DNTanksoverview
ConstructionProceduresandDesignfor
PrestressedConcreteTanks
BenefitsofPrestressedConcreteTanks
ApplicationsforPrestressedConcreteTanks
InspectionandRepairofotherTypesof
ConcreteTanks ConcreteTankServices
Formedin2011fromthemergerof
DYKandNatgun
Designandconstructprestressed
concretetanks
Thelargestprestressedconcrete
tankmanufacturerintheworld
130yearsofcombinedexperience
Over2,500completedtanks
Thehighestvaluetank
Customsizesfrom40,000
gallonsto40,000,000 gallons
andbeyond
Heightsupto85
Designandconstruction
capabilities
Currentlyconstructingover
40projectsworldwide
ACI350 CodeRequirementsforEnvironmental
EngineeringConcreteStructures
ACI350.3 SeismicDesignofLiquidContaining
ConcreteStructures
ASCE7/IBC
ACI372R DesignandConstructionofCircularWire
andStrandWrappedPrestressedConcrete
Structures
AWWAD110 StandardforWire andStrand
Wound,Circular,PrestressedConcreteWaterTanks
Innerconcretecore
Horizontalprestressing
providingcompression:
EfficientuseofMaterials
Flexiblefloorwallconnection
SecondaryAssuranceof
WaterTightness
Verticalposttensioning
Embeddedsteeldiaphragm
Floor/Foundation
Wall
Roof
Prestressing
Floor/Foundation
Spreadfooting
Membranefloorslab
MonolithicFloor
6PVCWaterstop atJoint
andgalvanizedbars
MultipleFloorSections
Seismic Cables
PVC Waterstop
Bearing Pad
Finished Concrete
Anchoredflexiblebase
40 Durometer
Bearing Pad
Soft Pad
Seismic Base
Restraint Cables
9 PVC Waterstop
with Centerbulb
Finished Concrete
Footing Surface
Finished Concrete
Footing Surface
No Mild Reinforcing
Anchoredflexiblebase
LosAngeles,California
January1994,Northridge
6.8M
TankWall
TYPE I
TYPE III
Pour Window
Vertical
Threadbar
Injection Port
Threadbar
Anchor Plate`
Seismic Cables
PVC Waterstop
Finished
Concrete
Castinplace
VerticallyPosttensioned
Steel Curtain
SteelCurtain
WallFormandPour
VerticalPostTensioning
Vertical Post-Tensioning
Epoxy grout
following PostTensioning
TYPE I
TYPE III
Precast
EmbeddedDiaphragm
PrecastPanelBeds
PanelsInPlace
Wall Slot
Plate
Wall Slot
In Place
Interior
Formwork
InternalWaterstop Cove
InitialShotcrete BaseCoat
SeismicBaseRestraintCables
RoofConstruction
Columnsupportedflatslabroof
Columnsupportedflatslabroof
dome detailing
Domedetailing
FinishedDome
Flat Slab
Concrete Dome
Duallanduse
Nointernalobstructionsfor
easiercleaning
SlightlyLoweroverallheight
Easilyutilizesflexible
connectionbetweenwalland
roof
Moreeconomicalatlarger
diameters
Accommodatesmore
differentialsettlement
Moreeconomicalatsmaller
diameters
AbrasiveBlasting/Prestressing /Shotcrete
Abrasive/WaterBlasting
Tankwrapping(Strand&Wire)
Shotcrete covercoat
Cab
Tower
Base
Center
Pin
AbrasiveBlasting/WaterBlasting(TypeI)
240ksi,7wire,
galvanizedstrand
WireCircumferentialPrestressing(TypeIII)
Shotcrete encasement
CASTINPLACE
CONCRTETANK
(Conventional)
PRESTRESSEDCONCRETETANK
INCREASEDDUCTILITY
HIGHQUALITY
COSTEFFECIENT
ALWAYS.!
33.0MG,40.0MG,
and(2)7.5MGReservoirs
SanMarcos,CA
200,000GallonReservoir
Sausalito,CA
125,000GallonReservoir
OutsideElPaso,TX
(2)5.0MGReservoirs
ElSegundo,CA
(23)4.0MGReservoirs
Carson,CA
ModifiedEggDigester
3.0MGTESTank
Orlando,FL
2.0MGReservoir
Jamul,CA
2.0MGReservoir
Jamul,CA
Cons
Prestressed ConcreteTanksSlightlyGreaterInitialCost
Pros
LeakFreeDesign
SteelTanksmust betakenoutofservice forrepainting (SteelNeeds
Redundancy) ConcreteDoesNot
Steellimitedtoatgradeinstallation.Concreteconstruction allowsat
gradeconstruction, partial backfill,orcomplete burial
Resistance toGunFire
Pros
ReducedFreeboard
2.0MGTankonPeninsula Sloshingheight12
SteelTank=12Freeboard
Prestressed ConcreteTank=5Freeboard
EliminateHighMaintenanceCosts!
Tank Dimensions
Tank Diameter =
Side W ater Depth =
Usuable Tank Capacity (1.5% Slope d Floor)=
83.0
25.00
1.00
FT.
7
1.28
800,000.00
FT.
FT.
MG
MG
DOLLA R S
FT.
MG
DOLLA R S
WeldedSteelTankMaintenance Costs
Re turnPeriod
Maintenance Scheduled
SqFt
UnitPrice
TotalPrice
20
14,092
$7.50
$105,690.00
20
19,500
$7.50
$146,250.00
20
$25,194.00
20
$25,194.00
$302,328.00
PrestressedConcreteTankMaintenance Costs
Re turnPeriod
20
Maintenance Scheduled
Powerwashing, Routine Maintenance, and Inspection
TOTAL MAINTENANCE COST PER 20 YEAR RETURN PERIOD
LS
LS
UnitPrice
$20,000.00
TotalPrice
$20,000.00
$20,000.00
LocalInvolvement
ConcreteSuppliers
Lumber
LocalLabor
Rentals
IceCreamShop
8MGGrahamReservoir,MountainView,CA
0.5MGReservoir,Laconia,NH
2MGReservoir,Anaheim,CA
Vent
1.1MGReservoir,NavalHospital,SanDiego,CA
1.2MGReservoir,SignalHill,CA
0.6MGReservoir,OverlandPark,KS
10MGReservoir,LosAngeles,CA
CONCRETE TAN
TANKSSERVICES
RVICES
DNTanksConcreteTank
ServicesDivision
DivisionofDNTanks
WorksNationwide
Performsinspection,
rehabilitation,retrofit,and
seismicupgradesofalltypes
ofconcretetanks
WaterDistrictsaskedfor
ourhelp,evenontanks
thatwedidnotbuild.
ResponsetoState
RequirementsforPeriodic
Inspection
ResponsetoNewState
MandatedRegulations
ResponsetoAging
Infrastructure
Seismicupgrades
ResponsetoChangein
TankNeeds
IncreasedSecurityNeeds
Location:SFBay,CA
Problem:SeismicRetrofit
Formingofnewmachinefootingand
seismiccablesystemapplication
Seismiccableattachedtowallbefore
automatedshotcreteapplication
DNTanksoverview
ConstructionProceduresandDesignforPrestressed
ConcreteTanks
BenefitsofPrestressedConcreteTanks/Applications
ModifyingorRetrofittingExistingConcreteWater
Storagetanks
Think Value
MikeHarper
mike.harper@dntanks.com
KevinPeacock
kevin.peacock@dntanks.com