1


Remove diaphragm for staircase slab
Walls are not meshed neither in vertical and horizontal
1. Opening beside lift core wall shall be supported by beams. Check it.
2. Please find the comments on model input only and not on design yet:
3.