Вы находитесь на странице: 1из 17

SPECTRUM

TECHNICAL SPECIFICATION

BRINE CHILLER ( 0 OC)


(SCREWED TYPE, WATER COOLED)
MANUFACTURING PLANT NO.2 AT DEWAS

Client: M/s NAVIN FLUORINE INTERNATIONAL LTD

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
PROJECT NO
DOCUMENT NO

21113
M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 1 OF 16

REVISION HISTORY
REVISION
00
01

File
Location

EFFECTIVE DATE
02-01-2014
24-01-2014

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

REASON FOR REVISION


FIRST ISSUE
CAPACITY CHANGED

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
21113

PROJECT NO
DOCUMENT NO

M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 2 OF 16

TABLE OF CONTENTS
1.0

APPROVAL SIGNATURES

2.0

OVERVIEW

3.0

INSPECTION, TESTING AND DISPATCH

4.0

DRAWINGS & DOCUMENTS

5.0

PACKING

6.0

SPARES

7.0

DATASHEET

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
21113

PROJECT NO
DOCUMENT NO

M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 3 OF 16

1.0 APPROVAL SIGNATURES


This document is prepared by the SPCPL team for the project of NAVIN FLUORINE
INTERNATIONAL LIMITED, DEWAS under the authority of their Project Manager. Hence this

document before being effective shall be approved by the QA team of NAVIN FLUORINE
INTERNATIONAL LIMITED, DEWAS, and authorized by the appropriate Project Authority.

SPCPL
Name

Designation

Prepared By

Rajesh Yerawar

Sr.Executive Mechanical

Checked By

Akhilesh Verma

Manager - Mechanical

Approved By

Sanjay Katkade

GM-Engineering

Name

Designation

Signature

Date

Signature

Date

CLIENT

Approved By

Authorized By

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
PROJECT NO
DOCUMENT NO

21113
M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 4 OF 16

2.0 OVERVIEW

2.1 Project introduction


Navin Flourine International Limited has envisioned setting up an Manufacturing plant No.2
facility at Dewas along with the necessary utilities.
Nearest railway station

DEWAS

Nearest airport

INDORE

Ambient conditions:

Summer ( DB / WB / % RH)

41.1 C / 25 C / 28 %

Monsoon ( DB / WB / % RH)

32.2 C / 27.8 C / 70 %

Winter ( DB / WB / % RH)

10 C / 7.2 C / 65 %

2.2 PROJECT STANDARD


Chiller units shall comply with all the requirements of the latest editions of the applicable international/
national codes and standards as far as they are equal to or more stringent than these specifications.
Units shall conform to the following standards/ codes of the latest edition.
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.

File
Location

Chiller performance shall be rated in accordance with AHRI standard 550/590.


Equipment fabrication and installation shall be in compliance with safety code for
mechanical refrigeration ASHRAE 15
Condenser shall include ASME U stamp and nameplate certifying compliance with
ASME section VIII, Division 1 1998 code for unfired pressure vessels.
Chiller shall be designed and constructed to meet UL & CSA requirements.
ASME standard B 31.5 1995 Refrigeration Piping.
National Electric code.
Electric motor as per IS 325 : 1996
Earthing acceptance as per standard code IS3043.
Mechanical vibration, balance quality requirement as per Grade G1 specified in ISO
1940/1.

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
21113

PROJECT NO
DOCUMENT NO

M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 5 OF 16

3.0 INSPECTION, TESTING AND DISPATCH


The Chiller will be subjected to inspection at manufacturers works in the presence of
purchaser/consultant.
During inspection following routine tests shall be carried out:

Visual inspection for workmanship and verification with respect to specifications.


Mechanical operation of valves etc.
Functional test for control circuits.
Tightness of screwed/bolted connections

The vendor shall supply to purchaser 3 sets of the certificates of Internal routine tests.
4.0 DRAWINGS & DOCUMENTS
Vendor to submit following Drawing & Documents at various stages.
4.1 Drawings (3 Sets)
-

GA Drawings, Engineering Drawings (For approval, Approved, As built, As installed)

Electrical Circuit Diagrams

System schematics

4.2 Manuals and Procedures (3 Sets)


-

Operation and Maintenance manuals

Specialized procedures, if applicable (such as Calibration, Cleaning, etc.)


Specifications and sources of some important materials, if applicable (such as lubricants,
cleaning agents, etc.)
4.3 Lists (3 Sets)
-

Equipment and Instrument list with component descriptions

Electrical component parts list with descriptions

Spare parts list with appropriate identification nos., if any

Change parts list with appropriate identification nos., if any

4.4 Factory Acceptance Test Certificates (3 Sets)


-

Detailed list of modifications after contract &/or in final approved design

Material specifications and test certificates

Instrument Calibration certificates


Functional/ Factory acceptance certificates (such as weld inspection, passivation, pressure/
vacuum holds, etc.)
Warranty certificates

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
21113

PROJECT NO
DOCUMENT NO

M - 00- D 05

Surface finish test reports

Food grade material certificate

REVISION NO

01

PAGE NO.

PAGE 6 OF 16

4.5 Site Acceptance Test (3 Sets)


-

Operational Qualification Protocol

5.0 PACKING
Equipment shall be dispatched to site packed in full wooden case (Sea Worthy). It shall be
wrapped in polythene sheets before putting in cases and it shall be ensured that damage to the
equipment does not occur during handling/transportation. Lifting hooks shall be provided for
unloading at site.

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
PROJECT NO
DOCUMENT NO

21113
M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 7 OF 16

6.0 SPARES
Commissioning Spares The vendors shall include in the quoted price sufficient quantities of commissioning spares
required for erection and commissioning of the equipment. These shall include such items as
Bolts and other miscellaneous parts.
Essential Spares The vendor shall supply spares required for two years trouble free operation & furnish list of
spare considered with offer.

7.0 DATASHEET
DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

GENERAL
( For complete Chiller Unit)
Type

Water Cooled Brine Chiller Unit

Manufacture / Model

Vendor to Specify

Tag Number

CHB-102

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
PROJECT NO
DOCUMENT NO

21113
M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 8 OF 16

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

Quantity (Nos.)

2 Nos.

Actual capacity at design conditions

50 TR

Chilled Brine Temperature Inlet / Outlet

0C / 5C

Cooling Water Temperature Inlet / Outlet

32C / 37C

Operating & Shipping Wt. (Kg)

Vendor to Specify

Noise Level

NMT 80 db (A) at 1m distance from unit

Evaporator type

Vendor to Specify

Overall Dimensions L x W x H

Vendor to Specify

Minimum Clearance Required.

Vendor to Specify

Refrigerant.

R134a

Main Incomer rating.

Vendor to Specify

Microprocessor

Required

Location

Indoor

Recommended Brine solution & flow


(Methanol + water /Cacl / MEG )

MEG ( % To be defined by vendor)

COMPRESSOR
Model

Vendor to Specify

Type

Screw type

Quantity Nos. per chiller

Vendor to Specify

Type of Compressor

Single / multistage

Type of drive

Belt (Vendor to Confirm)

MOC-Compressor

Cast Iron

MOC-Shaft

Vendor to Specify

Capacity control

To be provided ( details by vendor)

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
21113

PROJECT NO
DOCUMENT NO

M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 9 OF 16

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

Type of lubricant

Vendor to Specify

Type of Refrigerant

R134a

Charge of Refrigerant (Kg)

Vendor to Specify

Saturated suction pressure (kg/ cm)

Vendor to Specify

Saturated discharge pressure


(kg / cm)

Vendor to Specify

Design pressure (kg/ cm)

Vendor to Specify

Design temperature (C)

Vendor to Specify

Operating weight ( kg)

Vendor to Specify

Speed

Vendor to Specify

IKW consumed at 100% / 75% / 50 % / 25


% capacity
Operating TR at 100% / 75% / 50 % / 25 %
capacity
IKW /TR at constant condenser temperature
100% / 75% / 50 % / 25 % capacity

Vendor to Specify
Vendor to Specify
Vendor to Specify

Oil Separator and Lubrication

Required

Type of oil separator

Vendor to Specify

Lubrication pump

Automatic reversible type gear pump

RPM

Vendor to Specify

BHP

Vendor to Specify

First lot of oil

Vendor to Specify

First lot of refrigerant and inert gas

Vendor to Specify

Cooling water requirement

Vendor to Specify

Refrigerant charging and removal


arrangement with necessary valve
Minimum continuous operating load and
power consumption.

Vendor to Specify
Vendor to Specify

MOTOR / STARTER

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
PROJECT NO
DOCUMENT NO

21113
M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 10 OF 16

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

Manufacture- Model

Vendor to Specify

Type

Squirrel cage, two pole, induction type & air cooled

Quantity (Nos.) per chiller

Vendor to Specify

Type of power supply

415 V/ 50 Hz / 3 phase + Neutral

Type of enclosure

Vendor to Specify

Type of protection

Vendor to Specify

Class of Insulation

F with temperature rise limited to class B

Efficiency

Vendor to Specify

Type of starter

Vendor to Specify

Type of Bearings

Vendor to Specify

Speed (rpm)

Vendor to Specify

Frame size (mm)

Vendor to Specify

Electrical continuous power (KW)

Vendor to Specify

Starting current ( A )

Vendor to Specify

Continuous current ( A )

Vendor to Specify

Operating weight ( Kg)

Vendor to Specify

Connected load

Vendor to Specify

Controlling

VFD

EVAPORATOR
Manufacture Model

Vendor to Specify

Construction

Shell & Tube

Type

Flooded tubes without joints or U bends.

Quantity (Nos.) per chiller

Vendor to Specify

No of passes ( Nos)

Vendor to Specify

Nominal capacity (NTR)

Vendor to Specify

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
21113

PROJECT NO
DOCUMENT NO

M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 11 OF 16

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

Shell outlet diameter (mm)

Vendor to Specify

Overall length (mm)

Vendor to Specify

Number of tubes (Nos.)

Vendor to Specify

Tube outer dia. (mm)/ Tube material /


Length of Tubes)

Vendor to Specify

Number of Refrigerant circuit (Nos.)

Min. 2 Circuits (Vendor to Specify)

Operating charge (Kg)

Vendor to Specify

Design Chilled brine inlet temperature


(C)

5C

Design Chilled brine outlet temperature (C)

0 C

Brine Pressure drop (mmw)

Vendor to Specify

Brine flow Rate (m/ hr)

Vendor to Specify

Face area of tubes for heat transfer (cm )

Vendor to Specify

Design fouling factor

Vendor to Specify

Shell Material

IS 2062 (Vendor to Confirm)

Tube Material

Copper (Vendor to Confirm)

Shell Design Pressure (kg/ cm)

Vendor to Specify

Tube Design Pressure (kg/ cm)

Vendor to Specify

Shell Thickness

Vendor to Specify

Tube Thickness

22 gauge

Insulation Material

Vendor to Specify

Thickness of Insulation

Vendor to Specify

Insulation cladding

Vendor to Specify

Insulation area

Entire evaporator

Operating weight ( kg )

Vendor to Specify

Shipping weight ( kg)

Vendor to Specify

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
21113

PROJECT NO
DOCUMENT NO

M - 00- D 05

DESIGN PARAMETERS

REVISION NO

01

PAGE NO.

PAGE 12 OF 16

REQUIRED SPECIFICATIONS

Purge connection

To be provided

Safety valve & fixing arrangement

To be provided

Isolation valve for compressor maintenance

To be provided

Chilled brine flow switch & fixing


arrangement
Chilled brine drain nozzle with valve

To be provided

Chilled brine inlet nozzle

To be provided

Purge connection

To be provided

Chilled brine outlet nozzle

To be provided

Chilled brine vent with valve

To be provided

To be provided

CONDENSER ( WATER COOLED )


Manufacture Model

Vendor to Specify

Type

Shell & Tube type

Quantity ( Nos.) per chiller

Vendor to Specify

Nominal Capacity (NTR)

Vendor to Specify

Number of passes (Nos.)

Vendor to Specify

Shell outer diameter ( mm)

Vendor to Specify

Overall length ( mm )

Vendor to Specify

Cooling water inlet temperature (C )

32 C

Cooling water outlet temperature (C )

36 C

Water flow rate (m/ hr)

Vendor to Specify

Maximum storage capacity of refrigerant (kg)

Vendor to Specify

Fouling Factor

Vendor to Specify

Drain Connection (mm)

Vendor to Specify

Number of tubes ( Nos. ) x length

Vendor to Specify

Pressure drop (mmw)- water side

Vendor to Specify

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
PROJECT NO
DOCUMENT NO

21113
M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 13 OF 16

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

Shell Material

IS 2062 (Vendor to Confirm)

Tube Material

Vendor to Specify

Shell Design Pressure (kg/ cm)

Vendor to Specify

Tube Design Pressure (kg/ cm)

Vendor to Specify

Shell Thickness

Vendor to Specify

Tube Thickness

22 gauge

Purge connection
Safety valve & fixing arrangement
Fusible plug & fixing arrangement
Isolation valve for compressor maintenance
Cooling water flow switch & fixing
arrangement
Cooling water drain nozzle with valve
Cooling water inlet nozzle
Cooling water outlet nozzle
Cooling water vent with valve

To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided

REFRIGERANT CIRCUIT
MOC

Refrigerant circuit components shall include


hot gas muffler, high side pressure switch,
low side pressure switch liquid line shut-off
valves, suction and discharge shut-off
valves, filter drier, moisture indicating sight
glass, thermostatic expansion valve (Exv),
solenoid valve and complete operating
charge of refrigerant and compressor oil.
Temperature drop in Hot gas line, Liquid line
& Suction line
Insulation for Hot gas line
Insulation for Liquid line

File
Location

The inter connected refrigerant piping shall be heavy


duty, seamless copper tubes with weld able socket type
fittings of forged steel construction with reference code
ASME B 31.3
To be provided

Vendor to specify
Hot insulation to be provided
Cold insulation to be provided

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
21113

PROJECT NO
DOCUMENT NO

M - 00- D 05

DESIGN PARAMETERS

REVISION NO

01

PAGE NO.

PAGE 14 OF 16

REQUIRED SPECIFICATIONS

Liquid lines shall provide a float typemetering valve to maintain the proper level
of refrigerant in the evaporator under both
full and part load operating conditions for
improving part load efficiency.

To be provided

ACCESSORIES AND COMPONENTS


Flow Switch

Required

Victaulic Coupling at Condenser and


Evaporator Inlet and Outlet

Required

Anti Vibration Pad

Required

Pressure gauges with isolation cocks

Required

Thermowell

Required

Electrical details

Vendor to specify

Control details

Vendor to specify

Control cabling within skid

Required

Purge connection
Safety valve & fixing arrangement
Fusible plug & fixing arrangement
Isolation valve for compressor maintenance
Cooling water flow switch & fixing
arrangement
Cooling water drain nozzle with valve
Cooling water inlet nozzle
Cooling water outlet nozzle
Cooling water vent with valve

To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided

SAFETY INTERLOCKS / PROTECTION


Loss of refrigerant charge protection

To be provided

Low water flow detection

To be provided

Low chilled brine temperature protection

To be provided

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
PROJECT NO
DOCUMENT NO

21113
M - 00- D 05

REVISION NO

01

PAGE NO.

PAGE 15 OF 16

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

Low control voltage protection

To be provided

High hot gas pressure trip

To be provided

Low suction gas pressure trip

To be provided

Relay preventing reverse operation

To be provided

Single phase protection

To be provided

Low oil pressure protection

To be provided

Electric overload protection

To be provided

POWER CUM CONTROL PANEL


Components

Display
MOC
Mounting

Microprocessor
Power and control circuit terminal blocks
ON/OFF control switch
Replaceable solid-state relay panel
Diagnostic display panel on unit
Audio visual alarm
Automatic unloading
Pump out at beginning and end of every circuit cycle
Capacity control based on leaving chilled water
temperature and rate of change of return water
temperature
Capacity control based on leaving chilled water
temperature and rate of change of return water
temperature
interlocks / Safety Protection
Temperature indication
Pressure indication
Fault indication
Alarm (Audio Visual both)
Required, details by vendor
Powder coated CRCA sheet
On skid

DIMENSION & WEIGHT

REQUIRED SPECIFICATION

Operating / Shipping weight

Vendor to specify

Dimensions (L x W x H)

Vendor to specify

Functions

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BRINE CHILLER ( 0 0C )
21113

PROJECT NO
DOCUMENT NO

M - 00- D 05

DESIGN PARAMETERS

REVISION NO

01

PAGE NO.

PAGE 16 OF 16

REQUIRED SPECIFICATIONS

OTHERS
1. Refrigerant piping with all accessories

To be provided

2. Power cabling within skid

To be provided

3. Control cabling within skid

To be provided

4. Installation & onsite training

To be provided

5.Installation & onsite training

To be provided

6.Motor with screw alignment frame & belt


guard in case of belt drive

To be provided

7.Power cum control panel

To be provided

File
Location

Z:\PRJ1\API\NFIL
21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller
systems\21113 M-00-D05 URS CHILLER ( -0

C ) - R1.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

Вам также может понравиться