5, a v e n u e d u C o q
75009 Paris FRANCE
Tel : +33 (0)1 40 16 61 00
Fax : +33 (0)1 40 16 61 04
systra@systra.com
5 M inh.
The operational
metro network
Lines
:
6
Stations
:
64
Traffic
: about 1 M
passengers per day
Background
Neihu Line
B2
B1
B6
B7
B3
B4
B5
B8
B9
BR2
BR1
B10
B11
Stations
Mucha Line
Infrastructure
Dec. 2005
Taiwan
Superstructure
The tracks consist of steel running surface.
Neihu Line will be fully compatible with the
existing VAL system of Mucha Line, using
rubber tired driverless AGT technology with a
minimum headways of 72 seconds.
SYSTRAs Role
SYSTRA has already been deeply involved in
the Mucha Line at the beginning of 1990s. At
the time, SYSTRA carried out the coordination
between E&M systems and civil works and
ensured the training of operation and maintenance staff of the line.
Within the frame of Neihu Line, SYSTRA has
taken the role of Special Design Consultant
for the local designers, which are: China Engineering Consultants Inc. (CECI), Resources
Engineering Services Inc. (RESI), Moh and
Associates (MAA), of the Department of Rapid
Transit System (DORTS) of Taipei Municipal
Government. SYSTRA performed the following services:
The Project
Facts and figures
Length:
15 km
(4km tunnels, 11 km viaducts)
Number of stations: 12
(2 underground and 10 elevated)
Number of depot:
1
System type: rubber tired AGT driverless
The metro network, 2nd Phase (under construction):
7 lines, 70 km, 57 stations
Organisations involved
Owner: Department of Rapid Transit Systems
(DORTS)
Operator: Taipei Rapid Transit Corp. (TRTC)
Contractors: KSECO/Bombardier Transportation, Continental, Pan Asia
Detail Designers: CECI, RESI, MAA
Special Design Consultant: SYSTRA
Cost
Global: about 1 170 M USD
Financing
Central Government
Municipality
: 75%
: 25%
Key Dates
July 1999: starting of the Detail Design
August 1999: contract of assistance system (for
the lot 144 with CECI)
June 2001: contract for the U Shape viaduct
and assistance system for the lot 145 (with CECI).
contract of assistance to the depot design (with
RESI)
January 2003: contract for the rubber tired
AGT driverless basic design (with CECI and RESI)
May 2003: starting of the turnkey construction
contract for U Shape viaduct and systems
June 2008: scheduled revenue service starting
date
One of the key issues of this project is to minimize the mass of the structures, for a better
insertion of the line in the dense urban area
and to reduce the environmental impacts.